0% found this document useful (0 votes)
9 views7 pages

Ese P2

Uploaded by

sugargenieaahana
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
9 views7 pages

Ese P2

Uploaded by

sugargenieaahana
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 7

SGSE-T-CVL

CIVIL ENGINEERING

PAPER-II

Maximum Marks : 300


Time Allowed: Three Hours
1
oUESTION PAPER SPECIFIC INSTRUCTIONS

Please read each of the following instructions carefully


before attempting questions

There are EIGHT questions divided in TWO Sections.

Candidate has to attempt FIVE questions in all.

Question Nos. 1 and 5 are compulsory and out of the remaining, THREE are to be
attempted choosing at least ONE question from each Section.
The number of marks carried by a question/ part is indicated against it.

Wherever any assumptions are made for answering a question, they must be clearly
indicated.

Diagrams/Figures, wherever required, shall be drawn in the space provided for answering
the questions itself.

Unless otherwise mentioned, symbols and notations have their usual standard meanings.

Attempts of questions shall be counted in sequential order. Unless struck off, attempt of a
question shall be counted even if attempted party.

Any page or portion of the page left blank in the Question-cum-Answer (QCA) Booklet
must be clearly struck off.

Answers must be written in ENGLISH only.

SGSE T-CVL/69 1 [P.T.O.


SECTION-A

slides
1. (a) A rectangular plate of 0-50 m x 050m dimensions and weighing 500 N
down an inclined plane making 30 angle with the horizontal. The velocity of
inclined
the plate is 175 m/s. If the 2 mm gap between the plate and the
surface is filled with lubricating oil, find the viscosity of oil and express it in
units of poise as well as N-s/m, Assume the plate as frictionless. 12

The following is the set of observed data for successive 15 minutes period of
105 minutes storm in a catchment :
60 75 90 105
|Duration (min) 15 30 45
80 7-0 1:25 1·25 4-5
|Rainfall (cm/hr) 2-0 2-0
total rainfall
If the value of -index is 3-0 cm/hr, estimate the net runoff, the
12
and the value of W-index.
head of
(c) A hydraulic turbine has an output of 6600 kw when it works under a
would be its
25 m and runs at 100r.p.m. What is the type of the turbine? What
speed and what power will it develop when working under a head of 16 m?
12

(a)) A large stream flowing through an industrialised area is the only source of raw
water for the community water supply. The stream water is consistently turbid,
has hardness in excess of 300 mg/L as CaCO and has refractory organics
that are known precursor of trihalomethanes. Draw a schematic diagram of a
treatment plant that could render this water potable. Identify all the units.
State their purpose, show points of chemical addition and identify all the
chemicals. 12

(e) For BOD analysis, 30 mL of treated wastewater sample with DO of zero was
mixed with 270 mL of dilution water with DOof 10 mg/L. The 5th and 6th days
being holidays, the lab was closed. The final DO was measured as 4 mg/L on
the 7th day. It was also found that the incubator was set at 30 °C. Assuming
the BOD reaction rate constant as 023 day at 20 °C and the temperature
coefficient as 1-047, determine the 5-day, 20 °C BOD of the sample. 12

2. (a) Treated wastewater having a peak flow rate of 12000 m /day. BOD: of
30 mg/L, DO concentration of 1 mg/L and temperature of 27 °C is
in a stream. Before getting mnixed with the
discharged
wastewater, the stream has a
minimum flow rate of 0-4 m°/s, BODs of 4 mg/L, DO
and temperature of 25 °C. After concentration of7 me/L
sHelocity ofthe mixed flow is 0:2 m/s.instantaneous and complete mixing, the
For the mnixed flow, the BOD
constant is 0:-2 day and the reaeration reaction rate
Constant
Estimate the initial oxygen deicit and Do after two
is 0-4 dav1 at 20 °C.
days of fow. Take
temperature coefficient for BOD reacuon at constant as 1047 and for stream
regeration rate constant as 1016. lake equlibrium
water after mixing as 83 mg/L. concentration of DO for
20

2
SGSET-CVL/69
(b) () For a hydraulic jump na rectangular channel, the velocity and depth after
the jump are known to be O-80 m/s and 1-75 mrespectively. Calculate the
depth before jump, the energy loss and the power dissipated per metre
width. 15

What do you mean by iversion headworks? Distinguish clearly between a


weir and a barrage. 5
e) A water treatment plant n a city of 100000 population supplies water at
the rate of 150 Ipcd. Two equal capacity circular settling tanks are to be
provided to settle flocculent suspension through Type-II settling. Design
the tanks. Take SOR as 20 m'/m-d and water depth of 3-5 m. Leave
sludge zone of 05 m and keep inlet and outlet zones equal to the side
water depth. Calculate the weir loading. Draw the sketch of the tank
showing all the zones arnd dimensions. 12
ü) In an ideal granular media flter, the entire depth of the filter media should
contribute to the retention and removal of solids, ensuring longer filter
uns, less head loss and greater filtration rates. Why will the single media
flters fail to achieve this? How can the mixed media flter approach an
ideal filter in performance?

3. (a) ) Design a tube well for the following data :


Yield required = 0-10 m/s
Radius of circle of influence = 200 m
Coeficient of permeability 60 m/day
Drawdown = 6 m
Thickness of confined aquifer = 30 m 15

Describe briefly the various methods adopted as anti-waterlogging


measures.
5

(bl 9 Design an irrigation channel in alluvial soil according to Lacey's silt theory
for the following data :
Full supply discharge = 10 m°/s
Lacey's silt factor = 0-9
1 15
Side slopes of channel = (H) : 1(V)
2 5
i) What is gravity dam? Enumerate the various forces acting on gravity dam.
(9 Asettling column analysis is run to determine the settling characteristics
of sludge from an activated sludge reactor with the following results :
Concentration
of MLSS (mg/L) : 1000 2000 3000 4000 5000 6000

Settling 0-06
velocity (m/hr) : 2:8 1:4 0-4 02 01

The tlow to the secondary clarifier is 4200 m°/day with MLSS


Concentration of 2000 me/L. Determine the required diameter of the
Ciariner for a preselected solid flux rate of 2·5 kg/m-hr. Check the area 12
requirement for the clarification function also.

SGSE-T-CVL/69 3
[P.T.0.
chambers
horizontal flow grit control
channel type common velocity
LA) Why do the conventional are the
control devices? What aerated grit chamber has
over
require the velocity the 8
devices that are used? What advantages
chamber?
the conventional grit in the
of 0-9 m. The tension the
N has an effective area of 45°
with
4. (a) (9 Akite weighing 12:26 when the string makes an angle coefficients of lift and
kite string is 32:37 N of 32 km/hr, what are the
horizontal. For a wind with the horizontal? Takespecific
assumes an angle of 8° 10
drag if the kite N/m.
weight of air as 11:801 gravity
be provided to convey oil of specific
pipe has to of 1:25 m/s.
(ü) A 125 m diameter viscosity of 2-75centistokes at a velocity to convey
0-85 and kinematic a 120 mm diameter pipe is
used
the flow, if should be the velocity
In order to model centistokes. what 10
viscosity 1-0
water of kinematic
the model?
and the discharge in MSW.
generates 0-45 kg per capita per day of
population per day at
(b) A city of 1million capacity 4-5 metric tonnes averaging two trips centralised
Collection trucks of the waste to
the days in a week to transfer to
75% capacity operate all
many trucks per day will be required
How
processing and landfill site. is recycled, what is the 3mass of MSW
459% waste
transfer the waste? If albout the waste is 280 kg/m,what is
the
density of
entering the landfill? If the required for the landfill with the
projected
Determine the area the
volume of MSW? compacted waste is 450 kg/m and
the density of the 20
life of 30 years, if is limited to 15 m, Neglect
the volume of cover.
maximum height of the landfill
organisms based
Explain the following characteristic terms for biological
(c) () :
on their carbon and energy Sources
() Phototrophs
(1) Chemotrophs
(n) Autotrophs
(V) Heterotrophs
their trophic levels giving
Arrange the following organisms according to
your reasoning:
(A) Chemoheterotrophs
(B) Photoheterotrophs
(C) Photoautotrophs
10
(D) Chemoautotrophs
was reported as 4 mg/
(ü) The ambient air concentration of carbon monoxide
103·193kPa.. What will be
m° at the temperature of 25 °C and pressure of
3
10
the concentration in ppm at STP?

SGSE-T-CVL/69 4
SECTION--B

5. (a) Afield vane shear test wAs CATTied out on adeep-seated soft clay layer. The
torque
vane wAs 11-25 cm high and 75 cm acro88 the blades. The equivalent
then
recorded at the torque head at fallure WAs 800 kg-cm. The vane was
that
rotated very rapidly in order to completely remould the soil. It was found
the remoulded soil can be sheared by applying a torque of 400 kg-cm.
remoulded
Compute the shear strength of the soil in the undisturbed and
12
states and its sensitivity.
(b) A 25 m wide strip footing is founded at a depth of 2:0 m below the ground
level
35 kPa. Due to
in a homogeneous pure clay bed. The unit cohesion of clay is
seasonal fuctuations of water table from peak summer (fully dry soil) to peak
bearing
monsoon (fully saturated soil), compute the change in the net ultimate
12
capacity as per Terzaghi's theory.
(c) Design the thickness of a flexible pavement for the design life of 15 years
having two-lane single carriageway 7-0 m wide and present traffic of 800
commercial vehicles per day (CVPD). Out of total 800 CVPD, 300 have vehicle
damage factor (VDE) of 2:5 and 500 have VDF of 3-0. The planning and
construction period is 2 years and annual vehicle growth rate is 75%. Design
the
the flexible pavement from the data given below if the effective CBR of
subgrade is 9%. Assume any missing data suitably :

Design traffic Wearing Binder Base (mm) Sub-base


course (mm) course (mm) (mm)
5 msa 25 SDBC 50 DBM 250 150

10 msa 40 BC 50 DBM 250 200

20 rnsa 40 BC 80 DBM 250 200

30 msa 40 BC 95 DBM 250 200


12

(d) Calculate the speed restriction for a 2° curve on a broad-gauge section with
maximum permissible speed of 100 km/hr. Due to space restrictions, the
length of transition curve is limited to 50 m and superelevation provided is
60 mm. 12

(e) The following, staff readings were taken with a level :


1-255, 1-950, 2450, 3-100, 3900, 12i5, 1795, 2-800, 3-500, 0-560,
12}0, 1900, 2-955
The level was shifted after the 5th and 9th reading, and the 7th reading was
taken to a benchmark of RL 120-00 m. Arrange the data in tabular form and
find the reduced level of all the points by rise and fall method. Also apply the
usual checks for calculations. 12

SGSE-T-CVL/69 [P.T.0.
2° simple circular curve.
connected by a BC
O. (a) () Two straights AB and BC are to be respectively and the
AB and
Two points P and Q are selected on field :
in the
1ollowing observations are done
Length PÌ= 120 m
ZAPO = 130° 1700 m
Chainage of point P=
2CPO 120°
intersection and all other important points in
Calculate the chainages of 10
curve. Assume the standard chord length or Z0
the
corrections n positioning
(4) Explain the various sources of errors and their 10
with Global Positioning System (GPS).
sea
greenfield airport is proposed at an elevation of 250 m above mean
(b) 9 A maximum daily temperature at
level (m.s.l.). The monthly average of the
month of the year. During the
the proposed site is 45 °C during the hottest maximum
is 35 °C. The
same month, the average daily temperature length
difference in elevation is 6-0 m along the proposed runway of basic 15
2000 m. Calculate the actual length of runway to be provided.
site for a
(i) What are the various considerations in the selection of the
harbour? 5

(c) A concrete driven pile of 20 m length and 1m x 1 m in cross-section is fully


embedded in sand having unit weight,y =18 kN/m and =30°. Estimate the
ultimate load Q, which the pile can take and mention the contributions from
point load (tip load O, using Meyerhof's method) and frictional resistance Qs.
Consider Ng =55 (for ' =309, &=0-80, K=1-8 (1-sin ¢), Lr =15D. 20

7. (a) An infinite soil slope is having a slope angle as 25°. The soil
c'= 26 kN/m², 6' =20°, e = 071 and G =265. Given y,, = 10 properties are
the critical height of the slope considering stability
kN/m. Find out
number which
cohesion and F, =10, for cases 1) soil slope is dry and (ii) soilrepresents
submerged. slope is
20
b) ASmooth rigid vertical retaining wall of height 70 m supports two
horizontal backfill. Top layer 1 is of Z0n depth having layers of
andv= 15 kN/m,Bottom layer 2 is pure sand o=20°, c= 15 kN/m
Mention the practical depth of tensile crack. Alsowith =30° and y =17 kN/m 3
diagram and compute the total actve thrust on draw active earth pressure
entire soil layers are dry. the wall, Assume that the
20
H What is meant by wear of rallsr now 1S
(c) it measured?
adopted to reduce wear of rails. Explain the methods
10
(i) What is 'mucking' in the construction of
techniques for haulage of muck from the tunnels?
tunnel. Explain the various
10
2 1 R

6
SGSE-T-CVIJ69
8. (a) Estimate the traffic density and theoretical capacity of six-lane expressway at a
stream speed of 80km/hr. The average reaction time is 0-75 s and the average
length of vehicle is 5 m. 10

(b) List all the major methods of ground modifications (ground improvement) in
() cohesive soil and (ü) cohesionless soil. 10

(c) Abulding is proposed to be constructed on a thick silty clay deposit. The


maximum vertical load on a column is 5000 kN. Using Boussinesq's stress
distribution, calculate the minimum depth of soil exploration required for the
foundation design. Note that as per De Beer's recommendation, the vertical
additional stress should be less than or equal to 10% of the effective vertical
stress. Take unit weight, Y, of soil as 18 kN/m and Yu, = 10 kN/m'. 20

(d) 0 Asurvey line OPQR running in the east direction has a lake between points
Pand O: Pand Q are intervisible but it is not possible to measure its
length in the field. A traverse PABCQ was run around the lake and the
following measurements were done in the feld :
Line Length (m) Bearing
PA 160 N 15° E
AB 300 N 45° E
BC 200 N 60° E

CQ S30° E
Calculate the lerngths of the lines CÌ and OP. 10

(ü) Enist the various geological challenges need to be considered for


construction of tunnels in the Himalayan region. 10

SGSE-T-CVL/69 7
SB24-1008

You might also like