0% found this document useful (0 votes)
59 views

SCE Verification Checklist

Uploaded by

Li Qi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
59 views

SCE Verification Checklist

Uploaded by

Li Qi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

SCE Verification of Initial and Ongoing Suitability

- Documentation requirements
- Verification Plan requirements

The safety management system must include the arrangements for independent and competent persons to
verify that safety-critical elements are or will be suitable and will remain in good repair and condition
throughout the life cycle of the facility.

SCE Documentation typically in place for a Major Hazard Facility Available


Safety Assessment documentation: ☐
HAZID/HAZOP report, LOPA, Bowtie, SFAIRP, Consequence Modelling
SCE Identification and Performance Standards (Note 1) ☐
SCE Design Documentation: ☐
Basis of Design, P&ID’s, datasheets, calculations, functional description, SIL verification reports,
HAC drawings / report, installation, and commissioning records
SCE Management Plan (Note 2) ☐
SCE Verification Plan (Note 3) ☐
SCE Assurance Activities: ☐
Preventative Maintenance records, inspection records, Functional testing records, Job Plans,
Corrective Actions, action close-out records, record of SCE demands, Deferral Risk Assessments,
Arrangements for records
Comments: Click here to enter text.

Note 1 - SCE Determination and Identification


Is there a formal definition of what is an SCE? Yes ☐ No ☐ Unsure ☐
Is there a formal definition of what is a SCC/ Non-SCE? Yes ☐ No ☐ Unsure ☐
Is there a register of SCCs and SCEs? Yes ☐ No ☐ Unsure ☐
Are they flagged in the CMMS? Yes ☐ No ☐ Unsure ☐
Are SCEs physically tagged in in the field with a unique Yes ☐ No ☐ Unsure ☐
identifier?
Are staff aware of the implications when taking a SCE Yes ☐ No ☐ Unsure ☐
offline/ out of service?
Comments: Click here to enter text.

Note 2 - SCE Management Plan No procedure in place ☐


Does the plan identify how SCEs are to be tested? Yes ☐ No ☐ Unsure ☐
Does the plan identify the need for performance Yes ☐ No ☐ Unsure ☐
standards?
Does the plan identify what should happen if a SCE fails on Yes ☐ No ☐ Unsure ☐
a test?
Does the plan identify the reporting requirements internal Yes ☐ No ☐ Unsure ☐
and external for SCE failure?
Does the plan identify what should happen if an SCE is Yes ☐ No ☐ Unsure ☐
activated?
Does the plan detail the roles and responsibilities? Yes ☐ No ☐ Unsure ☐

Does the plan detail the requirements for Management of Yes ☐ No ☐ Unsure ☐
Change?
Are there a formal contingency plans in place for SCEs that Yes ☐ No ☐ Unsure ☐
are not available?
SCE Verification of Initial and Ongoing Suitability
- Documentation requirements
- Verification Plan requirements

Comments: Click here to enter text.

Note 3 - SCE Verification Plan No procedure in place ☐


Does the plan identify how SCEs are to be verified for initial Yes ☐ No ☐ Unsure ☐
use for each type of SCE? – e.g. design verification etc.
Does the plan identify how SCEs and SCCs are to be verified Yes ☐ No ☐ Unsure ☐
for ongoing use for each type of SCE and SCC? – e.g. audits.
Does the plan define the competence requirements for Yes ☐ No ☐ Unsure ☐
each type of verifier (for initial and in service)?
Does the plan define the independence requirements for Yes ☐ No ☐ Unsure ☐
each type of verifier (for initial and in service)?
Does the plan define a verification schedule? Yes ☐ No ☐ Unsure ☐
Is there a 3rd party audit in place for SCE verifications? Yes ☐ No ☐ Unsure ☐

Comments:

General Comments

You might also like