Application instructions Packaging
Surface preparation CIKOproof 2K-25 is available in 25kg kit consisting of
The concrete or cement substrate shall be free [Part-A] 20kg powder and [Part-B] 5 kg liquid.
from all loosely adhered particles, Shelf Life
efflorescence, dust, oil, grease or any other CIKOproof 2K-25 has a shelf life of 12 months in un-
contamination. In case of oil spillage, proper opened bags and if stored in accordance with CIKO
treatment should be carried out on the surface. instructions.
After ensuring sound substrate, dampen the Storage
surface with water just before the application of CIKOproof 2K-25 should be stored under enclosed
CIKOproof 2K-25. Wherever cracks, voids, shaded area at an ambient temperature between 5 ºC to
honeycombs, etc. are presents, the surface 40 ºC.
must be repaired using CIKO wide variety of Precautions
repairs materials. (Refer to CIKO technical
Do not apply over standing water.
team for more details).
Do not proceed with application if the ambient
Mixing temperature is below 8 ºC and above 40 ºC.
Liquid component of CIKOproof 2K-25 [Part-B] Do not re-temper the mixed material after initial
should be mixed with powder component [Part- mixing.
A] using heavy duty slow speed drill-paddle Re-Mixing every 15-20 minutes within the 60
assembly. The properly mixed material should minutes pot life is advisable.
be lump free. It is recommended to pour the It is recommended to use CIKObond PVA as a
powder part partially while mixing to achieve sealer on lightweight blocks, gypsum and dry
proper consistency free of lump. It is applicable substrates having high porosity.
to use 80 to 90 % of the liquid quantity [Part-B] Allow to cure for at least 3 days prior to service.
used in mixing to achieve a trowable
consistency if required. Health & safety
Application method Use standard dust mask to avoid inhalation of dust.
The mixed material should apply on the Powder when wet or moist can cause burns to skin and
cleaned and damped surface using brush, or eyes which should be protected during use. If comes in
steel trowel at the rate of 1.5 kg up to 3 kg per contact with eyes, flush with plenty of fresh water and
coat. Do not apply the material on standing seek medical advice.
water. Sponge can be used to get rid of Refer Material Safety Data Sheet for further details.
standing water or re damp the dried areas.
Care should be taken to coat the surface
without leaving any gap. The second coat must Technical Support
be applied in cross direction to the first coat at For any technical support, do not hesitate to contact
the same rate of consumption and depending CIKO team at any time as CIKO offers on and off site
on the required total DFT. Time gap in over- services to end users, specifier and contractors.
coating depends on ambient temperature,
which ranges between 2 and 6 hours. The first More from CIKO Middle East
coat must be dry and not affected by feet
A wide range of construction chemical products are
traffic. Protect the applied area from direct sun
light, wind rain and frost. manufactured by CIKO Middle East which includes:
At right angles, static repaired cracks, patched Concrete admixtures and additives
areas and wall to floor transitions, pipe Waterproofing and damp proof coatings
penetrations and floor drains; it is Surface treatments
recommended to embed a fibre mesh Flooring and toppings
sandwich between the coatings. To do so, Grouts and anchors
immediately after the application of the first
Tile adhesives and grout
coat, embed the fibre mesh by exerting force
using a steel trowel, brush or any suitable tool. Concrete repair materials
The required total dry film thickness of Adhesives and bonding agent
CIKOproof 2k-25 depends on the application Protective coating
area; intended to use location and required Joint Sealants and Moulding compounds
service life. Ancillaries