Change Management Procedure
Change Management Procedure
TABLE OF CONTENTS
1. Introduction
2. Scope
3. Procedure
- 3.1 Identification of Change
- 3.2 Submission and Logging
- 3.3 Initial Review and Classification
- 3.4 Impact Analysis
- 3.5 Review and Approval
- 3.6 Implementation
1. INTRODUCTION
2. SCOPE
This procedure applies to all contract changes in the EPC project, including
3. PROCEDURE
• The request is logged into the Change Management System (CMS) for
major).
• The Change Request, along with the impact analysis, is presented to the
• The CCB reviews the request and makes a decision to approve, reject, or
3.6. IMPLEMENTATION
stakeholders.
ensuring that all adjustments are documented and integrated into the
project plans.
documents.
• Regular reports on change status and impact are generated and shared
with stakeholders.
4. AUTHORIZATION
• The Project Manager ensures that all necessary approvals are obtained
review meetings.
©www.pragamticpc.com | [email protected] | Whatsapp: +91-9944254959
CHANGE MANAGEMENT PROCEDURE [TEMPLATE]:
6. COST EFFECTS
• Detailed cost estimates are prepared for each change, and the impact
7. SCHEDULE EFFECTS
8. TREND MEETINGS
changes.
• These meetings ensure that all stakeholders are informed of the status
9. CONTRACT AMENDMENTS
requests.
assessments.
requests.
©www.pragamticpc.com | [email protected] | Whatsapp: +91-9944254959
CHANGE MANAGEMENT PROCEDURE [TEMPLATE]:
change requests.
stakeholders.
improvement.