0% found this document useful (0 votes)
6 views

Mobilisasi Sosial

MOBILISASI SOSIAL DALAM PEKERJAAN JALAN

Uploaded by

routegame17
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
6 views

Mobilisasi Sosial

MOBILISASI SOSIAL DALAM PEKERJAAN JALAN

Uploaded by

routegame17
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

ITEM PEMBAYARAN NO. : 1.

2
JENIS PEKERJAAN : MOBILISASI

% TERHADAP TOTAL BIAYA PROYEK = 0,0000 %


Lembar 1.2-1
HARGA JUMLAH
No. URAIAN SATUAN VOL. SATUAN HARGA
(Rp.) (Rp.)

A. Sewa Tanah M2

B. PERALATAN
Periksa lembar 1.2-2 0

C. Kantor Lapangan dan Fasilitas 1 0


1 Base Camp
2 Kantor
3 Barak
4 Bengkel
5 Gudang, dan lain-lain
6 ...................... ....

D. MOBILISASI FASILITAS LABORATORIUM


1 Ruang Laboratorium (sesuai Gambar)

2 Soil & Aggregate Testing Ls 1 0


Compaction Test
CBR Test
Specific Gravity
Atterberg Limits
Grain Size Analysis
Field Density Test by Sand Cone Methode
Moisture Content
Abrasion of Aggregate by Los Angeles Machine

3 Bituminous Testing Ls 1 0
Marshall Asphalt Test
Extraction Test, Centrifuge/Refflux Method
Specific Gravity for Coarse Aggregate
Specific Gravity for Fine Aggregate
Mix Air Viod Content (Accurate Method)
Core Drill
Metal Thermometer
Accessories and Tolls
Penetration Test
Softening Point
Refusal Density Compactor

4 Concrete Testing
Slump Cone
Cylinder Mould for Compressive Strength
Beam Mould for Flexural Strength (RIGID)
Crushing Machine

5 Pendukung (Periksa Fasilitas Laboratorium)

6 Operasional (Periksa Fasilitas Laboratorium)

E. MOBILISASI PERSONIL
E.I. Personil Sesuai Struktur Organisasi

E.II. Personil Lainnya

F. LAINNYA
Papan Nama Proyek Bh 1 0
Pengukuran LS 1 0

G. DEMOBILISASI LS 1 0

(i) TOTAL BIAYA MOBILISASI 0


(ii) OVERHEAD & PROFIT 15,00 % x D 0,00
(iii) HARGA SATUAN PEKERJAAN = (i) +(ii) 0,00
Catatan : Harga Satuan Personil tersebut sudah termasuk seluruh pajak dan bea (kecuali PPN),
Asuransi Tenaga Kerja dan pengeluaran lainnya.
ITEM PEMBAYARAN NO. : 1.2
JENIS PEKERJAAN : MOBILISASI
Lembar 1.2-2
KODE HARGA JUMLAH
No. JENIS ALAT ALAT SATUAN VOL. SATUAN HARGA
(Rp.) (Rp.)

B. PERALATAN

1 ASPHALT MIXING PLANT E01 Unit -


2 ASPHALT FINISHER E02 Unit 1,00 -
3 POWER BROOM E03 Unit -
4 BULLDOZER 100-150 HP E04 Unit -
5 COMPRESSOR 4000-6500 L\M E05 Unit 1,00 -
6 CONCRETE MIXER 0.3-0.6 M3 E06 Unit -
7 CRANE 10-15 TON E07 Unit -
8 DUMP TRUCK 4 TON E08 Unit 3,00 -
9 DUMP TRUCK 7 TON E09 Unit -
10 EXCAVATOR 80-140 HP E10 Unit -
11 FLAT BED TRUCK 4 TON E11 Unit -
12 GENERATOR SET E12 Unit -
13 MOTOR GRADER >100 HP E13 Unit 1,00 -
14 TRACK LOADER 75-100 HP E14 Unit -
15 WHEEL LOADER 1.0-1.6 M3 E15 Unit -
16 THREE WHEEL ROLLER 6-8 T E16 Unit -
17 TANDEM ROLLER 6-8 T. E17 Unit 1,00 -
18 TIRE ROLLER 8-10 T. E18 Unit 1,00 -
19 VIBRATORY ROLLER 5-8 T. E19 Unit 1,00 -
20 CONCRETE VIBRATOR E20 Unit -
21 STONE CRUSHER E21 Unit -
22 WATER PUMP 70-100 mm E22 Unit -
23 WATER TANKER 3000-4500 L. E23 Unit 1,00 -

Total untuk Item B pada Lembar 1 0