Elevated Storage Reservoir Design PDF Free
Elevated Storage Reservoir Design PDF Free
1.00 INTRODUCTION
The following sheets pertain to the design of 2 lakh gallon capacity RCC Circular Overhead T
The tank is proposed to be built at east of Jammu city, at Nai Basti under the water supply p
It is basically a circular intze type tank with RCC shaft supporting the tank and the shaft is r
on open foundation.
2.00 REFERENCES
IS 3370 -2009 Code of Practice for Concrete structures for the storage of liquids
Part 1 : General Requirements
Part 2 : Reinforced Concrete Structures
IS 11682 -1985 Criteria for design of RCC staging for overhead water tanks
IS 875 : 1987 Code of Practice for Design Loads (other than earthquake) for buildings & s
Part 2 : Imposed Loads
Part 3 : Wind Loads
IS 1893 : 1984 Criteria for earthquake resistant design of structures
IS 11089: 1984 Code of Practice for Design & Construction of Ring Foundation
Kuang-han Chu & Omar.F.Afandi : Analysis of circular & annular slabs for chimney foundation
General
Capacity of tank proposed V = 909 m3
Free board hb = 0.60 m
SBC of soil = 15.00 T/m2
Density of water = 9.81 kN/m3
Density of concrete = 24.00 kN/m3
Density of soil = 19.00 kN/m3
Type of Foundation = Solid Circular Raft Foundation
Depth of foundation below ground level = 1.50 m
Material Properties
Grade of Concrete tank = M30
shaft = M30
foundation = M30
Top Dome
Inner Radius r1 = 6.00 m
Rise h1 = 2.00 m
Thickness t1 = 0.10 m
Bottom Dome
Inner Radius r3 = 4.00 m
Rise h2 = 1.60 m
Thickness t3 = 0.20 m
RCC Shaft
Diameter = 8.00 m
Thickness = 0.20 m
Height of shaft = 20.00 m
R2 - (R - 2.00 )2 = 6.00 2
R= 10.000 m
cos = 0.800
Hence, providing minimum steel of 0.24% as per IS3370- 2009 Part II, we have
Hence, providing minimum steel of 0.24% as per IS3370- 2009 Part II, we have
= 2 x 10.00 x
= 301.59 kN
Hw = 61.80 x
= 148.33 kN
6.30 10.30
2.00
b) Hoop tension
The hoop tension will be maximum at the top of the conical slab as the diameter is max.
at this location.
Angle , = 63.43 o
R2 - (R - 1.60 )2 = 4.00 2
R= 5.80 m
cos = 0.724
= 4946.71 kN
Area of dome surface = 2 x 5.80 x
Hence, providing minimum steel of 0.24% as per IS3370- 2009 Part II, we have
Angles = 63.43 o
= 43.60 0
AS per IS 11682:1985,
Min. thickness of shaft < 150 + (D-6000) where D =
120 =
< 166.67 mm
Hence, provide thk t = 200.00 mm
Parameters Empty
Weight considered (kN) 7006.21
Deflection (m) =Wl3/3EI 0.020
Time Period T (sec.) 2 / g 0.28
For 5% damping Sa/g 0.20
Horizontal Seismic Coefficient .I.Fo.Sa/g 0.075
Base shear, H (kNm) 525.47
Base Moment, M (kNm) 10509.31
e/r 0.30
Max. compressive stress in conc. (Mpa) 3.03
Permissible stress (Mpa) 10.66
OK
14.0 DESIGN OF CIRCULAR RAFT FOUNDATION
ity RCC Circular Overhead Tank.
sti under the water supply project.
g the tank and the shaft is rested
storage of liquids
water tanks
arthquake) for buildings & structures
ng Foundation
labs for chimney foundations
ar Raft Foundation
h1
r1
h
r2
h2 h3
r3
M25
1.5
2.0
6.0
8.5
IS 456 :2000
230
190
M25
10.98
0.29
0.90
1.11
608.00 - 80.90
>V, Hence OK
0.74 kN/m2
2.00
125.66 m2
2.40 kN/m2 125.66
31.36 x 0.24
0.10
76.65 kN/m2
0.08 N/mm2
8.00 N/mm2
OK
OK
31.36
1.80
17.42 kN/m
174.20 kN/m2
0.17 N/mm2
8.00 N/mm2
OK
art II, we have
OK
nsity of loading
2.00 x 2.40
2.00 m
10.00 m
643.19 mm2
) OK
1000
5655
OK
0.40 x 0.40
6.3
OK 61.80 kN/m2
1000
26180
OK
each face OK
0.40 x 6.30
24
58.59 + 11.52
63.43 o
6.00 = 243.99 kN
0.40 x 6.00
3017.82 mm2
) OK
463.25 kN
1000
65450
OK
/m
/m OK
2.00 = 16.60 m2
5.000 m
x 5.000 x 9.81
x 11.200 x 0.60 x 24
5115.96 + 2313.02
= 340.57 kN/m
1.12 = 380.77 kN
0.63 N/mm2
8.00 N/mm2
OK
14.40 kN/m2
0.50 )x 6.00
1000
40906
OK
each face OK
OK
+ 3r32) h3
1.60 2 ( 3 x5.8-1.6) 9.81
3
1.60 = 58.31 m2
24.00 = 279.88 kN
89.64 kN/m2
519.90 x 0.144
0.20
374.69 kN/m2
0.37 N/mm2
8.00 N/mm2 OK
OK
519.90
1.724
301.54 kN/m
1507.71 kN/m2
1.51 N/mm2
8.00 N/mm2 OK
art II, we have
1.60 m
5.80 m
9.81 = 9031.54 kN
149.59 = 451.18 kN
463.25 = 2819.29 kN
279.88 = 2592.90 kN
= 318.48 kN
15213.39 kN
2313.02 + 5115.96
5226.59 kN
-258.91 kN/m
indicates compression
1991.58 mm2
) OK
1000
20944
OK
1000
800
OK
internal dia of shaft
8000 mm
OK
0.20 = 103.04 m3
2473.06 kN
8.64 19.80
252.00 9.50
657.22 kN
4100 mm
oth faces
392.70 mm2 OK
oth faces
392.70 mm2 OK
27386 N/mm2
43.30 m4
Full
16037.74
0.045
0.42
0.18
0.068
1082.55
21650.95
0.30
6.20
10.66
OK
BILL OF QUANTITIES FOR R.C.C OVERHEAD TANK
Annular Footing
Pile Foundation
Dia = 600 x 0.090 x 25.00 x 40
Length = 25000
No. = 40
Capacity = 125MT
Pile cap
Width = 3000 2 x 4.10 x 3.00 x 1.00
Depth = 1000 2 x 4.10 x 1.00
OR
10.00 Walkway
10.10 Around tank 1.00 m wide 4 x 6.90 x 1.00 x 0.12
( 2 Nos.) 0.12 m thk 4 x 6.90 x 1.00
10.20 Landings 1.00 m wide 9 x 1.00 x 1.00 x 0.12
0.12 m thk 9 x 1.00 x 1.00
1.50 m wide 1 x 1.50 x 1.50 x 0.15
0.15 m thk 1 x 1.50 x 1.50
5.00 m wide 1 x 5.00 x 0.75 x 0.35
0.35 m thk 1 x 5.00 x 5.00
1.90 m wide 1 x 1.90 x 1.00 x 0.15
0.15 m thk 1 x 1.90 x 1.90
0.50 m wide 1 x 0.50 x 1.00 x 0.15
0.15 m thk 1 x 0.50 x 0.50
17.00 Painting
17.10 walls inside 2 x 6.00 x 6.30
outside 2 x 6.40 x 6.30
17.20 conical inside 2 x 5.00 x 4.57
outside 2 x 5.60 x 4.57
17.30 bot.dome inside
outside
17.40 Top dome inside
outside
17.50 Shaft inside 2 x 4.00 x 20.00
outside 2 x 4.20 x 20.00
17.60 Partition wall inside 2 x 5.70 x 6.30
outside 2 x 5.90 x 6.30
17.70 Walkways
Formwork
Volume (m3) (m2) Length (m) HYSD Steel (MT)
12.57 0.75% 0.80
125.66
0.30 1.50
0.63 3.15
57.19
38.64
6.18 1.50% 0.70
15.46
4.64 2.00% 0.70
7.73
46.37 1.50% 5.60
15.46
23.00
117.86
16.00
148.00
59.00
8.00
9.00
7.54
237.50
253.34
143.42
160.63
58.31
58.31
125.66
125.66
502.65
527.79
225.63
233.55
126.82
Annular Circular Footing
Solid Circular Footing
Pile Foundation
Karnataka Municipal Reforms Project (KMRP) Detailed Project Report- New OHTat Jewargi Town
Civil Work Items - RCC Over Head Tank of 2000 cu.m capacity and over 30m staging
height
c Earthwork in excavation for foundation for pile caps in all types of strata other
than hard rock upto 3m depth Cum
2 Boring in all types of soil (excluding rock) for piling of 600 dia piles including
protection of sides by either using temporary liner or driller's mud, etc.
complete R.M 25.00
4 Providing M-35 for R.C.C. 600 dia cast in situ bored piles, each of load
capacity as designed, place through steel shell sunk to the required depth
through all type of strata excluding provision of reinforcement including
placing concrete by tremmy arrangment including all leads and
lifts,compaction of concrete including chipping and dressing of RCC
Piles,cleaning the reinforcement etc complete.
Cum 282.80
Pilecap Cum 77.30
7 Cement mortar plastering 1:3 proportion 12 mm thick for both inside and
outside surface for top dome Cum 3.10
10 Two coats of water proof cement painting of approved colour and shade over
one coat of primer before removal of scaffolding for new R.C.C. over head
tanks 2779.30
23.00
12 M.S. Inspection door of size 60 cms x 60 cms. including M.S. frame, size 50
x 50 x 6 mm and shutters of 3mm thickness with hinges at top and locking
arrangements, painting
1
13 Aluminium monkey ladder 45 cms. wide including hand railing & cage to be
provided inside the tank 16.00
14 Supplying & fixing 40 mm dia G.I. medium duty pipes hand railing
3 rows fixed to 1:2:4 (M-150) vibrated R.C.C. post of size 100 x 150 mm at
top and 150 x 150 mm at bottom placed at 2 Mtr. intervals for a height of 750
mm painting G.I. pipes with two coats of anticorrosive steel paint over a
primer coat
Mtr 117.90
15 Pull and push type rolling shutters of approved make as per specifications
Sqm 3.15
16 Refilling pipeline trenches and foundation with selected available earth from
trench excavation and foundation Cum 41.00