Mastering Transformer
Mastering Transformer
[email protected] [email protected]
+91 78100 21618 +91 6369 577 904
MASTERING TRANSFORMER
7 pm to 8.30 pm India Time - Monday and Wednesday
Data Sheet: 8th July 2024
- Tap Changer details
- Type of Insulation – Uniform / Graded
- Minimum Clearance
- Creepage Distance
- Bushing CT Requirements
- Guaranteed Loss – No Load Loss & Load Loss
- No load current
- Weight, Noise Level
- Assignments and References for Power
Transformer, Converter Transformer, DT
-
Sizing Calculation: 10th July 2024
- Generator Step up Transformer (GSUT) Sizing
- Wind Turbine Generator (WTG) Transformer
Sizing
- Distribution Transformer Sizing
- Solar Inverter Transformer Sizing
- Transformer Sizing for SVC / STATCOM
- Role of Reactive power loss
- Auxiliary Transformer Sizing
- Transformer Dedicated Motor
- Load factor, Diversity Factor
- Assignment 1 – Distribution Transformer Sizing
- Assignment 2 – GSUT Sizing
- Assignment 3 – WTG Transformer Sizing
[email protected] [email protected]
+91 78100 21618 +91 6369 577 904
MASTERING TRANSFORMER
7 pm to 8.30 pm India Time - Monday and Wednesday
Vendor Drawing Review: 17th July 2024
- Name Plate
- General Arrangement Drawing
- Foundation Drawings
- Bushing and OLTC Drawings
- Cable Terminal Box / Busduct Interface Drawings
- Control Drawings
- Transport Details
- Oil Filling Instruction
- Schedule of Maintenance
[email protected] [email protected]
+91 78100 21618 +91 6369 577 904
MASTERING TRANSFORMER
7 pm to 8.30 pm India Time - Monday and Wednesday
Root Cause Analysis: 29th July 2024
- Transformer Failures
- Major Root Cause
- Root Cause Methodology
- Sample Root Cause Analysis Report Review
[email protected] [email protected]
+91 78100 21618 +91 6369 577 904