API-Single Order Staging
API-Single Order Staging
Note: If Control is NOT maintained in the Work Center, we have to enter manually here.
*** Maintain for Raw Materials 1873, 1874, 1875, 1876, 1877, 1878 and 1880
Define Product Group Types
In Properties-2 tab for Single Order Staging components, maintain Product Group Type – PS and Product Group SINGLE_ORDER
In Properties-2 tab for Cross Order Staging components, maintain Product Group Type – PS and Product Group CROSS_ORDER
Note: Maintain PS Group Type and Product Group for all Components appropriately.
Maintain Warehouse Parameters for Production
(Maintaining default Production Component Stock Type P2 for the Warehouse)
Define Document Types for Production
Item Types for Production
Order Type Single Order Cross Order Crate Part Manual Staging
Item Type PCSO PCCO PCCP PCNS
WPT P220 P320 P310 P999
Activity PICK REPL REPL REPL
Stock Stock Reserved for Order Stock Reserved for PSA Stock Reserved for PSA Stock Reserved for PSA
Create Goods Movement Bins (for Single Order/Cross Order/Crate Part/Not Staging)
WPT for Production Staging (for Single Order/Cross Order/Crate Part/Not Staging)
/SCWM/PSASTAGE (PSA Assignment to Bin by Entitled/Product)
Outbound Picking Strategy
Maintain the same Stock Removal Rules (FIFO, LIFO etc.,)
4 tasks are displayed. 2 tasks for Single Order (Pick Activity) and 2 for Cross Oder (REPL)
/SCWM/RFUI
Follow the above steps for Component-02 and complete consumption. The CONSUMPTION is now complete.
Define WPT
WPT Determination
Document Types, Item Types and Determination for production Inbound Delivery Process
Note:
Using document type INBM, the inbound delivery is created in EWM directly. Choosing Comm. To ERP – Via Goods Movement
Interface, the details of this inbound will be communicated to S4 by Goods Movement interface (without delivery, it will be
communicated to ERP)
Receiving Finished Material using RF - /SCWM/RFUI
What is EGR: Expected Goods Receipt widely used in Decentralized system. EWM cannot read Production order header
details (finished material). The Component details of the Production Order will be read in PMR. When the Production Order is
input in the RFUI the system will generate an EGR automatically in the background.
How to check whether the execution is success? Go to monitor and execute the inbound delivery with Prod Order #.
To check Handling Unit – Click Handling at the Header Level
Perform Goods Receipt from Monitor (In general this GR will be triggered through PPF actions)
Note: The delivery document 300000712 is specific to EWM, will not be displayed in S4
Note: The Queue will Not be created in this INBD doc 300000712, it will be created in Production Order 1000394.
Transaction: SLG1
Header Product, Stock type, WPT, Storage type, Destination Bin, Destination Storage Type & Bin, Status
Confirm WT
The finished material was moved from Source Bin (PROD-RECV-BIN) to Destination Bin (D003-01-02-E) determined by the
Putaway strategy maintained in the configuration.