0% found this document useful (0 votes)
28 views

INB Using RF With POSC & LOSC

Uploaded by

Sandy Kaliraman
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
28 views

INB Using RF With POSC & LOSC

Uploaded by

Sandy Kaliraman
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 8

Inbound Process using RF with POSC & LOSC Setup(SAP S/4

HANA Embedded EWM)

Introduction

Now I am writing my first blog post on SAP EWM for the inbound process using RF
screen in SAP S/4 HANA Embedded EWM version 2020 with POSC & LOSC setup
configuration steps.

Content

Configuration steps for POSC :

Path : SPRO->IMG->SCM Extended Warehouse Management->Extended


Warehouse Management->Cross-Process Settings->Warehouse Task->Define
Process-Oriented Storage Control

I am using External step "YIPW" & "YIUL" which is already present in the standard
SAP

2. I define the warehouse number ,select the Unloading (YIUL ) step and assign
the warehouse process type T365 ( copy of Y365)

3. I define the storage process YI01(Unloading & Putaway) for my warehouse AND1
4. The external steps YIUL & YIPW are assigned to storage process YI01 and is
linked to my warehouse AND1. Unloading step is set as Auto. WT creation and for
Putaway product /HU warehouse task option is selected.

This Completes the POSC setup.

Configuration in LOSC and WPT

Path : SPRO->IMG->SCM Extended Warehouse Management->Extended


Warehouse Management->Cross-Process Settings->Warehouse Task->Define
Layout-Oriented Storage Process Control

1. I define source, destination, intermediate storage types along with


intermediate storage section and intermediate storage bin and the warehouse
process type T351

2. In WPT T351 we provide the Source storage type T910 ,Bin GR-zone and Storage
process YI01

Test the Case using RF in FIORI


We select the inbound process (Purchase order and inbound delivery of ecc is
already created and distributed to SAP EWM. )

2. Receiving of Handling Units option and then Receive by Delivery

3. Enter the delivery and press enter again


4. Copy the HU from the list which was already pack before coming to EWM and
press enter again

4. Verify all the details and press enter


5. Complex unloading cannot be handled by Unlo button, we go CrWT button the WT
gets Created in background and will get ticked, later click on Conf button.

6.Now we check the monitor dashboard of Fiori and there is one warehouse task
created from Door to GR Zone

7. We scan the Destination Bin by copying the destination bin and entering in the
box( In the handled RF it would be automatic)
8.Unloading and Goods Receipt would be completed as shown below and in monitor
screen you can see based on the LOSC setup the task is created to intermediate
storage type and final putaway task is in waiting status "B" and intermediate task is
open.

9. I confirm the intermediate warehouse task in Monitor only and last warehouse task
to final bin is open now which i will complete it using RF as per queue generation.

10. We go through system guided option and scan the HU as shown below and enter
then scan the destination Bin and press enter
11. The final warehouse task gets completed and we can see in monitor the final
status of warehouse tasks is completed .