0% found this document useful (0 votes)
34 views4 pages

ETAP - Electrical Engineer

Uploaded by

imad.allakis
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
34 views4 pages

ETAP - Electrical Engineer

Uploaded by

imad.allakis
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

EDUCATION Lebanese university ; diploma of electrical engineering

LANGUAGES English, French, Arabic

COMPUTER SKILLS Microsoft offices, Auto cad, ETAP, Eco dial, Primavera.
GEOGRAPHICAL
Lebanon. Qatar, Kuwait, Saudi Arabia, Bahrain
EXPERIENCE

KEY QUALIFICATIONS Extensive experience in design, revise design estimate and costing, site
supervision and projects management Execution of MEP distribution projects, including
medium to ELV system. Installation of both aerial and underground, substation, switch gears,
water treatment plant ,chiller plant rail ,power plant, stadiums ,infrastructures networks ,
street lighting, pumping station,,,,. Regulations of internationals standards (NEC , IEC ,
BS,FEED……) attending many internationals seminaries , Lebanon Kuwait , Qatar, Saudi
Arabia , U.A.E , in project management , cost management .

Extensive experience in projects management, planning and controlling


resource requirements (financial and manpower) for projects groups
.good experience in operation and maintenance and also in asset
management.

Extensive experience in smart cities. data center systems design and


excution ,concept of operation, controls systems high level integration
,security platform, control platform, facility management, testing,
commissioning, hand over, operation and maintenance ,ERP systems
,ISMS, Asset management ,AGMS, IBMS CMIS ,workflow ,Master
Scada, ICT , CCTV .ACS and AV systems .

Projects:
Clients : HPP , PMC : DORSH International
Project description : design and built of SFSF at Hamad port , this project including as fully
stand alone terminal by providing as a minimum capacity for the processing ,storage and
transportation of bulk and palletized edible commodities including rice, sugar and oil ,the facility
shall be comprised of bulk storage silos and warehoused with minimum 2-year storage .the scope
including design ,supply ,installation hand over with all ELV systems along with integration with
port systems for telecom ,security , TOS and PMIS. CMIS/EAMS/TOS with SAP platform,
Master Scada with Rockwell. Data center system 240 rack 42U with Emerson design and
execution .chiller plant with York around 20mw with all scada and control system. Related to
chiller plant

NPP/047. PORT PROJECT , PMC: AECOM ,CLIENTS : NPP ,DAR : DESIGN


Project description : design and construction of centralized inspection area (CCIA) including
utilities buildings plus all infrastructure , road ,landscaping ,firefighting ,water pump stations,
HV networks ,substation , Tel/data with security network ,XRAY(box ,portal ,HRX)
.Scada, UPS , lightings ,CCTV all security ,traffic management AGMS,TETRA Asset
management IBMS ,WORKFLOW …
The scope including design, supply, installation, testing, hand over with all ELV along with
system integration with port system
CENTRALIZED CUSTOMS INSPECTION, NEW DOHA.
Integration between Xray(Nuctec) server CCIA and EL Nadeeb customs server for fully
operation for XRAY systems . Data center system 200 rack 42 U with Emerson design and
excution

MARSA- MALAZ , KEIMPESKI – HOTEL PEARL


,CONSULTANT : AEB
Project description : the project consist of 5 star Hotel (5 floor)
Around 290 rooms with royal suites and presidential , landscaping Restaurant ,big swimming
pool , 6 transformers with all low current system , 3 generators , one HV substation all MEP
works, total budget around 200 million USD.

ST .REGIS HOTEL & RESIDENTILAL TOWERS OWENER : ST REGIS ,


CONSULTANT : DAR AL HANDASAH
Project description : the project consist of : twin residential tower (22 floors each), circular
tower ( 22floors) , two hotels 7 stars ( 300 rooms, 14 floors ), 10 villas for VIP , complete
landscaping , big swimming pool , over 250000 sqm building , one chillers plant with cooling
tower around 12M tones, , 22 transformer 1600kva, 5transformer each one 2500 kva 3,3 kv for
chillers ,5HV switchgears , HV cables , CO parking ventilation system with around 60 jet fans

and 40 axial fans .one RO plant , one sewage treatment plant , all MEP
systems , total budget of project around 600 million USD.
- Operation and maintenance all the electrical systems for Hotel for 2
years.
Electrical Switching Stations For Stage 1 of Jubail 2 including 34.5 KV underground
cables
Owner: Royal Commission, Consultant: BECHTEL
Project Description: this project consist for the following system:
- Two switching station 34.5 KV for industrial area in Jubail
- 90 km single core 34,4 kv Switchgears 34,5kv panels
- ABTS ,control and protection system, load break switch
,station transformer , SACADA ,TEL ,

King Fahed University of Petroleum & Minerals KFUPM, Student


Housing Phase 2-, KSA KOUBAR
Owner : KFUPM, Consultant: ZUHAIR FAYEZ
Projects Description: These projects consist for 9 building for student
housing, and 2 building common area, total area for this projects 35000
sum .plus all the network outside cabling for all the buildings. The list
of system for this projects as follows:5 package substation 1500 KVA
.( RMU ,Transformer, LV panel),panel boards ,MV cables , FAS ,TEL
,DATA

Jabal AL Kaaba Project phase 1 , Makah , Owner : Abd Latif


, Consultant : Dar El Handsaw .
Project description: Four stars hotels of 33floors, 1800 rooms, 110m
high, over 120000 sqm .three basement, ground, typical floors with
helipad. the list of systems as follows:
- 10 package substation 1600 kva, panels, Elv....
Projects Description: Towers in Doha:
- Residential tower: 31 story, 75000 m2, 400 apartments. Two
basements.
- Dana tower : 28 story offices , 50000 m2
- Rabban tower : 27 story , 50000 m2 ., 200 apartment
- 67 villas : 67 villas , 74 apartment + all landscaping

Jan2000 –May2004
Participated in the design preparation of
technical specification and tender documents. Villa Kabalan (Design, Tender
Document

1994-1999 Execution of electrical works for buildings of several new


telephone exchanges within Lebanon. This projects consist for
all electrical works related to all telephone building , cabling
,panels boards, low current system ,earthling ………