RA - Stone Cladding Work
RA - Stone Cladding Work
CSP # 1650 Project Name Wadi Safar Infrastructure Package West Related Documentation/ Legislation
Routine non-Routine Emergency Task/Activity: Installation of lime Stone Cladding For Culverts RA No: REVISION 0
RISK ASSESSMENT RISK CONTROLS
Original Risk Original Risk With Residual Risk With
Without Controls Present Control Additional Control Measures Additional Control
SN Hazard Identified Affected Person Risk Risk Control Measure Already in Use
S L Rate
S L Rate
Needed S L Rate
(1-5) (1-5) (1-5) (1-5) (1-5) (1-5)
All workers shall receive induction training prior to
mobilize to site
All ground workers shall wear high visibility vest
Vehicle and heavy equipment must equip an audible
back-up alarm, and has to inspect frequently and
maintain it to ensure that it is in good condition prior to
operating.
Maintain a safe distance from operating equipment. All
ground personnel must establish eye contact with the
Potential of being
Workers and others operator when approaching or being near heavy
struck by or caught Workers/driver and
1 may suffer serious, 5 4 20 equipment 5 1 5
in between others
possible fatal, injury Provide to all concerned employees adequate hazard
equipment’s
awareness information on vehicle/heavy equipment
operation, including information on the consequences
associated with being in the vicinity of vehicle/heavy
equipment
Conduct pre-job communication meetings on site prior
to starting work to discuss relevant hazards, procedures
and assignments during job execution
Personnel shall not rest or sleep (e.g., seek shade) under
or around mechanical or heavy equipment at any time
2 Vehicular hazards All workers and Injury to persons, 3 3 9 Ensure all driver have a valid Saudi License 3 2 6
others working damage to other Crane and other equipment shall have a valid third party
nearby plant on certificate
site/vehicles on site Appropriate traffic management must be in place where
required
Travel as per road rules & permits
Ensure flagman are trained
Flashing hazards light
Warning signs and barriers
Pedestrian exclusion zone
Road closure permits to be obtained where required
Mobile plant to be fitted with operating flashing lights &
REV-0 Page 1 of 5
Hazard Identification and Risk Assessment – HIRA SFHI09-02 1
REV
Routine non-Routine Emergency Task/Activity: Installation of lime Stone Cladding For Culverts RA No: REVISION 0
RISK ASSESSMENT RISK CONTROLS
Original Risk Original Risk With Residual Risk With
Without Controls Present Control Additional Control Measures Additional Control
SN Hazard Identified Affected Person Risk Risk Control Measure Already in Use
S L Rate
S L Rate
Needed S L Rate
(1-5) (1-5) (1-5) (1-5) (1-5) (1-5)
reverse alarm
Apply appropriate signage and pedestrian control
Proper supervision at all times
Wear appropriate PPE for the specific task
It could suffer
injuries such as Maintained good housekeeping at all times
bruising and All workers must wear a strong safety shoes that have a
4 Slips, trips and falls All workers fractures if they trip 3 2 6 good grip 3 1 3
over objects, or slip, Good lightning in all areas
e.g. on spillages, and Horse playing is prohibited
fall
5 Pinch All workers Hand and Foot 3 3 9 Watch carefully doing the task avoid doing shortcut. 3 1 3
Injury Appropriate Personal Protective Equipment to be used.
Page 2 of 5
Hazard Identification and Risk Assessment – HIRA SFHI09-02 1
REV
Routine non-Routine Emergency Task/Activity: Installation of lime Stone Cladding For Culverts RA No: REVISION 0
RISK ASSESSMENT RISK CONTROLS
Original Risk Original Risk With Residual Risk With
Without Controls Present Control Additional Control Measures Additional Control
SN Hazard Identified Affected Person Risk Risk Control Measure Already in Use
S L Rate
S L Rate
Needed S L Rate
(1-5) (1-5) (1-5) (1-5) (1-5) (1-5)
E.g. hand gloves.
Proper communication and awareness of all members of
the crew.
Close monitoring and supervision in the activity
Page 3 of 5
Hazard Identification and Risk Assessment – HIRA SFHI09-02 1
REV
Routine non-Routine Emergency Task/Activity: Installation of lime Stone Cladding For Culverts RA No: REVISION 0
RISK ASSESSMENT RISK CONTROLS
Original Risk Original Risk With Residual Risk With
Without Controls Present Control Additional Control Measures Additional Control
SN Hazard Identified Affected Person Risk Risk Control Measure Already in Use
S L Rate
S L Rate
Needed S L Rate
(1-5) (1-5) (1-5) (1-5) (1-5) (1-5)
Avoid work at height, carry out work from an existing
place of work
Provide a safe working platform with guardrails, fences,
toe-boards, etc. that are strong enough to prevent a fall
Ensure that all equipment is inspected before use, and
do not use any piece of equipment found to be
defective.
Serious or even fatal Awareness training shall be provided to the workers
injury could occur if specially to those who will expose to working at height
Skilled workers / an operator falls Supervisor shall conduct pre-job communication
9 Falling from height 5 4 20 5 1 5
helpers and others from height. Others meetings on site prior to starting work to discuss
working below also relevant hazards, procedures and assignments during
at risk job execution
Ensure equipment is suitable, stable and strong enough
for the job, maintained and checked regularly
Take precautions when working on or near fragile
surfaces
Ladders in good condition, adequately secured (lashed)
and place on firm surface
Proper supervision is a must
11 Collapse of scaffold All operatives falls from height, 5 4 20 Ensure that scaffold to be use is certified and or 5 1 5
Worker under Serious injury or scaffolding requirements at contract stage, including
scaffolding also at even fatal, load rating and provision of loading bays
risk Ensure only competent person will erect scaffold and
inspected by certified scaffolding inspector
Page 4 of 5
Hazard Identification and Risk Assessment – HIRA SFHI09-02 1
REV
Routine non-Routine Emergency Task/Activity: Installation of lime Stone Cladding For Culverts RA No: REVISION 0
RISK ASSESSMENT RISK CONTROLS
Original Risk Original Risk With Residual Risk With
Without Controls Present Control Additional Control Measures Additional Control
SN Hazard Identified Affected Person Risk Risk Control Measure Already in Use
S L Rate
S L Rate
Needed S L Rate
(1-5) (1-5) (1-5) (1-5) (1-5) (1-5)
Ensure to select a secure foundation on which to build
and set the scaffold to avoid collapse
Ensure that the scaffold are stable
Inspect the scaffolding and use scaffolding tag to ensure
safety
Ensure that the scaffold is on a firm and level base. If it
has wheels, always make sure that it was secure.
Awareness training to the workers to be aware what are
the hazards regarding of scaffold
IF THE RESIDUAL RISK RATING IS 16 OR ABOVE, then additional controls need to be developed for the activity
Legend: S àSeverity and LàLikelihood: Hierarchy of Controls: Elimination, Substitution, Engineering, Administrative, PPE
LIKELYHOOD
RA Team Name 3 M. Siddique 4 Abid
Very Unlikely Unlikely Likely Very Likely Almost Certain
SEVERITY 1 2 3 4 5 Designation Civil Engineer Civil Foreman
Catastrophic 5 5 10 15 20 25
Critical 4 4 8 12 16 20
Serious 3 3 6 9 12 15
Prepared By: Approved By:
Medium 2 2 4 6 8 10
Minimal 1 1 2 3 4 5
Page 5 of 5