0% found this document useful (0 votes)
32 views

Permit Requi Rements Checklist

Uploaded by

bexcsla
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
32 views

Permit Requi Rements Checklist

Uploaded by

bexcsla
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 5

Water Permit for Deep Well Installations

Requirements CHECKBOX % COMMENT


1 Duly accomplished water permit form and notices ✘ Ye N 12.50%
Proof of land ownership of legal title to, or right to use the property where the water source is s o
2 situated: (SLUP,FLAGT, PAMB, etc.) ✘ Ye N 12.50%
s o
3 Certificate of Registration from appropriate agencies: (eg. SEC, DTI, etc.) ✘ Ye N 12.50%
Vicinity map/location plan with scale 1:10,000 or 1:50,000, or Google Earth/Map, showing the s o
4 exact location of the point of diversion of water. ✘ Ye N 12.50%
s o
Well Drilling Data (Pumping Test and Well Log Data); if well drilling data is not available,
information on depth of well, casing diameter, static water level and capacity of motor pump duly
5 certified by the applicant ✘ Ye N 12.50%
s o
Brief description of project stating among others, how water will be used, amount of water needed
6 ✘ Ye N 12.50%
s o
7 ECC,CNC or application of ECC and CNC duly received by the DENR office ✘ Ye N 12.50%
Penalty of 1,000 php for drilling the well without authority from the board pursuant to Article 90 s o
8 (j) of P.D. 1067 ✘ Ye N 12.50%
s o
Percentage = 88%
Discharge Permit - LLDA
Requirements CHECKBOX % COMMENT
Y
1 Notarized Application Form ✘ N 10.00% Needs to be notarized
Ye
2 Water Permit of Water Application Form from NWRB if the source of water is from groundwater. o
N 30.00% must apply water permit first
es

Water Treatment Facility Lay-out (with complete specification of the treatment process, duly signed and Y o
3 sealed by a licensed sanitary engineer) s ✘ N 30.00% must install wastewater treatment facility first
e
o
Engineer's Report including the following: project description, area and location, declaration of product s
capacity stating the quantity or volume and the generic name (s) of the product(s) if applicable, nature and
characteristic of applicant’s waste including its chemical composition, total daily volume of discharge of raw
4 waste, treatment process and estimated treatment efficiency, total daily volume of discharge of finally
Y
treated waste or effluent, with attached results of laboratory analysis, signed by a Professional Mechanical
✘ N 30.00% must install wastewater treatment facility first
e
Engineer (PME) o
s

Percentage = 10%
Discharge Permit - EMB
Requirements CHECKBOX % COMMENT
Y
1 Waste Water Line Layout (Duly signed and sealed by a registered sanitary or chemical engineer) ✘ N 10.00% must be signed by an authorized engineer
e
Y
2 Vicinity Map of the Plant (Duly signed and sealed by a registered sanitary or chemical engineer) o
N 10.00% must be signed by an authorized engineer

s
3 Notarized Application
Ye
✘ No 10.00%
Plan and Elevation Layout of Waste Water Treatment Facility with specifications (Duly signed and sealed by
es
Y o
4 a registered sanitary or chemical engineer) s ✘ N 10.00% must install wastewater treatment facility first
e
Y o
5 Environmental Compliance Certificate or Certificate of Non-Coverage ✘ s N 10.00%
eY
6 PCO Accreditation/Appointment Letter oN 10.00%

se
Engineer's Report prepared and signed by a Professional Mechanical Engineer (PME) including: (Project o
Description, Nature & Characteristics of Wastewater, Treatment Process, Total Daily Volume of Water s
Consumption & Final Discharge of Raw Wastewater, Information on Flow Measurement Equipment &
7 Procedure, Name of recieving body of water and its official classification, Environmental Management
Y
System Plan, Statement of the cause incurred in the installation and maintenance of the WTF, Quality &
✘ N 40.00% must install wastewater treatment facility first
e
Quantity of Abstracted Water) o
s

Percentage = 50%
LLDA Clearance
Requirements CHECKBOX % COMMENT
1 Notarized Application Form ✘ Ye N 15.00% Needs to be notarized
2 Environmental Compliance Certificate (ECC)/Certificate of Non-Coverage s o 10.00%
✘ Ye N
3 SEC Articles of Incorporation/Certificate of Business Registration from DTI s
✘ Ye No 10.00%
4 Environmental Impact Assessment, Initial Environmental Examination sYe o 20.00% Request from the client
✘ N
Engineer's Report containing the following information: project area and location, project rationale s o
(purpose of the project particularly environmental enhancement and mitigation purpose),
description of the project phases, project emissions/effluent/ hazardous wastes/solid waste and Ye ✘ N
5 other wastes (quantity if measurable), manpower, environmental management plan (land, water s o 30.00%
and air), project cost
Ye ✘ N
s o
Plans (signed by owner/CEO and Engineer) - Site Development Plan, Vicinity Map, Plant
6 Layout/Floor Plan ✘Ye N 15.00%
s o
Percentage = 50%
Hazardous Waste Generator (HWG) ID
Requirements CHECKBOX % COMMENT
Duly notarized affidavit attesting to the truth, accuracy and genuineness of all information
1 contained and attached in the application ✘ Ye N 15.00% Needs to be notarized
s o
2 Description of existing waste management plan ✘ Ye N 15.00%
3 Pollution Control Officer accreditation certificate ✘
sYe o
N 10.00%
4 Contingency and Emergency Plan ✘
sYe o
N 15.00%
5 Photographs of hazardous waste storage area sYe ✘
o
N 20.00% Hazardous waste storage not provided
6 Official Letter of Request ✘ s
Ye o
N 15.00% Needs to be notarized
7 ECC or CNC ✘ sYe o
N 10.00%
s
Percentage =o 80%