minutes and final setting time is25-30 minutes. Pot Flow, ASTM C939
life is 20 minutes Flow, at 5 drops, ASTM C1437 100-125
The recommended thickness of ARMORGROUT- Compressive strength, ASTM C109 : Flowable
60 in one pour should be between 20mm-50 mm.
24 hours 20 N/mm2
Minimum thicknesses should be 10mm and
7 days 50 -55 N/mm2
maximum thickness per pour should not exceed
100 mm. Should there be a requirement to pour 28 days 60 N/mm2
more than 100mm then coarse aggregate should C-827 expansion 0 - 0.4
be added to increase the thickness and strength of Height change, ASTM C1090
ARMORGROUT-60. 1, 3, 7 and 28 days 0 - 0.2 0 - 0.2 0 - 0.2
As a rule of thumb aggregate to be added should
not be more than 20% of the grout.
Recommended aggregates is the smooth rounded
aggregates not more than 10mm in size
Where aggregates inclusion are not desired,
material can be poured in stages to achieve final
pour of 100mm
ARMORSIL MANUFACTURING INCORPORATION
4636 Chestnut Street, Philadelphia, Pennsylvania
Page 2
Tel : +1 209 813 246, +1 415 670 9521
www.armorsil.com, [email protected], [email protected]
Technical Data Sheet
ARMORGROUT-60
STRUCTURAL GROUT
We Provide Armor for Building Structures