0% found this document useful (0 votes)
50 views3 pages

Camsur SAMPLE POW3

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
50 views3 pages

Camsur SAMPLE POW3

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

FORM POW-2015-01A-00

Page 1 of 3

CSSP: Basic Infrastructure Program (BIP) - Multi-Purpose Buildings/ Facilities to support Social Services - Construction of Multi-Purpose Building, Barangay Bahay, Libmanan, Camarines Sur
Libmanan, Camarines Sur

ITEMIZED BREAKDOWN
DIRECT COST TOTAL UNIT COST %
QTY.
ITEM NO. DESCRIPTION UNIT TOTAL UNIT COST (DIRECT+INDIRECT) DIRECT
As Submitted As Evaluated As Submitted As Evaluated As Submitted As Evaluated As Submitted As Evaluated COST

PART I FACILITIES FOR THE ENGINEER


Provision of Combined Field Office, Laboratory and Living Quarters
A.1.1(6) 10.00 - month 405,719.00 - 40,571.90 - 46,008.53 - 1.28
Building for the Engineer (Rental Basis)
TOTAL OF PART I 405,719.00 - 1.28
PART II OTHER GENERAL REQUIREMENTS
B.3 Permits and Clearances 1.00 - L.S. 288,914.00 - 288,914.00 - 303,359.70 - 0.91

B.5 Project Billboard/Signboard 1.00 - each 3,604.58 - 3,604.58 - 4,541.77 - 0.01

B.7(1) Occupational Safety and Health Program 10.00 - month 302,978.10 - 30,297.81 - 34,357.72 - 0.96

B.9 Mobilization/Demobilization 1.00 - L.S. 242,960.00 - 242,960.00 - 255,108.00 - 0.77

TOTAL OF PART II 838,456.68 - 2.65

VOLUME III
PART III-A EARTHWORK
801(1) Removal of Structures and Obstructions 1.00 - L.S. 130,536.97 - 130,536.97 - 164,476.58 - 0.41

802(1) Unsuitable Excavation 450.00 - cu.m. 120,632.18 - 268.07 - 337.77 - 0.38

804(1)b Embankment (from Borrow) 421.50 - cu.m. 356,667.27 - 846.19 - 1,066.19 - 1.13

804(4) Gravel Fill 115.00 - cu.m. 186,306.71 - 1,620.06 - 2,041.27 - 0.59

807(2) Softscape 1.00 - L.S. 200,000.00 - 200,000.00 - 252,000.00 - 0.63

TOTAL OF PART III-A 994,143.12 - 3.15


PART III-B PLAIN AND REINFORCED CONCRETE WORK
900(1)c1 Structural Concrete (Class A, 28 days) 23.40 - cu.m. 159,624.40 - 6,821.56 - 8,595.16 - 0.51

900(1)c2 Structural Concrete, Footings and Slab on Fill (Class A, 28 days) 155.30 - cu.m. 982,992.88 - 6,329.64 - 7,975.34 - 3.11

900(1)c3 Structural Concrete, Footing Tie Beams (Class A, 28 days) 9.20 - cu.m. 62,758.31 - 6,821.56 - 8,595.16 - 0.20

900(1)c4 Structural Concrete, Columns (Class A, 28 days) 21.70 - cu.m. 148,027.76 - 6,821.56 - 8,595.16 - 0.47

902(1)a Reinforcing Steel (Deformed, Grade 40) 15,889.00 - kgs. 1,196,173.66 - 75.28 - 94.86 - 3.79

903(2) Formworks and Falseworks 1,835.00 - sq.m. 711,903.03 - 387.96 - 488.83 - 2.25

TOTAL OF PART III-B 3,261,480.04 - 10.33


FORM POW-2015-01A-00
Page 2 of 3

CSSP: Basic Infrastructure Program (BIP) - Multi-Purpose Buildings/ Facilities to support Social Services - Construction of Multi-Purpose Building, Barangay Bahay, Libmanan, Camarines Sur
Libmanan, Camarines Sur

ITEMIZED BREAKDOWN
DIRECT COST TOTAL UNIT COST %
QTY.
ITEM NO. DESCRIPTION UNIT TOTAL UNIT COST (DIRECT+INDIRECT) DIRECT
As Submitted As Evaluated As Submitted As Evaluated As Submitted As Evaluated As Submitted As Evaluated COST
PART III-C FINISHINGS AND OTHER CIVIL WORKS
1000(1) Soil Poisoning 12,000.00 - Liters 4,795,075.56 - 399.59 - 503.48 - 15.18

1001(8) Sewer Line Works 1.00 - L.S. 177,272.23 - 177,272.23 - 223,363.01 - 0.56

1001(9) Storm Drainage and Downspout 1.00 - L.S. 96,563.63 - 96,563.63 - 121,670.18 - 0.31

1002(4) Plumbing Fixtures 1.00 - L.S. 71,804.80 - 71,804.80 - 90,474.05 - 0.23

1002(24) Cold Water Lines 1.00 - L.S. 29,506.40 - 29,506.40 - 37,178.06 - 0.09

1003(1)e1 Ceiling (Gypsum Board, Metal Frame) 135.00 - sq.m. 127,968.34 - 947.91 - 1,194.37 - 0.41

1004(2) Finishing Hardware 1.00 - L.S. 934,605.33 - 934,605.33 - 1,177,602.71 - 2.96

1006(6) Steel Doors and Frames 1.00 - L.S 241,809.71 - 241,809.71 - 304,680.24 - 0.77

1008(1)c Aluminum Glass Windows (Awning Type) 87.60 - sq.m. 323,042.28 - 3,687.70 - 4,646.50 - 1.02

1008(1)d Aluminum Glass Windows (Fixed Type) 6.40 - sq.m. 23,601.26 - 3,687.70 - 4,646.50 - 0.07

1013(2)a1 Fabricated Metal Roofing Accessory, gauge 26 (Ridge/Hip Rolls) 35.00 - L.M. 14,082.59 - 402.36 - 506.97 - 0.04

1013(2)a2 Fabricated Metal Roofing Accessory, gauge 26 (Flashings) 156.00 - L.M. 62,768.10 - 402.36 - 506.97 - 0.20

1013(2)b1 Fabricated Metal Roofing Accessory, gauge 24 (Gutters) 86.00 L.M. 43,112.22 - 501.30 - 631.64 - 0.14
Pre-painted Metal Sheets, Corrugated Type (Long Span, above
1014(1)b1 841.00 - sq.m. 552,993.53 - 657.54 - 828.50 - 1.75
0.427mm)
1018(1) Glazed Tiles and Trims 28.00 sq.m. 42,992.41 - 1,535.44 - 1,934.66 - 0.14

1018(2) Unglazed Tiles 10.00 - sq.m. 9,408.86 - 940.89 - 1,185.52 - 0.03

1021(1)c Cement Floor Finish (with Floor Hardener) 897.00 - sq.m. 307,077.40 - 342.34 - 431.35 - 0.97

1021(12) Floor Finishes 1.00 - L.S. 638,388.32 - 638,388.32 - 804,369.28 - 2.02

1027(1) Cement Plaster Finish 1,807.00 - sq.m. 341,471.45 - 188.97 - 238.10 - 1.08

1032(1)a Painting Works (Masonry/Concrete) 3,651.00 - sq.m. 896,601.63 - 245.58 - 309.43 - 2.84

1032(1)b Painting Works (Wood) 135.00 - sq.m. 30,876.75 - 228.72 - 288.18 - 0.10

1038(1) Reflective Insulation 770.00 - sq.m. 158,360.19 - 205.66 - 259.13 - 0.50

1046(2)a1 CHB Non Load Bearing (including Reinforcing Steel, 100mm) 13.00 - sq.m. 9,760.05 - 750.77 - 945.97 - 0.03

1046(2)a2 CHB Non Load Bearing (including Reinforcing Steel, 150mm) 1,005.00 - sq.m. 1,143,640.88 - 1,137.95 - 1,433.82 - 3.62

1047(1) Structural Steel 1.00 - L.S. 4,203,458.88 - 4,203,458.88 - 5,296,358.19 - 13.31

TOTAL OF PART III-C 15,276,242.77 - 48.36


FORM POW-2015-01A-00
Page 3 of 3

CSSP: Basic Infrastructure Program (BIP) - Multi-Purpose Buildings/ Facilities to support Social Services - Construction of Multi-Purpose Building, Barangay Bahay, Libmanan, Camarines Sur
Libmanan, Camarines Sur

ITEMIZED BREAKDOWN
DIRECT COST TOTAL UNIT COST %
QTY.
ITEM NO. DESCRIPTION UNIT TOTAL UNIT COST (DIRECT+INDIRECT) DIRECT
As Submitted As Evaluated As Submitted As Evaluated As Submitted As Evaluated As Submitted As Evaluated COST
PART III-D ELECTRICAL
1100(10) Conduits, Boxes & Fittings (Conduit Works/Conduit Rough-in) 1.00 - L.S. 393,805.79 - 393,805.79 - 496,195.30 - 1.25

1101(33) Wires and Wiring Devices 1.00 - L.S. 651,416.47 - 651,416.47 - 820,784.75 - 2.06

1102(1) Panelboard with Main & Branch Breakers 1.00 - L.S. 113,403.29 - 113,403.29 - 142,888.15 - 0.36
Pad Mounted Distribution Transformer (OISC) with Complete
1102(8) 1.00 - L.S. 836,181.84 - 836,181.84 - 1,053,589.12 - 2.65
Accessories (Free Standing)
1103(1) Lighting Fixtures and Lamps 1.00 - L.S. 499,339.10 - 499,339.10 - 629,167.27 - 1.58

TOTAL OF PART III-D 2,494,146.49 - 7.90


PART III-E MECHANICAL
1200(1) Ventilating Equipment 1.00 - L.S. 1,061,673.66 - 1,061,673.66 - 1,337,708.81 - 3.36

1208(1) Fire Alarm System 1.00 - L.S. 207,078.72 - 207,078.72 - 260,919.18 - 0.66

TOTAL OF PART III-E 1,268,752.37 - 4.02

VOLUME II

GENDER AND DEVELOPMENT (GAD) ATTRIBUTES


PART II-C EARTHWORK
100(3)a1 Individual Removal of Trees (Small, 150-300 mm dia.) 36.00 - each 31,556.27 - 876.56 - 1,104.47 - 0.10

102(1) Unsuitable Excavation 752.00 - cu.m. 201,589.81 - 268.07 - 337.77 - 0.64

104(2)a Embankment from Borrow (Common Soil) 1,920.00 - cu.m. 1,610,414.59 - 838.76 - 1,056.83 - 5.10

105(1)a Subgrade Preparation (Common Material) 1,023.00 - sq.m. 16,411.92 - 16.04 - 20.21 - 0.05

TOTAL OF PART II-C 1,859,972.59 - 5.89


PART II-D SUBBASE AND BASE COURSE
200(1) Aggregate Subbase Course 204.50 - cu.m. 246,393.38 - 1,204.86 - 1,518.12 - 0.78

TOTAL OF PART II-D 246,393.38 - 0.78

PART II-E SURFACE COURSES

300(2) Crushed Aggregate Surface Course 226.50 - cu.m. 280,714.50 - 1,239.36 - 1,561.59 - 0.89

311(1)c1 PCC Pavement (Unreinforced, 0.23m thk.) - 14 days 1,023.00 - sq.m. 1,412,121.83 - 1,380.37 - 1,739.27 - 4.47

TOTAL OF PART II-E 1,692,836.32 - 5.36

PART II-F BRIDGE CONSTRUCTION

404(1)a Reinforcing Steel (Grade 40) 4,257.00 - kgs. 311,915.83 - 73.27 - 92.32 - 0.99

405(1)a3 Structural Concrete, Class A (20.68 Mpa, 28 days) 18.00 - cu.m. 137,615.45 - 7,645.30 - 9,633.08 - 0.44

407(8) Lean Concrete, Class B (16.5 Mpa) 0.50 - cu.m. 2,563.15 - 5,126.31 - 6,459.15 - 0.01

TOTAL OF PART II-F 452,094.43 - 1.43


PART II-G DRAINAGE AND SLOPE PROTECTION STRUCTURES
500(3)b1 Lined Canal, Rectangular (Concrete) 232.00 - L.M. 1,506,179.31 - 6,492.15 - 8,180.11 - 4.77

502(5) Metal Frames and Gratings, Drainage Inlet 40.00 - pair 16,264.90 - 406.62 - 512.34 - 0.05

506(1) Stone Masonry 252.00 - cu.m. 956,708.25 - 3,796.46 - 4,783.54 - 3.03

TOTAL OF PART II-G 2,479,152.46 - 7.85


PART II-H MISCELLANEOUS STRUCTURES
600(7) Curb and Gutter (Precast) 172.00 - pc. 318,697.14 - 1,852.89 - 2,334.64 - 1.01

TOTAL OF PART II-H 318,697.14 - 1.01

GRAND TOTAL 31,588,086.80 - 100.00