83.koppolu Ongole 57 Lakhs. - TS - BOQ S - 11-3-24

Uploaded by

apgbc.mep
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
31 views275 pages

83.koppolu Ongole 57 Lakhs. - TS - BOQ S - 11-3-24

Uploaded by

apgbc.mep
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 275

Formula for 1000 polypots = W2 x

L/3140
Gives volume in Cubic Meter per
volume 1000 Bags.
Where
6”x10”W (15cm
& L are xwidth length of
25 cm)=15.0 1''= 2.54 cm
EX. Poly Bag in Cms.
Cm x 25.5 Cm =1.827 Cum
1.827 Cum
15 25.50
Bag size 0.001827
3.937 Cum
20.3 30.00
Bag size 0.003937 0.393700
22566.497 Cum
405 432
Bag size 15 x 16 22.566497 2256.649700

Formula for 1000 polypots = W2 x L/3140


Gives volume in Cubic Meter per 1000 Bags.
Where W & L are width length of Poly Bag in Cms.

size Kg/each L in Cm B in Cm 1000 No.s


2.5 4" x 7" 10.00 17.50 0.557 Cum 0.000557
5" x 8" 12.50 20.00 0.995 Cum 0.000995
5" x 9" 12.50 25.00 1.244 Cum 0.001244
4" x 6" 1.00 10.00 15.00 0.478 Cum 0.000478
7" x 8" 2.00 17.50 20.00 1.951 Cum 0.001951
8" x 10" 4.00 20.00 25.00 3.185 Cum 0.003185
8" x 12" 7.00 20.00 30.00 3.822 Cum 0.003822
13" x 13" 10.00 32.50 32.50 10.933 Cum 0.010933
15" x 16" 20.00 37.50 40.00 17.914 Cum 0.017914
18" x 18" 35.00 45.00 45.00 29.021 Cum 0.029021
21" x 21" 50.00 52.50 52.50 46.084 Cum 0.046084
25" x 25" 62.50 62.50 77.752 Cum 0.077752
30" x 30" 75.00 75.00 134.355 Cum 0.134355

Formula As per IS 4923:1997 Page No.4


Hollow Section
Width B 50 mm
Depth D 25 mm
Thickness T 3.2 mm
Area A
4.126 Sqcm
Weight per RMT
3.24 Kg/Rmt
Hollow Section
Width B 25 mm
Depth D 25 mm
Thickness T 3.2 mm
Area A
2.526 Sqcm
Weight per RMT
1.98 Kg/Rmt
Formula As per IS 4923:1997 Page No.4

A.P. Greening & Beautification Corporation -21-22


Raising plantations and landscape development works in ULB wise Red soil (SoR 2021-2022)

Convey
Name of
Name of the Name of Initial ance Total
Sl. No. the Lead Unit
ULB the Source Cost Charge (5+7)
District
s

(1) (2) (3) (4) (4) (5) (6) (7) (8)


Central
Zone
1 Bhimavaram Telikicherla 41.00 250.00 1 Cum 552.00 802.00

2 West Godavari Eluru Bhimadolu 25.00 250.00 1 Cum 348.00 598.00

3 Tadepalligudem Telikicherla 30.00 250.00 1 Cum 420.00 670.00

4 Eluru Gudivada Gollanapalle 63.00 250.00 1 Cum 816.00 1066.00

5 Krishna Gudivada Gollanapalle 57.00 250.00 1 Cum 744.00 994.00

5 NTR District Machlipatnam Bhimadolu 34.00 250.00 1 Cum 468.00 718.00

6 Vijayawada Telikicherla 62.00 250.00 1 Cum 804.00 1054.00

7 Guntur Chilkaluripeta Gudlapalle 60.00 250.00 1 Cum 780.00 1030.00

8 Bapatla Guntur Gannavarm 30.00 250.00 1 Cum 420.00 670.00

9 Palnadu Narasaraopeta Gudlapalle 61.00 250.00 1 Cum 792.00 1042.00

10 Tenali Agiripalle 1 Cum 0.00 0.00

North Zone 54.00 250.00


Patrunivalas 780.00
11 Srikakulam Srikakulam 60.00 250.00 1 Cum 1030.00
a
Patrunivalas 391.20
1 Manyam Srikakulam 28.00 250.00 1 Cum 641.20
a
Kandyamval 588.00
12 Vizianagaram Vizianagaram 44.00 250.00 1 Cum 838.00
asa
Kandyamval 564.00
2 Alluri Sitharama Raju Vizianagaram 42.00 250.00 1 Cum 814.00
asa
13 Visakhapatnam Visakhapatnam Narava 1 Cum 0.00 0.00

3 Anakapalli Visakhapatnam Narava 42.00 250.00 1 Cum 564.00 814.00

14 Kakinada Kakinada Srampalem 60.00 250.00 1 Cum 780.00 1030.00

15 Kona Seema Rajahmahendravaram Pangidi 60.00 250.00 1 Cum 780.00 1030.00

16 East Godavari Rajahmahendravaram Pangidi 48.00 250.00 1 Cum 636.00 886.00

South Zone - 1 60.00 250.00

16 YSR Kadapa Kadapa Dupalagattu 27.00 250.00 1 Cum 376.80 626.80

17 Annamayya Proddatur Neelapuram 27.00 250.00 1 Cum 376.80 626.80

18 Kurnool Kurnool Loddipalli 30.00 250.00 1 Cum 420.00 670.00

19 Nandyal Nandyal Gajulapalle 25.00 250.00 1 Cum 348.00 598.00


Madhavara 420.00
20 Adoni 30.00 250.00 1 Cum 670.00
m
Krishnaredd 0.00
21 Anantapur Anantapur 1 Cum 0.00
y palle
22 Sri Satyasai District Tadipatri Alurukona 24.00 250.00 1 Cum 333.60 583.60

23 Guntakal Kalvakatta 61.00 250.00 1 Cum 792.00 1042.00

24 Hindupuram Konapuram 61.00 250.00 1 Cum 792.00 1042.00

25 Dhramavaram Mamillapalle 27.00 250.00 1 Cum 376.80 626.80

South Zone - 2 27.00 250.00

26 Ongole Errajerla 30.00 250.00 1 Cum 420.00 670.00


Prakasam
1 Ongole Errajerla 25.00 250.00 1 Cum 348.00 598.00

27 SPS Nellore Nellore Dantaluru 61.00 250.00 1 Cum 792.00 1042.00

28 Kavali Musunuru 61.00 250.00 1 Cum 792.00 1042.00

29 Chittoor Chittoor Putalapattu 27.00 250.00 1 Cum 376.80 626.80


Chowdavar 540.00
30 Srikalahasti 40.00 250.00 1 Cum 790.00
am
Srivari 420.00
31 Sri. Balaji Dist Tirupati 30.00 250.00 1 Cum 670.00
mettu
Madanapall 348.00
32 Madanapalle 25.00 250.00 1 Cum 598.00
e
28250.00
average cost 882.8125
SOR: 2022-2023 7/15/2022

( No loading and unloading charges allowed for machinery loading and unloading )

(Lead)
charges
for trucks (Lead)
(Lead)
(Lead) and charges for
charges for
charges for trucks and (Lead)
trucks and tippers for (Lead)
trucks and
tippers for Cement/ tippers per charges for charges for
tippers for cu.meter for trucks and
Rubble/Size Steel/ trucks and
Sl No. Distance Earth / PCC slabs/ tippers per
stones/ Cut RCC Shahabad cu.meter for tippers for
Sand /Gravel
/ Murrum/ Stones/ poles/ AC slabs/ CC & water/ 1000 Bricks
Coarse & GI /1000 nos
Lime/ Surki/ Laterite litres
aggregate sheets/
per cu.meter blocks/
per cu.meter Packed
Wood/ cum
materials/
tonne

1 2 3 4 5 6 7 8
1 Lead up to 1 km 1 36.00 34.70 21.70 51.00 21.90 57.80
2 Lead up to 2 km 2 50.40 48.50 30.30 71.40 30.70 80.90
67.20 64.70 40.40 95.20 40.90 107.80
3 Lead up to 3 km 3
4 Lead up to 4 km 4 81.60 78.60 49.10 115.60 49.70 131.00
5 Lead up to 5 km 5 96.00 92.40 57.80 135.90 58.40 154.10
6 for Every km beyond 5 km up to 30 km 30 14.40 13.90 8.70 20.40 8.80 23.10
7 for Every km beyond 30 km 10000 12.00 11.60 7.20 17.00 7.30 19.30

C. LOADING AND UNLOADING CHARGES BY MANUAL MEANS ( idle


hire charges of trucks are not added)
Rubble/ size
Earth / stone/ cut
Sand /Gravel stone/
Cement in Steel in Bricks
Sl No. Description of item Murrum/ / Coarse
Rs/Tonne Rs/Tonne Rs/1000 Nos.
Surki/ Rs / aggregate,
cum Lime in
Rs/cum

8 Loading 24.90 49.80 82.10 98.50 68.50

9 Unloading 12.45 24.90 82.10 98.50 68.50

D. LOADING AND UNLOADING CHARGES BY MANUAL MEANS (including idle hire


charges of trucks)

Rubble/ size
Earth / stone/ cut
Sand /Gravel stone/
cement in steel in Bricks
Sl No. Description of item Murrum/ / Coarse
Rs/tonne Rs./tonne Rs/1000 Nos.
Surki/ Rs / aggregate,
cum Lime in
Rs/cum

10 Loading 129.90 154.80 197.70 214.00 259.10

11 Unloading 47.30 77.40 197.70 214.00 259.10

E.LOADING AND UNLOADING CHARGES BY MECHANICAL MEANS (including idle hire


charges of trucks)

Rubble/ size
Earth / stone/ cut
Sand /Gravel stone/
Sl No. Description of item Murrum/ / Coarse
Surki/ Rs / aggregate,
cum Lime in
Rs/cum

12 Loading 57.70 114.90

13 Unloading 18.20 18.20


A. (LEAD) CONVEYANCE CHARGES FOR MATERIALS BY
HEAD LOAD FOR THE YEAR:

Earth / Cement / PCC slab/


Sand /Gravel Reinforce- Shahbad
/ Murrum/ ment steel Str slab / CC
Lime/ Surki/ steel block/ BS
Size stone / Rs / tonne slab/ Late-
Cut stone rite /
Rubble / Wood Rs /
Total distance Coarse cum
( Total lead includes initial lead )
Total lead up to 50 m
(covered by item rate) initial lead initial lead initial lead
14 Total lead up to 100 m 75 43.8 95.5
15 Total lead up to 150 m 150 87.5 190.9
WS & SA SoR 2015-16 Page-10

COMMON SoR 2022-2023


Now approved are exclusive of taxes (i.e., VAT, Excise duty & GST). 15-7-7-22

WATER SUPPLY AND SANITARY ITEMS


Sl. SoR
CFMS CODE ITEM Item code Rate Labour Unit
No. Page No.

Supply, laying, jointing 101.60 mm dia


SWG pipe
MAT-01667 360 a) up to 1524mm (5') depth 156 BMW-A.01 419.00 1
MAT-01668 361 b) up to 914.40mm (3') depth 156 BMW-A.02 417.00 1
Supply, laying, jointing 152.40mm dia
SWG pipe
MAT-01669 362 a) up to 1524mm (5') depth 156 BMW-A.03 620.00 1
MAT-01670 363 b) up to 914.40mm (3') depth 156 BMW-A.04 609.00 1
Labour charges for laying , jointing ,
LAB-00411 364 testing SWG pipes up to 914.40mm (3') 156 BMW-A.05 260.00 1
depth
Labour charges for laying , jointing ,
LAB-00412 365 testing SWG pipes up to 1524mm (5') 156 BMW-A.06 323.00 1
depth

MAT-01677 366 Supply of 203.20mm (8") dia SWG pipe 157 BMW-A.17 448.00 1

MAT-01678 367 Supply of 254mm (10") dia SWG pipe 157 BMW-A.18 821.00 1
MAT-01679 368 Supply of 300mm (12") dia SWG pipe 157 BMW-A.19 1183.00 1
MAT-01732 369 150mm x 100mm SWG gully trap 159 BMW-A.72 533.00 1

Inspection chamber 3' dia and upto 3'


MAT-05235 370
depth
160 BMW-B.03 6118.00 1
Inspection chamber 3' dia - 3' above
MAT-05236 371
upto 5' depth
160 BMW-B.04 9557.00 1

Inspection chamber 457.2mm x


MAT-01738 372 457.2mm in brick masonry up to 161 BMW-B.06 3590.00 1
914.4mm ( 3) depth

MAT-01775,
373 75 mm (3") CI Nahany trap 1st quality 164 BMW-C.41,42 302.00 57.00 1
LAB-00163

MAT-01783,
374 Orissa pan 580mmx440mm - ISI marked 175 BMW-D.04,06 1551.00 428.00 1
LAB-00165
MAT-01786 375 Brick masonry seat 176 BMW-D.09 303.00 1
MAT-01787 376 C.C Squatting plate 176 BMW-D.10 90.00 1
MAT-01790,
377 S&F EWC with'S' trap 165 BMW-D.14,15 1889.00 300.00 1
LAB-00168
MAT-01791,
378 S&F Plastic seat and lid for EWC 165 BMW-D.16,17 850.00 87.00 1
LAB-00169
MAT-01798, Flat back Wash hand basin 1st quality
379 166, 167 BMW-D.24,28 1736.00 362.00 1
LAB-00170 550mmx400mm-single CP Pillar cock

MAT-01804, S&F flat back bowl urinal 440 x 265 x


380 167 BMW-D.33,36 898.00 144.00 1
LAB-00173 315
MAT-01806, S&F flat back bowl urinal 590 x 375 x
381 167 BMW-D.35,36 2935.00 144.00 1
LAB-00173 390
WS & SA SoR 2015-16 Page-11

Sl. SoR
CFMS CODE ITEM Item code Rate Labour Unit
No. Page No.

MAT-01807, S & F vitreous china porcelain sink (600


382 167 BMW-D.37,39 4789.00 362.00 1
LAB-00174 x 400 x 250)
MAT-01808, S & F vitreous china porcelain sink (750
383 167 BMW-D.38,39 5371.00 362.00 1
LAB-00174 x 450 x 250)
MAT-01809,
384 S&F RCC terrazo sink 167 BMW-D.40,41 781.00 256.00 1
LAB-00175
WS & SA SoR 2015-16 Page-12

Sl. SoR
CFMS CODE ITEM Item code Rate Labour Unit
No. Page No.

MAT-01812,
385 Angle stop cock 12.70mm heavy duty 168 BMW-E.05,06 453.00 49.00 1
LAB-00178
MAT-01813,
386 12.70mm NP bib tap heavy duty 168 BMW-E.07,08 387.00 33.00 1
LAB-00179
MAT-01814,
387 12.70mm NP bib tap 3 heavy duty 168 BMW-E.09,10 248.00 33.00 1
LAB-00180
MAT-01815,
388 S&F 31.75mm brass plumber union 168 BMW-E.11,12 68.00 16.00 1
LAB-00181

MAT-01826 389 12.7mm dia. NP push cock 169 BMW-E.29 259.00 1

GM peet valves
MAT-01847,
390 a) 15mm NB 170 BMW-F.21,22 604.00 50.00 1
LAB-00197
MAT-01846,
391 b) 20mm NB 170 BMW-F.19,20 812.00 50.00 1
LAB-00196
MAT-01845,
392 c) 25mm NB 170 BMW-F.17,18 1165.00 50.00 1
LAB-00195
MAT-01848,
393 d) 32mm NB 170 BMW-F.23,24 1768.00 43.00 1
LAB-00198
MAT-01849,
394 e) 40mm NB 170 BMW-F.25,26 2389.00 75.00 1
LAB-00199
MAT-01850,
395 f) 50mm NB 170 BMW-F.27,28 3498.00 101.00 1
LAB-00200
MAT-01851,
396 g) 65mm NB 170 BMW-F.29,30 5398.00 5459.00 1
LAB-00201
MAT-01852,
397 h) 80mm NB 170 BMW-F.31,32 7995.00 149.00 1
LAB-00202
S& F Nominal Bore GI pipe Medium
Grade properties & weight
MAT-05243,
398 a) 15mm Nominal bore 172 BMW-F.79,80 199.00 46.00 1
LAB-00233
MAT-05244,
399 b) 20mm Nominal bore 172 BMW-F.81,82 220.00 46.00 1
LAB-00235
MAT-05245,
400 c) 25mm Nominal bore 172, 173 BMW-F.83,84 286.00 46.00 1
LAB-00237
MAT-05246,
401 d) 32mm Nominal bore 173 BMW-F.85,86 398.00 46.00 1
LAB-00239
MAT-05247,
402 e) 40mm Nominal bore 173 BMW-F.87,88 444.00 50.00 1
LAB-00241
MAT-05248,
403 f) 50mm Nominal bore 173 BMW-F.89,90 48.00 76.00 1
LAB-00243
65mm Tata or Zenith make or
MAT-01870 404
equivalent.
184 BMW-F.91 837.00 1

MAT-01875, S & F 12.70 x 152.00 mm NP shower BMW-


405 173 179.00 22.00 1
LAB-00248 rose heavy F.100,101

MAT-01889, Polyetheylene water storage tank with


406 174 BMW-G.01,02 8.50 1.00 1
LAB-00258 Double layer
WS & SA SoR 2015-16 Page-13

Sl. SoR
CFMS CODE ITEM Item code Rate Labour Unit
No. Page No.

31.75mm dia. PVC flexible waste pipe,


MAT-01892 407
914.4mm length
175 BMW-G.05 24.00 1

Supply & fixing of PVC low level system


408
with internal components & short bend

MAT-01895 409 a) 10ltrs capacity single flush 175 BMW-G.08 1390.00 1


MAT-01897 410 b) 8 lts capacity single flush 175 BMW-G.10 786.00 1
Double socket PVC/SWR pipes 4
kgs/sqm
MAT-01898 411 a) 75mm dia. 175 BMW-G.11 236.00 3
MAT-01899 412 b) 90mm dia. 175 BMW-G.12 375.00 3
MAT-01900 413 c) 110mm dia. 175 BMW-G.13 447.00 3
MAT-01919 414 d) 160mm dia. 176 BMW-G.32 1066.00 3
Pipe clip
BMWG.
415 a) 75mm dia. 178 BMW-G.104 15.00 1
104
MAT-01992 416 b) 90mm dia. 178 BMW-G.105 16.00 1
MAT-01993 417 c) 110mm dia. 178 BMW-G.106 17.00 1
MAT-01994 418 d) 160mm dia. 178 BMW-G.107 33.00 1
3" (76.2mm) Nahany multi floor trap with
MAT-02005 419
jali
179 BMW-G.118 93.00 1

MAT-02006 420 4" (101.6mm) multi floor trap with jali 179 BMW-G.119 133.00 1
Labour charges for laying, fixing and
LAB-00259 421
commissioning the PVC pipes
180 BMW-G.152 79.00 1

Chiselling the brick masonry wall and


MAT-02151 422
repairs as directed by the department
184 BMW-I.07 34.00 1

MAT-02158,
423 Cost of NP chain and rubber plug 185 BMW-I.18,19 41.00 7.00 1
LAB-00266
MAT-02159, 25.4mm dia & 609.6mm long aluminium
424 185 BMW-I.20,21 162.00 50.00 1
LAB-00267 anodized towel rod
MAT-02163, S & F NP soap dish heavy type with NP
425 185 BMW-I.28,29 231.00 14.00 1
LAB-00271 screws
MAT-02171,
426 Teak wood blocks 76.2mm x 101.6mm 185 BMW-I.42,43 25.00 11.00 1
LAB-00277
Cutting holes in brick masonry &
LAB-00280 427
repaires labour charges
185 BMW-I.46 54.00 1

Cutting holes in RCC slab floor & repairs


LAB-00281 428
labour charges only
186 BMW- I.47 81.00 1

MAT-02172, 12.70mm PVC connection with brass


429 186 BMW-I.48,49 95.00 19.00 1
LAB-00282 union nut CP coated
Constructing Brick masonry support for
MAT-02180, G.I pipe with CM 304.8x228.6x 228.6
430 186 BMW-I.63,64 76.00 25.00 1
LAB-00290 mm size including plastering finishing etc
complete
MAT-02181, Supplying & fixing 304.8 x 228.6 mm CI
431 186 BMW-I.65,66 122.00 40.00 1
LAB-00291 frame and cover for gully traps
MAT-02206, S&F TV shap mirror with plastic frame
432 187 BMW-I.105,106 502.00 132.00 1
LAB-00306 size 609.60mm x 457.20mm
WS & SA SoR 2015-16 Page-14

Sl. SoR
CFMS CODE ITEM Item code Rate Labour Unit
No. Page No.

Supplying & fixing stainless steel sink


MAT-02213,
433 size 36" x 18" (914.4x457.2mm) 1 mm 188 BMW-I.119,120 7175.00 574.00 1
LAB-00313 thick with accessories
Supplying & fixing stainless steel sink
MAT-02215, size 20" x 18" x 8"
434 188 BMW-I.123,124 5142.00 509.00 1
MAT-02216 (508x457.2x203.20mm) 1 mm thick with
accessories

Supplying & fixing white glazed porcelain


MAT-02217 435
channel 4" x 24" (101.6 x 609.6mm)
188 BMW-I.125 522.00 1

Supplying & fixing steel surgical long


MAT-02218 436 elbow action handle 12.7mm dia bib 188 BMW-I.126 946.00 1
cock
Chrome plated bib cock cum health
MAT-02233 437
faucet jaquar make queen series
189 BMW-I.141 4166.00 1

CPVC Pipes
MAT-02312 438 15.90mm OD pipe - SDR 13.5 195 BMW-I.220 59.00 1
MAT-02313 439 22.20mm OD pipe - SDR 13.5 195 BMW-I.221 94.00 1
MAT-02314 440 28.60mm OD pipe - SDR 13.5 195 BMW-I.222 136.00 1
MAT-02315 441 34.90mm OD pipe - SDR 13.5 195 BMW-I.223 214.00 1
MAT-02316 442 41.30mm OD pipe - SDR 13.5 195 BMW-I.224 295.00 1
MAT-02317 443 54.00mm OD pipe - SDR 13.5 195 BMW-I.225 485.00 1
MAT-02318 444 15.90mm OD pipe - SDR 11 195 BMW-I.226 68.00 1
MAT-02319 445 22.20mm OD pipe - SDR 11 195 BMW-I.227 103.00 1
MAT-02320 446 28.60mm OD pipe - SDR 11 195 BMW-I.228 160.00 1
MAT-02321 447 34.90mm OD pipe - SDR 11 195 BMW-I.229 254.00 1
MAT-02322 448 41.30mm OD pipe - SDR 11 195 BMW-I.230 348.00 1
MAT-02323 449 54.00mm OD pipe - SDR 11 195 BMW-I.231 535.00 1
Buildings SoR
Polished Marble slabs16mm to 20mm
MAT-00781 450
thick marble slab
13 BMT-B.14 1070.00 1

NON SSR ITEMS


451 RCC cover for gully trap 132.00 1

Newly Added item


Part -IV Table
MAT-07652
452 110 mm Dia 6 Kgs/cm2 81 No. 20 & Item 339.00 43.00 1
LAB-00606 no 12.b
Part -IV Table
MAT-07650
453 75 mm Dia 6 Kgs/cm2 81 No. 20 & Item 162.00 43.00 1
LAB-00606 no 12.b
Part -IV Table
MAT-07648
454 50 mm Dia 6 Kgs/cm2 81 No. 20 & Item 74.00 43.00 1
LAB-00606 no 12.b
Part -IV Table
MAT-07665
455 25 mm Dia 10 Kgs/cm2 81 No. 20 & Item 35.00 39.00 1
LAB-00609 no.50 mm

MAT-02496 456 25mm PPR Ball Valve 203 BMW-I.404 215.00 1


WS & SA SoR 2015-16 Page-15

Sl. SoR
CFMS CODE ITEM Item code Rate Labour Unit
No. Page No.

MAT-02499 457 50mm PPR Ball Valve 203 BMW-I.407 540.00 1


MAT-02501 458 75mm PPR Ball Valve 203 BMW-I.409 1437.00 1
Gunmetal (GM) Ball valve with SS Ball
and SS Spindle
MAT-01864,
459 a) 15mm NB 171 BMW-F.55,56 456.00 61.00 1
LAB-00214
MAT-01865,
460 b) 20mm NB 171 BMW-F.57,58 592.00 61.00 1
LAB-00215
MAT-01866,
461 c) 25mm NB 171 BMW-F.59,60 864.00 61.00 1
LAB-00216
CPVC Pipes
MAT-02321 462 34.90mm ODPipe - SDR 11 195 BMW-I.229 254.00 1
MAT-02322 463 41.30mm ODPipe - SDR 11 195 BMW-I.230 348.00 1
MAT-02323 464 54mm ODPipe - SDR 11 195 BMW-I.231 535.00 1
WS & SA SoR 2015-16 Page-16

COMMON SoR 2022-2023


usive of taxes (i.e., VAT, Excise duty & GST). 15-7-7-22

R SUPPLY AND SANITARY ITEMS

Unit

RM
RM

RM
RM

RM

RM

RM

RM
RM
Each

Each

Each

Each

Each

Each

Each
Each

Each

Each

Each

Each

Each
WS & SA SoR 2015-16 Page-17

Unit

Each

Each

Each
WS & SA SoR 2015-16 Page-18

Unit

Each

Each

Each

Each

Each

Each

Each

Each

Each

Each

Each

Each

Each

RM

RM

RM

RM

RM

RM

RM

Each

Lt
WS & SA SoR 2015-16 Page-19

Unit

Each

Each
Each

RM
RM
RM
RM

Each

Each
Each
Each

Each

Each

RM

RM

Each

Each

Each

Each

Each

Each

Each

Each

Each

Each
WS & SA SoR 2015-16 Page-20

Unit

Each

Each

Each

Each

Each

RM
RM
RM
RM
RM
RM
RM
RM
RM
RM
RM
RM

sqm

Each

RM

RM

RM

RM

each
WS & SA SoR 2015-16 Page-21

Unit

each
each

Each

Each

Each

RM
RM
RM
WS & SA SoR 2015-16 Page-10

COMMON SoR 2022-2023


Now approved are exclusive of taxes (i.e., VAT, Excise dut

ELECTRICAL AND
ELECTRO-MECHANICAL W
SoR
Sl. CFMS
ITEM Page Item code
No. CODE
No.

Supply and Transportation of XLPE/PVC insulated & PVC


466 MAT-03496 68 ELEC-4.1.6.k
sheathed armoured cables 4C x 4 sq.mm

Supply and Transportation of XLPE/PVC insulated & PVC


465 MAT- 03497 68 ELEC-4.1.6.I
sheathed armoured cables 4C x 6 sq.mm

SWAGED / OCTAGONAL POLES AND GARDEN POSTS

Fabrication, supply and transportation of all sizes


swaged poles up to site confirming to IS 2713 / 1980
MAT- specifications. The pole should be painted with
467 106 ELEC-6.1.1
03928 primary coat of red oxide and black bituminous paint
up to ground level with base plate, including cost of all
materials etc., complete.(Rate per K. G)
Fabrication and Supply of M.S. Poles for garden posts
with 'B' class 60.25mm outer dia with base plate and
MAT-
468 suitable pole cap including cost and conveyance of all 106 ELEC-6.1.2
03929
material including fixing of luminaire and labour
charges etc., complete. (Rate per K. G)

MAT- Supply of different sizes of M. S. Pipe brackets (Rate


469 106 ELEC-6.1.3
03930 per K.G)
Galvanized Octogonal Pole
MAT- Fabrication, Transportation and supply of hot-dip galvanized
470 136 ELEC-6.1.4
03931 Octogonal Pole for 7.5 Mtrs height
MAT- Fabrication, Transportation and supply of hot-dip galvanized
471 137 ELEC-6.1.5
03932 Octogonal Pole for 9 Mtrs height
MAT- Fabrication, Transportation and supply of hot-dip galvanized
472 137 ELEC-6.1.6
03933 Octogonal Pole for 10 Mtrs height
MAT- Fabrication, Transportation and supply of hot-dip galvanized
473 137 ELEC-6.1.7
03934 Octogonal Pole for 12 Mtrs height
POLE BRACKETS
Fabrication, Transportation and supply of 1.0 Mtr Length
MAT-
474 Single Arm Bracket made with MS galvanized 139 ELEC-6.1.11
03938
40mm / 50mm dia Pipe.
Fabrication, Transportation and supply of 1.5 Mtr Length
MAT-
475 Single Arm Bracket made with MS galvanized 303 ELEC-6.1.12
03939
40mm / 50mm dia Pipe.
Fabrication, Transportation and supply of 1.0 Mtr Length
MAT-
476 Double Arm Bracket made with MS galvanized 303 ELEC-6.1.13
03940
40mm / 50mm dia Pipe.
Fabrication, Transportation and supply of 1.5 Mtr Length
477 Double Arm Bracket made with MS galvanized 303 ELEC-6.1.14
40mm / 50mm dia Pipe.
WS & SA SoR 2015-16 Page-11

SoR
Sl. CFMS
ITEM Page Item code
No. CODE
No.

Foundation and erection charges with special T&P, for


7.50 Mtrs long Octagonal /Conical pole duly erecting
on base plate duly providing 4 Nos foundation bolts
with nuts with providing of 0.45Mtr x 0.45Mtrs x1.20
MAT- Mtr size M20 cc work vibrated concreting mixing with
478 308 ELEC-6.1.31
03961 necessary steel (10kgs) reinforcement and curing for 7
days as directed by the field engineers during
execution including excavation of Earth/BT all labour
charges and cost and conveyance of materials
etc.complete.

Foundation and erection charges with special T&P, for


9.00Mtrs / 10Mtrs long Octagonal / Conical pole duly
erecting on base plate duly providing 4 Nos foundation
bolts with nuts with providing of 0.60Mtr x 0.60Mtrs x
MAT- 1.40 Mtr size M20 cc work vibrated concreting mixing
479 308 ELEC-6.1.32
03962 with necessary steel (15kgs) reinforcement and curing
for 7 days as directed by the field engineers during
execution including excavation of Earth/BT all labour
charges and
cost and conveyance of materials etc.complete

HIGH MAST POLES


Fabrication, transportation and supply of 12 Mtrs
Polygon High Mast with single section of 3mm thick of
Bottom 360mm and Top 150mm dia with BSEN -
MAT-
480 10025 grade S 355 JO steel plate for shaft, IS 2062 for 305 ELEC-6.1.21
03948
base plate, having a base plate of size 520mm dia
16mm thick with its accessories. Mast shall be in single
section for 12 Mtrs

Earth work exacavation with a approximate quantity of


4.0 Cum for errection of 12 Mtrs high mast and refilling
with a quantity of 0.53 Cum of PCC 1:4:8, 1.50 Cum M
MAT- 20 grade concrete and (80 Kgs) reinforced steel of
481 307 ELEC-6.1.26
03953 12mm / 10mm / 8mm, Soil bearing capacity of 10
T/Sqm, Anchor plate with cost and conveyance of all
above materials including labour charges for errection
of High Mast and Carraige etc complete.
FEEDER PILLAR BOXES
Supply and fixing of suitable out door type feeder piller box
made with 14 SWG CRCA sheet after 7 tank process
including S & F 40-63A FP MCB, 6 Nos SP MCB's, din chanel,
MAT-
482 bus bars, 6 Sqmm 3 core copper cable for internal wiring, 306 ELEC-6.1.24
03951
contactor, connectors and provision for energy
meter etc., complete for finished item of work..
FP MCBmake :Legrand / Schnieder / L&T
WS & SA SoR 2015-16 Page-12

SoR
Sl. CFMS
ITEM Page Item code
No. CODE
No.

Supply Installation Testing and commissioning of free


standing floor mounted dust and vermin proof
compartmentalised cubical panel made out of CRCA
sheet, required hardware, duly painted by two coats of
zinc/red oxide primer followed by Powder coated /
epoxy / PU painted with phosphatisation in grey or
required shade after rinsing. The panel having
PU/Neoprene rubber gasket of not less than 3mm
thickness,separate detachable, gland plate M.S. base
MAT-
483 channel, hinged door with locking arrangement for 310 ELEC-6.2.1
03976
equipment/switchgear. Thickness of sheet shall not be
less than 1.6mm up to 600mm length/width of any
compartment and be of 2.0mm above 600mm. Load
bearing structure shall be of 2.0mm thick sheet
supported by base M.S. channel if required. Side walls
and cable alley compartments having bolted type
doors with detachable extension type structure (only
outer area on all sides shall be measured and panel to
be abricated from CPRI approved fabricator).

GRP POLES
Supply and transportation of following glass reinforced
polymer (GRP) composite
type Conical pole with single arm bracket of length 1Mtr and
internal junction box
including labour charges etc., complete.

3.00 Mtrs height, Bottom dia 143mm, Top


MAT-
484 76mm, AV thickness 6mm and to withstand maximum 114 ELEC-6.1.34
03964
wind velocity 180Km/Hr
4.00 Mtrs height, Bottom dia 143mm, Top
MAT-
485 76mm, AV thickness 6mm and to withstand maximum 114
03965
wind velocity 180Km/Hr
6.00 Mtrs height, Bottom dia 143mm, Top
MAT-
486 76mm, AV thickness 6mm and to withstand maximum 114
03966
wind velocity 180Km/Hr
base bracket suitable for glass reinforced
polymer GRP)
Supply and transportation of base bracket suitable for glass
reinforced
polymer (GRP) composite type pole including labour charges
487
etc.,
complete.including labour charges etc., complete.
Makes: Bajaj / Kemrock / Valmont/Sumip / Helipole
MAT-
488 For 3.00 Mtrs Pole 114 ELEC-6.1.35
03970
MAT-
489 For 4.00 Mtrs Pole 115 ELEC-6.1.35
03971
MAT-
490 For 6.00 Mtrs Pole 115 ELEC-6.1.35
03972
LED STREET LIGHTS
MAT-
491 Supply and transportation of 20 W. LED Street light 256 ELEC-3.8.23
03360

MAT-
492 Supply and transportation of 30 W. LED Street light 256 ELEC-3.8.23
03361
WS & SA SoR 2015-16 Page-13

SoR
Sl. CFMS
ITEM Page Item code
No. CODE
No.

MAT-
493 Supply and transportation of 45 W. LED Street light 256 ELEC-3.8.23
03362

MAT-
494 Supply and transportation of 60 W. LED Street light 256 ELEC-3.8.23
03363

495 MAT-03364 Supply and transportation of 90 W. LED Street light 257 ELEC-3.8.24

496 MAT-03365 Supply and transportation of 120 W. LED Street light 257 ELEC-3.8.24

497 MAT-03366 Supply and transportation of 150 W. LED Street light 257 ELEC-3.8.24

498 MAT-03367 Supply and transportation of 180 W. LED Street light 257 ELEC-3.8.24

499 MAT-03368 Supply and transportation of 210 W. LED Street light 257 ELEC-3.8.24

500 MAT-03369 Supply and transportation of 20 W. LED Street light 256 ELEC-3.8.25

501 MAT-03370 Supply and transportation of 30 W. LED Street light 256 ELEC-3.8.25

502 MAT-03371 Supply and transportation of 45 W. LED Street light 256 ELEC-3.8.25

503 MAT-03372 Supply and transportation of 60 W. LED Street light 256 ELEC-3.8.25

504 MAT-03373 Supply and transportation of 90 W. LED Street light 257 ELEC-3.8.25

505 MAT-03374 Supply and transportation of 120 W. LED Street light 257 ELEC-3.8.25

506 MAT-03375 Supply and transportation of 150 W. LED Street light 257 ELEC-3.8.25

507 MAT-03376 Supply and transportation of 180 W. LED Street light 257 ELEC-3.8.25

508 MAT-03377 Supply and transportation of 210 W. LED Street light 257 ELEC-3.8.25

FLOOD LIGHTS

509 MAT-03384 Supply and transportation of 50/60. LED Flood light 259 ELEC-3.8.27

510 MAT-03385 Supply and transportation of 90/100. LED Flood light 259 ELEC-3.8.27

511 MAT-03386 Supply and transportation of 120 LED Flood light 259 ELEC-3.8.27

512 MAT-03387 Supply and transportation of 150. LED Flood light 259 ELEC-3.8.27

513 MAT-03388 Supply and transportation of 200. LED Flood light 259 ELEC-3.8.27
WS & SA SoR 2015-16 Page-14

SoR
Sl. CFMS
ITEM Page Item code
No. CODE
No.
112
SHEATHED FLEXIBLE COPPER CABLES
Supply of Single Core 25 Sqmm PVC insulated and
514 MAT-05466 sheathed FRLS copper round cable for voltage up to 1100V 218 ELEC-1.5.4
as per IS 694/1990.
Supply of Single Core 35 Sqmm PVC insulated and
515 MAT-05467 sheathed FRLS copper round cable for voltage up to 1100V 218 ELEC-1.5.4
as per IS 694/1990.
Supply of Single Core 50 Sqmm PVC insulated and
516 MAT-05468 sheathed FRLS copper round cable for voltage up to 1100V 218 ELEC-1.5.4
as per IS 694/1990.
Supply of Single Core 70 Sqmm PVC insulated and
517 MAT-05469 sheathed FRLS copper round cable for voltage up to 1100V 218 ELEC-1.5.4
as per IS 694/1990.

Supply of 2 core 1.5 Sqmm PVC insulated and sheathed


MAT-
518 FRLS copper round cable for voltage up to 1100V as per IS 218 ELEC-1.5.4
02769
694/1990.
Supply of 2 core 2.5 Sqmm PVC insulated and sheathed
MAT-
519 FRLS copper round cable for voltage up to 1100V as per IS 218 ELEC-1.5.4
02770
694/1990.
Supply of 3 core 1.5 Sqmm PVC insulated and sheathed
MAT-
520 FRLS copper round cable for voltage up to 1100V as per IS 218 ELEC-1.5.4
02772
694/1990.
Supply of 3 core 2.5 Sqmm PVC insulated and sheathed
MAT-
521 FRLS copper round cable for voltage up to 1100V as per IS 218 ELEC-1.5.4
02773
694/1990.
Supply of 3 core 4 Sqmm PVC insulated and sheathed FRLS
MAT-
522 copper round cable for voltage up to 1100V as per IS 218 ELEC-1.5.4
02774
694/1990.
Supply of 4 core 2.5 Sqmm PVC insulated and sheathed
MAT-
523 FRLS copper round cable for voltage up to 1100V as per IS 218 ELEC-1.5.4
02776
694/1990.
Supply of 4 core 4.0 Sqmm PVC insulated and sheathed
MAT-
524 FRLS copper round cable for voltage up to 1100V as per IS 218 ELEC-1.5.4
02777
694/1990.
EARTH CONDUCTORS
Supply and laying of following sizes Earth wire/Strip in
horizontal /Vertical run in Ground/surface/Recess including,
525 332 ELEC-6.7.6
revitting,soldering,saddles,making connection
etc as required 8 SWG Copper wire(0.1155Kgs/1Mtr)
MCBs (AS PER IS:60898-1:2002)

Supply of 6-32A SP MCB 10KA C/D Curve ISI Mark.


MAT-
526 Makes: Legrand-DX3 / Schneider-Acti9/Hager-h3/ Siemens- 234 ELEC-2.10.1
03070
5SX4/ Crabtree- Xpro/L&T-AU/Indo Asian-Opti pro

Supply of 40-63A SP MCB 10KA C/D Curve ISI Mark.


MAT-
527 Makes: Legrand-DX3 / Schneider-Acti9/Hager-h3/ Siemens- 234 ELEC-2.10.1
03073
5SX4/ Crabtree- Xpro/L&T-AU/Indo Asian-Opti pro

Independent earthing
G I pipe 40 mm dia B class Part I-Basic
528 MAT-00036 565
rate Item 35
WS & SA SoR 2015-16 Page-15

SoR
Sl. CFMS
ITEM Page Item code
No. CODE
No.
MAT- 25mm x 6mm GI Flat (1.18Kgs/1Mtr)
529 565 ELEC-6.7.6 . I
04151
MAT- Drilling of 12mm dia holes [ 4+16=20]
530 565 ELEC-8.4.20
04295
MAT- G.I Nuts, Bolts and Washers
531 565 ELEC-8.4.21
04296
MAT- 450mm x 50 mm (18" dia 2" )thick hume pipe ring
532 565 ELEC-8.4.22
04297
MAT- Hard coke
533 565 ELEC-8.1.10
04232
MAT- Salt
534 565 ELEC-8.1.11
04233
Supply of Automatic Street Light Control System 5 KW
with Optical Micro Sensor, Low volatage / High voltage
MAT- trip and reset, operating voltage 150 - 280V AC per
535 565 ELEC-3.5.2
03258 Phase, 50 HZ with suitable SMC enclousure of IP 54
protection, MCBs and contactor suitable to control the
load of of Three phase load with necessary clamping
thermo plastic cable junction boxes

Supply of 155 X 210 X 92 MM Size thermo plastic cable


junction boxes with IP66/67 weather proof, for outdoor
536 MAT-03956 installation with konckouts for cable entry including terminals 534 ELEC-6.1.29
etc.,

Supply of 205 X 255 X 112 MM Size thermo plastic cable


junction boxes with IP66/67 weather proof, for outdoor
537 MAT-03957 installation with konckouts for cable entry including terminals 534 ELEC-6.1.29
etc.,

Supply and making end termination with heavy Alluminium


538
MAT- lugs up to 16 sqmm (pin/ ring type) as per IS specification
493 ELEC-4.1.13
03560 duly crimped with crimping tool, PVC tape
etc

XLPE/PVC insulated & PVC sheathed unarmoured control


cables
Supply and Transportation of XLPE/PVC insulated & PVC
MAT- sheathed unarmoured control cables of 1.1 KV grade with
539 488 ELEC-4.1.5 b
03466 copper conductor as per IS 7098 Part-I -1988 etc complete 3C
x 1.5 sq.mm
Supply and Transportation of XLPE/PVC insulated & PVC
MAT- sheathed unarmoured control cables of 1.1 KV grade with
540 488 ELEC-4.1.5.L
03477 copper conductor as per IS 7098 Part-I -1988 etc complete 3C
x 2.5 sq.mm

PVC insulated and sheathed FRLS copper round cable

Supply of ……...PVC insulated and sheathed FRLS copper


MAT-
541 round cablefor voltage up to 1100V as per IS 694/1990. 3C x 437 ELEC-1.5.5.m
02783
4 sq.mm
WS & SA SoR 2015-16 Page-16

SoR
Sl. CFMS
ITEM Page Item code
No. CODE
No.

Supply of ……...PVC insulated and sheathed FRLS copper


MAT-
542 round cablefor voltage up to 1100V as per IS 694/1990. 4C x 437 ELEC-1.5.5.t
05489
6 sq.mm

543

544 MAT-00047 J- Bolts 30 cm long 20 Part-I (46)


WS & SA SoR 2015-16 Page-17

COMMON SoR 2022-2023


ve of taxes (i.e., VAT, Excise duty & GST). 15-7-7-22

ELECTRICAL AND
ELECTRO-MECHANICAL WORKS

Rate Labour Unit

Make: Torrent / Universal / Unicab / Havells / KEI


288.00 /Polycab/Gloster/Orbit/ Paragon/RR 1 RM
Kabel/RPG/Rhino/Pawancab/LS cable
Make: Torrent / Universal / Unicab / Havells / KEI
412.00 /Polycab/Gloster/Orbit/ Paragon/RR 1 RM
Kabel/RPG/Rhino/Pawancab/LS cable

82.00 1 Kg

74.00 1 Kg

74.00 1 Kg

Makes: Bajaj / Valmont/Laasma/Transrail/Utkarsh/


13,842.00 1 Each
Skipper/Consoul
Makes: Bajaj / Valmont/Laasma/Transrail/Utkarsh/
20,009.00 1 Each
Skipper/Consoul
Makes: Bajaj / Valmont/Laasma/Transrail/Utkarsh/
21,998.00 1 Each
Skipper/Consoul
Makes: Bajaj / Valmont/Laasma//Transrail/Utkarsh/
31,779.00 1 Each
Skipper/Consoul

Makes: Bajaj / Valmont/Laasma /Transrail/Utkarsh/


1,530.00 1 Each
Skipper/Consoul

Makes: Bajaj / Valmont/Laasma /Transrail/Utkarsh/


2,024.00 1 Each
Skipper/Consoul

Makes: Bajaj / Valmont/Laasma /Transrail/Utkarsh/


1,895.00 1 Each
Skipper/Consoul

delete 1 Each
WS & SA SoR 2015-16 Page-18

Rate Labour Unit

5,821.00 1 job

7,841.00 1 job

Makes: Bajaj / Valmont/Laasma/Transrail/Utkarsh/


123,585.00 1 Each
Skipper/Consoul

33,739.00 1 Each

21,539.00 FP MCB make :Legrand / Schnieder / L&T 1 Each


WS & SA SoR 2015-16 Page-19

Rate Labour Unit

5,320.00 1 sqm

Makes: Bajaj / Kemrock / Valmont/Sumip / Helipole

10,005.00 1 Each

12,712.00 1 Each

15,890.00 1 Each

Makes: Bajaj / Kemrock / Valmont/Sumip / Helipole

1,824.00 1 Each

1,824.00 1 Each

2,177.00 1 Each

1,822.00 1 Each
a) LUMINAIRE MAKE : Wipro(Skyline) / Philips (Green
line) /GE-Venture / Crompton(Neo Series) / Bajaj
2,852.00 (Edge) /Halonix(Lumos - Super) / Havells (Endura 1 Each
Series)/Capart(Premium)/Greenlites(Hi-Lux)/Polycab/Kes
elec/HPL(City Vision)/Jaquar (Premium)/Eveready/
Surya (Pollux) / FortuneArrt (Leaf)
b) LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA
/OSRAM / SAMSUNG / LG
WS & SA SoR 2015-16 Page-20

a) LUMINAIRE MAKE : Wipro(Skyline) / Philips (Green


line) /GE-Venture / Crompton(Neo Series) / Bajaj
Rate Labour
(Edge) /Halonix(Lumos - Super) / Havells (Endura
Unit
Series)/Capart(Premium)/Greenlites(Hi-Lux)/Polycab/Kes
elec/HPL(City Vision)/Jaquar (Premium)/Eveready/
4,324.00 Surya (Pollux) / FortuneArrt (Leaf) 1 Each
b) LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA
/OSRAM / SAMSUNG / LG
5,428.00 1 Each

8,464.00 1 Each
a) Luminaire Make : Wipro(Skyline) / Philips (Greenline
10,948.00 Extra) /GE- Venture / Crompton(Nexus / Hawk series) / 1 Each
Bajaj (Edge)/ Halonix (Modular/ Lumos-Super) / Havells
(EnduraSeries)/Greenlites(HILux)/Capart
12,650.00 1 Each
(Premium)/Polycab/Keselec/ HPL(City Vision)/Jaquar
(Premium) /Eveready /Surya (Pollux) / Fortune Art (Leaf)
14,260.00 b) LED MAKE :PHILIPS LUMILEDS / CREE / NICHIA / 1 Each
OSRAM / SAMSUNG / LG.
18,400.00 1 Each

1,702.00 1 Each

2,650.00 1 Each

4,140.00 1 Each
a) LUMINAIRE Makes: Syska / GM / C&S/ VIN/Gold
5,152.00 Medal 1 Each
/Pharox / Cosmo / Enrich/Pro-lite(I) / Renesola /
8,004.00 Stanjo /Goldwyn/ Ib LED/ Orbit/ Luker/Trinic/Rhino / GLO 1 Each
LED/ Vimal
9,660.00 b) LED MAKE : CREE / NICHIA / OSRAM / SAMSUNG / 1 Each
LG.
11,592.00 1 Each

13,248.00 1 Each

16,146.00 1 Each

5,382.00 1 Each
a) LUMINAIRE MAKE : Wipro / Philips/ GE-Venture /
9,522.00 Crompton/ Bajaj/Greenlites / Havells/Capart(Premium) 1 Each
/Halonix/ Polycab/Keselec/HPL/Jaquar/Eveready / Surya
12,337.00 (Lumasmax / O Flood)/ FortuneArrt (Fin) 1 Each

14,490.00 b) LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA 1 Each


/OSRAM / SAMSUNG.
17,388.00 1 Each
WS & SA SoR 2015-16 Page-21

Rate Labour Unit

288.00 1 Rmt

406.00 1 Rmt

576.00 1 Rmt

785.00 1 Rmt

59.00 1 Rmt

Makes: Finolex / RR kabel / Havells /KEI/Polycab/


92.00 Gloster/Goldmedal/GM 1 Rmt

79.00 1 Rmt

131.00 1 Rmt

183.00 1 Rmt

164.00 1 Rmt

249.00 1 Rmt

86.00 1 Rmt

Makes: Legrand-DX3 / Schneider-A9/Hager-h3/


Siemens- 5SX4/ Havells STADx /L&T-AU/Indo Asian-
240.00 Opti pro/ HPL (Techno) 1 Each

506.00 1 Each

1 Rm
248.00
WS & SA SoR 2015-16 Page-22

Rate Labour Unit

1 Rm
91.00

1 no
8.00

1 set
14.00

1 no
303.00

1 kg
24.00

19.00 1 kg

Make: Swadeep Nature Switch / Light Mate


/GL/Bajaj
16,280.00 1 Each

1,893.00
Make : Hensel/Sadhrish 1 Each

2,754.00
Make : Hensel/Sadhrish 1 Each

12.00
Makes:Dowels/Jainson/Comet 1 Each

Make: Torrent / Universal / Unicab / Havells / KEI


124.00 /Polycab/Gloster /orbit 1 RM
/ Paragon/ RR Kabel/ RPG/ Pawancab/LS cable

Make: Torrent / Universal / Unicab / Havells / KEI


150.00 /Polycab/Gloster /orbit 1 RM
/ Paragon/ RR Kabel/ RPG

Make: Torrent / Universal / Unicab / Havells / KEI


157.00 1 RM
/Polycab/Gloster /orbit / Paragon/ RR Kabel/ RPG
WS & SA SoR 2015-16 Page-23

Rate Labour Unit

Makes: V-Guard/Bonton /Finecab/ HPL / Million /


FortuneArt /Sudhakar/Orbit/ Tamra/Anchor /Plaza/
340.00 1 RM
Vihan/Spykaar/ Ollvin/Laser/Beljin/Rhino/ Standard/
Vimal

45.00 1 Each
Item Qty Cement

Total ks of Total bags of


Coefficent / cum
cement cement

PCC 30.00 160 4800 96


M25 Concrete 380 0 0
Brick Masonry 115.00 36 4140 82.8
Plastering 20mm Single Coat 226.00 6.048 1366.848 27.33696
Plastering 12mm Single Coat 305.00 4.32 1317.6 26.352
Flooring with Tandur / Shabad 95.00 7.456 708.32 14.1664
Steel 4000
Painting 425.00

Unite rate Amount


Cement 247 300 74100
Sand 47 2000 94000
Aggregate 27 1300 35100
Steel 4000 60 240000
Bricks 58880 6 353280
Flooring with Tandur / Shabad 11 2500 27500
Paint 85 60 5100
829,080.00
300,000.00
174150.00
1,303,230.00

As per BQS
Item Qty Cement

Total ks of Total bags of


Coefficent / cum
cement cement

PCC 86.62 160 13859.2 277.184


M25 Concrete 3775.485 380 1434684.3 28693.686
Brick Masonry 151.03 36 5437.08 108.7416
RR Masonry 79.16 59.4 4702.104 94.04208
Plastering 20mm Single Coat 6.048 0 0
Plastering 20mm two coats 86.62 5.76 498.9312 9.978624
Plastering 12mm Single Coat 36.00 4.32 155.52 3.1104
Plastering 12mm two coats 1261.06 4.08 5145.1248 102.902496
Flooring with Granite 632.51 7.50 4743.825 94.8765
Flooring with Cobblestone 1115.00 30.60 34119 682.38
Flooring with Rough black Kadapa
slabs 39.00 3.12 121.68 2.4336
Flooring with polished Tandur /
Shabad 20.80 7.46 155.168 3.10336
Steel 3270.00
Painting 0.00

Unite rate Amount


Cement 30073 bags 300 9,021,900.00
Sand 1829 2000 3,658,000.00
Aggregate 3476 1300 4,518,800.00
Steel 3270 60 196,200.00
Bricks 77327.36 6 463,964.16
RR Masonry 87.076 6 522.46
Flooring with Tandur / Shabad 6 2500 15,000.00
Paint 0 60 0
17,874,386.62
300,000.00
0.00
18,174,386.62
Sand Aggregate

Total ks Total ks
Coefficent / Coefficen
of sand in of sand in
cum t / cum
cum cum
0.45 13.5 0.9 27
0.45 0 0.9 0
0.2 23.0 512 58880 36.5
0.021 4.746 0 13.035714286
0.015 4.575 0
0.012 1.14 1.05 1073.31
4000 4000
0.2 85

laber
Unforeseen items door, w, v, wc, etc.,

Sand Aggregate

Total ks Total ks
Coefficent / Coefficen
of sand in of sand in
cum t / cum
cum cum
0.45 38.979 0.9 77.958
0.45 1698.968 0.9 3397.937
0.2 30.206 512 77327.36
0.33 26.1228 1.10 87.076
0.022 0 0
0.022 1.90564 0
0.015 0.54 0
0.015 18.9159 0
0.020 12.6502 1.05 632.51
0.065 72.475 1.05 1115.00 117,075.00

0.0140 0.546 1.05 40.95

0.0120 0.2496 1.1 22.88


3270 3270
0.2 0

17,874,386.62
laber
Unforeseen items door, w, v, wc, etc.,
18,174,386.62
GOVERNMENT OF ANDHRA PRADESH
A.P. GREENING AND BEAUTIFICATION CORPORATION, VIJAYAWADA
Rammavarapppadu Ring Road to Gannavaram Airport Project
Dt: 01.07.2022

Approx. Lowest Rate


Sl. Name of the plant Bag size Lowest Rate
Height of Quoted Firm
No Quoted
the plant (Sl. No.)

9 10

A PALM & CYCADS

1 ft clear
1 Bismarckia nobilis 21'' X 21'' 520.00 2
trunk
1 ft clear
2 Cycus revoulta 18'' X 18'' 450.00 5
trunk
3 Dypsis lutescens 18'' X 18'' 5' to 6' 232.00 3
25'' X 25'' 5' to 6' clear
4 Livistona rotundifolia 7650.00 1
trunk
5 Veitchia merrillii Green 18'' X 18'' 3' to 4 ' 300.00 2
6 Wodyetia bifurcata 18'' X 18'' 4' to 5' 390.00 5

B TOPIARY

7 Bougainvillea cones Pots 5' to 6' 7640.00 3


8 Bougainvillea ball 18'' X 18'' 3' 325.00 6
9 Ficus panda ball 18'' X 18'' 2' 225.00 6, 7
10 Ficus blakeana topiary 18'' X 18'' 3' to 4 ' 225.00 6, 7

C TREES

11 Plumeria rubra red 18'' X 18'' 2' to 3' 375.00 7


12 Plumeria obtusa alba 18'' X 18'' 2' to 3' 350.00 7
13 Plumeria acutifolia alba 18'' X 18'' 2' to 3' 412.00 1
14 Plumeria singapore dwarf 18'' X 18'' 2' to 3' 375.00 7
15 Azadirachta indica 18'' X 18'' 5' to 6' 170.00 6
16 Anthocephalus cadamba 18'' X 18'' 5' to 6' 160.00 5
17 Butea monosperma 18'' X 18'' 4' to 5' 170.00 6
18 Millingtonia hortensis 18'' X 18'' 5' to 6' 160.00 5
19 Nyctanthes arbor-tristis 18'' X 18'' 5' to 6' 165.00 7
20 Phyllanthus emblica 18'' X 18'' 5' to 6' 170.00 6
Dt: 01.07.2022

Approx. Lowest Rate


Sl. Name of the plant Bag size Lowest Rate
Height of Quoted Firm
No Quoted
the plant (Sl. No.)

9 10
21 Pisonia alba 18'' X 18'' 5' to 6' 170.00 6
22 Phyllanthus emblica 18'' X 18'' 5' to 6' 170.00 6
23 Syzygium cumini 18'' X 18'' 5' to 6' 170.00 6
24 Terminalia mantaly 18'' X 18'' 5' to 6' 250.00 6
25 Tabebuia avellanedae 18'' X 18'' 5' to 6' 170.00 6

D SHRUBS

26 Acalypha inferna 7'' x 8'' 1' to 1' 6'' 14.00 6


27 Acalypha green dwarf variegated 7'' x 8'' 1' to 1' 6'' 14.00 6
28 Bougainvillea formosa 7'' x 8'' 1' to 1' 6'' 25.00 5
29 Bougainvillea tamota red 7'' x 8'' 1' to 1' 6'' 25.00 5
30 Bougainvillea subra 7'' x 8'' 1' to 1' 6'' 30.00 5
31 Bougainville torch glow 7'' x 8'' 1' to 1' 6'' 25.00 5
32 Bougainvillea glabra 7'' x 8'' 1' to 1' 6'' 30.00 5
33 Bougainvillea thimma 7'' x 8'' 1' to 1' 6'' 30.00 5
34 Bougainvillea light pink 7'' x 8'' 1' to 1' 6'' 30.00 5
35 Duranta gold 7'' x 8'' 1' to 1' 6'' 14.00 6
36 Euphorbia milii 7'' x 8'' 1' to 1' 6'' 20.00 2, 4, 6
37 Ixora Red dwarf 7'' x 8'' 1' to 1' 6'' 15.00 6
38 Ixora chinensis red 7'' x 8'' 1' to 1' 6'' 15.00 6
39 Ixora chinensis yellow 7'' x 8'' 1' to 1' 6'' 15.00 6
40 Ixora chinensis pink 7'' x 8'' 1' to 1' 6'' 15.00 6
41 Leucophyllum frutescens 7'' x 8'' 1' to 1' 6'' 18.00 2, 4
42 Murayya paniculata 7'' x 8'' 1' to 1' 6'' 17.00 6
43 Plumbago auriculata 7'' x 8'' 1' to 1' 6'' 17.00 6
44 Tabernaemontana variegated 7'' x 8'' 1' to 1' 6'' 18.00 6, 7
45 Tabernaemontana divaricata dwarf 7'' x 8'' 1' to 1' 6'' 18.00 6
46 Yucca 7'' x 8'' 1' to 1' 6'' 20.00 6
Dt: 01.07.2022

Approx. Lowest Rate


Sl. Name of the plant Bag size Lowest Rate
Height of Quoted Firm
No Quoted
the plant (Sl. No.)

9 10

E GROUND COVERS

4'' X 6''
47 Lantana red 7'' x 8'' 1' to 1' 6'' 15.00 6

48 Lantana sellowiana 7'' x 8'' 1' to 1' 6'' 15.00 6


49 Lantana yellow 7'' x 8'' 1' to 1' 6'' 15.00 6
50 Pandanus gold 7'' x 8'' 1' to 1' 6'' 15.00 6

Wedelia trilobata 4'' X 6'' 6'' to 1' 7.75 7


51
Wedelia trilobata 7'' x 8'' 1' to 1' 6'' 13.00 3

Certify that the following lowest rates are arrived based on the lowest quote quoted by
agencies for plant wise and same are being proposed for adopt in the detailed estimates
for according sanction of estimates pertains in Central medians and Avenue plantation
from Ramavarappadu Ring Road to Gannavaram Airport Project.

Manager (UG) E.C. (Tech), M.D.,


Central Zone APG&BC APG&BC
GOVERNMENT OF ANDHRA PRADESH
APG&BC – Jagananna Haritha Nagaralu

Comparative Statement for Supply of plant material required for Central medians and Avenue plantation in ULBs

Approx.

Quoted

Quoted

Quoted
Lowest

Lowest
Height
of the
Sl. Bag

No of
Firms
plant

Rate

Rate

Firm
Name of the plant
No size

10 11 12
Central median plants
1 Veitchia merrillii green 18x18 3'-4' 1 300.00 1
2 Veitchia merrillii gold 18x18 3'-3'.6'' 2 900.00 4
3 Mimusops elengi 18x18 5'-6' 4 175.00 1
4 Terminalia mantaly 18x18 5'-6' 4 225.00 1
5 Phoenix roebelenii 18x18 3'-3'.4'' 3 325.00 4
6 Ficus black 18x18 3'-4' 3 230.00 9
7 Dypsis decaryi 18x18 6''-1 feet 2 275.00 4
clear trunk
8 Wodyetia bifurcata 18x18 4'-5' 7 350.00 2
9 Phoenix sylvestris 18x18 6''-1 feet 2 500.00 4
clear trunk
6''-1 feet
10 Bismarckia nobilis 18x18 1 350.00 1
clear trunk
11 Putranjiva roxburghii 18x18 4'-5' 5 140.00 1
12 Plumeria Singaporensis dwarf 18x18 2'.6'' 6 370.00 3
13 Sterculia foetida 18x18 5'-6' 6 160.00 1, 3
14 Ficus panda 18x18 2'-2'6'' 6 180.00 3
15 Tecoma gaudichaudi 18x18 5'-6' 3 150.00 3
6''-1 feet
16 Washingtonia robusta 18x18 3 425.00 9
clear trunk
17 Bignonia megapotamica 18x18 4'-5' 6 150.00 3
18 Cordia sebestena 18x18 4'-5' 6 140.00 3
19 Caryota urens 18x18 5'-6' 5 275.00 4
Avenues 0.00
20 Neolamarckia cadamba 18x18 5'-6' 5 150.00 1
21 Tabebuia rosea 18x18 5'-6' 5 150.00 1
22 Tabebuia avellanedae 18x18 5'-6' 5 160.00 1
23 Spathodea campanulata 18x18 5'-6 5 150.00 1
24 Mimusops elengi 18x18 5'-6' 4 175.00 1
25 Cordia sebestena 18x18 4'.6''-5' 5 175.00 1
Approx.

Quoted

Quoted

Quoted
Lowest

Lowest
Height
of the
Sl. Name of the plant Bag

No of
Firms
plant

Rate

Rate

Firm
No size

10 11 12
26 Peltophorum pterocarpum 18x18 5'-6' 5 160.00 1
27 Delonix regia 18x18 5'-6' 5 150.00 1
28 Pongamia pinnata 18x18 4'-5' 5 150.00 1
29 Bauhinia blakeana 18x18 4'-5' 5 160.00 1
30 Swietenia mahagoni 18x18 5'-6' 5 145.00 1
31 Millingtonia hortensis 18x18 5'-6' 5 150.00 1
32 Terminalia catappa 18x18 5'-6' 5 150.00 1
33 Hibiscus tiliaceus 18x18 5'-6' 3 150.00 1
Shrubs
34 Lantana sellowiana 7x8 8''-1' 9 12.00 2
35 Bougainvillea glabra 7x8 1'6''-2' 8 30.00 6
36 Bougainvillea formosa 7x8 1'6''-2' 9 15.00 6
37 Allamanda cathartica dwarf 7x8 8''-1' 8 12.00 2
38 Ixora chinensis 7x8 1'6''-2' 9 14.00 2
39 Tabernaemontana divaricata variegated 7x8 1'6''-2' 9 15.00 4
40 Jatropha integerrima 7x8 1'6''-2' 9 15.00 2
41 Tabernaemontana divaricata dwarf 7x8 8''-1' 9 15.00 2
42 Pandanus gold 7x8 6''- 8'' 9 15.00 2
43 Ixora dwarf 7x8 8"-1' 9 14.00 2
44 Lantana camara red & yellow 7x8 8''-1' 8 12.00 2
45 Galphimia glauca 7x8 8''-1' 9 15.00 2
46 Hymenocallis littoralis 7x8 6''-1' 9 11.00 2
47 Euphorbia milii hybrid 7x8 8''-1' 9 15.00 2
48 Plumbago auriculata 7x8 1'6''-2' 9 16.00 2
49 Lagerstroemia indica 7x8 2'-3' 8 25.00 4
50 Tecoma capensis 7x8 8''-1' 9 16.00 2
51 Duranta gold 7x8 8''-1' 9 13.00 2, 3
52 Leucophyllum frutescens 7x8 8''-1' 9 16.00 2
53 Nerium oleander 7x8 8''-1' 9 14.00 2
54 Tabernaemontana divaricata 7x8 1'6''-2' 9 15.00 2
A.P. Greening & Beautification Corporation
Name of the Work:- Preliminary Estimate for development of landscape
(Softscape & Hardscape) works in Dr.YSR gardens (75.0 Ac.) at polavaram
Project, Andhra Pradesh.
Estimate Cost: Rs.222.00 Crore
Amount
Sl.No Description of Item
(in Rs.)

I Dr. YSR Statue Garden

1 100' tall Dr. YSR Statue bronze- Provisional 400,000,000.00


Site development works such as profiling, retaining structures,
Hardscape works such as columnade of celebration, peripehral view
deck, 9m drive way, mural wall, people's plaza, Amphitheatre, river of
II life, meandering pathway, water cascade and features, glass bridge,
light and sound show, ramp and summit plaza

2 Dr. YSR Statue Garden- terracing -20,285 Sq.m 5,071,250.00


3 Dr,YSR Statue Garden retaining wall -491 r.m 3,928,000.00
III Hardscape works

4 Columns of celebration -60 No's 150,000,000.00


5 Peripherial view deck -2,182 Sq.m 6,262,340.00
6 9m driveway all around -4,050 Sq.m 11,623,500.00
7 Mural wall - 60Rm 12,600,000.00
8 People's plaza -3,390 Sq.m 9,729,300.00
9 Peoples plaza seating -52Sq.m 156,000.00
10 People's plaza stairs - 150Sq.m 430,500.00
11 Amphitheatre - 422Sq.m 2,532,000.00
12 River of Life - 580Sq.m 11,600,000.00
13 Meandering pathway - 240 Sq.m 688,800.00

14 Water cascade and Water feature (along ramp and steps)- 381 Sq.m 7,620,000.00

15 Glass bridge -30 Sq.m 30,000.00


16 Light and Sound show - 377 Sq.m 10,000,000.00
17 Ramp- 396 Sq.m 2,376,000.00
18 Steps - 104 Sq.m 624,000.00
19 Garland gardens water feature - 22 Sq.m 440,000.00
20 Garland gardens - Amphitheatre - 300 Sq.m 1,800,000.00
21 Summit plaza - 909 Sq.m 2,727,000.00
Interpretation center including museums, cafes, AV system and public
IV amenities such as toilets, ticket counter including internal
electrification, Fire fighting & HVAC

22 Amenity block - 4,005 Sq.m (1 No's) 146,823,300.00


23 Cafe - 235 Sq.m (2 No'S) 11,397,500.00
24 Ticket counter \ cafe - 235 Sq.m (3 No's) 11,397,500.00
V Dr. YSR Hill garden
Dr. YSR Hill garden area: Site development works such as profiling,
retaining structures, such as profiling, retaining structures, and
hardscape works such as oval pathway, circumambulatory water
feature, stairs, ramp

25 Dr.YSR Hill Garden -terracing-22,690 Sq.m 5,672,500.00

26 Dr. YSR Hill garden -retaining Wall -749 r.m 5,992,000.00


Hardscape works

27 Oval Pathway -5,648 sq.m 11,296,000.00

28 Circumambulatory water feature -1,289 Sq.m 992,530.00

29 Stairs -106 Sq.m 636,000.00

30 Ramp -1,140 Sq.m 6,840,000.00

VI Grand Stairs
Grand Stairs: Site development works such as profiling, retaining
structures, and hardscape works such as foundation, super structure,
finishing and features, water features

31 Grand stairs - Terracing -1,950 Sq.m 487,500.00

32 Grand stairs - Retaining wall -260 r.m 2,080,000.00

b Hardscape works

33 Foundation and Superstructure -1,950 Sq.m 19,500,000.00

34 Provision for Finishing and features 10,000,000.00

35 Water feature -180 Sq.m 3,600,000.00

Food court area: Site development works such as profiling, retaining


structures and building such as food court, toilets, restaurants, kitchen
VII and open dining including internal electrification, Fire fighting &
HVAC

36 Food Court -Terracing -5,343 Sq.m 1,335,750.00

37 Food Court -Retaining wall -297 r.m 2,376,000.00


Buildings

38 Foodcourt - 150 Sq.m (1 No's) 8,277,000.00

39 Toilets - 467 Sq.m (2 No'S) 24,657,600.00

40 Restaurants - 810 Sq.m (3 No's) 38,410,200.00


41 Kitchen - 142 Sq.m (4 No's) 5,347,720.00

42 Open dining - 297 Sq.m (5 No's) 9,997,020.00


Roads, parking, walkways and bioswales
VIII

43 Road Reataining Wall -4,224 r.m 33,792,000.00

44 Road Terracing -22,311 Sq.m 5,577,750.00

45 Roads and parking - 36,836 sq.m 184,180,000.00

46 Walk ways - 4,768 Sq.m 4,052,800.00

47 Bioswales (including culverts etc..) -1,668 sq.m 1,284,360.00

48 Parking Zone Terracing -23,692 Sq.m 5,923,000.00

49 Parking Zone retaining wall - 573 r.m 4,584,000.00

50 Tree court (near parking) -784 Sq.m 627,200.00


Circular plazas (7 nos), admin block, ticket counter and public
IX amenity zone

51 Circles -terracing -8,973 Sq.m 2,243,250.00

52 Circles -retaining wall -7,425 Sq.m 59,400,000.00

53 Admin and Amenity zone - terracing -1,650 Sq.m 412,500.00

54 Admin and Amenity zone -retaining wall -200 r.m 1,600,000.00

X Circle info block & Cable car block

55 Circle info block 2,350 Sq.m 33,229,000.00

56 Cable car block 500 Sq.m (3No's) 26,900,000.00

XI Open Air Theatre & Maidan

57 Open Air Theatre 4,602,000.00


58 Maidan - 5,000 Sq.m 500,000.00

XII Entrance plaza, Ascent Plaza, Double deck plaza and water feature

59 Entrance plaza (West) water feature - 572 Sq.m 11,440,000.00


60 Entrance plaza (East) water feature - 572 Sq.m 11,440,000.00
61 Ascent Plaza - water feature - 572 Sq.m 11,440,000.00
62 Double deck plaza - water feature - 572 Sq.m 11,440,000.00

XIII Recreation zone, children's play zone and yoga pavillion

63 Yoga Pavilion -192.0 Sq.m (2 No's) 6,846,720.00

64 Recreation zone -Terracing -17,179 Sq.m 4,299,250.00

65 Recreation zone -retaining wall -793 r.m 6,344,000.00

66 Children's play zone -3800 Sq.m 7,600,000.00


Softscape works such as welcome gardens, garden of ghats, gardens of
papikonda, garland gardens Avenue planting, and bio diversity forest
XIV

67 Welcome gardens (Dr. YSR Statue gardens) - 385 Sq.m 385,000.00

68 Garden of Ghats (Dr. YSR Statue gardens) - 427 Sq.m 427,000.00

69 Gardens of Papikonda (Dr. YSR Statue gardens) - 410 Sq.m 410,000.00

70 Garland gardens (Dr. YSR Statue gardens) - 1,026 Sq.m 1,282,500.00

71 Crescent Berm (Dr. YSR Hill garden) - 2,400 Sq.m 1,800,000.00

72 Flower garden (Dr. YSR Hill garden) - 19,093 Sq.m 14,319,750.00

73 Flower gardens of Grand Stairs - 362 Sq.m 271,500.00

74 Softscape for Entrance plaza (West) gardens -710 Sq.m 532,500.00

75 Softscape for Entrance plaza (East) gardens - 710 Sq.m 532,500.00

76 Softscape for Ascent Plaza - gardens - 502 Sq.m 376,500.00

77 Softscape for Double deck plaza - gardens - 502 Sq.m 376,500.00

78 Biodiversity Forest -1,11,988 Sq.m 38,242,400.00

79 Avenue planting and bio diversity forest 183,204,800.00


Hill trail, seating courts, adventure sports, cable car and cliff deck
XV
Hill trail and seat courts- 1,324 Rm
80 714,960.00
Adventure sports -Lumpsum
81 10,000,000.00
Cliff Deck and Cliff walk - 1965 Sq.m
82 19,650,000.00
Adventure play Zone - 7500 Sq.m
83 18,750,000.00
Cable Car Zone - 1,190 Sq.m
84 4,000,780.00
Provisional for external development and Landscape works Lighting
XVI and external Electrical works including decorative lighting. 40,000,000.00

XVII Provisional for MEP and sanitary works 20,000,000.00


Provisional for Signages, street furniture, art works and irrigation
XVIII works

85 Provisional for Signages, 2,000,000.00

86 Provisional for Street Furniture 2,000,000.00

87 Provisional for Artworks 2,000,000.00


Provision for auto meachine irrigiation system, Bore wells, STP,
XIX Pumps,motors etc.. 18,474,000.00
Total 1,786,863,330.00
PS contingencies 25,000,000.00
Quality Control @ 0.5% on total 8,934,317.00
Tender premium @ 5% on total 89,343,167.00
Seignorage charges @ 0.6% on total 10,721,180.00

NAC @ 0.1% on total 1,786,863.00


Price adjustment @ 5% on total 89,343,167.00

Structural drawings proof checking 16,000,000.00

Sub total 2,027,992,024.00


Add GST @ 18% on sub total 365,038,564.00

Architect fees @ 3.6% on sub total 73,007,713.00

Add GST @ 18% on Architect fees 13,141,388.00

PDMC charges @ 5% on sub total 101,399,601.00

Unforeseen items 4,420,710.00

Grand total 2,585,000,000.00

#NAME?
D A T A ( SOR 2022-23)
A.P. Greening & Beautification Corporation
A Rejuvenation of water body including strengthening of bund
and greenning and providing walking tracks at koppolu
cheruvu in division no.9 ( 24.33 Acres) at Ongole Municipal
Coporation, Prakasam District Andhra Pradesh. Under
AMRUT 2.0

B Sources and Leads


Material Quarry Lead in KM
1 Cement
2 Steel

maddipadu
3 Sand for concrete 16.00
maddipadu 16.00
4 Sand for mortar, plastering

Sand for filling maddipadu


5 16.00
6 Second Class Bricks NA 0.00
7 Fly ash bricks 290 x 225 x 140 NA 0.00
8 Fly ash bricks 290 x 100 x 140 NA 0.00
9 Fly ash bricks 225 x 100 x 60 NA 0.00
10 40mm HBG Metal Machine crushed Ramathertham 31.00
11 20mm HBG Metal Machine crushed Ramathertham 31.00
12 12mm HBG Metal Machine crushed Ramathertham 31.00
13 10mm HBG Metal Machine crushed Ramathertham 31.00
14 6mm HBG Metal Machine crushed Ramathertham 31.00
15 Rough Stone OTG Ramathertham 31.00
16 Rough Stone HBG Ramathertham 31.00
17 Gravel Pernamitta 8.00
18 Shahabad stone slabs NA 0.00
19 Kadapa stone slabs NA 0.00

Cement SOR 22-23


C
Cement: OPC 43 Gr/53 Gr
MAT-00005 Note: Rate as fixed by the Government 4220.00 tonne (1000 KGS )
exclusive of GST
D Steel Rates Feburary-2023
1 Fe - 500 63,000.00

2 Fe- 415 60,000.00

3 Mild Steel, Structural Steel 60,000.00


-
4 M.S Flats 60,000.00
7 M.S Plates 70,000.00
E Allowances
1 MA @ 25% 0.25
Overheads & Contractors Profit @13.615% 0.13615
2

F Water charges
MAT-00333 Type of Habitation 2 1 for Rural 95.00
MAT-00332 2 for Urban 125.00
D A T A ( SOR 2022-23)
Rejuvenation of water body including strengthening of bund and greenning and providing walking
tracks at koppolu cheruvu in division no.9 ( 24.33 Acres) at Ongole Municipal Coporation, Prakasam
District Andhra Pradesh. Under AMRUT 2.0

Estimate Input

Name of park Acres location district MA @ --%

Rejuvenation of water body including


Ongole
strengthening of bund and greenning and
24.33 Municipal Prakasam 0.25
providing walking tracks at koppolu cheruvu in
Coporation
division no.9
Red soil Plants/
1 1100.00 Cum 1000.00 month
cost & conveyance of dry cow dung powder and
Gunter-Circle- Gunter-Circle-
FYM as per Gunter-Circle-FSR 22-23 (Code: FSR 22-23 FSR 22-23
2 02-23-008) 1496.71 Cum
(Code: 02-23- 9989.32 (Code: 04-32-
008) 040)

No. of tiles rquired


Mangalore tiles size L B Thick (10/ L x B )= Ans + Rs.
thick and laying as per the pattern approved by the Ans10%
Input Engineer-in-Charge on roofs jointed with cement mortar 225 150 20 326 32.00
1:4 (1 cement : 4 coarse sand) mixed with 2% integral
water
Supplyproofing
& Fixingcompound,
Sadarhalli laid overstone
granite a bedwith
of 20 mm thick
5 line
Input dressing Double Patti of 5' length seating benches with
back rest and its width 16'' with 4" thick and 18" height
15000.00
with 4" thick and leg size 4'' width, including cost and
Supply and fixing of C.C. Kerb not less than M30 strength
of size 600 X 400 X 110 mm thick with bottom thickness of
110 mm up to height of 350 mm and top width of 50 mm
thick chamfering with 45° at starts at 350 mm height to
400 mm height as selected by the Engineer-in-charge
from approved source/ factory which is laid on existing CC
Bed in position to the required line, level and curvature
jointed with cement mortar 1:3 (1 cement : 3 coarse sand),
Input 0.6 0.4 0.11 533.33
including making joints with or without grooves (thickness
of joints except at sharp curve shall not to more than 5
mm), including making drainage opening wherever
required and including cost and conveyance of all
materials & labour charges including transportation from
approved source, loading & unloading charges including
contractor profit & overhead charges complete for finished
item of work..

C.C. Kerb in put


Supply and fixing of C.C. Kerb not less than M30 strength
Srikakulam 533.330 Rmt
1 of size 600 X 400 X 110 mm thick with bottom thickness of
110 mm up to height of 350 mm and top width of 50 mm
thick chamfering with 45° at starts at 350 mm height to Vizianagaram 500.000 Rmt
2 400 mm height as selected by the Engineer-in-charge
from approved source/ factory which is laid on existing CC
Bed in position to the required line, level and curvature
jointed with cement mortar 1:3 (1 cement : 3 coarse sand),
including making joints with or without grooves (thickness Visakapatnam 466.670 Rmt
N_Z
of joints except at sharp curve shall not to more than 5
3 mm), including making drainage opening wherever
required and including cost and conveyance of all
materials & labour charges including transportation from
approved source, loading & unloading charges including
contractor profit & overhead charges complete for finished East Godavari 583.330 Rmt
item of work..

4
Supply and fixing of C.C. Kerb not less than M30 strength
of size 600 X 375 X 100 mm thick with bottom thickness of West Godavari 475.000 Rmt 15800.00
5 100 mm upto height of 300 mm and top width of 50 mm
thick chamfering with 45° at starts at 300 mm height to
375 mm height as selected by the Engineer-in-charge
from approved source/ factory which is laid on existing CC Krishna 430.000 Rmt 15800.00
6 C_Z Bed in position to the required line, level and curvature
jointed with cement mortar 1:3 (1 cement : 3 coarse sand),
including making joints with or without grooves (thickness
of joints except at sharp curve shall not to more than 5
mm), including making drainage opening wherever
Guntur 458.000 Rmt 15800.00
required and including cost and conveyance of all
7 materials & labour charges including transportation from
Supply and fixing of C.C. Kerb not less than M30 strength
of size 600 X 400 X 110 mm thick with bottom thickness of Prakasam 535.000 Rmt
8 110 mm up to height of 350 mm and top width of 50 mm
thick chamfering with 45° at starts at 350 mm height to
400 mm height as selected by the Engineer-in-charge
from approved source/ factory which is laid on existing CC
Bed in position to the required line, level and curvature
jointed with cement mortar 1:3 (1 cement : 3 coarse sand),
including making joints with or without grooves (thickness
S_Z-2 of joints except at sharp curve shall not to more than 5
mm), including making drainage opening wherever
required and including cost and conveyance of all
materials & labour charges including transportation from
approved source, loading & unloading charges including
Supply and fixing of C.C. Kerb not less than M30 strength
of size 600 X 400 X 110 mm thick with bottom thickness of
110 mm up to height of 350 mm and top width of 50 mm
thick chamfering with 45° at starts at 350 mm height to
400 mm height as selected by the Engineer-in-charge
from approved source/ factory which is laid on existing CC
Bed in position to the required line, level and curvature
jointed with cement mortar 1:3 (1 cement : 3 coarse sand), Nellore 535.000 Rmt
including making joints with or without grooves (thickness
S_Z-2 of joints except at sharp curve shall not to more than 5
9 mm), including making drainage opening wherever
required and including cost and conveyance of all
materials & labour charges including transportation from
approved source, loading & unloading charges including
contractor profit & overhead charges complete for finished
Chittoor 400.000 Rmt
item of work.

10
Supply and fixing of C.C. Kerb not less than M30 strength
of size 450 X 450 X 110 mm thick with bottom thickness of Anantapur 533.000 Rmt 38.00 11500.00
11 110 mm up to height of 380 mm and top width of 50 mm
thick chamfering with 45° at starts at 380 mm height to
450 mm height as selected by the Engineer-in-charge
from approved source/ factory which is laid on existing CC Kurnool 488.000 Rmt 26.00 12000.00
12 Bed in position to the required line, level and curvature
S_Z-1 jointed with cement mortar 1:3 (1 cement : 3 coarse sand),
including making joints with or without grooves (thickness
of joints except at sharp curve shall not to more than 5
mm), including making drainage opening wherever
required and including cost and conveyance of all
Kadapa 577.000 Rmt 32.00 12500.00
materials & labour charges including transportation from
13 approved source, loading & unloading charges including
contractor profit & overhead charges complete for finished

Supply &
Delivery of
trees / Palms /
AMRUT -2017-20 shrubs and
specified
Supply & Delivery of topiary/trees/Palms/shrubs/lawn/ ground covers and specified plants plants as per
directions of
as per directions of officer in charge at site including cost of plants officer in
plants of bag size charge at site,
7" x 8" of plant height not less than 1.0 feet, all the plants
supplied shall
8" x 10" of plant height not less than 3.0 feet, be with sturdy
13" x 13" of Tree/Palm height not less than 5 feet, stem, well
formed crown,
13" x 13" of plant (Hedges & Shrub) height not less than 2 feet, vigorously
15" x 16" of plant (Tree/Palm/Topiary) height not less than 5 feet, growing tip,
18" x 18" plant (Tree/Palm/Topiary) height not less than 6 feet, bottom dia of the stem is healthy foliage
without any
0.75'' and above, infestation and
1 21" x 21" and above plant (Tree/Palm/Topiary) height not less than 7 feet, bottom dia of the the plants
shall be
stem is 1'' and above. supplied after
Heights mentioned above are excluding bag height. proper
All the plants supplied shall be with sturdy stem, well formed crown, vigorously growing tip, hardening off.
the rates
healthy foliage without any infestation and the plants shall be supplied after proper inclusive of
hardening off. cost of plants
and labour
the rates inclusive of cost of plants and labour charges for handling & complete for finished charges for
item of work. handling &
loading,
complete for
finished item
of work.
Approximat
plants of e weight of
Rs. Per plants of
bag size bag size in
Kgs
lawn
1 Perennial Rye Grasses Sqm Rs. 180 Sqm 2

2 For paspalum grass Sqm Rs. 100 Sqm 2

2 For Korean grass Sqm Rs. 200 Sqm 30


Ground cover
3 Ground covers 4" x 7" Rs. 20 Each 1
Hedge /shrub plants
4 Hedge / shrubs 7" x 8" Rs. 30 Each 2
5 Hedge / shrubs 8" x 10" Rs. 45 Each 4
6 Hedge / shrubs 13" x 13" Rs. 100 Each 10
Palms/Tree planting
7 For tall plants 15" x 16" Rs. 200 Each 20
8 For tall plants 18" x 18" Rs. 450 Each 35
9 For tall plants 21" x 21" Rs. 600 Each 50
8 For tall plants 25" x 25" Rs. 1200 Each 125
9 For tall plants 30" x 30" Rs. 1500 Each 150

Watering by pipe, 1000 Nos/per


5 DATA for Farmyard Manure- Rate per Cum Districts
weeding month

cost &
conveyance
Gunter-Circle :
of dry cow
Nellore,
dung powder Gunter-Circle-FSR
Prakasam ,
and FYM as Gunter-Circle-FSR 22-23 (Code: 02-23-008) 1496.71 Guntur ,
22-23 (Code: 04-32- 9989.32
per Gunter- 040)
Krishna West
Circle-FSR
Godavari ,
22-23 (Code:
02-23-008)
i

cost &
conveyance
of dry cow
dung powder
and FYM as Rajahmundry Rajahmundry Circle-
per
Rajahmundry Circle-FSR 22-23 (Code: 2-5-19) 455.0 Circle - FSR 22-23 (Code: )
Rajahmundry
Circle-FSR
22-23 (Code:
2-5-19)
ii

cost &
conveyance
of dry cow
Vishakhapatna
dung powder
m Circle-
and FYM as Vishakhapatnam
Srikakulam ,
per Vishakhapatnam Circle-FSR 22-23 (Code: 05-35-6) 1757.5 Vizianagaram ,
Circle-FSR 22-23 7957.88
Vishakhapat (Code: 05-42-11)
Vishakhapatna
nam Circle-
m ,East
FSR 22-23
Godavari,
(Code: 05-
35-6)
iii
cost &
conveyance
of dry cow
dung powder Anantapuram
Anantapuram Circle-
and FYM as Circle-
per
Anantapuram Circle-FSR 22-23 (Code: 04-28-005) 2486.43 Anantapur ,
FSR 22-23 (Code: 10206.06
04-32-011)
Anantapuram Chittoor
Circle-FSR
22-23 (Code:
iv 04-28-005)

cost &
conveyance
of dry cow
dung powder Kurnool Circle Kurnool Circle -FSR
and FYM as Kurnool Circle -FSR 22-23 (Code: 02-14-008) 2281.63 - Kurnool , 22-23 (Code: 04-32- 10201.61
per Kurnool kadapa 057)
Circle -FSR
22-23 (Code:
02-14-008)
v

Transport Charges Calucation for Estimate Purpose-16-17


Districts RS/MT
1 Srikakulam 1500
2 Vizianagaram 1400
3 Vishakhapatnam 1200
kadiya 4 East Godavari 1000
5 West Godavari 1200 700
6 Krishna 1300 800
7 Guntur 1350 800
8 Prakasam 1400
9 Nellore 1500
10 Chittoor 1700 1700
11 kadapa 1600 1700
12 Kurnool 1650 1600
13 Anantapur 1800 1700
Name of the
Sl. No. District Name of the ULB Rs. -----/Cum

1 2 3
Central Zone
1 West GodavarBhimavaram 802.00
2 Eluru 598.00
3 Tadepalligudem 670.00
4 Krishna Gudivada 1066.00
5 Machlipatnam 718.00
6 Vijayawada 1054.00
7 Guntur Chilkaluripeta 1030.00
8 Guntur 670.00
9 Narasaraopeta 1042.00
10 Tenali 0.00
North Zone
11 Srikakulam Srikakulam 1030.00
12 Vizianagaram Vizianagaram 838.00
13 Visakhapatna Visakhapatnam 0.00
14 East GodavariKakinada 1030.00
15 Rajahmahendravaram 1030.00
South Zone - 1
16 Kadapa Kadapa 626.80
17 Proddatur 626.80
18 Kurnool Kurnool 670.00
19 Nandyal 598.00
20 Adoni 670.00
21 Anantapur Anantapur 0.00
22 Tadipatri 583.60
23 Guntakal 1042.00
24 Hindupuram 1042.00
25 Dhramavaram 626.80
South Zone - 2
26 Prakasam Ongole 670.00
27 Nellore Nellore 1042.00
28 Kavali 1042.00
29 Chittoor Chittoor 626.80
30 Srikalahasti 790.00
31 Tirupati 670.00
32 Madanapalle 598.00

Multi activity play system (MAPS 10) 1 -Set 438,219.00 1 10


36
Convention
FOUR SEATER SWING 36,225.00 1 26
al Play
Equipment (
6 - Nos) 1 - SEATER ARC SWING 80,101.00 1 0
Set 10
BRIDGE LADDER SCRAMBLER 36,242.00 1 6

NET ROCK SCRAMBLER 56,668.00 1

Outdoor fitness equipment's (10-No's) -Set 1

BOQ's Input
Jungle clearence along the bund 10000
Sqm 10000 Sqm

Removing of hycanith 10000 Sqm


10000 Sqm

Stone pitching front side of the bund -1350 Sqm 1350 Sqm 300 4.5

profiling of existing bund with gravel 3600 CUM 1200 10 0.3


Fixing of Chain-link fabric-2700 m with 1.8 m
2700.0 Rmt 250.00 1.80 450
height

kadapa Kerb along the pathways - 500 Rmt

1 Construction of brick Toe wall for Plaza - 70 Rmt

Entrance plaza and path ways flooring with


2 40 Sqm
granite stone 18 mm thick -
Path ways and Seating plazas flooring with
3 200 Sqm
Shahabad / Tandur stone of 40 mm thick slabs -
Plaza flooring with Rough black Kadapa stone
4 250 Sqm
of 50 mm thick slabs -
pathways flooring with Cobble stone( size100 x
5 30 Sqm
100 x 100 mm) -

6 Pathway flooring with 60 mm thick CC pavers - 100 Sqm

7 Internal pathways flooring with chequered tiles - 180 Sqm

VDF concrete pavement 100 mm thick in


8 50 Sqm
parking area -
Murrum pathway with 150 mm thick gravel bed
9 1200 Sqm
-1200Sqm
MultiPlay court area with 150 mm thick gravel
10 400 Sqm
bed-

11 Seating area with 150 mm thick gravel bed- 134 Sqm

Sadarhalli granite seating benches with back rest


11 18 No.s
-

12 Kadapa slab (rough) 50mm thick stone edging - 170 Rmt

13 Construction of Planter Seater wall 93 Rmt 93 Rmt

Construction of M.S Gazebo of size 4.0 x 4.0 m -


14 1.0 Nos
1 No.s
Construction of Security / ticket room of size 3.0
15 1.0 Nos
m X 3.0 m

Civil works for fixing children play Equipment


16 10-No's (1 sets) in 450 sqm area with Sand 10.0 Nos 45 10 450
filling.

Supply, delivery and commissioning of 10-No's


17 10.0 Nos
Conventional Play Equipment (1 sets)

18 Multi Activity Play Equipment 0.0 Nos

Civil works for fixing Outdoor fitness


19 10.0 Nos 18 10 180
equipment's 10-No's (1 sets) in 180 sqm area.

Supply, delivery and commissioning of 10 - No's


20 10.0
Outdoor fitness equipment's (1 sets)

21 Construction of Stage 7 m x 4 m. 28.0 Sqm 7 4 28

Construction of M.S pergola of size 6.0 x 3.0 m -


22 2.0 Nos
2 No.s
Construction of Entrance Gate of size 4.0 m x 2.0
23 1.0 Nos
m
Construction of Entrance Arch with Gate of size
24 5.5 m x 2.30 m and 2 Wicket Gates size of 1.60 1.0 Nos
m x 2.0 m height
Construction of see through compound wall - 273
25 273.0 Rmt
Rmt

26 Construction of Water body 155.0 Sqm

Provision for minimum external electrification &


27 1,800,000.00 13.0% Err:509
illumination works

28 Provision for Irrigation facilities 150,000.00 5.0% Err:509

Sub Total - I (Hardscape works)

Softscape (Development & one month


1 Months
Maintenance)

29 Err:509 Err:509 Sqm 39 6 234


Developmen
t and
maintenance
30 of Lawn area Err:509 Err:509 Sqm 16 10 160
for one year

31 10 Err:509 Sqm 538 0.75 403.5


Err:509
6 Err:509 Sqm 269 1 269

32 22 Err:509 Err:509 Sqm 896 0.5 448

33 315.00 No.s 28 For tall plants


Trees - 315 No.s
34 0.00 No.s 43 Err:509
9 m light poles
2 Nos 0.5 ac. for 1pole #REF!
120 w LED
4 Nos
7.5 m light poles
2 Nos 0.5 ac. for 1pole #REF!
100 w LED
4 Nos
POLE LIGHT - 4M HIGH
35 Nos #REF!
20 w LED
35 Nos
A.P. Greening & Beautification Corporation

Name of the Work:- Rejuvenation of water body including strengthening of bund and greenning and providing walking tracks at
koppolu cheruvu in division no.9 ( 24.33 Acres) at Ongole Municipal Coporation, Prakasam District Andhra Pradesh. Under AMRUT
2.0

Lead chart as per common sor 2022-2023, cement rate as per SOR 22-23 & steel rate as per Feburary-2023 .

Reference S.No./ Initial MA


Sl. Source of to SSR Cost
Lead excluding Convey- Loading Unload
ing
No. Description Materials page Item Unit ance
in KM seigniorag Charges charges charge Total
number Code No. e charges s 25%

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13)
Ordinary Portland Cement 43 /
1 53 grade (including loading MAT-00005 1 MT 4220.00 4220.00
charges)

2 Reinforcement steel Fe- 500 1 MT 63000.00 63000.00


3 Reinforcement steel Fe- 415 1 MT 60000.00 60000.00
4 Mild Steel, Structural Steel 1 MT 60000.00 60000.00
5 MS flats 1 MT 60000.00 60000.00
6 M.S Plates 1 MT 70000.00 70000.00
Sand (un-screened for concrete maddipadu Part- I 27(a)
7 1 Cum 16.00 605.00 218.40 823.40
items) (Pg:12)
Sand (screened for mortar, Part- I 28
8 plastering items) maddipadu (Pg:12) 1 Cum 16.00 700.00 218.40 918.40

Part- I 27(b)
9 Sand for filling maddipadu (Pg:12) 1 Cum 16.00 460.00 218.40 678.40

10 Common burnt clay bricks


(23x11x7cm) NA Part- III
(Pg:10) BMT-A.01 1000 Nos 0.00 7500.00 0.00 7500.00

Flyash cement / lime solid Part- III BMT-A- 1000 Nos


11 blocks (50 Kgs/ sq.cm) NA (Pg:10) 10 0.00 30000.00 0.00 30000.00
290mmx225mmx140mm

Flyash cement / lime solid Part- III BMT-A- 1000 Nos


12 blocks (50 Kgs/ sq.cm) NA (Pg:11) 13 0.00 14000.00 0.00 14000.00
290mmx100mmx140mm

13 Aggregates 40mm nominal size Ramathertha Part- I M - 055 1 Cum 31.00 965.00 416.80 1381.80
(HBG) m (Pg:28)

14 Aggregates
(HBG)
20mm nominal size Ramathertha
m
Part- I
(Pg:27) M - 053 1 Cum 31.00 1565.00 416.80 1981.80

15 Aggregates 13.20 / 12.50mm


nominal size (HBG)
Ramathertha
m
Part- I
(Pg:27) M - 052 1 Cum 31.00 1260.00 416.80 1676.80

16 Aggregates
(HBG)
10mm nominal size Ramathertha
m
Part- I
(Pg:27) M - 051 1 Cum 31.00 1070.00 416.80 1486.80

17 Aggregates 6mm nominal size Ramathertha Part- I M - 050 1 Cum 31.00 865.00 416.80 1281.80
(HBG) m (Pg:27)

18 Ramathertha Part- I M - 036 1 Cum 31.00 895.00 416.80 1311.80


Aggregates 53 mm to 22.4 mm m (Pg:27)
Ramathertha Part- I
19 Stone Chips (at quarry) (Pg:14) item -67 1 Cum 31.00 435.00 416.80 851.80
m

Stone crusher dust finer than Part- I


20 3mm with not more than10% Ramathertha M - 021 432.00 827.00
(Pg:26) 1 Cum 31.00 395.00
passing 0.075 sieve. m

21 Rough Stone OTG Ramathertha Part- II R& 1 1 Cum 31.00 171.45 416.80 588.25
m B - (Pg:15)

22 Rough Stone (HBG) Ramathertha Part- II R& 12 1 Cum 31.00 298.00 416.80 714.80
m B - (Pg:15)

23 Coursed Rubble Stone 30 x 30 Ramathertha Part- II R& MAT- 1 Cum 31.00 716.05 416.80 1132.85
x 45 cm m B - (Pg:15) 00013
Reference S.No./ Initial MA
Sl. Source of to SSR Cost
Lead excluding Convey- Loading Unload
ing
No. Description Materials page Item Unit ance
in KM seigniorag Charges charges charge Total
number Code No. e charges s 25%

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13)

24 Through stone 20x20x 30 to 45 Ramathertha


cm - each 27/-x 65 No.s m
Part- I
(Pg:14) item -76 1 Cum 31.00 1800.00 416.80 2216.80

25 Through stone 25x25x 0.45 to


60 cm- each 39/-x 30 no.s
Ramathertha
m
Part- I
(Pg:14) item -77 1 Cum 31.00 1432.38 416.80 1849.18

26 Un-coursed rubble stones (at Ramathertha Part- I item -79 1 Cum 31.00 373.00 416.80 789.80
quarry) m (Pg:14)

27 Gravel Pernamitta Part- I M - 008 1 Cum 8.00 149.00 103.20 252.20


(Pg:25)

Rough Kadapa slabs minimum Part- III


28 of 40 mm thick (0.457m x NA BMT-B.01 10 Sqm 0.00 1250.00 0.00 1250.00
0.457m) (Pg:13)

Rough Kadapa slabs minimum Part- III


29 of 50 mm thick (0.457m x NA BMT-B.02 10 Sqm 0.00 1450.00 0.00 1450.00
0.457m) (Pg:13)
COMMON SoR 2022-2023
Now approved are exclusive of taxes (i.e., VAT, Excise duty & GST). 15-7-7-22

A.P. Greening & Beautification Corporation

Datas for Rejuvenation of water body including strengthening of bund and greenning and providing walking tracks at
koppolu cheruvu in division no.9 ( 24.33 Acres) at Ongole Municipal Coporation, Prakasam District Andhra Pradesh.
Under AMRUT 2.0

D A T A ( SOR 2022-23)
1 Red garden soil As per per Cum
Quotation 1100.00

2 River sand per Cum


As per lead 678.40
Gunter-
Circle-FSR
3 cost & conveyance of dry cow dung powder and FYM as per Gunter-Circ22-23 (Code: per Cum 1496.71
02-23-008)

MA @ 25% 0.25
CSSR -22-23
Part- I (LAB-
00120)
4

Mazdoor (Part I - Labour Rates-Common SoR ) per day 525.00


CSSR 22-
23_M-
189(a)
5 (MAT-
00332)

Water charges Kilolitter 125.00


Clearing unwanted growth (RSSR item no: 2b)
6 RSSR 21-22
item no: 2.b Sqm 7.670
Internal Transport of red soil and sand (conveyance charges for
materials by head load . Lead may be considered as per the respective
7 common SoR while finalizing the rate) CSSR 22-23 per Cum
pg.No.39
(A) 75.000
Spreading for red soil (RSSR item sl. No:14)
8 RSSR-21-22 per Cum
item sl.
No:14 29.710
Rolling (with hand roller/ demesha) (RSSR item sl.no: 15)
RSSR-21-22
9 per Cum
item sl.
No:15 46.280
Digging of trenches (the rate will be applicable based on the
classification of soil) (as per bldg.data)
10 per Cum
(BLD-CSTN-
2-1) 191.1
Homogeneous mixing of soil and FYM (FSR item sl.no: -01-02-006) Gunter-
Circl FSR 22-
11 23 item per Cum
sl.no: -01- 49.08
02-006
12
Internal Transportation of bag plants to the planting points
Gunter-
13 FSR; 2-2-16 Circl FSR- each
1 4''X7'' 0.5
22-23 ; 02-
Gunter-
02-016
14 Circl FSR- each
FSR; 2-2-17 2 5''X9'' 0.77
22-23 ; 02-
Gunter-
02-017
Circl FSR-
15 22-23 ; 02-
02-018
FSR; 2-2-18 3 6''X12'' each 1.19
Gunter-
Circl FSR-
16 22-23 ; 02-
FSR; 2-2-19 4 8''X10'' 02-019 each 1.53
RSSR-21-22
17 item sl.
RSSR20.D.ii Internal transportation of tall plants No:18.d.ii each 2.38

18
Planting [RSSR 20 e (i)]

RSSR-21-22
19 item sl. each
1 0.3*0.3*0.3 No:18.e.i 1.42

RSSR-21-22
20 item sl. each
2 0.45*0.45*0.45 No:18.e.ii 4.47

RSSR-21-22
21 item sl. each
3 0.6*0.6*0.6 No:18.e.iii 9.12

RSSR-21-22
22 item sl. each
4 0.75*0.75*0.75 No:18.e. iii 11.40

RSSR-21-22
23 item sl. each
5 0.9*0.9*0.9 No:18.e.iv 13.67

RSSR-21-22
24 item sl. each
6 1*1*1 No:18.e.v 15.25

Overheads & Contractors Profit @13.615% 0.13615

*Transport rates approved in the Forest Schedule of Rates are inclusive of loading
and unloading. The break-up of the rate will be as follows : 70% on transport; 30%
on loading and unloading. (8"X10") bag plants
Guntur- proporti
Sl No. Circle -FSR
Bag size 100 nos volum 2022-2023 onateRS Unite
./-
Guntur-
Circle -
FSR 2022-
1 8" x 12" 0.3822 331.70 100 nos
2023 02-
06-010

2 13" x 13" 1.0933 948.84 100 nos

3 8" x 10" 0.3185 276.42 100 nos

4 7" x 8" 0.1951 169.32 100 nos

Guntur-
Circle - 5 (4"X7") 57.95 100 nos
FSR 2022-
2023 02-
06-07
6
7
Internal Transportation of bag plants to the planting points

1 8" x 12" 0.3822 183.57 100 nos

2 8" x 10" 0.3185 152.98 100 nos


A.P. Greening & Beautification Corporation
Name of the Work:- General abstract estimate for Rejuvenation of water body including strengthening of
bund and greenning and providing walking tracks at koppolu cheruvu in division no.9 ( 24.33 Acres) at
Ongole Municipal Coporation, Prakasam District Andhra Pradesh. Under AMRUT 2.0

( Estimate prepared as per SOR 22-23) Estimate Cost: Rs.57.00 Lakhs


Amount
Sl.No Description of Item
(in Rs.)
Hardscape (Civil work)

1 Jungle clearence along the bund 10000 Sqm 168,750.00


2 Removing of hycanith 10000 Sqm 208,600.00
3 Stone pitching front side of the bund -1350 Sqm 1,241,937.51
4 profiling of existing bund with gravel - 3600 Cum 1,445,094.00

5 kadapa Kerb along the pathways - 500 Rmt 155,017.95

6 Murrum pathway with 150 mm thick gravel bed -1200Sqm 59,095.80

Sub Total - I 3,278,495.26


Softscape (Development & one month Maintenance)
7 Perennial gross -280 sqmts 131,610.50

8 Trees - 315 No.s 425,680.32

9 Floating plants 72,103.90

Sub Total - II 629,394.72

Total = ( Sub Total - I to Sub Total - II ) 3,907,889.98

10 Provision for transportation of bag plants 16,110.00


11 Provision for Irrigation facilities 150,000.00
12 Provision for water testing ( Collecting samples, laboratory testing process and reports ) 15,000.00

13 Add Price adjustment @ 5 % on Total = ( Sub Total - I to Sub Total - II ) 195,394.50

14 Add Tender premium @ 5 % on Total = ( Sub Total - I to Sub Total - II ) 195,394.50

15 Add NAC @ 0.1 % on Total = ( Sub Total - I to Sub Total - II )+10 to 14 4,479.79

Add Publication Charges @ 1 % on Total = ( Sub Total - I to Sub Total - II ) 39,078.90

Total 4,523,347.67

Add GST @18% on Total 814,202.58

Add seigniorage charges @ 1.50 % on Sub Total - I 49,177.43

Add Consultancy & engineering supervision Charges @ 5% on Total 226,167.38

Add unforeseen items 87,104.94

Grand Total 5,700,000.00


A.P. Greening and Beautification Corporation
Name of the Work:- Detailed estimate for Rejuvenation of water body including strengthening of bund and greenning and providing walking tracks at
koppolu cheruvu in division no.9 ( 24.33 Acres) at Ongole Municipal Coporation, Prakasam District Andhra Pradesh. Under AMRUT 2.0
( Estimate prepared as per SOR 22-23) Estimate Cost: Rs.57.00 Lakhs

Item Rate Per Unit Amount


Sl.No Description of Item Nos. L B D QTY Unit Unit
Code (in Rs.) (in Rs.)

Hardscape (Civil works)


Clearing and grubbing the land including uprooting wild vegetation, grass, bushes, shrubs,
saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and
disposal of unserviceable materials and stacking of serviceable material to be used or
RBR- auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not
1
STCL-2 exceeding 150 mm in thickness as per Technical Specification Clause 201 MORD / MORTH.
By Mechanical Means

Clearing along the bund 1 x 1 5000.00 5.00 25000.00


25000.00 Sqm 2.54 Sqm 63,500.00
Clearing thick jungle growth ( less than 50 percent open space ) including bushes upto 30 cm /
IRR- parthenium and other weeds including burning or disposing off the same as directed etc.,
2 PMW- complete.and it including all operational, incidental, labour charges, required tools, overheads
1-2 & contractors profit complete for finished item of work

Clearing along the bund 1 x 1 5000.00 5.00 25000.00


25000.00 Sqm 4.21 Sqm 105,250.00
3 MAT- Eradication of Weed growth by spraying chemicals from drain beds and water bodys etc.,
00342 complete for finished item of work and as directed by the engineer-in Charge and it including
all operational, incidental, labour charges, required tools, overheads & contractors profit
complete for finished item of work
Removing of water hycanith 1 x 1 500.00 20.00 10000.00
10000.00 Sqm 4.26 Sqm 42,600.00
4 IRR- Removal of Water Hyacinth beyond 30 cm thick and it including all operational, incidental,
PMW- labour charges, required tools, overheads & contractors profit complete for finished item of
3-25 (a) work

Removing of water hycanith 1 x 1 500.00 20.00 10000.00


10000.00 Sqm 16.60 Sqm 166,000.00
Stome pitching infornt of bund

5 (BLD- Earth work excavation for foundations (Manual Means) of buildings, septic tank, sump,
CSTN- compound wall in ordinary soils and depositing on bank with an initial lead of 10m and depth
2-1) up to 3m including all operational, incidental, labour charges such as shoring, sheeting,
planking, strutting etc., and overheads & contractors profit complete for finished item of work
excluding dewatering charges etc., as per SS 20 B(APSS 308)

For Toe wall


1 x 1 300.0 0.45 0.50 67.50

67.50 Cum 271.40 Cum 18,319.50


6 (BLD- Plain Cement Concrete (1:4:8) (cement: fine aggregate: Coarse aggregate) for foundations
CSTN- and under flooring bed using 162.0 kgs of cement, coarse aggregate 40mm size hard ,
3-5) machine crushed granite from approved quarry including cost and conveyance of all materials
like cement, sand, coarse aggregate, water etc., to site, and including all charges for machine
mixing, laying concrete in foundations and under flooring bed, ramming in 15 cm layers
finishing top surface to the required level curing etc., and overheads & contractors profit
complete for finished item of work. (APSS No. 402)

For Toe wall 1 x 1 300.0 0.45 0.10 13.50

13.50 Cum 4,556.33 Cum 61,510.46


7 Random Rubble stone masonry in CM (1:8) prop: (Cement: Screened sand) using hard granite
stones carted from approved quarry including cost and conveyance of all materials like
cement, screened sand, water,Rough stone Through stone, Coursed stones etc., from approved
( BLD- quarry, to site, including labour charges for cutting stones to required size and shape, mixing,
CSTN- of cement, mortar, construction, curing, charges for scaffolding etc., and overheads &
6-13 ) contractors profit complete for finished item of work. (APSS No. 601 & 615)

For Basement wall 1 x 1 300.00 0.45 0.70 94.50


94.50 Cum 4,511.57 Cum 426,343.37
8 (BLD- Filling with carted gravel in pathways, trenches, sides of foundations and basement with initial
CSTN- lead in layers not exceeding 15cm thick, watering and ramming including cost and conveyance
2-8) & of water to work site and all operational, incidental, labour charges, hire charges of T&P etc.,
Proc.No and overheads & contractors profit complete for finished item of work(APSS NO.309&310)
.20938
(R&B)/
Dt:14-5-
For leveling and profiling for pitching work 1 x 1 300.0 4.50 0.20 270.00
2019
Page 53 of 275
Item Rate Per Unit Amount
Sl.No Description of Item Nos. L B D QTY Unit Unit
Code (in Rs.) (in Rs.)

270.00 Cum 328.31 Cum 88,643.70


9 Providing and constructing 30 cm thick dry rubble stone pitching with pin headers at 2 per
sqm, complete with initial lead upto 50 m and all lifts including cost and conveyance to site
IRR- including all operational, incidental, labour charges, hand packing, laying to required slope
CAW-8- hand packing, finishing as directed by the Engineer- in-charge etc., and overheads &
3 contractors profit complete for finished item of work

( rubble stones : 0.275 cum/sqm, Stone Chips : 0.045cum/sqm, Pin Headers 30cm : 2/sqm)
For pitching 1 x 1 300.0 4.50 1350.00
1350.00 Cum 479.35 Cum 647,120.48
kadapa Kerb along the pathways -
10 (BLD- Earth work excavation for foundations (Manual Means) of buildings, septic tank, sump,
CSTN- compound wall in ordinary soils and depositing on bank with an initial lead of 10m and depth
2-1) up to 3m including all operational, incidental, labour charges such as shoring, sheeting,
planking, strutting etc., and overheads & contractors profit complete for finished item of work
excluding dewatering charges etc., as per SS 20 B(APSS 308)

kadapa Kerb along the pathways - 500 Rmt


1 x 1 500.0 0.30 0.30 45.00

45.00 Cum 271.40 Cum 12,213.00


11 (BLD- Plain Cement Concrete (1:4:8) (cement: fine aggregate: Coarse aggregate) for foundations
CSTN- and under flooring bed using 162.0 kgs of cement, coarse aggregate 40mm size hard ,
3-5) machine crushed granite from approved quarry including cost and conveyance of all materials
like cement, sand, coarse aggregate, water etc., to site, and including all charges for machine
mixing, laying concrete in foundations and under flooring bed, ramming in 15 cm layers
finishing top surface to the required level curing etc., and overheads & contractors profit
complete for finished item of work. (APSS No. 402)

kadapa Kerb along the pathways - 500 Rmt


1 x 1.0 500.00 0.30 0.10 15.00
15.00 Cum 4,556.33 Cum 68,344.95
12 (CPWD Supply and fixing of Kadapa stone Kerb of size 450 X 450 X 50 mm thick as selected by the
-II- Engineer-in-charge from approved source/ factory which is laid on existing CC Bed in
16.69) position to the required line, level and curvature jointed with cement mortar 1:3 (1 cement : 3
coarse sand), including making joints with or without grooves (thickness of joints except at
sharp curve shall not to more than 5 mm), including making drainage opening wherever
required and including cost and conveyance of all materials & labour charges including
transportation from approved source, loading & unloading charges, contractor profit &
overhead charges complete for finished item of work.

kadapa Kerb along the pathways - 500 Rmt


1 x 1 500 500.00

500.00 Rmt 148.92 Rmt 74,460.00


profiling of existing bund with gravel
13 Providing casing embankment using gravel from approved area in layers of 25 cm with
compaction including cost of all materials, machinery, labour, all operations such as materials
(IRR-
transporting, spreading in layer of specified thickness, breaking clods, sectioning, compacting
CAW-2-
each layer without watering by Road roller 10 tonne etc.,complete with 8 km transportation
8)
with loading & unloading and complete for finished item of work.

For site filling 1 x 1 1200.00 10.00 0.35 4200.00


4200.00 Cum 344.07 Cum 1,445,094.00
Murrum pathway with 150 mm thick gravel bed -1200Sqm

14 (BLD- Filling with carted gravel in pathways, trenches, sides of foundations and basement with initial
CSTN- lead in layers not exceeding 15cm thick, watering and ramming including cost and conveyance
2-8) & of water to work site and all operational, incidental, labour charges, hire charges of T&P etc.,
Proc.No and overheads & contractors profit complete for finished item of work(APSS NO.309&310)
.20938
(R&B)/
Dt:14-5-
2019 Murrum pathway with 150 mm thick gravel 1 x 1 300.0 4.00 0.15 180.00
bed -1200Sqm 180.00 Cum 328.31 Cum 59,095.80
Sub Total - I 3,278,495.26
Softscape
Bed preparation for Dibbling for Bermuda/Doob/ Shade Grass :-Dressing the surface to the
desired shape, laying 150 mm (6”) thick fine red garden soil, covered with a thin layer of 10
mm thick sand, watering, compacting to 4" thickness by hand roller including cost of red
garden soil, sand and labour charges etc. complete for bed preparation and dibbling rooted
slips of grass @2" apart and ramming including slipping of grass, racking the soil before
dibbling, watering and ramming complete etc., and it including all operational, incidental,
As per labour charges, required tools, overheads & contractors profit complete for finished item of
15
Data work excluding cost of dibbling grass and fertilizer for 1 sqm
Red garden soil in this context it is defined as sandy loamy garden soil congenial for plant
growth which shall be of light textured, crystaline, porous and friable, fertlie, slightly acidic or
neutral

Perennial Rye Grasses 1 x 1 280.0 280.00

Page 54 of 275
Item Rate Per Unit Amount
Sl.No Description of Item Nos. L B D QTY Unit Unit
Code (in Rs.) (in Rs.)

Total 280.00 Sqm 285.05 Sqm 79,814.00


Maintenance of lawns: Lawn mowing with electric motor / portable cutter machine and edging
& weeding of the lawns (once in 30 days) and application of fertilizers, insecticides,
As per Fungicides (once in a month) by manual excluding cost of fertilizers including all operational,
16
Data incidental ,labour charges for complete item of work,
100
Sqm/
Perennial Rye Grasses 1 x 1 280.00 280.00 Sqm month
280.00 Sqm 105.00 294.00
Maintenance of lawns: watering to the lawn once in 2 days @ 10 to 15 ltrs /per Sqmt basing
on season and weather conditions (15 watering is required in a month to maintain sub-soil
As per moisture continuously), excluding cost of water including all operational, incidental ,labour
17 `
Data charges for complete of work,

100
Perennial Rye Grasses
1 x 1 280.00 280.00 Sqm Sqm/
month
280.00 Sqm 393.75 1,102.50
Digging of 0.75x0.75x0.75 mtrs. pit, filling with soil mixture of red garden soil, farmyard
manure at 4:1 ratio including internal transport, application of fertilizers and chemicals (@ 20
gms/pit/sqmt), internal transportation of plants, planting the plants etc., and it including all
operational, incidental, labour charges, required tools, overheads & contractors profit
complete for finished item of work. (excluding cost of plant material, fertilizers and
As per
18 chemicals (@ 20 gms / pit/ sqmt)
Data
(Red garden soil in this context it is defined as sandy loamy garden soil congenial for plant
growth which shall be of light textured, crystalline, porous and friable, fertile, slightly acidic
or neutral)

For tall plants 315 315.00


Total 315.00 Nos 692.92 Each 218,269.80
Maintenance of Palms/Tree planting: Trimming (once in month) and application of fertilizers,
As per insecticides, Fungicides @ 20 gms/pit/sqmt) (once in quarterly) by manually excluding cost of
19
Data fertilizers, it including all operational, incidental ,labour charges, for complete of work for one
month maintenance.
100
Palms/Tree maintenance for 1 months Nos/
1 x 315 315.00 Nos
month
315.00 Nos 609.00 1,918.35
Maintenance of Palms/Tree planting: formation of basins 0.30m . away from the edges of
As per plant (once in a month) it including all operational, incidental ,labour charges for complete of
20 100
Data work for one month maintenance.
Nos/
month
Palms/Tree maintenance for 1 months 1 x 315 315.00 Nos

315.00 Nos 1092.00 3,439.80


Maintenance of Palms/Tree planting: watering (once in three days @ 5 Lts/per plant shall be
As per provide to maintain sub soil moisture continuously) by manually, but excluding cost of
21 100
Data water including all operational, incidental ,labour charges for complete of work. for one month
maintenance. Nos/
month
Palms/Tree maintenance for 1 months 1 x 315 315.00 Nos

315.00 Nos 945.00 2,976.75


22 Supply & Delivery of topiary/trees/Palms/shrubs/lawn/ ground covers and specified plants
as per directions of officer in charge at site including cost of plants
plants of bag size
7" x 8" of plant height not less than 1.0 feet,
8" x 10" of plant height not less than 3.0 feet,
13" x 13" of Tree/Palm height not less than 5 feet,
13" x 13" of plant (Hedges & Shrub) height not less than 2 feet,
15" x 16" of plant (Tree/Palm/Topiary) height not less than 5 feet,
18" x 18" plant (Tree/Palm/Topiary) height not less than 6 feet, bottom dia of the stem is 0.75''
and above,
21" x 21" and above plant (Tree/Palm/Topiary) height not less than 7 feet, bottom dia of the
stem is 1'' and above.
Heights mentioned above are excluding bag height.
All the plants supplied shall be with sturdy stem, well formed crown, vigorously growing tip,
healthy foliage without any infestation and the plants shall be supplied after proper hardening
off.
the rates inclusive of cost of plants and labour charges for handling & complete for finished
item of work.

lawn Bag size

Perennial Rye Grasses Sqm


280.0 Sqm 180.0 each 50,400.00
Plants names Bag size
syzygium cumini 21" x 21" 157 Nos 600 each 94,200.00
departm
ent
Page 55 of 275
supply
Item Rate Per Unit Amount
Sl.No Description of Item Nos. L B D QTY Unit Unit
Code (in Rs.) (in Rs.)
departm
ent Tabeuia roses 21" x 21" 158 Nos 600 each 94,800.00
supply
Floating plants
Horn wort small pot 180.0 Nos 400.00 each 72,000.00

Loading and unloading of plants bag size (21"X21") at site of work and stacking for lead less
As per upto 50 m and including labour charges, T&P etc.,and overheads & contractors profit
23
Data complete for finished item of work (excluding cost of plant bag) 100
Nos
Plants bag size 21" X 21" 315.00 Nos

315.00 Nos 3198.61 10,075.62


unloading of plants bag size (7"X8") at site of work and stacking for lead less upto 50 m and
As per including labour charges, T&P etc.,and overheads & contractors profit complete for finished
24
Data item of work (excluding cost of plant bag)

Plants bag size 7" X 8" 180.00 Nos


100
Nos
180.00 Nos 57.72 103.90

Sub Total - II 629,394.72


Total = ( Sub Total - I to Sub Total - II ) 3,907,889.98
Approxim
ate weight
Transportation of bag plants form Kadiyam No. of weight in
Bag size of plants Unit Unit
toOngole Municipal Coporation. plants Kgs
of bag
size in
Tall Plants 21" x 21" Kgs
50.00 315 Nos 15750.00 Kgs
Floating plants 7" x 8" 2.00 180 Nos 360.00 Kgs

Toatl plants 315 Nos 16110.00 Kgs


MT
25 L.S Provision for transportation of bag plants Total weight 16.110 LS 16,110.00

26 L.S Provision for Irrigation facilities 150,000.00


27 L.S Provision for water testing ( Collecting samples, laboratory testing process and reports ) 15,000.00
28 Add Price Price adjustment @ 5 % on Total = ( Sub Total - I to Sub Total - II ) 195,394.50
29 Add Tender premium @ 5 % on Total = ( Sub Total - I to Sub Total - II ) 195,394.50
30 Add NAC @ 0.1 % on Total = ( Sub Total - I to Sub Total - II )+25 to 29 4,479.79
31 Add Publication Charges @ 1 % on Total = ( Sub Total - I to Sub Total - II ) 39,078.90

Total 4,523,347.67
Add GST @18 % on Total 814,202.58
Add seigniorage charges @ 1.50 % on Sub Total - I 49,177.43
Add Consultancy & engineering supervision Charges @ 5% on Total 226,167.38
Add unforeseen items 87,104.94
Grand Total 5,700,000.00

Page 56 of 275
A.P. Greening and Beautification Corporation

Name of the Work:- Detailed estimate for development of landscape (Softscape & Hardscape) Rejuvenation of water body including
strengthening of bund and greenning and providing walking tracks at koppolu cheruvu in division no.9 ( 24.33 Acres) at Ongole
Municipal Coporation, Prakasam District Andhra Pradesh. Under AMRUT 2.0
Err:509
Rate Per
Sl.N Item Amount
Description of Item Nos. L B D QTY Unit Unit (in Unit
o Code (in Rs.)
Rs.)
Softscape
Bed preparation for Dibbling for Bermuda/Doob/ Shade Grass :-Dressing the
surface to the desired shape, laying 150 mm (6”) thick fine red garden soil, covered
with a thin layer of 10 mm thick sand, watering, compacting to 4" thickness by
hand roller including cost of red garden soil, sand and labour charges etc. complete
for bed preparation and dibbling rooted slips of grass @2" apart and ramming
including slipping of grass, racking the soil before dibbling, watering and
As per
1 Data
ramming complete etc., and it including all operational, incidental, labour charges,
required tools, overheads & contractors profit complete for finished item of work
excluding cost of dibbling grass and fertilizer for 1 sqm
Red garden soil in this context it is defined as sandy loamy garden soil congenial
for plant growth which shall be of light textured, crystaline, porous and friable,
fertlie, slightly acidic or neutral

For paspalum grass 1 x 1 50.00 10.00 500.00


500.00 Sqm 285.05 Sqm 142,525.00
Bed preparation for Korean/Mexican: Dressing the surface to the desired shape,
laying of 150 mm. (6”) thick fine red garden soil, covered with a thin layer of 10
mm thick sand, watering, rolling (compacting to 4" thickness by hand roller),
including the cost of red garden soil, sand and labour charges etc., for complete
bed preparation and laying and ramming of lawn mats / rolls in proper position on
existing prepared bed by internal transportation from dumped place, including cost
As per of labour for laying, ramming by hand roller / demesha, internal transportation and
2 Data watering etc., and it including all operational, incidental, labour charges, required
tools, overheads & contractors profit complete for finished item of work. excluding
cost of grass, fertilizers and chemicals etc., for 1 Sqm
(Red garden soil in this context it is defined as sandy loamy garden soil congenial
for plant growth which shall be of light textured, crystalline, porous and friable,
fertile, slightly acidic or neutral)

For Korean grass 1 x 1 47.50 10.00 475.00


475.00 Sqm 326.45 Sqm 155,063.75
Maintenance of lawns: Lawn mowing with electric motor / portable cutter machine
and edging & weeding of the lawns (once in 15 days from June - Nov and once in
30 days from Dec - May) with watering 10 to 15 ltrs /per Sqmt/per day basing on
As per season and weather conditions (30 watering is required in a month to maintain
3 Data sub-soil moisture continuously), application of fertilizers, insecticides, Fungicides
(once in a month) by manual excluding cost of fertilizers & water. for one year

For paspalum grass 1 x 1 500.00 500.00


For Korean grass 1 x 1 475.00 475.00
100
975.00 Sqm 942.38 Sqm/ 110,258.46
month

Hedge / shrub planting:Digging the trench of size 0.45 mtrs. depth, refilling with
red garden soil including cost of red garden soil and farmyard manure at 4:1 ratio,
internal transportation of plants, planting etc., including the application of
fertilizers and pesticides etc.,(@ 20 gms/pit/sqmt) and it including all operational,
incidental, labour charges, required tools, overheads & contractors profit complete
As per for finished item of work, but excluding the cost of the fertilizers (@ 20
4 Data gms/pit/sqmt) and plant material etc., - unit 1 Sqmt of work. (* 3 No./Sqm of
plants & bag size shall be arrived based on the spacing 0.6 c/c as per the design.)
(Red garden soil in this context it is defined as sandy loamy garden soil congenial
for plant growth which shall be of light textured, crystalline, porous and friable,
fertile, slightly acidic or neutral).

Shrub / Hedge planting 1 x 1 1294.17 1.20 1553.00


Total 1553.00 Sqm 717.30 Sqm 1,113,966.90
Maintenance of hedge/shrub planting: Trimming of hedges/shrubs (once in 15
days) watering (once in a day @ 5 Lts/per sqmt/per day shall be provide to
maintain sub soil moisture continuously). Edge cutting 0.30mtr. away from the
As per edges/shrub (once in a month) and application of fertilizers, insecticides,
5 Data 100
Fungicides ( once in a month @ 20 gms/pit/sqmt) etc., by manually excluding cost Sqm/
of water and fertilizers for one year month

For Hedge / shrub planting 1 x 1


1553.00 Sqm 2984.10 556,116.88
Bed preparation for Ground cover / Flower beds: Digging the trench of size 150
mm. depth, and Formation of 150 mm. (6") thick of soil mixture at 3:1:1 ratio red
garden soil, farmyard manure and river sand, application of fertilizers (@ 20
gms/pit/sqmt) by making smooth surface as per design including cost of soil
mixture, filling of the soil mixture and internal transportation etc., and it including
As per all operational, incidental, labour charges, required tools, overheads & contractors
6 Data profit complete for finished item of work. (excluding cost of plant material,
fertilizers and chemicals (@ 20 gms / pit/ sqmt))-unit 1 Sqmt of work. (* 25
No./Sqm of plants & bag size shall be arrived based on the spacing 0.2 c/c as per
the design.)(Red garden soil in this context it is defined as sandy loamy garden soil
congenial for plant growth which shall be of light textured, crystalline, porous and
friable, fertile, slightly acidic or neutral)

Page 57 of 275
Rate Per
Sl.N Item Amount
Description of Item Nos. L B D QTY Unit Unit (in Unit
o Code (in Rs.)
Rs.)
Groundcover/flower beds (Slope 1 x 1 4475.00 1.00
stablization) 4475.00
Total 4475.00 Sqm 288.75 Sqm 1,292,156.25
Maintenance of groundcover/flower beds: Weeding, Trimming/pinching and
keeping the ground cover in healthy condition (once in a fortnight). Watering to
As per ground cover (one's in three day's @ 5 litres/per Sqmts shall be provide to maintain
7 Data sub soil moisture continuously) by manually, excluding cost of water. (Observed
Data) for one year

groundcover/flower beds 1 x 1 100


4475.00 Sqm 1344.00 Sqm/ 721,728.00
month
Digging of 0.75x0.75x0.75 mtrs. pit, filling with soil mixture of red garden soil,
farmyard manure at 4:1 ratio including internal transport, application of fertilizers
and chemicals (@ 20 gms/pit/sqmt), internal transportation of plants, planting the
plants etc., and it including all operational, incidental, labour charges, required
As per tools, overheads & contractors profit complete for finished item of work.
8 Data (excluding cost of plant material, fertilizers and chemicals (@ 20 gms / pit/ sqmt)
(Red garden soil in this context it is defined as sandy loamy garden soil congenial
for plant growth which shall be of light textured, crystalline, porous and friable,
fertile, slightly acidic or neutral)
Ornamental planting 1 x 125 125.00
Trees 1 x 655 655.00
Total 780.00 Nos 692.92 Each 540,477.60
Maintenance of Palms/Tree planting: Trimming (once in month), watering (once
in three days @ 5 Lts/per plant shall be provide to maintain sub soil moisture
continuously), formation of basins 0.30m . away from the edges (once in a month)
As per
9 Data and application of fertilizers, insecticides, Fungicides @ 20 gms/pit/sqmt) (once in
100
quarterly) by manually, but excluding cost of water & fertilizers for month for Nos/
one year month

For Maintenance of Palms/Tree planting: 780.00 Nos 2646.00 247,665.60


Total - I 4,879,958.4
10 Supply & Delivery of topiary/trees/Palms/shrubs/lawn/ ground covers and
specified plants as per directions of officer in charge at site including cost of plants
plants of bag size
7" x 8" of plant height not less than 1.0 feet,
8" x 10" of plant height not less than 3.0 feet,
13" x 13" of Tree/Palm height not less than 5 feet,
13" x 13" of plant (Hedges & Shrub) height not less than 2 feet,
15" x 16" of plant (Tree/Palm/Topiary) height not less than 5 feet,
18" x 18" plant (Tree/Palm/Topiary) height not less than 6 feet, bottom dia of the
stem is 0.75'' and above,
21" x 21" and above plant (Tree/Palm/Topiary) height not less than 7 feet, bottom
dia of the stem is 1'' and above.
Heights mentioned above are excluding bag height.
All the plants supplied shall be with sturdy stem, well formed crown, vigorously
growing tip, healthy foliage without any infestation and the plants shall be supplied
after proper hardening off.
the rates inclusive of cost of plants and labour charges for handling & complete for
finished item of work.

Plants names Bag size


lawn
For paspalum grass Sqm 500.00 Sqm 100.00 Sqm 50,000.00
For Korean grass Sqm 475.00 Sqm 200.00 Sqm 95,000.00
Hedge /shrub plants
Shrub / Hedge planting 7" x 8" 15530.0 Nos 60.00 each 931,800.00
For Ground covers / Flower beds
Groundcover/flower beds (Slope 4" x 7"
stablization) 89500.0 Nos 30.00 each 2,685,000.00

Palms/Tree planting
Ornamental planting 21" x 21" 125.00 Nos 600.00 each 75,000.00
Trees 21" x 21" 655.00 Nos 600.00 each 393,000.00
Total : II Err:509
Total :I+II Err:509
Hardscape (Civil works)
11 (BLD- Earth work excavation for foundations (Manual Means) of buildings, septic tank,
CSTN- sump, compound wall in ordinary soils and depositing on bank with an initial lead
2-1) of 10m and depth up to 3m including all operational, incidental, labour charges
such as shoring, sheeting, planking, strutting etc., and overheads & contractors
profit complete for finished item of work excluding dewatering charges etc., as per
SS 20 B(APSS 308)

For C.C kerb 1 x 1 1735 0.30 0.30 156.15


For cobble stone flooring in path ways 1 x 1
57.14 3.50 0.10 20.00

For granite stone flooring at Entrance 1 x 1


plaza and path ways 81.50 10.00 0.10 81.50
For pathway flooring with tandur stone 1 x 1 576.25 4.00 0.10 230.50
For pathway flooring with kadappa stone 1 x 1 664.00 4.00 0.10 265.60
Page 58 of 275
Rate Per
Sl.N Item Amount
Description of Item Nos. L B D QTY Unit Unit (in Unit
o Code (in Rs.)
Rs.)
For pathway flooring with CC tiles 1 x 1 350.00 4.00 0.10 140.00
For parking area flooring with 60 mm thick 1 x 1
C.C pavers 135.00 3.00 0.10 40.50
934.25 Cum 271.40 Cum 253,555.45
12 (BLD- Plain Cement Concrete (1:4:8) (cement: fine aggregate: Coarse aggregate) for
CSTN- foundations and under flooring bed using 162.0 kgs of cement, coarse aggregate
3-5) 40mm size hard , machine crushed granite from approved quarry including cost
and conveyance of all materials like cement, sand, coarse aggregate, water etc., to
site, and including all charges for machine mixing, laying concrete in foundations
and under flooring bed, ramming in 15 cm layers finishing top surface to the
required level curing etc., and overheads & contractors profit complete for finished
item of work. (APSS No. 402)

For C.C kerb 1 x 1.00 1735.00 0.30 0.10 52.05


For cobble stone flooring in path ways
1 x 1.00 57.14 3.50 0.10 20.00
For granite stone flooring at Entrance
plaza and path ways 1 x 1.00 81.50 10.00 0.10 81.50

For pathway flooring with tandur stone 1 x 1.00 576.3 4.0 0.10 230.50

For pathway flooring with kadappa stone 1 x 1.00 664.0 4.0 0.10 265.60

For pathway flooring with CC tiles 1 x 1.00 350.0 4.0 0.10 140.00

789.65 Cum 4,556.33 Cum 3,597,905.98


13 (CPWD Supply and fixing of C.C. Kerb not less than M30 strength of size 600 X 400 X
-II- 110 mm thick with bottom thickness of 110 mm up to height of 350 mm and top
16.69) width of 50 mm thick chamfering with 45° at starts at 350 mm height to 400 mm
height as selected by the Engineer-in-charge from approved source/ factory which
is laid on existing CC Bed in position to the required line, level and curvature
jointed with cement mortar 1:3 (1 cement : 3 coarse sand), including making joints
with or without grooves (thickness of joints except at sharp curve shall not to more
than 5 mm), including making drainage opening wherever required and including
cost and conveyance of all materials & labour charges including transportation
from approved source, loading & unloading charges including contractor profit &
overhead charges complete for finished item of work..

For C.C kerb 1 x 1 1735 1735.00


1735.00 Rmt 599.16 Rmt 1,039,542.60
14 As Per Supply and fixing of Kadapa slab (rough) 50mm thick and size of 0.457x0.457m
Data stone edging including excavating trench in ordinary soil, laying P.C.C (1:4:8) 100
mm thick and fixing the stone in alignment and refilling the excavated soil
conveyance of all materials and labour charges including transportation complete
for finished item of work

For Soft scape works 1 x 1 850.00 850.00

850.00 Rmt 166.15 Rmt 141,227.50

15 (BLD- Filling with carted gravel in pathways, trenches, sides of foundations and basement
CSTN- with initial lead in layers not exceeding 15cm thick, watering and ramming
2-8) & including cost and conveyance of water to work site and all operational, incidental,
Proc.No labour charges, hire charges of T&P etc., and overheads & contractors profit
.20938 complete for finished item of work(APSS NO.309&310)
(R&B)/
Dt:14-5-
2019 For murrum pathway 1 x 1 1940.0 5.00 0.15 1455.00
For gravel court area 1 x 1 54.2 6.00 0.15 48.75
1503.75 Cum 328.31 Cum 493,696.16
16 (BLD- Flooring with 16 to 18mm thick high polished / Flame Finished / leather finished
CSTN- granite stone slabs other than black and regular colours (i.e. of shades like
9-7) paradise / bala flower / copper silk / laka red / lavender blue) with borders and
design as per the pattern approved by the Engineer-in-Charge of length not less
than 2.43 mts set over base coat of cement mortar (1:8) , 20mm thick using
screened sand over CC bed already laid or RCC roof slab including neat grey
cement slurry of honey like consistency spread @ 3.3 Kg per sqm and jointed
neatly with white cement paste mixed with pigment of matching shade to full depth
including cost and conveyance of all materials like cement , sand , water , granite
slabs etc., to work site and all operational, incidental labour & lift charges,
polishing charges and cost of base coat and overheads & contractors profit
complete for finished item of work (S.S.701 & special)

For granite stone flooring at Entrance


plaza and path ways 1 x 1 81.5 10.0 815.00

815.00 Sqm 4,044.67 Sqm 3,296,406.05

Page 59 of 275
Rate Per
Sl.N Item Amount
Description of Item Nos. L B D QTY Unit Unit (in Unit
o Code (in Rs.)
Rs.)
17 Flooring with grey/black colours granite cubes size of 100x100x100 mm with two
line dressed in proper shapes, and designs as per the directions of Engineer in-
charge with and laying 50 mm thick CM(1:8) bed and fixing cubes and filled
joints neatly with CM(1:1) in homogeneous or heterogeneous pattern as the colour
and pattern shall be as per the drawings furnished by the architect or as per the
directions of Engineer in-charge, and including cost and conveyance of all
materials like cement, fine aggregate (sand) , water, granite cobble ,wastage etc., to
site and , including all operations, incidental labour charges such as laying
Cement mortar, levelling , fixing cubes in approved pattern ,jointing and
complete for finished item of work.

For cobble stone flooring in path ways 1 x 1 57.14 3.5 199.99

199.99 Sqm 3,759.02 Sqm 751,766.41


18 (BLD- Filling with dust in pathways with initial lead in layers not exceeding 15cm thick,
CSTN- watering and ramming including cost and conveyance of water to work site and all
2-8) & operational, incidental, labour charges, hire charges of T&P etc., and overheads &
Proc.No contractors profit complete for finished item of work(APSS NO.309&310)
.20938
(R&B)/
Dt:14-5-
2019
For parking area flooring with 60 mm thick
C.C pavers 1 x 1 135 3 0.10 40.50

Stone Dust filling


1 x 1 310 5 0.15 232.50

273.00 Cum 987.90 Cum 269,696.70


19 As Per Supply of precast concrete blocks for paving of M-35 grade and thickness not less
Data than 60 mm for Light traffic areas conforming to IS 15658:2006 in all shapes and
designs as per the manufacturer's specification set over the 50 mm thick sand bed
with hand roller compaction with joint neatly in homogeneous or heterogeneous
pattern as the colour and pattern shall be as per the drawings furnished by the
architect, including cost and conveyance of all materials like cement, sand,
water, tiles, etc., to site including all operational, incidental, labour charges, laying
tiles to required slope as directed by the Engineer- in-charge etc., and
overheads & contractors profit complete for finished item of work

For parking area flooring with 60 mm thick


C.C pavers 1 x 1 135.00 3.00 405.00

405.00 Sqm 809.40 Sqm 327,806.81

Page 60 of 275
Rate Per
Sl.N Item Amount
Description of Item Nos. L B D QTY Unit Unit (in Unit
o Code (in Rs.)
Rs.)
20 (BLD- Flooring with Rough Shahabad / Tandur stone slabs of 40 mm thick set over base
CSTN- coat of cement mortar (1 : 8) 12 mm thick over CC bed already laid or RCC roof
9-2) slab, including pointing with cement mortar 1:3 duly filling joints nearly, including
cost of all materials like flooring stone, cement, sand, and water etc., complete,
including labour charges for dressing of flooring stones etc., complete for finished
item of work,. (APSS No.703 & 701)

For pathway flooring with tandur stone


1 x 1 576.3 4.0 2305.00

2305.00 Sqm 731.89 Sqm 1,687,011.83


21 (BLD- Flooring with Rough black Kadapa slabs minimum of 50 mm thick of size
CSTN- 0.457m x 0.457m set over base coat of cement mortar (1 : 8) 12 mm thick over CC
9-2) bed already laid or RCC roof slab, including pointing with cement mortar 1:3 duly
filling joints nearly, including cost of all materials like flooring stone, cement,
sand, and water etc., complete, including labour charges for dressing of flooring
stones etc., complete for finished item of work,. (APSS No.703 & 701)

For pathway flooring with kadappa stone 1 x 1 664.0 4.0 2656.00


2656.00 Sqm 721.37 Sqm 1,915,953.05
22 (BLD- Flooring with chequered cement concrete heavy duty tiles confirming to IS:13801
CSTN- using aggregates, cement, pigments of size 300mm x 300mm and thickness 25mm
9-4) of any shade as approved by Engineer - In - Charge set over base coat of cement
mortar (1:6), 12 mm thick using screened sand over CC bed already laid or RCC
roof slab including neat cement slurry of honey like consistency spread @ 3.3 kgs
per sqm and jointed with neat white cement to full depth mixed with pigment of
matching shade including cost and conveyance of all materials like cement, sand,
water and tiles etc., and overheads & contractors profit complete for finished item
of work.

For pathway flooring with CC tiles 1 x 1 350.0 4.0 1400.00


1400.00 Sqm 958.07 Sqm 1,341,300.84

For Construction of Planter boxes size of 3.2 m x 3.2 m x 0.45 m -20 No's
Seater wall -75 Rmt

21 (BLD- Earth work excavation for foundations (Manual Means) of buildings, septic tank,
CSTN- sump, compound wall in ordinary soils and depositing on bank with an initial lead
2-1) of 10m and depth up to 3m including all operational, incidental, labour charges
such as shoring, sheeting, planking, strutting etc., and overheads & contractors
profit complete for finished item of work excluding dewatering charges etc., as per
SS 20 B(APSS 308)

For planter box wall 20 x 1 12.8 0.45 0.45 51.84


For seating modules 5.0 x 2.0 m 0 x 1 14.0 0.45 0.30 0.00
For seater wall 1 x 1 75.0 0.45 0.45 15.19
67.03 cum 271.40 cum 18,191.94
22 (BLD- Plain Cement Concrete (1:4:8) (cement: fine aggregate: Coarse aggregate) for
CSTN- foundations and under flooring bed using 162.0 kgs of cement, coarse aggregate
3-5) 40mm size hard , machine crushed granite from approved quarry including cost
and conveyance of all materials like cement, sand, coarse aggregate, water etc., to
site, and including all charges for machine mixing, laying concrete in foundations
and under flooring bed, ramming in 15 cm layers finishing top surface to the
required level curing etc., and overheads & contractors profit complete for finished
item of work. (APSS No. 402)

For planter box wall 20 x 1 12.8 0.45 0.10 11.52


For seating modules 5.0 x 2.0 m 0 x 1 14.0 0.45 0.10 0.00
For seating modules 5.0 x 2.0 m floor bed 0 x 1 5.0 2.0 0.10 0.00
For seater wall 1 x 1 75.0 0.45 0.10 3.38
14.90 Cum 4,556.33 Cum 67,889.32
23 (BLD- Masonry work in CM(1:6) prop (Cement : Screened sand) in superstructure with
CSTN- fly ash cement / lime solid blocks of size 290mm x 225mm x 140mm from
5-17) approved source having minimum crushing strength of 50 Kg/Sqcm. including cost
and conveyance of all materials like cement, sand, bricks, water etc., to site,and
such as labour charges, like mixing cement mortar, scaffolding charges,
constructing masonry, lift charges, curing, overheads and contractor profit etc.,
complete for finished item of work. (APSS No. 501 & 504).

For planter box wall 20 x 1 12.8 0.23 0.80 47.10


For seating modules 5.0 x 2.0 m 0 x 1 14.0 0.23 0.40 0.00
For seater wall 1 x 1 75.0 0.23 0.80 13.80
60.90 cum 7,242.08 cum 441,042.67

Page 61 of 275
Rate Per
Sl.N Item Amount
Description of Item Nos. L B D QTY Unit Unit (in Unit
o Code (in Rs.)
Rs.)
24 (BLD- Plastering 12mm thick single coat in CM(1:5) using screened sand including cost
CSTN- and conveyance of all materials like cement, sand, water etc., to site and all
8-3 operational, incidental charges on materials and including cost of all labour
Amend charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc.,
ment in and overheads & contractors profit complete for finished item of work.(SS 901,903
SoR
& 904)
2016-17
)

For planter box wall 20 x 2 12.8 0.50 256.00


For seating modules 5.0 x 2.0 m 0 x 1 14.0 0.30 0.00
For seater wall 1 x 2 75.0 0.50 75.00
331.00 sqm 373.34 sqm 123,575.54

Page 62 of 275
Rate Per
Sl.N Item Amount
Description of Item Nos. L B D QTY Unit Unit (in Unit
o Code (in Rs.)
Rs.)
Providing 0.30 m wide Coping with Polished black Kadapa slabs minimum of 25
mm to 30 mm thick in single piece as specified set over a base coat of CM (1:5) ,
12mm thick using screened sand over already laid CC bed / RCC roof slab
including neat cement slurry of honey like consistency spread @ 3.3 Kgs per Sqm
(BLD-
and jointed with neat cement to full depth including cost and conveyance of all
25 CSTN- materials like cement, sand, water, flooring stones etc. complete including all
9-1) labour charges like dressing of flooring stones to the required size, flat nosing the
edges, mixing of cement mortar, laying, lift charges , cost of base coat, water
charges etc., and overheads & contractors profit complete for finished item of work
(APSS No.703 & 701)

For planter box wall top side 20 x 1 12.8 0.30 76.80


For planter box wall top side 1 x 1 75.0 0.30 22.50
99.30 Sqm 957.27 Sqm 95,056.89
26 (BLD- Supply & application of one coat water based cement primer of exterior grade II
CSTN- and two coats of acrylic exterior emulsion paint having VOC (Volatile Organic
12-2& Compound) content less than 50 grams/litre for exterior walls including cost and
Amend conveyance of all materials to site,and all operational, incidental, labour charges
ment in etc., and overheads & contractors profit complete for finished item of work in all
SoR
floors.
2011-
12)

For planter box wall 20 x 1 12.8 0.50 128.00


For seating modules 5.0 x 2.0 m 0 x 1 14.0 0.3 0.00
For planter box wall 1 x 1 75.0 0.50 37.50
For seater wall 1 x 2 75.0 0.50 75.00
240.50 Sqm 275.24 Sqm 66,195.22
27 (BLD- Flooring with chequered cement concrete heavy duty tiles confirming to IS:13801
CSTN- using aggregates, cement, pigments of size 300mm x 300mm and thickness 25mm
9-4) of any shade as approved by Engineer - In - Charge set over base coat of cement
mortar (1:6), 12 mm thick using screened sand over CC bed already laid or RCC
roof slab including neat cement slurry of honey like consistency spread @ 3.3 kgs
per sqm and jointed with neat white cement to full depth mixed with pigment of
matching shade including cost and conveyance of all materials like cement, sand,
water and tiles etc., and overheads & contractors profit complete for finished item
of work.

For seating modules 5.0 x 2.0 m floor bed 0 x 1.0 5.0 2.0
0.00
0.00 Sqm 958.07 Sqm -

Construction of main Entrance Gate size of 6.0 m x 2.30 m - 1 nos


28 (BLD- Earth work excavation for foundations (Manual Means) of buildings, septic tank,
CSTN- sump, compound wall in ordinary soils and depositing on bank with an initial lead
2-1) of 10m and depth up to 3m including all operational, incidental, labour charges
such as shoring, sheeting, planking, strutting etc., and overheads & contractors
profit complete for finished item of work excluding dewatering charges etc., as per
SS 20 B(APSS 308)

For Footings 1 x 2 1.20 1.20 1.50 4.32


4.32 Cum 271.40 Cum 1,172.45
29 (BLD- Plain Cement Concrete (1:4:8) (cement: fine aggregate: Coarse aggregate) for
CSTN- foundations and under flooring bed using 162.0 kgs of cement, coarse aggregate
3-5) 40mm size hard , machine crushed granite from approved quarry including cost
and conveyance of all materials like cement, sand, coarse aggregate, water etc., to
site, and including all charges for machine mixing, laying concrete in foundations
and under flooring bed, ramming in 15 cm layers finishing top surface to the
required level curing etc., and overheads & contractors profit complete for finished
item of work. (APSS No. 402)

For Footings 1 x 2 1.2 1.2 0.10 0.29


For Plinth Beam 1 x 1 10.00 0.40 0.10 0.40
0.69 Cum 4,556.33 Cum 3,143.87
30 (BLD- Supply and placing of the V.R.C.C Nominal Mix Concrete M 20 grade
CSTN- corresponding to IS 456 with minimum cement content of 350 kgs per 1 cum of
3-13-A) concrete using CONCRETE MIXER with 20mm size HBG graded machine
crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386
Part 1 to Part 8) from approved quarry and including cost and conveyance of all
materials like cement, fine aggregate (sand) coarse aggregate, water, etc., to site
and , centring using Steel scaffolding pipes , jack props , Waller’s , Foot plates ,
brackets , steel centring plates etc., including all operational, incidental and labour
charges such as machine mixing, laying concrete, vibrator, curing etc., and
overheads & contractors profit complete but excluding cost of steel and its
fabrication charges for finished item of work (APSS No. 402)

For Footings 1 x 2 0.9 0.9 0.30 0.49


0.49 Cum 9,421.96 Cum 4,616.76
For Pedestals 1 x 2 0.60 0.60 1.10 0.79
0.79 Cum 10,033.49 Cum 7,926.46
For Plinth Beam 1 x 1 10.00 0.23 0.30 0.69
0.69 Cum 12,077.14 Cum 8,333.23

Page 63 of 275
Rate Per
Sl.N Item Amount
Description of Item Nos. L B D QTY Unit Unit (in Unit
o Code (in Rs.)
Rs.)
31 (BLD- Supply and placing of the V.R.C.C Nominal Mix Concrete M 20 grade
CSTN- corresponding to IS 456 with minimum cement content of 350 kgs per 1 cum of
3-13-B) concrete using CONCRETE MIXER with 20mm size HBG graded machine
crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386
Part 1 to Part 8) from approved quarry and,including cost and conveyance of all
materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site
and , centring using Casurina Ballies, Bamboos, Wooden Reapers, Runners, Wood
Posts, Wall Plates etc., including all operational, incidental and labour charges
such as machine mixing, lifting of concrete manually, laying concrete, vibrator,
curing , overheads & contractors profit etc., complete but excluding cost of steel
and its fabrication charges for finished item of work (APSS No. 402)

For Columns 1 x 1 0.30 0.30 5.00 0.45


0.45 Cum 11,836.02 Cum 5,326.21
32 (BLD- Supply and placing of the V.R.C.C Nominal Mix Concrete M 20 grade
CSTN- corresponding to IS 456 with minimum cement content of 350 kgs per 1 cum of
3-13-C) concrete using CONCRETE MIXER with 20mm size HBG graded machine
crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386
Part 1 to Part 8) from approved quarry including cost and conveyance of all
materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site
and , centring using Casurina Ballies , Bamboos , Wooden Reapers , Runners ,
Wood Posts , Wall Plates etc., including all operational, incidental and labour
charges such as machine mixing, lifting of concrete manually, laying concrete,
vibrator, , curing , overheads & contractors profit etc., complete but excluding cost
of steel and its fabrication charges for finished item of work (APSS No. 402)

For Beam 1 x 1 5.00 0.30 0.45 0.68


0.68 Cum 10,262.59 Cum 6,978.56
33 (BLD- Providing High Yield Strength Deformed (HYSD) / Thermo Mechanically Treated
CSTN- (TMT) (Fe 500 / Fe 500D grade as per IS 1786-1979) of different diameters for
4.2)& RCC works , including labour charges for straightening, cutting, bending to
Amend required sizes and shapes, placing in position with cover blocks of approved
ment in materials and size and tying and lap-splicing with binding wire of 18 SWG,
SoR forming grills for reinforcement work as per approved designs and drawings,
2011- including cost and conveyance of steel bars, including all wastages such as
12 page overlaps, couplings, chairs, spacer bars including cost and conveyance of binding
No. 392 wire, cover blocks and all incidental, operational, labour charges such as cutting,
bending, placing in position, tying including overheads & contractors profit
complete for finished item of work.( APSS No.126)

For Footings 1 x 1 0.490 70.00 Kg/Cum 34.30


For Pedestals 1 x 1 0.790 70.00 Kg/Cum 55.30
For Plinth Beam 1 x 1 0.690 100.00 Kg/Cum 69.00
For Columns 1 x 1 0.450 100.00 Kg/Cum 45.00
For Beam 1 x 1 0.680 100.00 Kg/Cum 68.00
271.60 Kgs 92.15 Kgs 25,027.94
34 (BLD- Plastering 12mm thick single coat in CM(1:5) using screened sand including cost
CSTN- and conveyance of all materials like cement, sand, water etc., to site and all
8-3 operational, incidental charges on materials and including cost of all labour
Amend charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc.,
ment in and overheads & contractors profit complete for finished item of work.(SS 901,903
SoR & 904)
2016-
17 )

For beam 1 x 1 5.00 1.40 7.00


7.00 Sqm 386.60 Sqm 2,706.18
35 (As per Providing and applying PMCC / Deco orient base or Equivalent exterior Texture
Amend ( borders and design as per the pattern approved by the Engineer-in-Charge ) of
ment in average 2 to 3 mm thickness over plastered surface to prepare the surface even and
SoR smooth after thoroughly brushing the surface to remove all dirt and remains of
2011- loose powdered materials, applying emery paper, Sand the surface, clean & wipe
12) off loose dust, applying putty/ texture paint filler by putty knife / muslin pad, air
dry for 2 - 3 hrs for the surface preparation including cost and conveyance of all
materials to work site and all operational, incidental, labour charges, scaffolding
charges, overheads and contractors profit etc., complete for finished item of work
in all floors for external walls

For beam 1 x 1 5 1.4 7.00


7.00 Sqm 290.55 Sqm 2,033.86
36 Providing cladding to wall with High Polished Granite 16 to 18 mm thick up to 8'-
00 (2.43 M) other than black and regular colours, length equal to flooring slabs set
over base coat of CM(1:5) 12 mm thick using screened sand with cement slurry of
(BLD- honey like consistency spread at the rate of 3.30 kgs per sqm and jointing with
CSTN- white cement paste mixed with pigment of matching shade to full depth, including
9-7) cost of all materials like tiles, cement, sand and water etc., and overheads &
contractors profit complete for finished item of work.

For Columns 1 x 4 0.3 4.50 5.40


5.40 Sqm 4,063.97 Sqm 21,945.42

Page 64 of 275
Rate Per
Sl.N Item Amount
Description of Item Nos. L B D QTY Unit Unit (in Unit
o Code (in Rs.)
Rs.)
37 (BLD- Supply & application of one coat water based cement primer of exterior grade II
CSTN- and two coats of acrylic exterior emulsion paint having VOC (Volatile Organic
12-2& Compound) content less than 50 grams/litre for exterior walls including cost and
Amend conveyance of all materials to site,and all operational, incidental, labour charges
ment in etc., and overheads & contractors profit complete for finished item of work in all
SoR floors.
2011-
12)

For beam 1 x 1 5 1.4 7.00

7.00 Sqm 275.24 Sqm 1,926.71


38 As per Supply and fabrication of MS framed structure like Window Grills, Compound
Data Wall Grills, Iron Doors, Windows, Gates, MS Frame for chain link mesh works,
Roof Trusses by using square / rectangular MS hollow section as per IS 4923 &
Angles as per SP:6(1) IS Hand book, including cost of welding rods, power
charges, labour charges for cutting, placing, welding and erecting in position and
fixing, cost & convenience of all materials including wastage to site and complete
for finished item of work

For M.S column Size of 150 x 150 x 5 1 x 2 2.8 5.60 Rmt


mm thick MS hollow section

@ 22.26 kg per meter 22.26 5.60 124.66 Kgs


For M.S Gate 6.0 m x 2.4 m height
For main gate frame of Size 100x50x4 mm 1 x 2 10.5 21.00 Rmt
thick MS hollow section
For Wicket Gate frame of Size 100x50x4 1 x 2 8.3 16.60 Rmt
mm thick MS hollow section

@ 8.59 kg per meter 8.59 37.60 322.98 Kgs

For inner frame of main gate by size 1 x 4 3 12.00 Rmt


50x50x3.6 mm thick MS hollow section

For inner frame of Wicket gate by size 1 x 4 1.5 6.00 Rmt


50x50x3.6 mm thick MS hollow section
@ 4.98 kg per meter 4.98 18.00 89.64 Kgs

537.28 Kgs 118.87 Kgs 63,866.47


39 As per Supply and fabrication of MS framed structure like Window Grills, Compound
Data Wall Grills, Iron Doors, Windows, Gates, MS Frame for chain link mesh
works ,Roof Trusses by using MS Flats as per SP:6(1) IS Hand book , including
cost of welding rods, power charges, labour charges for cutting, placing, welding
and erecting in position and fixing, cost & convenience of all materials to site and
complete for finished item of work

For M.S Gate 6.0 m x 2.4 m height


For main gate inclined support of Size 1 x 2 35 70.00 Rmt
50x5 mm thick MS Flat section
For Wicket Gate inclined support of Size 1 x 2 20 40.00 Rmt
50x5 mm thick MS Flat section
@ 2.0 kg per meter 2 110.00 220.00 Kgs
220.00 Kgs 118.87 Kgs 26,151.40
40 As per Supply and fabrication works like Window Grills, Compound Wall Grills, Iron
Data Doors, Windows, Gates, Roof Trusses by using HR sheet/ Perforated Sheet as per
IS 2062 including cost of welding rods, power charges, labour charges for cutting,
placing, welding & erecting in position and fixing cost & convenience of all
materials to site and complete for finished item of work.

For M.S Gate 6.0 m x 2.4 m height


For main gate perforated sheet 2 mm thick 1 x 2 2.65 1 5.30 Sqm

For Wicket Gate perforated sheet 2 mm 1 x 2 1.5 1 3.00 Sqm


thick
@ 14.3 kg per Sqm 14.3 8.30 118.69 Kgs
118.69 Kgs 102.57 Kgs 12,173.55
41 (BLD- Painting to new iron work with one coat of Red oxide primer and two coats with
CSTN- synthetic enamel paint Grade-I VOC (Volatile Organic Compound) content less
12-7 & than 50 grams/litre over primer coat of red oxid, including cost and conveyance of
12-12- all materials like Red oxide primer, Synthetic Enamel Paint to site, incidental,
197) operational and all labour charges etc., and overheads & contractors profit
complete for finished item of work in all floors. (SS No. 1201, 1212 & 1207).

For M.S column Size of 150 x 150 x 5


mm thick MS hollow section 1 x 2 2.8 0.6 3.36

For M.S Gate 6.0 m x 2.4 m height


For main gate frame of Size 100x50x4 mm
thick MS hollow section 1 x 2 10.5 0.3 6.30

For Wicket Gate frame of Size 100x50x4


mm thick MS hollow section 1 x 2 8.3 0.3 4.98

Page 65 of 275
Rate Per
Sl.N Item Amount
Description of Item Nos. L B D QTY Unit Unit (in Unit
o Code (in Rs.)
Rs.)
For inner frame of main gate by size
50x50x3.6 mm thick MS hollow section
1 x 4 3 0.2 2.40

For inner frame of Wicket gate by size


50x50x3.6 mm thick MS hollow section
1 x 4 1.5 0.2 1.20

For main gate inclined support of Size


50x5 mm thick MS Flat section 1 x 2 35 0.1 7.00

For Wicket Gate inclined support of Size


50x5 mm thick MS Flat section 1 x 2 20 0.1 4.00
For main gate perforated sheet 2 mm thick
1 x 2 2.65 1 5.30

For Wicket Gate perforated sheet 2 mm


thick 1 x 2 1.5 1 3.00
37.54 Sqm 202.45 Sqm 7,599.97

Construction of MS pergola of size 10 x 4 m - 4 No's


42 (BLD- Earth work excavation for foundations (Manual Means) of buildings, septic tank,
CSTN- sump, compound wall in ordinary soils and depositing on bank with an initial lead
2-1) of 10m and depth up to 3m including all operational, incidental, labour charges
such as shoring, sheeting, planking, strutting etc., and overheads & contractors
profit complete for finished item of work excluding dewatering charges etc., as per
SS 20 B(APSS 308)

For RCC pedastal 4 x 10 1.20 1.20 1.5 86.40


86.40 Cum 271.40 Cum 23,448.96
43 (BLD- Plain Cement Concrete (1:4:8) (cement: fine aggregate: Coarse aggregate) for
CSTN- foundations and under flooring bed using 162.0 kgs of cement, coarse aggregate
3-5) 40mm size hard , machine crushed granite from approved quarry including cost
and conveyance of all materials like cement, sand, coarse aggregate, water etc., to
site, and including all charges for machine mixing, laying concrete in foundations
and under flooring bed, ramming in 15 cm layers finishing top surface to the
required level curing etc., and overheads & contractors profit complete for finished
item of work. (APSS No. 402)

For RCC pedastal 4 x 10 1.2 1.2 0.1 5.76


5.76 Cum 4,556.33 Cum 26,244.46
44 (BLD- Supply and placing of the V.R.C.C Nominal Mix Concrete M 20 grade
CSTN- corresponding to IS 456 with minimum cement content of 350 kgs per 1 cum of
3-13-A) concrete using CONCRETE MIXER with 20mm size HBG graded machine
crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386
Part 1 to Part 8) from approved quarry and including cost and conveyance of all
materials like cement, fine aggregate (sand) coarse aggregate, water, etc., to site
and , centring using Steel scaffolding pipes , jack props , Waller’s , Foot plates ,
brackets , steel centring plates etc., including all operational, incidental and labour
charges such as machine mixing, laying concrete, vibrator, curing etc., and
overheads & contractors profit complete but excluding cost of steel and its
fabrication charges for finished item of work (APSS No. 402)

For Footings 4 x 10 0.90 0.90 0.3 9.72 Cum 9,421.96 Cum 91,581.45
For Pedastal 4 x 10 0.60 0.60 1.1 15.84 Cum 10,033.49 Cum 158,930.48

45 (BLD- Filling with useful available excavated earth (excluding rock) with a lead of 50 m
CSTN- in trenches, sides of foundations and basement with initial lead in layers not
2-9) exceeding 15cm thick, watering and ramming including cost and conveyance of
water to work site and all operational, incidental, labour charges, hire charges of
T&P etc., and overheads & contractors profit complete for finished item of work
(APSS NO.309&310)

Excavated Quantity 1 x 1 86.40 86.40


86.40 Cum 38.91 Cum 3,361.82
46 (BLD- Providing High Yield Strength Deformed (HYSD) / Thermo Mechanically Treated
CSTN- (TMT) (Fe 500 / Fe 500D grade as per IS 1786-1979) of different diameters for
4.2)& RCC works , including labour charges for straightening, cutting, bending to
Amend required sizes and shapes, placing in position with cover blocks of approved
ment in materials and size and tying and lap-splicing with binding wire of 18 SWG,
SoR
forming grills for reinforcement work as per approved designs and drawings,
2011-12
page including cost and conveyance of steel bars, including all wastages such as
No. 392 overlaps, couplings, chairs, spacer bars including cost and conveyance of binding
wire, cover blocks and all incidental, operational, labour charges such as cutting,
bending, placing in position, tying including overheads & contractors profit
complete for finished item of work.( APSS No.126)

For Footings 1 x 1 9.72 70.00 kg/Cum 680.40


For Pedastal 1 x 1 15.84 70.00 kg/Cum 1108.80
1789.20 Kgs 92.15 Kgs 164,874.78

Page 66 of 275
Rate Per
Sl.N Item Amount
Description of Item Nos. L B D QTY Unit Unit (in Unit
o Code (in Rs.)
Rs.)
47 As per Supply and fabrication of MS framed structure like Window Grills, Compound
Data Wall Grills, Iron Doors, Windows, Gates, MS Frame for chain link mesh works,
Roof Trusses by using square / rectangular MS hollow section as per IS 4923 &
Angles as per SP:6(1) IS Hand book, including cost of welding rods, power
charges, labour charges for cutting, placing, welding and erecting in position and
fixing, cost & convenience of all materials including wastage to site and complete
for finished item of work

MS pergola of size 16.5 x 5.20 m


MS Coulmn section size : 150 mm x 150 4 x 10 3.0
mm x 5 mm thickness (22.26 kg per meter) 120.00 Rmt

@ 22.26 kg per meter 22.26 120.00 2671.20 Kgs


MS main purlin section size : 100 mm x 4 x 2 20
100 mm x 5mm thickness (14.41 kg per 160.00 Rmt
meter)
@14.41 kg per meter 14.41 160.00 2305.60 Kgs
MS Ridge purlin section size : 96 mm x 48 4 x 45 5.2
mm x4mm thickness (8.22 kg per meter) 936.00 Rmt

@ 8.22 kg per meter 8.22 936.00 7693.92 Kgs


Total kgs 12670.72 Kgs 118.87 Kgs 1,506,168.49

48 (BLD- Painting to new iron work with one coat of Red oxide primer and two coats with
CSTN- synthetic enamel paint Grade-I VOC (Volatile Organic Compound) content less
12-7 & than 50 grams/litre over primer coat of red oxid, including cost and conveyance of
12-12- all materials like Red oxide primer, Synthetic Enamel Paint to site, incidental,
197) operational and all labour charges etc., and overheads & contractors profit
complete for finished item of work in all floors. (SS No. 1201, 1212 & 1207).

MS Coulmn section size : 150 mm x 150 4x 10 3 0.60


mm x 5 mm thickness (22.26 kg per meter)
72.00

MS main purlin section size : 100 mm x 4x 2 20 0.40


100 mm x 5mm thickness (14.41 kg per
64.00
meter)

MS Ridge purlin section size : 96 mm x 48 4x 45 5.2 0.29


mm x4mm thickness (8.22 kg per meter) 271.44

407.44 Sqm 202.45 Sqm 82,486.23

Construction of Ornamental RCC columns of size 0.60 x 0.60 x 3.0 m - 24 No's


49 (BLD- Earth work excavation for foundations (Manual Means) of buildings, septic tank,
CSTN- sump, compound wall in ordinary soils and depositing on bank with an initial lead
2-1) of 10m and depth up to 3m including all operational, incidental, labour charges
such as shoring, sheeting, planking, strutting etc., and overheads & contractors
profit complete for finished item of work excluding dewatering charges etc., as per
SS 20 B(APSS 308)

For RCC footing 1 x 24 1.20 1.20 1.5 51.84


51.84 Cum 271.40 Cum 14,069.38
50 (BLD- Plain Cement Concrete (1:4:8) (cement: fine aggregate: Coarse aggregate) for
CSTN- foundations and under flooring bed using 162.0 kgs of cement, coarse aggregate
3-5) 40mm size hard , machine crushed granite from approved quarry including cost
and conveyance of all materials like cement, sand, coarse aggregate, water etc., to
site, and including all charges for machine mixing, laying concrete in foundations
and under flooring bed, ramming in 15 cm layers finishing top surface to the
required level curing etc., and overheads & contractors profit complete for finished
item of work. (APSS No. 402)

For RCC footing 7 x 24 1.2 1.2 0.1 24.19


24.19 Cum 4,556.33 Cum 110,217.62
51 (BLD- Supply and placing of the V.R.C.C Nominal Mix Concrete M 20 grade
CSTN- corresponding to IS 456 with minimum cement content of 350 kgs per 1 cum of
3-13-A) concrete using CONCRETE MIXER with 20mm size HBG graded machine
crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386
Part 1 to Part 8) from approved quarry and including cost and conveyance of all
materials like cement, fine aggregate (sand) coarse aggregate, water, etc., to site
and , centring using Steel scaffolding pipes , jack props , Waller’s , Foot plates ,
brackets , steel centring plates etc., including all operational, incidental and labour
charges such as machine mixing, laying concrete, vibrator, curing etc., and
overheads & contractors profit complete but excluding cost of steel and its
fabrication charges for finished item of work (APSS No. 402)

For Footings 7 x 24 0.90 0.90 0.3 40.82 Cum 9,421.96 Cum 384,604.41
For Pedastal 7 x 24 0.60 0.60 1.1 66.53 Cum 10,033.49 Cum 667,528.09

Page 67 of 275
Rate Per
Sl.N Item Amount
Description of Item Nos. L B D QTY Unit Unit (in Unit
o Code (in Rs.)
Rs.)
52 (BLD- Filling with useful available excavated earth (excluding rock) with a lead of 50 m
CSTN- in trenches, sides of foundations and basement with initial lead in layers not
2-9) exceeding 15cm thick, watering and ramming including cost and conveyance of
water to work site and all operational, incidental, labour charges, hire charges of
T&P etc., and overheads & contractors profit complete for finished item of work
(APSS NO.309&310)

Excavated Quantity 1 x 1 51.84 51.84


51.84 Cum 38.91 Cum 2,017.09

53 (BLD- Supply and placing of the V.R.C.C Nominal Mix Concrete M 20 grade
CSTN- corresponding to IS 456 with minimum cement content of 350 kgs per 1 cum of
3-13-B) concrete using CONCRETE MIXER with 20mm size HBG graded machine
crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386
Part 1 to Part 8) from approved quarry and,including cost and conveyance of all
materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site
and , centring using Casurina Ballies, Bamboos, Wooden Reapers, Runners, Wood
Posts, Wall Plates etc., including all operational, incidental and labour charges
such as machine mixing, lifting of concrete manually, laying concrete, vibrator,
curing , overheads & contractors profit etc., complete but excluding cost of steel
and its fabrication charges for finished item of work (APSS No. 402)

For columns 7 x 24 0.60 0.60 3.5 211.68 Cum 7,829.91 Cum 1,657,434.56

54 (BLD- Providing High Yield Strength Deformed (HYSD) / Thermo Mechanically Treated
CSTN- (TMT) (Fe 500 / Fe 500D grade as per IS 1786-1979) of different diameters for
4.2)& RCC works , including labour charges for straightening, cutting, bending to
Amend required sizes and shapes, placing in position with cover blocks of approved
ment in materials and size and tying and lap-splicing with binding wire of 18 SWG,
SoR
forming grills for reinforcement work as per approved designs and drawings,
2011-12
page including cost and conveyance of steel bars, including all wastages such as
No. 392 overlaps, couplings, chairs, spacer bars including cost and conveyance of binding
wire, cover blocks and all incidental, operational, labour charges such as cutting,
bending, placing in position, tying including overheads & contractors profit
complete for finished item of work.( APSS No.126)

For Footings 1 x 1 70.00 kg/Cum 2857.40


40.82
For Pedastal 1 x 1 70.00 kg/Cum 4657.10
66.53
For columns 1 x 1 70.00 kg/Cum 14817.60
211.68
22332.10 Kgs 92.15 Kgs 2,057,903.02
55 (BLD- Plastering 20mm thick in two coats using screened sand with base coat of 16mm
CSTN- thick in CM(1:6) and top coat of 4mm thick in CM(1:4) with dubara sponge
8-9) finishing including cost and conveyance of all materials like cement, sand, water
etc., to site, ,, and all operational, incidental charges on materials and including
cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges,
curing, including cutting grooves as directed by Engineer-in-charge etc., and
overheads & contractors profit complete for finished item of work .(SS 901,903 &
904)

For columns 4 x 24 0.6 3.5 201.60


201.60 Sqm 318.45 Sqm 64,199.52
56 (BLD- Providing cladding to wall with High Polished Granite 16 to 18 mm thick up to 8'-
CSTN- 00 (2.43 M) other than black and regular colours, length equal to flooring slabs set
9-7) over base coat of CM(1:5) 12 mm thick using screened sand with cement slurry of
honey like consistency spread at the rate of 3.30 kgs per sqm and jointing with
white cement paste mixed with pigment of matching shade to full depth, including
cost of all materials like tiles, cement, sand and water etc., and overheads &
contractors profit complete for finished item of work.

For columns 4 x 24 0.6 3.5 201.60


201.60 Sqm 3,713.99 Sqm 748,740.38
57 As per Supply and fabrication of MS framed structure like Window Grills, Compound
Data Wall Grills, Iron Doors, Windows, Gates, MS Frame for chain link mesh works,
Roof Trusses by using square / rectangular MS hollow section as per IS 4923 &
Angles as per SP:6(1) IS Hand book, including cost of welding rods, power
charges, labour charges for cutting, placing, welding and erecting in position and
fixing, cost & convenience of all materials including wastage to site and complete
for finished item of work

MS purlins along the columns 92.0 m


MS main purlin size : 150 mm x 150 mm x 1 x 2 76.0
5 mm thickness (22.26 kg per meter) 152.00 Rmt

@ 22.26 kg per meter 22.26 152.00 3383.52 Kgs


Total kgs 3383.52 Kgs 118.87 Kgs 402,199.02

58 (BLD- Painting to new iron work with one coat of Red oxide primer and two coats with
CSTN- synthetic enamel paint Grade-I VOC (Volatile Organic Compound) content less
12-7 & than 50 grams/litre over primer coat of red oxid, including cost and conveyance of
12-12- all materials like Red oxide primer, Synthetic Enamel Paint to site, incidental,
197) operational and all labour charges etc., and overheads & contractors profit
complete for finished item of work in all floors. (SS No. 1201, 1212 & 1207).

Page 68 of 275
Rate Per
Sl.N Item Amount
Description of Item Nos. L B D QTY Unit Unit (in Unit
o Code (in Rs.)
Rs.)
MS main purlin size : 150 mm x 150 mm x 1x 2 76 0.60
5 mm thickness (22.26 kg per meter)
91.20

91.20 Sqm 202.45 Sqm 18,463.44

Construction of Entrance Gate size of 4.0 m x 2.0 m-2


59 (BLD- Earth work excavation for foundations (Manual Means) of buildings, septic tank,
CSTN- sump, compound wall in ordinary soils and depositing on bank with an initial lead
2-1) of 10m and depth up to 3m including all operational, incidental, labour charges
such as shoring, sheeting, planking, strutting etc., and overheads & contractors
profit complete for finished item of work excluding dewatering charges etc., as per
SS 20 B(APSS 308)

For Footings 2 x 2 1.50 1.50 1.80 16.20


16.20 Cum 271.40 Cum 4,396.68
60 (BLD- Plain Cement Concrete (1:4:8) (cement: fine aggregate: Coarse aggregate) for
CSTN- foundations and under flooring bed using 162.0 kgs of cement, coarse aggregate
3-5) 40mm size hard , machine crushed granite from approved quarry including cost
and conveyance of all materials like cement, sand, coarse aggregate, water etc., to
site, and including all charges for machine mixing, laying concrete in foundations
and under flooring bed, ramming in 15 cm layers finishing top surface to the
required level curing etc., and overheads & contractors profit complete for finished
item of work. (APSS No. 402)

For Footings 2 x 2 1.5 1.5 0.10 0.90


For Plinth Beam 2 x 1 5.50 0.40 0.10 0.44
1.34 Cum 4,556.33 Cum 6,105.48
61 (BLD- Supply and placing of the V.R.C.C Nominal Mix Concrete M 20 grade
CSTN- corresponding to IS 456 with minimum cement content of 350 kgs per 1 cum of
3-13-A) concrete using CONCRETE MIXER with 20mm size HBG graded machine
crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386
Part 1 to Part 8) from approved quarry and including cost and conveyance of all
materials like cement, fine aggregate (sand) coarse aggregate, water, etc., to site
and , centring using Steel scaffolding pipes , jack props , Waller’s , Foot plates ,
brackets , steel centring plates etc., including all operational, incidental and labour
charges such as machine mixing, laying concrete, vibrator, curing etc., and
overheads & contractors profit complete but excluding cost of steel and its
fabrication charges for finished item of work (APSS No. 402)

For Footings 2 x 2 1.2 1.2 0.30 1.73


1.73 Cum 9,421.96 Cum 16,299.99
For Pedestals 2 x 2 0.75 0.75 0.90 2.03
2.03 Cum 10,033.49 Cum 20,367.98
For Plinth Beam 2 x 1 5.50 0.40 0.40 1.76
1.76 Cum 12,077.14 Cum 21,255.77
62 (BLD- Supply and placing of the V.R.C.C Nominal Mix Concrete M 20 grade
CSTN- corresponding to IS 456 with minimum cement content of 350 kgs per 1 cum of
3-13-B) concrete using CONCRETE MIXER with 20mm size HBG graded machine
crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386
Part 1 to Part 8) from approved quarry and,including cost and conveyance of all
materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site
and , centring using Casurina Ballies, Bamboos, Wooden Reapers, Runners, Wood
Posts, Wall Plates etc., including all operational, incidental and labour charges
such as machine mixing, lifting of concrete manually, laying concrete, vibrator,
curing , overheads & contractors profit etc., complete but excluding cost of steel
and its fabrication charges for finished item of work (APSS No. 402)

For Columns 2 x 1 0.40 0.40 5.00 1.60


For Columns 2 x 1 0.40 0.40 2.30 0.74
2.34 Cum 11,836.02 Cum 27,696.29

Page 69 of 275
Rate Per
Sl.N Item Amount
Description of Item Nos. L B D QTY Unit Unit (in Unit
o Code (in Rs.)
Rs.)
63 (BLD- Supply and placing of the V.R.C.C Nominal Mix Concrete M 20 grade
CSTN- corresponding to IS 456 with minimum cement content of 350 kgs per 1 cum of
3-13-C) concrete using CONCRETE MIXER with 20mm size HBG graded machine
crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386
Part 1 to Part 8) from approved quarry including cost and conveyance of all
materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site
and , centring using Casurina Ballies , Bamboos , Wooden Reapers , Runners ,
Wood Posts , Wall Plates etc., including all operational, incidental and labour
charges such as machine mixing, lifting of concrete manually, laying concrete,
vibrator, , curing , overheads & contractors profit etc., complete but excluding cost
of steel and its fabrication charges for finished item of work (APSS No. 402)

For Beam 2 x 1 5.50 0.40 0.30 1.32


1.32 Cum 10,262.59 Cum 13,546.62
64 (BLD- Providing High Yield Strength Deformed (HYSD) / Thermo Mechanically Treated
CSTN- (TMT) (Fe 500 / Fe 500D grade as per IS 1786-1979) of different diameters for
4.2)& RCC works , including labour charges for straightening, cutting, bending to
Amend required sizes and shapes, placing in position with cover blocks of approved
ment in materials and size and tying and lap-splicing with binding wire of 18 SWG,
SoR forming grills for reinforcement work as per approved designs and drawings,
2011- including cost and conveyance of steel bars, including all wastages such as
12 page overlaps, couplings, chairs, spacer bars including cost and conveyance of binding
No. 392 wire, cover blocks and all incidental, operational, labour charges such as cutting,
bending, placing in position, tying including overheads & contractors profit
complete for finished item of work.( APSS No.126)

For Footings 1 x 1 1.730 70.00 Kg/Cum 121.10


For Pedestals 1 x 1 2.030 70.00 Kg/Cum 142.10
For Plinth Beam 1 x 1 1.760 100.00 Kg/Cum 176.00
For Columns 1 x 1 2.340 100.00 Kg/Cum 234.00
For Beam 1 x 1 1.320 100.00 Kg/Cum 132.00
805.20 Kgs 92.15 Kgs 74,199.18
65 (BLD- Plastering 12mm thick single coat in CM(1:5) using screened sand including cost
CSTN- and conveyance of all materials like cement, sand, water etc., to site and all
8-3 operational, incidental charges on materials and including cost of all labour
Amend charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc.,
ment in and overheads & contractors profit complete for finished item of work.(SS 901,903
SoR & 904)
2016-
17 )

For beam 2 x 1 5.50 1.40 15.40


15.40 Sqm 386.60 Sqm 5,953.64
66 (As per Providing and applying PMCC / Deco orient base or Equivalent exterior Texture
Amend ( borders and design as per the pattern approved by the Engineer-in-Charge ) of
ment in average 2 to 3 mm thickness over plastered surface to prepare the surface even and
SoR smooth after thoroughly brushing the surface to remove all dirt and remains of
2011- loose powdered materials, applying emery paper, Sand the surface, clean & wipe
12) off loose dust, applying putty/ texture paint filler by putty knife / muslin pad, air
dry for 2 - 3 hrs for the surface preparation including cost and conveyance of all
materials to work site and all operational, incidental, labour charges, scaffolding
charges, overheads and contractors profit etc., complete for finished item of work
in all floors for external walls

For beam 2 x 1 5.5 1.4 15.40


15.40 Sqm 290.55 Sqm 4,474.47
67 Providing cladding to wall with High Polished Granite 16 to 18 mm thick up to 8'-
00 (2.43 M) other than black and regular colours, length equal to flooring slabs set
over base coat of CM(1:5) 12 mm thick using screened sand with cement slurry of
honey like consistency spread at the rate of 3.30 kgs per sqm and jointing with
(BLD- white cement paste mixed with pigment of matching shade to full depth, including
CSTN- cost of all materials like tiles, cement, sand and water etc., and overheads &
9-7) contractors profit complete for finished item of work.

For Columns 2 x 4 0.4 4.50 14.40


For Columns 2 x 4 0.4 2.00 6.40
20.80 Sqm 4,063.97 Sqm 84,530.58

Page 70 of 275
Rate Per
Sl.N Item Amount
Description of Item Nos. L B D QTY Unit Unit (in Unit
o Code (in Rs.)
Rs.)
68 (BLD- Supply & application of one coat water based cement primer of exterior grade II
CSTN- and two coats of acrylic exterior emulsion paint having VOC (Volatile Organic
12-2& Compound) content less than 50 grams/litre for exterior walls including cost and
Amend conveyance of all materials to site,and all operational, incidental, labour charges
ment in etc., and overheads & contractors profit complete for finished item of work in all
SoR floors.
2011-
12)

For beam 2 x 1 5.5 1.4 15.40

15.40 Sqm 275.24 Sqm 4,238.70


69 As per Supply and fabrication of MS framed structure like Window Grills, Compound
Data Wall Grills, Iron Doors, Windows, Gates, MS Frame for chain link mesh works,
Roof Trusses by using square / rectangular MS hollow section as per IS 4923 &
Angles as per SP:6(1) IS Hand book, including cost of welding rods, power
charges, labour charges for cutting, placing, welding and erecting in position and
fixing, cost & convenience of all materials including wastage to site and complete
for finished item of work

For M.S column Size of 150 x 150 x 5 mm 2 x 2 2.5 10.00 Rmt


thick MS hollow section

@ 22.26 kg per meter 22.26 10.00 222.60 Kgs


For M.S Gate 4.0 m x 2.0 m height
For sliding gate frame of Size 100x50x4 2 x 1 10 20.00 Rmt
mm thick MS hollow section
For Openable gate frame of Size 2 x 1 6 12.00 Rmt
100x50x4 mm thick MS hollow section
@ 8.59 kg per meter 8.59 32.00 274.88 Kgs

For inner frame of sliding gate by size 2 x 1 9.2 18.40 Rmt


50x50x3.6 mm thick MS hollow section

For inner frame of Openable gate by 2 x 1 5.3 10.60 Rmt


size 50x50x3.6 mm thick MS hollow
section

For inclined support of size 50x50x3.6 mm 2 x 1 2.60 5.20 Rmt


thick MS hollow section

@ 4.98 kg per meter 4.98 34.20 170.32 Kgs

For verticals in sliding gate of size of size 2 x 1 14.41 28.82 Rmt


25x25x2.6 mm thick MS hollow section

For verticals in Openable gate of size of 2 x 1 5.4 10.80 Rmt


size 25x25x2.6 mm thick MS hollow
section
For Horizontals in sliding gate of size 2 x 1 6.83 13.66 Rmt
25x25x2.6 mm thick MS hollow section
@ 1.69 kg per meter 1.69 53.28 90.04 Kgs
MS Angle of size 25x25x5mm for angle 2 x 1 14.4 28.80 Rmt
track
@ 1.8 kg per meter 1.8 14.40 25.92 Kgs
16mm Rebar for anchoring 2 x 24 0.3 14.40 Rmt
@ 1.6 kg per meter 1.6 7.20 11.52 Kgs
For guide rollers & V groove wheel 2 x 20 40.00 Nos
@ 2. kg per each 2 32.00 64.00 Kgs
@ 1.69kg per meter 1.69 53.28 90.04 Kgs
885.32 Kgs 118.87 Kgs 105,237.99
70 (BLD- Painting to new iron work with one coat of Red oxide primer and two coats with
CSTN- synthetic enamel paint Grade-I VOC (Volatile Organic Compound) content less
12-7 & than 50 grams/litre over primer coat of red oxid, including cost and conveyance of
12-12- all materials like Red oxide primer, Synthetic Enamel Paint to site, incidental,
197) operational and all labour charges etc., and overheads & contractors profit
complete for finished item of work in all floors. (SS No. 1201, 1212 & 1207).

For M.S column Size of 150 x 150 x 5 mm 2 x 2 2.5 0.6 6.00


thick MS hollow section

For M.S Gate 4.0 m x 2.0 m height


For sliding gate frame of Size 100x50x4 2 x 1 10 0.3 6.00
mm thick MS hollow section
For Openable gate frame of Size 2 x 1 6 0.3 3.60
100x50x4 mm thick MS hollow section
For inner frame of sliding gate by size 2 x 1 9.2 0.2 3.68
50x50x3.6 mm thick MS hollow section

For inner frame of Openable gate by 2 x 1 5.3 0.2 2.12


size 50x50x3.6 mm thick MS hollow
section

For inclined support of size 50x50x3.6 mm 2 x 1 2.60 0.2 1.04


thick MS hollow section

Page 71 of 275
Rate Per
Sl.N Item Amount
Description of Item Nos. L B D QTY Unit Unit (in Unit
o Code (in Rs.)
Rs.)
For verticals in sliding gate of size of size 2 x 1 14.41 0.1 2.88
25x25x2.6 mm thick MS hollow section

For verticals in Openable gate of size of 2 x 1 5.4 0.1 1.08


size 25x25x2.6 mm thick MS hollow
section
For Horizontals in sliding gate of size 2 x 1 6.83 0.1 1.37
25x25x2.6 mm thick MS hollow section
27.77 Sqm 202.45 Sqm 5,622.04

Construction of Water fountain - 4.0 m x 4.0 m

71 (BLD- Earth work excavation for foundations (Manual Means) of buildings, septic tank,
CSTN- sump, compound wall in ordinary soils and depositing on bank with an initial lead
2-1) of 10m and depth up to 3m including all operational, incidental, labour charges
such as shoring, sheeting, planking, strutting etc., and overheads & contractors
profit complete for finished item of work excluding dewatering charges etc., as per
SS 20 B(APSS 308)

For bas slab 1 x 1 5.00 5.00 0.75 18.75


18.75 Cum 271.40 Cum 5,088.75
72 (BLD- Plain Cement Concrete (1:4:8) (cement: fine aggregate: Coarse aggregate) for
CSTN- foundations and under flooring bed using 162.0 kgs of cement, coarse aggregate
3-5) 40mm size hard , machine crushed granite from approved quarry including cost
and conveyance of all materials like cement, sand, coarse aggregate, water etc.,
to site, and including all charges for machine mixing, laying concrete in
foundations and under flooring bed, ramming in 15 cm layers finishing top surface
to the required level curing etc., and overheads & contractors profit complete for
finished item of work. (APSS No. 402)

For bas slab bed 1 x 1 5.0 5.0 0.10 2.50


2.50 Cum 4,556.33 Cum 11,390.83
73 Supply and placing of the V.R.C.C Nominal Mix Concrete M 20 grade
corresponding to IS 456 with minimum cement content of 350 kgs per 1
cum of concrete using CONCRETE MIXER with 20mm size HBG graded
machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970
and IS 2386 Part 1 to Part 8) from approved quarry and using mixed with
integral cement water proofing powder confirming to IS: 2645-2003
manufactured by reputed manufacturers as approved by Engineer-in-charge
at 0.5 Kg per one bag of cement , and including cost and conveyance of all
materials like cement, fine aggregate (sand) coarse aggregate, water, etc.,
(BLD- to site and , centring using Steel scaffolding pipes , jack props , Waller’s ,
CSTN- Foot plates , brackets , steel centring plates etc., including all operational,
3-13-A) incidental and labour charges such as machine mixing, laying concrete,
vibrator, , curing etc., and overheads & contractors profit complete but
excluding cost of steel and its fabrication charges for finished item of work
(APSS No. 402)

For bas slab 1 x 1 5.00 5.00 0.15 3.75 Cum 10,237.14 Cum 38,389.28
For pedestal 1 x 1 0.90 0.90 1.50 1.22 Cum 10,033.49 Cum 12,240.86

74 Supply and placing of the V.R.C.C Nominal Mix Concrete M 20 grade


corresponding to IS 456 with minimum cement content of 350 kgs per 1
cum of concrete using CONCRETE MIXER with 20mm size HBG graded
machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970
and IS 2386 Part 1 to Part 8) from approved quarry and using mixed with
integral cement water proofing powder confirming to IS: 2645-2003
manufactured by reputed manufacturers as approved by Engineer-in-charge
at 0.5 Kg per one bag of cement and including cost and conveyance of all
materials like cement, fine aggregate (sand) coarse aggregate, water etc., to
(BLD- site and , centring using Casurina Ballies, Bamboos, Wooden Reapers,
CSTN- Runners, Wood Posts, Wall Plates etc., including all operational, incidental
3-13-B) and labour charges such as machine mixing, lifting of concrete manually,
laying concrete, vibrator, , curing , overheads & contractors profit etc.,
complete but excluding cost of steel and its fabrication charges for finished
item of work (APSS No. 402)

For R.C.C side wall 200 mm thick height


0.75 m 1 x 1 16.00 0.70 11.20 Sqm

For R.C.C inner side wall 200 mm thick


height 1.20 m 1 x 1 16.00 1.15 18.40 Sqm

29.60 Sqm 3,078.38 Sqm 91,120.05

Page 72 of 275
Rate Per
Sl.N Item Amount
Description of Item Nos. L B D QTY Unit Unit (in Unit
o Code (in Rs.)
Rs.)
75 Providing High Yield Strength Deformed (HYSD) / Thermo Mechanically
Treated (TMT) (Fe 500 / Fe 500D grade as per IS 1786-1979) of different
diameters for RCC works , including labour charges for straightening,
(BLD- cutting, bending to required sizes and shapes, placing in position with cover
CSTN- blocks of approved materials and size and tying and lap-splicing with
4.2)& binding wire of 18 SWG, forming grills for reinforcement work as per
Amend approved designs and drawings, including cost and conveyance of steel
ment bars, including all wastages such as overlaps, couplings, chairs, spacer bars
in SoR including cost and conveyance of binding wire, cover blocks and all
2011- incidental, operational, labour charges such as cutting, bending, placing in
12 position, tying including overheads & contractors profit complete for
page finished item of work.( APSS No.126)
No.
392

For bas slab 1 x 1 3.750 50.00 Kg/Cum 187.50


For pedestal 1 x 1 1.220 50.00 Kg/Cum 61.00
For R.C.C side wall 200 mm thick height
0.75 m 1 x 1 5.920 50.00 Kg/Cum 296.00

544.5 Kgs 92.15 Kgs 50,175.68


76 Masonry work in CM(1:6) prop (Cement : Screened sand) in superstructure
with fly ash cement / lime solid blocks of size 290mm x 225mm x 140mm
from approved source having minimum crushing strength of 50 Kg/Sqcm.
including cost and conveyance of all materials like cement, sand, bricks,
(BLD- water etc., to site,and such as labour charges, like mixing cement mortar,
CSTN- scaffolding charges, constructing masonry, lift charges, curing, overheads
5-17) and contractor profit etc., complete for finished item of work. (APSS No. 501
& 504).

For steped wall 100 mm thick avarage


height 0.6 m 1 x 4 4.00 1.50 0.60 11.20

11.20 Sqm 7,242.08 Sqm 81,111.30


77 Flooring with granite stone tiles 8mm thick (mirror polished of all shades) of
1st quality and of size as approved by Engineer-in-charge with borders and
design as per the approved flooring pattern as directed by the Engineer-In -
Charge, laying tiles using spacers of 2mm thick, set over a base coat of CM
(1:8) prop. 12mm thick using screened sand over CC bed already laid or RCC
roof slab , including neat cement slurry of honey like consistency spread
@ 3.3 kgs per Sqm. and jointed neatly with white cement paste to full
(BLD- depth mixed with pigment of matching shade including cost and
CSTN- conveyance of all materials like cement, sand, water, tiles, white cement
9-9) etc., to site (excluding cost of C.C. bed) including cost of base coat and all
labour charges for mixing of cement mortar, laying tiles to required slope
as directed by the Engineer- in-charge etc., and overheads & contractors
profit complete for finished item of work. (APSS No.701 & 707)

For Foubtain area 1 x 1 5.00 5.00 25.00


25.00 Sqm 1,902.60 Sqm 47,565.00
78 Providing cladding to walls with granite stone tiles 8mm thick (mirror
polished of all shades) of 1st quality length equal to flooring slabs set over
base coat of CM(1:5) 12 mm thick using screened sand with cement slurry
of honey like consistency spread at the rate of 3.30 kgs per sqm and jointing
(BLD- with white cement paste mixed with pigment of matching shade to full
CSTN- depth, including cost of all materials like tiles, cement, sand and water etc.,
9-21) and overheads & contractors profit complete for finished item of work.

For R.C.C side wall 200 mm thick height


0.75 m 1 x 1 16.0 0.7 11.20 Sqm

For R.C.C inner side wall 200 mm thick


height 1.20 m 1 x 1 16.0 1.15 18.40 Sqm

For steped wall 100 mm thick avarage


height 0.6 m 1 x 4 4.0 1.5 24.00 Sqm
53.60 Sqm 2,065.22 Sqm 110,695.79

Construction of Food court size of - 6.5 x 4.50 m

79 (BLD- Earth work excavation for foundations (Manual Means) of buildings, septic tank,
CSTN- sump, compound wall in ordinary soils and depositing on bank with an initial lead
2-1) of 10m and depth up to 3m including all operational, incidental, labour charges
such as shoring, sheeting, planking, strutting etc., and overheads & contractors
profit complete for finished item of work excluding dewatering charges etc., as per
SS 20 B(APSS 308)

For RCC Column Footings 1 x 6 1.50 1.50 1.5 20.25


For Basement wall 1 x 1 22.00 0.6 0.6 7.92
28.17 Cum 271.40 Cum 7,645.34

Page 73 of 275
Rate Per
Sl.N Item Amount
Description of Item Nos. L B D QTY Unit Unit (in Unit
o Code (in Rs.)
Rs.)
80 (BLD- Plain Cement Concrete (1:4:8) (cement: fine aggregate: Coarse aggregate) for
CSTN- foundations and under flooring bed using 162.0 kgs of cement, coarse aggregate
3-5) 40mm size hard , machine crushed granite from approved quarry including cost
and conveyance of all materials like cement, sand, coarse aggregate, water etc.,
to site, and including all charges for machine mixing, laying concrete in
foundations and under flooring bed, ramming in 15 cm layers finishing top surface
to the required level curing etc., and overheads & contractors profit complete for
finished item of work. (APSS No. 402)

For RCC Column Footings 1 x 6 1.5 1.5 0.1 1.35


For Basement wall 1 x 1 22 0.6 0.1 1.32
For Floor bed 1 x 1 6.50 4.5 0.1 2.93
5.60 Cum 4,556.33 Cum 25,515.45
81 Random Rubble stone masonry in CM (1:8) prop: (Cement: Screened sand)
using hard granite stones carted from approved quarry including cost and
conveyance of all materials like cement, screened sand, water,Rough stone
Through stone, Coursed stones etc., from approved quarry, to site, including
labour charges for cutting stones to required size and shape, mixing, of cement,
( BLD-
CSTN-6- mortar, construction, curing, charges for scaffolding etc., and overheads &
contractors profit complete for finished item of work. (APSS No. 601 & 615)
13 )

For Basement wall 1 x 1 22.0 0.45 0.6 5.94


5.94 Cum 4,511.57 Cum 26,798.73
82 (BLD- Supply and placing of the V.R.C.C Nominal Mix Concrete M 20 grade
CSTN- corresponding to IS 456 with minimum cement content of 350 kgs per 1 cum of
3-13-A) concrete using CONCRETE MIXER with 20mm size HBG graded machine
crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386
Part 1 to Part 8) from approved quarry and including cost and conveyance of all
materials like cement, fine aggregate (sand) coarse aggregate, water, etc., to site
and , centring using Steel scaffolding pipes , jack props , Waller’s , Foot plates ,
brackets , steel centring plates etc., including all operational, incidental and labour
charges such as machine mixing, laying concrete, vibrator, curing etc., and
overheads & contractors profit complete but excluding cost of steel and its
fabrication charges for finished item of work (APSS No. 402)

For Footings 1 x 6 1.20 1.20 0.3 2.59 Cum 9,421.96 Cum 24,402.88
For Pedastal 1 x 6 0.45 0.45 1.1 1.34 Cum 10,033.49 Cum 13,444.88
For Plinth beam 1 x 1 23.40 0.30 0.3 2.11 Cum 12,077.14 Cum 25,482.77

83 (BLD- Filling with useful available excavated earth (excluding rock) with a lead of 50 m
CSTN- in trenches, sides of foundations and basement with initial lead in layers not
2-9) & exceeding 15cm thick, watering and ramming including cost and conveyance of
Proc.N water to work site and all operational, incidental, labour charges, hire charges of
o.2093 T&P etc., and overheads & contractors profit complete for finished item of work
8 (APSS NO.309&310)
(R&B)/
Dt:14-
5-2019 50% of Excavated Quantity 1 x 0.5 24.62 12.31
12.31 Cum 38.91 Cum 478.98
84 (BLD- Supply and placing of the V.R.C.C Nominal Mix Concrete M 20 grade
CSTN- corresponding to IS 456 with minimum cement content of 350 kgs per 1 cum of
3-13-B) concrete using CONCRETE MIXER with 20mm size HBG graded machine
crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386
Part 1 to Part 8) from approved quarry and,including cost and conveyance of all
materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site
and , centring using Casurina Ballies, Bamboos, Wooden Reapers, Runners,
Wood Posts, Wall Plates etc., including all operational, incidental and labour
charges such as machine mixing, lifting of concrete manually, laying concrete,
vibrator, curing , overheads & contractors profit etc., complete but excluding cost
of steel and its fabrication charges for finished item of work (APSS No. 402)

For RCC Columns 1 x 6 0.23 0.30 3.50 1.45


1.45 Cum 11,836.02 Cum 17,162.23
Lintel beam for doors-1 1 x 1 1.50 0.23 0.15 0.05
Lintel beam for Window-1 1 x 3 1.80 0.23 0.15 0.19
0.24 Cum 11,726.10 Cum 2,814.26
85 (BLD- Supply and placing of the V.R.C.C Nominal Mix Concrete M 20 grade
CSTN- corresponding to IS 456 with minimum cement content of 350 kgs per 1 cum of
3-13-C) concrete using CONCRETE MIXER with 20mm size HBG graded machine
crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386
Part 1 to Part 8) from approved quarry including cost and conveyance of all
materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site
and , centring using Casurina Ballies , Bamboos , Wooden Reapers , Runners ,
Wood Posts , Wall Plates etc., including all operational, incidental and labour
charges such as machine mixing, lifting of concrete manually, laying concrete,
vibrator, , curing , overheads & contractors profit etc., complete but excluding cost
of steel and its fabrication charges for finished item of work (APSS No. 402)

Beam 1 x 1 26.50 0.23 0.30 1.83


1.83 Cum 10,262.59 Cum 18,780.54
Slab 125 mm thick 1 x 1 6.6 5.5 36.30
Page 74 of 275
Rate Per
Sl.N Item Amount
Description of Item Nos. L B D QTY Unit Unit (in Unit
o Code (in Rs.)
Rs.)
36.30 sqm 1,248.84 sqm 45,332.89
86 (BLD- Reinforced Cement Concrete Nominal Mix M 20 grade corresponding to IS 456
CSTN- with minimum cement content of 350 kgs per 1 cum of concrete using
3-13-C) CONCRETE MIXER with using 12mm size hard granite machine crushed graded
metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from
approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of
concrete including cost and conveyance of all materials like cement, fine
aggregate (Sand), coarse aggregate, water etc., to site including steel centring,
shuttering, labour charges such as ,Concrete machine mixing, laying concrete,
lift charges, curing etc., and overheads & contractors profit complete for finished
item of work (APSS No. 402 & 403) for platforms and shelves.

25mm thick shelves : 1 x 4 3.0 0.6 7.20


7.20 sqm 264.62 sqm 1,905.26
87 (BLD- Providing High Yield Strength Deformed (HYSD) / Thermo Mechanically Treated
CSTN- (TMT) (Fe 500 / Fe 500D grade as per IS 1786-1979) of different diameters for
4.2)& RCC works , including labour charges for straightening, cutting, bending to
Amend required sizes and shapes, placing in position with cover blocks of approved
ment in materials and size and tying and lap-splicing with binding wire of 18 SWG,
SoR forming grills for reinforcement work as per approved designs and drawings,
2011- including cost and conveyance of steel bars, including all wastages such as
12 overlaps, couplings, chairs, spacer bars including cost and conveyance of binding
page wire, cover blocks and all incidental, operational, labour charges such as cutting,
No. 392 bending, placing in position, tying including overheads & contractors profit
complete for finished item of work.( APSS No.126)

For Footings 1 x 1 2.59 70.00 kg/Cum 181.30


For Pedastal 1 x 1 1.34 70.00 kg/Cum 93.80
For Plinth beam 1 x 1 2.11 100.00 kg/Cum 211.00
Columns 1 x 1 1.45 100.00 kg/Cum 145.00
Lintel beam 1 x 1 0.24 70.00 kg/Cum 16.80
beams 1 x 1 1.83 70.00 kg/Cum 128.10
Slab 125 mm thick 1 x 1 4.54 70.00 kg/Cum 317.63
25mm thick shelves : 1 x 1 0.18 70.00 kg/Cum 12.60
1106.23 Kgs 92.15 Kgs 101,939.09
88 (BLD- Providing impervious coat to exposed RCC roof slab surfaces to required slopes
CSTN- with CM (1:3) prop. using screened sand 20mm thick (average) mixed with
10-25) integral cement water proofing liquid confirming to IS: 2645-2003 manufactured
by reputed manufacturers as approved by Engineer-in-charge at 1 Kg per one
bag of cement, laid over roof slab when it is green, finished smooth with a floating
coat of neat cement and thread lining at regular intervals of 45cmx45cm including
cost and conveyance of all materials like cement, sand, water proofing
compound, water etc., to site, , and operational, incidental, and labour charges for
mixing mortar, laying, lift charges, rendering smooth and thread lining, curing
including rounding off junctions of wall and slab etc., and overheads & contractors
profit complete for finished item of work. (APSS No. 901 & 903).

Roof 1 x 1 6.6 5.5 36.30


36.30 Sqm 536.98 Sqm 19,492.37

89 (BLD- Brick masonry for panel walls in superstructure with CM (1:8) prop: (Cement :
CSTN- Screened sand) using common burnt clay bricks of class as per Table- I of
5-5) IS:1077-1992, Non- Modular or traditional size 23 x 11 x 7 cms from approved
source having minimum crushing strength of 40 Kg/Sqcm. including cost and
conveyance of all materials like cement, screened sand, bricks, water etc., to site,
, and such as labour charges, like mixing cement mortar, scaffolding charges,
constructing masonry, lift charges, curing, etc., and overheads & contractors profit
complete for finished item of work. (APSS No. 501 & 504).

For Walls 230mm thick 1 x 1 26.50 0.23 3.00 18.29


For shelves Walls 230mm thick 1 x 2 0.60 0.23 2.40 0.66
Deductions
Lintel beam for doors -1 x 1 1.5 0.23 0.15 -0.05
Lintel beam for Window -1 x 3 1.8 0.23 0.15 -0.19
For Doors -1 x 1 1.20 0.23 2.1 -0.58
For windows -1 x 3 1.50 0.23 1.20 -1.24
16.89 Cum 7,461.66 Cum 126,027.44
90 ( BLD- Plastering 12mm thick in two coats using screened sand with base coat of 8mm
CSTN- thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge
8-10) finishing including cost and conveyance of all materials like cement, sand, water
etc., to site, ,, and all operational, incidental charges on materials and including
cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges,
curing, including cutting grooves as directed by Engineer - in - charge etc., and
overheads & contractors profit complete for finished item of work. (SS 901,903 &
904)

For in side Walls 230 mm thick 1 x 1 26.5 3.15 83.48

Page 75 of 275
Rate Per
Sl.N Item Amount
Description of Item Nos. L B D QTY Unit Unit (in Unit
o Code (in Rs.)
Rs.)
For shelves Walls 230mm thick 1 x 2 0.6 2.40 2.88
For shelves 2 x 4 3.00 0.60 14.40
Deductions for Out side Plastering
For Doors -1 x 1 1.2 2.1 -2.52
For window -1 x 3 1.5 1.2 -5.40
92.84 Sqm 518.58 Sqm 48,144.97

91 (BLD- Plastering 20mm thick in two coats using screened sand with base coat of 16mm
CSTN- thick in CM(1:6) and top coat of 4mm thick in CM(1:4) with dubara sponge
8-9) finishing including cost and conveyance of all materials like cement, sand, water
etc., to site, ,, and all operational, incidental charges on materials and including
cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges,
curing, including cutting grooves as directed by Engineer-in-charge etc., and
overheads & contractors profit complete for finished item of work .(SS 901,903 &
904)

For Walls 230 mm thick 1 x 1 26.5 3.50 92.75


Add Jambs
For Doors 1 x 1 5.20 0.23 1.20
For window 1 x 3 6.00 0.23 4.14
Deductions
For Doors -1 x 1 1.2 2.1 -2.52
For window -1 x 3 1.5 1.2 -5.40
90.17 Sqm 534.09 Sqm 48,158.90

92 (BLD- Ornamental ceiling plastering 12mm thick single coat in CM (1:5) using screened
CSTN- sand including cost and conveyance of all materials like cement, sand, water etc.,
8-3 to site, ,, and all operational, incidental charges on materials and including cost of
Amend all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-
ment in charge etc., and overheads & contractors profit complete for finished item of work.
SoR (SS 901,903 & 904)
2016-
17)

Inside Plastering
For ceiling plastering 1 x 1 6.6 5.5 36.30
36.30 Sqm 400.32 Sqm 14,531.62

93 (BLD- Flooring with polished Shahabad / Tandur stone slabs of 15mm to 18mm thick set
CSTN- over a base coat of CM (1:8) , 12mm thick using screened sand over already laid
9-1) CC bed / RCC roof slab including neat cement slurry of honey like consistency
spread @ 3.3 Kgs per Sqm and jointed with neat cement to full depth including
cost and conveyance of all materials like cement, sand, water, flooring stones etc.
complete including sales & other taxes on all materials including all labour
charges like dressing of flooring stones to the required size, mixing of cement
mortar, laying, lift charges , cost of base coat, water charges etc., and overheads
& contractors profit complete for finished item of work. (APSS No.703 & 701)

Flooring 1 x 1 6.5 4.5 29.25 Sqm 724.53 Sqm 21,192.50

94 (BLD- Supply & application of one coat water based cement primer of interior grade I
CSTN- and two coats of acrylic emulsion paint having VOC (Volatile Organic
12-2& Compound) content less than 50 grams/litre for internal walls including cost and
Amend conveyance of all materials to site, and all operational, incidental, labour charges
ment in etc., and overheads & contractors profit complete for finished item of work in all
SoR floors.
2011-
12)
For ceiling plastering 1 x 1 6.6 5.5 36.30
For in side Walls 230 mm thick 1 x 1 26.5 3.15 83.48
For shelves Walls 230mm thick 1 x 2 0.6 2.4 2.88
For shelves 2 x 4 3 0.6 14.40
Deductions for Out side Plastering
For Doors -1 x 1 1.2 2.1 -2.52
For window -1 x 3 1.5 1.2 -5.40
129.14 Sqm 201.23 Sqm 25,986.84

95 (BLD- Supply & application of one coat water based cement primer of exterior grade II
CSTN- and two coats of acrylic exterior emulsion paint having VOC (Volatile Organic
12-2& Compound) content less than 50 grams/litre for exterior walls including cost and
Amend conveyance of all materials to site,and all operational, incidental, labour charges
ment in etc., and overheads & contractors profit complete for finished item of work in all
SoR floors.
2011-
12)
For Walls 230 mm thick 1 x 1 26.5 3.5 92.75
Add Jambs 0
For Doors 1 x 1 5.2 0.23 1.20
For window 1 x 3 6 0.23 4.14
Deductions
For Doors -1 x 1 1.2 2.1 -2.52
For window -1 x 3 1.5 1.2 -5.40
90.17 Sqm 275.24 Sqm 24,818.39

Page 76 of 275
Rate Per
Sl.N Item Amount
Description of Item Nos. L B D QTY Unit Unit (in Unit
o Code (in Rs.)
Rs.)
96 (BLD- Supply and fixing doors as per drawings with medium teak wood frame of section
CSTN- 100mm x 65 mm and ISI marked flush door shutters of 30 mm thick double
13-1) shutters with bond wood solid block board type Core having cross bands and
face veneers, hot pressed bonded with water proof phenol formaldehyde
synthetic resin factory made conforming to IS 2202-1991 (Part-I) both sides
commercial ply with internal lipping on all sides including cost and conveyance to
site of teak wood frame, flush shutter including supply and fixing 6 Nos. MS Z
hold fasts of size 300 mm x 40 mm x 5mm including cost of ISI marked MS
powder coated fixtures of 6 Nos. butt hinges (IS:205) 150mm long, 1 No. aldrop
(IS:2681) 300mm long, 2 Nos. tower bolts (IS:204) of 200 mm x 10 mm dia at top,
2 Nos. 150 mm long handles (IS:208), 2 Nos. door stoppers and 2 Nos. rubber
bushes including fixing the fixtures to door with required number of screws, bolt
and nuts including labour charges for fixing the frame in position, fixing the shutter
to the frame etc., including overheads & contractors profit complete for finished
item of work as per APSS 1001 & 1002 (The vertical frame of door shall be
embedded in flooring for a depth of not less than 10 mm) (1200mm x 2100mm)

For Door-1 1 x 1 1.2 2.1 2.52 Sqm 4,094.18 Sqm 10,317.33

97 Providing and fixing of Window with Two Sliding Shutters and with Grill Outer
Frame Size 90 mm x 50 mm have a rebate of 15mm x 5 mm to fit grill made of
10mm MS Sq Rods for horizontal bars welded at a regular pitch of 150mm to
12mm x 6 mm MS flat. made of Galvanized Steel (Base Steel as per IS 513, D
quality, galvanized as per IS 277 with Zinc of 120 GSM), using factory made
section powder coated with Pure polyester powder upto 50-60 microns thick with
total coated thickness of 0.58 mm for Outer Frame and 0.58 mm thickness for
Sliding Shutter Section, the Outer Frame for Two Tracks with Grill provision size
of 90 mm x 50 mm and the Window Shutter section of 0.58 mm x 36 mm and the
outer Frame with two integrated guide tracks of 12mm width and 24mm deep for
provision to slide the Shutter / sash frame and facilitates with a water drain outlet
component made of PVC and the shutter frame fitted with 5mm thick plain float
glass of reputed make and fixed with EPDM weathering seal resistant
accessories and handle made of Alumimium 1 No. per each shutter and cut to
length miter joined with corner brackets including installation of window system at
site using anchor fasteners, Silicon sealant applied at the Outer frame corners
inclusive of conveyance of all materials accessories, labour charges, and erection
at site with complete finished item of work.

windows 1 x 3 1.5 1.2 5.40 Sqm 7,185.01 Sqm 38,799.05

Construction of OAT 300 seating capacity and with stage 37.0 sqm

98 (BLD- Earth work excavation for foundations (Manual Means) of buildings, septic tank,
CSTN- sump, compound wall in ordinary soils and depositing on bank with an initial lead
2-1) of 10m and depth up to 3m including all operational, incidental, labour charges
such as shoring, sheeting, planking, strutting etc., and overheads & contractors
profit complete for finished item of work excluding dewatering charges etc., as per
SS 20 B(APSS 308)

For OAT step -1 16.20


1 x 1 45.00 0.60 0.60
For OAT step -2 0.60 16.56
1 x 1 46.00 0.60
For OAT step -3 0.60 16.92
1 x 1 47.00 0.60
For OAT step -4 0.60 17.28
1 x 1 48.00 0.60
For OAT step -5 0.60 17.64
1 x 1 49.00 0.60
For OAT step -6 0.60 18.00
1 x 1 50.00 0.60
For OAT step -7 0.90 41.31
1 x 1 51.00 0.90
For OAT side wall from step -1 to step -5 0.90 17.01
1 x 2 10.50 0.90
For stage wall 0.50 11.10
1 x 1 37.00 0.60
For approach steps for stage 0.20 0.80
1 x 2 2.00 1.00
For approach steps for seating area 0.20 3.36
14 x 2 1.20 0.50
176.18 Cum 271.40 Cum 47,815.25
99 (BLD- Plain Cement Concrete (1:4:8) (cement: fine aggregate: Coarse aggregate) for
CSTN- foundations and under flooring bed using 162.0 kgs of cement, coarse aggregate
3-5) 40mm size hard , machine crushed granite from approved quarry including cost
and conveyance of all materials like cement, sand, coarse aggregate, water etc.,
to site, and including all charges for machine mixing, laying concrete in
foundations and under flooring bed, ramming in 15 cm layers finishing top surface
to the required level curing etc., and overheads & contractors profit complete for
finished item of work. (APSS No. 402)

2.70
For OAT step -1 1 x 1 45.0 0.60 0.10
2.76
For OAT step -2 1 x 1 46.0 0.60 0.10
2.82
For OAT step -3 1 x 1 47.0 0.60 0.10
Page 77 of 275
Rate Per
Sl.N Item Amount
Description of Item Nos. L B D QTY Unit Unit (in Unit
o Code (in Rs.)
Rs.)
2.88
For OAT step -4 1 x 1 48.0 0.60 0.10
2.94
For OAT step -5 1 x 1 49.0 0.60 0.10
3.00
For OAT step -6 1 x 1 50.0 0.60 0.10
4.59
For OAT step -7 1 x 1 51.0 0.90 0.10
For OAT side wall from step -1 to step -5 1.89
1 x 2 10.50 0.90 0.10
For stage wall 2.22
1 x 1 37.00 0.60 0.10
For approach steps for stage 0.40
1 x 2 2.00 1.00 0.10
For approach steps for seating area 1.68
14 x 2 1.20 0.50 0.10
For stage floor bed 7.30
1 x 1 73.00 0.10
35.18 Cum 4,556.33 Cum 160,291.69

100 (BLD- Masonry work in CM(1:6) prop (Cement : Screened sand) in superstructure with
CSTN- fly ash cement / lime solid blocks of size 290mm x 225mm x 140mm from
5-17) approved source having minimum crushing strength of 50 Kg/Sqcm. including
cost and conveyance of all materials like cement, sand, bricks, water etc., to
site,and such as labour charges, like mixing cement mortar, scaffolding charges,
constructing masonry, lift charges, curing, overheads and contractor profit etc.,
complete for finished item of work. (APSS No. 501 & 504).

For OAT step -1 18.23


1 x 1 45.00 0.45 0.90
For OAT step -2 24.84
1 x 1 46.00 0.45 1.20
For OAT step -3 32.78
1 x 1 47.00 0.45 1.55
For OAT step -4 41.04
1 x 1 48.00 0.45 1.90
For OAT step -5 49.61
1 x 1 49.00 0.45 2.25
For OAT step -6 58.50
1 x 1 50.00 0.45 2.60
For OAT step -7 71.15
1 x 1 51.00 0.45 3.10
For OAT side wall from step -1 to step -5 23.63
1 x 2 10.50 0.45 2.50
For stage wall 14.99
1 x 1 37.00 0.45 0.90
For approach steps for stage -1 0.90
1 x 2 2.00 0.90 0.25
For approach steps for stage -2 0.36
1 x 2 2.00 0.60 0.15
For approach steps for stage -3 0.18
1 x 2 2.00 0.30 0.15
For approach steps for seating area 2.52
14 x 2 1.20 0.5 0.15
338.73 cum 7,242.08 cum 2,453,109.76
(BLD- Filling with useful available excavated earth (excluding rock) with a lead of 50 m
CSTN- in trenches, sides of foundations and basement with initial lead in layers not
2-9) & exceeding 15cm thick, watering and ramming including cost and conveyance of
### Proc.N water to work site and all operational, incidental, labour charges, hire charges of
o.2093 T&P etc., and overheads & contractors profit complete for finished item of work
8 (APSS NO.309&310)
(R&B)/
Dt:14-
stage filling by using excavated Quantity 1 x 1 176.18 176.18

176.18 Cum 38.91 Cum 6,855.16


(BLD- Filling with carted gravel in pathways, trenches, sides of foundations and
CSTN- basement with initial lead in layers not exceeding 15cm thick, watering and
2-8) & ramming including cost and conveyance of water to work site and all operational,
### Proc.N incidental, labour charges, hire charges of T&P etc., and overheads & contractors
o.2093 profit complete for finished item of work(APSS NO.309&310)
8
(R&B)/
Dt:14-
Gravel filling between steps 1&2 1 x 1 46.00 1.20 0.60 33.12
Gravel filling between steps 2&3 1 x 1 47.00 1.20 0.95 53.58
Gravel filling between steps 3&4 1 x 1 48.00 1.20 1.30 74.88
Gravel filling between steps 4&5 1 x 1 49.00 1.20 1.65 97.02
Gravel filling between steps 5&6 1 x 1 50.00 1.20 2.00 120.00
Gravel filling between steps 6&7 1 x 1 51.00 1.20 2.20 134.64
513.24 Cum 328.31 Cum 168,501.82

Page 78 of 275
Rate Per
Sl.N Item Amount
Description of Item Nos. L B D QTY Unit Unit (in Unit
o Code (in Rs.)
Rs.)
103 (BLD- Plastering 20mm thick in two coats using screened sand with base coat of 16mm
CSTN- thick in CM(1:6) and top coat of 4mm thick in CM(1:4) with dubara sponge
8-9) finishing including cost and conveyance of all materials like cement, sand, water
etc., to site, ,, and all operational, incidental charges on materials and including
cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges,
curing, including cutting grooves as directed by Engineer-in-charge etc., and
overheads & contractors profit complete for finished item of work .(SS 901,903 &
904)

For OAT step -1 20.25


1 x 1 45.00 0.45
For OAT step -2 20.70
1 x 1 46.00 0.45
For OAT step -3 21.15
1 x 1 47.00 0.45
For OAT step -4 21.60
1 x 1 48.00 0.45
For OAT step -5 22.05
1 x 1 49.00 0.45
For OAT step -6 22.50
1 x 1 50.00 0.45
For OAT step -7 132.60
1 x 1 51.00 2.60
For OAT side wall from step -1 to step -5 27.30
1 x 2 10.50 1.30
For stage wall 20.35
1 x 1 37.00 0.55
For approach steps for seating area 15.12
14 x 2 1.2 0.45
323.62 sqm 520.83 sqm 168,551.00
(BLD- Providing 0.5 wide Coping with 16 to 18mm thick High Polished granite up to 8'-
CSTN- 00 (2.43 M) other than black and regular colours with borders and design as per
9-7) the pattern approved by the Engineer-in-Charge , set over base coat of cement
mortar (1:5) , 12mm thick using screened sand over the stone ,Brick masonry or
CC bed already laid , including neat grey cement slurry of honey like consistency
spread 3.3 Kg per sqm and jointed neatly with white cement paste mixed with
104 pigment of matching shade to full depth including cost and conveyance of all
materials like cement , sand , water , granite slabs etc., to work site and all
operational, incidental labour & lift charges, half rounding the edges of treads ,
polishing charges and cost of base coat and overheads & contractors profit
complete for finished item of work for Coping (S.S.701 & special)

For OAT step -1 22.50


1 x 1 45.00 0.50
For OAT step -2 23.00
1 x 1 46.00 0.50
For OAT step -3 23.50
1 x 1 47.00 0.50
For OAT step -4 24.00
1 x 1 48.00 0.50
For OAT step -5 24.50
1 x 1 49.00 0.50
For OAT step -6 25.00
1 x 1 50.00 0.50
For OAT step -7 25.50
1 x 1 51.00 0.50
For OAT side wall from step -1 to step -5 10.50
1 x 2 10.50 0.50

178.50 Sqm 4,967.10 Sqm 886,627.35


105 (BLD- Supply & application of one coat water based cement primer of exterior grade II
CSTN- and two coats of acrylic exterior emulsion paint having VOC (Volatile Organic
12-2& Compound) content less than 50 grams/litre for exterior walls including cost and
Amend conveyance of all materials to site,and all operational, incidental, labour charges
ment in etc., and overheads & contractors profit complete for finished item of work in all
SoR floors.
2011-
12)

For OAT step -1 1 x 1 45.00 0.45 20.25

For OAT step -2 1 x 1 46.00 0.45 20.70

For OAT step -3 1 x 1 47.00 0.45 21.15

For OAT step -4 1 x 1 48.00 0.45 21.60

For OAT step -5 1 x 1 49.00 0.45 22.05

For OAT step -6 1 x 1 50.00 0.45 22.50

For OAT step -7 1 x 1 51.00 2.60 132.60

For OAT side wall from step -1 to step -5 1 x 2 10.50 1.30 27.30

For stage wall 1 x 1 37.00 0.55 20.35

For approach steps for seating area 14 x 2 1.20 0.45 15.12


323.62 Sqm 275.24 Sqm
89,073.17

Page 79 of 275
Rate Per
Sl.N Item Amount
Description of Item Nos. L B D QTY Unit Unit (in Unit
o Code (in Rs.)
Rs.)
106 (BLD- Flooring with 16 to 18mm thick high polished / Flame Finished / leather finished
CSTN- granite stone slabs other than black and regular colours (i.e. of shades like
9-7) paradise / bala flower / copper silk / laka red / lavender blue) with borders and
design as per the pattern approved by the Engineer-in-Charge of length not less
than 2.43 mts set over base coat of cement mortar (1:8) , 20mm thick using
screened sand over CC bed already laid or RCC roof slab including neat grey
cement slurry of honey like consistency spread @ 3.3 Kg per sqm and jointed
neatly with white cement paste mixed with pigment of matching shade to full
depth including cost and conveyance of all materials like cement , sand , water ,
granite slabs etc., to work site and all operational, incidental labour & lift charges,
polishing charges and cost of base coat and overheads & contractors profit
complete for finished item of work (S.S.701 & special)

For stage flooring 73.00


1 x 1 73.00
73.00 Sqm 4,044.67 Sqm 295,260.91
107 (BLD- Providing Treads with 16 to 18mm thick high polished / Flame Finished / leather
CSTN- finished granite stone slabs other than black and regular colour granite with
9-7) borders and design as per the pattern approved by the Engineer-in-Charge of
length not less than 2.43 mts set over base coat of cement mortar (1:5) , 12mm
thick using screened sand over CC bed already laid or RCC roof slab including
neat grey cement slurry of honey like consistency spread @ 3.3 Kg per sqm and
jointed neatly with white cement paste mixed with pigment of matching shade to
full depth including cost and conveyance of all materials like cement , sand ,
water , granite slabs etc., to work site and all operational, incidental labour & lift
charges, half rounding the edges of treads , polishing charges and cost of base
coat and overheads & contractors profit complete for finished item of work for
Treads (S.S.701 & special)

For approach steps for stage 1 x 2.0 2.0 0.3 1.20


For approach steps for seating area 14 x 2.0 1.2 0.3 10.08
11.28 Sqm 5,070.60 Sqm 57,196.37
108 (BLD- Providing Risers to steps walls with 16 to 18mm thick high polished / Flame
CSTN- Finished / leather finished granite stone slabs other than black and regular colour
9-7) granite with length equal to flooring stone, set over base coat of CM(1:5) 12 mm
thick using screened sand with cement slurry of honey like consistency spread at
the rate of 3.30 kgs per sqm and jointing with white cement paste mixed with
pigment of matching shade to full depth, including cost of all materials like tiles,
cement, sand and water etc., and overheads & contractors profit complete for
finished item of work. for Risers-0.15 m(APSS No.701 &707)

For approach steps for stage 1 x 2.0 2.0 0.10 0.40


For approach steps for seating area 14 x 2.0 1.2 0.10 3.36
3.76 Sqm 4,191.88 Sqm 15,761.47

Construction of Green room at OAT size of 3.7 m X 2.70 m - 2 No's

109 (BLD- Earth work excavation for foundations (Manual Means) of buildings, septic tank,
CSTN- sump, compound wall in ordinary soils and depositing on bank with an initial lead
2-1) of 10m and depth up to 3m including all operational, incidental, labour charges
such as shoring, sheeting, planking, strutting etc., and overheads & contractors
profit complete for finished item of work excluding dewatering charges etc., as per
SS 20 B(APSS 308)

For RCC Column Footings 1 x 6 1.50 1.50 1.8 24.30


For Basement wall 1 x 1 20.00 0.6 0.6 7.20
31.50 Cum 271.40 Cum 8,549.10
110 (BLD- Plain Cement Concrete (1:4:8) (cement: fine aggregate: Coarse aggregate) for
CSTN- foundations and under flooring bed using 162.0 kgs of cement, coarse aggregate
3-5) 40mm size hard , machine crushed granite from approved quarry including cost
and conveyance of all materials like cement, sand, coarse aggregate, water etc.,
to site, and including all charges for machine mixing, laying concrete in
foundations and under flooring bed, ramming in 15 cm layers finishing top surface
to the required level curing etc., and overheads & contractors profit complete for
finished item of work. (APSS No. 402)

For RCC Column Footings 1 x 6 1.5 1.5 0.1 1.35


For Basement wall 1 x 1 20.00 0.6 0.1 1.20
For Floor bed 1 x 2 3.70 2.7 0.1 2.00
4.55 Cum 4,556.33 Cum 20,731.30
111 Random Rubble stone masonry in CM (1:8) prop: (Cement: Screened sand)
using hard granite stones carted from approved quarry including cost and
conveyance of all materials like cement, screened sand, water,Rough stone
( BLD- Through stone, Coursed stones etc., from approved quarry, to site, including
CSTN-6- labour charges for cutting stones to required size and shape, mixing, of cement,
13 ) mortar, construction, curing, charges for scaffolding etc., and overheads &
contractors profit complete for finished item of work. (APSS No. 601 & 615)

For Basement wall 1 x 1 20.00 0.45 0.6 5.40


5.40 Cum 4,511.57 Cum 24,362.48

Page 80 of 275
Rate Per
Sl.N Item Amount
Description of Item Nos. L B D QTY Unit Unit (in Unit
o Code (in Rs.)
Rs.)
112 (BLD- Supply and placing of the V.R.C.C Nominal Mix Concrete M 20 grade
CSTN- corresponding to IS 456 with minimum cement content of 350 kgs per 1 cum of
3-13-A) concrete using CONCRETE MIXER with 20mm size HBG graded machine
crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386
Part 1 to Part 8) from approved quarry and including cost and conveyance of all
materials like cement, fine aggregate (sand) coarse aggregate, water, etc., to site
and , centring using Steel scaffolding pipes , jack props , Waller’s , Foot plates ,
brackets , steel centring plates etc., including all operational, incidental and labour
charges such as machine mixing, laying concrete, vibrator, curing etc., and
overheads & contractors profit complete but excluding cost of steel and its
fabrication charges for finished item of work (APSS No. 402)

For Footings 1 x 6 1.20 1.20 0.3 2.59 Cum 9,421.96 Cum 24,402.88
For Pedastal 1 x 6 0.45 0.45 0.9 1.09 Cum 10,033.49 Cum 10,936.50
For Plinth beam 1 x 1 20.00 0.30 0.3 1.80 Cum 12,077.1 Cum 21,738.85

113 (BLD- Filling with useful available excavated earth (excluding rock) with a lead of 50 m
CSTN- in trenches, sides of foundations and basement with initial lead in layers not
2-9) & exceeding 15cm thick, watering and ramming including cost and conveyance of
Proc.N water to work site and all operational, incidental, labour charges, hire charges of
o.2093 T&P etc., and overheads & contractors profit complete for finished item of work
8 (APSS NO.309&310)
(R&B)/
Dt:14-
5-2019 50% of Excavated Quantity 1 x 0.5 31.50 15.75
15.75 Cum 38.91 Cum 612.83
114 (BLD- Supply and placing of the V.R.C.C Nominal Mix Concrete M 20 grade
CSTN- corresponding to IS 456 with minimum cement content of 350 kgs per 1 cum of
3-13-B) concrete using CONCRETE MIXER with 20mm size HBG graded machine
crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386
Part 1 to Part 8) from approved quarry and,including cost and conveyance of all
materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site
and , centring using Casurina Ballies, Bamboos, Wooden Reapers, Runners,
Wood Posts, Wall Plates etc., including all operational, incidental and labour
charges such as machine mixing, lifting of concrete manually, laying concrete,
vibrator, curing , overheads & contractors profit etc., complete but excluding cost
of steel and its fabrication charges for finished item of work (APSS No. 402)

For RCC Columns 1 x 6 0.23 0.30 3.20 1.32


1.32 Cum 11,836.02 Cum 15,623.55
Lintel beam for doors-1 1 x 2 1.20 0.23 0.15 0.08
Lintel beam for Window-1 1 x 2 1.50 0.23 0.15 0.10
0.18 Cum 11,726.10 Cum 2,110.70
115 (BLD- Supply and placing of the V.R.C.C Nominal Mix Concrete M 20 grade
CSTN- corresponding to IS 456 with minimum cement content of 350 kgs per 1 cum of
3-13-C) concrete using CONCRETE MIXER with 20mm size HBG graded machine
crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386
Part 1 to Part 8) from approved quarry including cost and conveyance of all
materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site
and , centring using Casurina Ballies , Bamboos , Wooden Reapers , Runners ,
Wood Posts , Wall Plates etc., including all operational, incidental and labour
charges such as machine mixing, lifting of concrete manually, laying concrete,
vibrator, , curing , overheads & contractors profit etc., complete but excluding cost
of steel and its fabrication charges for finished item of work (APSS No. 402)

Beam 1 x 1 20.00 0.23 0.30 1.38


1.38 Cum 10,262.59 Cum 14,162.37
Slab 125 mm thick 1.0 x 2.0 3.7 2.7 19.98
19.98 sqm 1,248.84 sqm 24,951.82
116 (BLD- Reinforced Cement Concrete Nominal Mix M 20 grade corresponding to IS 456
CSTN- with minimum cement content of 350 kgs per 1 cum of concrete using
3-13-C) CONCRETE MIXER with using 12mm size hard granite machine crushed graded
metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from
approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of
concrete including cost and conveyance of all materials like cement, fine
aggregate (Sand), coarse aggregate, water etc., to site including steel centring,
shuttering, labour charges such as ,Concrete machine mixing, laying concrete,
lift charges, curing etc., and overheads & contractors profit complete for finished
item of work (APSS No. 402 & 403) for platforms and shelves.

25mm thick shelves : 3 x 4 3.0 0.6 21.60


21.60 sqm 264.62 sqm 5,715.79
117 (BLD- Providing High Yield Strength Deformed (HYSD) / Thermo Mechanically Treated
CSTN- (TMT) (Fe 500 / Fe 500D grade as per IS 1786-1979) of different diameters for
4.2)& RCC works , including labour charges for straightening, cutting, bending to
Amend required sizes and shapes, placing in position with cover blocks of approved
ment in materials and size and tying and lap-splicing with binding wire of 18 SWG,
SoR forming grills for reinforcement work as per approved designs and drawings,
2011- including cost and conveyance of steel bars, including all wastages such as
12 overlaps, couplings, chairs, spacer bars including cost and conveyance of binding
page wire, cover blocks and all incidental, operational, labour charges such as cutting,
No. 392 bending, placing in position, tying including overheads & contractors profit
complete for finished item of work.( APSS No.126)

For Footings 1 x 1 1.73 70.00 kg/Cum 121.10


For Pedastal 1 x 1 0.73 70.00 kg/Cum 51.10
For Plinth beam 1 x 1 1.08 100.0 kg/Cum 108.00
Columns 1 x 1 0.97 100.0 kg/Cum 97.00
Page 81 of 275
Rate Per
Sl.N Item Amount
Description of Item Nos. L B D QTY Unit Unit (in Unit
o Code (in Rs.)
Rs.)
Lintel beam 1 x 1 0.09 70.0 kg/Cum 6.30
beams 1 x 1 0.83 100.0 kg/Cum 83.00
slab 125 mm thick 1 x 1 2.00 70.00 kg/Cum 140.00
25mm thick shelves : 1 x 1 0.54 70.00 kg/Cum 37.80
644.30 Kgs 92.15 Kgs 59,372.25
118 (BLD- Providing impervious coat to exposed RCC roof slab surfaces to required slopes
CSTN- with CM (1:3) prop. using screened sand 20mm thick (average) mixed with
10-25) integral cement water proofing liquid confirming to IS: 2645-2003 manufactured
by reputed manufacturers as approved by Engineer-in-charge at 1 Kg per one
bag of cement, laid over roof slab when it is green, finished smooth with a floating
coat of neat cement and thread lining at regular intervals of 45cmx45cm including
cost and conveyance of all materials like cement, sand, water proofing
compound, water etc., to site, , and operational, incidental, and labour charges for
mixing mortar, laying, lift charges, rendering smooth and thread lining, curing
including rounding off junctions of wall and slab etc., and overheads & contractors
profit complete for finished item of work. (APSS No. 901 & 903).

Roof 1 x 2.0 3.7 2.7 19.98


19.98 Sqm 536.98 Sqm 10,728.86

119 (BLD- Brick masonry for panel walls in superstructure with CM (1:8) prop: (Cement :
CSTN- Screened sand) using common burnt clay bricks of class as per Table- I of
5-5) IS:1077-1992, Non- Modular or traditional size 23 x 11 x 7 cms from approved
source having minimum crushing strength of 40 Kg/Sqcm. including cost and
conveyance of all materials like cement, screened sand, bricks, water etc., to site,
, and such as labour charges, like mixing cement mortar, scaffolding charges,
constructing masonry, lift charges, curing, etc., and overheads & contractors profit
complete for finished item of work. (APSS No. 501 & 504).

For Walls 230mm thick 1 x 1 20.00 0.23 3.00 13.80


For shelves Walls 230mm thick 1 x 6 0.60 0.23 2.40 1.99
Deductions
Lintel beam for doors -1 x 2 1.20 0.23 0.15 -0.08
Lintel beam for Window -1 x 2 1.50 0.23 0.15 -0.10
For Doors -1 x 2 0.90 0.23 2.1 -0.87
For windows -1 x 2 1.20 0.23 1.20 -0.66
14.08 Cum 7,461.66 Cum 105,060.17
120 ( BLD- Plastering 12mm thick in two coats using screened sand with base coat of 8mm
CSTN- thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge
8-10) finishing including cost and conveyance of all materials like cement, sand, water
etc., to site, ,, and all operational, incidental charges on materials and including
cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges,
curing, including cutting grooves as directed by Engineer - in - charge etc., and
overheads & contractors profit complete for finished item of work. (SS 901,903 &
904)

For in side Walls 230 mm thick 1 x 1 20 3.15 63.00


For shelves Walls 230mm thick 2 x 6 0.60 2.40 17.28
For shelves 3 x 4 3.00 0.60 21.60
Deductions for Out side Plastering
For Doors -1 x 2 0.90 2.10 -3.78
For window -1 x 2 1.20 1.2 -2.88
95.22 Sqm 518.58 Sqm 49,379.19

121 (BLD- Plastering 20mm thick in two coats using screened sand with base coat of 16mm
CSTN- thick in CM(1:6) and top coat of 4mm thick in CM(1:4) with dubara sponge
8-9) finishing including cost and conveyance of all materials like cement, sand, water
etc., to site, ,, and all operational, incidental charges on materials and including
cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges,
curing, including cutting grooves as directed by Engineer-in-charge etc., and
overheads & contractors profit complete for finished item of work .(SS 901,903 &
904)

For Walls 230 mm thick 1 x 1 20.00 3.45 69.00


Add Jambs
For Doors 1 x 1 4.90 0.23 1.13
For window 1 x 1 4.80 0.23 1.10
Deductions for Out side Plastering
For Doors -1 x 1 0.90 2.10 -1.89
For window -1 x 1 1.20 1.2 -1.44
67.90 Sqm 534.09 Sqm 36,264.71

122 (BLD- Ornamental ceiling plastering 12mm thick single coat in CM (1:5) using screened
CSTN- sand including cost and conveyance of all materials like cement, sand, water etc.,
8-3 to site, ,, and all operational, incidental charges on materials and including cost of
Amend all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-
ment in charge etc., and overheads & contractors profit complete for finished item of work.
SoR (SS 901,903 & 904)
2016-
17)

Inside Plastering
For ceiling plastering 1 x 2.0 3.7 2.7 19.98
19.98 Sqm 400.32 Sqm 7,998.39

Page 82 of 275
Rate Per
Sl.N Item Amount
Description of Item Nos. L B D QTY Unit Unit (in Unit
o Code (in Rs.)
Rs.)
123 (BLD- Flooring with 16 to 18mm thick high polished / Flame Finished / leather finished
CSTN- granite stone slabs other than black and regular colours (i.e. of shades like
9-7) paradise / bala flower / copper silk / laka red / lavender blue) with borders and
design as per the pattern approved by the Engineer-in-Charge of length not less
than 2.43 mts set over base coat of cement mortar (1:8) , 20mm thick using
screened sand over CC bed already laid or RCC roof slab including neat grey
cement slurry of honey like consistency spread @ 3.3 Kg per sqm and jointed
neatly with white cement paste mixed with pigment of matching shade to full
depth including cost and conveyance of all materials like cement , sand , water ,
granite slabs etc., to work site and all operational, incidental labour & lift charges,
polishing charges and cost of base coat and overheads & contractors profit
complete for finished item of work (S.S.701 & special)

Flooring 1 x 2 3.7 2.7 19.98 Sqm 4,044.67 Sqm 80,812.51

124 (BLD- Supply & application of one coat water based cement primer of interior grade I
CSTN- and two coats of acrylic emulsion paint having VOC (Volatile Organic
12-2& Compound) content less than 50 grams/litre for internal walls including cost and
Amend conveyance of all materials to site, and all operational, incidental, labour charges
ment in etc., and overheads & contractors profit complete for finished item of work in all
SoR floors.
2011-
12)
For ceiling plastering 1 x 2 3.7 2.7 19.98
For in side Walls 230 mm thick 1 x 1 20 3.15 63.00
For shelves Walls 230mm thick 2 x 6 0.6 2.4 17.28
For shelves 3 x 4 3.00 0.60 21.60
Deductions for Out side Plastering
For Doors -1 x 2 0.9 2.1 -3.78
For window -1 x 2 1.2 1.2 -2.88
115.20 Sqm 201.23 Sqm 23,181.70

125 (BLD- Supply & application of one coat water based cement primer of exterior grade II
CSTN- and two coats of acrylic exterior emulsion paint having VOC (Volatile Organic
12-2& Compound) content less than 50 grams/litre for exterior walls including cost and
Amend conveyance of all materials to site,and all operational, incidental, labour charges
ment in etc., and overheads & contractors profit complete for finished item of work in all
SoR floors.
2011-
12)
For Walls 230 mm thick 1 x 1 20 3.45 69.00
Add Jambs
For Doors 1 x 1 4.9 0.23 1.13
For window 1 x 1 4.8 0.23 1.10
Deductions for Out side Plastering
For Doors -1 x 1 0.9 2.1 -1.89
For window -1 x 1 1.2 1.2 -1.44
67.90 Sqm 275.24 Sqm 18,688.80
126 (BLD- Supply and fixing doors as per drawings with medium teak wood frame of section
CSTN- 100mm x 65 mm and ISI marked flush door shutters of 30 mm thick single
13-1) shutter with bond wood solid block board type Core having cross bands and face
veneers, hot pressed bonded with water proof phenol formaldehyde synthetic
resin factory made conforming to IS 2202-1991 (Part-I) both sides commercial ply
with internal lipping on all sides including cost and conveyance to site of teak
wood frame, flush shutter including supply and fixing 6 Nos. MS Z hold fasts of
size 300 mm x 40 mm x 5mm including cost of ISI marked MS powder coated
fixtures of 3 Nos. butt hinges (IS:205) 150mm long, 1 No. aldrop (IS:2681)
300mm long, 1 No. tower bolt (IS:204) of 200 mm x 10 mm dia at top, 2 Nos. 150
mm long handles (IS:208), 1 No. door stopper and 1 No. rubber bush including
fixing the fixtures to door with required number of screws, bolt and nuts including
labour charges for fixing the frame in position, fixing the shutter to the frame etc,
including overheads & contractors profit complete for finished item of work as per
APSS 1001 & 1002 (The vertical frame of door shall be embedded in flooring for a
depth of not less than 10 mm) (900mm x 2100mm)

For Doors 1 x 2 0.9 2.1 3.78 Sqm 4,481.18 Sqm 16,938.86

127 As per Providing and fixing of Window with Two Sliding Shutters and with Grill Outer
data Frame Size 90 mm x 50 mm have a rebate of 15mm x 5 mm to fit grill made of
10mm MS Sq Rods for horizontal bars welded at a regular pitch of 150mm to
12mm x 6 mm MS flat. made of Galvanized Steel (Base Steel as per IS 513, D
quality, galvanized as per IS 277 with Zinc of 120 GSM), using factory made
section powder coated with Pure polyester powder upto 50-60 microns thick with
total coated thickness of 0.58 mm for Outer Frame and 0.58 mm thickness for
Sliding Shutter Section, the Outer Frame for Two Tracks with Grill provision size
of 90 mm x 50 mm and the Window Shutter section of 0.58 mm x 36 mm and the
outer Frame with two integrated guide tracks of 12mm width and 24mm deep for
provision to slide the Shutter / sash frame and facilitates with a water drain outlet
component made of PVC and the shutter frame fitted with 5mm thick plain float
glass of reputed make and fixed with EPDM weathering seal resistant
accessories and handle made of Alumimium 1 No. per each shutter and cut to
length miter joined with corner brackets including installation of window system at
site using anchor fasteners, Silicon sealant applied at the Outer frame corners
inclusive of conveyance of all materials accessories, labour charges, and erection
at site with complete finished item of work.

For windows 1 x 2 1.2 1.2 2.88 Sqm 7,185.01 Sqm 20,692.83

Construction of Toilet block at OAT size of 10 m X 3.70 m

Page 83 of 275
Rate Per
Sl.N Item Amount
Description of Item Nos. L B D QTY Unit Unit (in Unit
o Code (in Rs.)
Rs.)
128 (BLD- Earth work excavation for foundations (Manual Means) of buildings, septic tank,
CSTN- sump, compound wall in ordinary soils and depositing on bank with an initial lead
2-1) of 10m and depth up to 3m including all operational, incidental, labour charges
such as shoring, sheeting, planking, strutting etc., and overheads & contractors
profit complete for finished item of work excluding dewatering charges etc., as per
SS 20 B(APSS 308)

For RCC Column Footings 1 x 10 1.50 1.50 1.5 33.75


For basement wall 1 x 1 31.30 0.6 0.6 11.27
45.02 Cum 271.40 Cum 12,218.43
129 (BLD- Plain Cement Concrete (1:4:8) (cement: fine aggregate: Coarse aggregate) for
CSTN- foundations and under flooring bed using 162.0 kgs of cement, coarse aggregate
3-5) 40mm size hard , machine crushed granite from approved quarry including cost
and conveyance of all materials like cement, sand, coarse aggregate, water etc.,
to site, and including all charges for machine mixing, laying concrete in
foundations and under flooring bed, ramming in 15 cm layers finishing top surface
to the required level curing etc., and overheads & contractors profit complete for
finished item of work. (APSS No. 402)

For RCC Column Footings 1 x 10 1.5 1.5 0.1 2.25


For basement wall 1 x 1 31.30 0.60 0.1 1.88
For floor bed 1 x 1 10.50 3.7 0.1 3.89
8.02 Cum 4,556.33 Cum 36,541.77
130 Random Rubble stone masonry in CM (1:8) prop: (Cement: Screened sand)
using hard granite stones carted from approved quarry including cost and
conveyance of all materials like cement, screened sand, water,Rough stone
( BLD-
CSTN-6- Through stone, Coursed stones etc., from approved quarry, to site, including
13 ) labour charges for cutting stones to required size and shape, mixing, of cement,
mortar, construction, curing, charges for scaffolding etc., and overheads &
contractors profit complete for finished item of work. (APSS No. 601 & 615)

For Basement wall 1 x 1 31.30 0.45 0.5 7.04


7.04 Cum 4,511.57 Cum 31,761.45
131 (BLD- Supply and placing of the V.R.C.C Nominal Mix Concrete M 20 grade
CSTN- corresponding to IS 456 with minimum cement content of 350 kgs per 1 cum of
3-13-A) concrete using CONCRETE MIXER with 20mm size HBG graded machine
crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386
Part 1 to Part 8) from approved quarry and including cost and conveyance of all
materials like cement, fine aggregate (sand) coarse aggregate, water, etc., to site
and , centring using Steel scaffolding pipes , jack props , Waller’s , Foot plates ,
brackets , steel centring plates etc., including all operational, incidental and labour
charges such as machine mixing, laying concrete, vibrator, curing etc., and
overheads & contractors profit complete but excluding cost of steel and its
fabrication charges for finished item of work (APSS No. 402)

For Footings 1 x 10 1.20 1.20 0.3 4.32 Cum 9,421.96 Cum 40,702.87
For Pedastal 1 x 10 0.60 0.60 1.1 3.96 Cum 10,033.49 Cum 39,732.62
For Plinth beam 1 x 1 31.30 0.30 0.3 2.82 Cum 12,077.14 Cum 34,057.53

132 (BLD- Filling with useful available excavated earth (excluding rock) with a lead of 50 m
CSTN- in trenches, sides of foundations and basement with initial lead in layers not
2-9) & exceeding 15cm thick, watering and ramming including cost and conveyance of
Proc.N water to work site and all operational, incidental, labour charges, hire charges of
o.2093 T&P etc., and overheads & contractors profit complete for finished item of work
8 (APSS NO.309&310)
(R&B)/
Dt:14- Excavated Quantity 1 x 1 45.02 45.02
45.02 Cum 38.91 Cum 1,751.73
133 (BLD- Supply and placing of the V.R.C.C Nominal Mix Concrete M 20 grade
CSTN- corresponding to IS 456 with minimum cement content of 350 kgs per 1 cum of
3-13-B) concrete using CONCRETE MIXER with 20mm size HBG graded machine
crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386
Part 1 to Part 8) from approved quarry and,including cost and conveyance of all
materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site
and , centring using Casurina Ballies, Bamboos, Wooden Reapers, Runners,
Wood Posts, Wall Plates etc., including all operational, incidental and labour
charges such as machine mixing, lifting of concrete manually, laying concrete,
vibrator, curing , overheads & contractors profit etc., complete but excluding cost
of steel and its fabrication charges for finished item of work (APSS No. 402)

For RCC Columns 1 x 10 0.30 0.30 3.00 2.70


2.70 Cum 11,836.02 Cum 31,957.25
Lintel beam for doors-1 1 x 2 1.50 0.23 0.23 0.16
Lintel beam for doors-2 1 x 2 5.00 0.1 0.15 0.15
0.31 Cum 11,726.10 Cum 3,635.09
134 (BLD- Supply and placing of the V.R.C.C Nominal Mix Concrete M 20 grade
CSTN- corresponding to IS 456 with minimum cement content of 350 kgs per 1 cum of
3-13-C) concrete using CONCRETE MIXER with 20mm size HBG graded machine
crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386
Part 1 to Part 8) from approved quarry including cost and conveyance of all
materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site
and , centring using Casurina Ballies , Bamboos , Wooden Reapers , Runners ,
Wood Posts , Wall Plates etc., including all operational, incidental and labour
charges such as machine mixing, lifting of concrete manually, laying concrete,
vibrator, , curing , overheads & contractors profit etc., complete but excluding cost
of steel and its fabrication charges for finished item of work (APSS No. 402)

Beam 1 x 1 39.00 0.3 0.30 3.51


3.51 Cum 10,262.59 Cum 36,021.69
Slab 125 mm thick 1 x 1 10.5 3.7 38.85
38.85 sqm 1,248.84 sqm 48,517.43

Page 84 of 275
Rate Per
Sl.N Item Amount
Description of Item Nos. L B D QTY Unit Unit (in Unit
o Code (in Rs.)
Rs.)
135 (BLD- Providing High Yield Strength Deformed (HYSD) / Thermo Mechanically Treated
CSTN- (TMT) (Fe 500 / Fe 500D grade as per IS 1786-1979) of different diameters for
4.2)& RCC works , including labour charges for straightening, cutting, bending to
Amend required sizes and shapes, placing in position with cover blocks of approved
ment in materials and size and tying and lap-splicing with binding wire of 18 SWG,
SoR forming grills for reinforcement work as per approved designs and drawings,
2011- including cost and conveyance of steel bars, including all wastages such as
12 overlaps, couplings, chairs, spacer bars including cost and conveyance of binding
page wire, cover blocks and all incidental, operational, labour charges such as cutting,
No. 392 bending, placing in position, tying including overheads & contractors profit
complete for finished item of work.( APSS No.126)

For Footings 1 x 1 4.32 70.00 kg/Cum 302.40


For Pedastal 1 x 1 3.96 70 kg/Cum 277.20
For Plinth beam 1 x 1 2.82 100 kg/Cum 282.00
Columns 1 x 1 2.70 100.00 kg/Cum 270.00
Lintel beam 1 x 1 0.31 70.00 kg/Cum 21.70
beams 1 x 1 3.51 100.00 kg/Cum 351.00
Slab 125 mm thick 1 x 1 4.86 70.00 kg/Cum 339.94
1844.24 Kgs 92.15 Kgs 169,946.72
136 (BLD- Providing impervious coat to exposed RCC roof slab surfaces to required slopes
CSTN- with CM (1:3) prop. using screened sand 20mm thick (average) mixed with
10-25) integral cement water proofing liquid confirming to IS: 2645-2003 manufactured
by reputed manufacturers as approved by Engineer-in-charge at 1 Kg per one
bag of cement, laid over roof slab when it is green, finished smooth with a floating
coat of neat cement and thread lining at regular intervals of 45cmx45cm including
cost and conveyance of all materials like cement, sand, water proofing
compound, water etc., to site, , and operational, incidental, and labour charges for
mixing mortar, laying, lift charges, rendering smooth and thread lining, curing
including rounding off junctions of wall and slab etc., and overheads & contractors
profit complete for finished item of work. (APSS No. 901 & 903).

slab 1 x 1 10.5 3.7 38.85


38.85 Sqm 536.98 Sqm 20,861.67

137 (BLD- Brick masonry for panel walls in superstructure with CM (1:8) prop: (Cement :
CSTN- Screened sand) using common burnt clay bricks of class as per Table- I of
5-5) IS:1077-1992, Non- Modular or traditional size 23 x 11 x 7 cms from approved
source having minimum crushing strength of 40 Kg/Sqcm. including cost and
conveyance of all materials like cement, screened sand, bricks, water etc., to site,
, and such as labour charges, like mixing cement mortar, scaffolding charges,
constructing masonry, lift charges, curing, etc., and overheads & contractors profit
complete for finished item of work. (APSS No. 501 & 504).

For Walls 230mm thick 1 x 1 31.30 0.23 3.00 21.60


Deductions
Lintel beam for doors-1 -1 x 2 1.5 0.23 0.23 -0.16
For doors-1 -1 x 2 1.2 0.23 2.1 -1.16
For ventilaters -1 x 12 0.60 0.23 0.60 -0.99
19.29 Cum 7,461.66 Cum 143,935.42
138 (BLD- Reinforced Brick Masonry for partition walls (11.0 cm thick) in CM (1:4) prop.
CSTN- (Cement : Screened sand) using common burnt clay bricks of class as per Table-
5-12) I of IS:1077-1992, Non- Modular or traditional size 23 x 11 x 7 cms from
approved source having minimum crushing strength of 40 Kg/Sq.cm and placing
2 Nos. of 6mm M.S plain rods in every third layer with free ends of the
reinforcement pegged into mortar joints of main brick walls where applicable
including cost and conveyance of all materials like cement, steel, sand, bricks,
water etc., to site, ,, all operational, incidental charges such as labour charges for
mixing cement mortar, scaffolding charges, constructing masonry, lift charges,
curing, etc., and overheads & contractors profit but excluding cost of steel and its
fabrication charges complete for finished item of work. (APSS No. of 501 & 509)

For Walls 115 mm thick 1 x 4 1.40 2.15 12.04


For Walls 115 mm thick Parapet Wall 1 x 1 29.00 0.30 8.70
For Walls 115 mm thick Urinal partision 1 x 3 0.90 1.80
4.86
wall
Deductions
for doors-2 -1 x 8 0.75 2.1 -12.60
Lintel beam for doors-2 -1 x 2 5 0.15 -1.50
11.50 Sqm 990.25 Sqm 11,387.88
139 (BLD- Plastering 20mm thick in two coats using screened sand with base coat of 16mm
CSTN- thick in CM(1:6) and top coat of 4mm thick in CM(1:4) with dubara sponge
8-9) finishing including cost and conveyance of all materials like cement, sand, water
etc., to site, ,, and all operational, incidental charges on materials and including
cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges,
curing, including cutting grooves as directed by Engineer-in-charge etc., and
overheads & contractors profit complete for finished item of work .(SS 901,903 &
904)

Out side Plastering


For out side Wall 1 x 1 31.30 3.00 93.90
For out side 115 mm thick Parapet Wall 1 x 2 29.00 0.35 20.30

Inside wall Plastering


For inside Wall 1 x 1 39.00 0.90 35.10
Add Jambs
For Doors-1 1 x 2 5.40 0.23 2.48
For ventilaters 1 x 12 2.1 0.23 5.80
Deductions for Out side Plastering
Page 85 of 275
Rate Per
Sl.N Item Amount
Description of Item Nos. L B D QTY Unit Unit (in Unit
o Code (in Rs.)
Rs.)
For doors-1 -1 x 2 1.2 2.1 -5.04
For ventilaters -1 x 12 0.6 0.6 -4.32
148.22 Sqm 534.09 Sqm 79,162.82

140 (BLD- Ornamental ceiling plastering 12mm thick single coat in CM (1:5) using screened
CSTN- sand including cost and conveyance of all materials like cement, sand, water etc.,
8-3 to site, ,, and all operational, incidental charges on materials and including cost of
Amend all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-
ment in charge etc., and overheads & contractors profit complete for finished item of work.
SoR (SS 901,903 & 904)
2016-
17) Inside Plastering
For ceiling plastering 1 x 1 10.50 3.70 38.85
38.85 Sqm 400.32 Sqm 15,552.43

141 (BLD- Flooring with non-skid full body ceramic floor tiles of size 300mm x 300mm and
CSTN- thickness between 7 - 8mm 1st quality conforming to IS: 13711, IS: 13712, IS:
9-6) 13630(Part 1 to 15) of any colour and finish in all shades and designs as
approved by Engineer-in-charge, set over base coat of cement mortar (1:8),
12mm thick using screened sand over CC bed already laid or RCC roof slab,
including neat cement slurry of honey like consistency spread @ 3.3 Kgs per Sqm
& jointed neatly with white cement paste to full depth mixed with pigment of
matching shade, including cost of all materials like cement, screened sand , water
and tiles etc., and overheads & contractors profit complete for finished item of
work. (APSS No.701 & 707)

Flooring 1 x 1 10.50 3.70 38.85 Sqm 1,008.81 Sqm 39,192.27

142 (BLD- Providing dadooing to walls with glazed full body ceramic tiles of any size and
CSTN- thickness between 5 to 7mm 1st quality conforming to IS: 13711, IS: 13712, IS:
9-18) 13630(Parts 1 to 15) of any colour and finish in all shades and designs with
borders as approved by Engineer-in-Charge set over base coat of CM(1:5) 12
mm thick using screened sand with cement slurry of honey like consistency
spread at the rate of 3.30 kgs per sqm and jointing with white cement paste mixed
with pigment of matching shade to full depth, including cost of all materials like
tiles, cement, sand and water etc., and overheads & contractors profit complete
for finished item of work.

Inside wall
For Walls 230mm thick 1 x 1 31.30 2.30 71.99
For Walls 115 mm thick 2 x 4 1.4 2.15 24.08
For Walls 115 mm thick Urinal partision 2 x 3 0.9 1.8 9.72
wall
Deductions for Out side Plastering
For doors-1 -1 x 2 1.2 2.1 -5.04

For doors-2 -2 x 8 0.75 2.1 -25.20

75.55 Sqm 720.66 Sqm 54,445.86

143 (BLD- Supply & application of one coat water based cement primer of exterior grade II
CSTN- and two coats of acrylic exterior emulsion paint having VOC (Volatile Organic
12-2& Compound) content less than 50 grams/litre for exterior walls including cost and
Amend conveyance of all materials to site,and all operational, incidental, labour charges
ment in etc., and overheads & contractors profit complete for finished item of work in all
SoR floors.
2011-
12)

For ceiling plastering 1 x 1 10.5 3.7 38.85


For out side 115 mm thick Parapet Wall 1 x 2 29 0.35 20.30

For out side Wall 1 x 1 31.3 3 93.90

For inside Wall 1 x 1 39 0.9 35.10

Add Jambs
For Doors-1 1 x 2 5.4 0.23 2.48
For ventilaters 1 x 12 2.1 0.23 5.80

Deductions for Out side Plastering


For doors-1 -1 x 2 1.2 2.1 -5.04

For ventilaters -1 x 12 0.6 0.6 -4.32

187.07 Sqm 275.24 Sqm 51,489.15

144 (BLD- Supply and fixing doors as per drawings with medium teak wood frame of section
CSTN- 100mm x 65 mm and ISI marked flush door shutters of 30 mm thick double
13-1) shutters with bond wood solid block board type Core having cross bands and
face veneers, hot pressed bonded with water proof phenol formaldehyde
synthetic resin factory made conforming to IS 2202-1991 (Part-I) both sides
commercial ply with internal lipping on all sides including cost and conveyance to
site of teak wood frame, flush shutter including supply and fixing 6 Nos. MS Z
hold fasts of size 300 mm x 40 mm x 5mm including cost of ISI marked MS
powder coated fixtures of 6 Nos. butt hinges (IS:205) 150mm long, 1 No. aldrop
(IS:2681) 300mm long, 2 Nos. tower bolts (IS:204) of 200 mm x 10 mm dia at top,
2 Nos. 150 mm long handles (IS:208), 2 Nos. door stoppers and 2 Nos. rubber
bushes including fixing the fixtures to door with required number of screws, bolt
and nuts including labour charges for fixing the frame in position, fixing the shutter
to the frame etc., including overheads & contractors profit complete for finished
item of work as per APSS 1001 & 1002 (The vertical frame of door shall be
embedded in flooring for a depth of not less than 10 mm) (1200mm x 2100mm)

Page 86 of 275
Rate Per
Sl.N Item Amount
Description of Item Nos. L B D QTY Unit Unit (in Unit
o Code (in Rs.)
Rs.)
For Door-1 1 x 2 1.20 2.00 4.80 Sqm 4,094.18 Sqm 19,652.06

145 As per Supply and fixing of toilet door shutter with frame made of M.S. door frame of
Data 5mmX48mmX48mm (L angel) as allround frame the frame is coated with one
coat of red oxide and two coats of enamel of approved color. For shutter and the
shutter is made with 16mm Bison Lam shutter with allround ‘U’ Lipping of PPS
section of 12mmX18mmX12mmX0.60mm, along hardware of 200m long and
12mm dia aluminum aldrop( ISI make)2 Nos, 2Nos of 125m m handle, 3 Nos of
RT patte hinges IS 304gr SS 2mmX12mmX180mm long with a pole receiver of
10mmDia X 40mm by welded on 3mmX40mm SS 304, plate it works as receiver
for RT Patee hinges it is welded to M.S. angle . M.S. angle will be fixed to wall of
self expandable screws and caps. including cost and conveyance of all materials,
accessories, labour charges for transportation, erection at site with templates for
casement sizing overheads and contractors profit etc., complete for finished item
of work (750mm x 2100mm )

For Door-2 1 x 8 0.75 2.10 12.60 Sqm 4,658.22 Sqm 58,693.57

146 As per Providing, supplying & fixing of Single fixed Louvers Ventilator made made of
Data prepainted steel (Base steel as per IS 513 of 0.80 mm thick galvanized as per IS
277 with Zinc of 120 GSM), finish painted with a polyester paint of 60-65 microns
thick and section for outer frame of 80 x 45 mm, centre mullion of 80 x 60 mm,
section for shutter of 52 x 25 mm x 0.6 mm thick, outer frame and mullions to
have rebate for glazed shutter with a provision for guard bars/grills and the
sections cut to length metre joined with corner bracket, centre mullion fixed with
mullion cap, 1 No. of High grade nylon latch handle, window stopper, 2 nos. of
with MS Powder coated /SS ball bearing butt Hinges provided per shutter and
windows fitted with 4 mm thick plain float glass with rubber gaskets including
fixing the frames in concrete/masonry wall by means of self expanding screws,
Including 10 mm Square guard bars with 6” (152.4mm) pitch etc., complete for
finished item of work. including cost and conveyance of all materials, accessories,
labour charges for transportation, erection at site, overheads and contractor profit
etc., complete for finished item of work
Fixed louvers Ventilators 1 x 12 0.60 0.6 4.32
4.32 Sqm 4,615.04 Sqm 19,936.97

147 As per Supplying and fixing European Water Closet of 1st quality conforming to IS:2556-
Data Part-2-1973 of white glazed with 'S' trap,supplying and fixing best Indian make
plastic seat and lid for European water closets with rubber or plastic Buffers as
per IS 2548-1996 and 10 litres capacity single flush PVC low level cistern with
internal components and fixed using required size of nails and screws, angle stop
cock 12.70mm dia. first quality Indian make heavy duty, 12mm PVC connections
with brass union nuts CP coated including cost and conveyance of all materials to
site, overheads & contractors profit etc., complete for finished item of work for all
floors.

For Toilets 1 x 4 4.00


4.00 Nos 5,579.63 Nos 22,318.52
148 As per Supplying and fixing 580mm x 440mm long Orissa pan white glazed Water Closet
Data- 1st quality ISI marked confirming to IS:2556-Part-3-1981 with "P" or "S" trap, ISI
40 marked and providing masonry seat, CC squatting plate and 10 litres capacity
single flush PVC low level cistern with internal components fixed on 2 Nos. of
teak wood blocks of size 76.20mm x 101.60mm using required size of nails,
screws as approved by Engineer-in-charge, angle stop cock 12.70mm dia. first
quality Indian make heavy duty, 12.70mm PVC connection with brass union nuts
CP coated , 31.75mm brass plumber union, P trap or S trap of Indian W.C. shall
be encased on CC (1:2:4) 150mm alround well above the joint to stop leakage at
the joint etc., complete including cost and conveyance of all materials to site, cost
of CC bed, labour charges and seigniorage charges, overheads & contractors
profit etc., complete for finished item of work.

For Toilets 1 x 4 4.00


4.00 Nos 4,770.00 Nos 19,080.00
149 As per Supplying and fixing Indian make Flat Back Wash Hand Basin 1st quality
Data conforming to IS:2556-Part-4:1972 of size 550mm x 400mm with 32 mm nominal
size C.P. Fitting with parallel pipe thread conforming to IS:2963-1979 and fitted
with 15 mm nominal bore Chromium Plated Pillar Tap of 1st quality Indian make
heavy duty complete with standard CI brackets including wooden blocks ,1
No.12.70mm PVC connection with brass union nuts CP coated , angle stop cock
12.70mm dia. first quality Indian make heavy duty, 31.75mm dia. PVC flexible
waste pipe 914.4mm length of 1st quality including cost and conveyance of all
materials to site, labour charges , overheads & contractors profit for finished item
of work

For Toilets 1 x 4 4.00


4.00 Nos 2,697.79 Nos 10,791.16
150 As per Supplying and fixing white glazed flat back Bowl urinals of size 440 mm x 265 mm
Data x 315 mm with integral flushing rim fixed with screws complete Indian make
(HSW/Parry/Neycer) conforming to IS:2556-1995 as approved by Engineer-in-
charge, including supply and fixing 12.7mm PVC connection with brass plumber
union nuts CP coated, 12.70mm push cock 1st quality of approved make , 31.75
mm dia PVC flexible waste pipe of 914.4 mm length of Ist quality including cost
and conveyance of all materials to site, labour charges , overheads & contractors
profit complete for finished item of work for all floors.

For Toilets 1 x 8 8.00


8.00 Nos 1,496.03 Nos 11,968.24

Construction of Toilet block size of 5.50 m X 3.70 m


151 (BLD- Earth work excavation for foundations (Manual Means) of buildings, septic tank,
CSTN- sump, compound wall in ordinary soils and depositing on bank with an initial lead
2-1) of 10m and depth up to 3m including all operational, incidental, labour charges
such as shoring, sheeting, planking, strutting etc., and overheads & contractors
profit complete for finished item of work excluding dewatering charges etc., as per
SS 20 B(APSS 308)

Page 87 of 275
Rate Per
Sl.N Item Amount
Description of Item Nos. L B D QTY Unit Unit (in Unit
o Code (in Rs.)
Rs.)
For RCC Column Footings 1 x 6 1.50 1.50 1.5 20.25
For basement wall 1 x 1 22.10 0.6 0.6 7.96
28.21 Cum 271.40 Cum 7,656.19
152 (BLD- Plain Cement Concrete (1:4:8) (cement: fine aggregate: Coarse aggregate) for
CSTN- foundations and under flooring bed using 162.0 kgs of cement, coarse aggregate
3-5) 40mm size hard , machine crushed granite from approved quarry including cost
and conveyance of all materials like cement, sand, coarse aggregate, water etc.,
to site, and including all charges for machine mixing, laying concrete in
foundations and under flooring bed, ramming in 15 cm layers finishing top surface
to the required level curing etc., and overheads & contractors profit complete for
finished item of work. (APSS No. 402)

For RCC Column Footings 1 x 6 1.5 1.5 0.1 1.35


For basement wall 1 x 1 22.10 0.60 0.1 1.33
For floor bed 1 x 1 5.50 3.7 0.1 2.04
4.72 Cum 4,556.33 Cum 21,505.88
153 Random Rubble stone masonry in CM (1:8) prop: (Cement: Screened sand)
using hard granite stones carted from approved quarry including cost and
conveyance of all materials like cement, screened sand, water,Rough stone
( BLD-
CSTN-6- Through stone, Coursed stones etc., from approved quarry, to site, including
13 ) labour charges for cutting stones to required size and shape, mixing, of cement,
mortar, construction, curing, charges for scaffolding etc., and overheads &
contractors profit complete for finished item of work. (APSS No. 601 & 615)

For Basement wall 1 x 1 22.10 0.45 0.5 4.97


4.97 Cum 4,511.57 Cum 22,422.50
154 (BLD- Supply and placing of the V.R.C.C Nominal Mix Concrete M 20 grade
CSTN- corresponding to IS 456 with minimum cement content of 350 kgs per 1 cum of
3-13-A) concrete using CONCRETE MIXER with 20mm size HBG graded machine
crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386
Part 1 to Part 8) from approved quarry and including cost and conveyance of all
materials like cement, fine aggregate (sand) coarse aggregate, water, etc., to site
and , centring using Steel scaffolding pipes , jack props , Waller’s , Foot plates ,
brackets , steel centring plates etc., including all operational, incidental and labour
charges such as machine mixing, laying concrete, vibrator, curing etc., and
overheads & contractors profit complete but excluding cost of steel and its
fabrication charges for finished item of work (APSS No. 402)

For Footings 1 x 6 1.20 1.20 0.3 2.59 Cum 9,421.96 Cum 24,402.88
For Pedastal 1 x 6 0.60 0.60 1.1 2.38 Cum 10,033.49 Cum 23,879.71
For Plinth beam 1 x 1 22.10 0.30 0.3 1.99 Cum 12,077.14 Cum 24,033.51

155 (BLD- Filling with useful available excavated earth (excluding rock) with a lead of 50 m
CSTN- in trenches, sides of foundations and basement with initial lead in layers not
2-9) & exceeding 15cm thick, watering and ramming including cost and conveyance of
Proc.N water to work site and all operational, incidental, labour charges, hire charges of
o.2093 T&P etc., and overheads & contractors profit complete for finished item of work
8 (APSS NO.309&310)
(R&B)/
Dt:14- Excavated Quantity 1 x 1 28.21 28.21
28.21 Cum 38.91 Cum 1,097.65
156 (BLD- Supply and placing of the V.R.C.C Nominal Mix Concrete M 20 grade
CSTN- corresponding to IS 456 with minimum cement content of 350 kgs per 1 cum of
3-13-B) concrete using CONCRETE MIXER with 20mm size HBG graded machine
crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386
Part 1 to Part 8) from approved quarry and,including cost and conveyance of all
materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site
and , centring using Casurina Ballies, Bamboos, Wooden Reapers, Runners,
Wood Posts, Wall Plates etc., including all operational, incidental and labour
charges such as machine mixing, lifting of concrete manually, laying concrete,
vibrator, curing , overheads & contractors profit etc., complete but excluding cost
of steel and its fabrication charges for finished item of work (APSS No. 402)

For RCC Columns 1 x 6 0.30 0.30 3.00 1.62


1.62 Cum 11,836.02 Cum 19,174.35
Lintel beam for doors-1 1 x 2 1.50 0.23 0.23 0.16
Lintel beam for doors-2 1 x 2 2.30 0.1 0.15 0.07
0.23 Cum 11,726.10 Cum 2,697.00
157 (BLD- Supply and placing of the V.R.C.C Nominal Mix Concrete M 20 grade
CSTN- corresponding to IS 456 with minimum cement content of 350 kgs per 1 cum of
3-13-C) concrete using CONCRETE MIXER with 20mm size HBG graded machine
crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386
Part 1 to Part 8) from approved quarry including cost and conveyance of all
materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site
and , centring using Casurina Ballies , Bamboos , Wooden Reapers , Runners ,
Wood Posts , Wall Plates etc., including all operational, incidental and labour
charges such as machine mixing, lifting of concrete manually, laying concrete,
vibrator, , curing , overheads & contractors profit etc., complete but excluding cost
of steel and its fabrication charges for finished item of work (APSS No. 402)

Beam 1 x 1 22.10 0.3 0.30 1.99


1.99 Cum 10,262.59 Cum 20,422.55
Slab 125 mm thick 1 x 1 6 4.2 25.20
25.20 sqm 1,248.84 sqm 31,470.77

Page 88 of 275
Rate Per
Sl.N Item Amount
Description of Item Nos. L B D QTY Unit Unit (in Unit
o Code (in Rs.)
Rs.)
158 (BLD- Providing High Yield Strength Deformed (HYSD) / Thermo Mechanically Treated
CSTN- (TMT) (Fe 500 / Fe 500D grade as per IS 1786-1979) of different diameters for
4.2)& RCC works , including labour charges for straightening, cutting, bending to
Amend required sizes and shapes, placing in position with cover blocks of approved
ment in materials and size and tying and lap-splicing with binding wire of 18 SWG,
SoR forming grills for reinforcement work as per approved designs and drawings,
2011- including cost and conveyance of steel bars, including all wastages such as
12 overlaps, couplings, chairs, spacer bars including cost and conveyance of binding
page wire, cover blocks and all incidental, operational, labour charges such as cutting,
No. 392 bending, placing in position, tying including overheads & contractors profit
complete for finished item of work.( APSS No.126)

For Footings 1 x 1 2.59 70.00 kg/Cum 181.30


For Pedastal 1 x 1 2.38 70 kg/Cum 166.60
For Plinth beam 1 x 1 1.99 100 kg/Cum 199.00
Columns 1 x 1 1.62 100.00 kg/Cum 162.00
Lintel beam 1 x 1 0.23 70.00 kg/Cum 16.10
beams 1 x 1 1.99 100.00 kg/Cum 199.00
Slab 125 mm thick 1 x 1 3.15 70.00 kg/Cum 220.50
1144.50 Kgs 92.15 Kgs 105,465.68
159 (BLD- Providing impervious coat to exposed RCC roof slab surfaces to required slopes
CSTN- with CM (1:3) prop. using screened sand 20mm thick (average) mixed with
10-25) integral cement water proofing liquid confirming to IS: 2645-2003 manufactured
by reputed manufacturers as approved by Engineer-in-charge at 1 Kg per one
bag of cement, laid over roof slab when it is green, finished smooth with a floating
coat of neat cement and thread lining at regular intervals of 45cmx45cm including
cost and conveyance of all materials like cement, sand, water proofing
compound, water etc., to site, , and operational, incidental, and labour charges for
mixing mortar, laying, lift charges, rendering smooth and thread lining, curing
including rounding off junctions of wall and slab etc., and overheads & contractors
profit complete for finished item of work. (APSS No. 901 & 903).

slab 1 x 1 6 4.2 25.20


25.20 Sqm 536.98 Sqm 13,531.90

160 (BLD- Brick masonry for panel walls in superstructure with CM (1:8) prop: (Cement :
CSTN- Screened sand) using common burnt clay bricks of class as per Table- I of
5-5) IS:1077-1992, Non- Modular or traditional size 23 x 11 x 7 cms from approved
source having minimum crushing strength of 40 Kg/Sqcm. including cost and
conveyance of all materials like cement, screened sand, bricks, water etc., to site,
, and such as labour charges, like mixing cement mortar, scaffolding charges,
constructing masonry, lift charges, curing, etc., and overheads & contractors profit
complete for finished item of work. (APSS No. 501 & 504).

For Walls 230mm thick 1 x 1 22.10 0.23 3.00 15.25


Deductions
Lintel beam for doors-1 -1 x 2 1.5 0.23 0.23 -0.16
For doors-1 -1 x 2 1.2 0.23 2.1 -1.16
For ventilaters -1 x 6 0.60 0.23 0.60 -0.50
13.43 Cum 7,461.66 Cum 100,210.09
161 (BLD- Reinforced Brick Masonry for partition walls (11.0 cm thick) in CM (1:4) prop.
CSTN- (Cement : Screened sand) using common burnt clay bricks of class as per Table-
5-12) I of IS:1077-1992, Non- Modular or traditional size 23 x 11 x 7 cms from
approved source having minimum crushing strength of 40 Kg/Sq.cm and placing
2 Nos. of 6mm M.S plain rods in every third layer with free ends of the
reinforcement pegged into mortar joints of main brick walls where applicable
including cost and conveyance of all materials like cement, steel, sand, bricks,
water etc., to site, ,, all operational, incidental charges such as labour charges for
mixing cement mortar, scaffolding charges, constructing masonry, lift charges,
curing, etc., and overheads & contractors profit but excluding cost of steel and its
fabrication charges complete for finished item of work. (APSS No. of 501 & 509)

For Walls 115 mm thick 1 x 2 1.40 2.15 6.02


For Walls 115 mm thick Parapet Wall 1 x 1 20.40 0.30 6.12
Deductions
for doors-2 -1 x 4 0.75 2.1 -6.30
Lintel beam for doors-2 -1 x 2 2.3 0.15 -0.69
5.15 Sqm 990.25 Sqm 5,099.79
162 (BLD- Plastering 20mm thick in two coats using screened sand with base coat of 16mm
CSTN- thick in CM(1:6) and top coat of 4mm thick in CM(1:4) with dubara sponge
8-9) finishing including cost and conveyance of all materials like cement, sand, water
etc., to site, ,, and all operational, incidental charges on materials and including
cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges,
curing, including cutting grooves as directed by Engineer-in-charge etc., and
overheads & contractors profit complete for finished item of work .(SS 901,903 &
904)

Out side Plastering


For out side Wall 1 x 1 22.10 3.00 66.30
For out side 115 mm thick Parapet Wall 1 x 2 20.40 0.35 14.28

Inside wall Plastering


For inside Wall 1 x 1 22.10 0.90 19.89
Add Jambs
For Doors-1 1 x 2 5.40 0.23 2.48
For ventilaters 1 x 6 2.1 0.23 2.90
Deductions for Out side Plastering
For doors-1 -1 x 2 1.2 2.1 -5.04

Page 89 of 275
Rate Per
Sl.N Item Amount
Description of Item Nos. L B D QTY Unit Unit (in Unit
o Code (in Rs.)
Rs.)
For ventilaters -1 x 6 0.6 0.6 -2.16
98.65 Sqm 534.09 Sqm 52,687.98

163 (BLD- Ornamental ceiling plastering 12mm thick single coat in CM (1:5) using screened
CSTN- sand including cost and conveyance of all materials like cement, sand, water etc.,
8-3 to site, ,, and all operational, incidental charges on materials and including cost of
Amend all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-
ment in charge etc., and overheads & contractors profit complete for finished item of work.
SoR (SS 901,903 & 904)
2016-
17) Inside Plastering
For ceiling plastering 1 x 1 6.00 4.20 25.20
25.20 Sqm 400.32 Sqm 10,088.06

164 (BLD- Flooring with non-skid full body ceramic floor tiles of size 300mm x 300mm and
CSTN- thickness between 7 - 8mm 1st quality conforming to IS: 13711, IS: 13712, IS:
9-6) 13630(Part 1 to 15) of any colour and finish in all shades and designs as
approved by Engineer-in-charge, set over base coat of cement mortar (1:8),
12mm thick using screened sand over CC bed already laid or RCC roof slab,
including neat cement slurry of honey like consistency spread @ 3.3 Kgs per Sqm
& jointed neatly with white cement paste to full depth mixed with pigment of
matching shade, including cost of all materials like cement, screened sand , water
and tiles etc., and overheads & contractors profit complete for finished item of
work. (APSS No.701 & 707)

Flooring 1 x 1 5.50 3.70 20.35 Sqm 1,008.81 Sqm 20,529.28

165 (BLD- Providing dadooing to walls with glazed full body ceramic tiles of any size and
CSTN- thickness between 5 to 7mm 1st quality conforming to IS: 13711, IS: 13712, IS:
9-18) 13630(Parts 1 to 15) of any colour and finish in all shades and designs with
borders as approved by Engineer-in-Charge set over base coat of CM(1:5) 12
mm thick using screened sand with cement slurry of honey like consistency
spread at the rate of 3.30 kgs per sqm and jointing with white cement paste mixed
with pigment of matching shade to full depth, including cost of all materials like
tiles, cement, sand and water etc., and overheads & contractors profit complete
for finished item of work.

Inside wall
For Walls 230mm thick 1 x 1 22.10 2.30 50.83
For Walls 115 mm thick 2 x 2 1.4 2.15 12.04
Deductions for Out side Plastering
For doors-1 -1 x 2 1.2 2.1 -5.04

For doors-2 -2 x 4 0.75 2.1 -12.60

45.23 Sqm 720.66 Sqm 32,595.45

166 (BLD- Supply & application of one coat water based cement primer of exterior grade II
CSTN- and two coats of acrylic exterior emulsion paint having VOC (Volatile Organic
12-2& Compound) content less than 50 grams/litre for exterior walls including cost and
Amend conveyance of all materials to site,and all operational, incidental, labour charges
ment in etc., and overheads & contractors profit complete for finished item of work in all
SoR floors.
2011-
12)

For ceiling plastering 1 x 1 6 4.2 25.20


For out side 115 mm thick Parapet Wall 1 x 2 20.4 0.35 14.28

For out side Wall 1 x 1 22.1 3 66.30

For inside Wall 1 x 1 22.1 0.9 19.89

Add Jambs
For Doors-1 1 x 2 5.4 0.23 2.48
For ventilaters 1 x 6 2.1 0.23 2.90

Deductions for Out side Plastering


For doors-1 -1 x 2 1.2 2.1 -5.04

For ventilaters -1 x 6 0.6 0.6 -2.16

123.85 Sqm 275.24 Sqm 34,088.47

167 (BLD- Supply and fixing doors as per drawings with medium teak wood frame of section
CSTN- 100mm x 65 mm and ISI marked flush door shutters of 30 mm thick double
13-1) shutters with bond wood solid block board type Core having cross bands and
face veneers, hot pressed bonded with water proof phenol formaldehyde
synthetic resin factory made conforming to IS 2202-1991 (Part-I) both sides
commercial ply with internal lipping on all sides including cost and conveyance to
site of teak wood frame, flush shutter including supply and fixing 6 Nos. MS Z
hold fasts of size 300 mm x 40 mm x 5mm including cost of ISI marked MS
powder coated fixtures of 6 Nos. butt hinges (IS:205) 150mm long, 1 No. aldrop
(IS:2681) 300mm long, 2 Nos. tower bolts (IS:204) of 200 mm x 10 mm dia at top,
2 Nos. 150 mm long handles (IS:208), 2 Nos. door stoppers and 2 Nos. rubber
bushes including fixing the fixtures to door with required number of screws, bolt
and nuts including labour charges for fixing the frame in position, fixing the shutter
to the frame etc., including overheads & contractors profit complete for finished
item of work as per APSS 1001 & 1002 (The vertical frame of door shall be
embedded in flooring for a depth of not less than 10 mm) (1200mm x 2100mm)

For Door-1 1 x 2 1.20 2.00 4.80 Sqm 4,094.18 Sqm 19,652.06

Page 90 of 275
Rate Per
Sl.N Item Amount
Description of Item Nos. L B D QTY Unit Unit (in Unit
o Code (in Rs.)
Rs.)
168 As per Supply and fixing of toilet door shutter with frame made of M.S. door frame of
Data 5mmX48mmX48mm (L angel) as allround frame the frame is coated with one
coat of red oxide and two coats of enamel of approved color. For shutter and the
shutter is made with 16mm Bison Lam shutter with allround ‘U’ Lipping of PPS
section of 12mmX18mmX12mmX0.60mm, along hardware of 200m long and
12mm dia aluminum aldrop( ISI make)2 Nos, 2Nos of 125m m handle, 3 Nos of
RT patte hinges IS 304gr SS 2mmX12mmX180mm long with a pole receiver of
10mmDia X 40mm by welded on 3mmX40mm SS 304, plate it works as receiver
for RT Patee hinges it is welded to M.S. angle . M.S. angle will be fixed to wall of
self expandable screws and caps. including cost and conveyance of all materials,
accessories, labour charges for transportation, erection at site with templates for
casement sizing overheads and contractors profit etc., complete for finished item
of work (750mm x 2100mm )

For Door-2 1 x 4 0.75 2.10 6.30 Sqm 4,658.22 Sqm 29,346.79

169 As per Providing, supplying & fixing of Single fixed Louvers Ventilator made made of
Data prepainted steel (Base steel as per IS 513 of 0.80 mm thick galvanized as per IS
277 with Zinc of 120 GSM), finish painted with a polyester paint of 60-65 microns
thick and section for outer frame of 80 x 45 mm, centre mullion of 80 x 60 mm,
section for shutter of 52 x 25 mm x 0.6 mm thick, outer frame and mullions to
have rebate for glazed shutter with a provision for guard bars/grills and the
sections cut to length metre joined with corner bracket, centre mullion fixed with
mullion cap, 1 No. of High grade nylon latch handle, window stopper, 2 nos. of
with MS Powder coated /SS ball bearing butt Hinges provided per shutter and
windows fitted with 4 mm thick plain float glass with rubber gaskets including
fixing the frames in concrete/masonry wall by means of self expanding screws,
Including 10 mm Square guard bars with 6” (152.4mm) pitch etc., complete for
finished item of work. including cost and conveyance of all materials, accessories,
labour charges for transportation, erection at site, overheads and contractor profit
etc., complete for finished item of work
Fixed louvers Ventilators 1 x 6 0.60 0.6 2.16
2.16 Sqm 4,615.04 Sqm 9,968.49

170 As per Supplying and fixing European Water Closet of 1st quality conforming to IS:2556-
Data Part-2-1973 of white glazed with 'S' trap,supplying and fixing best Indian make
plastic seat and lid for European water closets with rubber or plastic Buffers as
per IS 2548-1996 and 10 litres capacity single flush PVC low level cistern with
internal components and fixed using required size of nails and screws, angle stop
cock 12.70mm dia. first quality Indian make heavy duty, 12mm PVC connections
with brass union nuts CP coated including cost and conveyance of all materials to
site, overheads & contractors profit etc., complete for finished item of work for all
floors.

For Toilets 1 x 2 2.00


2.00 Nos 5,579.63 Nos 11,159.26
171 As per Supplying and fixing 580mm x 440mm long Orissa pan white glazed Water Closet
Data- 1st quality ISI marked confirming to IS:2556-Part-3-1981 with "P" or "S" trap, ISI
40 marked and providing masonry seat, CC squatting plate and 10 litres capacity
single flush PVC low level cistern with internal components fixed on 2 Nos. of
teak wood blocks of size 76.20mm x 101.60mm using required size of nails,
screws as approved by Engineer-in-charge, angle stop cock 12.70mm dia. first
quality Indian make heavy duty, 12.70mm PVC connection with brass union nuts
CP coated , 31.75mm brass plumber union, P trap or S trap of Indian W.C. shall
be encased on CC (1:2:4) 150mm alround well above the joint to stop leakage at
the joint etc., complete including cost and conveyance of all materials to site, cost
of CC bed, labour charges and seigniorage charges, overheads & contractors
profit etc., complete for finished item of work.

For Toilets 1 x 2 2.00


2.00 Nos 4,770.00 Nos 9,540.00
172 As per Supplying and fixing Indian make Flat Back Wash Hand Basin 1st quality
Data conforming to IS:2556-Part-4:1972 of size 550mm x 400mm with 32 mm nominal
size C.P. Fitting with parallel pipe thread conforming to IS:2963-1979 and fitted
with 15 mm nominal bore Chromium Plated Pillar Tap of 1st quality Indian make
heavy duty complete with standard CI brackets including wooden blocks ,1
No.12.70mm PVC connection with brass union nuts CP coated , angle stop cock
12.70mm dia. first quality Indian make heavy duty, 31.75mm dia. PVC flexible
waste pipe 914.4mm length of 1st quality including cost and conveyance of all
materials to site, labour charges , overheads & contractors profit for finished item
of work

For Toilets 1 x 4 4.00


4.00 Nos 2,697.79 Nos 10,791.16

Civil works for fixing children play Equipment 10-No's in 300 sqm area with
Sand filling and Construction of toe wall around play area-70 m
173 (BLD- Earth work excavation for foundations (Manual Means) of buildings, septic tank,
CSTN- sump, compound wall in ordinary soils and depositing on bank with an initial lead
2-1) of 10m and depth up to 3m including all operational, incidental, labour charges
such as shoring, sheeting, planking, strutting etc., and overheads & contractors
profit complete for finished item of work excluding dewatering charges etc., as per
SS 20 B(APSS 308)

For brick wall around the play area 1 x 1 70.00 0.45 0.45 14.18
Pedestals for 12 No's play Equipment 1 x 60 0.60 0.60 0.75 16.20
30.38 Cum 271.40 Cum 8,245.13

Page 91 of 275
Rate Per
Sl.N Item Amount
Description of Item Nos. L B D QTY Unit Unit (in Unit
o Code (in Rs.)
Rs.)
174 (BLD- Plain Cement Concrete (1:4:8) (cement: fine aggregate: Coarse aggregate) for
CSTN- foundations and under flooring bed using 162.0 kgs of cement, coarse aggregate
3-5) 40mm size hard , machine crushed granite from approved quarry including cost
and conveyance of all materials like cement, sand, coarse aggregate, water etc., to
site, and including all charges for machine mixing, laying concrete in foundations
and under flooring bed, ramming in 15 cm layers finishing top surface to the
required level curing etc., and overheads & contractors profit complete for finished
item of work. (APSS No. 402)

For brick wall around the play area 1 x 1 70.00 0.45 0.10 3.15
Pedestals for 12 No's play Equipment 1 x 60 0.60 0.60 0.10 2.16
5.31 Cum 4,556.33 Cum 24,194.11
175 (BLD- Masonry work in CM(1:6) prop (Cement : Screened sand) in superstructure with
CSTN- fly ash cement / lime solid blocks of size 290mm x 225mm x 140mm from
5-17) approved source having minimum crushing strength of 50 Kg/Sqcm. including cost
and conveyance of all materials like cement, sand, bricks, water etc., to site,and
such as labour charges, like mixing cement mortar, scaffolding charges,
constructing masonry, lift charges, curing, overheads and contractor profit etc.,
complete for finished item of work. (APSS No. 501 & 504).

For brick wall around the play area 1 X 1 70.0 0.23 0.50 8.05
8.05 Cum 7,242.08 Cum 58,298.74
176 (BLD- Plastering 12mm thick single coat in CM(1:5) using screened sand including cost
CSTN- and conveyance of all materials like cement, sand, water etc., to site and all
8-3 operational, incidental charges on materials and including cost of all labour
Amend charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc.,
ment in and overheads & contractors profit complete for finished item of work.(SS 901,903
SoR
& 904)
2016-17
)
For brick wall around the play area 1 X 1 70 0.50 35.00
35.00 Sqm 373.34 Sqm 13,066.90
177 (BLD- Supply & application of one coat water based cement primer of exterior grade II
CSTN- and two coats of acrylic exterior emulsion paint having VOC (Volatile Organic
12-2& Compound) content less than 50 grams/litre for exterior walls including cost and
Amend conveyance of all materials to site,and all operational, incidental, labour charges
ment in etc., and overheads & contractors profit complete for finished item of work in all
SoR
floors.
2011-
12)
For brick wall around the play area 1 X 1 70.0 0.27 18.90
18.90 Sqm 275.24 Sqm 5,202.04
Providing 0.30 m wide Coping with Polished black Kadapa slabs minimum of 25
mm to 30 mm thick in single piece as specified set over a base coat of CM (1:5) ,
12mm thick using screened sand over already laid CC bed / RCC roof slab
including neat cement slurry of honey like consistency spread @ 3.3 Kgs per Sqm
and jointed with neat cement to full depth including cost and conveyance of all
(BLD-
materials like cement, sand, water, flooring stones etc. complete including all
178 CSTN-
9-1) labour charges like dressing of flooring stones to the required size, flat nosing the
edges, mixing of cement mortar, laying, lift charges , cost of base coat, water
charges etc., and overheads & contractors profit complete for finished item of work
(APSS No.703 & 701)

For brick wall around the play area 1 X 1 70 0.3 21.00


21.00 Sqm 957.27 Sqm 20,102.67
179 (BLD- Vibrated Plain Cement Concrete M 20 Nominal mix using Concrete MIXER,
CSTN- 20mm size hard granite machine crushed graded metal (coarse aggregate - as per
3-13-C) IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry, using a
minimum quantity of 350 kgs. of cement per 1 cum of concrete , including cost and
conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate,
water etc., to site including steel centring, shuttering, machine mixing, lift
charges, laying concrete, vibrating, curing, overheads & contractors profit etc.,
complete for finished item of work (APSS No. 402 & 403)

Pedestals for 12 No's play Equipment 1 x 60 0.50 0.50 0.60 9.00


9.00 Cum 6,992.73 Cum 62,934.57
180 (BLD- Providing High Yield Strength Deformed (HYSD) / Thermo Mechanically Treated
CSTN- (TMT) (Fe 500 / Fe 500D grade as per IS 1786-1979) of different diameters for
4.2)& RCC works , including labour charges for straightening, cutting, bending to
Amend required sizes and shapes, placing in position with cover blocks of approved
ment in materials and size and tying and lap-splicing with binding wire of 18 SWG,
SoR
forming grills for reinforcement work as per approved designs and drawings,
2011-12
page including cost and conveyance of steel bars, including all wastages such as
No. 392 overlaps, couplings, chairs, spacer bars including cost and conveyance of binding
wire, cover blocks and all incidental, operational, labour charges such as cutting,
bending, placing in position, tying including overheads & contractors profit
complete for finished item of work.( APSS No.126)

Pedestals for 12 No's play Equipment 1 x1 9.00 60.0 kg/cum 540.00


540.00 Kg 92.15 Kg 49,761.00

Page 92 of 275
Rate Per
Sl.N Item Amount
Description of Item Nos. L B D QTY Unit Unit (in Unit
o Code (in Rs.)
Rs.)
181 (BLD- Filling with carted coarse sand in play area, pathway, foundations bed and
CSTN- basement with initial lead in layers not exceeding 15cm thick, watering and
2-8) & ramming including cost and conveyance of water to work site and all operational,
Proc.No incidental ,labour charges, hire charges of T&P etc., and overheads & contractors
.20938 profit complete for finished item of work(APSS NO.309&310)
(R&B)/
Dt:14-5-
2019

For Children play area 1 x 1 Err:509 Err:509 0.30 Err:509


Err:509 Cum 817.38 Cum Err:509

Conventional Play Equipment ( 10 - Nos) 1 -Set


182 Supply, Delivery, Installation and Commissioning of 1.5m x 2.2m size of FOUR
SEATER SWING of Arihant/ Equivalent make including transportation,
installation, commissioning, loading and unloading etc., for complete finished
item of the work.

1.Swing leg pipe : 40NB hot dip galvanized swing leg pipe of length 2300mm
conforming to IS 1239 with GI thickness up to 60µ.

2. Top pipe : Four Seater swing top fixed to 50NB Galvanized pipe having C
Class material of length 1490mm at the center and two junction box frame at the
ends to attach leg pipes.

3. Junction box : 225mmx103mm junction box made from 5mm thick GI plate to
house the two swing leg pipes & top pipe.

4. Seat frame: side frame consist of Rectangular tube having 50X25X4 mm thick.
20NB bend pipe used for seat frame support. 40NB bend is used for Entry Support
structure.

5. Bearing Assembly: Shaft for UCP 207 Bearing is self-lubricated made of SKF
make shall be provided for smooth & trouble-free movement.

6. Pipes:- All metal pipes should be used of Heavy Duty ('C' Class) of
TATA/Jindal make only with Hot Dipped Galvanized Pipes conforming to IS 1239
(Part 1) with GI thickness not less than 60micron.

7. Powder coating:- It shall be done with pure polyester raw material. Dry film
thickness maintained within the range of 50-70 microns. It is tested for adhesion
test (According to ASTM-D-3359) with the help of cross hatch cutter instruments.

8. Nut and Bolts:- Galvanized/ S.S./Allen Bolt/Button Head Allen Bolt & Nuts /
Nylon Lock Nuts are used with PVC Bolt Caps.

9. All open ends of pipe been closed by GI caps for user safety against entrapment.

10. Certificate: ISO9001:2015


11. Color: Multicolor for optional or customized & As per RAL shade.

12. Packaging: Safety 3 layer packaging like 1st EPE Foam 2nd HDPE Film and
3rd is Stretch wrap.
Cost of the Equipment 1.00 No 36225.00 Each 36225.00
183 Supply, Delivery, Installation and Commissioning of 6.5m x 1.5m size of FOUR
SEATER ARC SWING of Arihant/ Equivalent make including transportation,
installation, commissioning, loading and unloading etc., for complete finished item
of the work.

Page 93 of 275
Rate Per
Sl.N Item Amount
Description of Item Nos. L B D QTY Unit Unit (in Unit
o Code (in Rs.)
Rs.)
1. Arc swimg frame: 6000mm long 80NB Pipe bent in Single Piece & welded
together with a flange 5mm thick & ISA of 40x40x5mm to form a strong frame at
bottom & middle. The 80NB pipe is hot dip galvanized pipe conforming to IS 1239
with GI thickness of 60µ. Height of the frame is 2700mm.

2. Top pipe : 50NB Top Pipe with two Arc Swing Flanges welded at both its ends.
Pipe can withstanding torsional stress created due to swinging motion. These
50NB top pipe is hot dip galvanized pipe of length 2950mm conforming to IS 1239
with GI thickness of 60µ.

3. Seat assembly :
a) Swing clamp assembly: Swing clamps made up of two parts are joined together
with M6 Allen bolts along with S-Hook & a specially designed swing pin.The S-
Hook is specially designed to house a bearing for smooth & noiseless swinging.
The clamps are made from injection molded Nylon-6 plastic.
b) Chain : Rubber dip molded swing chain of dia. 6mm & 1450mm Long.
c) Hook: S-Hook of dia 8mm & 145x130 Triangular hook of Grade SS 304.
d) Seat: Rubber Seat made by Natural Rubber with sufficient reinforcement.

4. Bearing: Bearing is self-lubricated made of SKF/ NTN/ NACHI make shall be


provided for smooth & trouble-free movement.

5. Pins and Circlips: 12mm diameter pins shall be made from EN8 material &
Circlip A10.
6. Pipes:- All metal pipes should be used of Heavy Duty ('C' Class) of
TATA/Jindal make only with Hot Dipped Galvanized Pipes conforming to IS 1239
(Part 1) with GI thickness not less than 60micron.

7. Powder coating:- It shall be done with pure polyester raw material. Dry film
thickness maintained within the range of 50-70 microns. It is tested for adhesion
test (According to ASTM-D-3359) with the help of cross hatch cutter instruments.

8. Nut and Bolts:- Galvanized/ S.S./Allen Bolt/Button Head Allen Bolt & Nuts /
Nylon Lock Nuts are used with PVC Bolt Caps.
9. All open ends of pipe been closed by GI caps for user safety against entrapment.

10. Certificate: ISO9001:2015


11. Color: Multicolor for optional or customized & As per RAL shade.
12. Packaging: Safety 3 layer packaging like 1st EPE Foam 2nd HDPE Film and
3rd is Stretch wrap.
Cost of the Equipment 2.00 No 80101.00 Each 160202.00
184 Supply, Delivery, Installation and Commissioning of4.3m x 2.4m size of S'
BRIDGE LADDER SCRAMBLER of Arihant/ Equivalent make including
transportation, installation, commissioning, loading and unloading etc., for
complete finished item of the work.

1. S-Bridge top frame: Two ISF 50x10, 500mm long conforming to IS 1730-1961
welded in between two 25NB hot dip galvanized bend pipe 2300mm & 3810mm
long respectively conforming to IS 1239. The ISF 50x5, 130mm long 4nos. with
holes is welded to bend pipes for fixing the support pipes. The 20NB GI pipes
400mm long 17nos. equally spaced are welded between two bend pipes.

2. Support Pipe: 40NB hot dip galvanized pipe 2550mm long conforming to IS
1239 with 150x150x5mm GI base plate & 130mm long ISF 50x10 conforming to
IS 1730- 1961 welded at the bottom & top ends of pipe respectively

3. Ladder Frame: ISF 50x10, 500mm long conforming to IS 1730-1961 & ISA
25x25x5 conforming to IS 808-1964 welded in between two 40NB hot dip
galvanized pipe 2550mm long conforming to IS1239. The four 25NB GI pipes
400mm long equally spaced at 300mm forming ladder steps are welded between
two pipes.

4. Pipes:- All metal pipes should be used of Heavy Duty ('C' Class) of
TATA/Jindal make only with Hot Dipped Galvanized Pipes conforming to IS 1239
(Part 1) with GI thickness not less than 60micron.

Page 94 of 275
Rate Per
Sl.N Item Amount
Description of Item Nos. L B D QTY Unit Unit (in Unit
o Code (in Rs.)
Rs.)
5. Powder coating:- It shall be done with pure polyester raw material. Dry film
thickness maintained within the range of 50-70 microns. It is tested for adhesion
test (According to ASTM-D-3359) with the help of cross hatch cutter instruments.

6. Nut and Bolts:- Galvanized/ S.S./Allen Bolt/Button Head Allen Bolt & Nuts /
Nylon Lock Nuts are used with PVC Bolt Caps.
7. All open ends of pipe been closed by GI caps for user safety against entrapment.

8. Certificate: ISO9001:2015
9. Color: Multicolor for optional or customized & As per RAL shade.
10. Packaging: Safety 3 layer packaging like 1st EPE Foam 2nd HDPE Film and
3rd is Stretch wrap.

Cost of the Equipment 1.00 No 36242.00 Each 36242.00


185 supply, delivery and commissioning of FRP Deluxe Wave Slide of 7 feet height,
10' length and 20'' width of Arihant / Equivalent make including transportation,
installation, commissioning, loading and unloading in complete finished item of
the work.

1. Supporting Main Pipes for platform:- 80NB hot dip galvanized pipe of length
2400mm conforming to IS 1239 with GI thickness up to 60µ.

2. FRP Wave Slide:- Wave Slide chute is made up of FRP of lenght 10' and width
20''. The chute has its end such as it causes safe landing of the child. The landing
portion is horizontal with respect to the ground. The centre of the slide is supported
by stand made up of 50NB pipe and 5mm thich MS plate and landing of the slide
is supported by stand made up of 25NB pipe and 5mm thick MS plate with GI
plating.

3. Platform:-
a. Material:- MS Plate with anti-skid surface on top.
b. Thickness:- Minimum thickness of 5 mm.
c. Shape:- Square.
d. Brazing Frame:- ISA 25x25x5mm or ISA40x40x5mm thick and ISF 40x5mm
thick which is galvanized and then duly Powder Coated.
e. Vertical Pipes:- 80NB GI pipes should be used of Heavt Duty ('C' Class) of
TATA/Jindal make only with Hot Dipped Galvanized Pipes conforming to IS 1239
(Part 1) with GI thickness not less than 60micron.

4. Ladder: - The ladder is made up of with required size and thickness of L angle/
cirular pipes with necessary supporting steps and suitable railing over the platform
& for ladder as per the safety norms.

5. FRP (FIBER REINFORCED PLASTIC):- All the Fiber Reinforced Plastics


(FRP) materials are processed by the hand laid process which is considered to be
the best of its type. International quality of Gel coats which is duly mixed with U.V
stabilized pigment to give the required color to the product. Thickness of the FRP
material should not less than 5 mm as per the product. The FRP material should be
tested for abrasion resistance & UTS (ultimate tensile test).

6. Pipes:- All metal pipes should be used of Heavy Duty ('C' Class) of
TATA/Jindal make only with Hot Dipped Galvanized Pipes conforming to IS 1239
(Part 1) with GI thickness not less than 60micron.

7. Powder coating:- It shall be done with pure polyester raw material. Dry film
thickness maintained within the range of 50-70 microns. It is tested for adhesion
test (According to ASTM-D-3359) with the help of cross hatch cutter instruments.

8. Nut and Bolts:- Galvanized/ S.S./Allen Bolt/Button Head Allen Bolt & Nuts /
Nylon Lock Nuts are used with PVC Bolt Caps.

9. All open ends of pipes been closed by GI caps for user safety against
entrapment.
10. Certificate: ISO9001:2015
11. Color: Multicolor for optional or customized & As per RAL shade.

Page 95 of 275
Rate Per
Sl.N Item Amount
Description of Item Nos. L B D QTY Unit Unit (in Unit
o Code (in Rs.)
Rs.)
12. Packaging: Safety 3 layer packaging like 1st EPE Foam 2nd HDPE Film and
3rd is Stretch wrap.

Cost of the Equipment 2 Nos 65000.00 Each 130,000.00


186 Supply, delivery and commissioning of Four seated See Saw of 8 feet length, 4'
width and 1'6'' hieght of Arihant / Equivalent make including transportation,
installation, commissioning, loading and unloading in complete finished item of
the work.

1. Centre Main Frame Structure:- 80NB hot dip galvanized pipes conforming to
IS 1239.
2. See saws:- 2 Nos of See saws made up of 80NB GI pipe conforming to IS 1239
with proper holdings.
3. FRP Seats: - 4 nos. of FRP Seats
4. FRP (FIBER REINFORCED PLASTIC):- All the Fiber Reinforced Plastics
(FRP) materials are processed by the hand laid process which is considered to be
the best of its type. International quality of Gel coats which is duly mixed with U.V
stabilized pigment to give the required color to the product. Thickness of the FRP
material should not less than 5 mm as per the product. The FRP material should be
tested for abrasion resistance & UTS (ultimate tensile test).

5. Pipes:- All metal pipes should be used of Heavy Duty ('C' Class) of
TATA/Jindal make only with Hot Dipped Galvanized Pipes conforming to IS 1239
(Part 1) with GI thickness not less than 60micron.

6. Powder coating:- It shall be done with pure polyester raw material. Dry film
thickness maintained within the range of 50-70 microns. It is tested for adhesion
test (According to ASTM-D-3359) with the help of cross hatch cutter instruments.

7. Nut and Bolts:- Galvanized/ S.S./Allen Bolt/Button Head Allen Bolt & Nuts /
Nylon Lock Nuts are used with PVC Bolt Caps.
8. All open ends of pipes been closed by GI caps for user safety against
entrapment.
9. Certificate: ISO9001:2015
10. Color: Multicolor for optional or customized & As per RAL shade.
11. Packaging: Safety 3 layer packaging like 1st EPE Foam 2nd HDPE Film and
3rd is Stretch wrap.

Cost of the Equipment 1 Nos 36000.00 Each 36,000.00


187 Supply, delivery and commissioning of 6' length, 6' width and 8' height of SELF
JULA with 4inch square box section made up of MS 'C' class of 6.00 mm
thickness material of TATA/JINDAL make for main frame and for cross supports
for jointing main frame and horizontal at top and 50mm dia of MS C Class of
4.50mm thickness pipes of TATA/JINDAL make for other supporting structures
for hanging jhula with the help of specially designed ISI certified bearings and
providing seats with suitable material with seating capacity of 6 to 8 persons at a
time and two coats of Anti-Corrosive primer & two coats Auto-motive spray paint
of approved make as a matt finishing as directed by the engineer in-charge
including transportation, installation, commissioning, loading and un loading etc.,
complete with all bolts and nuts for finished item of the work excluding cost of
civil works.

Cost of the Equipment 1 Nos 110000.00 Each 110,000.00

Page 96 of 275
Rate Per
Sl.N Item Amount
Description of Item Nos. L B D QTY Unit Unit (in Unit
o Code (in Rs.)
Rs.)
188 Supply, delivery and commissioning of 10' length, 8' width and 8' height of
MULTIPLE SPECIAL SWINGS with 4inch square box section made up of MS
'C' class of 6.00 mm thickness material of TATA/JINDAL make for main frame
and 6” C - channel fabricated as square box for crass bar and 50mm dia of MS C
Class of 4.50mm thickness pipes of TATA/JINDAL make for hanging 3 nos of
swings with the help of specially designed ISI certified bearings and providing
seats with suitable material with seating capacity of 2 persons in each swing and
two coats of Anti-Corrosive primer & two coats Auto-motive spray paint of
approved make as a matt finishing as directed by the engineer in-charge including
transportation, installation, commissioning, loading and un loading etc., complete
for finished item of the work excluding cost of civil works.

1 Nos 105000.00 105,000.00


189 Supply, Delivery, Installation and Commissioning of 2.5m x 1.5m size of NET
ROCK SCRAMBLER of Arihant/ Equivalent make including transportation,
installation, commissioning, loading and unloading in complete finished item of
the work.

1. Pad: Rock climber 7Ft. pad made from Fiber Reinforced Plastic (FRP) attached
to the angular frame. The pad is provided with rock shaped part ergonomically
spaced in zig-zag manner for climbing act.The rocks are bolted on same platform,
with a gradient of 65 degree from the ground.

2. Supports: Bend angular frame made from 40NB Galvanized pipe conforming to
IS 1239:1979 with base plates fixed on each end and grounded for strong
foundation.It has Ø12 U-hook on one side for attaching rope.It has profile plate for
top support. and has plate 130x50x5 for bottom support.

3.Top pipe: It is made from 40NB top pipe of 1190mm long with Dia. 12 U-
Hooks fixed on one side.
4. Rope: Rope size conforming to standards EN11761:1998 for minimum grip
requirement. It is size of Ø18 of nylon.Mesh size conforming to standards
EN1176-1:1998& ASTM - F1487:07a for safety against entrapment of head &
neck

5. Clamp: Its is made from nylon. nylon rope attached by specially designed nylon
rope clamps used which has rope integrated inside which hold it tightly and avoids
breaking

6. Bottom pipe: It is made from 40NB bottom pipe of 1190mm long with Dia. 12
U-Hooks fixed on one side.
7. Rock: It is made from Fiber Reinforced Plastic (FRP).
8. Pipes:- All metal pipes should be used of Heavy Duty ('C' Class) of
TATA/Jindal make only with Hot Dipped Galvanized Pipes conforming to IS 1239
(Part 1) with GI thickness not less than 60micron.

9. FRP (FIBER REINFORCED PLASTIC): All the Fiber Reinforced Plastics


(FRP) materials are processed by the hand laid process which is considered to be
the best of its type. International quality of Gel coats which is duly mixed with U.V
stabilized pigment to give the required color to the product. Thickness of the FRP
material varies from 3 mm to 5 mm as per the product. The FRP material should be
tested for abrasion resistance & UTS (ultimate tensile test).

10. Powder coating:- It shall be done with pure polyester raw material. Dry film
thickness maintained within the range of 50-70 microns. It is tested for adhesion
test (According to ASTM-D-3359) with the help of cross hatch cutter instruments.

Page 97 of 275
Rate Per
Sl.N Item Amount
Description of Item Nos. L B D QTY Unit Unit (in Unit
o Code (in Rs.)
Rs.)
11. Nut and Bolts:- Galvanized/ S.S./Allen Bolt/Button Head Allen Bolt & Nuts /
Nylon Lock Nuts are used with PVC Bolt Caps.
12. All open ends of pipe been closed by GI caps for user safety against
entrapment.
13. Certificate: ISO9001:2015
14. Color: Multicolor for optional or customized & As per RAL shade.
15. Packaging: Safety 3 layer packaging like 1st EPE Foam 2nd HDPE Film and
3rd is Stretch wrap.

Cost of the Equipment 1.00 No 56668.00 Each 56,668.00

190
Err:509 Err:509

191

Provision for MEP works for Water Cascade fountain work Providing, fixing,
testing & commissioning of Nozzles , Lights ,Filter Pumps, Pool fittings ,
Wires/cables of various sizes including necessary accessories , uPVC pipes ,
Valves, fittings etc of required size , Boarding and Ladging and Installation,
Chlorine Dosing Unit as required complete as per the direction of Engineer- 200,000.00
in-charge and including cost of all materials to site, incidental operational
and all labour charges overheads & contractors profit etc., complete for
finished item of work

192
193 Provision for renovation of existing Compound wall & ticket counter 1,000,000.00
194 Err:509 Err:509
195 For drainage and irrigation facilities Err:509
Total -III Err:509
Total= I+II+III Err:509
Add GST @12% on Total Err:509
Add seigniorage Charges @ 0.6% on Total Err:509
Add unforeseen items Err:509
Grand Total Err:509
#NAME?

Page 98 of 275
A.P. Greening and Beautification Corporation
Name of the Work:- Detailed estimate for Rejuvenation of water body including strengthening of bund and greenning and providing walking
tracks at koppolu cheruvu in division no.9 ( 24.33 Acres) at Ongole Municipal Coporation, Prakasam District Andhra Pradesh. Under AMRUT
2.0
( Estimate prepared as per SOR 22-23) Estimate Cost: Rs.57.00 Lakhs

Item Rate Per Unit Amount


Sl.No Description of Item Nos. L B D QTY Unit Unit
Code (in Rs.) (in Rs.)

Hardscape (Civil works)


Clearing and grubbing the land including uprooting wild vegetation, grass, bushes,
shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut
earlier and disposal of unserviceable materials and stacking of serviceable material to
RBR- be used or auctioned, upto a lead of 1000 m including removal and disposal of top
1
STCL-2 organic soil not exceeding 150 mm in thickness as per Technical Specification Clause
201 MORD / MORTH. By Mechanical Means

Cleaning along the bund 1 x 1 200.00 10.00 2000.00


Cleaning along the bund 1 x 1 200.00 10.00 2000.00
Cleaning along the bund 1 x 1 200.00 10.00 2000.00
Cleaning along the bund 1 x 1 200.00 10.00 2000.00
Cleaning along the bund 1 x 1 200.00 10.00 2000.00
Cleaning along the bund 1 x 1 200.00 10.00 2000.00
Cleaning along the bund 1 x 1 160.00 10.00 1600.00
13600.00
Deduct 20% for voids -2720.00
10880.00 Sqm 2.54 Sqm 27,635.20
Clearing thick jungle growth ( less than 50 percent open space ) including bushes upto
IRR- 30 cm / parthenium and other weeds including burning or disposing off the same as
2 PMW- directed etc., complete.and it including all operational, incidental, labour charges,
1-2 required tools, overheads & contractors profit complete for finished item of work

Cleaning along the bund 1 x 1 200.00 10.00 2000.00


Cleaning along the bund 1 x 1 200.00 10.00 2000.00
Cleaning along the bund 1 x 1 200.00 10.00 2000.00
Cleaning along the bund 1 x 1 200.00 10.00 2000.00
Cleaning along the bund 1 x 1 200.00 10.00 2000.00
Cleaning along the bund 1 x 1 200.00 10.00 2000.00
Cleaning along the bund 1 x 1 160.00 10.00 1600.00
13600.00
Deduct 20% for voids -2720.00
10880.00 Sqm 4.21 Sqm 45,804.80
3 IRR- Removal of Water Hyacinth beyond 30 cm thick and it including all operational,
PMW- incidental, labour charges, required tools, overheads & contractors profit complete for
3-25 (a) finished item of work

Spraying along the chemicals 1 x 1 200.00 190.00 38000.00


Spraying along the chemicals 1 x 1 100.00 190.00 19000.00
Spraying along the chemicals 1 x 1 200.00 145.00 29000.00
Spraying along the chemicals 1 x 1 190.00 112.00 21280.00
107280.00
Deduct 20% for voids -10728.00
96552.00 Sqm 16.60 Sqm 1,602,763.20

Murrum pathway with 150 mm thick gravel bed -1200Sqm

4 (BLD- Filling with carted gravel in pathways, trenches, sides of foundations and basement
CSTN- with initial lead in layers not exceeding 15cm thick, watering and ramming including
2-8) & cost and conveyance of water to work site and all operational, incidental, labour
Proc.No charges, hire charges of T&P etc., and overheads & contractors profit complete for
.20938 finished item of work(APSS NO.309&310)
(R&B)/
Dt:14-5-
2019 Murrum pathway with 150 mm thick 1 x 1 300.0 4.00 0.15 180.00
gravel bed -1200Sqm 180.00 Cum 328.31 Cum 59,095.80
5 (BLD- Earth work excavation for foundations (Manual Means) of buildings, septic tank,
CSTN- sump, compound wall in ordinary soils and depositing on bank with an initial lead of
2-1) 10m and depth up to 3m including all operational, incidental, labour charges such as
shoring, sheeting, planking, strutting etc., and overheads & contractors profit complete
for finished item of work excluding dewatering charges etc., as per SS 20 B(APSS
308)
For fencing poles 1 x 328 0.45 0.45 0.45 29.89
For fencing support poles 1 x 33 0.45 0.45 0.45 3.01
32.90 Cum 271.40 Cum 8,929.06

Page 99 of 275
Item Rate Per Unit Amount
Sl.No Description of Item Nos. L B D QTY Unit Unit
Code (in Rs.) (in Rs.)

6 (BLD- Plain Cement Concrete (1:4:8) (cement: fine aggregate: Coarse aggregate) for
CSTN- foundations and under flooring bed using 162.0 kgs of cement, coarse aggregate
3-5) 40mm size hard , machine crushed granite from approved quarry including cost and
conveyance of all materials like cement, sand, coarse aggregate, water etc., to site, and
including all charges for machine mixing, laying concrete in foundations and under
flooring bed, ramming in 15 cm layers finishing top surface to the required level
curing etc., and overheads & contractors profit complete for finished item of work.
(APSS No. 402)
For fencing poles 1 x 328 0.45 0.45 0.10 6.64
For fencing support poles 1 x 33 0.45 0.45 0.10 0.67
7.31 Cum 4,556.33 Cum 33,306.77
Digging of 0.75x0.75x0.75 mtrs. pit, filling with soil mixture of red garden soil,
farmyard manure at 4:1 ratio including internal transport, application of fertilizers and
chemicals (@ 20 gms/pit/sqmt), internal transportation of plants, planting the plants
etc., and it including all operational, incidental, labour charges, required tools,
overheads & contractors profit complete for finished item of work. (excluding cost of
As per
7 plant material, fertilizers and chemicals (@ 20 gms / pit/ sqmt)
Data
(Red garden soil in this context it is defined as sandy loamy garden soil congenial for
plant growth which shall be of light textured, crystalline, porous and friable, fertile,
slightly acidic or neutral)

For tall plants 315 315.00


Total 315.00 Nos 692.92 Each 218,269.80
Maintenance of Palms/Tree planting: Trimming (once in month) and application of
As per fertilizers, insecticides, Fungicides @ 20 gms/pit/sqmt) (once in quarterly) by
8
Data manually excluding cost of fertilizers, it including all operational, incidental ,labour
charges, for complete of work for one month maintenance.
100
Palms/Tree maintenance for 1 months Nos/
1 x 315 315.00 Nos
month
315.00 Nos 609.00 1,918.35
Maintenance of Palms/Tree planting: formation of basins 0.30m . away from the edges
As per of plant (once in a month) it including all operational, incidental ,labour charges for
9 100
Data complete of work for one month maintenance.
Nos/
month
Palms/Tree maintenance for 1 months 1 x 315 315.00 Nos

315.00 Nos 1092.00 3,439.80


Maintenance of Palms/Tree planting: watering (once in three days @ 5 Lts/per plant
As per shall be provide to maintain sub soil moisture continuously) by manually, but
10 100
Data excluding cost of water including all operational, incidental ,labour charges for
complete of work. for one month maintenance. Nos/
month
Palms/Tree maintenance for 1 months 1 x 315 315.00 Nos

315.00 Nos 945.00 2,976.75


Loading and unloading of plants bag size (21"X21") at site of work and stacking for
As per lead less upto 50 m and including labour charges, T&P etc.,and overheads &
11
Data contractors profit complete for finished item of work (excluding cost of plant bag) 100
Nos
Plants bag size 21" X 21" 315.00 Nos

315.00 Nos 3198.61 10,075.62


Supplimental Items
12 (BLD- Vibrated Plain Cement Concrete (1:3:6) nominal mix using 220 kg of cement and
CSTN- 20mm graded machine crushed hard granite metal (coarse aggregate) from approved
3-10 & quarry including cost and conveyance of all materials like cement, fine aggregate
11) (sand), coarse aggregate, water etc., and including all charges for Concrete Mixer,
machine mixing, laying concrete in position, vibrating, curing, overheads &
contractors profit etc., for finished item of work (APSS No. 402)

For fencing poles 1 x 328 0.45 0.45 0.35 23.25


For fencing support poles 1 x 33 0.45 0.45 0.35 2.34
25.59 Cum 5,610.78 Cum 143,579.86
13 As per Supply and fabrication of MS framed structure like Window Grills, Compound Wall
Data Grills, Iron Doors, Windows, Gates, MS Frame for chain link mesh works, Roof
Trusses by using square / rectangular MS hollow section as per IS 4923 & Angles as
per SP:6(1) IS Hand book, including cost of welding rods, power charges, labour
charges for cutting, placing, welding and erecting in position and fixing, cost &
convenience of all materials including wastage to site and complete for finished item
of work
Page 100 of 275
Item Rate Per Unit Amount
Sl.No Description of Item Nos. L B D QTY Unit Unit
Code (in Rs.) (in Rs.)

For fencing poles of 50x50x2.9mm 328


thick MS hollow section @ 4.12 1 x 2.40 787.20 Rmt
Kg/Rmt
For intermediate supporting poles 33
fencing poles of 50x50x2.9mm thick 1 x 2.40 79.20 Rmt
MS hollow section @ 4.12 Kg/Rmt
@ 4.12 kg per meter 4.12 866.40 3569.57 Kgs
M S Angle 25x25x5 mm fixing at top
of the mesh @ 1.18 Kg/Rmt 1 x 1 820.00 820.00 Rmt
@ 1.18 kg per meter 1.18 820.00 967.60 Kgs
12mm square bar for hold fast @ 1.13
Kg/Rmt 2 x 328 0.15 98.40 Rmt
@ 1.13 kg per meter 1.13 98.40 111.19 Kgs
Total kgs 4648.36 Kgs 118.87 Kgs 552,550.55
14 As per Supply and fabrication of MS framed structure like Window Grills, Compound Wall
Data Grills, Iron Doors, Windows, Gates, MS Frame for chain link mesh works ,Roof
Trusses by using MS Flats as per SP:6(1) IS Hand book , including cost of welding
rods, power charges, labour charges for cutting, placing, welding and erecting in
position and fixing, cost & convenience of all materials to site and complete for
finished item of work
MS flat of 25x5mmthick @ 1.00 328
Kg/Rmt for fixing of chain-link mesh 1 x 1.80 590.40 Rmt
@ 1.0 kg per meter 1 590.40 590.40 Kgs 118.87 Kgs 70,180.85

15 As per Supply and fabrication works like Window Grills, Compound Wall Grills, Iron Doors,
Data Windows, Gates, Roof Trusses by using MS solid plate section as per IS 1730
including cost of welding rods, power charges, labour charges for cutting, placing,
welding & erecting in position and fixing cost & convenience of all materials
including wastage to site and complete for finished item of work.

MS plate of 50x50x5mm thick @


39.20 Kg/Sqmt for for closing fencing 1 x 328 0.05 0.05 0.82
poles top
@39.20 kg per Sqm 39.2 0.82 32.14 Kgs 130.52 Kgs 4,194.91

16 (BLD- Painting to new iron work with one coat of Red oxide primer and two coats with
CSTN- synthetic enamel paint Grade-I VOC (Volatile Organic Compound) content less than
12-7 & 50 grams/litre over primer coat of red oxid, including cost and conveyance of all
12-12- materials like Red oxide primer, Synthetic Enamel Paint to site, incidental, operational
197) and all labour charges etc., and overheads & contractors profit complete for finished
item of work in all floors. (SS No. 1201, 1212 & 1207).

For fencing poles of 50x50x2.9mm


thick MS hollow section @ 4.12 1 x 328 2.40 0.20 157.44
Kg/Rmt
M S Angle 25x25x5 mm fixing at top
of the mesh @ 1.18 Kg/Rmt 1 x 33 2.40 0.10 7.92

MS flat of 25x5mmthick @ 1.00


Kg/Rmt for fixing of chain-link mesh 1 x 328 1.80 0.05 29.52

MS plate of 50x50x5mm thick @


39.20 Kg/Sqmt for for closing fencing
1 x 328 0.05 0.05 0.82
poles top

195.70 Sqm 202.45 Sqm 39,619.47


17 DSR Supplying and fixing G.I. Chain link fabric fencing of required width in mesh size
16-70.1 50x50 mm opening of 4 mm dia GI wire including strengthening with 2 mm dia wire
at page or nuts, bolts and washers/welding in the MS angle frame/ RCC fencing posts as
920 required complete as per the direction of Engineer-in-charge and including cost of all
materials to site, incidental operational and all labour charges overheads & contractors
profit etc., complete for finished item of work

For chain-link mesh 1 x 1 820.00 1.80 1476.00


1476.00 Sqm 903.74 Sqm 1,333,920.24

Page 101 of 275


Item Rate Per Unit Amount
Sl.No Description of Item Nos. L B D QTY Unit Unit
Code (in Rs.) (in Rs.)

18 Supply & Delivery of topiary/trees/Palms/shrubs/lawn/ ground covers and specified


plants as per directions of officer in charge at site including cost of plants
plants of bag size
7" x 8" of plant height not less than 1.0 feet,
8" x 10" of plant height not less than 3.0 feet,
13" x 13" of Tree/Palm height not less than 5 feet,
13" x 13" of plant (Hedges & Shrub) height not less than 2 feet,
15" x 16" of plant (Tree/Palm/Topiary) height not less than 5 feet,
18" x 18" plant (Tree/Palm/Topiary) height not less than 6 feet, bottom dia of the stem
is 0.75'' and above,
21" x 21" and above plant (Tree/Palm/Topiary) height not less than 7 feet, bottom dia
of the stem is 1'' and above.
Heights mentioned above are excluding bag height.
All the plants supplied shall be with sturdy stem, well formed crown, vigorously
growing tip, healthy foliage without any infestation and the plants shall be supplied
after proper hardening off.
the rates inclusive of cost of plants and labour charges for handling & complete for
finished item of work.

Plants names Bag size


syzygium cumini 21" x 21" 157 Nos 450 each 70,650.00
Tabeuia roses 21" x 21" 158 Nos 350 each 55,300.00

Towards cost and supply of iron gate of size 3.0x1.8 m with 40mmx40mmx2.9mm
thick hellow section alround the outside and 16mm verticle square rods inside of the
gate and Ms flat 40mm size with 5mm thick across the gate and iron arrows above the
AS per gate including conveyance charges and fabrication charges, fixing of the gate with
19 Quatatio brick masonary colums of size 0.45x0.45x3 m with CM(1:6) with foundation p.c.c
n (1:4:8) 100 thick and plastering CM(1:4) 20mm thick and fixing of gate with 4 hinges
including painting of gate and columns Etc., complete for finished item of work

Gate with Brick Masonary columns 1 x 1 1.00


1.00 No 58,000.00 Each 58,000.00
Supplying and fixing of Name board 3.60X0.60 m height with MS framework made
up of 2 mm thick aluminium sheet coverd gum sheet flexi of name board and fixing of
As per Vertical post 50 x 50 M.S Square of 1.20 m height as approved by Engineer-in charge
20 Quotatio and framework with 25 x 25mm G.I Square section welding/ fitted with suitable bolts
n and nuts including cost and conveyance of all materials to site, incidental, operational
and all labour charges etc., complete for finished item of work.

Name board 3.60 length 0.60m height


with MS framework 1 x 1 1.00

1.00 No 15,000.00 No 15,000.00


Approxim
Transportation of bag plants form ate weight
No. of weight in
Vijayawada to Ongole Municipal Bag size of plants Unit Unit
plants Kgs
Coporation. of bag
size in
Tall trees 21" x 21" Kgs
50.00 315 Nos 15750.00 Kgs

Toatl plants 315 Nos 15750.00 Kgs

21 Provision for transportation of bag plants Total weight 15.750 MT 1500 23,625.00

Sub Total 4,380,836.03

Add [email protected]% 210,280.00

Net Value of work done 4,591,116.00

Add seigniorage charges 28,307.00

Sub total 4,619,423.00

Add [email protected]% 4,619.00

Sub total 4,624,042.00

Add GST@18% 832,328.00

Add APG&BC Supervision charges@5% 229,555.80

Sub total 5,685,926.00

Page 102 of 275


Item Rate Per Unit Amount
Sl.No Description of Item Nos. L B D QTY Unit Unit
Code (in Rs.) (in Rs.)

Unforseen items 14,074.00

Grand Total 5,700,000.00

Page 103 of 275


A.P. Greening & Beautification Corporation, Vijayawada

Name of the Work:- Rejuvenation of water body including strengthening of bund and greenning and providing walking tracks at koppolu cheruvu in division no.9 ( 24.33 Acres) at
Ongole Municipal Coporation, Prakasam District Andhra Pradesh. Under AMRUT 2.0

Deviation Statement
As per TS estimate As per Revised estimate Excess Less
S. Amount Amount Amount Amount REMARKS
Description of item Unit Qty Rate Qty Rate Qty Qty
No. in Rs. in Rs. in Rs. in Rs.
Clearing and grubbing the land including uprooting wild As per acutals
vegetation, grass, bushes, shrubs, saplings and trees of
girth upto 300 mm, removal of stumps of such trees cut
earlier and disposal of unserviceable materials and
stacking of serviceable material to be used or auctioned,
upto a lead of 1000 m including removal and disposal of
1 top organic soil not exceeding 150 mm in thickness as per Sqm 25000.00 2.54 63500 10880.00 2.54 27,635.20 0.00 - 14120.00 35,864.80
Technical Specification Clause 201 MORD / MORTH. By
Mechanical Means

Clearing thick jungle growth ( less than 50 percent open As per acutals
space ) including bushes upto 30 cm / parthenium and
other weeds including burning or disposing off the same as
directed etc., complete.and it including all operational,
incidental, labour charges, required tools, overheads &
2 contractors profit complete for finished item of work Sqm 25000.00 4.21 105250 10880.00 4.21 45,804.80 0.00 - 14120.00 59,445.20

Eradication of Weed growth by spraying chemicals from As per acutals


drain beds and water bodys etc., complete for finished
item of work and as directed by the engineer-in Charge
and it including all operational, incidental, labour charges,
3 required tools, overheads & contractors profit complete Sqm 10000.00 4.26 42600 4.26 - 0.00 - 10000.00 42,600.00
for finished item of work

Removal of Water Hyacinth beyond 30 cm thick and it As per acutals


including all operational, incidental, labour charges,
4 required tools, overheads & contractors profit complete Sqm 10000.00 16.6 166000 96552.00 16.60 1,602,763.20 86552.00 1,436,763.20 0.00 -
for finished item of work

Earth work excavation for foundations (Manual Means) of


buildings, septic tank, sump, compound wall in ordinary
soils and depositing on bank with an initial lead of 10m
and depth up to 3m including all operational, incidental,
labour charges such as shoring, sheeting, planking,
5 strutting etc., and overheads & contractors profit Cum 112.50 271.40 30532.5
complete for finished item of work excluding dewatering 32.90 271.40 8,929.06 0.00 - 79.60 21,603.44
charges etc., as per SS 20 B(APSS 308)
Plain Cement Concrete (1:4:8) (cement: fine aggregate: There is no
Coarse aggregate) for foundations and under flooring bed provison for the
using 162.0 kgs of cement, coarse aggregate 40mm size fencing of this
hard , machine crushed granite from approved quarry tank located in the
including cost and conveyance of all materials like cement, builtup area .
sand, coarse aggregate, water etc., to site, and including Since, fencing is
all charges for machine mixing, laying concrete in
foundations and under flooring bed, ramming in 15 cm neccesiated
layers finishing top surface to the required level curing alround the tank.
6 etc., and overheads & contractors profit complete for Cum 28.50 4,556.33 129855.41 7.31 4,556.33 33,306.77 0.00 - 21.19 96,548.63 Since stone
finished item of work. (APSS No. 402) pitching item
amount
incorporated in
fencing
item.Hence
quantity comesout
less.

Random Rubble stone masonry in CM (1:8) prop: (Cement: There is no


Screened sand) using hard granite stones carted from provison for the
approved quarry including cost and conveyance of all fencing of this
materials like cement, screened sand, water,Rough stone tank located in the
Through stone, Coursed stones etc., from approved builtup area .
quarry, to site, including labour charges for cutting stones Since, fencing is
to required size and shape, mixing, of cement, mortar,
construction, curing, charges for scaffolding etc., and neccesiated
overheads & contractors profit complete for finished item alround the tank.
7 of work. (APSS No. 601 & 615) Cum 94.50 4511.57 426343.37 4,511.57 - 0.00 - 94.50 426,343.37 Since stone
pitching item
amount
incorporated in
fencing
item.Hence item
deleted.

Filling with carted gravel in pathways, trenches, sides of As per acutals


foundations and basement with initial lead in layers not
exceeding 15cm thick, watering and ramming including
cost and conveyance of water to work site and all
operational, incidental, labour charges, hire charges of
8 T&P etc., and overheads & contractors profit complete for Cum 450.00 328.31 147739.5 180.00 328.31 59,095.80 0.00 - 270.00 88,643.70
finished item of work(APSS NO.309&310)

Providing and constructing 30 cm thick dry rubble stone There is no


pitching with pin headers at 2 per sqm, complete with provison for the
initial lead upto 50 m and all lifts including cost and fencing of this
conveyance to site including all operational, incidental, tank located in the
labour charges, hand packing, laying to required slope builtup area .
hand packing, finishing as directed by the Engineer- in- Since, fencing is
charge etc., and overheads & contractors profit complete
for finished item of work neccesiated
alround the tank.
9 ( rubble stones : 0.275 cum/sqm, Stone Chips : Cum 1350.00 479.35 647120.48 479.35 - 0.00 - 1350.00 647,120.48 Since stone
0.045cum/sqm, Pin Headers 30cm : 2/sqm) pitching item
amount
incorporated in
fencing
item.Hence item
deleted.
Supply and fixing of Kadapa stone Kerb of size 450 X 450 X There is no
50 mm thick as selected by the Engineer-in-charge from provison for the
approved source/ factory which is laid on existing CC Bed fencing of this
in position to the required line, level and curvature jointed tank located in the
with cement mortar 1:3 (1 cement : 3 coarse sand), builtup area .
including making joints with or without grooves (thickness Since, fencing is
of joints except at sharp curve shall not to more than 5
mm), including making drainage opening wherever neccesiated
required and including cost and conveyance of all alround the tank.
10 materials & labour charges including transportation from Rmt 500.00 148.92 74460 148.92 - 0.00 - 500.00 74,460.00 Since stone
approved source, loading & unloading charges, contractor pitching item
profit & overhead charges complete for finished item of amount
work. incorporated in
fencing
item.Hence item
deleted.

Providing casing embankment using gravel from approved There is no


area in layers of 25 cm with compaction including cost of provison for the
all materials, machinery, labour, all operations such as fencing of this
materials transporting, spreading in layer of specified tank located in the
thickness, breaking clods, sectioning, compacting each builtup area .
layer without watering by Road roller 10 tonne Since, fencing is
etc.,complete with 8 km transportation with loading &
unloading and complete for finished item of work. neccesiated
alround the tank.
11 Cum 4200.00 344.07 1445094 344.07 - 0.00 - 4200.00 1,445,094.00 Since stone
pitching item
amount
incorporated in
fencing
item.Hence item
deleted.

Softscape - - 0.00 - 0.00 -


Bed preparation for Dibbling for Bermuda/Doob/ Shade As per site
Grass :-Dressing the surface to the desired shape, laying condition this item
150 mm (6”) thick fine red garden soil, covered with a thin deleted.
layer of 10 mm thick sand, watering, compacting to 4"
thickness by hand roller including cost of red garden soil,
sand and labour charges etc. complete for bed
preparation and dibbling rooted slips of grass @2" apart
and ramming including slipping of grass, racking the soil
12 before dibbling, watering and ramming complete etc., and Sqm 280.00 285.05 79814 285.05 - 0.00 - 280.00 79,814.00
it including all operational, incidental, labour charges,
required tools, overheads & contractors profit complete
for finished item of work excluding cost of dibbling grass
and fertilizer for 1 sqm
Red garden soil in this context it is defined as sandy loamy
garden soil congenial for plant growth which shall be of
light textured, crystaline, porous and friable, fertlie,
slightly acidic or neutral
Maintenance of lawns: Lawn mowing with electric motor / As per site
portable cutter machine and edging & weeding of the condition this item
13 lawns (once in 30 days) and application of fertilizers, Sqm 280.00 105.00 294 105.00 - 0.00 - 280.00 294.00 deleted.
insecticides, Fungicides (once in a month) by manual
excluding cost of fertilizers including all operational,
incidental ,labour charges for complete item of work,
Maintenance of lawns: watering to the lawn once in 2 As per site
days @ 10 to 15 ltrs /per Sqmt basing on season and condition this item
14 weather conditions (15 watering is required in a month to Sqm 280.00 393.75 1102.5 393.75 - 0.00 - 280.00 1,102.50 deleted.
maintain sub-soil moisture continuously), excluding cost of
water including all operational, incidental ,labour charges
for complete of work,
Digging of 0.75x0.75x0.75 mtrs. pit, filling with soil mixture
of red garden soil, farmyard manure at 4:1 ratio including
internal transport, application of fertilizers and chemicals
(@ 20 gms/pit/sqmt), internal transportation of plants,
planting the plants etc., and it including all operational,
incidental, labour charges, required tools, overheads &
15 contractors profit complete for finished item of work. Nos 315.00 692.92 218269.8 315.00 692.92 218,269.80 0.00 - 0.00 -
(excluding cost of plant material, fertilizers and chemicals
(@ 20 gms / pit/ sqmt)
(Red garden soil in this context it is defined as sandy loamy
garden soil congenial for plant growth which shall be of
light textured, crystalline, porous and friable, fertile,
slightly acidic or neutral)
Maintenance of Palms/Tree planting: Trimming (once in
month) and application of fertilizers, insecticides,
Fungicides @ 20 gms/pit/sqmt) (once in quarterly) by
manually excluding cost of fertilizers, it including all
16 operational, incidental ,labour charges, for complete of Nos 315.00 609.00 1918.35 315.00 609.00 1,918.35 0.00 - 0.00 -
work for one month maintenance.

Maintenance of Palms/Tree planting: formation of basins


0.30m . away from the edges of plant (once in a month) it
including all operational, incidental ,labour charges for
17 complete of work for one month maintenance. Nos 315.00 1092.00 3439.8 315.00 1,092.00 3,439.80 0.00 - 0.00 -

Maintenance of Palms/Tree planting: watering (once in


three days @ 5 Lts/per plant shall be provide to maintain
sub soil moisture continuously) by manually, but
excluding cost of water including all operational, incidental
18 ,labour charges for complete of work. for one month Nos 315.00 945.00 2976.75 315.00 945.00 2,976.75 0.00 - 0.00 -
maintenance.

Supply & Delivery of topiary/trees/Palms/shrubs/lawn/


ground covers and specified plants as per directions of
officer in charge at site including cost of plants
plants of bag size
7" x 8" of plant height not less than 1.0 feet,
8" x 10" of plant height not less than 3.0 feet,
13" x 13" of Tree/Palm height not less than 5 feet,
13" x 13" of plant (Hedges & Shrub) height not less than 2
feet,
15" x 16" of plant (Tree/Palm/Topiary) height not less than
5 feet,
18" x 18" plant (Tree/Palm/Topiary) height not less than 6
feet, bottom dia of the stem is 0.75'' and above, - - 0.00 - 0.00 -
21" x 21" and above plant (Tree/Palm/Topiary) height not
less than 7 feet, bottom dia of the stem is 1'' and above.
Heights mentioned above are excluding bag height.
All the plants supplied shall be with sturdy stem, well
formed crown, vigorously growing tip, healthy foliage
without any infestation and the plants shall be supplied
after proper hardening off.
the rates inclusive of cost of plants and labour charges for
handling & complete for finished item of work.

19 Perennial Rye Grasses Sqm 280 - - 0.00 - 280.00 -

20 syzygium cumini Nos 157.00 - - 0.00 - 157.00 -


21 Tabeuia roses Nos 158.00 - - 0.00 - 158.00 -

22 Horn wort Nos 180 - - 0.00 - 180.00 -


Loading and unloading of plants bag size (21"X21") at site
of work and stacking for lead less upto 50 m and including
labour charges, T&P etc.,and overheads & contractors
23 profit complete for finished item of work (excluding cost Nos 315.00 3198.61 10075.62 315.00 3,198.61 10,075.62 0.00 - 0.00 -
of plant bag)

unloading of plants bag size (7"X8") at site of work and As per site
stacking for lead less upto 50 m and including labour condition this item
charges, T&P etc.,and overheads & contractors profit deleted.
24 complete for finished item of work (excluding cost of Nos 180.00 57.72 103.9 57.72 - 0.00 - 180.00 103.90
plant bag)

Supplimental Items
Vibrated Plain Cement Concrete (1:3:6) nominal mix using There is no
220 kg of cement and 20mm graded machine crushed provison for the
hard granite metal (coarse aggregate) from approved fencing of this
quarry including cost and conveyance of all materials like tank located in the
cement, fine aggregate (sand), coarse aggregate, water builtup area .
etc., and including all charges for Concrete Mixer, machine Since, fencing is
25 mixing, laying concrete in position, vibrating, curing, Cum 25.59 5,610.78 143,579.86 25.59 143,579.86 0.00 - neccesiated
overheads & contractors profit etc., for finished item of
work (APSS No. 402) alround the
tank.Hence item
proposed.

Supply and fabrication of MS framed structure like There is no


Window Grills, Compound Wall Grills, Iron Doors, provison for the
Windows, Gates, MS Frame for chain link mesh works, fencing of this
Roof Trusses by using square / rectangular MS hollow tank located in the
section as per IS 4923 & Angles as per SP:6(1) IS Hand builtup area .
book, including cost of welding rods, power charges, Since, fencing is
labour charges for cutting, placing, welding and erecting in
26 position and fixing, cost & convenience of all materials Kgs 4648.36 118.87 552,550.55 4648.36 552,550.55 0.00 - neccesiated
including wastage to site and complete for finished item of alround the
work tank.Hence item
proposed.

Supply and fabrication of MS framed structure like There is no


Window Grills, Compound Wall Grills, Iron Doors, provison for the
Windows, Gates, MS Frame for chain link mesh fencing of this
works ,Roof Trusses by using MS Flats as per SP:6(1) IS tank located in the
Hand book , including cost of welding rods, power builtup area .
27 charges, labour charges for cutting, placing, welding and Kgs 590.40 118.87 70,180.85 590.40 70,180.85 0.00 - Since, fencing is
erecting in position and fixing, cost & convenience of all
materials to site and complete for finished item of work neccesiated
alround the
tank.Hence item
proposed.
Supply and fabrication works like Window Grills, There is no
Compound Wall Grills, Iron Doors, Windows, Gates, Roof provison for the
Trusses by using MS solid plate section as per IS 1730 fencing of this
including cost of welding rods, power charges, labour tank located in the
charges for cutting, placing, welding & erecting in position builtup area .
28 and fixing cost & convenience of all materials including Kgs 32.14 130.52 4,194.91 32.14 4,194.91 0.00 - Since, fencing is
wastage to site and complete for finished item of work.
neccesiated
alround the
tank.Hence item
proposed.
Painting to new iron work with one coat of Red oxide There is no
primer and two coats with synthetic enamel paint Grade-I provison for the
VOC (Volatile Organic Compound) content less than 50 fencing of this
grams/litre over primer coat of red oxid, including cost and tank located in the
conveyance of all materials like Red oxide primer, builtup area .
Synthetic Enamel Paint to site, incidental, operational and Since, fencing is
29 all labour charges etc., and overheads & contractors profit Sqm 195.70 202.45 39,619.47 195.70 39,619.47 0.00 - neccesiated
complete for finished item of work in all floors. (SS No.
1201, 1212 & 1207). alround the
tank.Hence item
proposed.

Supplying and fixing G.I. Chain link fabric fencing of There is no


required width in mesh size 50x50 mm opening of 4 mm provison for the
dia GI wire including strengthening with 2 mm dia wire or fencing of this
nuts, bolts and washers/welding in the MS angle frame/ tank located in the
RCC fencing posts as required complete as per the builtup area .
direction of Engineer-in-charge and including cost of all Since, fencing is
30 materials to site, incidental operational and all labour Sqm 1476.00 903.74 1,333,920.24 1476.00 1,333,920.24 0.00 - neccesiated
charges overheads & contractors profit etc., complete
for finished item of work alround the
tank.Hence item
proposed.

Supply & Delivery of topiary/trees/Palms/shrubs/lawn/


ground covers and specified plants as per directions of
officer in charge at site including cost of plants
plants of bag size
7" x 8" of plant height not less than 1.0 feet,
8" x 10" of plant height not less than 3.0 feet,
13" x 13" of Tree/Palm height not less than 5 feet,
13" x 13" of plant (Hedges & Shrub) height not less than 2
feet,
15" x 16" of plant (Tree/Palm/Topiary) height not less than
syzygium
5 feet, cumini As per MD
instructions these
31 Each 157.00 450.00 70,650.00 157.00 70,650.00 0.00 - plants are
proposed

Tabeuia roses As per MD


instructions these
32 Each 158.00 350.00 55,300.00 158.00 55,300.00 0.00 - plants are
proposed

Towards cost and supply of iron gate of size 3.0x1.8 m Proposed gate at
with 40mmx40mmx2.9mm thick hellow section alround the Entrance of
33 the outside and 16mm verticle square rods inside of the Each 1.00 58,000.00 58,000.00 1.00 58,000.00 0.00 - tank
gate and Ms flat 40mm size with 5mm thick across the
gate and iron arrows above the gate including conveyance
charges and fabrication charges, fixing of the gate with
Supplying and fixing of Name board 3.60X0.60 m height For identification
with MS framework made up of 2 mm thick aluminium of Tank details
34 sheet coverd gum sheet flexi of name board and fixing of Each 1.00 15,000.00 15,000.00 1.00 15,000.00 0.00 - Name board got
Vertical post 50 x 50 M.S Square of 1.20 m height as erected
approved by Engineer-in charge and framework with 25 x
25mm G.I Square section welding/ fitted with suitable
Transportation of bag plants form Vijayawada to Ongole Transportation of
Municipal Coporation. bag plants form
35 Mt 15.75 1,500.00 23,625.00 15.75 23,625.00 0.00 - Vijayawada to
Ongole

ECV Value 3,596,489.98 Total 4,380,836.03 Total 3,803,384.08 Total 3,019,038.02

Add TP @ 4.80% 210,280.00 TP 182,562.00 TP 144,914.00

Value of workdone 4,591,116.03 AE&SI 3,985,946.08 AE&SI 3,163,952.02

Add seigniorage
28,307.00
charges

Sub total 4,619,423.00

Add [email protected]% 4,619.00 (784,346.06)

Sub total 4,624,042.00 (784,346.05)

Add GST@18% 832,328.00


Add APG&BC Supervision
charges@5% 229,556.00

Sub total 5,685,926.00

Unforseen items 14,074.00

Grand total 5,700,000.00


A.P. Greening & Beautification Corporation, Vijayawada

Name of the Work:- Rejuvenation of water body including strengthening of bund and greenning and providing walking tracks at koppolu cheruvu in
division no.9 ( 24.33 Acres) at Ongole Municipal Coporation, Prakasam District Andhra Pradesh. Under AMRUT 2.0

Bill of Quantities
Estimate Contract Value: Rs.38,03,384.00
S. Amount
Qty Unit Description of item Item code Rate words Unit
No. in Rs.
Removal of Water Hyacinth beyond 30 cm thick and it including all operational, incidental,
labour charges, required tools, overheads & contractors profit complete for finished item of
1 86552.00 Sqm work IRR-PMW-3-25 (a) 16.6 Rupees Sixteen Paise Sixty Only Sqm 1436763.2

Vibrated Plain Cement Concrete (1:3:6) nominal mix using 220 kg of cement and 20mm graded
machine crushed hard granite metal (coarse aggregate) from approved quarry including cost
and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water
etc., and including all charges for Concrete Mixer, machine mixing, laying concrete in position, Rupees Five Thousand Six
2 25.59 Cum vibrating, curing, overheads & contractors profit etc., for finished item of work (APSS No. 402) As per Data 5,610.78 Hundred Ten Paise SeventyEight Cum 143579.86
Only

Supply and fabrication of MS framed structure like Window Grills, Compound Wall Grills, Iron
Doors, Windows, Gates, MS Frame for chain link mesh works, Roof Trusses by using square /
rectangular MS hollow section as per IS 4923 & Angles as per SP:6(1) IS Hand book, including
cost of welding rods, power charges, labour charges for cutting, placing, welding and erecting Rupees One Hundred Eighteen
3 4648.36 Kgs in position and fixing, cost & convenience of all materials including wastage to site and As per Data 118.87 Kgs 552550.55
Paise EightySeven Only
complete for finished item of work

Supply and fabrication of MS framed structure like Window Grills, Compound Wall Grills, Iron
Doors, Windows, Gates, MS Frame for chain link mesh works ,Roof Trusses by using MS Flats
as per SP:6(1) IS Hand book , including cost of welding rods, power charges, labour charges for
cutting, placing, welding and erecting in position and fixing, cost & convenience of all materials Rupees One Hundred Eighteen
4 590.40 Kgs As per Data 118.87 Kgs 70180.85
to site and complete for finished item of work Paise EightySeven Only

Supply and fabrication works like Window Grills, Compound Wall Grills, Iron Doors, Windows,
Gates, Roof Trusses by using MS solid plate section as per IS 1730 including cost of welding
rods, power charges, labour charges for cutting, placing, welding & erecting in position and Rupees One Hundred Thirty
5 32.14 Kgs fixing cost & convenience of all materials including wastage to site and complete for finished As per Data 130.52 Kgs 4194.91
Paise FiftyTwo Only
item of work.

Painting to new iron work with one coat of Red oxide primer and two coats with synthetic
enamel paint Grade-I VOC (Volatile Organic Compound) content less than 50 grams/litre over
primer coat of red oxid, including cost and conveyance of all materials like Red oxide primer,
Synthetic Enamel Paint to site, incidental, operational and all labour charges etc., and (BLD-CSTN-12-7 & Rupees Two Hundred Two Paise
6 195.70 Sqm overheads & contractors profit complete for finished item of work in all floors. (SS No. 1201, 202.45 Sqm 39619.47
12-12-197) FourtyFive Only
1212 & 1207).
Supplying and fixing G.I. Chain link fabric fencing of required width in mesh size 50x50 mm
opening of 4 mm dia GI wire including strengthening with 2 mm dia wire or nuts, bolts and
washers/welding in the MS angle frame/ RCC fencing posts as required complete as per the
direction of Engineer-in-charge and including cost of all materials to site, incidental DSR 16-70.1 at Rupees Nine Hundred Three
7 1476.00 Sqm operational and all labour charges overheads & contractors profit etc., complete for finished 903.74 Sqm 1333920.24
page 920 Paise SeventyFour Only
item of work

Supply & Delivery of topiary/trees/Palms/shrubs/lawn/ ground covers and specified plants as


per directions of officer in charge at site including cost of plants
plants of bag size
7" x 8" of plant height not less than 1.0 feet,
8" x 10" of plant height not less than 3.0 feet,
13" x 13" of Tree/Palm height not less than 5 feet,
13" x 13" of plant (Hedges & Shrub) height not less than 2 feet,
15" x 16" of plant (Tree/Palm/Topiary) height not less than 5 feet,
18" x 18" plant (Tree/Palm/Topiary) height not less than 6 feet, bottom dia of the stem is
0.75'' and above,
21" x 21" and above plant (Tree/Palm/Topiary) height not less than 7 feet, bottom dia of the
stem is 1'' and above.
8 Heights mentioned above are excluding bag height.
All the plants supplied shall be with sturdy stem, well formed crown, vigorously growing tip,
healthy foliage without any infestation and the plants shall be supplied after proper hardening
off.
the rates inclusive of cost of plants and labour charges for handling & complete for finished
item of work.

syzygium cumini

157.00 Each As per Data 450.00 Rupees Four Hundred Fifty Only Each 70650

Tabeuia roses
9 158.00 Each As per Data 350.00 Rupees Three Hundred Fifty Only Each 55300

Towards cost and supply of iron gate of size 3.0x1.8 m with 40mmx40mmx2.9mm thick hellow
section alround the outside and 16mm verticle square rods inside of the gate and Ms flat
40mm size with 5mm thick across the gate and iron arrows above the gate including
conveyance charges and fabrication charges, fixing of the gate with brick masonary colums of
size 0.45x0.45x3 m with CM(1:6) with foundation p.c.c (1:4:8) 100 thick and plastering Rupees FiftyEight Thousand
10 1.00 Each AS per Quatation 58,000.00 Each 58000
CM(1:4) 20mm thick and fixing of gate with 4 hinges including painting of gate and columns Only
Etc., complete for finished item of work

Supplying and fixing of Name board 3.60X0.60 m height with MS framework made up of 2 mm
thick aluminium sheet coverd gum sheet flexi of name board and fixing of Vertical post 50 x
50 M.S Square of 1.20 m height as approved by Engineer-in charge and framework with 25 x
25mm G.I Square section welding/ fitted with suitable bolts and nuts including cost and As per
11 1.00 Each conveyance of all materials to site, incidental, operational and all labour charges etc., 15,000.00 Rupees Fifteen Thousand Only Each 15000
Quotation
complete for finished item of work.

Transportation of bag plants form Vijayawada to Ongole Municipal Coporation.


Rupees One Thousand Five
12 15.75 Mt 1,500.00 Mt 23625
Hundred Only
Total 3,803,384.08

Say 3,803,384.00

Rupees ThirtyEight Lakh Three Thousand Three Hundred EightyFour Only


* The above rates are exciusive of GST & Seigniorage charges
CIVIL DATA : Page-114

A.P. Greening & Beautification Corporation


D A T A ( SOR 2022-23)

Name of the Work:- Rejuvenation of water body including strengthening of bund and greenning and providing walking
tracks at koppolu cheruvu in division no.9 ( 24.33 Acres) at Ongole Municipal Coporation, Prakasam District Andhra
Pradesh. Under AMRUT 2.0

CEMENT MORTAR PER CUM CM (1:2) CM (1:3) CM (1:4) CM (1:5) CM (1:6) CM (1:8)
Cost of Sand for mortar & Plastering
964.32 964.32 964.32 964.32 964.32 964.32
( 1.05 cum )
Cost of cement 3038.40 2025.60 1519.20 1215.36 1012.80 759.60
Mazdoor ( Unskilled ) for mixing mortar
105.00 105.00 105.00 105.00 105.00 105.00
( 0.20 Nos.)

MA @ 25% 26.25 26.25 26.25 26.25 26.25 26.25


Rate per Cum 4133.97 3121.2 2614.77 2310.93 2108.37 1855.17

20 mm HBG graded metal


Aggregates 20mm nominal size 0.60 1981.80 1189.08
Aggregates 13.20 / 12.50mm nominal size 0.15 1676.80 251.52
Aggregates 10mm nominal size 0.15 1486.80 223.02
Aggregates 6mm nominal size 0.10 1281.80 128.18
Rate per Cum 1791.80

12 mm HBG graded metal


Aggregates 13.20 / 12.50mm nominal size 0.60 1676.80 1006.08
Aggregates 10mm nominal size 0.20 1486.80 297.36
Aggregates 6mm nominal size 0.20 1281.80 256.36
Rate per Cum 1559.80

D A T A ( SOR 2022-23)

Sl. No. CFMS code Description Quantity Unit Rate (Rs.) Per Unit Amount (Rs.)

Vibrated Plain Cement Concrete (1:3:6) nominal mix using 220 kg of cement and 20mm graded machine
crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all
1 materials like cement, fine aggregate (sand), coarse aggregate, water etc., and including all charges for Concrete
Mixer, machine mixing, laying concrete in position, vibrating, curing, overheads & contractors profit etc., for
finished item of work (APSS No. 402)

(BLD-CSTN-3-10 & 11)


Unit : 1cum
A.MATERIALS :
HBG 20mm size graded metal 0.90 Cum 1791.80 1 Cum 1612.62
As per lead Sand 0.45 Cum 823.40 1 Cum 370.53

MAT-00005 Cement 220.00 Kgs 4220.00 1 MT 928.40

MAT-00332 Water ( including for curing ) 1.20 Kl 125.00 1 Kl 150.00


B.MACHINERY :
HIR-00016, Concrete Mixer 10 / 7 cft (0.2 / 0.8
1.00 hour 188.10 1 hour 188.10
LAB-00329, cum)capacity
HIR-00150 Crew Charges 1.00 hour 306.80 1 hour 306.80
Add MA on crew charges 0.25 306.80 76.70
HIR-00040, Needle vibrator 40mm ( petrol ) 1.00 hours 38.20 1 hour 38.20
LAB-00352,
HIR-00174 Crew charges 1.00 hours 220.90 1 hour 220.90
CIVIL DATA : Page-115

Sl. No. CFMS code Description Quantity Unit Rate (Rs.) Per Unit Amount (Rs.)
Add MA on crew charges 0.25 220.90 55.23
C.LABOUR :
LAB-00011 1st class mason 0.10 Nos. 630.00 1 Each 63.00

LAB-00120 Mazdoor (Unskilled) 1.39 Nos. 525.00 1 Each 729.75


MA @ 25% 0.25 792.75 198.19
Rate for 1 cum 4938.41
Overheads & Contractors Profit @13.615% 0.13615 4938.41 672.36
Rate per 1 cum 5610.78

1.70mts 1.80mts
Painting to new iron work with one coat of Red oxide primer and two coats with synthetic enamel paint Grade-I
VOC (Volatile Organic Compound) content less than 50 grams/litre over primer coat of red oxid, including cost
2 and conveyance of all materials like Red oxide primer, Synthetic Enamel Paint to site, incidental, operational and
all labour charges etc., and overheads & contractors profit complete for finished item of work in all floors. (SS
No. 1201, 1212 & 1207).
(BLD-CSTN-12-7 & 12-12-197)
Unit : 10 sqm
A.MATERIALS :
MAT-01075 Red oxide primer 0.70 Ltr 145.00 1 Ltr 101.50
MAT-01102 Cost of Synthetic Enamel Paint 1.10 Ltr 270.00 1 Ltr 297.00
B.LABOUR :
for primer coat
LAB-00035 1st Class Painter 0.21 Nos. 705.00 1 Each 148.05
LAB-00093 2nd Class Painter 0.49 Nos. 565.00 1 Each 276.85
For enamel painting
LAB-00035 1st Class Painter 0.33 Nos. 705.00 1 Each 232.65
LAB-00093 2nd Class Painter 0.77 Nos. 565.00 1 Each 435.05
MA @ 25% 0.25 1092.60 273.15
Sundries including brushes , ladders etc., @
0.01 1764.25 17.64
1%
1781.89
Overheads & Contractors Profit @13.615% 0.13615 1781.89 242.60
Rate per 10 sqm 2024.50
Rate per 1 sqm 202.45

fixing jallies & Rolling shutter


Supply and fabrication of MS framed structure like Window Grills, Compound Wall Grills, Iron Doors,
Windows, Gates, MS Frame for chain link mesh works, Roof Trusses by using square / rectangular MS hollow
Data as per
3 section as per IS 4923 & Angles as per SP:6(1) IS Hand book, including cost of welding rods, power charges,
SOR
labour charges for cutting, placing, welding and erecting in position and fixing, cost & convenience of all
materials including wastage to site and complete for finished item of work
Data for 1 Kg
Cost of MS steel including @ 2.5% wastage 1.025 Kg 60.00 1.00 Kg 61.50
LAB-00420 Fabrication charges 1.00 Kg 30.00 1.00 Kg 30.00
MA @ 25% on 75% fabrication after
deduction of power charges and welding 0.25 22.50 5.63
rods and welding machine
LAB-00421 Erections charges 1.00 Kg 6.00 1.00 Kg 6.00
MA @ 25% 0.25 6.00 1.50
Overheads & Contractors Profit @13.615% 0.13615 104.63 14.24
Rate for 1 Kg 118.87
Angles
MS Flats
CIVIL DATA : Page-116

Sl. No. CFMS code Description Quantity Unit Rate (Rs.) Per Unit Amount (Rs.)

Supply and fabrication of MS framed structure like Window Grills, Compound Wall Grills, Iron Doors,
Windows, Gates, MS Frame for chain link mesh works ,Roof Trusses by using MS Flats as per SP:6(1) IS Hand
4
book , including cost of welding rods, power charges, labour charges for cutting, placing, welding and erecting
in position and fixing, cost & convenience of all materials to site and complete for finished item of work

Data for 1 Kg
Cost of MS steel including @2.5% wastage 1.025 Kg 60.00 1.00 Kg 61.50
LAB-00420 Fabrication charges 1.00 Kg 30.00 1.00 Kg 30.00
MA @ 25% on 75% fabrication after
deduction of power charges and welding 0.25 22.50 5.63
rods and welding machine
LAB-00421 Erections charges 1.00 Kg 6.00 1.00 Kg 6.00
MA @ 25% 0.25 6.00 1.50
Overheads & Contractors Profit @13.615% 0.13615 104.63 14.24
Rate for 1 Kg 118.87
MS solid plate
Supply and fabrication works like Window Grills, Compound Wall Grills, Iron Doors, Windows, Gates, Roof
Trusses by using MS solid plate section as per IS 1730 including cost of welding rods, power charges, labour
5
charges for cutting, placing, welding & erecting in position and fixing cost & convenience of all materials
including wastage to site and complete for finished item of work.
Data for 1 Kg
Cost of MS solid plate including @ 2.5%
1.025 Kg 70.00 1.00 Kg 71.75
wastage
LAB-00420 Fabrication charges 1.00 Kg 30.00 1.00 Kg 30.00
MA @ 25% on 75% fabrication after
deduction of power charges and welding 0.25 22.50 5.63
rods and welding machine
LAB-00421 Erections charges 1.00 Kg 6.00 1.00 Kg 6.00
MA @ 25% 0.25 6.00 1.50
Overheads & Contractors Profit @13.615% 0.13615 114.88 15.64
Rate for 1 Kg 130.52

Supplying and fixing G.I. Chain link fabric fencing of required width in mesh size 50x50 mm opening of 4 mm
dia GI wire including strengthening with 2 mm dia wire or nuts, bolts and washers/welding in the MS angle
DSR 16-70.1
6 frame/ RCC fencing posts as required complete as per the direction of Engineer-in-charge and including cost of
at page 920
all materials to site, incidental operational and all labour charges overheads & contractors profit etc., complete
for finished item of work
Unit =10 Sqm
Taking output = 1 Sqm
A.Material
Chainlink mesh [50x50mm opening] of 4mm
MAT-00886 10.50 Sqm 506.00 1 Sqm 5313.00
dia

B.Labour for fixing & stretching fencing

LAB-00002 Blacksmith 2.14 day 590.00 1 day 1262.60

LAB-00120 Beldar (Mazdoor) 1.62 day 525.00 1 day 850.50

MA @ 25% 0.25 2113.10 528.28

7954.38
Overheads & Contractors Profit @13.615% 0.13615 7954.38 1082.99
Rate per 10.00 Sqm 9037.36
Rate per 1.00 Sqm 903.74
A.P. GREENING AND BEAUTIFICATION CORPORATION

Name of the Work:- Rejuvenation of water body including strengthening of bund and greenning and providing walking tracks at koppolu cheruvu in division
no.9 ( 24.33 Acres) at Ongole Municipal Coporation, Prakasam District Andhra Pradesh. Under AMRUT 2.0
Ist and Final bill

Coefficient of coefficinet of coefficinet of


S.NO ITEM Unit
sand aggregates Garvel
Qty Sand Metal Gravel

1 Earth work Cum 0.00 0.00 1.00 32.90 0.00 0.00 32.90
2 PCC Cum 0.45 0.90 0.00 7.31 3.29 6.58 0.00
3 VCC Cum 0.45 0.90 0.00 25.59 11.52 23.03 0.00
#REF! Gravel Cum 0.45 0.90 0.00 180.00 81.00 162.00 0.00
Total Quantity 95.81 191.61 32.90
Seigniorage Charges
Description Unit Rate Qty Amount
Sand Cum 100.00 95.81 9581.00
Aggregate Cum 90.00 191.61 17245.00
Selected earth Cum 45.00 32.90 1481.00
Sub Total 28,307.00
Joinery data 77

A.P. Greening & Beautification Corporation


D A T A ( SOR 2022-23)
Name of the Work:- Rejuvenation of water body including strengthening of bund and greenning and providing walking
tracks at koppolu cheruvu in division no.9 ( 24.33 Acres) at Ongole Municipal Coporation, Prakasam District Andhra
Pradesh. Under AMRUT 2.0
CFMS code
a) Labour charges for wrought and put up (BLD-CSTN-13-1)
LAB-00004 1st class carpenter 5.31 Nos. 705.00 1 Each 3743.55
LAB-00060 2nd class carpenter 12.39 Nos. 565.00 1 Each 7000.35
LAB-00120 Man Mazdoor 8.80 Nos. 525.00 1 Each 4620.00
Labour charges per 1 cum 15363.90

b) Labour charges for aluminium doors ( S.No.11 of Page No. 396 of SoR 2011-12 )
LAB-00004 1st class carpenter 0.099 Nos. 705.00 Each 69.80
LAB-00091 2nd class carpenter 0.198 Nos. 565.00 Each 111.87
LAB-00004 Power Saw Cutter -Hand Operated -Operator 0.099 Nos. 705.00 Each 69.80
LAB-00004
Power Drill -Hand Operated -Operator 0.099 Nos. 705.00 Each 69.80
LAB-00120 Mazdoor(Unskilled) 0.297 Nos. 525.00 Each 155.92
LAB-00010 Non-technical work inspector 0.099 Nos. 685.00 Each 67.82
MA @ 25% 0.25 545.00 136.25
Machinery
HIR-00206 Power Saw Cutter -Hand Operated -Hire
charges 0.793 Hrs 132.00 1 Hour 104.68
HIR-00207 Power Drill -Hand Operated -Hire charges 0.793 Hrs 121.00 1 Hour 95.95
881.87
Power charges for Motors 1% 0.01 881.87 8.82
Labour charges per 1 sqm 890.69

c) Labour charges for aluminium sliding windows ( S.No.10 of Page No. 395 of SoR 2011-12 )
LAB-00004 1st class carpenter 0.096 Nos. 705.00 Each 67.68
LAB-00060 2nd class carpenter 0.289 Nos. 565.00 Each 163.29
LAB-00004 Power Saw Cutter -Hand Operated -Operator 0.096 Nos. 705.00 Each 67.68
LAB-00004
Power Drill -Hand Operated -Operator 0.096 Nos. 705.00 Each 67.68
LAB-00120 Mazdoor(Unskilled) 0.289 Nos. 525.00 Each 151.73
LAB-00010 Non-technical work inspector 0.096 Nos. 685.00 Each 65.76
MA @ 25% 0.25 583.81 145.95
C.Machinery
HIR-00206 Power Saw Cutter -Hand Operated -Hire
charges 0.771 Hrs 132.00 1 Hour 101.77
HIR-00207 Power Drill -Hand Operated -Hire charges 0.771 Hrs 121.00 1 Hour 93.29
924.83
Power charges for Motors 1% 0.01 924.83 9.25
Labour charges per 1 sqm 934.07

d) Labour charges for aluminium partitions partly glazed ( S.No.8 of Page No. 394 of SoR 2011-12 )
LAB-00004 1st class carpenter 0.434 Nos. 705.00 Each 305.97
LAB-00060 2nd class carpenter 0.434 Nos. 565.00 Each 245.21
LAB-00004
Power Saw Cutter -Hand Operated -Operator 0.043 Nos. 705.00 Each 30.31
LAB-00004
Power Drill -Hand Operated -Operator 0.058 Nos. 705.00 Each 40.89
LAB-00120 Mazdoor(Unskilled) 0.145 Nos. 525.00 Each 76.13
LAB-00010 Non-technical work inspector 0.072 Nos. 685.00 Each 49.32
MA @ 25% 0.25 747.83 186.96
C.Machinery
HIR-00206 Power Saw Cutter -Hand Operated -Hire
charges 0.347 Hrs 132.00 1 Hour 45.80
HIR-00207 Power Drill -Hand Operated -Hire charges 0.463 Hrs 121.00 1 Hour 56.02
1036.61
Power charges for Motors 1% 0.01 1036.61 10.37
Labour charges per 1 sqm 1046.98

e) Labour charges for aluminium casement windows ( S.No.9 of Page No. 394 of SoR 2011-12 )
LAB-00004 1st class carpenter 0.100 Nos. 705.00 Each 70.50
Joinery data 78

LAB-00060 2nd class carpenter 0.300 Nos. 565.00 Each 169.50


LAB-00004 Power Saw Cutter -Hand Operated -Operator 0.100 Nos. 705.00 Each 70.50
LAB-00004
Power Drill -Hand Operated -Operator 0.100 Nos. 705.00 Each 70.50
LAB-00120 Mazdoor(Unskilled) 0.300 Nos. 525.00 Each 157.50
LAB-00010 Non-technical work inspector 0.100 Nos. 685.00 Each 68.50
MA @ 25% 0.25 607.00 151.75
C.Machinery
HIR-00206 Power Saw Cutter -Hand Operated -Hire
charges 0.800 Hrs 132.00 1 Hour 105.60
HIR-00207 Power Drill -Hand Operated -Hire charges 0.800 Hrs 121.00 1 Hour 96.80
961.15
Power charges for Motors 1% 0.01 961.15 9.61
Labour charges per 1 sqm 970.76

12 Supply and fixing doors as per drawings with medium teak wood frame of section 100mm x 65 mm and
ISI marked flush door shutters of 30 mm thick double shutters with bond wood solid block board type Core
having cross bands and face veneers, hot pressed bonded with water proof phenol formaldehyde synthetic
resin factory made conforming to IS 2202-1991 (Part-I) both sides commercial ply with internal lipping on all
sides including cost and conveyance to site of teak wood frame, flush shutter including supply and fixing 6
Nos. MS Z hold fasts of size 300 mm x 40 mm x 5mm including cost of ISI marked MS powder coated
fixtures of 6 Nos. butt hinges (IS:205) 150mm long, 1 No. aldrop (IS:2681) 300mm long, 2 Nos. tower bolts
(IS:204) of 200 mm x 10 mm dia at top, 2 Nos. 150 mm long handles (IS:208), 2 Nos. door stoppers and 2
Nos. rubber bushes including fixing the fixtures to door with required number of screws, bolt and nuts
including labour charges for fixing the frame in position, fixing the shutter to the frame etc, including
overheads & contractors profit complete for finished item of work as per APSS 1001 & 1002 (The vertical
frame of door shall be embedded in flooring for a depth of not less than 10 mm) (2000mm x 2100mm)

(BLD-CSTN-13-1)
Size : 2.00m x 2.10m 4.20 Sqm
Quantity analysis
Outer frame - Vertical 2 x 2.11
= 4.22 x 0.10 x 0.065 0.02743 cum
Outer frame - Horizontal 1 x 2.00
= 2.00 x 0.10 x 0.065 0.01300 cum
0.04043 cum

30 mm thick flush shutter 2 x 0.95 x 2.05 3.895 sqm

MAT-00847 Cost of medium TW frame 2 m to 3m length 0.02743 cum 92130.00 1 cum 2527.13
MAT-00846 Cost of medium TW frame up to 2 m length 0.01300 cum 81950.00 1 cum 1065.35
MAT-01345 Cost of 30 mm thick flush shutter 3.895 sqm 1400.00 1 sqm 5453.00
Cost of MS Z hold fasts 6 Nos. 25.00 Each 150.00
MAT-00921 Cost of MS powder coated tower bolt 200mm
long 2 Nos. 56.00 Each 112.00
MAT-00935 Cost of MS powder coated butt hinges
Cost
150mm of long
MS powder coated aldrop 300mm 6 Nos. 39.00 Each 234.00
MAT-00950 Cost
long of MS powder coated handle 150mm 1 No. 154.00 Each 154.00
MAT-00941 long 2 Nos. 49.00 Each 98.00
MAT-00958 Cost of MS powder coated door stopper 2 Nos. 45.00 Each 90.00
Cost of rubber bush 2 Nos. 25.00 Each 50.00
Labour charges for frame work 0.04043 cum 15363.90 1 cum 621.16
MA @ 25% 0.25 621.16 155.29
LAB-00429
Labour charges for fixing flush door shutter to
the frame , fixing the fixtures to the shutter 3.895 sqm 421.00 1 sqm 1639.80
MA @ 25% 0.25 1639.80 409.95
Add for nails & screws etc. 3.32
Rate for 4.20 sqm 12762.99
Rate for 1 sqm 3038.81
Overheads & Contractors Profit @13.615% 0.13615 3038.81 413.73
Rate for 1 sqm 3452.54
Joinery data 79

13 Supply and fixing doors as per drawings with medium teak wood frame of section 100mm x 65 mm and
ISI marked flush door shutters of 30 mm thick double shutters with bond wood solid block board type Core
having cross bands and face veneers, hot pressed bonded with water proof phenol formaldehyde synthetic
resin factory made conforming to IS 2202-1991 (Part-I) both sides commercial ply with internal lipping on all
sides including cost and conveyance to site of teak wood frame, flush shutter including

supply and fixing 6 Nos. MS Z hold fasts of size 300 mm x 40 mm x 5mm including cost of ISI marked MS
powder coated fixtures of 6 Nos. butt hinges (IS:205)150mm long, 1 No. aldrop (IS:2681) 300mm long, 2
Nos. tower bolts (IS:204) of 200 mm x 10 mm dia at top, 2 Nos. 150 mm long handles (IS:208), 2 Nos. door
stoppers and 2 Nos. rubber bushes including fixing the fixtures to door with required number of screws, bolt
and nuts including labour charges for fixing the frame in position, fixing the shutter to the frame etc, including
overheads & contractors profit complete for finished item of work as per APSS 1001 & 1002 (The vertical
frame of door shall be embedded in flooring for a depth of not less than 10 mm) (1800mm x 2100mm)

(BLD-CSTN-13-1)
Size : 1.80m x 2.10m 3.78 Sqm
Quantity analysis
Outer frame - Vertical 2 x 2.11
= 4.22 x 0.10 x 0.065 0.02743 cum
Outer frame - Horizontal 1 x 1.80
= 1.80 x 0.10 x 0.065 0.01170 cum
0.03913 cum

30 mm thick flush shutter 2 x 0.85 x 2.05 3.485 sqm

MAT-00847 Cost of medium TW frame 2 m to 3m length 0.0274 cum 92130.00 1 cum 2527.13
MAT-00846 Cost of medium TW frame up to 2 m length 0.0117 cum 81950.00 1 cum 958.82
MAT-01345 Cost of 30 mm thick flush shutter 3.485 sqm 1400.00 1 sqm 4879.00
Cost of MS Z hold fasts 6 Nos. 25.00 Each 150.00
MAT-00921 Cost of MS powder coated tower bolt 200mm
long 2 Nos. 56.00 Each 112.00
MAT-00935 Cost of MS powder coated butt hinges
Cost
150mm of long
MS powder coated aldrop 300mm 6 Nos. 39.00 Each 234.00
MAT-00950 Cost of MS powder coated handle 150mm
long 1 No. 154.00 Each 154.00
MAT-00941 long 2 Nos. 49.00 Each 98.00
MAT-00958 Cost of MS powder coated door stopper 2 Nos. 45.00 Each 90.00
Cost of Rubber bush 2 Nos. 25.00 Each 50.00
Labour charges for frame work 0.03913 cum 15363.90 1 cum 601.19
MA @ 25% 0.25 601.19 150.30
LAB-00429
Labour charges for fixing flush door shutter to
the frame , fixing the fixtures to the shutter 3.49 sqm 421.00 1 sqm 1467.19
MA @ 25% 0.25 1467.19 366.80
Add for nails & screws etc. 5.45
Rate for 3.78 sqm 11843.86
Rate for 1 sqm 3133.30
Overheads & Contractors Profit @13.615% 0.13615 3133.30 426.60
Rate for 1 sqm 3559.89
Say 3560

14 Supply and fixing doors as per drawings with medium teak wood frame of section 100mm x 65 mm and
ISI marked flush door shutters of 30 mm thick double shutters with bond wood solid block board type Core
having cross bands and face veneers, hot pressed bonded with water proof phenol formaldehyde synthetic
resin factory made conforming to IS 2202-1991 (Part-I) both sides commercial ply with internal lipping on all
sides including cost and conveyance to site of teak wood frame, flush shutter including

supply and fixing 6 Nos. MS Z hold fasts of size 300 mm x 40 mm x 5mm including cost of ISI marked MS
powder coated fixtures of 6 Nos. butt hinges (IS:205) 150mm long, 1 No. aldrop (IS:2681) 300mm long, 2
Nos. tower bolts (IS:204) of 200 mm x 10 mm dia at top, 2 Nos. 150 mm long handles (IS:208), 2 Nos. door
stoppers and 2 Nos. rubber bushes including fixing the fixtures to door with required number of screws, bolt
and nuts including labour charges for fixing the frame in position, fixing the shutter to the frame etc.,
including overheads & contractors profit complete for finished item of work as per APSS 1001 & 1002 (The
vertical frame of door shall be embedded in flooring for a depth of not less than 10 mm) (1500mm x
2100mm)

(BLD-CSTN-13-1)
Joinery data 80

Size : 1.50m x 2.10m 3.15 Sqm


Quantity analysis
Outer frame - Vertical 2 x 2.11
= 4.22 x 0.10 x 0.065 0.02743 cum
Outer frame - Horizontal 1 x 1.50
= 1.50 x 0.10 x 0.065 0.00975 cum
0.03718 cum

30 mm thick flush shutter 2 x 0.70 x 2.05 2.87 sqm

MAT-00847 Cost of medium TW frame 2 m to 3m length 0.02743 cum 92130.00 1 cum 2527.13
MAT-00846 Cost of medium TW frame up to 2 m length 0.00975 cum 81950.00 1 cum 799.01
MAT-01345 Cost of 30 mm thick flush shutter 2.87 sqm 1400.00 1 sqm 4018.00
Cost of MS Z hold fasts 6 Nos. 25.00 Each 150.00
MAT-00921 Cost of MS powder coated tower bolt 200mm
long 2 Nos. 56.00 Each 112.00
MAT-00935 Cost of MS powder coated butt hinges
Cost
150mm of long
MS powder coated aldrop 300mm 6 Nos. 39.00 Each 234.00
MAT-00950 Cost of MS powder coated handle 150mm
long 1 No. 154.00 Each 154.00
MAT-00941 long 2 Nos. 49.00 Each 98.00
MAT-00958 Cost of MS powder coated door stopper 2 Nos. 45.00 Each 90.00
Cost of rubber bush 2 Nos. 25.00 Each 50.00
Labour charges for frame work 0.03718 cum 15363.90 1 cum 571.23
MA @ 25% 0.25 571.23 142.81
LAB-00429
Labour charges for fixing flush door shutter to
the frame , fixing the fixtures to the shutter 2.87 sqm 421.00 1 sqm 1208.27
MA @ 25% 0.25 1208.27 302.07
Add for nails & screws etc. 5.89
Rate for 3.15 sqm 10462.40
Rate for 1 sqm 3321.40
Overheads & Contractors Profit @13.615% 0.13615 3321.40 452.21
Rate for 1 sqm 3773.61
Say 3774

55 Supply and fixing doors as per drawings with medium teak wood frame of section 100mm x 65 mm and
ISI marked flush door shutters of 30 mm thick double shutters with bond wood solid block board type Core
having cross bands and face veneers, hot pressed bonded with water proof phenol formaldehyde synthetic
resin factory made conforming to IS 2202-1991 (Part-I) both sides commercial ply with internal lipping on all
sides including cost and conveyance to site of teak wood frame, flush shutter including supply and fixing 6
Nos. MS Z hold fasts of size 300 mm x 40 mm x 5mm including cost of ISI marked MS powder coated
fixtures of 6 Nos. butt hinges (IS:205) 150mm long, 1 No. aldrop (IS:2681) 300mm long, 2 Nos. tower bolts
(IS:204) of 200 mm x 10 mm dia at top, 2 Nos. 150 mm long handles (IS:208), 2 Nos. door stoppers and 2
Nos. rubber bushes including fixing the fixtures to door with required number of screws, bolt and nuts
including labour charges for fixing the frame in position, fixing the shutter to the frame etc., including
overheads & contractors profit complete for finished item of work as per APSS 1001 & 1002 (The vertical
frame of door shall be embedded in flooring for a depth of not less than 10 mm) (1200mm x 2100mm)

(BLD-CSTN-13-1)
Size : 1.20m x 2.10m 2.52 Sqm
Quantity analysis
Outer frame - Vertical 2 x 2.11
= 4.22 x 0.10 x 0.065 0.02743 cum
Outer frame - Horizontal 1 x 1.20
= 1.20 x 0.10 x 0.065 0.00780 cum
0.03523 cum

30 mm thick flush shutter 2 x 0.55 x 2.05 2.255 sqm

MAT-00847 Cost of medium TW frame 2 m to 3m length 0.0274 cum 92130.00 1 cum 2527.13
MAT-00846 Cost of medium TW frame below 2 m length 0.0078 cum 81950.00 1 cum 639.21
MAT-01345 Cost of 30 mm thick flush shutter 2.255 sqm 1400.00 1 sqm 3157.00
Cost of MS Z hold fasts 6 Nos. 25.00 Each 150.00
MAT-00921 Cost of MS powder coated tower bolt 200mm
long 2 Nos. 56.00 Each 112.00
Joinery data 81

MAT-00935 Cost of MS powder coated butt hinges


Cost
150mm of long
MS powder coated aldrop 300mm 6 Nos. 39.00 Each 234.00
MAT-00950 Cost
long of MS powder coated handle 150mm 1 No. 154.00 Each 154.00
MAT-00941 long 2 Nos. 49.00 Each 98.00
MAT-00958 Cost of MS powder coated door stopper 2 Nos. 45.00 Each 90.00
Cost of rubber bush 2 Nos. 25.00 Each 50.00
Labour charges for frame work 0.035 cum 15363.90 1 cum 541.27
MA @ 25% 0.25 541.27 135.32
LAB-00429
Labour charges for fixing flush door shutter to
the frame , fixing the fixtures to the shutter 2.255 sqm 421.00 1 sqm 949.35
MA @ 25% 0.25 949.35 237.34
Add for nails & screws etc. 6.34
Rate for 2.52 sqm 9080.96
Rate for 1 sqm 3603.55
Overheads & Contractors Profit @13.615% 0.13615 3603.55 490.62
Rate for 1 sqm 4094.18
Say 4094

56 Supply and fixing doors as per drawings with medium teak wood frame of section 100mm x 65 mm and
ISI marked flush door shutters of 30 mm thick single shutter with bond wood solid block board type Core
having cross bands and face veneers, hot pressed bonded with water proof phenol formaldehyde synthetic
resin factory made conforming to IS 2202-1991 (Part-I) both sides commercial ply with internal lipping on all
sides including cost and conveyance to site of teak wood frame, flush shutter including supply and fixing 6
Nos. MS Z hold fasts of size 300 mm x 40 mm x 5mm including cost of ISI marked MS powder coated
fixtures of 3 Nos. butt hinges (IS:205) 150mm long, 1 No. aldrop (IS:2681) 300mm long, 1 No. tower bolt
(IS:204) of 200 mm x 10 mm dia at top , 2 Nos. 150 mm long handles (IS:208), 1 No. door stopper and 1 No.
rubber bush including fixing the fixtures to door with required number of screws, bolt and nuts including
labour charges for fixing the frame in position, fixing the shutter to the frame etc., including overheads &
contractors profit complete for finished item of work as per APSS 1001 & 1002 (The vertical frame of door
shall be embedded in flooring for a depth of not less than 10 mm) (1000mm x 2100mm)

(BLD-CSTN-13-1)
Size : 1.00m x 2.10m 2.10 sqm
Quantity analysis
Outer frame - Vertical 2 x 2.11
= 4.22 x 0.10 x 0.065 0.02743 cum
Outer frame - Horizontal 1 x 1.00
= 1.00 x 0.10 x 0.065 0.00650 cum
0.03393 cum

30 mm thick flush shutter 0.90 x 2.05 1.845 sqm

Cost analysis
MAT-00847 Cost of medium TW frame 2 m to 3m length 0.02743 cum 92130.00 1 cum 2527.13
MAT-00846 Cost of medium TW frame up to 2 m length 0.00650 cum 81950.00 1 cum 532.68
MAT-01345 Cost of 30 mm thick flush shutter 1.845 sqm 1400.00 1 sqm 2583.00
Cost of MS Z hold fasts 6 Nos. 25.00 Each 150.00
MAT-00921 Cost of MS powder coated tower bolt 200mm
long 1 No. 56.00 Each 56.00
MAT-00935 Cost of MS powder coated butt hinges
Cost
150mm of long
MS powder coated aldrop 300mm 3 Nos. 39.00 Each 117.00
MAT-00950 Cost of MS powder coated handle 150mm
long 1 No. 154.00 Each 154.00
MAT-00941 long 2 Nos. 49.00 Each 98.00
MAT-00958 Cost of MS powder coated door stopper 1 No. 45.00 Each 45.00
Cost of rubber bush 1 No. 25.00 Each 25.00
Labour charges for frame work 0.0339 cum 15363.90 1 cum 521.30
MA @ 25% 0.25 521.30 130.32
LAB-00429
Labour charges for fixing flush door shutter to
the frame , fixing the fixtures to the shutter 1.845 sqm 421.00 1 sqm 776.75
MA @ 25% 0.25 776.75 194.19
Add for nails & screws etc. 6.30
Rate for 2.10 sqm 7916.65
Overheads & Contractors Profit @13.615% 0.13615 7916.65 1077.85
8994.51
Joinery data 82

Rate for 1 sqm 4283.10


Say 4283

53 Supply and fixing doors as per drawings with medium teak wood frame of section 100mm x 65 mm and ISI
marked flush door shutters of 30 mm thick single shutter with bond wood solid block board type Core having
cross bands and face veneers, hot pressed bonded with water proof phenol formaldehyde synthetic resin
factory made conforming to IS 2202-1991 (Part-I) both sides commercial ply with internal lipping on all sides
including cost and conveyance to site of teak wood frame, flush shutter including supply and fixing 6 Nos.
MS Z hold fasts of size 300 mm x 40 mm x 5mm including cost of ISI marked MS powder coated fixtures of 3
Nos. butt hinges (IS:205) 150mm long, 1 No. aldrop (IS:2681) 300mm long, 1 No. tower bolt (IS:204) of 200
mm x 10 mm dia at top, 2 Nos. 150 mm long handles (IS:208), 1 No. door stopper and 1 No. rubber bush
including fixing the fixtures to door with required number of screws, bolt and nuts including labour charges
for fixing the frame in position, fixing the shutter to the frame etc, including overheads & contractors profit
complete for finished item of work as per APSS 1001 & 1002 (The vertical frame of door shall be embedded
in flooring for a depth of not less than 10 mm) (900mm x 2100mm)

(BLD-CSTN-13-1)
Size : 0.90m x 2.10m 1.89 sqm
Quantity analysis
Outer frame - Vertical 2 x 2.11
= 4.22 x 0.10 x 0.065 0.02743 cum
Outer frame - Horizontal 1 x 0.90
= 0.90 x 0.10 x 0.065 0.00585 cum
0.03328 cum

30 mm thick flush shutter 0.80 x 2.05 1.64 sqm

Cost analysis
MAT-00847 Cost of medium TW frame 2 m to 3m length 0.02743 cum 92130.00 1 cum 2527.13
MAT-00846 Cost of medium TW frame up to 2 m length 0.00585 cum 81950.00 1 cum 479.41
MAT-01345 Cost of 30 mm thick flush shutter 1.64 sqm 1400.00 1 sqm 2296.00
Cost of MS Z hold fasts 6 Nos. 25.00 Each 150.00
MAT-00921 Cost of MS powder coated tower bolt 200mm
long 1 No. 56.00 Each 56.00
MAT-00935 Cost of MS powder coated butt hinges
Cost
150mm of long
MS powder coated aldrop 300mm 3 Nos. 39.00 Each 117.00
MAT-00950 Cost of MS powder coated handle 150mm
long 1 No. 154.00 Each 154.00
MAT-00941 long 2 Nos. 49.00 Each 98.00
MAT-00958 Cost of MS powder coated door stopper 1 No. 45.00 Each 45.00
Cost of rubber bush 1 No. 25.00 Each 25.00
Labour charges for frame work 0.03328 cum 15363.90 1 cum 511.31
MA @ 25% 0.25 511.31 127.83
LAB-00429
Labour charges for fixing flush door shutter to
the frame , fixing the fixtures to the shutter 1.64 sqm 421.00 1 sqm 690.44
MA @ 25% 0.25 690.44 172.61
Add for nails & screws etc. 4.78
Rate for 1.89 sqm 7454.50
Overheads & Contractors Profit @13.615% 0.13615 7454.50 1014.93
8469.43
Rate for 1 sqm 4481.18
Say 4481

54 Supply and fixing of toilet door shutter with frame made of M.S. door frame of 5mmX48mmX48mm (L
angel) as allround frame the frame is coated with one coat of red oxide and two coats of enamel of approved
color. For shutter and the shutter is made with 16mm Bison Lam shutter with allround ‘U’ Lipping of PPS
section of 12mmX18mmX12mmX0.60mm, along hardware of 200m long and 12mm dia aluminum
aldrop( ISI make)2 Nos, 2Nos of 125m m handle, 3 Nos of RT patte hinges IS 304gr SS
2mmX12mmX180mm long with a pole receiver of 10mmDia X 40mm by welded on 3mmX40mm SS 304,
plate it works as receiver for RT Patee hinges it is welded to M.S. angle . M.S. angle will be fixed to wall of
self expandable screws and caps. including cost and conveyance of all materials, accessories, labour charges
for transportation, erection at site with templates for casement sizing overheads and contractors profit etc.,
complete for finished item of work (750mm x 2100mm )
Joinery data 83

MAT-01399
BM Rate as per SSR 1.00 Sqm 4100.00 1.00 Sqm 4100.00
T-
N.70
Overheads & Contractors Profit @13.615% 0.14 4100.00 558.21
Rate for 1 Sqm 4658.22

55 Providing and fixing of Window with Two Sliding Shutters and with Grill Outer Frame Size 90 mm x 50 mm
have a rebate of 15mm x 5 mm to fit grill made of 10mm MS Sq Rods for horizontal bars welded at a regular
pitch of 150mm to 12mm x 6 mm MS flat. made of Galvanized Steel (Base Steel as per IS 513, D quality,
galvanized as per IS 277 with Zinc of 120 GSM), using factory made section powder coated with Pure
polyester powder upto 50-60 microns thick with total coated thickness of 0.58 mm for Outer Frame and 0.58
mm thickness for Sliding Shutter Section, the Outer Frame for Two Tracks with Grill provision size of 90 mm
x 50 mm and the Window Shutter section of 0.58 mm x 36 mm and the outer Frame with two integrated
guide tracks of 12mm width and 24mm deep for provision to slide the Shutter / sash frame and facilitates with
a water drain outlet component made of PVC and the shutter frame fitted with 5mm thick plain float glass of
reputed make and fixed with EPDM weathering seal resistant accessories and handle made of Alumimium 1
No. per each shutter and cut to length miter joined with corner brackets including installation of window
system at site using anchor fasteners, Silicon sealant applied at the Outer frame corners inclusive of
conveyance of all materials accessories, labour charges, and erection at site with complete finished item of
work.

MAT-01447 BM
T-
P.39 Rate as per SSR 1.00 Sqm 6324.00 1.00 Sqm 6324.00

Overheads & Contractors Profit @13.615% 0.13615 6324.00 861.01


Rate for 1 Sqm 7185.01
56 Providing, supplying & fixing of Single fixed Louvers Ventilator made made of prepainted steel (Base steel as
per IS 513 of 0.80 mm thick galvanized as per IS 277 with Zinc of 120 GSM), finish painted with a polyester
paint of 60-65 microns thick and section for outer frame of 80 x 45 mm, centre mullion of 80 x 60 mm, section
for shutter of 52 x 25 mm x 0.6 mm thick, outer frame and mullions to have rebate for glazed shutter with a
provision for guard bars/grills and the sections cut to length metre joined with corner bracket, centre mullion
fixed with mullion cap, 1 No. of High grade nylon latch handle, window stopper, 2 nos. of with MS Powder
coated /SS ball bearing butt Hinges provided per shutter and windows fitted with 4 mm thick plain float glass
with rubber gaskets including fixing the frames in concrete/masonry wall by means of self expanding screws,
Including 10 mm Square guard bars with 6” (152.4mm) pitch etc., complete for finished item of work.
including cost and conveyance of all materials, accessories, labour charges for transportation, erection at site,
overheads and contractor profit etc., complete for finished item of work

MAT-01468 BM Rate as per SSR 1.00 Sqm 4062.00 1.00 Sqm 4062.00
T- Overheads & Contractors Profit @13.615% 0.13615 4062.00 553.04
P.60
Rate for 1 Sqm 4615.04
Say 4615
A.P. Greening and Beautification Corporation
D A T A ( SOR 2022-23)
Name of the Work:- Rejuvenation of water body including strengthening of bund and greenning and providing
walking tracks at koppolu cheruvu in division no.9 ( 24.33 Acres) at Ongole Municipal Coporation, Prakasam
District Andhra Pradesh. Under AMRUT 2.0
Sl.No CFMS CODE Description Qty Unit Rate Per Unit Amount
1 13 House service connections (PP Saddle)PP Clamp saddles-PP clamp Saddles shall be manufactured by injection
moulding using virgin polypropylene. Mechanical tapping saddles for water works purposes and designed for use
with PVC/PE pipe as per IS 4985/IS 4984 respectively. These saddles should be contoured to fit around the pipe. PP
saddles shall be Blue/Black moulded-in with Nickel plated Brass / SS 304 metal female threaded outlets. Seal shall
be thermoplastic elastomer rubber suitable for drinking water and nut-bolt-washer with SS. The PP Clamp saddle
fittings shall be mouldedwith SS 304/Nickel plated Brass female threaded outlet inserted to connect necessary
fittings. Thread dimension shall conform to IS-554/ISO-7. Adequate thickness of PP shall be provided to hold brass
insert in place and avoid leakage while pressure applications. Fasteners shall be threaded type, with SS. Fasteners of
size 125mm and above. The grade of raw material used must be certified by WRAS, UK for type test as per BS 6920
from their certified laboratories like NSF International Ltd. UK and certificate of Compliance to be produced for the
following parameters: i) Odour&Flavour of water ii) Appearance of water iii) Growth of Micro Organism iv)
Extraction of Substances that may be of concern to public health (Cyto toxicity) v) Extraction of Metals excluding all
taxes. as approved by the Engineer-In-Charge including cost and conveyance of all materials, labour charges ,
overheads & contractors profit complete for finished item of work .
MAT-08320 Rate as per SSR 75x1" 1 No. 148.00 Each 148.00
148.00
Overheads & Contractors Profit @13.615%
0.13615 148.00 20.15
Rate per Each 168.15
1 14 Supplying and Laying, jointing of UPVC 25 mm dia pipes 10 Kgs/cm2 for potable water supplies conforming to
IS : 4985/2000 (3rd revision) with bell ends (Socket) as per specification in light Grey/Natural Ivory Grey/ Any other
Color (except White) laying, jointing of pipes as per BIS No.7634 part-III/75 for PVC, including cost of trench
excavation laying, fixing and commissioning the pipes including couplers/ bends/ tees with solvent jointing as per
standardpractice and refilling etc. including cost and conveyance of all materials to site, labour charges, overheads &
contractors profit complete for finished item of work

c) 25 mm dia
25 mm Dia 10 Kgs/cm2 1.00 RM 35.00 1 RM 35.00
Labour charges as per (Part -IV Item 12.b) 1 RM 39.00 1 RM 39.00
MA @ 25% 0.250 39.00 9.75
83.75
Overheads & Contractors Profit @13.615% 0.13615 83.75 11.40
Rate per 1 RM 95.15

18 15 Supplying and fixing of SWR PVC 75mm dia pipes (Prince/Sudhakar/Kisan/Supreme or any ISI brand) 4
Kg/Sq.cm. and fixing all special such as plain bends, off sets, door bends, single junctions, double junctions as per
site requirement, fixing with PVC clamps if necessary with required number of Bombay nails including cost and
conveyance of all materials to site, labour charges, overheads & contractors profit complete for finished item of work
at all floor levels. (APSS No. 1302 1319 & 1326)

a) 75mm dia
Data for 6 RM
Cost of 75mm dia pipe 6.00 RM 236.00 3 RM 472.00
Labour charges 6.00 RM 79.00 1 RM 474.00
946.00
157.67
Overheads & Contractors Profit @13.615% 0.13615 157.67 21.47
Rate per 1 RM 179.14
b) 90mm dia
Data for 6 RM
Cost of 90mm dia pipe 6.00 RM 375.00 3 RM 750.00
Cost of PVC clamps 3 Nos. 16.00 Each 48.00
Labour charges 6 RM 79.00 1 RM 474.00
1272.00
Rate per 1 RM 212.00
Overheads & Contractors Profit @13.615% 0.13615 212.00 28.86
240.86
say 241
A.P. Greening & Beautification Corporation
D A T A ( SOR 2022-23)
Datas for Rejuvenation of water body including strengthening of bund and greenning and providing
walking tracks at koppolu cheruvu in division no.9 ( 24.33 Acres) at Ongole Municipal Coporation,
Prakasam District Andhra Pradesh. Under AMRUT 2.0
Sl. Amount in
Ref. Code Description Qty Unit Rate in Rs. Unit
No: Rs.
1 LANDSCAPE DEVELOPMENT WORKS
1.1 Dibbling for Dhoob / Selection / Shade Grass
16 Bed preparation for Dibbling for Bermuda/Doob/ Shade Grass :-Dressing
the surface to the desired shape, laying 150 mm (6”) thick fine red garden
soil, covered with a thin layer of 10 mm thick sand, watering, compacting
to 4" thickness by hand roller including cost of red garden soil, sand and
labour charges etc. complete for bed preparation and dibbling rooted
slips of grass @2" apart and ramming including slipping of grass, racking
the soil before dibbling, watering and ramming complete etc., and it
including all operational, incidental, labour charges, required tools,
overheads & contractors profit complete for finished item of work
excluding cost of dibbling grass and fertilizer for 1 sqm
Red garden soil in this context it is defined as sandy loamy garden soil
congenial for plant growth which shall be of light textured, crystaline,
porous and friable, fertlie, slightly acidic or neutral

Unit = 1 Sq.m.
A). Materials:
As per Red garden soil
Quotation 0.15 cum. 1100 per Cum 165.00

As per lead River sand 0.01 cum. 678.4 per Cum 6.78
B). Labour:
Clearing unwanted growth
RSSR 21-22 (RSSR item no: 2b)
1 sqm. 7.67 Sqm 7.67
item no: 2.b

Internal Transport of red


garden soil and sand
(conveyance charges for
CSSR 22-23 materials by head load .
pg.No.39 Lead may be considered as 0.16 cum. 75.000 per Cum 12.00
(A) per the respective common
SoR while finalizing the
rate)

RSSR-21-22 Spreading for red garden soil


item sl. 0.15 cum. 29.710 per Cum 4.46
No:14

RSSR-21-22 Spreading for sand


item sl. 0.01 cum 29.710 per Cum 0.30
No:14

Page 85 of 275
Sl. Amount in
Ref. Code Description Qty Unit Rate in Rs. Unit
No: Rs.
RSSR-21-22 Rolling (with hand roller/
item sl. demesha) 0.15 cum. 46.280 per Cum 6.94
No:15
Mazdoor for application of
CSSR -22-23 fertilizers (Observed Data)
Part- I
0.002 No 525.00 per day 1.05
(LAB-
00120)

C). Dibbling rooted slips


C).Dibbling rooted slips of
grass @ 2" apart and
ramming including slipping
of grass, racking soil before
dibbling, watering etc., and
CSSR -22-23
ramming complete for
Part- I
finished item of work 0.055 nos. 525.00 per day 28.88
(LAB-
(Observed Data)
00120)
(out put = 72 sqmt./4 no.
mazdoor).

Rate per sqmt. 4/72

MA @ 25% 0.25 61.30 15.33


Sub-total 248.41
D).Water charges @ 1% on
sub-total 0.010 248.41 2.48

Overheads & Contractors


Profit @13.615% 0.13615 250.89 34.16
Rate per Sqmt = 285.05
(A+B+C+D)

17 Digging of 0.75x0.75x0.75 mtrs. pit, filling with soil mixture of red


garden soil, farmyard manure at 4:1 ratio including internal transport,
application of fertilizers and chemicals (@ 20 gms/pit/sqmt), internal
transportation of plants, planting the plants etc., and it including all
operational, incidental, labour charges, required tools, overheads &
contractors profit complete for finished item of work. (excluding cost of
plant material, fertilizers and chemicals (@ 20 gms / pit/ sqmt)
(Red garden soil in this context it is defined as sandy loamy garden soil
congenial for plant growth which shall be of light textured, crystalline,
porous and friable, fertile, slightly acidic or neutral)

Unit = 1 no.
A). Materials:

Page 86 of 275
Sl. Amount in
Ref. Code Description Qty Unit Rate in Rs. Unit
No: Rs.
As per Red garden soil 0.272 Cum 1100.00 Cum 299.20
Quotation
FYM (cost & conveyance of 0.064 Cum 1496.71 Cum 95.79
Gunter- dry cow dung powder or
Circle-FSR FYM) (FSR item sl.no:
22-23 (Code: 2.19.008
02-23-008)

B). Labour:
Digging of Pit in ordinary 0.42 Cum 238.88 Cum 100.33
(BLD- soils (as per bldg.data)
CSTN-2-1)

Homogeneous mixing of soil 0.336 Cum 49.08 Cum 16.49


Gunter-Circl and FYM (FSR item sl.no:
FSR 22-23 01.02.006)
item sl.no: -
01-02-006

Internal Transportation of red 0.336 Cum 75.000 Cum 25.20


garden soil and FYM
(conveyance charges for
CSSR 22-23 materials by head load. -
pg.No.39 Lead may be considered as
(A) per respective common SoR
while finalizing the rate)

Internal transportation of bag 0.025 Nos. 525.00 each 13.13


CSSR -22-23 plants for bag size (21"X21")
Part- I to the planting points
(LAB-
00120) (Observed Data)

Planting [RSSR 20.e.(average 1 No 11.40 each 11.40


rate of iii & iv)] (labour
RSSR-21-22 charges for re-filling of pits
item sl. and planting and stacking
No:18.e. iii sticks excluding cost of
stick.)

Mazdoor for application of 0.001 No 525.00 per day 0.53


CSSR -22-23 fertilizers (Observed Data)
Part- I
(LAB-
00120)

MA @ 25% 0.25 167.08 41.77

Page 87 of 275
Sl. Amount in
Ref. Code Description Qty Unit Rate in Rs. Unit
No: Rs.
Sub-total 603.84
C).Water charges @ 1% on
sub-total 0.010 603.84 6.04

Overheads & Contractors


Profit @13.615% 0.13615 609.88 83.04
Total per each = (A+B+C) 692.92

2 Maintenance Operations (Manual)


18 APUGBCL Maintenance of lawns: Lawn mowing with electric motor / portable cutter machine
2.1 A and edging & weeding of the lawns (once in 30 days) and application of fertilizers,
insecticides, Fungicides (once in a month) by manual excluding cost of fertilizers
including all operational, incidental ,labour charges for complete item of work,

unit = 100 Sqmt per month

A). Lawn mowing with


electric motor / petrol
portable cutter machine and
edging & weeding of the
lawns in the frequency of
once in 30 days. Keeping the
lawn grass laid not more than
2 cm. Based on the time
motion study, one man-day is
worked out for 539 Sqmts.
For 100 Sqmts = 0.19 man-
days, i.e. 1 x 0.19 = 0.19
man-days.

0.19 nos. 525 Day 99.75


B). Application of fertilizers,
insecticides, fungicides (@20
gms/pit/sqmt) etc. once in a
month, excluding cost of
fertilizers . Based on time
motion study, one man-day is
worked out for 8400 Sqmts.
For 100 Sqmts it will be 0.01
man-day.

0.01 nos. 525 Day 5.25


Total rate per 100 Sqmt per
month = (A+B)
105.00

Page 88 of 275
Sl. Amount in
Ref. Code Description Qty Unit Rate in Rs. Unit
No: Rs.
19 APUGBCL Maintenance of lawns: watering to the lawn once in 2 days @ 10 to 15 ltrs /per
2.1 B Sqmt basing on season and weather conditions (15 watering is required in a month to
maintain sub-soil moisture continuously), excluding cost of water including all
operational, incidental ,labour charges for complete of work,

unit = 100 Sqmt per month

A). Watering the lawns once


in 2days @ 10 to 15 litres/per
Sqmts basing on season and
weather condition ( 15
watering per month shall be
required to maintain sub soil
moisture continuously),
excluding cost of water.
Based on the time motion
study, one man-day can be
watering for 1820 Sqmts. For
100 Sqmts = 0.05 man-days.
15 watering in a month for
100 Sqmts = 15*0.05= 0.75
man-days.

0.75 nos. 525 Day 393.75


Total rate per 100 Sqmt per
month 393.75
20 APUGBCL Maintenance of Palms/Tree planting: Trimming (once in month) and application of
2.3 A fertilizers, insecticides, Fungicides @ 20 gms/pit/sqmt) (once in quarterly) by
manually excluding cost of fertilizers, it including all operational, incidental ,labour
charges, for complete of work

Unit = 100 nos. per month

A). Trimming of Palms/Tree


once in month. Based on the
time motion study, one man-
day is worked out for 91 nos.
For 100 nos it will be 1.1
man-day
1.1 nos. 525 day 577.50

Page 89 of 275
Sl. Amount in
Ref. Code Description Qty Unit Rate in Rs. Unit
No: Rs.
B). Application of fertilizers,
insecticides, fungicides (@20
gms/pit/sqmt) etc., once in
quarterly excluding cost of
fertilizers. Based on time
motion study, one man-day is
worked out for 480 nos . For
100 nos it will be 0.20 man-
days, for month = 0.06 man-
days.

0.06 nos. 525 day 31.50


Total Rate per 100 nos. per
month (A+B)
609.00
21 APUGBCL Maintenance of Palms/Tree planting: formation of basins 0.30m . away from the
2.3 B edges of plant (once in a month) it including all operational, incidental ,labour charges
for complete of work

Unit = 100 nos. per month

A). Formation of basins for


each and every plant upto 1ft.
away from the plant, once in
30 days. Based on the time
motion study, one man-day is
worked out for 48 nos. in a
day. For 100 nos it will be
2.08 man-days.
2.08 nos. 525 day 1092.00
Total Rate per 100 nos. per
month
1092.00

22 APUGBCL Maintenance of Palms/Tree planting: watering (once in three days @ 5 Lts/per


2.3 C plant shall be provide to maintain sub soil moisture continuously) by manually, but
excluding cost of water including all operational, incidental ,labour charges for
complete of work.

Unit = 100 nos. per month

Page 90 of 275
Sl. Amount in
Ref. Code Description Qty Unit Rate in Rs. Unit
No: Rs.
A). Watering and weeding to
Palms/Tree once in a three
days @ 5 litres/per plant (10
watering in a month required
to maintain sub soil moisture
continuously). Based on the
time motion study, one man-
day can be watering for 546
nos per day. For 100 nos =
0.18 man-days. 10 watering
for 100 nos = 10 x 0.18= 1.80
man-days

1.8 nos. 525 day 945.00


Total Rate per 100 nos. per
month 945.00
Loading and Unloading of tall plants

23 APGBC 3.7 Loading and unloading of plants bag size (21"X21") at site of work and stacking for
lead less upto 50 m and including labour charges, T&P etc.,and overheads &
contractors profit complete for finished item of work (excluding cost of plant bag)

Unit = 100 Nos.


Loading / unloading of plants 4.29 Nos. 525.00 per day 2252.25
of bag size (21"X21")
MA @ 25% 0.25 2252.25 563.06
Overheads & Contractors 0.13615 2815.31 383.30
Profit @13.615%
Rate 100 Nos. 3198.61

24 Guntur- unloading of plants bag size (7"X8") at site of work and stacking for lead less upto 50
Circle -FSR m and including labour charges, T&P etc.,and overheads & contractors profit
2022-2023 complete for finished item of work (excluding cost of plant bag)
02-06-07

Unit = 100 Nos.


unloading of plants of bag 50.80 100 Nos 50.8
size (7"x8")

Overheads & Contractors 0.13615 50.80 6.92


Profit @13.615%

Rate 100 Nos.


57.72

Page 91 of 275
CIVIL DATA : Page-92

A.P. Greening & Beautification Corporation


D A T A ( SOR 2022-23)
Datas for Rejuvenation of water body including strengthening of bund and greenning and providing walking
tracks at koppolu cheruvu in division no.9 ( 24.33 Acres) at Ongole Municipal Coporation, Prakasam District
Andhra Pradesh. Under AMRUT 2.0
S.No./ Item
Sl. No. Description Quantity Unit Rate (Rs.) Per Unit Amount (Rs.)
Code No.

1 MAT- Clearing the light Jungle like Shrub, bushes, grass, wild vegetation and it including all operational, incidental,
00480 labour charges, required tools, overheads & contractors profit complete for finished item of work

CSSR-22-23, part -II Pg.no 21 Item No. 110


Unit : 1 sqm
Clearing light Jungle 1.00 2.80 2.80
Overheads & Contractors Profit 0.13615 2.80 0.38
@13.615%
Rate per 1 Sqm 3.18

2 Alignment and fixing of planting point with 0.45 mtrs. length sticks including material cost, transport and
overheads & contractors profit complete for finished item of work.

RSSR 20-21 Item No. 18-I-b


Unit : 1 No.
Taking output : 100.00 Nos.
a) Labour
Rate as per RSSR 21-22 Item No. 18-I-b 100.00 Nos. 114.72 100 Nos. 114.72

MA @ 25% 0.25 114.72 28.68


143.40
Overheads & Contractors Profit 0.13615 143.40 19.52
@13.615%
Rate per 100 Nos. 162.92
Rate per 1 plant 1.63

3 Earth work excavation for foundations (Manual Means) of buildings, septic tank, sump, compound wall in
ordinary soils and depositing on bank with an initial lead of 10m and depth up to 3m including all operational,
incidental, labour charges such as shoring, sheeting, planking, strutting etc., and overheads & contractors
profit complete for finished item of work excluding dewatering charges etc., as per SS 20 B(APSS 308)

(BLD-CSTN-2-1)
Ordinary Soil - Manual Means up to 3m depth
Unit : 1 cum
Taking output : 10.00 cum
a) Labour
Mazdoor ( Unskilled) 3.64 Nos. 525.00 1 No. 1911.00
MA @ 25% 0.25 1911.00 477.75
Total-a 2388.75
S.No. 2-B- Add extra 25% for pits 0.25 2388.75 597.19
1
Overheads & Contractors Profit 0.13615 2985.94 406.54
@13.615%
Cost for 10 cum 3392.47
Rate per cum 339.25
CIVIL DATA : Page-93

S.No./ Item
Sl. No. Description Quantity Unit Rate (Rs.) Per Unit Amount (Rs.)
Code No.

4 Filling with red soil in in pits/trenches with initial lead in layers not exceeding 15cm thick, watering and
ramming including cost and conveyance of water to work site and all operational, incidental, labour charges,
hire charges of T&P etc., and overheads & contractors profit complete for finished item of work(APSS
NO.309&310)
(BLD-CSTN-2-8) & Proc.No.20938 (R&B)/ Dt:14-5-2019
Unit : 1 cum
Taking output 6.00 cum
a) Labour
Mazdoor ( Unskilled ) 0.31 Nos. 525.00 1 No. 162.75
MA @ 25% 0.25 162.75 40.69
b)Material :
Cost of red soil 6.00 cum 1100.00 1 cum 6600.00
water charges @ 1% 0.01 6803.44 68.03
6871.47
Overheads & Contractors Profit 0.13615 6871.47 935.55
@13.615%
Rate per 6 cum 7807.02
Rate per 1 cum 1301.17

5 As per Filling with Red soil (Red soil in this context it is defined as sandy loamy garden soil congenial for plant
Quotation growth which shall be of light textured, crystalline, porous and friable, fertile, slightly acidic or neutral) in
pits/trenches and including cost and conveyance of red soil to work site and it including all operational,
incidental ,labour charges, required tools, overheads & contractors profit complete for finished item of work.

Unit : 1 cum
As per Quotation 1.00 Cum 1100.00 1 cum 1100.00
Rate per 1 cum 1100.00

6 Cost and Conveyance of Farm Yard Manure or dry cow dung powder including loading, unloading, internal
transport and application of the FYM into the pits/trenches and it including all operational, incidental, labour
Gunter- charges, required tools, overheads & contractors profit complete for finished item of work. (0.028 cum Farm
Circle-FSR yard Manure for each pit.)
22-23
(Code: 02-
23-008) cost & conveyance of dry cow dung powder and FYM as per
Gunter-Circle-FSR 22-23 (Code: 02-23-008)

Unit : 1 cum
As per FSR 1.00 Cum 1496.71 1 Cum 1496.71
Overheads & Contractors Profit 0.13615 1496.71 203.78
@13.615%
Rate per 1 cum 1700.49

7 Conveyance charges for internal transprot upto 100 mt with head load and application of the red soil and FYM
into the pit and it including all operational, incidental ,labour charges, required tools, overheads &
contractors profit complete for finished item of work.

CSSR 22-23, Item No. Table A(2), Page No.39

Unit : 1 cum
As per CSSR 1.00 Cum 75.00 1 cum 75.00
MA @ 25% 0.25 75.00 18.75
Overheads & Contractors Profit 0.13615 93.75 12.76
@13.615%
CIVIL DATA : Page-94

S.No./ Item
Sl. No. Description Quantity Unit Rate (Rs.) Per Unit Amount (Rs.)
Code No.

Rate per 1 cum 106.51

8 Internal transportation of tall plants from plants stacking place to planting pit, it including all operational,
incidental ,labour charges, overheads & contractors profit complete for finished item of work.
RSSR 21-22, Item No.18-d-ii
Unit : 1 No.s
As per RSSR 100.00 No. 237.58 100 Nos. 237.58
MA @ 25% 0.25 237.58 59.40
Overheads & Contractors Profit 0.13615 296.98 40.43
@13.615%
Rate per 100 Nos. 337.41
Rate per 1 plant 3.37

9 Removing polythene bag, planting by keeping the ball of earth intact, fixing the plant by refilling with dug out
of soil /supplied soli FYM mixer and ramming around the plant , it including all operational,
incidental ,labour charges, required tools, overheads & contractors profit complete for finished item of work.

RSSR 21-22, Item No.18-e-iii+iv


Unit : 1 No.
As per RSSR 1.00 No. 11.40 1 No. 11.40
MA @ 25% 0.25 11.40 2.85
Overheads & Contractors Profit 0.13615 14.25 1.94
@13.615%
Rate per 1 No 16.19

10 Circular weeding cum deep soil working to a dia of 1 m and to a depth of 10 cm around the plant and it
including all operational, incidental ,labour charges, required tools, overheads & contractors profit complete
for finished item of work

RSSR 21-22, Item No.18-I-a


Unit : 1 No.
As per RSSR 1.00 No. 15.25 1 No. 15.25
MA @ 25% 0.25 15.25 3.81
Overheads & Contractors Profit 0.13615 19.06 2.60
@13.615%
Rate per 1 No 21.66

11 Cost of bamboo stakes of 2.00 mt height including transport at the planting plants for avenue plantation
including overheads & contractors profit complete for finished item of work.

As per Quotation
Unit : 1 No.
As per Quotation 1.00 No. 25.00 1 No. 25.00
Rate per 1 No 25.00

12 Watch and ward including watering, pruning, cleaning the area and application of fertilizers and chemicals as
directed by site in-charge .
As per G.O 224 MA&UD dt:13.10.2015
Unit : per Month
As per G.O 224 MA&UD 1.00 Month 12000.00 1 Month 12000.00
dt:13.10.2015
Rate per Month 12000.00
CIVIL DATA : Page-95

S.No./ Item
Sl. No. Description Quantity Unit Rate (Rs.) Per Unit Amount (Rs.)
Code No.

13 Hire charges of tractor mounted water tanker for filling sump by 5000 ltrs capacity tanker (120 waterings for
one year ie. once in a three days @ 5 litres per sqm/plant per each time) and it including all operational,
incidental ,labour charges, required tools, overheads & contractors profit complete for finished item of work

RSSR 21-22 Item No. 26


Unit : 1 trip
As per RSSR 1.00 Trip 608.36 1 Trip 608.36
Overheads & Contractors Profit 0.13615 608.36 82.83
@13.615%
Rate per 1 trip (5000 ltrs capacity 691.19
tanker)

14 Watering to the plants from the near by source i.e., bore well, open well or kunta and it including all
operational, incidental ,labour charges, required tools, overheads & contractors profit complete for finished
item of work
RSSR 21-22, Item No.25
Unit : 1 No.
As per RSSR 1.00 No. 6.79 1 No. 6.79
MA @ 25% 0.25 6.79 1.70
Overheads & Contractors Profit 0.13615 8.49 1.16
@13.615%
Rate per 1 No 9.64
15 Watering by pipe, weeding and soil working 1 Mt Dai around the plant, fertilizer application, pesticide
application and watch and ward. and it including, labour charges, required tools, overheads & contractors
profit complete for finished item of work

Gunter-Circle-FSR 22-23 (Code: 04-32-040)


Unit : 1 No.
As per FSR 1000.00 No. 9989.32 1000 No. 9989.32
MA @ 25% 0.25 9989.32 2497.33
Overheads & Contractors Profit 0.13615 12486.65 1700.06
@13.615%
Rate per 1000 Nos/per 14186.71
month
16 As per Supply, deliveryand and fixing of HDPE Tree Guards confirming to ISI standards with following Technical
Quotation specifications
1. The tree guard should be made of Virgin HDPE
2. Width – 1200 mm
3. Height – 1800 mm
4. Diameter – 375 mm
5. Horizontal regular filament average thickness should not be less than 4 mm.
6. Vertical regular filament average thickness should not be less than 4 mm.
7. All joints average thicknesses should not be less than 6 mm
8. Regular mesh gap should not be more than 45mm x 55mm..
9. Longitudinal additional extra thick filament (two bars) shall be placed at 4 places along the height of
1800mm with a filament average thickness should not be less than 5 mm.
10. Circumference additional extra thick filament (two bars) shall be placed at 5 places along the width of
1200mm with a filament average thickness should not be less than 5 mm.
CIVIL DATA : Page-96

S.No./ Item
Sl. No. Description Quantity Unit Rate (Rs.) Per Unit Amount (Rs.)
Code No.

11. Weight of the sheet (1200mmX1800mm) should not be less than 1.50 kgs excluding display board and
cable ties.
12. Melt Flow Index (MFI) should be as per Raw Material data sheet submitted by the contractor. (+ 20%
allowable)
13. Supply of 18 Nos cable ties (100 mm length).
14. Color – Dark blue or Green variants
15. Suitable for outdoor use (Must be tested for presence of UV resistance material)
16. Display board of size 300mm x 150mm of plastic glow sheet blend of HDPP / tin plate/ACP with a
suitable hole at each corner for tie up.
The rates inclusive of loading, transportation to the site, unloading. complete for finished item of work.

As per Quotation
Unit : 1 No.
HDPE Tree Guards 1.00 No. 254.30 1 No. 254.30
Rate per each 254.30
17 MAD Painting With Asian Apex exterior emulsion paint two coats over two coats of primary coat of Asian exterior
CIRCULAR emulsion paint and painting of clip art / vector art /3D bubble art with enamel paint over old plastered walls of
Roc. Public/Govt. Institution’s compound walls, Medians and Islands including cost and conveyance of all
No.148Y20 materials and labor charges etc…complete including removing of posters and rubbing work for walls up to 10
15/M3 feet height. overheads & contractors profit complete for finished item of work. as per (ANNEXURE TO THE
CIRCULAR ROC NO. 1481/2017/M3, Dt. 13.06.2017)

ANNEXURE TO THE CIRCULAR ROC NO. 1481/2017/M3, Dt. 13.06.2017 (3)


Unit : 1 sqm
Painting for Medians and Islands per Sft 1 Sft. 25.00

Painting for Medians and Islands per 1 Sqm 269.10


Sqm
Overheads & Contractors Profit 269.10 36.64
@13.615% 0.13615
Rate per 1 Sqm 305.74
18 RBR- Clearing and grubbing the land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees
STCL-2 of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and
stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal
of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201 MORD /
MORTH. By Mechanical Means

In area of non-thorny jungle (light


jungle)Taking output : 10000 Sqm
Unit = 1.00 Sqm
A) Machinery
Dozer D 50 with attachment or suitable 10.00 Hours 1907.00 1 Hour 19070.00
machinery for removal of trees &
stumps

Tractor 1.00 Hours 521.00 1 Hour 521.00


B) LABOUR
Mazdoor (unskilled) 4.16 Day 525.00 1 Day 2184.00
MA @ 25% 0.25 2184.00 546.00
22321.00
Overheads & Contractors Profit 0.13615 22321.00 3039.00
@13.615%
Rate per 1 Sqm = (a+b)/10000 2.54
A.P. GREENING & BEAUTIFICATION CORPORATION

Line Estimate for development and beautification works at Eco park (183.0
acres), Idupulapaya, Kadapa dt. Andhra Pradesh.
Estimate Cost: Rs.1,871.42 Lakhs
Amount
S.No Description of Item (in Rs.)
HARDSCAPE (Civil woks)
1 CC Kerb - 5000m 5,000,000.00
2 Construction of seating wall at crafts village& adventure 380,000.00
zone- 50m
3 stone edging for softscape works- 500m 40,000.00

4 Flooring with CC pavers near park zones& floral garden- 4,000,000.00


4000 sqm
Granite flooring at entrance plaza, amphitheatre,
5 camping area & gazebos- 3000 sqm 12,900,000.00

6 Planter boxes- 25 nos 874,200.00


7 Construction of WBM road 3.5 km and 6.0 m width 3,850,000.00
8 Construction of OAT- 1500 sqm (350 members) 3,000,000.00
9 Granite benches- 30 nos 495,000.00

10 Children play& Fitness equipment including civil works 2,381,725.00


at family zone
11 Vendor shops at entrance- 5m x3m (6 nos) 3,900,000.00
12 Cottages at camping area- 6m x6m (10 nos) 16,000,000.00
13 Toilet block- 7m x 5m (3 no) 1,800,000.00
14 Craft village shops - 3m x 3m (15nos) 3,000,000.00
15 Bamboo treated Gazebo- 6m dia (3 nos) 3,900,000.00
16 construction of cafeteria - 14mx10m (1no) 6,100,000.00
17 Tree deck- 3mx 3m (5nos) 1,500,000.00

18 Construction of interpretation center at entrance- 45m x 23,220,000.00


12m
19 Percolation pits- 3 nos 100,000.00
20 Gabion structure- 2 nos 400,000.00
21 Loose boulder structure- 25 nos 625,000.00
22 Countour bunding - 800 m 160,000.00
23 Construction of Watch tower 3.0 x 3.0 m it including cos 6,000,000.00
24 Provision for soap football 500,000.00
25 Provision for Board walk- 600m length& 1.5m wide 12,000,000.00
26 Provision for Zip line- 100m 700,000.00
27 Provision for Cable cycling- 100m 1,000,000.00
28 Provision for nature play- 10 nos 500,000.00

29 Provision for renovation /repair works to existing road 1,000,000.00


including construction of CD works
30 Provision for illumination works 8,673,315.00
31 Provision for Irrigation facilities 8,673,315.00
Sub Total - I (Hardscape works) 132,672,555.00
Softscape (Development & Maintenance)
32 Topiary trees- 10,000 nos 8,674,000.00
33 Shrub planting/ Hedge- 15000 sqm 22,245,000.00
34 Lawn area - 5000 sqm 2,172,000.00
Sub Total - II (Softscape works) 33,091,000.00
Total: I + II 165,763,555.00
Add GST @ 12% on TOTAL : I + II 19,891,627.00
Add seigniorage charges @ 0.6% on TOTAL : I + II 994,581.00
Add unforeseen items 491,859.00
Grand Total 187,141,622.00
Rupees eighteen hundred and seventy five lakhs only
A.P. Greening & Beautification Corporation

Name of the work: Estimate for Burial Ground Entrance Arch


Estimate Cost: Rs.1.99 Lakhs
Sl.
SoR Description of Item Nos L B D Qty Unit Rate in Rs Unit Amount
No
Entrance Arch
1 (BLD- Earth work excavation for foundations (Manual Means) of
CSTN- buildings, septic tank, sump, compound wall in ordinary
2-1) soils and depositing on bank with an initial lead of 10m
and depth up to 3m including all operational, incidental,
labour charges such as shoring, sheeting, planking,
strutting etc., and overheads & contractors profit complete
for finished item of work excluding dewatering charges
etc., as per SS 20 B(APSS 308)

For Footings 1 x 2 1.50 1.50 1.80 8.10


8.10 Cum 271.40 Cum 2,198.34
2 (BLD- Plain Cement Concrete (1:4:8) (cement: fine aggregate:
CSTN- Coarse aggregate) for foundations and under flooring bed
3-5) using 162.0 kgs of cement, coarse aggregate 40mm size
hard , machine crushed granite from approved quarry
including cost and conveyance of all materials like
cement, sand, coarse aggregate, water etc., to site, and
including all charges for machine mixing, laying concrete
in foundations and under flooring bed, ramming in 15 cm
layers finishing top surface to the required level curing
etc., and overheads & contractors profit complete for
finished item of work. (APSS No. 402)

For Footings 1 x 2 1.5 1.5 0.10 0.45


For Plinth Beam 1 x 1 5.50 0.40 0.10 0.22
0.67 Cum 4,556.33 Cum 3,052.74
3 (BLD- Supply and placing of the V.R.C.C Nominal Mix Concrete
CSTN- M 20 grade corresponding to IS 456 with minimum
3-13- cement content of 350 kgs per 1 cum of concrete using
A) CONCRETE MIXER with 20mm size HBG graded
machine crushed hard granite metal (coarse aggregate - as
per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from
approved quarry and including cost and conveyance of all
materials like cement, fine aggregate (sand) coarse
aggregate, water, etc., to site and , centring using Steel
scaffolding pipes , jack props , Waller’s , Foot plates ,
brackets , steel centring plates etc., including all
operational, incidental and labour charges such as machine
mixing, laying concrete, vibrator, curing etc., and
overheads & contractors profit complete but excluding
cost of steel and its fabrication charges for finished item of
work (APSS No. 402)

For Footings 1 x 2 1.2 1.2 0.30 0.86


0.86 Cum 9,421.96 Cum 8,102.89
For Pedestals 1 x 2 0.75 0.75 0.90 1.01
1.01 Cum 10,033.49 Cum 10,133.82
For Plinth Beam 1 x 1 5.50 0.40 0.40 0.88
0.88 Cum 12,077.14 Cum 10,627.88
4 (BLD- Supply and placing of the V.R.C.C Nominal Mix Concrete
CSTN- M 20 grade corresponding to IS 456 with minimum
3-13-B) cement content of 350 kgs per 1 cum of concrete using
CONCRETE MIXER with 20mm size HBG graded
machine crushed hard granite metal (coarse aggregate - as
per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from
approved quarry and,including cost and conveyance of all
materials like cement, fine aggregate (sand) coarse
aggregate, water etc., to site and , centring using Casurina
Ballies, Bamboos, Wooden Reapers, Runners, Wood
Posts, Wall Plates etc., including all operational, incidental
and labour charges such as machine mixing, lifting of
concrete manually, laying concrete, vibrator, curing ,
overheads & contractors profit etc., complete but
excluding cost of steel and its fabrication charges for
finished item of work (APSS No. 402)

For Columns 1 x 1 0.40 0.40 5.00 0.80


For Columns 1 x 1 0.40 0.40 2.30 0.37
1.17 Cum 11,836.02 Cum 13,848.14
5 (BLD- Supply and placing of the V.R.C.C Nominal Mix Concrete
CSTN- M 20 grade corresponding to IS 456 with minimum
3-13-C) cement content of 350 kgs per 1 cum of concrete using
CONCRETE MIXER with 20mm size HBG graded
machine crushed hard granite metal (coarse aggregate - as
per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from
approved quarry including cost and conveyance of all
materials like cement, fine aggregate (sand) coarse
aggregate, water etc., to site and , centring using
Casurina Ballies , Bamboos , Wooden Reapers , Runners ,
Wood Posts , Wall Plates etc., including all operational,
incidental and labour charges such as machine mixing,
lifting of concrete manually, laying concrete, vibrator, ,
curing , overheads & contractors profit etc., complete but
excluding cost of steel and its fabrication charges for
finished item of work (APSS No. 402)

For Beam 1 x 1 5.50 0.40 0.30 0.66


0.66 Cum 10,262.59 Cum 6,773.31
6 (BLD- Providing High Yield Strength Deformed (HYSD) /
CSTN- Thermo Mechanically Treated (TMT) (Fe 500 / Fe 500D
4.2)& grade as per IS 1786-1979) of different diameters for RCC
Amend works , including labour charges for straightening, cutting,
ment in bending to required sizes and shapes, placing in position
SoR with cover blocks of approved materials and size and tying
2011- and lap-splicing with binding wire of 18 SWG, forming
12 page grills for reinforcement work as per approved designs and
No. drawings, including cost and conveyance of steel bars,
392 including all wastages such as overlaps, couplings, chairs,
spacer bars including cost and conveyance of binding
wire, cover blocks and all incidental, operational, labour
charges such as cutting, bending, placing in position, tying
including overheads & contractors profit complete for
finished item of work.( APSS No.126)

For Footings 1 x 1 0.860 70.00 Kg/Cum 60.20


For Pedestals 1 x 1 1.010 70.00 Kg/Cum 70.70
For Plinth Beam 1 x 1 0.880 100.00 Kg/Cum 88.00
For Columns 1 x 1 1.170 100.00 Kg/Cum 117.00
For Beam 1 x 1 0.660 100.00 Kg/Cum 66.00
401.90 Kgs 92.15 Kgs 37,035.09
7 (BLD- Plastering 12mm thick single coat in CM(1:5) using
CSTN- screened sand including cost and conveyance of all
8-3 materials like cement, sand, water etc., to site and all
Amend operational, incidental charges on materials and including
ment in cost of all labour charges for mixing mortar, finishing,
SoR curing as directed by Engineer-in-charge etc., and
2016- overheads & contractors profit complete for finished item
17 ) of work.(SS 901,903 & 904)

For beam 1 x 1 5.50 1.40 7.70


7.70 Sqm 386.60 Sqm 2,976.82
8 (As Providing and applying PMCC / Deco orient base or
per Equivalent exterior Texture ( borders and design as per the
Amend pattern approved by the Engineer-in-Charge ) of average 2
ment in to 3 mm thickness over plastered surface to prepare the
SoR surface even and smooth after thoroughly brushing the
2011- surface to remove all dirt and remains of loose powdered
12) materials, applying emery paper, Sand the surface, clean
& wipe off loose dust, applying putty/ texture paint filler
by putty knife / muslin pad, air dry for 2 - 3 hrs for the
surface preparation including cost and conveyance of all
materials to work site and all operational, incidental,
labour charges, scaffolding charges, overheads and
contractors profit etc., complete for finished item of work
in all floors for external walls

For beam 1 x 1 5.5 1.4 7.70


7.70 Sqm 290.55 Sqm 2,237.24
9 Providing cladding to wall with High Polished Granite 16
to 18 mm thick up to 8'-00 (2.43 M) other than black and
regular colours, length equal to flooring slabs set over base
coat of CM(1:5) 12 mm thick using screened sand with
(BLD- cement slurry of honey like consistency spread at the rate
CSTN- of 3.30 kgs per sqm and jointing with white cement paste
9-7) mixed with pigment of matching shade to full depth,
including cost of all materials like tiles, cement, sand and
water etc., and overheads & contractors profit complete
for finished item of work.

For Columns 1 x 4 0.4 4.50 7.20


For Columns 1 x 4 0.4 2.00 3.20
10.40 Sqm 4,063.97 Sqm 42,265.29
10 (BLD- Supply & application of one coat water based cement
CSTN- primer of exterior grade II and two coats of acrylic
12-2& exterior emulsion paint having VOC (Volatile Organic
Amend Compound) content less than 50 grams/litre for exterior
ment in walls including cost and conveyance of all materials to
SoR site,and all operational, incidental, labour charges etc., and
2011- overheads & contractors profit complete for finished item
12) of work in all floors.

For beam 1 x 1 5.5 1.4 7.70

7.70 Sqm 275.24 Sqm 2,119.35


11 As per Supply and fabrication of MS framed structure like
Data Window Grills, Compound Wall Grills, Iron Doors,
Windows, Gates, MS Frame for chain link mesh works,
Roof Trusses by using square / rectangular MS hollow
section as per IS 4923 & Angles as per SP:6(1) IS Hand
book, including cost of welding rods, power charges,
labour charges for cutting, placing, welding and erecting
in position and fixing, cost & convenience of all materials
including wastage to site and complete for finished item of
work
For M.S column Size of 1 x 2 2.5 5.00 Rmt
150 x 150 x 5 mm thick
MS hollow section
@ 22.26 kg per meter 22.26 5.00 111.30 Kgs
For M.S Gate 4.0 m x 2.0 m height
For sliding gate frame of 1 x 1 10 10.00 Rmt
Size 100x50x4 mm thick
MS hollow section
For Openable gate frame 1 x 1 6 6.00 Rmt
of Size 100x50x4 mm
thick MS hollow section

@ 8.59 kg per meter 8.59 16.00 137.44 Kgs

For inner frame of sliding 1 x 1 9.2 9.20 Rmt


gate by size 50x50x3.6
mm thick MS hollow
section
For inner frame of 1 x 1 5.3 5.30 Rmt
Openable gate by size
50x50x3.6 mm thick MS
hollow section

For inclined support of 1 x 1 2.60 2.60 Rmt


size 50x50x3.6 mm thick
MS hollow section
@ 4.98 kg per meter 4.98 17.10 85.16 Kgs

For verticals in sliding 1 x 1 14.41 14.41 Rmt


gate of size of size
25x25x2.6 mm thick MS
hollow section
For verticals in Openable 1 x 1 5.4 5.40 Rmt
gate of size of size
25x25x2.6 mm thick MS
hollow section
For Horizontals in sliding 1 x 1 6.83 6.83 Rmt
gate of size 25x25x2.6
mm thick MS hollow
section
@ 1.69 kg per meter 1.69 26.64 45.02 Kgs
MS Angle of size 1 x 1 14.4 14.40 Rmt
25x25x5mm for angle
track
@ 1.8 kg per meter 1.8 14.40 25.92 Kgs
16mm Rebar for 1 x 24 0.3 7.20 Rmt
anchoring
@ 1.6 kg per meter 1.6 7.20 11.52 Kgs
For guide rollers & V 1 x 20 20.00 Nos
groove wheel
@ 2. kg per each 2 32.00 64.00 Kgs
@ 1.69kg per meter 1.69 26.64 45.02 Kgs
461.38 Kgs 118.87 Kgs 54,844.24
12 (BLD- Painting to new iron work with one coat of Red oxide
CSTN- primer and two coats with synthetic enamel paint Grade-I
12-7 & VOC (Volatile Organic Compound) content less than 50
12-12- grams/litre over primer coat of red oxid, including cost
197) and conveyance of all materials like Red oxide primer,
Synthetic Enamel Paint to site, incidental, operational and
all labour charges etc., and overheads & contractors profit
complete for finished
For M.S column Size ofitem of
1 work
x 2 in all
2.5 floors.
0.6 (SS No. 3.00
150 x 150 x 5 mm thick
MS hollow section
For M.S Gate 4.0 m x 2.0 m height
For sliding gate frame of 1 x 1 10 0.3 3.00
Size 100x50x4 mm thick
MS hollow section
For Openable gate frame 1 x 1 6 0.3 1.80
of Size 100x50x4 mm
thick MS hollow section

For inner frame of sliding 1 x 1 9.2 0.2 1.84


gate by size 50x50x3.6
mm thick MS hollow
section
For inner frame of 1 x 1 5.3 0.2 1.06
Openable gate by size
50x50x3.6 mm thick MS
hollow section

For inclined support of 1 x 1 2.60 0.2 0.52


size 50x50x3.6 mm thick
MS hollow section
For verticals in sliding 1 x 1 14.41 0.1 1.44
gate of size of size
25x25x2.6 mm thick MS
hollow section
For verticals in Openable 1 x 1 5.4 0.1 0.54
gate of size of size
25x25x2.6 mm thick MS
hollow section
For Horizontals in sliding 1 x 1 6.83 0.1 0.68
gate of size 25x25x2.6
mm thick MS hollow
section
13.88 Sqm 202.45 Sqm 2,810.01

Unforseen Items
Total 199,025.2
A.P. Greening & Beautification Corporation

For Construction of see through compound wall

Estimate Cost: Rs.49.03 Lakhs


Sl.
SoR Description of Item Nos L B D Qty Unit Rate in Rs Unit Amount
No
For Construction of see through compound wall -490.0
Rmt
1 (BLD- Earth work excavation for foundations (Manual Means) of
CSTN- buildings, septic tank, sump, compound wall in ordinary soils
2-1) and depositing on bank with an initial lead of 10m and depth
up to 3m including all operational, incidental, labour charges
such as shoring, sheeting, planking, strutting etc., and
overheads & contractors profit complete for finished item of
work excluding dewatering charges etc., as per SS 20 B(APSS
308)

For Footings 1 x 98 1.50 1.50 1.50 330.75


For Basement wall 1 x 1 273.00 0.60 0.60 98.28
429.03 Cum 271.40 Cum 116,438.74
2 (BLD- Plain Cement Concrete (1:4:8) (cement: fine aggregate:
CSTN- Coarse aggregate) for foundations and under flooring bed
3-5) using 162.0 kgs of cement, coarse aggregate 40mm size hard
, machine crushed granite from approved quarry including
cost and conveyance of all materials like cement, sand, coarse
aggregate, water etc., to site, and including all charges for
machine mixing, laying concrete in foundations and under
flooring bed, ramming in 15 cm layers finishing top surface to
the required level curing etc., and overheads & contractors
profit complete for finished item of work. (APSS No. 402)

For Footings 1 x 98 1.50 1.50 0.10 22.05


For Basement wall 1 x 1 273.00 0.60 0.10 16.38
38.43 Cum 4,556.33 Cum 175,099.76
3 Random Rubble stone masonry in CM (1:8) prop: (Cement:
Screened sand) using hard granite stones carted from
approved quarry including cost and conveyance of all materials
like cement, screened sand, water,Rough stone Through
stone, Coursed stones etc., from approved quarry, to site,
(BLD- including labour charges for cutting stones to required size and
CSTN- shape, mixing, of cement, mortar, construction, curing,
6-13) charges for scaffolding etc., and overheads & contractors profit
complete for finished item of work. (APSS No. 601 & 615)

For Basement wall 1 x 1 273.00 0.45 0.60 73.71


Deductions
Columns -1 x 98 0.30 0.3 0.6 -5.29
68.42 Cum 4,511.57 Cum 308,681.62
4 (BLD- Supply and placing of the V.R.C.C Nominal Mix Concrete M 20
CSTN- grade corresponding to IS 456 with minimum cement content
3-13-A) of 350 kgs per 1 cum of concrete using CONCRETE MIXER
with 20mm size HBG graded machine crushed hard granite
metal (coarse aggregate - as per IS 383 - 1970 and IS 2386
Part 1 to Part 8) from approved quarry and including cost and
conveyance of all materials like cement, fine aggregate (sand)
coarse aggregate, water, etc., to site and , centring using
Steel scaffolding pipes , jack props , Waller’s , Foot plates ,
brackets , steel centring plates etc., including all operational,
incidental and labour charges such as machine mixing, laying
concrete, vibrator, curing etc., and overheads & contractors
profit complete but excluding cost of steel and its fabrication
charges for finished item of work (APSS No. 402)

For Footings 1 x 98 1.20 1.20 0.30 42.34


42.34 Cum 9,421.96 Cum 398,925.79
For Pedestals 1 x 98 0.60 0.60 0.80 28.22
28.22 Cum 10,033.49 Cum 283,145.09
For Plinth Beam above 1 x 1 273.00 0.23 0.30 18.84
the basement wall

18.84 Cum 12,077.14 Cum 227,533.32


5 (BLD- Providing High Yield Strength Deformed (HYSD) / Thermo
CSTN- Mechanically Treated (TMT) (Fe 500 / Fe 500D grade as per
4.2)& IS 1786-1979) of different diameters for RCC works , including
Amend labour charges for straightening, cutting, bending to required
ment in sizes and shapes, placing in position with cover blocks of
SoR approved materials and size and tying and lap-splicing with
2011- binding wire of 18 SWG, forming grills for reinforcement work
12 as per approved designs and drawings, including cost and
page conveyance of steel bars, including all wastages such as
No. overlaps, couplings, chairs, spacer bars including cost and
392 conveyance of binding wire, cover blocks and all incidental,
operational, labour charges such as cutting, bending, placing
in position, tying including overheads & contractors profit
complete for finished item of work.( APSS No.126)

For Footings 1 x 1 42.3 70 kg/m3 2963.80


For Pedestals 1 x 1 28.2 70 kg/m3 1975.40
For Plinth Beam above 1884.00
the basement wall 1 x 1 19 100 kg/m3

6823.20 Kgs 92.15 Kgs 628,757.88


6 (BLD- Masonry work in CM(1:6) prop (Cement : Screened sand) in
CSTN- superstructure with fly ash cement / lime solid blocks of size
5-17) 290mm x 225mm x 140mm from approved source having
minimum crushing strength of 50 Kg/Sqcm. including cost and
conveyance of all materials like cement, sand, bricks, water
etc., to site,and such as labour charges, like mixing cement
mortar, scaffolding charges, constructing masonry, lift charges,
curing, overheads and contractor profit etc., complete for
finished item of work. (APSS No. 501 & 504).

For Brick Masonry wall 1 x 1 273.00 0.3 0.50 40.95

For Brick Masonry 1 x 98.00 0.30 0.3 1.30 11.47


pedestal above the
basement wall @ 5 m
c/c
52.42 Cum 7,461.66 Cum 391,140.22
7 As per Supply and fabrication of MS framed structure like
Data Window Grills, Compound Wall Grills, Iron Doors,
Windows, Gates, MS Frame for chain link mesh works,
Roof Trusses by using square / rectangular MS hollow
section as per IS 4923 & Angles as per SP:6(1) IS Hand
book, including cost of welding rods, power charges,
labour charges for cutting, placing, welding and erecting in
position and fixing, cost & convenience of all materials
including wastage to site and complete for finished item of
Compound Wall Grill 4.50 m x 1.30 m
For vertical support
using MS hollow
section 70 x 30 x 3.2
98 x 7 1.50 1029.00 Rmt
mm thick @ 4.50
Kg/Rmt

For Horizontal
support using MS
hollow section 70 x
98 x 2 4.80 940.80 Rmt
30 x 3.2 mm thick @
4.50 Kg/Rmt

@ 4.5 kg per meter 4.5 1969.80 8864.10 Kgs


Total kgs 8864.10 Kgs 118.87 Kgs 1,053,675.57
8 As per Supply and fabrication of MS framed structure like
Data Window Grills, Compound Wall Grills, Iron Doors,
Windows, Gates, MS Frame for chain link mesh
works ,Roof Trusses by using MS Flats as per SP:6(1) IS
Hand book , including cost of welding rods, power
charges, labour charges for cutting, placing, welding and
erecting in position and fixing, cost & convenience of all
materials to site and complete for finished item of work
For Horizontal
support using MS flat
of 40 x 5 mm thick @ 98 x 1 4.80 470.40 Rmt
1.6 Kg/Rmt

For internal supports


as per design using
MS flat of 40 x 5 mm
98 x 32 1.22 3825.92 Rmt
thick @ 1.6 Kg/Rmt

@ 1.6 kg per meter 1 4296.32 4296.32 Kgs 118.87 Kgs 510,703.56

9 As per Supply and fabrication works like Window Grills,


Data Compound Wall Grills, Iron Doors, Windows, Gates, Roof
Trusses by using MS solid plate section as per IS 1730
including cost of welding rods, power charges, labour
charges for cutting, placing, welding & erecting in position
and fixing cost & convenience of all materials including
wastage to site and complete for finished item of work.
MS plate of
120x120x5mm thick
@ 39.20 Kg/Sqmt as 98 x 1 0.125 0.125 1.53
per design

@39.20 kg per Sqm


39.2 1.53 59.98 Kgs 130.52 Kgs 7,828.59

10 (BLD- Painting to new iron work with one coat of Red oxide
CSTN- primer and two coats with synthetic enamel paint Grade-I
12-7 &
VOC (Volatile Organic Compound) content less than 50
12-12-
197) grams/litre over primer coat of red oxid, including cost and
conveyance of all materials like Red oxide primer,
Synthetic Enamel Paint to site, incidental, operational and
all labour charges etc., and overheads & contractors profit
complete for finished item of work in all floors. (SS No.
1201, 1212 &
For vertical 1207).
support
using MS hollow
section 70 x 30 x 3.2
mm thick @ 4.50 98 x 7 1.5 0.20 205.80
Kg/Rmt

For Horizontal
support using MS
hollow section 70 x
30 x 3.2 mm thick @ 98 x 2 4.8 0.20 188.16
4.50 Kg/Rmt

For Horizontal
support using MS flat 98 x 1 4.8 0.09 42.34
of 40 x 5 mm thick @
1.6 Kg/Rmt
For internal supports
as per design using 98 x 32 1.22 0.09 344.33
MS flat of 40 x 5 mm
thick @ 1.6 Kg/Rmt
MS plate of
120x120x5mm thick 98 x 1 0.125 0.125 1.53
@ 39.20 Kg/Sqmt as
per design
782.16 Sqm 202.45 Sqm 158,348.29
11 (BLD- Vibrated Plain Cement Concrete M 20 Nominal mix using
CSTN- Concrete MIXER, 20mm size hard granite machine crushed
3-13-C) graded metal (coarse aggregate - as per IS 383 - 1970 and IS
2386 Part 1 to Part 8) from approved quarry, using a minimum
quantity of 350 kgs. of cement per 1 cum of concrete ,
including cost and conveyance of all materials like cement,
fine aggregate (Sand), coarse aggregate, water etc., to site
including steel centring, shuttering, machine mixing, lift
charges, laying concrete, vibrating, curing, overheads &
contractors profit etc., complete for finished item of work
(APSS No. 402 & 403)

For fixing MS grills in 1 x 98 4.5 0.3 0.1 13.23


bewteen pedestals
above the basement
wall.
13.23 Cum 6,992.73 Cum 92,513.84
12 ( BLD- Plastering 12mm thick in two coats using screened sand with
CSTN- base coat of 8mm thick in CM (1:6) and top coat of 4mm thick
8-10) in CM (1:4) with dubara sponge finishing including cost and
conveyance of all materials like cement, sand, water etc., to
site, ,, and all operational, incidental charges on materials and
including cost of all labour charges for mixing mortar, finishing,
scaffolding, lift charges, curing, including cutting grooves as
directed by Engineer - in - charge etc., and overheads &
contractors profit complete for finished item of work. (SS
901,903 & 904)

For Brick Masonry wall 1 x 2 273.00 0.65 354.90

For Brick Masonry 4 x 98 0.3 1.3 152.88


pedestal above the
basement wall @ 5 m
c/c
507.78 Sqm 518.58 Sqm 263,322.51
1 (BLD- Providing and applying PMCC / Deco orient base or Equivalent
CSTN- exterior Texture ( borders and design as per the pattern
12-2& approved by the Engineer-in-Charge ) of average 2 to 3 mm
Amend thickness over plastered surface to prepare the surface even
ment in and smooth after thoroughly brushing the surface to remove all
SoR dirt and remains of loose powdered materials, applying emery
2011- paper, Sand the surface, clean & wipe off loose dust, applying
12) putty/ texture paint filler by putty knife / muslin pad, air dry for
2 - 3 hrs for the surface preparation including cost and
conveyance of all materials to work site and all operational,
incidental, labour charges, scaffolding charges, overheads and
contractors profit etc., complete for finished item of work in all
floors for external walls

For Brick Masonry wall 1 x 2 273 0.65 354.90

For Brick Masonry 4 x 98 0.3 1.3 152.88


pedestal above the
basement wall @ 5 m
c/c
507.78 Sqm 290.55 Sqm 147,536.01
13 (BLD- Supply & application of one coat water based cement primer of
CSTN- exterior grade II and two coats of acrylic exterior emulsion
12-2& paint having VOC (Volatile Organic Compound) content less
Amend than 50 grams/litre for exterior walls including cost and
ment in conveyance of all materials to site,and all operational,
SoR incidental, labour charges etc., and overheads & contractors
2011- profit complete for finished item of work in all floors.
12)

For Brick Masonry 1 x 2 273.00 0.65 354.90


For Brick Masonry 4 x 98 0.3 1.3 152.88
pedestal above the
basement wall @ 5 m
c/c
507.78 Sqm 275.24 Sqm 139,761.37
Unforeseen Items
Grand Total 4,903,412.16
CIVIL DATA : Page-108

D A T A ( SOR 2022-23)
Name of the Work:- Rejuvenation of water body including strengthening of bund and greenning and providing walking
tracks at koppolu cheruvu in division no.9 ( 24.33 Acres) at Ongole Municipal Coporation, Prakasam District Andhra
Pradesh. Under AMRUT 2.0

CEMENT MORTAR PER CUM CM (1:2) CM (1:3) CM (1:4) CM (1:5) CM (1:6) CM (1:8)
Cost of Sand for mortar & Plastering 964.32 964.32 964.32 964.32 964.32 964.32
( 1.05 cum )
Cost of cement 3038.40 2025.60 1519.20 1215.36 1012.80 759.60
Mazdoor ( Unskilled ) for mixing mortar 105.00 105.00 105.00 105.00 105.00 105.00
( 0.20 Nos.)

MA @ 25% 26.25 26.25 26.25 26.25 26.25 26.25


Rate per Cum 4133.97 3121.17 2614.77 2310.93 2108.37 1855.17

20 mm HBG graded metal


Aggregates 20mm nominal size 0.60 1981.80 1189.08
Aggregates 13.20 / 12.50mm nominal 0.15 1676.80 251.52
size
Aggregates 10mm nominal size 0.15 1486.80 223.02
Aggregates 6mm nominal size 0.10 1281.80 128.18
Rate per Cum 1791.80

12 mm HBG graded metal


Aggregates 13.20 / 12.50mm nominal 0.60 1676.80 1006.08
size
Aggregates 10mm nominal size 0.20 1486.80 297.36
Aggregates 6mm nominal size 0.20 1281.80 256.36
Rate per Cum 1559.80

DATA (2017-18)

S.No./
Item
Sl. No. Description Quantity Unit Rate (Rs.) Per Unit Amount (Rs.)
Code
No.
Dismantling & Clearing work's
1 Dismantling, clearing away and carefully stacking useful materials for re-use and disposal of unserviceable
materials with 100m lead as directed by Executive Engineer duly taking actual premeasurements before
dismantling including all labour charges , overheads & contractor profit etc., complete

a) Brick masonry
(BLD-CSTN-14-9/299)
Mazdoor(unskilled) 0.409 Nos. 525.00 1 Each 214.73
MA @ 25% 0.25 214.73 53.68
Rate per 1 cum 268.41
Overheads & Contractors Profit 0.13615 268.41 36.54
@13.615%
Rate per 1 cum 304.95

b) Unreinforced cement concrete up to 15cm thickness


(BLD-CSTN-14-8/296)
Mazdoor(unskilled) 2.44 Nos. 525.00 1 Each 1281.00
MA @ 25% 0.25 1281.00 320.25
CIVIL DATA : Page-109

S.No./
Item
Sl. No. Description Quantity Unit Rate (Rs.) Per Unit Amount (Rs.)
Code
No.
Rate per 1 cum 1601.25
Overheads & Contractors Profit 0.13615 1601.25 218.01
@13.615%
Rate per 1 cum 1819.26

c) Unreinforced cement concrete more than 15cm thickness


(BLD-CSTN-14-8/297)
Mazdoor(unskilled) 4.88 Nos. 525.00 1 Each 2562.00
MA @ 25% 0.25 2562.00 640.50
Rate per 1 cum 3202.50
Overheads & Contractors Profit 0.13615 3202.50 436.02
@13.615%
Rate per 1 cum 3638.52

d) Reinforced cement concrete


(BLD-CSTN-14-8/298)
Mazdoor(unskilled) 4.32 Nos. 525.00 1 Each 2268.00
MA @ 25% 0.25 2268.00 567.00
for cutting steel bars (BLD-CSTN-14-
10/300)
Blacksmith 2nd class 0.50 Nos. 565.00 1 Each 282.50
Mazdoor(Male) 0.50 Nos. 525.00 1 Each 262.50
MA @ 25% 0.25 545.00 136.25
Rate per 1 cum 3516.25
Overheads & Contractors Profit 0.13615 3516.25 478.74
@13.615%
Rate per 1 cum 3994.99

e) Kadapa slabs or shahabad stone slabs on sand bed


Rate as per SSR- BMT-S.11 10.00 sqm 84.00 10 sqm 84.00
MA @ 25% 0.25 84.00 21.00
Rate per 10 sqm 105.00
Rate per 1 sqm 10.50
Overheads & Contractors Profit 0.13615 10.50 1.43
@13.615%
Rate per 1 sqm 11.93

f) Stone masonry in cement mortar


Rate as per SSR -BMT-S.01 1.00 cum 498.00 1 cum 498.00
MA @ 25% 0.25 498.00 124.50
Rate per 1 cum 622.50
Overheads & Contractors Profit 0.13615 622.50 84.75
@13.615%
Rate per 1 cum 707.25

g) Pan tiled or Mangalore tiled roof with out roof timbers :


Rate as per SSR- BMT-S.04 10.00 sqm 152.00 10 sqm 152.00
MA @ 25% 0.25 152.00 38.00
Rate per 10 sqm 190.00
Rate per 1 sqm 19.00
Overheads & Contractors Profit 0.13615 19.00 2.59
@13.615%
Rate per 1 sqm 21.59
CIVIL DATA : Page-110

S.No./
Item
Sl. No. Description Quantity Unit Rate (Rs.) Per Unit Amount (Rs.)
Code
No.

h) Flat stone in roof or floors including lifting :


Rate as per SSR- BMT-S.03 10.00 sqm 182.00 10 sqm 182.00
MA @ 25% 0.25 182.00 45.50
Rate per 10 sqm 227.50
Rate per 1 sqm 22.75
Overheads & Contractors Profit 0.13615 22.75 3.10
@13.615%
Rate per 1 sqm 25.85

i) Wrought and framed timber in roofs or floors ;


Rate as per SSR S.No.826(BMT-S.06) 1.00 cum 263.00 1 cum 263.00
MA @ 25% 0.25 263.00 65.75
Rate per 1 cum 328.75
Overheads & Contractors Profit 0.13615 328.75 44.76
@13.615%
Rate per 1 cum 373.51

j) Old lime mortar plaster


Rate as per SSR BMT-S.07 10.00 sqm 60.00 10 sqm 60.00
MA @ 25% 0.25 60.00 15.00
Rate per 10 sqm 75.00
Rate per 1 sqm 7.50
Overheads & Contractors Profit 0.13615 7.50 1.02
@13.615%
Rate per 1 sqm 8.52

k) Old cement mortar plaster


Rate as per SSR BMT-S.08 10.00 sqm 75.00 10 sqm 75.00
MA @ 25% 0.25 75.00 18.75
Rate per 10 sqm 93.75
Rate per 1 sqm 9.38
Overheads & Contractors Profit 0.13615 9.38 1.28
@13.615%
Rate per 1 sqm 10.65

l) Clean removal of lime plaster from walls and raking out joints 20mm deep
or from terraced roof and raking out joints 100 mm deep
Rate as per SSR BMT-S.14 10.00 sqm 55.00 10 sqm 55.00
MA @ 25% 0.25 55.00 13.75
Rate per 10 sqm 68.75
Rate per 1 sqm 6.88
Overheads & Contractors Profit 0.13615 6.88 0.94
@13.615%
Rate per 1 sqm 7.81

m) Clean removal of cement plaster from walls and raking out joint 200 mm deep
Rate as per SSR BMT-S.15 10.00 sqm 68.00 10 sqm 68.00
MA @ 25% 0.25 68.00 17.00
Rate per 10 sqm 85.00
Rate per 1 sqm 8.50
Overheads & Contractors Profit 0.13615 8.50 1.16
@13.615%
Rate per 1 sqm 9.66
CIVIL DATA : Page-111

S.No./
Item
Sl. No. Description Quantity Unit Rate (Rs.) Per Unit Amount (Rs.)
Code
No.
2 Dismantling doors , windows and clear storey windows, Ventilators etc., ( wood or steel ) shutters including
Chowkhats , architraves, hold fasts and other attachments etc., and stacking them within 100m lead including
labour charge etc., and overheads & contractors profit complete for finished item of work

(BLD-CSTN-14-11)
a) Not exceeding 3 sqm in area :
Details of cost per each :
2nd class mason 0.10 Nos. 565.00 1 No. 56.50
Mazdoor(Male) 0.20 Nos. 525.00 1 No. 105.00
2nd class Blacksmith 0.05 Nos. 565.00 1 No. 28.25
MA @ 25% 0.25 189.75 47.44
237.19
Overheads & Contractors Profit 0.13615 237.19 32.29
@13.615%
Cost per each 269.48

b) Exceeding 3 sqm in area :


Details of cost per each :
2nd class mason 0.13 Nos. 565.00 1 No. 73.45
Mazdoor(Male) 0.27 Nos. 525.00 1 No. 141.75
2nd class Blacksmith 0.07 Nos. 565.00 1 No. 39.55
MA @ 25% 0.25 254.75 63.69
318.44
Overheads & Contractors Profit 0.13615 318.44 43.36
@13.615%
Cost per each 361.79

1 RBR- Clearing and grubbing the land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees
STCL-2 of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and
stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and
disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201
MORD / MORTH. By Mechanical Means

In area of non-thorny jungle (light jungle)


Taking output : 10000.00 Sqm
Unit = 1.00 Sqm
A) Machinery
Dozer D 50 with attachment or suitable 10.00 Hours 1907.00 1 Hour 19070.00
machinery for removal of trees &
stumps

Tractor 1.00 Hours 521.00 1 Hour 521.00


B) LABOUR
Mazdoor (unskilled) 4.16 Day 525.00 1 Day 2184.00
MA @ 25% 0.25 2184.00 546.00
22321.00
Overheads & Contractors Profit 0.13615 22321.00 3039.00
@13.615%
Rate per 10 Sqm = (a+b)/1000 25.36

Rate per 1 sqm 2.54


Earth work excavation
CIVIL DATA : Page-112

S.No./
Item
Sl. No. Description Quantity Unit Rate (Rs.) Per Unit Amount (Rs.)
Code
No.
1 Earth work excavation for foundations (Manual Means) of buildings, septic tank, sump, compound wall in
ordinary soils and depositing on bank with an initial lead of 10m and depth up to 3m including all
operational, incidental, labour charges such as shoring, sheeting, planking, strutting etc., and overheads &
contractors profit complete for finished item of work excluding dewatering charges etc., as per SS 20 B(APSS
308)

(BLD-CSTN-2-1)
Ordinary Soil - Manual Means up to 3m depth
Unit : 1 cum
Taking output : 10.00 cum
a) Labour
Mazdoor ( Unskilled) 3.64 Nos. 525.00 1 No. 1911.00
MA @ 25% 0.25 1911.00 477.75
2388.75
b&c)
Overheads & Contractors Profit @13.61 0.13615 2388.75 325.23
Cost for 10 cum ( a+b+c) 2713.98
Rate per 1 cum 271.40

2 Earth work excavation for foundations (Mechanical Means) for buildings in ordinary soils and depositing on
bank for all lifts and with an initial lead of 10m and up to 3m depth including all operational, incidental,
labour charges such as shoring, sheeting, planking, strutting etc., and overheads & contractors profit
complete for finished item of work excluding dewatering charges etc., as per SS 20 B(APSS 308)
(BLKD-CSTN-2-2)
Ordinary Soil - Mechanical Means up to 3m depth
Unit : 1 cum
Taking output : 240.00 cum
a) Labour
Mazdoor ( Unskilled) 8.32 Nos. 525.00 1 No. 4368.00
MA @ 25% 0.25 4368.00 1092.00
b) Machinery
Shovel 0.85 cum 110hp 6.00 hours 3157.40 1 Hour 18944.40
Crew charges 6.00 hours 326.30 1 Hour 1957.80
Add MA on crew charges 0.25 1957.80 489.45
26851.65
c&d)
Overheads & Contractors Profit @13.61 0.13615 26851.65 3655.85
Cost for 240 cum ( a+b+c+d) 30507.50
Rate per 1 cum (a+b+c+d) / 240 127.11

3 Earth work excavation for foundations (Manual Means) of buildings in ordinary rock ( not requiring
blasting ) and depositing on bank with an initial lead of 10m and depth up to 3m including all operational,
incidental, labour charges such as shoring, sheeting, planking, strutting etc., and overheads & contractors
profit complete for finished item of work excluding dewatering charges etc., as per SS 20 B(APSS 308)
(BLD-CSTN-2-4)
Ordinary rock(not requiring blasting) - Manual Means up to 3m depth
Unit : 1 cum
Taking output : 10.00 cum
a) Labour
Mazdoor ( Unskilled) 5.20 Nos. 525.00 1 No. 2730.00
CIVIL DATA : Page-113

S.No./
Item
Sl. No. Description Quantity Unit Rate (Rs.) Per Unit Amount (Rs.)
Code
No.
MA @ 25% 0.25 2730.00 682.50
3412.50
b&c)
Overheads & Contractors Profit @13.61 0.13615 667.50 3412.50 464.61
Cost for 10 cum ( a+b+c) 3877.11
Rate per 1 cum (a+b+c) / 10 387.71
Rate per 1 cum

4 Earth work excavation for foundations (Mechanical Means) for buildings in ordinary rock (not requiring
blasting) and depositing on bank for all lifts and with an initial lead of 10m and up to 3m depth including all
operational, incidental, labour charges such as shoring, sheeting, planking, strutting etc., and overheads &
contractors profit complete for finished item of work excluding dewatering charges etc., as per SS 20 B(APSS
308)
(BLKD-CSTN-2-5)
Ordinary rock(not requiring blasting)- Mechanical Means up to 3m depth
Unit : 1 cum
Taking output : 180.00 cum
a) Labour
Mazdoor ( Unskilled) 6.24 Nos. 525.00 1 No. 3276.00
MA @ 25% 0.25 3276.00 819.00
b) Machinery
Shovel 0.50cum 75hp 6.00 hours 3157.40 1 Hour 18944.40
Crew charges 6.00 hours 326.30 1 Hour 1957.80
Add MA on crew charges 0.25 1957.80 489.45
25486.65
c&d)
Overheads & Contractors Profit @13.61 0.13615 25486.65 3470.01
Cost for 180 cum ( a+b+c+d) 28956.66
Rate per 1 cum (a+b+c+d) / 180 160.87
Rate per 1 cum

5 Earth work excavation for foundations for buildings in hard rock (requiring blasting) and depositing on bank
for all lifts and with an initial lead of 10m and up to 3m depth including all operational, incidental, labour
charges such as shoring, sheeting, planking, strutting etc., and overheads & contractors profit complete for
finished item of work excluding dewatering charges etc., as per SS 20 B(APSS 308)
(BLKD-CSTN-2-6)
Hard rock (requiring blasting)- up to 3m depth
Unit : 1 cum
Taking output : 10.00 cum
a) Labour
Driller 0.50 Nos. 615.00 1 No. 307.50
Blaster 0.25 Nos. 690.00 1 No. 172.50
Mazdoor ( Unskilled) 8.35 Nos. 525.00 1 No. 4383.75
MA @ 25% 0.25 4863.75 1215.94
b) Machinery
Air compressor 7cmm (diesel) 1.00 hour 1452.80 1 Hour 1452.80
Jack hammer/Pneumatic breaker 2.00 hours 18.60 1 Hour 37.20
Crew charges
Air compressor 1.00 Hours 294.50 1 Hour 294.50
Jack hammer/Pneumatic breaker 2.00 Hours 460.20 1 Hour 920.40
Add MA on crew charges 0.25 1214.90 303.73
c)Material
Gelatin 80% 3.50 Kgs 68.00 1 Kg 238.00
CIVIL DATA : Page-114

S.No./
Item
Sl. No. Description Quantity Unit Rate (Rs.) Per Unit Amount (Rs.)
Code
No.
Detonator electric 14 Nos. 12.00 1 No. 168.00
9494.31
c&d)
Overheads & Contractors Profit @13.61 0.13615 9494.31 1292.65
Cost for 10 cum ( a+b+c+d) 10786.96
Rate per 1 cum (a+b+c+d) / 10 1078.70
Rate per 1 cum

6 Earth work excavation for foundations for buildings in hard rock (blasting prohibited) and depositing on
bank for all lifts and with an initial lead of 10m and up to 3m depth including all operational, incidental,
labour charges such as shoring, sheeting, planking, strutting etc., and overheads & contractors profit
complete for finished item of work excluding dewatering charges etc., as per SS 20 B(APSS 308)

(BLKD-CSTN-2-7)
Hard rock (blasting prohibited)- up to 3m depth
Unit : 1 cum
Taking output : 10.00 cum
a) Labour
Mazdoor ( Unskilled) 5.20 Nos. 525.00 1 No. 2730.00
MA @ 25% 0.25 2730.00 682.50
b) Machinery
Air compressor 6.00 Hours 1452.80 1 Hour 8716.80
Jack hammer/Pneumatic breaker 12.00 Hours 18.60 1 Hour 223.20
Crew charges
Air compressor 6.00 Hours 294.50 1 Hour 1767.00
Jack hammer/Pneumatic breaker 12.00 Hours 460.20 1 Hour 5522.40
Add MA on crew charges 0.25 7289.40 1822.35
21464.25
c&d)
Overheads & Contractors Profit @13.61 0.13615 21464.25 2922.36
Cost for 10 cum ( a+b+c+d) 24386.61
Rate per 1 cum (a+b+c+d) / 10 2438.66
Rate per 1 cum

3 Boring for Cast-in-Situ piles Augering and boring of holes in site for Bored cast-in-situ R.C.C. Piles for building
foundations in loamy, clayey soils like Black cotton soils and ordinary soils without under reams as per IS 2911
- 1980 as per approved designs including all operations, incidental, labour charges, hire charges of machinery,
augur bore drill and shell equipment, etc, complete for all depths and for finished item of work for piles of
following diameters.

Amendment in page 400 of SoR 2011-2012

a) Up to 300 mm dia
Unit : 1 RM
a) Labour
Mazdoor ( Unskilled) 0.526 Nos. 525.00 1 No. 276.15
MA @ 25% 0.25 276.15 69.04
345.19
Overheads & Contractors Profit @13.61 0.13615 345.19 47.00
Rate per 1Rmt 392.18
b) Up to 350 mm dia to 450 mm dia
Unit : 1 RM
a) Labour
Mazdoor ( Unskilled) 0.631 Nos. 525.00 1 No. 331.28
CIVIL DATA : Page-115

S.No./
Item
Sl. No. Description Quantity Unit Rate (Rs.) Per Unit Amount (Rs.)
Code
No.
MA @ 25% 0.25 331.28 82.82
414.09
Overheads & Contractors Profit @13.61 0.13615 414.09 56.38
Rate per 1Rmt 470.47

4 Under Reaming for Cast-in-Situ piles Under-reaming for Bored cast-in-situ R.C.C. Piles for building foundations
in loamy, clayey soils like Black cotton soils and ordinary soils with Augering and boring equipment in site as
per IS 2911 - 1980 as per approved designs including all operations, incidental, labour charges, hire charges of
machinery, augur bore drill and shell equipment, etc, complete for all depths and for finished item of work for
piles of following diameters.

Amendment in page 400 of SoR 2011-2012

a) Up to 300 mm dia - double under reaming


Unit : 1 Bulb each
a) Labour
Mazdoor ( Unskilled) 0.560 Nos. 525.00 1 No. 294.00
MA @ 25% 0.25 294.00 73.50
367.50
Overheads & Contractors Profit @13.61 0.13615 367.50 50.04
Rate per 1 each 417.54
b) Up to 350 mm dia to 450 mm dia - double under reaming
Unit : 1 RM
a) Labour
Mazdoor ( Unskilled) 0.789 Nos. 525.00 1 No. 414.23
MA @ 25% 0.25 414.23 103.56
517.78
Overheads & Contractors Profit @13.61 0.13615 517.78 70.50
Rate per 1Rmt 588.28
Conveyance of un-useful excavated earth to a distance of 5 KM for disposal including hire charges of T & P,
labour charges etc., and overheads & contractors profit complete for finished item of work.

Rate as per SoR 1 cum 96.00 1 cum 96.00


Rate per 1 cum 96.00

1 As per Carting away of excavated earth / debris to a lead of 1KM (the rate including conveyance charges, loading,
SOR 16- unloading charges by mechanical means ) including ideal hire charges of truck etc. complete as directed by
17 the Departmental Authorities of the work.

Conveyance for 1 KM vide Pg.No.39 of 1.000 Cum 31.69 1 Cum 31.69


SSR 2016-17
Loading charges by mechanical means 1.000 Cum 114.33 1 Cum 114.33
vide Pg.No.39 of SSR 2016-17
Overheads & Contractors Profit 0.13615 146.02 19.88
@13.615%
Total 165.90

Filling work's
2 Filling with carted coarse sand in Children play area with initial lead in layers not exceeding 15cm thick,
watering and ramming including cost and conveyance of water to work site and all operational,
incidental ,labour charges, hire charges of T&P etc., and overheads & contractors profit complete for finished
item of work(APSS NO.309&310)

(BLD-CSTN-2-8) & Amendment in page 12 of SoR 2014.15


Unit : 1 cum
CIVIL DATA : Page-116

S.No./
Item
Sl. No. Description Quantity Unit Rate (Rs.) Per Unit Amount (Rs.)
Code
No.
Taking output 6.00 cum
a) Labour
Mazdoor ( Unskilled ) 0.31 Nos. 525.00 1 No. 162.75
MA @ 25% 0.25 162.75 40.69
b)Material :
Coarse sand for filling 6.00 cum 678.40 1 cum 4070.40
Water 0.10 Kl 103.00 1 Kl 10.30
4284.14
Overheads & Contractors Profit 0.13615 4284.14 583.29
@13.615%
Rate per 6 cum 4867.42
Rate per 1 cum 811.24

2 Filling with carted gravel in trenches, sides of foundations and basement with initial lead in layers not
exceeding 15cm thick, watering and ramming including cost and conveyance of water to work site and all
operational, incidental, labour charges, hire charges of T&P etc., and overheads & contractors profit complete
for finished item of work(APSS NO.309&310)

(BLD-CSTN-2-8) & Amendment in page 12 of SoR 2014.15


Unit : 1 cum
Taking output 6.00 cum
a) Labour
Mazdoor ( Unskilled ) 0.31 Nos. 525.00 1 No. 162.75
MA @ 25% 0.25 162.75 40.69
b)Material :
Gravel 6.00 cum 252.20 1 cum 1513.20
Water 0.72 Kl 103.00 1 Kl 74.16
1790.80
Overheads & Contractors Profit 0.13615 1790.80 243.82
@13.615%
Rate per 6 cum 5349.56
Rate per 1 cum 339.10

#REF! Filling with useful available excavated earth (excluding rock) with a lead of 50 m in trenches, sides of
foundations and basement with initial lead in layers not exceeding 15cm thick, watering and ramming
including cost and conveyance of water to work site and all operational, incidental, labour charges, hire
charges of T&P etc., and overheads & contractors profit complete for finished item of work (APSS
NO.309&310)
(BLD-CSTN-2-9) & Amendment in page 13 of SoR 2014.15
Unit : 1 cum
Taking output : 6.00 cum
a) Labour
Mazdoor ( Unskilled ) 0.31 Nos. 525.00 1 No. 162.75
MA @ 25% 0.25 162.75 40.69
203.44
Water 0.72 Kl 103.00 1 Kl 74.16
Rate per 6 cum (a+b+c) 277.60
Overheads & Contractors Profit 0.13615 277.60 37.79
@13.615% 315.39
Rate per 1 cum 52.57

Cement Concrete (nominal mix)


CIVIL DATA : Page-117

S.No./
Item
Sl. No. Description Quantity Unit Rate (Rs.) Per Unit Amount (Rs.)
Code
No.
3 Plain Cement Concrete (1:4:8) (cement: fine aggregate: Coarse aggregate) for foundations and under
flooring bed using 162.0 kgs of cement, coarse aggregate 40mm size hard , machine crushed granite from
approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water
etc. to site, including sales & other taxes on all materials and including all charges for machine mixing, laying
concrete in foundations and under flooring bed, ramming in 15 cm layers finishing top surface to the required
level curing etc., and overheads & contractors profit complete for finished item of work. (APSS No. 402)

(BLD-CSTN-3-5)
Unit : 1 cum
A.MATERIALS :
Cement 162.00 Kgs 4220.00 1000 Kgs 683.64
Coarse aggregate 40MM 0.90 Cum 1381.80 1 Cum 1243.62
Fine aggregate ( Sand ) 0.45 Cum 823.40 1 Cum 370.53
Water (including curing) 1.20 kl 103.00 1 kl 123.60
B.MACHINERY :
Concrete Mixer 10 / 7 cft (0.2 / 0.8 1.00 hour 188.10 1 hour 188.10
cum)capacity
Crew charges 1.00 hour 306.80 1 hour 306.80
Add MA on crew charges 0.25 306.80 76.70
C.LABOUR :
1st class mason 0.10 Nos. 630.00 1 63.00
Mazdoor (unskilled) 1.39 Nos. 525.00 1 Each 729.75
MA @ 25% 0.25 792.75 198.19
3983.93
Overheads & Contractors Profit 0.13615 3983.93 542.41
@13.615%
Rate per 1 cum 4526.34

5 Vibrated Plain Cement Concrete (1:3:6) nominal mix using 220 kg of cement and 20mm graded machine
crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all
materials like cement, fine aggregate (sand), coarse aggregate, water etc. to site, sales & other taxes on all
materials, all charges for Concrete Mixer , machine mixing, laying concrete in position, vibrating, curing,
centring charges, overheads & contractors profit etc., for finished item of work for footings and basement .

(BLD-CSTN-3-10 & 11)


Unit : 1cum
A.MATERIALS :
HBG 40mm size metal 0.00 Cum 1381.80 1 Cum 0.00
HBG 20mm size graded metal 0.90 Cum 1791.80 1 Cum 1612.62
Sand 0.45 Cum 823.40 1 Cum 370.53
Cement 220.00 Kgs 4220.00 1 MT 928.40
Water ( including for curing ) 1.20 Kl 103.00 1 Kl 123.60
B.MACHINERY :
Concrete Mixer 10 / 7 cft (0.2 / 0.8 1.00 hour 188.10 1 hour 188.10
cum)capacity
Crew Charges 1.00 hour 306.80 1 hour 306.80
Add MA on crew charges 0.25 306.80 76.70
Needle vibrator 40mm ( petrol ) 1.00 hours 38.20 1 hour 38.20
Crew charges 1.00 hours 220.90 1 hour 220.90
CIVIL DATA : Page-118

S.No./
Item
Sl. No. Description Quantity Unit Rate (Rs.) Per Unit Amount (Rs.)
Code
No.
Add MA on crew charges 0.25 220.90 55.23
C.LABOUR :
1st class mason 0.10 Nos. 630.00 1 Each 63.00
Mazdoor (Unskilled) 1.39 Nos. 525.00 1 Each 729.75
MA @ 25% 0.25 792.75 198.19
Rate for 1 cum 4912.01
Centring & Scaffolding (Hire) 1.00 Cum 67.00 1 Cum 67.00
Centring & Scaffolding (Labour) 1.00 Cum 363.00 1 Cum 363.00
MA @ 25% 0.25 363.00 90.75
5432.76
Overheads & Contractors Profit 0.13615 5432.76 739.67
@13.615%
Rate per 1 cum 6172.43

6 Plain Cement Concrete (1:3:6) nominal mix using 20mm size graded machine crushed hard granite metal
(coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and
conveyance of all materials like cement, fine aggregate(sand), coarse aggregate, water etc. to site, including
sales & other taxes on all materials and including all charges for mixing, laying concrete in position, curing
etc., & lift charges , and overheads & contractors profit for Bed Blocks & Hold Fasts for finished item of work.
(APSS No. 402)
(BLD-CSTN-3-10 & 11)
Unit : 1cum
A.MATERIALS :
HBG 20mm size metal 0.90 Cum 1791.80 1 Cum 1612.62
Sand 0.45 Cum 823.40 1 Cum 370.53
Cement 220.00 Kgs 4220.00 1 MT 928.40
Water ( including for curing ) 1.20 Kl 103.00 1 Kl 123.60
B.MACHINERY :
Concrete Mixer 10 / 7 cft (0.2 / 0.8 1.00 hour 188.10 1 hour 188.10
cum)capacity
Crew Charges 1.00 hour 306.80 1 hour 306.80
Add MA on crew charges 0.25 306.80 76.70
C.LABOUR :
1st class mason 0.10 Nos. 630.00 1 Each 63.00
Mazdoor (Unskilled) 1.39 Nos. 525.00 1 Each 729.75
MA @ 25% 0.25 792.75 198.19
Rate per 1 cum 4597.69

Rate for other Floors FF


Rate as worked out above 4597.69
Hire charges of centring and scaffolding 67.00
Lift charges for scaffolding 363.00
MA @ 25% 90.75
Lift charges ( Page 131 of Std. Data ) 0.00

MA @ 25% 0.00
Rate per 1 cum 5118.44
Overheads & Contractors Profit 696.88
@13.615%
Rate per 1 cum 5815.32

Design mix concrete


CIVIL DATA : Page-119

S.No./
Item
Sl. No. Description Quantity Unit Rate (Rs.) Per Unit Amount (Rs.)
Code
No.
7 Plain Cement Concrete M 20 design mix using WEIGH BATCHER / MIXER, 20mm size hard granite machine
crushed graded metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved
quarry, using a minimum quantity of 330 kgs. of cement per 1 cum of concrete ,and using mixed with integral
cement water proofing powder confirming to IS: 2645-2003 manufactured by reputed manufacturers as
approved by Engineer-in-charge at 0.5 Kg per one bag of cement including cost and conveyance of all
materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site including steel centring,
shuttering, machine mixing, lift charges, laying concrete, vibrating, curing, overheads & contractors profit
etc., complete for finished item of work (APSS No. 402 & 403) for Stairs Base slab/ steps
(BLD-CSTN-3-16)
Unit : 1cum
A.MATERIALS :
Cement 330.00 Kgs 4220.00 1000 Kgs 1392.60
HBG 20mm size metal 0.80 Cum 1791.80 1 Cum 1433.44
Sand 0.40 Cum 823.40 1 Cum 329.36
Water ( including for curing ) 1.20 Kl 103.00 1 Kl 123.60
Integral Cement Waterproofing 3.50 Ltr 205.00 1 Ltr 717.50
Admixture for Concrete Slabs and
mortar plastering works. ( Dosage :
100ml Per bag of 50 Kgs Cement)
Complies with I.S. 2645-2003

B.MACHINERY :
Batching plant 0.50 cum 0.308 hour 233.80 1 hour 72.01
Crew charges 0.308 hour 473.50 1 hour 145.84
Needle vibrator 40mm ( petrol ) 0.308 hours 38.20 1 hour 11.77
Crew charges 0.308 hours 220.90 1 hour 68.04
Add MA on crew charges 0.25 213.88 53.47
C.LABOUR :
1st class mason 0.067 Nos. 630.00 1 Each 42.21
2nd class mason 0.067 Nos. 565.00 1 Each 37.86
Mazdoor (Unskilled) 3.077 Nos. 525.00 1 Each 1615.43
MA @ 25% 0.25 1695.49 423.87
Rate per 1 cum 6466.98

Rate for other Floors FF SF TF 4F


Cost of M 20 design mix 6466.98 6466.98 6466.98 6466.98
Hire charges of centring and scaffolding 0.00 67.00 67.00 67.00
Lift charges for scaffolding 0.00 399.30 435.60 471.90
MA @ 25% 0.00 99.83 108.90 117.98
Lift charges ( Page 131 of Std. Data ) 0.00 169.55 339.10 508.65

MA @ 25% 0.00 42.39 84.77 127.16


Rate per 1 cum 6466.98 7245.04 7502.36 7759.67
Overheads & Contractors Profit 880.48 986.41 1021.45 1056.48
@13.615%
Rate per 1 cum 7347.46 8231.46 8523.80 8816.14

8 Reinforced Cement Concrete M 20 design mix using 12mm size hard granite machine crushed graded metal
(coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry, using a minimum
quantity of 330 kgs. of cement per 1 cum of concrete using WEIGH BATCHER / MIXER including cost and
conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site including
steel centring, shuttering, labour charges such as weigh batching, machine mixing, laying concrete, lift
charges, curing etc., and overheads & contractors profit complete for finished item of work (APSS No. 402 &
403) for platforms and shelves.
CIVIL DATA : Page-120

S.No./
Item
Sl. No. Description Quantity Unit Rate (Rs.) Per Unit Amount (Rs.)
Code
No.
(BLD-CSTN-3-16)
A.MATERIALS :
Cement 330.00 Kgs 4220.00 1000 Kgs 1392.60
12mm HBG graded metal 0.80 Cum 1559.80 1 Cum 1247.84
Sand 0.40 Cum 823.40 1 Cum 329.36
B.LABOUR :
1st class Mason 0.067 Nos 630.00 1 Each 42.21
2nd class Mason 0.133 Nos 565.00 1 Each 75.15
Mazdoor (both men&women) 3.077 Nos 525.00 1 Each 1615.43
MA @ 25% 0.25 1732.78 433.20
C.MACHINERY :
Batching plant 0.50 cum 0.308 hour 233.80 1 hour 72.01
Crew charges 0.308 hour 473.50 1 hour 145.84
Add MA on crew charges 0.25 145.84 36.46
Water(including for curing) 1.20 kl 103.00 1 kl 123.60
Basic cost per 1cum 5513.68

a) 50mm thick platforms :


Cost of M 20 design mix 0.05 cum 5513.68 1 cum 275.68

Rate for other Floors FF SF TF 4F


Rate as worked out above 275.68 275.68 275.68 275.68
Hire charges of centring and scaffolding 82.50 82.50 82.50 82.50
(50% of roof slab)
Lift charges for scaffolding 93.00 102.50 111.50 0.00
MA @ 25% 23.25 25.63 27.88 0.00
Lift charges ( Page 131 of Std. Data ) 0.00 8.66 17.33 25.99

MA @ 25% 0.00 2.17 4.33 6.50


Rate per 1 sqm 474.43 497.14 519.22 390.67
Overheads & Contractors Profit 64.59 67.69 70.69 53.19
@13.615%
Rate per 1 sqm 539.03 564.82 589.91 443.86

b) 25mm thick shelves :


Cost of M 20 design mix 0.025 cum 5513.68 1 cum 137.84
Rate per 1sqm 137.84

Rate for other Floors FF SF TF 4F


Rate as worked out above 137.84 137.84 137.84 137.84
Hire charges of centring and scaffolding 41.25 41.25 41.25 41.25
(25% of roof slab)
Lift charges for scaffolding 46.50 51.25 55.75 0.00
MA @ 25% 11.63 12.81 13.94 0.00
Lift charges ( Page 131 of Std. Data ) 0.00 4.33 8.66 13.00

MA @ 25% 0.00 1.08 2.17 3.25


Rate per 1 sqm 237.22 248.57 259.61 195.34
Overheads & Contractors Profit 32.30 33.84 35.35 26.60
@13.615%
Rate per 1 sqm 269.51 282.41 294.96 221.93
CIVIL DATA : Page-121

S.No./
Item
Sl. No. Description Quantity Unit Rate (Rs.) Per Unit Amount (Rs.)
Code
No.
Nominal Mix
9 Supply and placing of the V.R.C.C Nominal Mix Concrete M 20 grade corresponding to IS 456 with minimum
cement content of 350 kgs per 1 cum of concrete using CONCRETE MIXER with 20mm size HBG graded
machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from
approved quarry and including cost and conveyance of all materials like cement, fine aggregate (sand) coarse
aggregate, water, etc., to site and sales & other taxes on all materials , centring using Steel scaffolding pipes ,
jack props , Waller’s , Foot plates , brackets , steel centring plates etc., including all operational, incidental and
labour charges such as machine mixing, laying concrete, vibrator, , curing etc., and overheads & contractors
profit complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)

(BLD-CSTN-3-13-A)
FOUNDATIONS , PLINTH , PEDESTALS ( Below Plinth)
A.MATERIALS :
Cement 350.00 Kgs 4220.00 1000 Kgs 1477.00
20mm HBG graded metal 0.90 Cum 1791.80 1 Cum 1612.62
Sand 0.45 Cum 823.40 1 Cum 370.53
B.LABOUR :
1st class Mason 0.133 Nos 630.00 1 Each 83.79
2nd class Mason 0.267 Nos 565.00 1 Each 150.86
Mazdoor (both men&women) 3.60 Nos 525.00 1 Each 1890.00
MA @ 25% 0.25 2124.65 531.16
C.MACHINERY :
Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) 1.000 hours 188.10 1 hour 188.10
capacity
Crew charges 1.000 hours 306.80 1 hour 306.80
Needle vibrator 40mm ( petrol ) 1.000 hours 38.20 1 hour 38.20
Crew charges 1.000 hours 220.90 1 hour 220.90
Add MA on crew charges 0.25 527.70 a 131.93
Water(including for curing) 1.20 kl 103.00 1 kl 123.60
Rate per 1 cum 7125.48

* a Footings
Rate for Cost of M 20 Nominal mix 1.00 Cum 7125.48 1 Cum 7125.48
Hire charges of centring and scaffolding 1.00 Cum 301.00 1 Cum 301.00
Labour charges 1.00 Cum 672.00 1 Cum 672.00
MA @ 25% 0.25 672.00 168.00
8266.48
Overheads & Contractors Profit 0.13615 8266.48 1125.48
@13.615%
Rate per 1 cum 9391.96

* a.1) 0.450mm thick Retaining wall


Nominal Mix Concrete M 20 grade 0.45 cum 7125.48 1.00 cum 3206.47

Rate for other Floors FF SF


Rate as above 3206.47 3206.47
PH-31-B Hire charges of centring and scaffolding 0.00 0.00

Labour charges 0.00 0.00


MA @ 25% 0.00 0.00
Lift charges of materials(Manual) 0.00 95.61
MA @ 25% 0.00 23.90
Rate per 1 sqm 3206.47 3325.98
CIVIL DATA : Page-122

S.No./
Item
Sl. No. Description Quantity Unit Rate (Rs.) Per Unit Amount (Rs.)
Code
No.
Overheads & Contractors Profit 436.56 452.83
@13.615%
Rate per 1 sqm 3643.03 3778.81

b Column pedestals
Rate for Cost of M 20 Nominal mix 1.00 Cum 7125.48 1 Cum 7125.48
Hire charges of centring and scaffolding 1.00 Cum 343.00 1 Cum 343.00
Labour charges 1.00 Cum 1069.00 1 Cum 1069.00
MA @ 25% 0.25 1069.00 267.25
8804.73
Overheads & Contractors Profit 0.13615 8804.73 1198.76
@13.615%
Rate per 1 cum 10003.50

c Plinth Beams
Rate for Cost of M 20 Nominal mix 1.00 Cum 7125.48 1 Cum 7125.48
Hire charges of centring and scaffolding 1.00 Cum 1453.00 1 Cum 1453.00
Labour charges 1.00 Cum 1620.00 1 Cum 1620.00
MA @ 25% 0.25 1620.00 405.00
10603.48
Overheads & Contractors Profit 0.13615 10603.48 1443.66
@13.615%
Rate per 1 cum 12047.15

d Base slab 450 mm thick for Sump / Septic tank :


Rate for Cost of M 20 Nominal mix 0.45 Cum 7125.48 1 Cum 3206.47
Hire charges of centring and scaffolding 0.45 Cum 67.00 1 Cum 30.15
Labour charges 0.45 Cum 363.00 1 Cum 163.35
MA @ 25% 0.25 163.35 40.84
3440.80
Overheads & Contractors Profit 0.13615 3440.80 468.47
@13.615%
Rate per 1 sqm 3909.27

e Base slab150mm thick for Sump / Septic tank :


Rate for Cost of M 20 Nominal mix 0.15 Cum 7125.48 1 Cum 1068.82
Hire charges of centring and scaffolding 0.15 Cum 67.00 1 Cum 10.05
Labour charges 0.15 Cum 363.00 1 Cum 54.45
MA @ 25% 0.25 54.45 13.61
1146.93
Overheads & Contractors Profit 0.13615 1146.93 156.16
@13.615%
Rate per 1 sqm 1303.09

f Base slab 100mm thick for Sump / Septic tank :


Rate for Cost of M 20 Nominal mix 0.10 Cum 7125.48 1 Cum 712.55
Hire charges of centring and scaffolding 0.10 Cum 67.00 1 Cum 6.70
Labour charges 0.10 Cum 363.00 1 Cum 36.30
MA @ 25% 0.25 36.30 9.08
764.62
Overheads & Contractors Profit 0.13615 764.62 104.10
@13.615%
Rate per 1 sqm 868.73
CIVIL DATA : Page-123

S.No./
Item
Sl. No. Description Quantity Unit Rate (Rs.) Per Unit Amount (Rs.)
Code
No.
10 Supply and placing of the V.R.C.C Nominal Mix Concrete M 20 grade corresponding to IS 456 with minimum
cement content of 350 kgs per 1 cum of concrete using CONCRETE MIXER with 20mm size HBG graded
machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from
approved quarry and,including cost and conveyance of all materials like cement, fine aggregate (sand) coarse
aggregate, water etc., to site and sales & other taxes on all materials, centring using Casurina Ballies,
Bamboos, Wooden Reapers, Runners, Wood Posts, Wall Plates etc., including all operational, incidental and
labour charges such as machine mixing, lifting of concrete manually, laying concrete, vibrator, , curing ,
overheads & contractors profit etc., complete but excluding cost of steel and its fabrication charges for
finished item of work (APSS No. 402)

(BLD-CSTN-3-13-B)
COLUMNS, LINTELS, WATER TANKS, RCC WALL IN BUILDINGS:
A.MATERIALS :
Cement 350.00 Kgs 4220.00 1000 Kgs 1477.00
20mm HBG graded metal 0.90 Cum 1791.80 1 Cum 1612.62
Sand 0.45 Cum 823.40 1 Cum 370.53
B.LABOUR :
1st class Mason 0.167 Nos 630.00 1 Each 105.21
2nd class Mason 0.167 Nos 565.00 1 Each 94.36
Mazdoor (both men&women) 4.70 Nos 525.00 1 Each 2467.50
MA @ 25% 0.25 2667.07 666.77
C.MACHINERY :
Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) 1.000 hours 188.10 1 hour 188.10
capacity
Crew charges 1.000 hours 306.80 1 hour 306.80
Needle vibrator 40mm ( petrol ) 1.000 hours 38.20 1 hour 38.20
Crew charges 1.000 hours 220.90 1 hour 220.90
Add MA on crew charges 0.25 527.70 131.93
Water(including for curing) 1.20 kl 103.00 1 kl 123.60
Rate per 1 cum 7803.51

a Pile Column
Rate per 1 sqm 1.00 Cum 7803.51 1 Cum 7803.51
Overheads & Contractors Profit 0.13615 7803.51 1062.45
@13.615%
Rate per 1 cum 8865.95
b Columns
Rate as above 7803.51
Hire charges of centring and scaffolding 249.00
Labour charges 1871.00
MA @ 25% 467.75
Lift charges of materials(Manual) 0.00
MA @ 25% 0.00
Rate per 1 cum 10391.26
Overheads & Contractors Profit 1414.77
@13.615%
Rate per 1 cum 11806.03

b) Lintels :
Rate for other Floors FF SF TF
Rate as above 7803.51 7803.51 7803.51
Hire charges of centring and scaffolding 826.00 826.00 826.00
Labour charges 1332.00 1465.00 1598.00
MA @ 25% 333.00 366.25 399.50
Lift charges of materials(Manual) 0.00 266.71 533.41
CIVIL DATA : Page-124

S.No./
Item
Sl. No. Description Quantity Unit Rate (Rs.) Per Unit Amount (Rs.)
Code
No.
MA @ 25% 0.00 66.68 133.35
Rate per 1 cum 10294.51 10794.14 11293.77
Overheads & Contractors Profit 1401.60 1469.62 1537.65
@13.615%
Rate per 1 cum 11696.11 12263.76 12831.42

c) WATER TANKS, SUMP, LIFT :


WATER TANKS 150 mm thick side walls

Rate for Cost of M 20 Nominal mix 0.15 cum 7803.51 1.00 cum 1170.53

Rate for other Floors FF SF TF


Rate as above 1170.53 1170.53 1170.53
Hire charges of centring and scaffolding 0.00 0.00 0.00
Lift charges of materials(Manual) 0.00 40.01 80.01
MA @ 25% 0.00 10.00 20.00
Rate per 1 sqm 1170.53 1220.53 1270.54
Overheads & Contractors Profit 159.37 166.18 172.98
@13.615%
Rate per 1 sqm 1329.90 1386.71 1443.52

d) 230 mm thick side walls


Rate for Cost of M 20 Nominal mix 0.52 cum 7803.51 1.00 cum 4057.82

Rate for other Floors FF


Rate as above 4057.82
Hire charges of centring and scaffolding 0.00
Labour charges 0.00
MA @ 25% 0.00
Lift charges of materials(Manual) 0.00
MA @ 25% 0.00
Rate per 1 sqm 4057.82
Overheads & Contractors Profit 552.47
@13.615%
Rate per 1 sqm 4610.29

11 Supply and placing of the V.R.C.C Nominal Mix Concrete M 20 grade corresponding to IS 456 with minimum
cement content of 350 kgs per 1 cum of concrete using CONCRETE MIXER with 20mm size HBG graded
machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8)
from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand)
coarse aggregate, water etc., to site and sales & other taxes on all materials , centring using Casurina Ballies
, Bamboos , Wooden Reapers , Runners , Wood Posts , Wall Plates etc., including all operational, incidental
and labour charges such as machine mixing, lifting of concrete manually, laying concrete, vibrator, , curing ,
overheads & contractors profit etc., complete but excluding cost of steel and its fabrication charges for
finished item of work (APSS No. 402)

(BLD-CSTN-3-13-C)
RCC SLABS , BEAMS :
A.MATERIALS :

Cement 350.00 Kgs 4220.00 1000 Kgs 1477.00


20mm HBG graded metal 0.90 Cum 1791.80 1 Cum 1612.62
CIVIL DATA : Page-125

S.No./
Item
Sl. No. Description Quantity Unit Rate (Rs.) Per Unit Amount (Rs.)
Code
No.
Sand 0.45 Cum 823.40 1 Cum 370.53
B.LABOUR :
1st class Mason 0.067 Nos 630.00 1 Each 42.21
2nd class Mason 0.133 Nos 565.00 1 Each 75.15
Mazdoor (both men&women) 2.500 Nos 525.00 1 Each 1312.50
MA @ 25% 0.25 1429.86 357.46
C.MACHINERY :
Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) 0.267 hours 188.10 1 hour 50.22
capacity
Crew charges 0.267 hours 306.80 1 hour 81.92
Needle vibrator 40mm ( petrol ) 0.267 hours 38.20 1 hour 10.20
Crew charges 0.267 hours 220.90 1 hour 58.98
Add MA on crew charges 0.25 140.90 35.22
Water(including for curing) 1.20 kl 103.00 1 kl 123.60
Rate per 1 cum 5607.61

A) Beam's
un supported height up to 3.66 m
Rate for other Floors FF SF TF
Rate as above 5607.61 5607.61 5607.61
Hire charges of centring and scaffolding 1458.00 1458.00 1458.00
Labour , lift charges for scaffolding 1569.00 1726.00 1883.00

MA @ 25% 392.25 431.50 470.75


Lift charges of materials(Manual) 0.00 142.99 285.97
MA @ 25% 0.00 35.75 71.49
Rate for 1 cum 9026.86 9401.84 9776.82
Overheads & Contractors Profit 1229.01 1280.06 1331.11
@13.615%
Rate per 1 cum 10255.87 10681.90 11107.93

B) RCC SLABS :
a) Roof Slabs 115mm thick :
un supported height up to 3.66 m
Rate for Cost of M 20 Nominal mix 0.115 Cum 5607.61 1 Cum 644.88

Rate for other Floors FF SF TF


Rate as above 644.88 644.88 644.88
Hire charges of centring and scaffolding 165.00 165.00 165.00
Labour , lift charges for scaffolding 186.00 205.00 223.00

MA @ 25% 46.50 51.25 55.75


Lift charges of materials(Manual) 0.00 16.44 32.89
MA @ 25% 0.00 4.11 8.22
Rate per 1 sqm 1042.38 1086.68 1129.73
Overheads & Contractors Profit 141.92 147.95 153.81
@13.615%
Rate per 1 sqm 1184.30 1234.63 1283.54

b) Roof Slabs 125mm thick :


un supported height up to 3.66 m
Rate for Cost of M 20 Nominal mix 0.125 Cum 5607.61 1 Cum 700.95
CIVIL DATA : Page-126

S.No./
Item
Sl. No. Description Quantity Unit Rate (Rs.) Per Unit Amount (Rs.)
Code
No.
Rate for other Floors FF SF TF
Rate as above 700.95 700.95 700.95
Hire charges of centring and scaffolding 165.00 165.00 165.00
Labour , lift charges for scaffolding 186.00 205.00 223.00

MA @ 25% 46.50 51.25 55.75


Lift charges of materials(Manual) 0.00 17.87 35.75
MA @ 25% 0.00 4.47 8.94
Rate per 1 sqm 1098.45 1144.54 1189.38
Overheads & Contractors Profit 149.55 155.83 161.93
@13.615%
Rate per 1 sqm 1248.00 1300.37 1351.31

c) Roof Slabs 150mm thick :


Rate for Cost of M 20 Nominal mix 0.15 Cum 5607.61 1 Cum 841.14

un supported height up to 3.66 m


Rate for other Floors FF SF TF
Rate as above 841.14 841.14 841.14
Hire charges of centring and scaffolding 165.00 165.00 165.00
Lift charges for scaffolding 186.00 205.00 223.00
MA @ 25% 46.50 51.25 55.75
Lift charges of materials(Manual) 0.00 21.45 42.90
MA @ 25% 0.00 5.36 10.72
Rate per 1 sqm 1238.64 1289.20 1338.51
Overheads & Contractors Profit 168.64 175.52 182.24
@13.615%
Rate per 1 sqm 1407.28 1464.72 1520.75

d) Roof Slabs 175mm thick :


Rate for Cost of M 20 Nominal mix 0.175 Cum 5607.61 1 Cum 981.33

for un supported height of 3.66 m


Rate for other Floors FF SF TF
Rate as above 981.33 981.33 981.33
Hire charges of centring and scaffolding 170.00 170.00 170.00
Labour , lift charges for scaffolding 193.00 212.00 232.00

MA @ 25% 48.25 53.00 58.00


Lift charges of materials(Manual) 0.00 25.02 50.04
MA @ 25% 0.00 6.26 12.51
Rate per 1 sqm 1392.58 1447.61 1503.89
Overheads & Contractors Profit 189.6 197.09 204.75
@13.615%
Rate per 1 sqm 1582.18 1644.70 1708.64

e) Base Slabs 300 mm thick :


Rate for Cost of M 20 Nominal mix 0.30 Cum 5607.61 1 Cum 1682.28

for un supported height of 3.66 m


Rate for other Floors FF SF TF
Rate as above 1682.28 1682.28 1682.28
Hire charges of centring and scaffolding 170.00 170.00 170.00
CIVIL DATA : Page-127

S.No./
Item
Sl. No. Description Quantity Unit Rate (Rs.) Per Unit Amount (Rs.)
Code
No.
Labour , lift charges for scaffolding 193.00 212.00 232.00

MA @ 25% 48.25 53.00 58.00


Lift charges of materials(Manual) 0.00 42.90 85.79
MA @ 25% 0.00 10.72 21.45
Rate per 1 sqm 2093.53 2170.90 2249.52
Overheads & Contractors Profit 285.03 295.57 306.27
@13.615%
Rate per 1 sqm 2378.56 2466.47 2555.79

a Foundation/Base Slabs
Rate for Cost of M 20 Nominal mix 1.00 Cum 5607.61 1 Cum 5607.61
Hire charges of centring and scaffolding 1.00 Cum 301.00 1 Cum 301.00
Labour charges 1.00 Cum 672.00 1 Cum 672.00
MA @ 25% 0.25 672.00 168.00
6748.61
Overheads & Contractors Profit 0.13615 6748.61 918.82
@13.615%
Rate per 1 cum 7667.43

d) 0.23mm thickside wlls


Rate for Cost of M 20 Nominal mix 0.45 cum 5607.61 1.00 cum 2523.42

Rate for other Floors FF SF


Rate as above 2523.42 2523.42
PH-31-B Hire charges of centring and scaffolding 0.00 0.00

Labour charges 0.00 0.00


MA @ 25% 0.00 0.00
Lift charges of materials(Manual) 0.00 64.34
MA @ 25% 0.00 16.09
Rate per 1 sqm 2523.42 2603.86
Overheads & Contractors Profit 343.56 354.52
@13.615%
Rate per 1 sqm 2866.98 2958.38

#REF! Supply and placing of the V.R.C.C Nominal Mix Concrete M 20 grade corresponding to IS 456 with minimum
cement content of 350 kgs per 1 cum of concrete using CONCRETE MIXER with 20mm size HBG graded
machine crushed hard granite metal(coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from
approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse
aggregate, water etc., to site and including sales & other taxes on all materials , centring using Casurina Ballies
, Bamboos , Wooden Reapers , Runners , Wood Posts , Wall Plates etc., for 60cm wide sun-shades 7.5cm
thick at fixed end and 5cm thick at free end with an average thickness of 6.25cm including all operational,
incidental and labour charges such as , machine mixing, lifting of concrete manually, laying concrete, curing,
overheads & contractors profit complete etc., but excluding cost of steel and its fabrication charges for
finished item of work (APSS No. 402, 403 & 903)

(BLD-CSTN-3-13-C)
A.MATERIALS :
Cement 350.00 Kgs 4220.00 1000 Kgs 1477.00
20mm HBG graded metal 0.90 Cum 1791.80 1 Cum 1612.62
Sand 0.45 Cum 823.40 1 Cum 370.53
B.LABOUR :
CIVIL DATA : Page-128

S.No./
Item
Sl. No. Description Quantity Unit Rate (Rs.) Per Unit Amount (Rs.)
Code
No.
1st class Mason 0.067 Nos 630.00 1 Each 42.21
2nd class Mason 0.133 Nos 565.00 1 Each 75.15
Mazdoor (both men&women) 2.500 Nos 525.00 1 Each 1312.50
MA @ 25% 0.25 1429.86 357.46

C.MACHINERY :
Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) 0.267 hours 188.10 1 hour 50.22
capacity
Crew charges 0.267 hours 306.80 1 hour 81.92
Add MA on crew charges 0.25 81.92 20.48
Water(including for curing) 1.20 kl 103.00 1 kl 123.60
Rate per 1 cum 5523.69

Cost of RCC M 20 Nominal Mix Concrete 0.0375 cum 5523.69 1 cum 207.14

Rate for other Floors FF


Rate as above 207.14
Hire charges of centring and scaffolding 97.80
Labour , lift charges for scaffolding 122.40
MA @ 25% 30.60
Lift charges of materials(Manual) 0.00
MA @ 25% 0.00
Rate per 1 RM 457.94
Overheads & Contractors Profit 62.35
@13.615%
Rate per 1 RM 520.29

#REF! Plain Cement Concrete M 20 Nominal mix using Concrete MIXER, 20mm size hard granite machine crushed
graded metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry,
using a minimum quantity of 350 kgs. of cement per 1 cum of concrete , including cost and conveyance of all
materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site including steel centring,
shuttering, machine mixing, lift charges, laying concrete, vibrating, curing, overheads & contractors profit
etc., complete for finished item of work (APSS No. 402 & 403)

(BLD-CSTN-3-13-C)
Unit : 1cum
A.MATERIALS :
HBG 20mm size metal 0.90 Cum 1791.80 1 Cum 1612.62
Sand 0.45 Cum 823.40 1 Cum 370.53
Cement 350.00 Kgs 4220.00 1000 Kgs 1477.00
Water ( including for curing ) 1.20 Kl 103.00 1 Kl 123.60
B.MACHINERY :
Concrete Mixer 10 / 7 cft (0.2 / 0.8 0.267 hour 188.10 1 hour 50.22
cum)capacity
Crew charges 0.267 hour 306.80 1 hour 81.92
Needle vibrator 40mm ( petrol ) 0.267 hours 38.20 1 hour 10.20
Crew charges 0.267 hours 220.90 1 hour 58.98
MA @ 25% 0.25 140.90 35.22
C.LABOUR :
1st class mason 0.067 Nos. 630.00 1 Each 42.21
2nd class mason 0.133 Nos. 565.00 1 Each 75.15
Mazdoor (Unskilled) 2.500 Nos. 525.00 1 Each 1312.50
CIVIL DATA : Page-129

S.No./
Item
Sl. No. Description Quantity Unit Rate (Rs.) Per Unit Amount (Rs.)
Code
No.
MA @ 25% 0.25 1429.86 357.46
Rate per 1 cum 5607.61

Rate for other Floors FF


Cost of M 20 design mix 5607.61
Hire charges of centring and scaffolding 0.00
Lift charges for scaffolding 0.00
MA @ 25% 0.00
Lift charges ( Page 131 of Std. Data ) 0.00

MA @ 25% 0.00
Rate per 1 cum 5607.61
Overheads & Contractors Profit 763.48
@13.615%
Rate per 1 cum 6371.09

#REF! Reinforced Cement Concrete Nominal Mix M 20 grade corresponding to IS 456 with minimum cement
content of 350 kgs per 1 cum of concrete using CONCRETE MIXER with using 12mm size hard granite
machine crushed graded metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from
approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concrete including cost and
conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site including
steel centring, shuttering, labour charges such as ,Concrete machine mixing, laying concrete, lift charges,
curing etc., and overheads & contractors profit complete for finished item of work (APSS No. 402 & 403) for
platforms and shelves.

(BLD-CSTN-3-13-C)
A.MATERIALS :
Cement 350.00 Kgs 4220.00 1000 Kgs 1477.00
12mm HBG graded metal 0.90 Cum 1559.80 1 Cum 1403.82
Sand 0.45 Cum 823.40 1 Cum 370.53
B.LABOUR :
1st class Mason 0.067 Nos 630.00 1 Each 42.21
2nd class Mason 0.133 Nos 565.00 1 Each 75.15
Mazdoor (both men&women) 2.500 Nos 525.00 1 Each 1312.50
MA @ 25% 0.25 1429.86 357.46
C.MACHINERY :
Concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) 0.267 hours 188.10 1 hours 50.22
capacity
Crew charges 0.267 hours 306.80 1 hours 81.92
Add MA on crew charges 0.25 81.92 1 20.48
Water(including for curing) 1.20 kl 103.00 123.60
Rate per 1 cum 5314.89
a) 50mm thick platforms :
Cost of M 20 design mix 0.05 cum 5314.89 1 cum 265.74

Rate for other Floors FF SF TF


Rate as worked out above 265.74 265.74 265.74
Hire charges of centring and scaffolding 82.50 82.50 82.50
(50% of roof slab)
Lift charges for scaffolding 93.00 102.50 111.50
MA @ 25% 23.25 25.63 27.88
Lift charges ( Page 131 of Std. Data ) 0.00 7.15 14.30
CIVIL DATA : Page-130

S.No./
Item
Sl. No. Description Quantity Unit Rate (Rs.) Per Unit Amount (Rs.)
Code
No.
MA @ 25% 0.00 1.79 3.57
Rate per 1 sqm 464.49 485.31 505.49
Overheads & Contractors Profit 63.24 66.07 68.82
@13.615%
Rate per 1 sqm 527.74 551.38 574.32

b) 25mm thick shelves :


Cost of M 20 design mix 0.025 cum 5314.89 1 cum 132.87
Rate per 1sqm 132.87

Rate for other Floors FF SF TF


Rate as worked out above 132.87 132.87 132.87
Hire charges of centring and scaffolding 41.25 41.25 41.25
(25% of roof slab)
Lift charges for scaffolding 46.50 51.25 55.75
MA @ 25% 11.63 12.81 13.94
Lift charges ( Page 131 of Std. Data ) 0.00 3.57 7.15

MA @ 25% 0.00 0.89 1.79


Rate per 1 sqm 232.25 242.65 252.75
Overheads & Contractors Profit 31.62 33.04 34.41
@13.615%
Rate per 1 sqm 263.87 275.69 287.16

Brick masonry
#REF! Brick masonry for panel walls in superstructure with CM (1:8) prop: (Cement : Screened sand) using common
burnt clay bricks of class as per Table- I of IS:1077-1992, Non- Modular or traditional size 23 x 11 x 7 cms from
approved source having minimum crushing strength of 40 Kg/Sqcm. including cost and conveyance of all
materials like cement, screened sand, bricks, water etc., to site, including sales & other taxes on all materials
and such as labour charges, like mixing cement mortar, scaffolding charges, constructing masonry, lift
charges, curing, etc., and overheads & contractors profit complete for finished item of work. (APSS No. 501 &
504).

(BLD-CSTN-5-5)
Unit : 1cum
A.MATERIALS :
Cement 36.00 Kgs 4220.00 1000 Kgs 151.92
Common burnt clay bricks 23x11x7cms 512 Nos 7500.00 1000 Nos 3840.00
Fine aggregate ( Sand ) 0.20 cu.m. 918.40 1 cu.m. 183.68
B.LABOUR :
1st class mason 0.24 Nos. 630.00 1 Each 151.20
2nd class mason 0.56 Nos. 565.00 1 Each 316.40
Mazdoor (Unskilled) 1.89 Nos. 525.00 1 Each 992.25
MA @ 25% 0.25 1459.85 364.96
water charges @ 1% 0.01 6000.41 60.00
Rate per 1 cum 6060.42

a Up to basement
Rate as worked out above 1.00 Cum 6060.42 1 Cum 6060.42
Overheads & Contractors Profit 0.13615 6060.42 825.13
@13.615%
Rate per 1 cum 6885.54
CIVIL DATA : Page-131

S.No./
Item
Sl. No. Description Quantity Unit Rate (Rs.) Per Unit Amount (Rs.)
Code
No.

b) Superstructure :
Rate for other Floors FF SF TF
Rate as worked out above 6060.42 6060.42 6060.42
Hire charges for Access Scaffolding 46.87 46.87 46.87

Labour charges for scaffolding 368.17 526.87 685.74


MA @ 25% 92.04 131.72 171.44
Lift charges ( Page 131 of Std. Data ) 0.00 145.99 291.97

MA @ 25% 0.00 36.50 72.99


Rate per 1 cum 6567.50 6948.36 7329.42
Overheads & Contractors Profit 894.16 946.02 997.9
@13.615%
Rate per 1 cum 7461.66 7894.38 8327.32
Say 7462 7894 8327

#REF! Brick Masonry for super-structure on ground floor (11.0 cm thick) in CM (1:4) prop. (Cement : Screened
sand) using common burnt clay bricks of class as per Table- I of IS:1077-1992, Non- Modular or traditional size
23 x 11 x 7 cms from approved source having minimum crushing strength of 40 Kg/Sq.cm and including cost
and conveyance of all materials like cement, sand, bricks, water etc., to site, including sales & other taxes on
all materials, all operational, incidental charges such as labour charges for mixing cement mortar, scaffolding
charges, constructing masonry, lift charges, curing, etc., and overheads & contractors profit complete for
finished item of work.

(BLD-CSTN-5-11)
Unit : 10 sqm
A.MATERIALS :
Common burnt clay bricks 23x11x7cms Nos. 565.00 7500.00 1000 565.00 4237.50

Cement Kgs 79.20 4220.00 1000 Kgs 334.22


Fine aggregate (sand) Cum 0.22 918.40 1 Cum 202.05
B.LABOUR :
1st class mason day 0.6 630.00 1 day 378
2nd class mason day 0.6 565.00 1 day 339
Mazdoor (Unskilled) day 2.75 525.00 1 day 1443.75
MA @ 25% 0.25 2160.75 540.1875
Add water charges 1% 0.01 7474.71 74.75
D.Grand Total for 10 sqm 7549.46
Overheads&Contractors Profit 0.13615 7549.46 1027.86
@13.615%
Rate per 10 Sqm 8577.32
Rate per 1 Sqm 857.73

#REF! Reinforced Brick Masonry for partition walls (11.0 cm thick) in CM (1:4) prop. (Cement : Screened sand)
using common burnt clay bricks of class as per Table- I of IS:1077-1992, Non- Modular or traditional size 23
x 11 x 7 cms from approved source having minimum crushing strength of 40 Kg/Sq.cm and placing 2 Nos. of
6mm M.S plain rods in every third layer with free ends of the reinforcement pegged into mortar joints of main
brick walls where applicable including cost and conveyance of all materials like cement, steel, sand, bricks,
water etc., to site, including sales & other taxes on all materials, all operational, incidental charges such as
labour charges for mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing, etc.,
and overheads & contractors profit but excluding cost of steel and its fabrication charges complete for
finished item of work. (APSS No. of 501 & 509)
(BLD-CSTN-5-12)
Unit - 10sqm
A.MATERIALS :
CIVIL DATA : Page-132

S.No./
Item
Sl. No. Description Quantity Unit Rate (Rs.) Per Unit Amount (Rs.)
Code
No.
Common burnt clay bricks 23x11x7cms 565 Nos. 7500.00 1000 Nos. 4237.50
Cement 79.20 Kgs 4220.00 1000 Kgs 334.22
Fine aggregate ( Sand ) 0.22 cu.m. 918.40 1 cu.m. 202.05
B.LABOUR :
1st class mason 0.60 Nos. 630.00 1 Each 378.00
2nd class mason 0.60 Nos. 565.00 1 Each 339.00
Mazdoor (Unskilled) 2.75 Nos. 525.00 1 Each 1443.75
MA @ 25% 0.25 2160.75 540.19
water charges @ 1% 0.01 7474.71 74.75
Rate per 10 sqm 7549.46
Rate per 1 sqm 754.95

Rate for other Floors FF SF TF


Rate as worked out above 754.95 754.95 754.95
Hire charges for Access Scaffolding 10.78 10.78 10.78

Labour charges for scaffolding 84.68 121.18 157.72


MA @ 25% 21.17 30.30 39.43
Lift charges ( Page 131 of Std. Data ) 0.00 21.61 43.22

MA @ 25% 0.00 5.40 10.81


Rate per 1 sqm 871.58 944.22 1016.91
Overheads & Contractors Profit 118.67 128.56 138.45
@13.615%
Rate per 1 sqm 990.25 1072.78 1155.36

#REF! Masonry work in CM(1:6) prop (Cement : Screened sand) in superstructure with fly ash cement / lime solid
blocks of size 290mm x 225mm x 140mm from approved source having minimum crushing strength of 50
Kg/Sqcm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, including
sales & other taxes on all materials and such as labour charges, like mixing cement mortar, scaffolding
charges, constructing masonry, lift charges, curing, overheads and contractor profit etc., complete for finished
item of work. (APSS No. 501 & 504).
(BLD-CSTN-5-17)
Unit = 1 Cum
A.MATERIALS
No of blocks required for 110 Nos 30000.00 1000 Nos 3300.00
1 Cum of Masonry
Cement 24.00 Kgs 4220.00 1000 Kgs 101.28
Fine aggregate ( Sand ) 0.10 cu.m. 918.40 1 cu.m. 91.84
B .LABOUR
Mason 1st class 0.42 Nos. 630.00 1 Each 264.60
Mason 2nd class 0.92 Nos. 565.00 1 Each 519.80
Man Mazdoor 0.70 Nos. 525.00 1 Each 367.50
Woman Mazdoor 2.10 Nos. 525.00 1 Each 1102.50
MA @ 25% 0.25 2254.40 563.60
water charges @ 1% 0.01 6311.12 63.11
Rate per 1 cum 6374.23

a) Rate for Foundation , Basement , Compound wall


Rate as above 1.00 cum 6374.23 1 cum 6374.23
Overheads & Contractors Profit 0.13615 6374.23 867.85
@13.615%
Rate per 1 cum 7242.08
CIVIL DATA : Page-133

S.No./
Item
Sl. No. Description Quantity Unit Rate (Rs.) Per Unit Amount (Rs.)
Code
No.

b) Superstructure :
Rate for other Floors FF SF TF
Rate as worked out above 6374.23 6374.23 6374.23
Hire charges for Access Scaffolding 47.91 47.91 47.91

Labour charges for scaffolding 376.36 538.58 700.98


MA @ 25% 94.09 134.65 175.25
Lift charges ( Page 131 of Std. Data ) 0.00 225.44 450.88

MA @ 25% 0.00 56.36 112.72


6892.59 7377.17 7861.97
Overheads & Contractors Profit 938.43 1004.40 1070.41
@13.615%
Rate per 1 cum 7831.02 8381.57 8932.38

#REF! Reinforced Masonry for partition walls (100 mm thick) in CM (1:4) prop. (Cement : Screened sand) using fly
ash cement / lime solid blocks of size 290mm x 100mm x 140mm having minimum compressive strength of
50 Kg/Sq.cm and placing 2 Nos. of 6mm M.S plain rods in every third layer with free ends of the
reinforcement pegged into mortar joints of main brick walls where applicable including cost and conveyance
of all materials like cement, steel, sand, bricks, water etc., to site, including sales & other taxes on all
materials, all operational, incidental charges such as labour charges for mixing cement mortar, scaffolding
charges, constructing masonry, lift charges, curing, etc., and overheads & contractors profit but excluding
cost of steel and its fabrication charges complete for finished item of work. (APSS No. of 509)
(BLD-CSTN-5-12)
Unit - 10sqm
A.MATERIALS :
Fly ash lime solid blocks 247 Nos. 14000.00 1000 Nos. 3458.00
Cement 36.00 Kgs 4220.00 1000 Kgs 151.92
Fine aggregate ( Sand ) 0.10 cu.m. 918.40 1 cu.m. 91.84
B.LABOUR :
1st class mason 0.60 Nos. 630.00 1 Each 378.00
2nd class mason 0.60 Nos. 565.00 1 Each 339.00
Mazdoor (Unskilled) 2.75 Nos. 525.00 1 Each 1443.75
MA @ 25% 0.25 2160.75 540.19
water charges @ 1% 0.01 6402.70 64.03
Rate per 10 sqm 6466.72
Rate per 1 sqm 646.67

Internal walls :
Rate for other Floors FF SF TF
Rate as worked out above 646.67 646.67 646.67
Hire charges for Access Scaffolding 10.78 10.78 10.78

Labour charges for scaffolding 84.68 121.18 157.72


MA @ 25% 21.17 30.30 39.43
Lift charges ( Page 131 of Std. Data ) 0.00 21.61 43.22

MA @ 25% 0.00 5.40 10.81


Rate per 1 sqm 763.30 835.94 908.62
Overheads & Contractors Profit 103.92 113.81 123.71
@13.615%
Rate per 1 sqm 867.22 949.75 1032.33
CIVIL DATA : Page-134

S.No./
Item
Sl. No. Description Quantity Unit Rate (Rs.) Per Unit Amount (Rs.)
Code
No.

Steel work's
14 Providing High Yield Strength Deformed (HYSD)/TMT (Fe 500 grade as per IS 1786-1979) of
different diameters for RCC works , including labour charges for straightening, cutting, bending to
required sizes and shapes, placing in position with cover blocks of approved materials and size and
tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per
approved designs and drawings, including cost and conveyance of steel bars, including all wastages
such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire,
cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in
position, tying including sales and other taxes on all materials etc. ,and overheads & contractors
profit complete for finished item of work.( APSS No.126)

(BLD-CSTN-4.2)& Amendment in SoR 2011-12 page No. 392


Unit - 1 MT
a) Material
HYSD bars including 5% for overlaps and 1.05 MT 63000.00 1 MT 66150.00
wastage
Binding wire 6.00 Kgs 70.00 1 Kgs 420.00
b) Labour for cutting , bending , shifting to
site , tying and placing in position

1st class Blacksmith / Bar bender 3.00 Nos. 750.00 1 Each 2250.00
2nd class Blacksmith / Bar bender 7.00 Nos. 590.00 1 Each 4130.00
Mazdoor(Unskilled) 10.00 Nos. 525.00 1 Each 5250.00
MA @ 25% 0.25 11630.00 2907.50
81107.50

Rate for other Floors FF


Rate as worked out above 81107.50
Lift charges ( Page 131 of Std. Data ) 0.00

MA @ 25% 0.00
Rate per 1 MT 81107.50
Overheads & Contractors Profit 11042.79
@13.615%
Rate per 1 MT 92150.29
Rate per 1 Kg 92.15

8 Providing Thermo Mechanically Treated (TMT) (Fe 500 grade as per IS 1786-1979) of different diameters for
RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing
in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18
SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and
conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost
and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting,
bending, placing in position, tying including sales and other taxes on all materials etc. ,and overheads &
contractors profit complete for finished item of work.( APSS No.126)

(BLD-CSTN-4.2)& Amendment in SoR 2011-12 page No. 392


Unit - 1 MT
a) Material
TMT bars including 5% for overlaps and 1.05 MT 63000.00 1 MT 66150.00
wastage
Binding wire 6.00 Kgs 70.00 1 Kgs 420.00
CIVIL DATA : Page-135

S.No./
Item
Sl. No. Description Quantity Unit Rate (Rs.) Per Unit Amount (Rs.)
Code
No.
b) Labour for cutting , bending , shifting to
site , tying and placing in position

1st class Blacksmith / Bar bender 3.00 Nos. 750.00 1 Each 2250.00
2nd class Blacksmith / Bar bender 7.00 Nos. 590.00 1 Each 4130.00

Mazdoor(Unskilled) 10.00 Nos. 525.00 1 Each 5250.00


MA @ 25% 0.25 11630.00 2907.50
81107.50

Rate for other Floors FF


Rate as worked out above 81107.50
Lift charges ( Page 131 of Std. Data ) 0.00

MA @ 25% 0.00
Rate per 1 MT 81107.50
Overheads & Contractors Profit 11042.79
@13.615%
Rate per 1 MT 92150.29
Rate per 1 Kg 92.15

9 Providing Mild steel (MS) steel bars (Fe 250 grade as per IS 432) of different diameters including labour
charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks
of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for
reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars,
including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of
binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in
position, tying including sales and other taxes on all materials etc. ,and overheads & contractors profit
complete for finished item of work.( APSS No.126)
(BLD-CSTN-4.2)& Amendment in SoR 2011-12 page No. 392
Unit - 1 MT
a) Material
Mild steel bars including 5% for 1.05 MT 60000.00 1 MT 63000.00
overlaps and wastage
Binding wire 6.00 Kgs 70.00 1 Kgs 420.00
b) Labour for cutting , bending , shifting to
site , tying and placing in position

1st class Blacksmith / Bar bender 3.00 Nos. 750.00 1 Each 2250.00
2nd class Blacksmith / Bar bender 7.00 Nos. 590.00 1 Each 4130.00

Mazdoor(Unskilled) 10.00 Nos. 525.00 1 Each 5250.00


MA @ 25% 0.25 11630.00 2907.50
77957.50

Rate for other Floors FF SF TF


Rate as worked out above 77957.50 77957.50 77957.50
Lift charges ( Page 131 of Std. Data ) 0.00 1163.00 2326.00

MA @ 25% 0.00 290.75 581.50


Rate per 1 MT 77957.50 79411.25 80865.00
Overheads & Contractors Profit 10613.91 10811.84 11009.77
@13.615%
Rate per 1 MT 88571.41 90223.09 91874.77
CIVIL DATA : Page-136

S.No./
Item
Sl. No. Description Quantity Unit Rate (Rs.) Per Unit Amount (Rs.)
Code
No.

Plastering work's
10 Ornamental ceiling plastering 12mm thick single coat in CM (1:5) using screened sand including cost and
conveyance of all materials like cement, sand, water etc., to site, including sales & other taxes on all
materials, and all operational, incidental charges on materials and including cost of all labour charges for
mixing mortar, finishing, curing as directed by Engineer-in-charge etc., and overheads & contractors profit
complete for finished item of work.(SS 901,903 & 904)
(BLD-CSTN-8-3)
Unit : 10 sqm
A.MATERIALS :
Cement 43.20 Kgs 4220.00 1000 Kgs 182.30
Fine aggregate ( Sand ) 0.15 cu.m. 918.40 1 cu.m. 137.76
B.LABOUR :
1st Class Mason 0.45 Nos. 630.00 1 Each 283.50
2st Class Mason 1.05 Nos. 565.00 1 Each 593.25
Mazdoor (Unskilled) 2.80 Nos. 525.00 1 Each 1470.00
MA @ 25% 0.25 2346.75 586.69
water charges @ 1% 0.01 3253.50 32.54
Rate per 10 Sqm 3286.04
Rate per 1 Sqm 328.60

Rate for other Floors FF SF TF 4F


Rate as worked out above 328.60 328.60 328.60 328.60
Hire charges for Access Scaffolding 2.57 2.57 2.57 2.57

Labour charges for scaffolding 16.94 24.04 31.13 38.23


MA @ 25% 4.24 6.01 7.78 9.56
Lift charges ( Page 131 of Std. Data ) 0.00 23.47 46.94 70.40

MA @ 25% 0.00 5.87 11.74 17.60


Rate per 1 Sqm 352.35 390.56 428.76 466.96
Overheads & Contractors Profit 47.97 53.17 58.37 63.58
@13.615%
Rate per 1 Sqm 400.32 443.73 487.13 530.54

#REF! Plastering 12mm thick in two coats using screened sand with base coat of 8mm thick in CM (1:6) and top coat
of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like
cement, sand, water etc., to site, including sales & other taxes on all materials, and all operational, incidental
charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift
charges, curing, including cutting grooves as directed by Engineer - in - charge etc., and overheads &
contractors profit complete for finished item of work. (SS 901,903 & 904)

( BLD-CSTN-8-10)
Unit : 10 sqm
A.MATERIALS :
Base coat in CM(1:6) , 8mm thick
Cement 26.40 Kgs 4220.00 1000 Kgs 111.41
Fine aggregate (Sand) 0.11 Cum 918.40 1 Cum 101.02
Top coat in CM(1:4) , 4mm thick
Cement 14.40 Kgs 4220.00 1000 Kgs 60.77
Fine aggregate (Sand) 0.04 Cum 918.40 1 Cum 36.74
B.LABOUR :
1st Class Mason 0.63 Nos. 630.00 1 Each 396.90
2nd Class Mason 1.47 Nos. 565.00 1 Each 830.55
CIVIL DATA : Page-137

S.No./
Item
Sl. No. Description Quantity Unit Rate (Rs.) Per Unit Amount (Rs.)
Code
No.
Mazdoor (Unskilled) 3.90 Nos. 525.00 1 Each 2047.50
MA @ 25% 0.25 3274.95 818.74
water charges @ 1% 0.01 4403.62 44.04
Rate per 10 Sqm 4447.66
Rate per 1 Sqm 444.77

a Up to basement
Rate as worked out above 1.00 Sqm 444.77 1 Sqm 444.77
Overheads & Contractors Profit 0.13615 444.77 60.56
@13.615%
Rate per 1 Sqm 505.33

Walls in superstructure :
Rate for other Floors FF
Rate as worked out above 444.77
Hire charges for Access Scaffolding 1.08

Labour charges for scaffolding 8.47


MA @ 25% 2.12
Lift charges ( Page 131 of Std. Data ) 0.00

MA @ 25% 0.00
Rate per 1 Sqm 456.44
Overheads & Contractors Profit 62.14
@13.615%
Rate per 1 Sqm 518.58

#REF! Plastering 12mm thick single coat in CM(1:5) using screened sand including cost and conveyance of all
materials like cement, sand, water etc., to site, including sales & other taxes on all materials, and all
operational, incidental charges on materials and including cost of all labour charges for mixing mortar,
finishing, curing as directed by Engineer-in-charge etc., and overheads & contractors profit complete for
finished item of work.(SS 901,903 & 904)

(BLD-CSTN-8-3)
Unit : 10 sqm
A.MATERIALS :
Cement 43.20 Kgs 4220.00 1000 Kgs 182.30
Fine aggregate ( Sand ) 0.15 cu.m. 918.40 1 cu.m. 137.76
B.LABOUR :
1st Class Mason 0.45 Nos. 630.00 1 Each 283.50
2st Class Mason 1.05 Nos. 565.00 1 Each 593.25
Mazdoor (Unskilled) 2.80 Nos. 525.00 1 Each 1470.00
MA @ 25% 0.25 2346.75 586.69
water charges @ 1% 0.01 3253.50 32.54
Rate per 10 Sqm 3286.04
Rate per 1 Sqm 328.60

a) for basement :
Rate per 1 Sqm 1.00 sqm 328.60 1 sqm 328.60
Overheads & Contractors Profit 0.13615 328.60 44.74
@13.615%
Rate per 1 Sqm 373.34

b) Walls in superstructure :
Rate for other Floors FF
Rate as worked out above 328.60
CIVIL DATA : Page-138

S.No./
Item
Sl. No. Description Quantity Unit Rate (Rs.) Per Unit Amount (Rs.)
Code
No.
Hire charges for Access Scaffolding 1.08
Labour charges for scaffolding 8.47
MA @ 25% 2.12
Lift charges ( Page 131 of Std. Data ) 0.00
MA @ 25% 0.00
340.27
Overheads & Contractors Profit 46.33
@13.615%
Rate per 1 Sqm 386.60

#REF! Plastering 20mm thick in two coats using screened sand with base coat of 16mm thick in CM(1:6) and top
coat of 4mm thick in CM(1:4) with dubara sponge finishing including cost and conveyance of all materials like
cement, sand, water etc., to site, including sales & other taxes on all materials, and all operational, incidental
charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift
charges, curing, including cutting grooves as directed by Engineer-in-charge etc., and overheads & contractors
profit complete for finished item of work .(SS 901,903 & 904)
(BLD-CSTN-8-9)
Unit : 10 sqm
A.MATERIALS :
Base coat in CM(1:6) , 16mm thick

Cement 43.20 Kgs 4220.00 1000 Kgs 182.30


Fine aggregate (Sand) 0.18 Cum 918.40 1 Cum 165.31
Top coat in CM(1:4) , 4mm thick
Cement 14.40 Kgs 4220.00 1000 Kgs 60.77
Fine aggregate (Sand) 0.04 Cum 918.40 1 Cum 36.74
B.LABOUR :
1st Class Mason 0.63 Nos. 630.00 1 Each 396.90
2nd Class Mason 1.47 Nos. 565.00 1 Each 830.55
Mazdoor (Unskilled) 3.90 Nos. 525.00 1 Each 2047.50
MA @ 25% 0.25 3274.95 818.74
water charges @ 1% 0.01 4538.81 45.39
Rate per 10 Sqm 4584.20
Rate per 1 Sqm 458.42

a) for basement :
Rate per 1 Sqm 1.00 sqm 458.42 1 sqm 458.42
Overheads & Contractors Profit 0.13615 458.42 62.41
@13.615%
Rate per 1 Sqm 520.83

Walls in superstructure :
Rate for other Floors FF SF TF
Rate as worked out above 458.42 458.42 458.42
Hire charges for Access Scaffolding 1.08 1.08 1.08

Labour charges for scaffolding 8.47 12.12 15.77


MA @ 25% 2.12 3.03 3.94
Lift charges ( Page 131 of Std. Data ) 0.00 32.75 65.50

MA @ 25% 0.00 8.19 16.38


470.09 515.59 561.09
Overheads & Contractors Profit 64.00 70.20 76.39
@13.615%
Rate per 1 Sqm 534.09 585.79 637.48
CIVIL DATA : Page-139

S.No./
Item
Sl. No. Description Quantity Unit Rate (Rs.) Per Unit Amount (Rs.)
Code
No.
#REF! Plastering 20mm thick single coat in CM(1:5) using screened sand including cost and conveyance of all
materials like cement, sand, water etc., to site, including sales & other taxes on all materials, and all
operational, incidental charges on materials and including cost of all labour charges for mixing mortar,
finishing, curing as directed by Engineer-in-charge etc., and overheads & contractors profit complete for
finished item of work .(SS 901,903 & 904)
(BLD-CSTN-8-8)
Unit : 10 sqm
A.MATERIALS :
Cement 60.48 Kgs 4220.00 1000 Kgs 255.23
Fine aggregate (Sand) 0.21 Cum 918.40 1 Cum 192.86
B.LABOUR :
2nd Class Mason 0.94 Nos. 565.00 1 Each 531.10
Mazdoor (Unskilled) 1.60 Nos. 525.00 1 Each 840.00
MA @ 25% 0.25 1371.10 342.78
water charges @ 1% 0.01 2161.96 21.62
Rate per 10 Sqm 2183.58
Rate per 1 Sqm 218.36

a) for basement :
Rate per 1 Sqm 1.00 sqm 218.36 1 sqm 218.36
Overheads & Contractors Profit 0.13615 218.36 29.73
@13.615%
Rate per 1 Sqm 248.09
Say

b) Walls in superstructure :
Rate for other Floors FF SF TF
Rate as worked out above 218.36 218.36 218.36
Hire charges for Access Scaffolding 1.08 1.08 1.08

Labour charges for scaffolding 8.47 12.12 15.77


MA @ 25% 2.12 3.03 3.94
Lift charges ( Page 131 of Std. Data ) 0.00 13.71 27.42

MA @ 25% 0.00 3.43 6.86


230.03 251.73 273.43
Overheads & Contractors Profit 31.32 34.27 37.23
@13.615%
Rate per 1 Sqm 261.35 286.00 310.66

#REF! Providing impervious coat to exposed RCC roof slab surfaces to required slopes with CM (1:3) prop. using
screened sand 20mm thick (average) mixed with integral cement water proofing liquid confirming to IS: 2645-
2003 manufactured by reputed manufacturers as approved by Engineer-in-charge at 1 Kg per one bag of
cement, laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread
lining at regular intervals of 45cmx45cm including cost and conveyance of all materials like cement, sand,
water proofing compound, water etc., to site, including sales & other taxes on all materials and operational,
incidental, and labour charges for mixing mortar, laying, lift charges, rendering smooth and thread lining,
curing including rounding off junctions of wall and slab etc., and overheads & contractors profit complete for
finished item of work. (APSS No. 901 & 903).
(BLD-CSTN-10-25)
Unit : 10 sqm
A.MATERIALS :
Cement 100.80 Kgs 4220.00 1000 Kgs 425.38
Fine aggregate (Sand) 0.21 Cum 918.40 1 Cum 192.86
Integral cement waterproofing liquid 0.40 Ltrs 129.00 1.00 Ltrs 51.60
CIVIL DATA : Page-140

S.No./
Item
Sl. No. Description Quantity Unit Rate (Rs.) Per Unit Amount (Rs.)
Code
No.
B.LABOUR :
1st Class Mason 0.66 Nos. 630.00 1 Each 415.80
2nd Class Mason 1.54 Nos. 565.00 1 Each 870.10
Mazdoor (Unskilled) 3.70 Nos. 525.00 1 Each 1942.50
MA @ 25% 0.25 3228.40 807.10
water charges @ 1% 0.01 4705.34 47.05
Rate per 10 Sqm 4752.39

Rate for other Floors FF SF TF


Rate as worked out above 4752.39 4752.39 4752.39
Lift charges ( Page 131 of Std. Data ) 0.00 322.84 645.68

MA @ 25% 0.00 80.71 161.42


4752.39 5155.94 5559.49
Overheads & Contractors Profit 647.04 701.98 756.93
@13.615% 5399.43 5857.92 6316.42
Rate per 1 Sqm 539.94 585.79 631.64

#REF! Providing impervious coat to exposed RCC roof slab surfaces of sump , sump side wall, sump bottom slab,
in side of septic tank , in sunken slabs etc. to required slopes with CM (1:3) prop. using screened sand 12mm
thick mixed with integral cement water proofing liquid confirming to IS: 2645-2003 manufactured by reputed
manufacturers as approved by Engineer-in-charge at 1 Kg per one bag of cement, laid over roof slab when it is
green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of
45cmx45cm where ever necessary including cost and conveyance of all materials like cement, sand, water
proofing compound, water etc., to site, including sales & other taxes on all materials and operational,
incidental, and labour charges for mixing mortar, laying, lift charges, rendering smooth and thread lining,
curing including rounding off junctions of wall and slab etc., and overheads & contractors profit complete for
finished item of work. (APSS No. 901 & 903).
(BLD-CSTN-8-2)
A.MATERIALS :
Cement 72.00 Kgs 4220.00 1000 Kgs 303.84
Fine aggregate (Sand) 0.15 Cum 918.40 1 Cum 137.76
Integral cement waterproofing liquid 0.29 Ltrs 129.00 1.00 Ltrs 37.41

B.LABOUR :
1st Class Mason 0.45 Nos. 630.00 1 Each 283.50
2st Class Mason 1.05 Nos. 565.00 1 Each 593.25
Mazdoor (Unskilled) 2.80 Nos. 525.00 1 Each 1470.00
MA @ 25% 0.25 2346.75 586.69
water charges @ 1% 0.01 3412.45 34.12
Rate per 10 Sqm 3446.57

Rate for other Floors FF SF TF


Rate as worked out above 3446.57 3446.57 3446.57
Lift charges ( Page 131 of Std. Data ) 0.00 234.68 469.35

MA @ 25% 0.00 58.67 117.34


3446.57 3739.92 4033.26
Overheads & Contractors Profit 469.25 509.19 549.13
@13.615%
Rate per 10 Sqm 3915.82 4249.11 4582.39
Rate per 1 Sqm 391.58 424.91 458.24
CIVIL DATA : Page-141

S.No./
Item
Sl. No. Description Quantity Unit Rate (Rs.) Per Unit Amount (Rs.)
Code
No.
#REF! RCM facia 50mm thick in CM(1:3) using screened sand for drop walls, fins with rabbit wire mesh & nominal
reinforcement as directed by Engineer - In - Charge with dubara sponge finishing, including cost and
conveyance of all materials to site, sales & other taxes on all materials,operationals &incidental, cost and
conveyance of cement, wire mesh, water to work site, centring, scaffolding and form work, lift charges etc.,
and overheads & contractors profit complete for finished item of work but excluding cost of steel and its
fabrication charges for finished item of work(APSS NO.403&903)

(BLD-CSTN-8-11)
Unit : 10 sqm
A)MATERIALS
Rabbit wire mesh 13.30 sqm 21.00 1 sqm 279.30
Cement for base coat and plastering 240.00 Kgs 4220.00 1000 Kgs 1012.80

Cement for lumps 50.00 Kgs 4220.00 1000 Kgs 211.00


Fine aggregate (Sand) 0.50 cu.m. 918.40 1 cu.m. 459.20
Excluding HYSD steel/mild steel &
binding wire
B) LABOUR CHARGES
1st Class Mason 8.00 Nos. 630.00 1 Each 5040.00
Operator concrete mixer 1.00 Nos. 615.00 1 Each 615.00
Mazdoor (Unskilled) 10.00 Nos. 525.00 1 Each 5250.00
MA @ 25% 0.25 10905.00 2726.25
C)Machinery :
Concrete Mixer 10 / 7 cft (0.2 / 0.8 2.00 hours 188.10 1 hours 376.20
cum)capacity
Crew charges 2.00 hours 306.80 1 hours 613.60
Add MA on crew charges 0.25 306.80 153.40
water charges @ 1% 0.01 16736.75 167.37
Rate per 10 Sqm 16904.12
Rate per 1 Sqm 1690.41

Rate for other Floors FF SF TF


Rate as worked out above 1690.41 1690.41 1690.41
Hire charges for Access Scaffolding 1.08 2.16 3.24

Labour charges for scaffolding 8.47 12.12 15.77


MA @ 25% 2.12 3.03 3.94
Lift charges ( Page 131 of Std. Data ) 0.00 109.05 218.10

MA @ 25% 0.00 27.26 54.53


1702.08 1844.03 1985.99
Overheads & Contractors Profit 231.74 251.07 270.39
@13.615%
Rate per 1 Sqm 1933.82 2095.10 2256.38
Flooring
#REF! Flooring with red cement plaster in cm 1:3 with required slopes and neat float finishing by using red oxide at
10 kg. for 10.00 sqm , finished smooth with a floating coat of neat red oxide mixed cement and thread lining
at regular intervals of 45cmx45cm including cost and conveyance of all materials like cement, sand, red
oxide, water etc., to site, including sales & other taxes on all materials and operational, incidental, and labour
charges for mixing mortar, laying, lift charges, rendering smooth and thread lining, curing including rounding
off junctions of wall and slab etc., and overheads & contractors profit complete for finished item of work.
(BLD-CSTN-8-3)BLD CSTN 9-16 (114) at page 56
Unit : 10 sqm
A.MATERIALS :
CIVIL DATA : Page-142

S.No./
Item
Sl. No. Description Quantity Unit Rate (Rs.) Per Unit Amount (Rs.)
Code
No.
Cement 72.00 Kgs 4220.00 1000 Kgs 303.84
Fine aggregate ( Sand ) 0.15 cu.m. 918.40 1 cu.m. 137.76
Redoxide SoR 372 at 34 10.00 kgs. 145.00 1.00 kgs. 1450.00
B.LABOUR :
1st Class Mason 0.45 Nos. 630.00 1 Each 283.50
2st Class Mason 1.05 Nos. 565.00 1 Each 593.25
Mazdoor (Unskilled) 2.80 Nos. 525.00 1 Each 1470.00
Masons for polishing 1.10 Nos. 630.00 1 Each 693.00
MA @ 25% 0.25 3039.75 759.94
water charges @ 1% 0.01 5691.29 56.91
Rate per 10 Sqm 5748.20
Rate per 1 Sqm 574.82

a) for basement :
Rate per 1 Sqm 1.00 sqm 574.82 1 sqm 574.82
Overheads & Contractors Profit 0.13615 574.82 78.26
@13.615%

Rate per 1 Sqm 653.08

#REF! Flooring with KHONDALITE STONE slabs minimum of 75 mm thick set over a base coat of CM (1:8) , 12mm
thick using screened sand over already laid CC bed including neat cement slurry of honey like consistency
spread @ 3.3 Kgs per Sqm and jointed with neat cement to full depth including cost and conveyance of all
materials like cement, sand, water, flooring stones etc. complete including sales & other taxes on all
materials including all labour charges like dressing of flooring stones to the required size, mixing of cement
mortar, laying, lift charges , cost of base coat, water charges etc., and overheads & contractors profit
complete for finished item of work. (APSS No.703 & 701)
(BLD-CSTN-9-1)
Unit = 10 sqm.
A. MATERIALS:
Qty KHONDALITE STONE slabs minimum of 10.5 Sqm 860.00 1 Sqm 9030.00
75 mm thick
Cement for CM (1:8) proportion for 21.60 Kgs 4220.00 1000 Kgs 91.15
base coat
Cement for slurry 33.00 Kgs 4220.00 1000 Kgs 139.26
Cement for pointing 20.00 Kgs 4220.00 1000 Kgs 84.40
Sand for CM(1:8) 0.12 Cum 918.40 1 Cum 110.21
B .LABOUR
Mason 1st class 3.10 Nos 630.00 1 Each 1953.00
Mason 2nd class 1.10 Nos 565.00 1 Each 621.50
Mazdoor(un skilled) 0.86 Nos 525.00 1 Each 451.50
MA @ 25% 0.25 3026.00 756.50
Add water charges 1% 0.01 13237.52 132.38
Rate for 10 sqm 13369.90

Rate for other floors FF


Rate as worked out above 13369.90
Lift charges ( Page 131 of Std. Data ) 0.00

MA @ 25% 0.00
13369.90
Overheads & Contractors Profit 1820.31
@13.615%
Rate per 10 Sqm 15190.21
Rate per 1 Sqm 1519.02
CIVIL DATA : Page-143

S.No./
Item
Sl. No. Description Quantity Unit Rate (Rs.) Per Unit Amount (Rs.)
Code
No.
#REF! Flooring with polished Shahabad / Tandur stone slabs of 15mm to 18mm thick set over a base coat of CM
(1:8) , 12mm thick using screened sand over already laid CC bed / RCC roof slab including neat cement slurry
of honey like consistency spread @ 3.3 Kgs per Sqm and jointed with neat cement to full depth including
cost and conveyance of all materials like cement, sand, water, flooring stones etc. complete including sales &
other taxes on all materials including all labour charges like dressing of flooring stones to the required size,
mixing of cement mortar, laying, lift charges , cost of base coat, water charges etc., and overheads &
contractors profit complete for finished item of work. (APSS No.703 & 701)

(BLD-CSTN-9-1)
Unit = 10 sqm.
A. MATERIALS:
Polished Shahabad stone 15 to 18mm 11.00 Sqm 1914.94 10 Sqm 2106.43
thick
Cement for CM (1:8) proportion for 21.60 Kgs 4220.00 1000 Kgs 91.15
base coat
Cement for slurry 33.00 Kgs 4220.00 1000 Kgs 139.26
Cement for pointing 20.00 Kgs 4220.00 1000 Kgs 84.40
Sand for CM(1:8) 0.12 Cum 918.40 1 Cum 110.21
B .LABOUR
Mason 1st class 3.10 Nos 630.00 1 Each 1953.00
Mason 2nd class 1.10 Nos 565.00 1 Each 621.50
Mazdoor(un skilled) 0.86 Nos 525.00 1 Each 451.50
MA @ 25% 0.25 3026.00 756.50
Add water charges 1% 0.01 6313.95 63.14
Rate for 10 sqm 6377.09

Rate for other floors FF


Rate as worked out above 6377.09
Lift charges ( Page 131 of Std. Data ) 0.00

MA @ 25% 0.00
6377.09
Overheads & Contractors Profit 868.24
@13.615%
Rate per 10 Sqm 7245.33
Rate per 1 Sqm 724.53

#REF! Flooring with Rough Shahabad / Tandur stone slabs of 40 mm thick set over base coat of cement mortar
(1 : 8) 12 mm thick over CC bed already laid or RCC roof slab, including pointing with cement mortar 1:3 duly
filling joints nearly, including cost of all materials like flooring stone, cement, sand, and water etc., complete,
including labour charges for dressing of flooring stones etc., complete for finished item of work,. (APSS
No.703 & 701)

(BLD-CSTN-9-2)
Unit = 10 sqm.
A. MATERIALS:
Rough Shahabad / Tandur stone slabs of 10.5 Sqm 1537.35 10 Sqm 1614.22
40 mm thick
Cement for CM (1:8) proportion for 21.60 Kgs 4220.00 1000 Kgs 91.15
base coat
Cement for CM 1:3 proportion for 9.60 Kgs 4220.00 1000 Kgs 40.51
pointing
CIVIL DATA : Page-144

S.No./
Item
Sl. No. Description Quantity Unit Rate (Rs.) Per Unit Amount (Rs.)
Code
No.
Sand for CM (1:8) proportion 0.12 Kgs 918.40 1 Cum 110.21
Sand for CM (1:3) proportion 0.02 Cum 918.40 1 Cum 18.37
B .LABOUR
Mason 1st class 0.96 Nos 630.00 1 Each 604.80
Mason 2nd class 2.24 Nos 565.00 1 Each 1265.60
Mazdoor(un skilled) 3.30 Nos 525.00 1 Each 1732.50
MA @ 25% 0.25 3602.90 900.73
Add water charges 1% 0.01 6378.08 63.78
Rate for 10 sqm 6441.86

Rate for other floors FF


Rate as worked out above 6441.86
Lift charges ( Page 131 of Std. Data ) 0.00

MA @ 25% 0.00
6441.86
Overheads & Contractors Profit 877.06
Rate per 10 Sqm
@13.615% 7318.92
Rate per 1 Sqm 731.89

#REF! Flooring with (latoth) leather finish Tandur stone slabs of 18 to 22 mm thickset over a base coat of CM
(1:8) , 12mm thick using screened sand over already laid CC bed / RCC roof slab including neat cement slurry
of honey like consistency spread @ 3.3 Kgs per Sqm and jointed with neat cement to full depth including
cost and conveyance of all materials like cement, sand, water, flooring stones etc. complete including sales &
other taxes on all materials including all labour charges like dressing of flooring stones to the required size,
mixing of cement mortar, laying, lift charges , cost of base coat, water charges etc., and overheads &
contractors profit complete for finished item of work. (APSS No.703 & 701)

(BLD-CSTN-9-1)
Unit = 10 sqm.
A. MATERIALS:
As per Latoth finish Shahabad stone 18 to 22 11.00 Sqm 591.25 1 Sqm 6503.75
Quotation mm thick
Cement for CM (1:8) proportion for base 21.60 Kgs 4220.00 1000 Kgs 91.15
coat

Cement for slurry 33.00 Kgs 4220.00 1000 Kgs 139.26


Cement for pointing 20.00 Kgs 4220.00 1000 Kgs 84.40
Sand for CM(1:8) 0.12 Cum 918.40 1 Cum 110.21
B .LABOUR
Mason 1st class 3.10 Nos 465.00 1 Each 1441.50
Mason 2nd class 1.10 Nos 420.00 1 Each 462.00
Mazdoor(un skilled) 0.86 Nos 370.00 1 Each 318.20
MA @ 20% 0.20 2221.70 444.34
Add water charges 1% 0.01 9594.81 95.95
Rate per 10 Sqm 9690.76
Rate per 1 Sqm 969.08
CIVIL DATA : Page-145

S.No./
Item
Sl. No. Description Quantity Unit Rate (Rs.) Per Unit Amount (Rs.)
Code
No.
#REF! Flooring with Polished black Kadapa slabs minimum of 15mm thick of size 0.457m x 0.457m set over a base
coat of CM (1:8) , 12mm thick using screened sand over already laid CC bed / RCC roof slab including neat
cement slurry of honey like consistency spread @ 3.3 Kgs per Sqm and jointed with neat cement to full
depth including cost and conveyance of all materials like cement, sand, water, flooring stones etc. complete
including sales & other taxes on all materials including all labour charges like dressing of flooring stones to
the required size, mixing of cement mortar, laying, lift charges , cost of base coat, water charges etc., and
overheads & contractors profit complete for finished item of work. (APSS No.703 & 701)

(BLD-CSTN-9-1)
Unit = 10 sqm.
A. MATERIALS:
Polished black Kadapa slabs minimum 11.00 Sqm 1764.01 10 Sqm 1940.41
of 15mm thick

Cement for CM (1:8) proportion for 21.60 Kgs 4220.00 1000 Kgs 91.15
base coat
Cement for slurry 33.00 Kgs 4220.00 1000 Kgs 139.26
Cement for pointing 20.00 Kgs 4220.00 1000 Kgs 84.40
Sand for CM(1:8) 0.12 Cum 918.40 1 Cum 110.21
B .LABOUR
Mason 1st class 3.10 Nos 630.00 1 Each 1953.00
Mason 2nd class 1.10 Nos 565.00 1 Each 621.50
Mazdoor(un skilled) 0.86 Nos 525.00 1 Each 451.50
MA @ 25% 0.25 3026.00 756.50
Add water charges 1% 0.01 6147.93 61.48
Rate for 10 sqm 6209.41

Rate for other floors FF


Rate as worked out above 6209.41
Lift charges ( Page 131 of Std. Data ) 0.00

MA @ 25% 0.00
6209.41
Overheads & Contractors Profit 845.41
Rate per 10 Sqm
@13.615% 7054.82
Rate per 1 Sqm 705.48

#REF! Flooring with Rough black Kadapa slabs minimum of 50 mm thick of size 0.457m x 0.457m set over base
coat of cement mortar (1 : 8) 12 mm thick over CC bed already laid or RCC roof slab, including pointing with
cement mortar 1:3 duly filling joints nearly, including cost of all materials like flooring stone, cement, sand,
and water etc., complete, including labour charges for dressing of flooring stones etc., complete for finished
item of work,. (APSS No.703 & 701)

(BLD-CSTN-9-2)
Unit = 10 sqm.
A. MATERIALS:
Rough black Kadapa slabs minimum of 10.5 Sqm 1450.00 10 Sqm 1522.50
50 mm thick

Cement for CM (1:8) proportion for 21.60 Kgs 4220.00 1000 Kgs 91.15
base coat
CIVIL DATA : Page-146

S.No./
Item
Sl. No. Description Quantity Unit Rate (Rs.) Per Unit Amount (Rs.)
Code
No.
Cement for CM 1:3 proportion for 9.60 Kgs 4220.00 1000 Kgs 40.51
pointing
Sand for CM (1:8) proportion 0.12 Kgs 918.40 1 Cum 110.21
Sand for CM (1:3) proportion 0.02 Cum 918.40 1 Cum 18.37
B .LABOUR
Mason 1st class 0.96 Nos 630.00 1 Each 604.80
Mason 2nd class 2.24 Nos 565.00 1 Each 1265.60
Mazdoor(un skilled) 3.30 Nos 525.00 1 Each 1732.50
MA @ 25% 0.25 3602.90 900.73
Add water charges 1% 0.01 6286.37 62.86
Rate for 10 sqm 6349.23

Rate for other floors FF


Rate as worked out above 6349.23
Lift charges ( Page 131 of Std. Data ) 0.00

MA @ 25% 0.00
6349.23
Overheads & Contractors Profit 864.45
Rate per 10 Sqm
@13.615% 7213.68
Rate per 1 Sqm 721.37

#REF! Flooring with non-skid full body ceramic floor tiles of size 300mm x 300mm and thickness between 7 - 8mm
1st quality conforming to IS: 13711, IS: 13712, IS: 13630(Part 1 to 15) of any colour and finish in all shades and
designs as approved by Engineer-in-charge, set over base coat of cement mortar (1:8), 12mm thick using
screened sand over CC bed already laid or RCC roof slab, including neat cement slurry of honey like
consistency spread @ 3.3 Kgs per Sqm & jointed neatly with white cement paste to full depth mixed with
pigment of matching shade, including cost of all materials like cement, screened sand , water and tiles etc.,
and overheads & contractors profit complete for finished item of work. (APSS No.701 & 707)

(BLD-CSTN-9-6)
Unit = 10 sqm.
A. MATERIALS:
Ceramic tiles 7 to 8mm thick (300mm x 10.50 Sqm 370.00 1 Sqm 3885.00
300mm)
Cement for CM(1:8) proportion for base 21.60 Kgs 4220.00 1000 Kgs 91.15
coat
Cement for slurry 33.00 Kgs 4220.00 1000 Kgs 139.26
White Cement 2.00 Kgs 31.00 1 Kg 62.00
Sand for CM(1:8) 0.12 Cum 918.40 1 Cum 110.21
B .LABOUR
Mason 1st class 0.96 Nos 630.00 1 Each 604.80
Mason 2nd class 2.24 Nos 565.00 1 Each 1265.60
Mazdoor(un skilled) 3.30 Nos 525.00 1 Each 1732.50
MA @ 25% 0.25 3602.90 900.73
Add water charges 1% 0.01 8791.25 87.91
Rate for 10sqm 8879.16

Rate for other Floors FF SF


Rate as worked out above 8879.16 8879.16
Lift charges ( Page 131 of Std. Data ) 0.00 360.29

MA @ 25% 0.00 90.07


CIVIL DATA : Page-147

S.No./
Item
Sl. No. Description Quantity Unit Rate (Rs.) Per Unit Amount (Rs.)
Code
No.
8879.16 9329.52
Overheads & Contractors Profit 1208.90 1270.21
@13.615%
Rate per 10 Sqm 10088.06 10599.73
Rate per 1 Sqm 1008.81 1059.97

#REF! Flooring with soluble salt porcelain vitrified tiles screen printed and polished of size 600 x 600 mm and
thickness between 8 to 10mm 1st quality conforming to IS: 13711, IS: 13712, IS: 13630(Parts 1 to 15) of any
colour and finish in all shades and designs with borders and design as per the approved flooring pattern as
directed by the Engineer-In -Charge, laying tiles using spacers of 2mm thick, set over a base coat of CM (1:8)
prop. 12mm thick using screened sand over CC bed already laid or RCC roof slab , including neat cement
slurry of honey like consistency spread @ 3.3 kgs per Sqm. and jointed neatly with white cement paste to
full depth mixed with pigment of matching shade including cost and conveyance of all materials like
cement, sand, water, tiles, white cement etc., to site (excluding cost of C.C. bed) including cost of base coat
and all labour charges for mixing of cement mortar, laying tiles to required slope as directed by the
Engineer- in-charge etc., and overheads & contractors profit complete for finished item of work. (APSS
No.701 & 707)

(BLD-CSTN-9-5)
Unit = 10 sqm.
A. MATERIALS:
Vitrified tiles 8 to 10mm thick of size 10.50 Sqm 425.00 1 Sqm 4462.50
600mm x 600mm
Cement for CM(1:8)proportion for base 21.60 Kgs 4220.00 1000 Kgs 91.15
coat
Cement for slurry 33.00 Kgs 4220.00 1000 Kgs 139.26
White Cement 6.00 Kgs 31.00 1 Kg 186.00
Sand for CM(1:8) 0.12 Cum 918.40 1 Cum 110.21
B .LABOUR
Mason 1st class 0.96 Nos 630.00 1 Each 604.80
Mason 2nd class 2.24 Nos 565.00 1 Each 1265.60
Mazdoor(un skilled) 3.30 Nos 525.00 1 Each 1732.50
MA @ 25% 0.25 3602.90 900.73
Add water charges 1% 0.01 9492.75 94.93
Rate for 10sqm 9587.67

Rate for other Floors FF SF


Rate as worked out above 9587.67 9587.67
Lift charges ( Page 131 of Std. Data ) 0.00 360.29

MA @ 25% 0.00 90.07


9587.67 10038.03
Overheads & Contractors Profit 1305.36 1366.68
@13.615%
Rate per 10 Sqm 10893.03 11404.71
Rate per 1 Sqm 1089.30 1140.47
CIVIL DATA : Page-148

S.No./
Item
Sl. No. Description Quantity Unit Rate (Rs.) Per Unit Amount (Rs.)
Code
No.
#REF! Flooring with granite stone tiles 8mm thick (mirror polished of all shades) of 1st quality and of size as
approved by Engineer-in-charge with borders and design as per the approved flooring pattern as directed by
the Engineer-In -Charge, laying tiles using spacers of 2mm thick, set over a base coat of CM (1:8) prop.
12mm thick using screened sand over CC bed already laid or RCC roof slab , including neat cement slurry of
honey like consistency spread @ 3.3 kgs per Sqm. and jointed neatly with white cement paste to full depth
mixed with pigment of matching shade including cost and conveyance of all materials like cement, sand,
water, tiles, white cement etc., to site (excluding cost of C.C. bed) including cost of base coat and all labour
charges for mixing of cement mortar, laying tiles to required slope as directed by the Engineer- in-charge
etc., and overheads & contractors profit complete for finished item of work. (APSS No.701 & 707)

(BLD-CSTN-9-9)
Unit = 10 sqm.
A. MATERIALS:
Granite stone tiles 8mm thick (mirror 10.50 Sqm 1100.00 1 Sqm 11550.00
polished of all shades)
Cement for CM(1:8) for base coat 21.60 Kgs 4220.00 1000 Kgs 91.15
Cement for slurry 33.00 Kgs 4220.00 1000 Kg 139.26
White Cement 6.00 Kgs 31.00 1 Kg 186.00
Sand for CM(1:8) 0.12 Cum 918.40 1 Cum 110.21
B .LABOUR
Mason 1st class 0.96 Nos 630.00 1 Each 604.80
Mason 2nd class 2.24 Nos 565.00 1 Each 1265.60
Mazdoor(un skilled) 3.30 Nos 525.00 1 Each 1732.50
MA @ 25% 0.25 3602.90 900.73
Add water charges 1% 0.01 16580.25 165.80
Rate for 10 sqm 16746.05

Rate for other Floors FF SF


Rate as worked out above 16746.05 16746.05
Lift charges ( Page 131 of Std. Data ) 0.00 360.29

MA @ 25% 0.00 90.07


16746.05 17196.41
Overheads & Contractors Profit 2279.97 2341.29
@13.615%
Rate per 10 Sqm 19026.02 19537.70
Rate per 1 Sqm 1902.60 1953.77

19 Flooring with 16 to 18mm thick high polished/leather finished granite stone slabs other than black and regular
colours (i.e. of shades like paradise / bala flower / copper silk / laka red / lavender blue) with borders and
design ,finished as per the pattern approved by the Engineer-in-Charge of length not less than 2.43 mts set
over base coat of cement mortar (1:8) , 20mm thick using screened sand over CC bed already laid or RCC roof
slab including neat grey cement slurry of honey like consistency spread @ 3.3 Kg per sqm and jointed neatly
with white cement paste mixed with pigment of matching shade to full depth including cost and conveyance
of all materials like cement , sand , water , granite slabs etc., to work site and all operational, incidental labour
& lift charges, polishing charges and all other taxes on all materials, cost of base coat and overheads &
contractors profit complete for finished item of work (S.S.701 & special)

(BLD-CSTN-9-7)
Unit = 10 sqm.
A. MATERIALS:
High polished/leather finished slabs 10.50 Sqm 2501.69 1 Sqm 26267.75
other than black 16 to 18mm thick
CIVIL DATA : Page-149

S.No./
Item
Sl. No. Description Quantity Unit Rate (Rs.) Per Unit Amount (Rs.)
Code
No.
Cement for CM(1:8) for base coat 36.00 Kgs 4220.00 1000 Kgs 151.92
Cement for slurry 33.00 Kgs 4220.00 1000 Kgs 139.26
White cement for jointing 6.00 Kgs 31.00 1 Kg 186.00
Sand for CM(1:8) 0.20 Cum 918.40 1 Cum 183.68
B .LABOUR
Mason 1st class 3.00 Nos 630.00 1 Each 1890.00
Mason 2nd class 1.00 Nos 565.00 1 Each 565.00
Mazdoor(un skilled) 8.00 Nos 525.00 1 Each 4200.00
MA @ 25% 0.25 6655.00 1663.75
Add water charges 1% 0.01 35247.35 352.47
Rate for 10sqm 35599.83

Rate for other Floors FF


Rate as worked out above 35599.83
Lift charges ( Page 131 of Std. Data ) 0.00

MA @ 25% 0.00
35599.83
Overheads & Contractors Profit 4846.92
@13.615%
Rate per 10 Sqm 40446.75
Rate per 1 Sqm 4044.67

20 Flooring with 16 to 18mm thick Antique Finished granite slabs other than black and regular colours (i.e. of
shades like paradise / bala flower / copper silk / laka red / lavender blue) with borders and design as per the
pattern approved by the Engineer-in-Charge of length not less than 2.43 mts set over base coat of cement
mortar (1:8) , 20mm thick using screened sand over CC bed already laid or RCC roof slab including neat grey
cement slurry of honey like consistency spread @ 3.3 Kg per sqm and jointed neatly with white cement paste
mixed with pigment of matching shade to full depth including cost and conveyance of all materials like
cement , sand , water , granite slabs etc., to work site and all operational, incidental labour & lift charges,
polishing charges and all other taxes on all materials, cost of base coat and overheads & contractors profit
complete for finished item of work (S.S.701 & special)
(BLD-CSTN-9-7)
Unit = 10 sqm.
A. MATERIALS:
As per Quotation Antique Finished granite slabs other 10.50 Sqm 3041.69 1 Sqm 31937.75
than black 16 to 18mm thick
Cement for CM(1:8) for base coat 36.00 Kgs 4220.00 1000 Kgs 151.92
Cement for slurry 33.00 Kgs 4220.00 1000 Kgs 139.26
White cement for jointing 6.00 Kgs 31.00 1 Kg 186.00
Sand for CM(1:8) 0.20 Cum 918.40 1 Cum 183.68
B .LABOUR
Mason 1st class 3.00 Nos 630.00 1 Each 1890.00
Mason 2nd class 1.00 Nos 565.00 1 Each 565.00
Mazdoor(un skilled) 8.00 Nos 525.00 1 Each 4200.00
MA @ 25% 0.25 6655.00 1663.75
Add water charges 1% 0.01 40917.35 409.17
Rate for 10sqm 41326.53

Rate for other Floors FF SF


Rate as worked out above 41326.53 41326.53
Lift charges ( Page 131 of Std. Data ) 0.00 665.50

MA @ 25% 0.00 166.38


CIVIL DATA : Page-150

S.No./
Item
Sl. No. Description Quantity Unit Rate (Rs.) Per Unit Amount (Rs.)
Code
No.
41326.53 42158.40
Overheads & Contractors Profit 5626.61 5739.87
@13.615%
Rate per 10 Sqm 46953.14 47898.27
Rate per 1 Sqm 4695.31 4789.83

21 Flooring with 16 to 18 mm thick high polished granite stone slabs black colour as approved by the
Engineer-in-Charge of length not less than 2.43 mts set over base coat of cement mortar (1:8) , 20mm thick
using screened sand over CC bed already laid or RCC roof slab including neat grey cement slurry of honey like
consistency spread @ 3.3 Kg per sqm and jointed neatly with white cement paste mixed with pigment of
matching shade to full depth including cost and conveyance of all materials like cement , sand , water , granite
slabs etc., to work site and all operational, incidental labour & lift charges, half rounding the edge , polishing
charges and all other taxes on all materials, cost of base coat and overheads & contractors profit complete for
finished item of work for platforms (S.S.701 & special)
(BLD-CSTN-9-7)
Unit = 10 sqm.
A. MATERIALS:
High polished granite slabs black 16 to 10.50 Sqm 2101.69 1 Sqm 22067.75
18mm thick
Cement for CM(1:8) for base coat 36.00 Kgs 4220.00 1000 Kgs 151.92
Cement for slurry 33.00 Kgs 4220.00 1000 Kgs 139.26
White cement for jointing 6.00 Kgs 31.00 1 Kg 186.00
Sand for CM(1:8) 0.20 Cum 918.40 1 Cum 183.68
B .LABOUR
Mason 1st class 3.00 Nos 630.00 1 Each 1890.00
Mason 2nd class 1.00 Nos 565.00 1 Each 565.00
Mazdoor(un skilled) 8.00 Nos 525.00 1 Each 4200.00
MA @ 25% 0.25 6655.00 1663.75
Machine cutting charges 16.67 RM 19.00 1 RM 316.73
Half rounding the edges 16.67 RM 350.00 1 RM 5834.50
MA @ 25% 0.25 2460.49 615.12
Add water charges 1% 0.01 37813.71 378.14
Rate for 10 sqm 38191.85

Rate for other Floors FF SF


Rate as worked out above 38191.85 38191.85
Lift charges ( Page 131 of Std. Data ) 0.00 665.50

MA @ 25% 0.00 166.38


38191.85 39023.72
Overheads & Contractors Profit 5199.82 5313.08
@13.615%
Rate per 10 Sqm 43391.67 44336.80
Rate per 1 Sqm 4339.17 4433.68

22 Granolithic Concrete flooring 20 mm thick with (1:1:2), using 6mm to 12 mm size hard granite machine
crushed metal and screened sand laid over CC bed already laid or RCC roof slab, in alternate panels of size not
exceeding 1.50 m x 1.50 m, using glass strips and finishing the top surface to required smoothness and slopes
and thread lining including cost of all materials like cement, metal sand and water and overheads &
contractors profit complete for finished item of work. (APSS No.701 & 710)
(BLD-CSTN-9-13)
Unit : 10sqm
CIVIL DATA : Page-151

S.No./
Item
Sl. No. Description Quantity Unit Rate (Rs.) Per Unit Amount (Rs.)
Code
No.
A.MATERIALS :
6mm to 12mm HBG Metal 0.17 Cum 1559.80 1 Cum 265.17
Cement 120.00 Kgs 4220.00 1000 Kgs 506.40
Sand 0.085 Cum 823.40 1 Cum 69.99
Add for glass strips 10.00 Sqm 12.00 1 Sqm 120.00
B. LABOUR
Mason 1st class 1.25 Nos. 630.00 1 Each 787.50
Mason 2nd class 0.06 Nos. 565.00 1 Each 33.90
Mazdoor (unskilled) 3.00 Nos. 525.00 1 Each 1575.00
MA @ 25% 0.25 2396.40 599.10
Add water charges 1% 0.01 3957.06 39.57
Rate per 10 Sqm 3996.63

Rate for other Floors FF SF


Rate as worked out above 3996.63 3996.63
Lift charges ( Page 131 of Std. Data ) 0.00 239.64

MA @ 25% 0.00 59.91


3996.63 4296.18
Overheads & Contractors Profit 544.14 584.92
@13.615%
Rate per 10 Sqm 4540.77 4881.10
Rate per 1 Sqm 454.08 488.11

23 Flooring with chequered cement concrete heavy duty tiles confirming to IS:13801 using aggregates, cement,
pigments of size 300mm x 300mm and thickness 25mm of any shade as approved by Engineer - In - Charge
set over base coat of cement mortar (1:6), 12 mm thick using screened sand over CC bed already laid or RCC
roof slab including neat cement slurry of honey like consistency spread @ 3.3 kgs per sqm and jointed with
neat white cement to full depth mixed with pigment of matching shade including cost and conveyance of all
materials like cement, sand, water and tiles etc., and overheads & contractors profit complete for finished
item of work.
(BLD-CSTN-9-4)
Unit : 10sqm
A.MATERIALS :
Chequered tiles 25mm thick 10.50 sqm 325.00 1 sqm 3412.50

Cement for CM(1:6) proportion for base 28.80 Kgs 4220.00 1000 Kgs 121.54
coat
Cement for slurry 33.00 Kgs 4220.00 1000 Kgs 139.26
White cement for jointing & pointing 2.00 Kgs 31.00 1.00 Kgs 62.00

Sand for CM(1:6) proportion 0.12 Cum 918.40 1 Cum 110.21


B. LABOUR
Mason 1st class 0.96 Nos. 630.00 1 Each 604.80
Mason 2nd class 2.24 Nos. 565.00 1 Each 1265.60
Mazdoor (unskilled) 3.30 Nos. 525.00 1 Each 1732.50
MA @ 25% 0.25 3602.90 900.73
Add water charges 1% 0.01 8349.13 83.49
Rate per 10 Sqm 8432.62

Rate for other Floors FF SF


Rate as worked out above 8432.62 8432.62
CIVIL DATA : Page-152

S.No./
Item
Sl. No. Description Quantity Unit Rate (Rs.) Per Unit Amount (Rs.)
Code
No.
Lift charges ( Page 131 of Std. Data ) 0.00 360.29

MA @ 25% 0.00 90.07


8432.62 8882.98
Overheads & Contractors Profit 1148.10 1209.42
@13.615%
Rate per 10 Sqm 9580.72 10092.40
Rate per 1 Sqm 958.07 1009.24

24 Brick Flooring with common burnt clay bricks of class as per Table- I of IS:1077-1992, Non- Modular or
traditional size 23 x 11 x 7 cms from approved source having minimum crushing strength of 40 Kg/Sqcm.
approved by Engineer - In - Charge set over base coat of cement mortar (1:3), 12 mm thick using screened
sand over CC bed already laid or RCC roof slab including neat cement slurry of honey like consistency spread
@ 3.3 kgs per sqm and including cost and conveyance of all materials like cement, sand, water and tiles etc.,
and overheads & contractors profit complete for finished item of work.

(BLD-CSTN-9-4)
Unit : 10sqm
A.MATERIALS :
Common burnt clay bricks 23x11x7cms 300.00 Nos 7500.00 1000 Nos 2250.00

Cement for CM(1:3) proportion for base 72.00 Kgs 4220.00 1000 Kgs 303.84
coat
Cement for slurry 33.00 Kgs 4220.00 1000 Kgs 139.26
Sand for CM(1:3) proportion 0.15 Cum 918.40 1 Cum 137.76
B. LABOUR
Mason 1st class 0.96 Nos. 630.00 1 Each 604.80
Mason 2nd class 2.24 Nos. 565.00 1 Each 1265.60
Mazdoor (unskilled) 3.30 Nos. 525.00 1 Each 1732.50
MA @ 25% 0.25 3602.90 900.73
Add water charges 1% 0.01 6433.76 64.34
Rate per 10 Sqm 7398.82

Rate for other Floors FF SF


Rate as worked out above 8432.62 8432.62
Lift charges ( Page 131 of Std. Data ) 0.00 360.29

MA @ 25% 0.00 90.07


8432.62 8882.98
Overheads & Contractors Profit 1148.10 1209.42
@13.615%
Rate per 10 Sqm 9580.72 10092.40
Rate per 1 Sqm 958.07 1009.24

Treads and risers


25 Providing polished Shahabad / Tandur stone slabs of 15mm to 18mm thick in single piece as specified set
over a base coat of CM (1:5) , 12mm thick using screened sand over already laid CC bed / RCC roof slab
including neat cement slurry of honey like consistency spread @ 3.3 Kgs per Sqm and jointed with neat
cement to full depth including cost and conveyance of all materials like cement, sand, water, flooring stones
etc. complete including sales & other taxes on all materials including all labour charges like dressing of
flooring stones to the required size, flat nosing the edges, mixing of cement mortar, laying, lift charges , cost
of base coat, water charges etc., and overheads & contractors profit complete for finished item of work for
treads and risers. (APSS No.703 & 701)
a) Treads of 0.30m wide :
CIVIL DATA : Page-153

S.No./
Item
Sl. No. Description Quantity Unit Rate (Rs.) Per Unit Amount (Rs.)
Code
No.
(BLD-CSTN-9-1)
Unit = 10 sqm.
A. MATERIALS:
Polished Shahabad stone 15 to 18mm 11.00 Sqm 1914.94 10 Sqm 2106.43
thick
Cement for CM (1:5) proportion for 34.56 Kgs 4220.00 1000 Kgs 145.84
base coat
Cement for slurry 33.00 Kgs 4220.00 1000 Kgs 139.26
Cement for jointing 20.00 Kgs 4220.00 1000 Kgs 84.40
Sand for CM(1:5) 0.12 Cum 918.40 1 Cum 110.21
B .LABOUR
Mason 1st class 3.10 Nos 630.00 1 Each 1953.00
Mason 2nd class 1.10 Nos 565.00 1 Each 621.50
Mazdoor(un skilled) 0.86 Nos 525.00 1 Each 451.50
MA @ 25% 0.25 3026.00 756.50
Flat nosing the edges 33.33 RM 55.00 1 RM 1833.15
MA @ 25% 0.25 733.26 183.32
Add water charges 1% 0.01 8385.11 83.85
Rate for 10sqm 8468.96

Rate for other floors FF SF


Rate as worked out above 8468.96 8468.96
Lift charges ( Page 131 of Std. Data ) 0.00 302.60

MA @ 25% 0.00 75.65


8468.96 8847.21
Overheads & Contractors Profit 1153.05 1204.55
@13.615%
Rate per 10 Sqm 9622.01 10051.76
Rate per 1 Sqm 962.20 1005.18

b) Risers of 0.15m height :


(BLD-CSTN-9-23)
Unit = 10 sqm
A.MATERIALS :
Cost of Shahabad stone slabs 11.00 sqm 1914.94 10 sqm 2106.43
Sand for CM(1:5) base coat 0.12 cum 918.40 1 cum 110.21
Cement for CM(1:5) base coat 34.56 Kgs 4220.00 1000 Kgs 145.84
Cement for slurry 33.00 Kgs 4220.00 1000 Kgs 139.26
B.LABOUR
Mason 1st class 0.96 Nos. 630.00 1 Each 604.80
Mason 2nd class 2.24 Nos. 565.00 1 Each 1265.60
Mazdoor(unskilled) 3.10 Nos. 525.00 1 Each 1627.50
MA @ 25% 0.25 3497.90 874.48
Add water charges 1% 0.01 6874.12 68.74
Rate for 10 sqm 6942.86

Rate for other Floors FF SF


Rate as worked out above 6942.86 6942.86
Lift charges ( Page 131 of Std. Data ) 0.00 349.79

MA @ 25% 0.00 87.45


6942.86 7380.10
CIVIL DATA : Page-154

S.No./
Item
Sl. No. Description Quantity Unit Rate (Rs.) Per Unit Amount (Rs.)
Code
No.
Overheads & Contractors Profit 945.27 1004.80
@13.615%
Rate per 10 Sqm 7888.13 8384.90
Rate per 1 Sqm 788.81 838.49

26 Providing Polished black Kadapa slabs minimum of 15mm thick in single piece as specified set over a base
coat of CM (1:5) , 12mm thick using screened sand over already laid CC bed / RCC roof slab including neat
cement slurry of honey like consistency spread @ 3.3 Kgs per Sqm and jointed with neat cement to full
depth including cost and conveyance of all materials like cement, sand, water, flooring stones etc. complete
including sales & other taxes on all materials including all labour charges like dressing of flooring stones to
the required size, flat nosing the edges, mixing of cement mortar, laying, lift charges , cost of base coat, water
charges etc., and overheads & contractors profit complete for finished item of work for treads and risers.
(APSS No.703 & 701)
a) Treads of 0.30m wide : 0.30
(BLD-CSTN-9-1)
Unit = 10 sqm. 10
A. MATERIALS:
Polished black Kadapa slabs minimum 11.00 Sqm 2646.02 10 Sqm 2910.62
of 15mm thick
Cement for CM (1:5) proportion for 34.56 Kgs 4220.00 1000 Kgs 145.84
base
Cementcoatfor slurry 33.00 Kgs 4220.00 1000 Kgs 139.26
Cement for jointing 20.00 Kgs 4220.00 1000 Kgs 84.40
Sand for CM(1:5) 0.12 Cum 918.40 1 Cum 110.21
B .LABOUR
Mason 1st class 3.10 Nos 630.00 1 Each 1953.00
Mason 2nd class 1.10 Nos 565.00 1 Each 621.50
Mazdoor(un skilled) 0.86 Nos 525.00 1 Each 451.50
MA @ 25% 0.25 3026.00 756.50
Flat nosing the edges 33.33 RM 55.00 1 RM 1833.33
MA @ 25% 0.25 733.33 183.33
Add water charges 1% 0.01 9189.49 91.89
Rate for 10sqm 9281.39

Rate for other floors FF SF


Rate as worked out above 9281.39 9281.39
Lift charges ( Page 131 of Std. Data ) 0.00 302.60

MA @ 25% 0.00 75.65


9281.39 9659.64
Overheads & Contractors Profit 1263.66 1315.16
@13.615%
Rate per 10 Sqm 10545.05 10974.80
Rate per 1 Sqm 1054.50 1097.48

b) Risers of 0.15m height :


(BLD-CSTN-9-23)
Unit = 10 sqm
A.MATERIALS :
Cost of Kadapa stone slabs 11.00 sqm 2646.02 10 sqm 2910.62
Sand for CM(1:5) base coat 0.12 cum 918.40 1 cum 110.21
Cement for CM(1:5) base coat 34.56 Kgs 4220.00 1000 Kgs 145.84
Cement for slurry 33.00 Kgs 4220.00 1000 Kgs 139.26
B.LABOUR
Mason 1st class 0.96 Nos. 630.00 1 Each 604.80
Mason 2nd class 2.24 Nos. 565.00 1 Each 1265.60
CIVIL DATA : Page-155

S.No./
Item
Sl. No. Description Quantity Unit Rate (Rs.) Per Unit Amount (Rs.)
Code
No.
Mazdoor(unskilled) 3.10 Nos. 525.00 1 Each 1627.50
MA @ 25% 0.25 3497.90 874.48
Add water charges 1% 0.01 7678.30 76.78
Rate for 10 sqm 7755.09

Rate for other Floors FF SF


Rate as worked out above 7755.09 7755.09
Lift charges ( Page 131 of Std. Data ) 0.00 349.79

MA @ 25% 0.00 87.45


7755.09 8192.32
Overheads & Contractors Profit 1055.85 1115.38
@13.615%
Rate per 10 Sqm 8810.94 9307.70
Rate per 1 Sqm 881.09 930.77

#REF! Providing Coping with 16 to 18mm thick High Polished granite up to 8'-00 (2.43 M) other than black and
regular colours with borders and design as per the pattern approved by the Engineer-in-Charge of length not
less than 2.43 mts set over base coat of cement mortar (1:5) , 12mm thick using screened sand over CC bed
already laid or RCC roof slab including neat grey cement slurry of honey like consistency spread @ 3.3 Kg per
sqm and jointed neatly with white cement paste mixed with pigment of matching shade to full depth
including cost and conveyance of all materials like cement , sand , water , granite slabs etc., to work site and
all operational, incidental labour & lift charges, half rounding the edges of treads , polishing charges and all
other taxes on all materials, cost of base coat and overheads & contractors profit complete for finished item
of work for Coping 0.50 m wide (S.S.701 & special)

a) Coping wide : 0.5 m

(BLD-CSTN-9-7)
Unit 10 sqm.
A. MATERIALS:
High Polished Granite 16 to 18 mm 10.50 Sqm 2501.69 1 Sqm 26267.75
thick
Cement for CM(1:5) for base coat 34.56 Kgs 4220.00 1000 Kgs 145.84
Cement for slurry 33.00 Kgs 4220.00 1000 Kgs 139.26
White cement for jointing 6.00 Kgs 31.00 1 Kg 186.00
Sand for CM(1:5) 0.12 Cum 918.40 1 Cum 110.21
B .LABOUR
Mason 1st class 3.00 Nos 630.00 1 Each 1890.00
Mason 2nd class 1.00 Nos 565.00 1 Each 565.00
Mazdoor(un skilled) 8.00 Nos 525.00 1 Each 4200.00
MA @ 25% 0.25 6655.00 1663.75
Machine cutting charges 20.00 RM 19.00 1 RM 380.00
Half rounding the edges 20.00 RM 350.00 1 RM 7000.00
MA @ 25% 0.25 2952.00 738.00
Add water charges 1% 0.01 43285.81 432.86
Rate for 10sqm 43718.66

Rate for other Floors FF


Rate as worked out above 43718.66
Lift charges ( Page 131 of Std. Data ) 0.00
CIVIL DATA : Page-156

S.No./
Item
Sl. No. Description Quantity Unit Rate (Rs.) Per Unit Amount (Rs.)
Code
No.
MA @ 25% 0.00

43718.66
Overheads & Contractors Profit 5952.30
@13.615%
Rate per 10 Sqm 49670.96
Rate per 1 Sqm 4967.10

#REF! Providing Treads with 16 to 18mm thick High Polished granite up to 8'-00 (2.43 M) other than black and
regular colours with borders and design as per the pattern approved by the Engineer-in-Charge of length not
less than 2.43 mts set over base coat of cement mortar (1:5) , 12mm thick using screened sand over CC bed
already laid or RCC roof slab including neat grey cement slurry of honey like consistency spread @ 3.3 Kg per
sqm and jointed neatly with white cement paste mixed with pigment of matching shade to full depth
including cost and conveyance of all materials like cement , sand , water , granite slabs etc., to work site and
all operational, incidental labour & lift charges, half rounding the edges of treads , polishing charges and all
other taxes on all materials, cost of base coat and overheads & contractors profit complete for finished item
of work for Treads (S.S.701 & special)

a) Treads wide : 0.3 m


(BLD-CSTN-9-7)
Unit 10 sqm.
A. MATERIALS:
High Polished Granite 16 to 18 mm 10.50 Sqm 2501.69 1 Sqm 26267.75
thick
Cement for CM(1:5) for base coat 34.56 Kgs 4220.00 1000 Kgs 145.84
Cement for slurry 33.00 Kgs 4220.00 1000 Kgs 139.26
White cement for jointing 6.00 Kgs 31.00 1 Kg 186.00
Sand for CM(1:5) 0.12 Cum 918.40 1 Cum 110.21
B .LABOUR
Mason 1st class 3.00 Nos 630.00 1 Each 1890.00
Mason 2nd class 1.00 Nos 565.00 1 Each 565.00
Mazdoor(un skilled) 8.00 Nos 525.00 1 Each 4200.00
MA @ 25% 0.25 6655.00 1663.75
Machine cutting charges 33.33 RM 19.00 1 RM 633.33
Half rounding the edges 33.33 RM 350.00 1 RM 11666.67
MA @ 25% 0.25 4920.00 1230.00
Add water charges 1% 0.01 48697.81 486.98
Rate for 10sqm 49184.78

Rate for other Floors FF SF


Rate as worked out above 49184.78 49184.78
Lift charges ( Page 131 of Std. Data ) 0.00 492.00

MA @ 25% 0.00 123.00


49184.78 49799.78
Overheads & Contractors Profit 6696.51 6780.24
@13.615%
Rate per 10 Sqm 55881.29 56580.02
Rate per 1 Sqm 5588.13 5658.00
CIVIL DATA : Page-157

S.No./
Item
Sl. No. Description Quantity Unit Rate (Rs.) Per Unit Amount (Rs.)
Code
No.
#REF! b) Providing Risers to steps walls with High Polished Granite 16 to 18 mm thick up to 8'-00 (2.43 M) other
than black and regular colours length equal to flooring stone, set over base coat of CM(1:5) 12 mm thick
using screened sand with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and
jointing with white cement paste mixed with pigment of matching shade to full depth, including cost of all
materials like tiles, cement, sand and water etc., and overheads & contractors profit complete for finished
item of work. for Risers-0.15 m(APSS No.701 &707)

Risers of 0.15m height : 0.15 m


(BLD-CSTN-9-19)
Unit= 10.00 sqm
A.MATERIALS :
Cost of high polished granite 10.50 sqm 2501.69 1 sqm 26267.75
Sand for CM(1:5) base coat 0.12 cum 918.40 1 cum 110.21
Cement for CM(1:5) base coat 34.56 Kgs 4220.00 1000 Kgs 145.84
Cement for slurry 33.00 Kgs 4220.00 1000 Kgs 139.26
White cement for jointing & pointing 5.00 Kgs 31.00 1 Kg 155.00

Machine cutting charges 66.67 RM 19.00 1 RM 1266.67


MA @ 25% 0.25 506.67 126.67
B.LABOUR
Mason 1st class 2.10 Nos. 630.00 1 Each 1323.00
Man Mazdoor(Beldar) 4.90 Nos. 525.00 1 Each 2572.50
MA @ 25% 0.25 3895.50 973.88
Add water charges 1% 0.01 33080.76 330.81
Rate for 10 sqm 33411.57

Rate for other Floors FF


Rate as worked out above 33411.57
Lift charges ( Page 131 of Std. Data ) 0.00

MA @ 25% 0.00
33411.57
Overheads & Contractors Profit 4548.99
@13.615%
Rate per 10 Sqm 37960.56
Rate per 1 Sqm 3796.06
Say 3796

#REF! Providing Treads for step's with 16 to 18mm thick Antique Finished granite I- CLASS slabs up to 8'-00 (2.43
M) other than black and regular colours with borders and design as per the pattern approved by the
Engineer-in-Charge of length not less than 2.43 mts set over base coat of cement mortar (1:5) , 12mm thick
using screened sand over CC bed already laid or RCC roof slab including neat grey cement slurry of honey like
consistency spread @ 3.3 Kg per sqm and jointed neatly with white cement paste mixed with pigment of
matching shade to full depth including cost and conveyance of all materials like cement , sand , water , granite
slabs etc., to work site and all operational, incidental labour & lift charges, half rounding the edges of treads ,
polishing charges and all other taxes on all materials, cost of base coat and overheads & contractors profit
complete for finished item of work for Coping &Treads (S.S.701 & special)

a) Treads wide : 0.33 m


(BLD-CSTN-9-7)
Unit 10 sqm.
A. MATERIALS:
As per Quotation Antique Finished granite 16 to 18 mm 10.50 Sqm 3041.69 1 Sqm 31937.75
thick

Cement for CM(1:5) for base coat 34.56 Kgs 4220.00 1000 Kgs 145.84
CIVIL DATA : Page-158

S.No./
Item
Sl. No. Description Quantity Unit Rate (Rs.) Per Unit Amount (Rs.)
Code
No.
Cement for slurry 33.00 Kgs 4220.00 1000 Kgs 139.26
White cement for jointing 6.00 Kgs 31.00 1 Kg 186.00
Sand for CM(1:5) 0.12 Cum 918.40 1 Cum 110.21
B .LABOUR
Mason 1st class 3.00 Nos 630.00 1 Each 1890.00
Mason 2nd class 1.00 Nos 565.00 1 Each 565.00
Mazdoor(un skilled) 8.00 Nos 525.00 1 Each 4200.00
MA @ 25% 0.25 6655.00 1663.75
Machine cutting charges 30.30 RM 19.00 1 RM 575.76
Half rounding the edges 30.30 RM 350.00 1 RM 10606.06
MA @ 25% 0.25 4472.73 1118.18
Add water charges 1% 0.01 53137.81 531.38
Rate for 10sqm 53669.18

Rate for other Floors FF SF


Rate as worked out above 53669.18 53669.18
Lift charges ( Page 131 of Std. Data ) 0.00 665.50

MA @ 25% 0.00 166.38


53669.18 54501.06
Overheads & Contractors Profit 7307.06 7420.32
@13.615%
Rate per 10 Sqm 60976.24 61921.38
Rate per 1 Sqm 6097.62 6192.14

#REF! a) Providing Risers to steps with 16 to 18mm thick Antique Finished granite I- CLASS slabs length equal to
flooring stone, set over base coat of CM(1:5) 12 mm thick using screened sand with cement slurry of honey
like consistency spread at the rate of 3.30 kgs per sqm and jointing with white cement paste mixed with
pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc.,
and overheads & contractors profit complete for finished item of work. for Risers-0.13 m(APSS No.701 &707)

b) Risers of 0.15m height : 0.13 m


(BLD-CSTN-9-19)
Unit= 10.00 sqm
A.MATERIALS :
As per Quotation Antique Finished granite 16 to 18 mm 10.50 sqm 3041.69 1 sqm 31937.75
thick
Sand for CM(1:5) base coat 0.12 cum 918.40 1 cum 110.21
Cement for CM(1:5) base coat 34.56 Kgs 4220.00 1000 Kgs 145.84
Cement for slurry 33.00 Kgs 4220.00 1000 Kgs 139.26
White cement for jointing & pointing 5.00 Kgs 31.00 1 Kg 155.00

Machine cutting charges 76.92 RM 19.00 1 RM 1461.54


MA @ 25% 0.25 584.62 146.15
B.LABOUR
Mason 1st class 2.10 Nos. 630.00 1 Each 1323.00
Man Mazdoor(Beldar) 4.90 Nos. 525.00 1 Each 2572.50
MA @ 25% 0.25 3895.50 973.88
Add water charges 1% 0.01 38965.12 389.65
Rate for 10 sqm 39354.77

Rate for other Floors FF SF


CIVIL DATA : Page-159

S.No./
Item
Sl. No. Description Quantity Unit Rate (Rs.) Per Unit Amount (Rs.)
Code
No.
Rate as worked out above 39354.77 39354.77
Lift charges ( Page 131 of Std. Data ) 0.00 389.55

MA @ 25% 0.00 97.39


39354.77 39841.71
Overheads & Contractors Profit 5358.15 5424.45
@13.615%
Rate per 10 Sqm 44712.92 45266.16
Rate per 1 Sqm 4471.29 4526.62

Skirting & Dadooing, Cladding


19 Providing skirting to internal walls to 10.00 cm height with Polished Shahabad/Tandur stone slabs 15mm to
18mm thick, length equal to flooring stones set over base coat of CM(1:5) 12 mm thick using screened sand
with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointing with white
cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles,
cement, sand and water etc., complete and overheads & contractors profit complete for finished item of
work.(APSS No.701 &707)

(BLD-CSTN-9-23)
Unit = 10 sqm
A.MATERIALS :
Cost of Shahabad stone slabs 11.00 sqm 1914.94 10 sqm 2106.43
Sand for CM(1:5) base coat 0.12 cum 918.40 1 cum 110.21
Cement for CM(1:5) base coat 34.56 Kgs 4220.00 1000 Kgs 145.84
Cement for slurry 33.00 Kgs 4220.00 1000 Kgs 139.26
B.LABOUR
Mason 1st class 0.96 Nos. 630.00 1 Each 604.80
Mason 2nd class 2.24 Nos. 565.00 1 Each 1265.60
Mazdoor(unskilled) 3.10 Nos. 525.00 1 Each 1627.50
MA @ 25% 0.25 3497.90 874.48
Add water charges 1% 0.01 6874.12 68.74
Rate for 10 sqm 6942.86

Rate for other Floors FF


Rate as worked out above 6942.86
Lift charges ( Page 131 of Std. Data ) 0.00

MA @ 25% 0.00
6942.86
Overheads & Contractors Profit 945.27
@13.615%
Rate per 10 Sqm 7888.13
Rate per 1 RM 78.88

20 Providing skirting to internal walls to 10.00 cm height with Polished Kadapa stone slabs minimum of 15mm
thick, length equal to flooring stones set over base coat of CM(1:5) 12 mm thick using screened sand with
cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointing with white cement
paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement,
sand and water etc., complete and overheads & contractors profit complete for finished item of work.(APSS
No.701 &707)
(BLD-CSTN-9-22)
Unit = 10 sqm
A.MATERIALS :
Cost of Kdapa stone slabs 11.00 sqm 1764.01 10 sqm 1940.41
CIVIL DATA : Page-160

S.No./
Item
Sl. No. Description Quantity Unit Rate (Rs.) Per Unit Amount (Rs.)
Code
No.
Sand for CM(1:5) base coat 0.12 cum 918.40 1 cum 110.21
Cement for CM(1:5) base coat 34.56 Kgs 4220.00 1000 Kgs 145.84
Cement for slurry 33.00 Kgs 4220.00 1000 Kgs 139.26
B.LABOUR
Mason 1st class 0.96 Nos. 630.00 1 Each 604.80
Mason 2nd class 2.24 Nos. 565.00 1 Each 1265.60
Mazdoor(unskilled) 3.10 Nos. 525.00 1 Each 1627.50
MA @ 25% 0.25 3497.90 874.48
Add water charges 1% 0.01 6708.10 67.08
Rate for 10 sqm 6775.18

Rate for other Floors FF SF


Rate as worked out above 6775.18 6775.18
Lift charges ( Page 131 of Std. Data ) 0.00 349.79

MA @ 25% 0.00 87.45


6775.18 7212.42
Overheads & Contractors Profit 922.44 981.97
@13.615%
Rate per 10 Sqm 7697.62 8194.39
Rate per 1 RM 76.98 81.94

21 Providing skirting to internal walls to 10 cm height with non-skid full body ceramic floor tiles of thickness
between 7 - 8mm 1st quality conforming to IS: 13711, IS: 13712, IS: 13630(Part 1 to 15) of any colour and
finish in all shades and designs as approved by Engineer-in-charge, length equal to flooring tiles, set over base
coat of CM(1:5) 12 mm thick using screened sand with cement slurry of honey like consistency spread at the
rate of 3.30 kgs per sqm and jointing with white cement paste mixed with pigment of matching shade to full
depth, including cost of all materials like tiles, cement, sand and water, overheads & contractors profit
complete for finished item of work.(APSS No.701 &707)
(BLD-CSTN-9-18)
Unit = 10 sqm
A.MATERIALS :
Cost of full body ceramic tiles 8 mm 10.50 sqm 375.00 1 sqm 3937.50
thick
Sand for CM(1:5) base coat 0.12 cum 918.40 1 cum 110.21
Cement for CM(1:5) base coat 34.56 Kgs 4220.00 1000 Kgs 145.84
Cement for slurry 33.00 Kgs 4220.00 1000 Kgs 139.26
White cement for jointing & pointing 6.00 Kgs 31.00 1 Kg 186.00

B.LABOUR
Mason 1st class 0.77 Nos. 630.00 1 Each 485.10
Mazdoor(unskilled) 0.80 Nos. 525.00 1 Each 420.00
MA @ 25% 0.25 905.10 226.28
Add water charges 1% 0.01 5650.19 56.50
Rate per 10 Sqm 5706.69

Rate for other Floors FF SF


Rate as worked out above 5706.69 5706.69
Lift charges ( Page 131 of Std. Data ) 0.00 90.51

MA @ 25% 0.00 22.63


5706.69 5819.83
Overheads & Contractors Profit 776.97 792.37
@13.615%
CIVIL DATA : Page-161

S.No./
Item
Sl. No. Description Quantity Unit Rate (Rs.) Per Unit Amount (Rs.)
Code
No.
Rate per 10 Sqm 6483.66 6612.20
Rate per 1 RM 64.84 66.12

22 Providing skirting to internal walls to 10 cm height with soluble salt porcelain vitrified tiles screen printed
and polished of thickness between 8 to 10mm 1st quality conforming to IS: 13711, IS: 13712, IS: 13630(Parts
1 to 15) of any colour and finish in all shades and designs, length equal to flooring tiles, set over base coat of
CM(1:5) 12 mm thick using screened sand with cement slurry of honey like consistency spread at the rate of
3.30 kgs per sqm and jointing with white cement paste mixed with pigment of matching shade to full depth,
including cost of all materials like tiles, cement, sand and water etc., and overheads & contractors profit
complete for finished item of work.(APSS No.701 &707)
(BLD-CSTN-9-20)
Unit = 10 sqm
Cost of vitrified tiles 8-10mm thick 10.50 sqm 425.00 1 sqm 4462.50
Sand for CM(1:5) base coat 0.12 cum 918.40 1 cum 110.21
Cement for CM(1:5) base coat 34.56 Kgs 4220.00 1000 Kgs 145.84
Cement for slurry 33.00 Kgs 4220.00 1000 Kgs 139.26
White cement for jointing & pointing 2.00 Kgs 31.00 1 Kg 62.00

B.LABOUR
Mason 1st class 0.96 Nos. 630.00 1 Each 604.80
Mason 2st class 2.24 Nos. 565.00 1 Each 1265.60
Mazdoor(unskilled) 3.30 Nos. 525.00 1 Each 1732.50
MA @ 25% 0.25 3602.90 900.73
Add water charges 1% 0.01 9423.44 94.23
Rate for 10 sqm 9517.67

Rate for other Floors FF SF


Rate as worked out above 9517.67 9517.67
Lift charges ( Page 131 of Std. Data ) 0.00 360.29

MA @ 25% 0.00 90.07


9517.67 9968.03
Overheads & Contractors Profit 1295.83 1357.15
@13.615%
Rate per 10 Sqm 10813.50 11325.18
Rate per 1 RM 108.14 113.25

18 Providing cladding Granite to walls with High Polished Granite 16 to 18 mm thick up to 8'-00 (2.43 M)
other than black and regular colours, length equal to flooring slabs set over base coat of CM(1:5) 12 mm thick
using screened sand with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and
jointing with white cement paste mixed with pigment of matching shade to full depth, including cost of all
materials like tiles, cement, sand and water etc., and overheads & contractors profit complete for finished
item of work.

(BLD-CSTN-9-19)
cladding Size of 1.20 mx0.75 m
Unit 10.00 0.75
A.MATERIALS :
Cost of high polished granite 10.50 sqm 2501.69 1 sqm 26267.75
CIVIL DATA : Page-162

S.No./
Item
Sl. No. Description Quantity Unit Rate (Rs.) Per Unit Amount (Rs.)
Code
No.
Sand for CM(1:5) base coat 0.12 cum 918.40 1 cum 110.21
Cement for CM(1:5) base coat 34.56 Kgs 4220.00 1000 Kgs 145.84
Cement for slurry 33.00 Kgs 4220.00 1000 Kgs 139.26
White cement for jointing & pointing 5.00 Kgs 31.00 1 Kg 155.00

Machine cutting charges 13.33 RM 19.00 1 RM 253.33


MA @ 25% 0.25 101.33 25.33
B.LABOUR
Mason 1st class 2.10 Nos. 630.00 1 Each 1323.00
Man Mazdoor(Beldar) 4.90 Nos. 525.00 1 Each 2572.50
MA @ 25% 0.25 3895.50 973.88
Add water charges 1% 0.01 31966.10 319.66
Rate for 10 sqm 32285.76

Rate for other Floors FF


Rate as worked out above 32285.76
Lift charges ( Page 131 of Std. Data ) 0.00

MA @ 25% 0.00
32285.76
Overheads & Contractors Profit 4395.71
@13.615%
Rate per 10 Sqm 36681.47
Rate per 1 Sqm 3668.15

#REF! Providing cladding to walls with granite stone tiles 8mm thick (mirror polished of all shades) of 1st quality
length equal to flooring slabs set over base coat of CM(1:5) 12 mm thick using screened sand with cement
slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointing with white cement paste
mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and
water etc., and overheads & contractors profit complete for finished item of work.

(BLD-CSTN-9-21)
Unit = 10 sqm
A.MATERIALS :
granite stone tiles 8mm thick 10.50 sqm 1100.00 1 sqm 11550.00
Sand for CM(1:5) base coat 0.12 cum 918.40 1 cum 110.21
Cement for CM(1:5) base coat 34.56 Kgs 4220.00 1000 Kgs 145.84
Cement for slurry 33.00 Kgs 4220.00 1000 Kgs 139.26
White cement for jointing & pointing 5.00 Kgs 31.00 1 Kg 155.00

Machine cutting charges 66.67 RM 19.00 1 RM 1266.73


MA @ 25% 0.25 506.69 126.67
B.LABOUR
Mason 1st class 0.96 Nos. 630.00 1 Each 604.80
Mason 2st class 2.24 Nos. 565.00 1 Each 1265.60
Man Mazdoor(Beldar) 3.30 Nos. 525.00 1 Each 1732.50
MA @ 25% 0.25 3602.90 900.73
Add water charges 1% 0.01 17997.34 179.97
Rate for 10 sqm 18177.31
CIVIL DATA : Page-163

S.No./
Item
Sl. No. Description Quantity Unit Rate (Rs.) Per Unit Amount (Rs.)
Code
No.
Rate for other Floors FF SF
Rate as worked out above 18177.31 18177.31
Lift charges ( Page 131 of Std. Data ) 0.00 360.29

MA @ 25% 0.00 90.07


18177.31 18627.68
Overheads & Contractors Profit 2474.84 2536.16
@13.615%
Rate per 10 Sqm 20652.15 21163.84
Rate per 1 sqm 2065.22 211.64

#REF! Providing dadooing to walls with glazed full body ceramic tiles of any size and thickness between 5 to 7mm
1st quality conforming to IS: 13711, IS: 13712, IS: 13630(Parts 1 to 15) of any colour and finish in all shades
and designs with borders as approved by Engineer-in-Charge set over base coat of CM(1:5) 12 mm thick using
screened sand with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and
jointing with white cement paste mixed with pigment of matching shade to full depth, including cost of all
materials like tiles, cement, sand and water etc., and overheads & contractors profit complete for finished
item of work.
(BLD-CSTN-9-18)
Unit = 10 sqm
A.MATERIALS :
Cost of glazed coloured tiles 10.50 sqm 435.00 1 sqm 4567.50
Sand for CM(1:5) base coat 0.12 cum 918.40 1 cum 110.21
Cement for CM(1:5) base coat 34.56 Kgs 4220.00 1000 Kgs 145.84
Cement for slurry 33.00 Kgs 4220.00 1000 Kgs 139.26
White cement for jointing & pointing 6.00 Kgs 31.00 1 Kg 186.00

B.LABOUR
Mason 1st class 0.77 Nos. 630.00 1 Each 485.10
Mazdoor(unskilled) 0.80 Nos. 525.00 1 Each 420.00
MA @ 25% 0.25 905.10 226.28
Add water charges 1% 0.01 6280.19 62.80
Rate for 10 sqm 6342.99

Rate for other Floors FF SF


Rate as worked out above 6342.99 6342.99
Lift charges ( Page 131 of Std. Data ) 0.00 90.51

MA @ 25% 0.00 22.63


6342.99 6456.13
Overheads & Contractors Profit 863.60 879.00
@13.615%
Rate per 10 Sqm 7206.59 7335.13
Rate per 1 Sqm 720.66 733.51

#REF! Full rounding the edges of granite stone slabs of all thickness including polishing the same as per SoR BMM-
V.11

MATERIAL:
BMM- Rate as per SSR 1 Rmt 453.00 1.00 Rmt 453.00
V.11

Overheads & Contractors Profit 0.13615 453.00 61.68


@13.615%
Cost of 1 Rmt 514.68
CIVIL DATA : Page-164

S.No./
Item
Sl. No. Description Quantity Unit Rate (Rs.) Per Unit Amount (Rs.)
Code
No.
#REF! Half Rounding the edges of granite stone slabs of all thickness including polishing the same as per SoR BMM-
V.10

MATERIAL:
BMM- Rate as per SSR 1 Rmt 350.00 1.00 Rmt 350.00
V.10

Overheads & Contractors Profit 0.13615 350.00 47.65


@13.615%
Cost of 1 Rmt 397.65

Painting
21 White washing two coats with white cement to ceiling to give an even shade after thoroughly brushing the
surface to remove all dirt and remains of loose powdered materials including cost of all materials , labour
charges and incidental such as scaffolding , lift charges etc., and overheads & contractors profit complete for
finished item of work in all floors.

(BLD-CSTN-11-5)
Unit : 10 sqm
A.MATERIALS :
White cement 2.00 kgs 31.00 1 kgs 62.00
B.LABOUR :
Painter 1st class 0.063 Nos. 705.00 1 Each 44.42
Painter 2nd class 0.147 Nos. 565.00 1 Each 83.05
Mazdoor(unskilled) 0.32 Nos. 525.00 1 Each 168.00
MA @ 25% 0.25 295.47 73.87
Sundries including brushes , ladders 1% 431.34 4.31
etc., @ 1%
Rate per 10 sqm 435.65
Overheads & Contractors Profit 0.13615 435.65 59.31
@13.615%
Rate per 10 sqm 494.96
Rate per 1 sqm 49.50

22 Providing and applying Wall putty of White Cement or Polymer or Cement based of average 1 to 2 mm
thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the
surface to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface,
clean & wipe off loose dust, applying knifing paste filler by putty knife / muslin pad, air dry for 2 - 3 hrs, sand
with 180 and 320 No., emery paper for the surface preparation including cost and conveyance of all materials
to work site and all operational, incidental, labour charges, over heads and contractors profit etc., complete
for finished item of work in all floors for Internal walls
(As per Amendment in SoR 2011-12)
Unit = 10 Sqm
wall putty 23.00 Kgs 600.00 20 Kg 690.00
Painter 1st class 0.273 Nos. 705.00 1 Each 192.47
Painter 2nd class 0.637 Nos. 565.00 1 Each 359.91
Mazdoor 0.910 Nos. 525.00 1 Each 477.75
MA @ 25% 0.25 1030.12 257.53
Sundries for emery papers, fillers, knife 0.01 1977.65 19.78
etc., @ 1%
1997.43
Overheads & Contractors Profit 0.13615 1997.43 271.95
@13.615%
Rate per 10 sqm 2269.38
Rate per 1 sqm 226.94
CIVIL DATA : Page-165

S.No./
Item
Sl. No. Description Quantity Unit Rate (Rs.) Per Unit Amount (Rs.)
Code
No.

23 Providing and applying PMCC / Deco orient base or Equivalent exterior Texture (Brick Leave White Houzz
Wallpaper Paint Background Orange Red Texture) of average 2 to 3 mm thickness over plastered surface to
prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of
loose powdered materials, applying emery paper, Sand the surface, clean & wipe off loose dust, applying
putty/ texture paint filler by putty knife / muslin pad, air dry for 2 - 3 hrs for the surface preparation
including cost and conveyance of all materials to work site and all operational, incidental, labour charges,
scaffolding charges, overheads and contractors profit etc., complete for finished item of work in all floors for
external walls
(As per Amendment in SoR 2011-12)
Unit = 10 Sqm
exterior texture 34.50 Kgs 818.00 25 Kg 1128.84
Painter 1st class 0.273 Nos. 705.00 1 Each 192.47
Painter 2nd class 0.637 Nos. 565.00 1 Each 359.91
Mazdoor 0.91 Nos. 525.00 1 Each 477.75
MA @ 25% 0.25 1030.12 257.53
Sundries for emery papers, fillers, knife 0.01 2416.49 24.16
etc., @ 1%
Hire charges for Access Scaffolding 10 sqm 1.08 1 sqm 10.80

Labour charges for scaffolding 10 sqm 8.47 1 sqm 84.70


MA @ 25% 0.25 84.70 21.18
2557.33
Overheads & Contractors Profit 0.13615 2557.33 348.18
@13.615%
Rate per 10 sqm 2905.51
Rate per 1 sqm 290.55

24 Painting to new walls with 2 coats of Acrylic based Oil bound Washable Distemper having VOC content less
than 50 grams/litre over primer coat using white cement as approved by Engineer-In-Charge, making 3 coats
in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose
powdered materials, including cost and conveyance of all materials to work site and all operational,
incidental, labour charges etc., and overheads & contractors profit complete for finished item of work as per
APSS 911 for internal walls in all floors.
(BLD-CSTN-12-1)
Unit = 10 Sqm
Cost of white cement 0.50 Kg 31.00 1 Kg 15.50
Painter 1st class 0.08 Nos. 705.00 1 Each 56.40
Painter 2nd class 0.19 Nos. 565.00 1 Each 107.35
Cost of washable oil bound distemper 1.70 Ltrs 81.00 1 Ltr 137.70

Painter 1st class 0.36 Nos. 705.00 1 Each 253.80


Painter 2nd class 0.84 Nos. 565.00 1 Each 474.60
MA @ 25% 0.25 892.15 223.04
Sundries including brushes , ladders 0.01 1268.39 12.68
etc., @ 1%
1281.07
Overheads & Contractors Profit 0.13615 1281.07 174.42
@13.615%
Rate per 10 sqm 1455.49
Rate per 1 sqm 145.55
CIVIL DATA : Page-166

S.No./
Item
Sl. No. Description Quantity Unit Rate (Rs.) Per Unit Amount (Rs.)
Code
No.
23 Painting to new walls with 2 coats of water proof cement paint of shade as approved by the Engineer-In-
Charge over a base coat of approved white cement base coat making 3 coats in all to give an even shade after
thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost
and conveyance of all materials to work site and all operational, incidental, labour charges etc., and
overheads & contractors profit complete for finished item of work as per SS 912 in all floors
(BLD-CSTN-12-1 & 12-5)
Cost of white cement for base coat 1.00 Kgs 31.00 1 Kgs 31.00

Painter 1st class 0.08 Nos. 705.00 1 Each 56.40


Painter 2nd class 0.19 Nos. 565.00 1 Each 107.35
Water proof cement paint 2.00 Kgs 1009.00 25 Kgs 80.72
Painter 1st class 0.15 Nos. 705.00 1 Each 105.75
Painter 2nd class 0.35 Nos. 565.00 1 Each 197.75
Mazdoor(unskilled) 1.50 Nos. 525.00 1 Each 787.50
MA @ 25% 0.25 1254.75 313.69
Sundries including brushes , ladders 0.01 1680.16 16.80
etc., @ 1%
1696.96
Overheads & Contractors Profit 0.13615 1696.96 231.04
@13.615%
Rate per 10 sqm 1928.00
Rate per 1 sqm 192.80

24 Supply & application of one coat water based cement primer of interior grade I and two coats of acrylic
emulsion paint having VOC (Volatile Organic Compound) content less than 50 grams/litre for internal walls
including cost and conveyance of all materials to site, sales & other taxes, incidental, operational and all
labour charges etc., and overheads & contractors profit complete for finished item of work in all floors.

(BLD-CSTN-12-2& Amendment in SoR 2011-12)


Unit 10 Sqm.
A. Materials:-
Cost of cement primer interior grade I 1.00 Kg 160.00 1 Kg 160.00

Painter 1st class 0.21 Nos. 705.00 1 Each 148.05


Painter 2nd class 0.49 Nos. 565.00 1 Each 276.85
Acrylic emulsion paint 0.80 Ltrs 190.00 1 Ltrs 152.00
Painter 1st class 0.36 Nos. 705.00 1 Each 253.80
Painter 2nd class 0.84 Nos. 565.00 1 Each 474.60
MA @ 25% 0.25 1153.30 288.33
Sundries including brushes , ladders 0.01 1753.63 17.54
etc., @ 1%
1771.16
Overheads & Contractors Profit 0.13615 1771.16 241.14
@13.615%
Rate per 10 sqm 2012.30
Rate per 1 sqm 201.23

#REF! Supply & application of one coat water based cement primer of exterior grade II and two coats of acrylic
exterior emulsion paint having VOC (Volatile Organic Compound) content less than 50 grams/litre for
exterior walls including cost and conveyance of all materials to site, sales & other taxes, incidental,
operational and all labour charges etc., and overheads & contractors profit complete for finished item of work
in all floors.
CIVIL DATA : Page-167

S.No./
Item
Sl. No. Description Quantity Unit Rate (Rs.) Per Unit Amount (Rs.)
Code
No.
(BLD-CSTN-12-2& Amendment in SoR
2011-12)

Unit 10 Sqm.
A. Materials:-
Cost of cement primer exterior grade II 1.00 Kg 200.00 1 Kg 200.00
Painter 1st class 0.21 Nos. 705.00 1 Each 148.05
Painter 2nd class 0.49 Nos. 565.00 1 Each 276.85
Acrylic emulsion paint 0.80 Ltrs 190.00 1 Ltrs 152.00
Painter 1st class 0.21 Nos. 705.00 1 Each 148.05
Painter 2nd class 0.49 Nos. 565.00 1 Each 276.85
Mazdoor(Unskilled) 1.50 Nos. 525.00 1 Each 787.50
MA @ 25% 0.25 1637.30 409.33
Sundries including brushes , ladders 0.01 2398.63 23.99
etc., @ 1%
2422.61
Overheads & Contractors Profit 0.13615 2422.61 329.84
@13.615%
Rate per 10 sqm 2752.45
Rate per 1 sqm 275.24

#REF! Painting to new wood work and flush shutters with lappam finish , over a primary coat and painting two
coats of synthetic enamel paint Grade-I VOC (Volatile Organic Compound) content less than 50 grams/litre of
approved shade including cost and conveyance of all materials to site cost of primer coat and all labour
charges etc. complete including applying sand paper on lappam coats for neat finish including sales & other
taxes on cost of all materials etc., and overheads & contractors profit complete in all floors (APSS No.1200,
1207 & 1211).
(BLD-CSTN-12-6 & 12-12-195)
Cost of Putty for wood work 1 Kg 130.00 1 Kg 130.00
Primer Coat
Cost of Wood Primer 0.70 Ltr 160.00 1 Ltr 112.00
1st Class Painter 0.21 Nos. 705.00 1 Each 148.05
2nd Class Painter 0.49 Nos. 565.00 1 Each 276.85
2 coats of Enamel painting
Cost of Synthetic Enamel Paint 1.20 Ltr 270.00 1 Ltr 324.00
1st Class Painter 0.36 Nos. 705.00 1 Each 253.80
2nd Class Painter 0.84 Nos. 565.00 1 Each 474.60
MA @ 25% 0.25 1153.30 288.33
Sundries including brushes , ladders 0.01 2007.63 20.08
etc., @ 1%
2027.70
Overheads & Contractors Profit 0.13615 2027.70 276.07
@13.615%
Rate per 10 sqm 2303.77
Rate per 1 sqm 230.38

1.70mts 1.80mts
13 Painting primer coat on new wood work using red oxide Iron primer paint grade - 1 of approved brand
including cost and conveyance of all materials to site , all labour charges etc., and overheads & contractors
profit complete in all floors.(APSS No. 1201, 1212 & 1207).

(BLD-CSTN-12-7)
Unit : 10 sqm
A.MATERIALS :
Red oxide primer 0.70 Ltr 145.00 1 Ltr 101.50
CIVIL DATA : Page-168

S.No./
Item
Sl. No. Description Quantity Unit Rate (Rs.) Per Unit Amount (Rs.)
Code
No.
B.LABOUR :
1st Class Painter 0.21 Nos. 705.00 1 Each 148.05
2nd Class Painter 0.49 Nos. 565.00 1 Each 276.85
MA @ 25% 0.25 424.90 106.23
Sundries including brushes , ladders 0.01 632.63 6.33
etc., @ 1%

638.95
Overheads & Contractors Profit 0.13615 638.95 86.99
@13.615%
Rate per 10 sqm 725.94
Rate per 1 sqm 72.59

14 Painting two coats with synthetic enamel paint Grade-II VOC (Volatile Organic Compound) content less than
50 grams/litre to new iron work including cost and conveyance of all materials to site, sales & other taxes,
incidental, operational and all labour charges etc., and overheads & contractors profit complete for finished
item of work in all floors. (SS No. 1201, 1212 & 1207).

(BLD-CSTN-12-12-197)
Unit : 10 sqm
A.MATERIALS :
Cost of Synthetic Enamel Paint 1.10 Ltr 270.00 1 Ltr 297.00
B.LABOUR :
1st Class Painter 0.33 Nos. 705.00 1 Each 232.65
2nd Class Painter 0.77 Nos. 565.00 1 Each 435.05
MA @ 25% 0.25 667.70 166.93
Sundries including brushes , ladders 0.01 1131.63 11.32
etc., @ 1%
1142.94
Overheads & Contractors Profit 0.13615 1142.94 155.61
@13.615%
Rate per 10 sqm 1298.55
Rate per 1 sqm 129.86

14 Painting to new iron work with one coat of Red oxide primer and two coats with synthetic enamel paint
Grade-II VOC (Volatile Organic Compound) content less than 50 grams/litre over primer coat of red oxid,
including cost and conveyance of all materials like Red oxide primer ,Synthetic Enamel Paint to site, sales &
other taxes, incidental, operational and all labour charges etc., and overheads & contractors profit complete
for finished item of work in all floors. (SS No. 1201, 1212 & 1207).

(BLD-CSTN-12-7 & 12-12-197)


Unit : 10 sqm
A.MATERIALS :
Red oxide primer 0.70 Ltr 145.00 1 Ltr 101.50
Cost of Synthetic Enamel Paint 1.10 Ltr 270.00 1 Ltr 297.00
B.LABOUR :
for primer coat
1st Class Painter 0.21 Nos. 705.00 1 Each 148.05
2nd Class Painter 0.49 Nos. 565.00 1 Each 276.85
for enamel painting
1st Class Painter 0.33 Nos. 705.00 1 Each 232.65
2nd Class Painter 0.77 Nos. 565.00 1 Each 435.05
CIVIL DATA : Page-169

S.No./
Item
Sl. No. Description Quantity Unit Rate (Rs.) Per Unit Amount (Rs.)
Code
No.
MA @ 25% 0.25 1092.60 273.15
Sundries including brushes , ladders 0.01 1764.25 17.64
etc., @ 1%
1781.89
Overheads & Contractors Profit 0.13615 1781.89 242.60
@13.615%
Rate per 10 sqm 2024.50
Rate per 1 sqm 202.45

15 Supply and fixing jallies ( cement concrete ) of 50mm thick as per the design approved by the Engineer-in-
Charge including cost and conveyance of materials to site and labour charges etc., overheads & contractors
profit complete for finished item of work.

Cost of 50mm thick jali 1.00 sqm 388.00 1 sqm 388.00


1st class mason 0.06 Nos. 630.00 1 Each 37.80
2nd class mason 0.06 Nos. 565.00 1 Each 33.90
Mazdoor(unskilled) 0.275 Nos. 525.00 1 Each 144.38
MA @ 25% 0.25 216.08 54.02
658.09
Rate for other Floors FF SF
Rate as worked out above 658.09 658.09
Hire charges for Access Scaffolding 10.78 10.78
Labour charges for scaffolding 84.68 121.18
MA @ 25% 21.17 30.30
Lift charges ( Page 131 of Std. Data ) 0.00 2.16
MA @ 25% 0.00 0.54
Rate for 1 sqm 774.72 823.05
Overheads & Contractors Profit 105.48 112.06
@13.615%
Rate per 1 sqm 880.20 935.11

16 Supply & fixing of Rolling shutter made of 80 x 1.25 mm machine rolled CRCA laths, interlocked together
through their entire length and jointed together at the ends by end-locks, mounted on specially designed pipe
shaft of 50mm dia nominal bore MS B class pipe with brackets, plates, guide channels, stoppers, bottom
locking plates and arrangements for inside & outside locking with push-pull operations including cost of hood
cover and springs complete, painted with one coat of approved steel primer, locks, ball bearings, all
accessories etc., overheads & contractors profit complete for finished item of work as per special spn: 1108
Rate as per SSR 1.00 sqm 4025.00 1 sqm 4025.00
Overheads & Contractors Profit 0.13615 4025.00 548.00
@13.615% 4573.00
Rate per 1 sqm Say 4573

False ceiling
17 Providing and fixing in true horizontal level 12 mm - Mineral Fiber sheet 600 x 600 (Square / Tegular) edge
tiles with a Humidity Resistance of 90% RH,Average NRC 0.50, Light Reflectance >80%, Thermal Conductivity
λ= 0.052 to 0.057 w/mk, Fire Performance Class 0/Class 1 using hot dipped Galvanized Steel section exposed
surface with pre-coated capping, main Tee of size 24 x 32 mm at every 1200 mm c/c maximum and rotary
stitched cross tee of size 24 x 27 mm at every 600 mm c/c and sub-cross tee of size 24 mm x 25 mm at 1200
mm c/c and wall angle of size 19 x 19 mm fixed to periphery of the wall and the above grid is suspended at
every 1200 mm c/c in both directions using 2.0 mm thick pre-straightened GI Wire including cost and
conveyance of all materials and labour charges such as cutting , fixing of standing of frame work exposing roof
making, overheads & contractor profit etc., complete for finished item of work in all floor in all floors.

(BLD-CSTN-10-33 & vide Page No. 391 of SoR 2011-12)


CIVIL DATA : Page-170

S.No./
Item
Sl. No. Description Quantity Unit Rate (Rs.) Per Unit Amount (Rs.)
Code
No.
Unit 1 Sqm
A) Material requirement
12mm Mineral Fiber sheet 600 x 600 1.00 sqm 467.00 1 sqm 467.00

Hot dipped GI Angle - Precoated - Grid - 0.40 RM 37.00 1 RM 14.80


19mmx19mmX0.7mm
Polyster painted GI - T section - 1.60 RM 50.00 1 RM 80.00
1200mm - 24x32mm and 24x25mm
(sub-cross Tee)
Polyster painted GI-T Section - 300mm - 1.60 RM 49.00 1 RM 78.40
24mm x 27mm
GI Rod - prestraightened - 2.0mm dia - 1.28 RM 10.00 1 RM 12.80
Connecting Rod
6mm Nylon Rawl Plug 1.28 Nos. 4.00 1 No. 5.12
B) Labour charges
1st Class Carpenter 0.12 Nos. 705.00 1 No. 84.60
2nd Class Carpenter 0.12 Nos. 565.00 1 No. 67.80
1st Class Painter 0.024 Nos. 705.00 1 No. 16.92
2nd Class Painter 0.024 Nos. 565.00 1 No. 13.56
Power Saw cutter - Hand Operated - 0.012 Nos. 705.00 1 No. 8.46
Operator
Power Drill - Hand Operated - Operator 0.012 Nos. 705.00 1 No. 8.46
Unskilled Mazdoor 0.072 Nos. 525.00 1 No. 37.80
MA @ 25% 0.25 237.60 59.40
C) Machinery
Power Saw cutter - Hand Operated - 0.32 Hours 132.00 1 No. 42.24
Hire Charges
Power Drill - Hand Operated - Hire 0.32 Hours 121.00 1 No. 38.72
Charges 1036.08
Scaffolding charges 1% 0.01 1036.08 10.36
Basic Cost per 1 sqm 1046.44
Overheads & Contractors Profit 0.13615 1046.44 142.47
@13.615%
Rate per 1 sqm 1188.91
Say 1189

18 Supplying and fixing Gyp Board Suspended regular single layer false ceiling (GS-MFSC-4.1) using 12.5 mm
thick Gyp Board conforming to IS 2095 - 1993 fixing to Gyp steel GI perimeter channels of size 20 mm x 27
mm x 30 mm(web) of 0.55 mm thick along the perimeter of ceiling screw fixed to brick work/ partition at 610
mm c/c and suspending the frame work using Intermediate channels (45 mm x 15mm x 15mm x 0.9 mm)
from soffit at 1220 mm c/c with ceiling angle (25 mm x 10 mm x 0.55 mm) fixed with GI Cleat and steel
expansion fasteners & connecting clip to the ceiling channels (with knurled web of 51.5 mm x 26 mm x 10.5
mm x 0.55 mm) fixed in direction perpendicular to the intermediate channel at 457 mm c/c and fixing the
12.5 mm tapered edge Gypboard with 25 mm drywall screws at 230 mm c/c & jointing and finishing using
joint compound and paper tape to have a flush look including filling the tapered & square edges with jointing
compound, two coats of drywall topcoat including overheads and contractor profit etc., complete for finished
item of work
(BLD-CSTN-10-31 & vide Page No. 389 of SoR 2011-12)
Unit - 1 Sqm
A) Material requirement as per India
Gypsum
12.5mm Gypboard
1219mm x 1829mm size Boards 1.03 sqm 221.00 1 sqm 227.63
GI Ceiling Angle - 25mm x 10mm x 0.64 RM 78.00 1 RM 49.92
0.5mm
GI Ceiling section - 51.5mm x 26mm x 0.84 RM 106.00 1 RM 89.04
10.5mm x 0.55mm thick
CIVIL DATA : Page-171

S.No./
Item
Sl. No. Description Quantity Unit Rate (Rs.) Per Unit Amount (Rs.)
Code
No.
Intermediate channel - 45mm x 15mm x 0.84 RM 78.00 1 RM 65.52
15mm x 0.9mm
Perimeter channel - 20mm x 27mm x 0.40 RM 69.00 1 RM 27.60
30mm (web) of 0.55mm thick
Connecting Clips 1.84 Nos. 10.00 1 No. 18.40
Rawl Plug 0.64 Nos. 4.00 1 No. 2.56
Soffit Cleats 0.64 Nos. 5.00 1 No. 3.20
Drywall screws - 25mm 18.00 Nos. 4.00 1 No. 72.00
Jointing Compound 0.55 Kgs. 32.00 1 Kg. 17.60
Jointing Paper tape 1.46 RM 6.00 1 RM 8.76
Drywall top coat 0.15 Ltrs 150.00 1 Ltr 22.50
B) Labour Charges
1st Class Carpenter 0.12 Nos. 705.00 1 No. 84.60
2nd Class Carpenter 0.12 Nos. 565.00 1 No. 67.80
1st Class Painter 0.024 Nos. 705.00 1 No. 16.92
2nd Class Painter 0.024 Nos. 565.00 1 No. 13.56
Power Saw cutter - Hand Operated - 0.012 Nos. 705.00 1 No. 8.46
Operator
Power Drill - Hand Operated - Operator 0.024 Nos. 705.00 1 No. 16.92
Unskilled Mazdoor 0.072 Nos. 525.00 1 No. 37.80
MA @ 25% 0.25 246.06 61.52
C) Machinery
Power Saw cutter - Hand Operated - 0.32 Hours 132.00 1 Hour 42.24
Hire Charges
Power Drill - Hand Operated - Hire 0.64 Hours 121.00 1 Hour 77.44
Charges 1031.99
Scaffolding charges 1% 0.01 1031.99 10.32
Rate per 1 sqm 1042.30
Overheads & Contractors Profit 0.13615 1042.30 141.91
@13.615% 1184.21
Say 1184

19 Providing and fixing Thermocole False ceiling in true horizontal level 600mm x 600mm using 12mm thick
Thermocole sheet, anodized Aluminium Tee sections of size 24.50mm x 24.0mm x 2.4mm in grid with cross
tee of size 24mm x 24.5mm at every 600mm centre to centre and anodised aluminium wall angle of size
24mm x 24mm fixed to periphery of the wall and the above grid is suspended at every 1200mm centre to
centre in both directions using 2.0mm thick GI wire for finished of size 600mm x 600mm including cost and
conveyance of all materials and labour charges such as cutting , fixing of standing of frame work exposing
roof complete for finished item of work in all floors. (The rate is inclusive of overheads & contractor profit).

(BLD-CSTN-10-34 & vide Page No. 392 of SoR 2011-12)


Unit 1 Sqm
A) Material requirement
12mm Thermocole sheet 1.00 sqm 32.00 1 sqm 32.00
Aluminium angle - 24mmx 24mm 0.40 RM 33.00 1 RM 13.20
Anodised Aluminium T section - 24mm x 3.20 RM 32.00 1 RM 102.40
24.5mm
GI x 2.4mm
rod-prestraightened 2.0mm dia. - 1.28 Nos. 10.00 1 No. 12.80
Connecting
Rawl plugs rod 1.28 Nos. 4.00 1 No. 5.12
B) Labour charges
1st Class Carpenter 0.11 Nos. 705.00 1 No. 76.14
2nd Class Carpenter 0.11 Nos. 565.00 1 No. 61.02
Power Saw cutter - Hand Operated - 0.02 Nos. 705.00 1 No. 14.10
Operator
Power Drill - Hand Operated - Operator 0.04 Nos. 705.00 1 No. 28.20
Unskilled Mazdoor 0.20 Nos. 525.00 1 No. 105.00
MA @ 25% 0.25 284.46 71.12
C) Machinery
Power Saw cutter - Hand Operated - 0.16 Hours 132.00 1 No. 21.12
Hire Charges
Power Drill - Hand Operated - Hire 0.32 Hours 121.00 1 No. 38.72
Charges 580.94
Scaffolding charges 1% 0.01 580.94 5.81
Basic Cost per 1 Sqm 586.74
Overheads & Contractors Profit 0.13615 586.74 79.89
@13.615%
Rate per 1 sqm 666.63
Say 667
CIVIL DATA : Page-172

S.No./
Item
Sl. No. Description Quantity Unit Rate (Rs.) Per Unit Amount (Rs.)
Code
No.

Roofing
20 Roofing with corrugated G.I sheets 0.80mm thick fixed with G.I ‘J’ bolts & nuts 8 mm dia with bitumen & G.I
limpet washers filled with white lead & including a coat of approved steel primer and two coats of approved
paint on over lapping of sheets complete (up to a pitch of 600) etc., complete, excluding the cost of purlins,
rafters, trusses including cost and conveyance of all materials , labour charges , overheads and contractors
profit etc., complete for finished item of work in all floors.

Unit : 10 sqm
A. MATERIALS:
G.I corrugated 0.80 mm thick sheets 103.09 Kgs 70.00 1 Kg 7216.30
G.I scam bolts & nuts 2 x 27 (laps) x 17 = 47.91 Nos. 6.00 1 No. 287.46
884
G.I ‘J’ bolts 8 mm dia 2 x 5 x 27 sheets x 43.90 Nos. 11.00 1 No. 482.90
3 nos washers
Limpet = 810 nos.
(for with
scam washers or
& ‘J’ bolts) 91.82 Nos. 2.00 1 No. 183.64
screws,
884 ifwashers
+ 810
Bitumen wooden
= 1694 battens used. 91.82 Nos. 2.00 1 No. 183.64
Zinc cromate yellow paint 0.14 Ltrs 200.00 1 Ltr 28.00
Ready mixed paint 0.20 Ltrs 270.00 1 Ltr 54.00
B. LABOUR
For roofing
Carpenter II class 0.84 Nos. 565.00 1 No. 474.60
Man mazdoor (beldar) 0.91 Nos. 525.00 1 No. 477.75
For primer painting one coat
Painter 1st class 0.018 Nos. 705.00 1 No. 12.69
Painter 1st class 0.042 Nos. 565.00 1 No. 23.73
Mazdoor (coolie) 0.06 Nos. 525.00 1 No. 31.50
For two coats of painting to over laps
Painter 1st class 0.042 Nos. 705.00 1 No. 29.61
Painter 1st class 0.098 Nos. 565.00 1 No. 55.37
Mazdor (coolie) 0.14 Nos. 525.00 1 No. 73.50
MA @ 25% 0.25 1178.75 294.69
Rate per 10 sqm 9909.38
Rate per 1 sqm 990.94
Overheads & Contractors Profit 0.13615 990.94 134.92
@13.615%
Rate per 1 sqm 1125.85
say 1126

21 Supplying and fixing of Pre-painted Galvalume Trapezoidal Profile Roofing sheets with 0.50mm thickness,
Coating: Alu-Zinc coating AZ150 GSM. Tensile Strength: 550 MPA. Paint coating: Regular Modified Polyester
painting. Painting Thickness (Top): 18 to 20 Microns, (Bottom): 5 to 7 Microns. Sheet Width: 1.020, Length:
Maximum 12 Meters with Regular Range Colours fixed with G.I ‘J’ bolts & nuts 8 mm dia with bitumen & G.I
limpet washers filled with white lead & including a coat of approved steel primer and two coats of approved
paint on over lapping of sheets complete (up to a pitch of 600) etc., complete, excluding the cost of purlins,
rafters, trusses including cost and conveyance of all materials , labour charges , overheads and contractors
profit etc., complete for finished item of work in all floors.

Unit : 10 sqm
A. MATERIALS:
Galvalume sheet 0.50mm thick 10.50 sqm 407.00 1 sqm 4273.50
G.I scam bolts & nuts 2 x 27 (laps) x 17 = 47.91 Nos. 6.00 1 No. 287.46
884
G.I ‘J’ bolts 8 mm dia 2 x 5 x 27 sheets x 43.90 Nos. 11.00 1 No. 482.90
3 nos = 810 nos. with washers or
screws, if wooden battens used.
Limpet washers (for scam & ‘J’ bolts) 91.82 Nos. 2.00 1 No. 183.64
Bitumen washers 91.82 Nos. 2.00 1 No. 183.64
B. LABOUR
For roofing
Carpenter II class 0.84 Nos. 565.00 1 No. 474.60
Man mazdoor (beldar) 0.91 Nos. 525.00 1 No. 477.75
MA @ 25% 0.25 952.35 238.09
CIVIL DATA : Page-173

S.No./
Item
Sl. No. Description Quantity Unit Rate (Rs.) Per Unit Amount (Rs.)
Code
No.
Rate per 10 sqm 6601.58
Rate per 1 sqm 660.16
Overheads & Contractors Profit 0.13615 660.16 89.88
@13.615%
Rate per 1 sqm 750.04
say 750
15 BLD.CST Providing and laying of best tiled roofing with pressed clay (Mangalore tiles) size 250 x 150 x 15 mm thick and
N-10.9 laying as per the pattern approved by the Engineer-in-Charge on roofs jointed with cement mortar 1:4 (1
cement : 4 coarse sand) mixed with 2% integral water proofing compound, laid over a bed of 20 mm thick
cement mortar 1:4 (1 cement : 4 coarse sand) including Rabbit wire mesh (Chicken mesh) of not less than 30
gauge and jointed neatly with white cement paste to full depth mixed with pigment of matching shade at
required place including cost and conveyance of all materials like cement, sand, water, tiles, Rabbit wire
mesh, white cement etc., to site including cost of all labour charges for mixing of cement mortar, laying
tiles to required slope as directed by the Engineer- in-charge etc., and overheads & contractors profit
complete for finished item of work.

Details of cost for 10 sqm


MATERIAL:
No. of tiles rquired 10/0.250 x 0.15 =
266 + 10%
As per Pressed clay tiles 15mm thick 250x150 293.00 Nos. 25.00 1 Each 7325.00
Market mm size (Mangalore Tile)
Rate
BMT- Rabbit wire mesh (Chicken mesh) of not 10.00 Sqm 21.00 1 Sqm 210.00
F.28 less than 30 gauge

Cement Mortar (1:4) 0.09 Cum 2614.77 1 Cum 235.33


BMT- High durable cementitious acrylic based 0.01 Kg 0.00 1 Kg 0.00
H.26 waterproofing
systems
LABOUR:
Mason (brick layer) 1 st class 0.50 Day 630.00 Day 315.00
Man mazdoor 1.10 Day 525.00 Day 577.50
Woman mazdoor 2.20 Day 525.00 Day 1155.00
MA @ 25% 0.25 2047.50 511.88
Add Water Charges @ 1% 0.01 10329.70 103.30
Cost of 10 sqm 10433.00
Cost of 1 sqm 1043.30

16 ( BLD- Supply and fixing of cement bonded board 8 mm thick and laying as per the pattern approved by the
CSTN- Engineer-in-Charge on purlins, rafters, trusses, including cost and conveyance of all materials like approved
10-26 ) cement bonded board, nails, labour charges , overheads and contractors profit etc., complete for finished
item of work in all floors. excluding the cost of purlins, rafters, trusses.

Unit : 10 Sqm
MATERIAL:
BMT-K.90 Cement Bonded Board 8mm Thick 10 Sqm 309.00 1 Sqm 3090.00
LABOUR:
Carpenter 1st class 2.5 Day 705.00 1 Day 1762.50
Mazdoor 2 Day 525.00 1 Day 1050.00
MA @ 25% 0.25 2812.50 703.13
Add CPOH @ 13.615% 0.13615 6605.63 899.36
Cost of 10 sqm 7504.98
Cost of 1 sqm 750.50
CIVIL DATA : Page-174

S.No./
Item
Sl. No. Description Quantity Unit Rate (Rs.) Per Unit Amount (Rs.)
Code
No.

#REF! Random Rubble stone masonry in CM (1:8) prop: (Cement: Screened sand) using hard granite stones carted
from approved quarry including cost and conveyance of all materials like cement, screened sand,
water,Rough stone Through stone, Coursed stones etc., from approved quarry, to site, including labour
charges for cutting stones to required size and shape, mixing, of cement, mortar, construction, curing,
charges for scaffolding etc., and overheads & contractors profit complete for finished item of work. (APSS
No. 601 & 615)

( BLD-CSTN-6-13 )
Unit = 1 cum
A.MATERIALS
Cement 59.40 Kgs 4220.00 1000 Kgs 250.67
Coursed stone 0.44 Cum 1132.85 1 Cum 498.45
Rough stone (HBG) 0.50 Cum 714.80 1 Cum 357.40
Through stone 25x25x 0.45 to 60 cm- 0.16 Cum 1849.18 1 Cum 295.87
each 39/-x 30 no.s
Fine aggregate(sand) 0.33 Cum 823.40 1 Cum 271.72
B) LABOUR
1st class mason 1.20 Nos. 630.00 1 Each 756.00
Mazdoor (unskilled) 2.00 Nos. 525.00 1 Each 1050.00
MA @ 25% 0.25 1806.00 451.50
3931.61
Add water charges 0.01 3931.61 39.32
Rate per 1 cum 3970.93

a Up to basement
Rate as worked out above 1.00 Cum 3970.93 1 Cum 3970.93
Overheads & Contractors Profit 0.13615 3970.93 540.64
@13.615%
Rate per 1 cum 4511.57

b) Superstructure :
Rate for other Floors FF SF
Rate as worked out above 3970.93 3970.93
Hire charges for Access Scaffolding 23.96 23.96

Labour charges for scaffolding 188.18 269.29


MA @ 25% 47.05 67.32
Lift charges ( Page 131 of Std. Data ) 0.00 180.60

MA @ 25% 0.00 45.15


Rate per 1 cum 4230.11 4557.25
Overheads & Contractors Profit 575.93 620.47
@13.615%
Rate per 1 cum 4806.04 5177.72

#REF! Coursed Rubble stone masonry 2nd sort, in CM (1:6) prop: (Cement: Sand) using hard granite stones from
approved quarry including cost and conveyance of all materials like Coursed Rubble stones, Through stones
25 x 25x 45 to 60 cms, cement, sand, water, etc., to site, all operational, incidental, and labour charges such
as cutting stones to required size and shape, mixing of cement mortar, constructing masonry, curing etc.,
complete for finished item of work. (APSS No. 601 & 612)
CIVIL DATA : Page-175

S.No./
Item
Sl. No. Description Quantity Unit Rate (Rs.) Per Unit Amount (Rs.)
Code
No.
BLD-CSTN-6-6
A. MATERIALS:
Cost of cement 76.80 Kgs 4220.00 1000 Kgs 324.10
Coursed Rubble Stone 0.94 Cum 1132.85 1 Cum 1064.88
Through stones 25 x 25x 45 to 60 cms 0.16 Cum 1849.18 1 Cum 295.87

Sand 0.32 cu.m. 823.40 1 cu.m. 263.49


B. LABOUR:
1st Class Mason 1.50 Nos 630.00 1 Each 945.00
Mazdoor (unskilled) 2.32 Nos 525.00 1 Each 1218.00
MA @ 25% 0.25 2163.00 540.75
Add water charges @ 1% 0.01 4652.08 46.52
Rate per 1 cum 4698.60

a Up to basement
Rate as worked out above 1.00 Cum 4698.60 1 Cum 4698.60
Overheads & Contractors Profit 0.13615 4698.60 639.71
@13.615%
Rate per 1 cum 5338.32

b Superstructure :
Rate for other Floors FF SF
Rate as worked out above 4698.60 4698.60
Hire charges for Access Scaffolding 23.96 46.87

Labour charges for scaffolding 188.18 526.87


MA @ 25% 47.05 131.72
Lift charges ( Page 131 of Std. Data ) 0.00 216.30

MA @ 25% 0.00 54.08


Rate per 1 cum 4957.78 5674.43
Overheads & Contractors Profit 675 772.57
@13.615%
Rate per 1 cum 5632.78 6447.00

Pointing for masonry work


29 Flush/Sunk Pointing to Brick / RR Masonry in CM (1:3) including cost and conveyance of all materials at site
excluding seigniorage charges on all materials and all operational, incidental labour charges, curing etc
complete for finished item of work. (BLD-CSTN-7-1)
BLD-CSTN-7-1
Unit = 10 sqm
A. MATERIALS:
Lead Cement 14.4 Kg 4220.00 1000 Kg 60.77
Lead Fine aggregate (Sand) 0.03 Cum 918.40 1 Cum 27.55
B. LABOUR:
Mason 2nd class 0.5 Day 565.00 1 Day 282.50
Mazdoor (unskilled) 0.74 Day 525.00 1 Day 388.50
MA @ 25% 0.25 671.00 167.75
Add water charges @ 1% 0.01 927.07 9.27
936.34
Add contractor profit @ 13.615% 0.13615 936.34 127.48
Rate per 10 Sqm 1063.82
Rate per 1 Sqm 106.38
CIVIL DATA : Page-176

S.No./
Item
Sl. No. Description Quantity Unit Rate (Rs.) Per Unit Amount (Rs.)
Code
No.

30 Raised Pointing to RR Masonry in CM (1:3) including cost and conveyance of all materials at site excluding
seigniorage charges on all materials and all operational, incidental labour charges, curing etc complete for
finished item of work. (BLD-CSTN-7-3)
BLD-CSTN-7-3
Unit = 10 sqm
A. MATERIALS:
Lead Cement 28.8 Kg 4220.00 1000 Kg 121.54
Lead Fine aggregate (Sand) 0.06 Cum 918.40 1 Cum 55.10
B. LABOUR:
Mason 2nd class 0.5 Day 565.00 1 Day 282.50
Mazdoor (unskilled) 0.74 Day 525.00 1 Day 388.50
MA @ 25% 0.25 671.00 167.75
Add water charges @ 1% 0.01 1015.39 10.15
1025.54
Overheads & Contractors Profit 0.13615 1025.54 139.63
@13.615%
Rate per 10 Sqm 1165.17
Rate per 1 Sqm 116.52

Kerb work
#REF! Supply and fixing of C.C. Kerb not less than M30 strength of size 600 X 375 X 100 mm thick with bottom
thickness of 100 mm upto height of 300 mm and top width of 50 mm thick chamfering with 45° at starts at
300 mm height to 375 mm height as selected by the Engineer-in-charge from approved source/ factory which
is laid on existing CC Bed jointing with C.M(1:3) including cost and conveyance of all materials & labour
charges including transportation , loading & unloading charges including contractor profit & overhead charges
complete for finished item of work.

Unit : 6 Rmt
A.MATERIALS :
As per Material cost(Market rate) including 6.00 Rmt 481.83 1 Rmt 2890.98
Quotation transportation as per market rate
Add wastage @ 2% 0.020 2890.98 57.82
Lead Add cost of CM(1:3) 0.025 Cum 3121.17 1 Cum 78.03
B. LABOUR
Mason 1st class 0.063 Nos. 630.00 1 Each 39.69
Mason 2nd class 0.147 Nos. 565.00 1 Each 83.05
Mazdoor (unskiled) 0.217 Nos. 525.00 1 Each 113.93
MA @ 25% 0.250 236.67 59.17
Rate per 6 Rmt 3322.67
Rate per 1 Rmt 553.78

#REF! Supply and fixing of Ornamental Vacuum Dewatered Pimple finished Splay C.C. Kerb of Basant Betons make
not less than M40 strength, of size 600 X 375 X 100 mm thick with bottom thickness of 100 mm upto height
of 300 mm and top width of 50 mm thick chamfering with 45° at starts at 300 mm height to 375 mm (As per
drawing), can be laid on existing CC Bed jointing with C.M(1:3) including cost and conveyance of all material
with all Taxes & labour charges including transportation complete for finished item of work

Unit : 6 Rmt
A.MATERIALS :
CIVIL DATA : Page-177

S.No./
Item
Sl. No. Description Quantity Unit Rate (Rs.) Per Unit Amount (Rs.)
Code
No.
As per Material cost(Market rate) including 6.00 Rmt 572.30 1 Rmt 3433.80
Quotati transportation as per market rate
on
Add wastage @ 2% 0.020 3433.80 68.68
Lead Add cost of CM(1:3) 0.025 Cum 3121.17 1 Cum 78.03
B. LABOUR
Mason 1st class 0.06 Nos. 630.00 1 Each 39.69
Mason 2nd class 0.15 Nos. 565.00 1 Each 83.05
Mazdoor (unskiled) 0.22 Nos. 525.00 1 Each 113.93
MA @ 25% 0.25 236.67 59.17
Rate per 6 Rmt 3876.34
Add Transportation Charges 6.0 Rmt 145.00 1 Rmt 870.00
Rate per 1 Rmt 791.06

#REF! Supply and fixing of Kadapa slab (rough) 50mm thick and size of 0.457x0.457m stone edging including
excavating trench in ordinary soil and fixing the stone in alignment and refilling the excavated soil conveyance
of all materials and labour charges including transportation complete for finished item of work

Unit : 10 Rmt=4.57 sqm


A.MATERIALS :
BMT- Rough Kadapa stone (50 mm) thick size 4.57 Sqm 145.00 1 Sqm 662.65
B.02 0.457 x 0.457m
B. LABOUR
Excavating trench (10x0.15x0.15) in 0.082 Nos. 525.00 1 cum 43.05
ordinary soil
Mazdoor (unskiled) for fixing stone 0.22 Nos. 525.00 1 day 115.50
MA @ 25% 0.25 158.55 39.64
860.84
Overheads & Contractors Profit 0.13615 860.84 117.20
@13.615%
10 Rmt= 4.57 Sqm 978.04
1 Rmt 97.80

#REF! Supply & fixing of Dressed Granite cubes of size of 100x100x100 mm for Heavy traffic areas the shapes and
designs as per the specification set over the 50 mm thick sand bed with hand roller compaction with joint
neatly in homogeneous or heterogeneous pattern as the colour and pattern shall be as per the drawings
furnished by the architect, including cost of all materials like cement, sand water and tiles etc., complete for
finished item of work

Unit : 10 Sqm
A. MATERIALS :
As Per Dressed Granite cubes of size of 1000.00 Nos 25.00 1 Each 25000.00
Quotati 100x100x100 mm
on
Lead Filling Sand 0.50 Cum 678.40 1 Cum 339.20

Lead Cement for jointing 6.00 Kgs 4220.00 1000 Kg 25.32


B. LABOUR
BMT- Labour charges as per SoR 10.00 Sqm 220.00 1 Sqm 2200.00
D.32
MA @ 25% 0.25 2200.00 550.00
Add water charges 1% 0.01 28114.52 281.15
Total 28395.67
CIVIL DATA : Page-178

S.No./
Item
Sl. No. Description Quantity Unit Rate (Rs.) Per Unit Amount (Rs.)
Code
No.
Rate per 10 Sqm 28395.67
Rate per 1 Sqm 2839.57

#REF! Supply of precast concrete blocks for paving of M-30 grade and thickness not less than 50 mm for Non- traffic
areas conforming to IS 15658:2006 in all shapes and designs as per the manufacturer's specification set over
the 50 mm thick sand bed with hand roller compaction with joint neatly in homogeneous or heterogeneous
pattern as the colour and pattern shall be as per the drawings furnished by the architect, including cost of all
materials like cement, sand water and tiles etc., complete for finished item of work
Unit : 10 Sqm
A. MATERIALS :
BMT-D- Precast concrete blocks for paving of M- 10.10 Sqm 350.00 1 sqm 3535.00
12 30 grade and thickness not less than 50
mm for Non-traffic areas

Lead Sand for base 0.50 Cum 678.40 1 Cum 339.20


Lead Cement for jointing at edges 6.00 Kgs 4220.00 1000 Kgs 25.32
B. LABOUR
BMT- Labour charges for laying & fixing of 10.00 Sqm 220.00 1 Sqm 2200.00
D.17 precast concrete blocks for paving of all
grades, any thickness, all sizes & shapes
including all labour charges for loading
& unloading, laying to desired lines and
levels complete excluding cost of
cement, sand, water, electricity etc

MA @ 25% 0.25 2200.00 550.00


Add water charges 1% 0.01 6649.52 66.50
Total 6716.02
Overheads & Contractors Profit 0.13615 6716.02 914.39
@13.615%
10 Sqm 7630.40
1 Sqm 763.04

#REF! Data as Supply of precast concrete blocks for paving of M-35 grade and thickness not less than 60 mm for Light traffic
per SOR areas conforming to IS 15658:2006 in all shapes and designs as per the manufacturer's specification set over
2016-17 the 50 mm thick sand bed with hand roller compaction with joint neatly in homogeneous or heterogeneous
pattern as the colour and pattern shall be as per the drawings furnished by the architect, including cost of all
materials like cement, sand water and tiles etc., complete for finished item of work

Unit : 10 Sqm
A. MATERIALS :
BMT-D- precast concrete blocks for paving of M- 10.10 Sqm 390.00 1 sqm 3939.00
13 35 grade and thickness not less than 60
mm for Light traffic areas

Lead Sand for base 0.50 Cum 678.40 1 Cum 339.20


Lead Cement for jointing at edges 6.00 Kgs 4220.00 1000 Kgs 25.32
B. LABOUR
CIVIL DATA : Page-179

S.No./
Item
Sl. No. Description Quantity Unit Rate (Rs.) Per Unit Amount (Rs.)
Code
No.
BMT- Labour charges for laying & fixing of 10.00 Sqm 220.00 1 Sqm 2200.00
D.17 precast concrete blocks for paving of all
grades, any thickness, all sizes & shapes
including all labour charges for loading
& unloading, laying to desired lines and
levels complete excluding cost of
cement, sand, water, electricity etc

MA @ 25% 0.25 2200.00 550.00


Add water charges 1% 0.01 7053.52 70.54
Total 7124.06
Overheads & Contractors Profit 0.13615 7124.06 969.94
@13.615%
10 Sqm 8094.00
1 Sqm 809.40

#REF! Supply of precast concrete blocks for paving of M-40 grade and thickness not less than 80 mm for Medium
traffic areas conforming to IS 15658:2006 in all shapes and designs as per the manufacturer's specification set
over the 50 mm thick sand bed with hand roller compaction with joint neatly in homogeneous or
heterogeneous pattern as the colour and pattern shall be as per the drawings furnished by the architect,
including cost of all materials like cement, sand water and tiles etc., complete for finished item of work

Unit : 10 Sqm
A. MATERIALS :
BMT-D- precast concrete blocks for paving of M- 10.10 Sqm 550.00 1 Sqm 5555.00
14 40 grade and thickness not less than 80
mm for Medium traffic areas

Lead Sand for base 0.50 Cum 678.40 1 Cum 339.20


Lead Cement for jointing at edges 6.00 Kgs 4220.00 1000 Kgs 25.32
B. LABOUR
BMT- Labour charges for laying & fixing of 10.00 Sqm 220.00 1 Sqm 2200.00
D.17 precast concrete blocks for paving of all
grades, any thickness, all sizes & shapes
including all labour charges for loading
& unloading, laying to desired lines and
levels complete excluding cost of
cement, sand, water, electricity etc

MA @ 25% 0.25 2200.00 550.00


Add water charges 1% 0.01 8669.52 86.70
Total 8756.22
Overheads & Contractors Profit 0.13615 8756.22 1192.16
@13.615%
10 Sqm 9948.37
1 Sqm 994.84
CIVIL DATA : Page-180

S.No./
Item
Sl. No. Description Quantity Unit Rate (Rs.) Per Unit Amount (Rs.)
Code
No.
#REF! Supply of precast concrete blocks for paving of M-50 grade and thickness not less than100 mm for Heavy
traffic areas conforming to IS 15658:2006 in all shapes and designs as per the manufacturer's specification set
over the 100 mm thick sand bed with hand roller compaction with joint neatly in homogeneous or
heterogeneous pattern as the colour and pattern shall be as per the drawings furnished by the architect,
including cost of all materials like cement, sand water and tiles etc., complete for finished item of work

Unit : 10 Sqm
A. MATERIALS :
BMT-D- precast concrete blocks for paving of M- 10.10 Sqm 610.00 1 Sqm 6161.00
15 50 grade and thickness not less than
100 mm for Heavy traffic areas

Lead Sand for base 1.00 Cum 678.40 1 Cum 678.40


Lead Cement for jointing at edges 6.00 Kgs 4220.00 1000 Kgs 25.32
B. LABOUR
BMT- Labour charges for laying & fixing of 10.00 Sqm 220.00 1 Sqm 2200.00
D.17 precast concrete blocks for paving of all
grades, any thickness, all sizes & shapes
including all labour charges for loading
& unloading, laying to desired lines and
levels complete excluding cost of
cement, sand, water, electricity etc

MA @ 25% 0.25 2200.00 550.00


Add water charges 1% 0.01 9614.72 96.15
Total 9710.87
Overheads & Contractors Profit 0.13615 9710.87 1322.13
@13.615%
10 Sqm 11033.00
1 Sqm 1103.30

#REF! Supply of precast concrete blocks for paving of M-55 grade and thickness not less than120 mm for very heavy
traffic areas conforming to IS 15658:2006 in all shapes and designs as per the manufacturer's specification set
over the 50 mm thick sand bed with hand roller compaction with joint neatly in homogeneous or
heterogeneous pattern as the colour and pattern shall be as per the drawings furnished by the architect,
including cost of all materials like cement, sand water and tiles etc., complete for finished item of work

Unit : 10 Sqm
A. MATERIALS :
BMT-D- precast concrete blocks for paving of M- 10.10 Sqm 700.00 1 Sqm 7070.00
16 55 grade and thickness not less than
120 mm for very heavy traffic areas

Lead Sand for base 0.50 Cum 678.40 1 Cum 339.20


Lead Cement for jointing at edges 6.00 Kgs 4220.00 1000 Kgs 25.32
B. LABOUR
CIVIL DATA : Page-181

S.No./
Item
Sl. No. Description Quantity Unit Rate (Rs.) Per Unit Amount (Rs.)
Code
No.
BMT- Labour charges for laying & fixing of 10.00 Sqm 220.00 1 Sqm 2200.00
D.32 precast concrete blocks for paving of all
grades, any thickness, all sizes & shapes
including all labour charges for loading
& unloading, laying to desired lines and
levels complete excluding cost of
cement, sand, water, electricity etc

MA @ 25% 0.25 2200.00 550.00


Add water charges 1% 0.01 10184.52 101.85
Total 10286.37
Overheads & Contractors Profit 0.13615 10286.37 1400.49
@13.615%
10 Sqm 11686.85
1 Sqm 1168.69

34 Data as Supply & Laying of Shot Blasted Pavers of Basant Betons make not less than M40 strength and size of 200 x
per SOR 100 x 60 mm for Medium traffic areas in rectangle shapes and regular colours designs as per the
2016-17 manufacturer's specification set over the 50 mm thick sand bed with hand roller compaction with joint neatly
in homogeneous or heterogeneous pattern as the colour and pattern shall be as per the drawings furnished
by the architect, including cost of Transportation & cost of all materials with all Taxes like cement, sand water
and tiles etc., complete for finished item of work

Unit : 10 Sqm
A. MATERIALS :
As per Shot Blasted Pavers “Key Blok” size: 10.05 Sqm 1327.50 1 Sqm 13341.38
Quotati 200 x 100 x 60 mm
on
Lead Sand for base 0.50 Cum 678.40 1 Cum 339.20
Cement for jointing at edges 6.00 Kgs 4220.00 1000 Kgs 25.32
B. LABOUR
BMT- Labour charges for laying & fixing of 10.00 Sqm 220.00 1 Sqm 2200.00
D.32 precast concrete blocks for paving of all
grades, any thickness, all sizes & shapes
including all labour charges for loading
& unloading, laying to desired lines and
levels complete excluding cost of
cement, sand, water, electricity etc

MA @ 25% 0.25 2200.00 550.00


Add water charges 1% 0.01 16455.90 164.56
Rate per 10Sqm 16620.45
Add Transportation Charges 10.05 Sqm 240.00 1 Sqm 2412.00
Rate per 1Sqm 1903.25

Light Weight Steel Works by using Rectangular hollow sections

square / rectangular MS hollow section


CIVIL DATA : Page-182

S.No./
Item
Sl. No. Description Quantity Unit Rate (Rs.) Per Unit Amount (Rs.)
Code
No.
20 Data as Supply and fabrication of MS framed structure like Window Grills, Compound Wall Grills, Iron Doors,
per SOR Windows, Gates, MS Frame for chain link mesh works, Roof Trusses by using square / rectangular MS hollow
2016-17 section as per IS 4923 including cost of welding rods, power charges, labour charges for cutting, placing,
welding and erecting in position and fixing, cost & convenience of all materials including wastage to site with
all taxes and duties etc complete for finished item of work

Data for 1 Kg
Cost of MS steel including @ 2.5% 1.025 Kg 60.00 1.00 Kg 61.50
wastage
BMM- Fabrication charges 1.00 Kg 30.00 1.00 Kg 30.00
V.14
MA @ 25% on 75% fabrication after 0.25 22.50 5.63
deduction of power charges and
welding rods and welding machine
BMM- Erections charges 1.00 Kg 6.00 1.00 Kg 6.00
V.15
MA @ 25% 0.25 6.00 1.50
Over heads of @ 13.615% 0.13615 104.63 14.24
Rate for 1 Kg 118.87
MS Flats
#REF! Supply and fabrication of MS framed structure like Window Grills, Compound Wall Grills, Iron Doors,
Windows, Gates, MS Frame for chain link mesh works ,Roof Trusses by using MS Flats as per SP:6(1) IS Hand
book , including cost of welding rods, power charges, labour charges for cutting, placing, welding and erecting
in position and fixing, cost & convenience of all materials to site with all taxes and duties etc complete for
finished item of work
Data for 1 Kg
Cost of MS steel including @2.5% 1.025 Kg 60.00 1.00 Kg 61.50
wastage
BMM- Fabrication charges 1.00 Kg 30.00 1.00 Kg 30.00
V.14
MA @ 25% on 75% fabrication after 0.25 22.50 5.63
deduction of power charges and
welding rods and welding machine
BMM- Erections charges 1.00 Kg 6.00 1.00 Kg 6.00
V.15
MA @ 25% 0.25 6.00 1.50
Over heads of @ 13.615% 0.13615 104.63 14.24
Rate for 1 Kg 118.87
MS solid plate
#REF! Supply and fabrication works like Window Grills, Compound Wall Grills, Iron Doors, Windows, Gates, Roof
Trusses by using MS solid plate section as per IS 1730 including cost of welding rods, power charges, labour
charges for cutting, placing, welding & erecting in position and fixing cost & convenience of all materials
including wastage to site with all taxes and duties etc complete for finished item of work.

Data for 1 Kg
Cost of MS solid plate including @ 2.5% 1.025 Kg 70.00 1.00 Kg 71.75
wastage
BMM- Fabrication charges 1.00 Kg 30.00 1.00 Kg 30.00
V.16
MA @ 25% on 75% fabrication after 0.25 22.50 5.63
deduction of power charges and
welding rods and welding machine
BMM- Erections charges 1.00 Kg 6.00 1.00 Kg 6.00
V.17
CIVIL DATA : Page-183

S.No./
Item
Sl. No. Description Quantity Unit Rate (Rs.) Per Unit Amount (Rs.)
Code
No.
MA @ 25% 0.25 6.00 1.50
Over heads of @ 13.615% 0.13615 114.88 15.64
Rate for 1 Kg 130.52
MS Sheet
#REF! Supply and fabrication works like Window Grills, Compound Wall Grills, Iron Doors, Windows, Gates, Roof
Trusses by using HR sheet as per IS 2062 including cost of welding rods, power charges, labour charges for
cutting, placing, welding & erecting in position and fixing cost & convenience of all materials to site with all
taxes and duties etc complete for finished item of work.

Data for 1 Kg
Cost of HR sheet 1.6mm thick including 1.025 Kg 70.00 1.00 Kg 71.75
@ 2.5% wastage
BMM- Fabrication charges 1.00 Kg 30.00 1.00 Kg 30.00
V.16
MA @ 25% on 75% fabrication after 0.25 22.50 5.63
deduction of power charges and
welding rods and welding machine
BMM- Erections charges 1.00 Kg 6.00 1.00 Kg 6.00
V.17
MA @ 25% 0.25 6.00 1.50
Over heads of @ 13.615% 0.13615 114.88 15.64
Rate for 1 Kg 130.52
Tubes & pipes
21 Supply and fabrication of MS framed structure like Window Grills, Compound Wall Grills, Iron Doors,
Windows, Gates, MS Frames for Chain link mesh, Roof Trusses by using tubes & pipes MS hollow section as
per IS 1161 including cost of welding rods, power charges, labour charges for cutting, placing, welding and
erecting in position and fixing, cost & convenience of all materials including wastage to site with all taxes and
duties etc complete for finished item of work
Data for 1 Kg
BMT-F- Cost of MS hollow tubes & pipes Kg 1.025 76.00 1 Kg 77.90
04 section including @ 2.5% wastage
BMM- Fabrication charges Kg 1.00 30.00 1 Kg 30.00
V.14
MA @ 25% on 75% fabrication after 0.25 22.50 5.63
deduction of power charges and
welding rods and welding machine
BMM- Erections charges Kg 1.00 6.00 1 Kg 6.00
V.15
MA @ 25% 0.25 6.00 1.50
Over heads of @ 13.615% 0.13615 121.02 16.48
Rate for 1 Kg 137.50

22 CPWD Supply and laying of the C.C. pavement of V.R.C.C Nominal Mix Concrete M 20 grade corresponding to IS
16.75 & 456 with minimum cement content of 350 kgs per 1 cum of concrete using CONCRETE MIXER with 20mm size
(BLD- HBG graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1
CSTN-3- to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate
13-C) (sand) coarse aggregate, water etc. including all operational, incidental and labour charges.The design mix
concrete shall be laid and finished with screed board vibrator , vacuum dewatering process and finally
finished by floating, brooming with wire brush etc. complete as per specifications and directions of Engineer-
in-charge including pannel shuttering & labour charges.

Unit :1 Cum
CIVIL DATA : Page-184

S.No./
Item
Sl. No. Description Quantity Unit Rate (Rs.) Per Unit Amount (Rs.)
Code
No.
(BLD- A) M-20 grade concrete for CC work 1.000 Cum 5607.61 1 Cum 5607.61
CSTN-3- (using cement @ 330 kg/cum)
13-C)
9999 Operational charges for vacuum 57.200 L.S. 1.73 L.S. 98.96
dewatering system including screed
vibration , placing of filter mat, top mat,
vacuum process, floating , troweling,
brooming etc.
9999 T & P charges including consumable 41.600 L.S. 1.73 L.S. 71.97
power charges, loading , unloading and
hire charges of equipments
Hire charges of panel shuttering 1.000 Cum 301.00 1 Cum 301.00
Labour charges 1.000 Cum 672.00 1 Cum 672.00
MA @ 25% 0.250 672.00 168.00
Add water charges @ 1% except on [A] 0.010 1143.92 11.44

6930.97
Overheads & Contractors Profit 0.136 6930.97 943.65
@13.615%
Rate per 1 cum 7874.63

23 RBR- Construction of granular sub-base by providing Well graded/ Close Graded granular sub-base material as per
SBBS1 - Table 400.1, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place
3 method with rotavator at OMC, and compacting with Vibratory pad foot roller 8 t to achieve the desired
density, complete as per Technical Specification Clause 401 MORD / MORTH.

For Grading III Material (CBR Value


minimum 20)
Unit = cum
Taking output = 300 cum
a) Labour
Mason II Class 2.400 Day 565.00 1 Day 1356.00
Mazdoor (Unskilled) 8.000 Day 525.00 1 Day 4200.00
MA @ 25% 0.250 5556.00 1389.00
6945.00
b) Machinery
Vibratory pad foot roller 8 t 6.000 Hour 3111.00 1 Hour 18666.00
Crew Charges 6.000 Hour 368.20 1 Hour 2209.20
MA @ 25% 0.250 2209.20 552.30
Tractor with Rotavator 25 cum per hour 12.000 Hour 532.00 1 Hour 6384.00

Water tanker 6 kl capacity 3.000 Hour 806.00 1 Hour 2418.00


30229.50
c) Material
Well graded/ Close Graded granular
sub-base material as per Table 400.1

7 mm to 5 mm 134.400 Cum 1024.80 1 Cum 137733.12


5 mm to 2.36 mm 48.000 Cum 871.80 1 Cum 41846.40
2.36 mm below 201.600 Cum 851.80 1 Cum 171722.88
Water 18.000 Kl 125.00 1 Kl 351302.40
Cost for 300 cum = a+b+c 388476.90
CIVIL DATA : Page-185

S.No./
Item
Sl. No. Description Quantity Unit Rate (Rs.) Per Unit Amount (Rs.)
Code
No.
MA @ 25% 0.250 388476.90 97119.22
Rate per 300 cum 485596.12
Rate per cum 1618.65

22 (IRR- Providing casing embankment using gravel from approved area in layers of 25 cm with compaction including
CAW-2- cost of all materials, machinery, labour, all operations such as materials transporting, spreading in layer of
8) specified thickness, breaking clods, sectioning, compacting each layer without watering by Road roller 10
tonne etc.,complete with initial lead up to 70.0 km and all lifts etc., include all incidental incomplete.

(IRR-CAW-2-8)
Unit : 1.00 cum
Taking output = 677.28 cum
a)Machinery
Angle dozer 90hp 6.06 hour 1650.20 1.00 hour 10000.21
Fuel/Energy charges 6.06 hour 1055.30 1.00 hour 6395.12
Road Roller 10tonne 6.16 hour 192.30 1.00 hour 1184.57
Fuel/Energy charges 6.16 hour 1234.30 1.00 hour 7603.29
b) Labour
Crew for Dozer 6.06 hour 326.30 1.00 hour 1977.38
Crew for road roller 6.16 hour 299.50 1.00 hour 1844.92
Work inspector 2.00 day 685.00 1.00 day 1370.00
Mazdoor 4.00 day 525.00 1.00 day 2100.00
MA @ 25% 0.25 7292.30 1823.07
c)Material :
Murrum/gravel 677.28 cum 252.20 1.00 cum 170810.02
205108.57
Overheads&Contractors Profit 0.13615 205108.57 27925.53
@13.615%
Rate per 677.28 cum 233034.11
Rate per 1.00 cum 344.07
23 Providing and constructing 30 cm thick rubble stone pitching set in CM 1: 5 proportion with pin headers at 2
per sqm in including cost of all materials, labour, packing chips and mortar, finishing, curing etc., complete
with initial lead up to 50 m and all lifts.
( rubble stones : 0.275 cum/sqm, Stone Chips : 0.045cum/sqm, Pin Headers 30cm : 2/sqm)

IRR-CAW-8-7
Unit = 100 sqm
Taking output = 1 Sqm
A.MATERIALS
Cement 3000.00 Kgs 4220.00 1000 Kgs 12660.00
Un-coursed rubble stones (at quarry) 27.50 Cum 789.80 1 Cum 21719.50
Pin header (Through stone) 25x25x30 3.75 Cum 2216.80 1 Cum 8313.00

Stone chips @ 15 % quarry 4.50 Cum 851.80 1 Cum 3833.10


Fine aggregate(sand) 10.50 Cum 918.40 1 Cum 9643.20
B) LABOUR
Crew for Pump 2.00 Hours 153.50 1 Hours 307.00
Work Inspector 1.00 Day 685.00 1 Day 685.00
Mason Class II 5.00 Day 565.00 1 Day 2825.00
Mazdoor (unskilled) 12.00 Day 525.00 1 Day 6300.00
MA @ 25% 0.25 10117.00 2529.25
C) Machinery
CIVIL DATA : Page-186

S.No./
Item
Sl. No. Description Quantity Unit Rate (Rs.) Per Unit Amount (Rs.)
Code
No.
Dewatering pump 5 hp (Diesel) 2.00 Hours 146.80 1 Hour 293.60
Add water charges 0.01 69108.65 691.09
69799.74
Overheads & Contractors Profit 0.13615 69799.74 9503.23
@13.615%
Rate per 100 sqm 79302.97
Rate per 1 sqm 793.03
24 Soling with 150 - 200 mm cubes hard stone including 25% of Metal of 45 - 90 mm size for packing and 20%
Gravel for filling interstices and compacting with 80 tonne Roller including hire charges of Power Roller,
watering etc. complete.

RBR-SBBS-5
Unit = cum
Taking output = 1 cum
A.MATERIALS
Hard stone 150 - 200 mm size (Granite) 1.100 cum 514.80 1.00 cum 566.28
(Soling Stone)
45-90 mm size metal (Hand broken) 0.270 cum 1144.80 1.00 cum 309.10
Gravel 0.220 cum 252.20 1.00 cum 55.48
Water 0.100 kl 125.00 1 kl 12.50
B) LABOUR
Men Mazdoor for conveyance & 1.100 day 525.00 1 day 577.50
packing
Women Mazdoor 0.700 day 525.00 1 day 367.50
MA @ 25% 0.250 945.00 236.25
C) Machinery
Hire & Fuel charges for vibratory Roller 0.100 hour 3111.00 1.00 hour 311.10
8 tonne to Consolidating soling

Crew charges for vibratory Roller 8 0.100 hour 368.20 1.00 hour 36.82
tonne
MA @ 25% 0.250 36.82 9.21
Water Tanker 6Kl capacity 0.016 hour 806.00 1.00 hour 12.90
2494.63
Overheads & Contractors Profit @ 0.13615 2494.63 339.64
13.615%
Rate per cum = (a+b+c+d) 2834.28

25 Providing and fixing 1.80 metre long RCC fencing posts with 6 mm bar bibs as per design in plate No. 22/2/2.
(earth work & concrete to be paid for separately)

BLD-CSTN-15-6
Unit =Details of cost for 10 posts, i.e., 0.336 Cu. M
Taking output = 1 Post
A.Material
Cement concrete M 20 design mix using 0.336 cum 5607.611 1 cum 1884.157204
(BLD-CSTN-3-13 12mm size hard granite machine
- c) crushed graded meta
M.S. reinforcement 6 mm dia bars 26.440 kg 81.108 1 kg 2144.4823
10 x 4 x 1.88 = 75.20 metres
(BLD-CSTN-4.2) 10 x 9 x 0.50 = 45.00 metres./ l20.00 m
120.20 m @ 0.22 Kg/m=26.44 Kg
CIVIL DATA : Page-187

S.No./
Item
Sl. No. Description Quantity Unit Rate (Rs.) Per Unit Amount (Rs.)
Code
No.

SOR 17-18 Canteringand shuttering 0.336 cum 430.000 1 cum 144.48


Pg.no 66 item
1-B
Plastering 12mm thick single coat in 9.880 sqm 328.600 1 sqm 3246.568
CM(1:5)
(BLD-CSTN-8-3)

B.Labour for fixing posts in line


Mason, 1st Class 0.120 day 630.00 1 day 75.60
Mason, 2nd Class 0.120 day 565.00 1 day 67.80
Mazdoor (Male) 0.250 day 525.00 1 day 131.25
MA @ 25% 0.25 day 274.65 68.66
Add Water charges @ 1% 0.010 7694.34 76.94
7839.94
Overheads & Contractors Profit @ 0.13615 7839.94 1067.41
13.615%
Rate per 10 Posts 8907.35
Rate per 1 Post 890.74

26 Supplying and fixing galvanised steel barbed wire (IS : 278-1962 Type I) weighing 9.38 Kg per 100 metres
(min.), Straining and fixing to any type of standard, rails, straining bolts, including securing with and provision
of galvanised mild steel wire, staples or steel pins, etc., as directed (Posts and struts of wood, concrete, steel,
etc.) and straining bolts shall be paid for separately).
BLD-CSTN-15-7
Unit =Details of Cost per 100 metres (day line of wire)
Taking output = 1 Rmt
A.Material
Galvanised steel barbed wire IS type I 9.380 kg 101.00 1 kg 947.380
SOR 15-16 weighing 9.38 Kg/100 metre
BMT-F.07/08 IOWA/Glidden Type

Carriage of barbed wire.


G.I. staples steel pins or binding wire LS 150.00 LS 150.000

B.Labour for fixing & stretching wire


Blacksmith, 1st Class 0.150 day 590.00 1 day 88.500
Blacksmith/Mason Cl-, 2nd Class 0.150 day 565.00 1 day 84.750
Mazdoor (male). 0.300 day 525.00 1 day 157.500
MA @ 25% 0.25 330.75 82.69
Add water charges @ 1 % 0.010 1428.13 14.281
Overheads & Contractors Profit 0.136 1525.10 207.642
@13.615%
Cost for 100 metres day line of wire 1732.741
Rate per Rmt 17.33

23 Supplying and fixing G.I. Chainlink fabric fencing of required width in mesh size 50x50 mm opening of 4 mm
dia GI wire including strengthening with 2 mm dia wire or nuts, bolts and washers/welding in the MS angle
frame/ RCC fencing posts as required complete as per the direction of Engineer-in-charge and including cost
of all materials to site labour charges etc., complete for finished item of work.

Labour charges for chainlink mesh as per Govt of India Data DSR 16-70.1 at page 920 of year 2015
Unit =10 Sqm
Taking output = 1 Sqm
A.Material
CIVIL DATA : Page-188

S.No./
Item
Sl. No. Description Quantity Unit Rate (Rs.) Per Unit Amount (Rs.)
Code
No.

BMT F.20Pg No. Chainlink mesh [50x50mm opening] of


10.50 Sqm 506.00 1 Sqm 5313.00
10 4mm dia
Carriage 156.00 LS 1.78 LS 277.68
B.Labour for fixing & stretching fencing

day day
SoR - I.2 Pg.6 Blacksmith 2.14 590.00 1 1262.60

SoR - III.3 Pg.8 Beldar (Mazdoor) 1.62 day 525.00 1 day 850.50

Sundries including GI wire, nuts, bolts


174.75 LS 1.78 311.06
and washers

MA @ 25% 0.25 2113.10 528.28


Overheads & Contractors Profit @13.61 0.13615 8543.11 1163.14
Rate per 10.00 Sqm 9706.25
Rate per 1.00 Sqm 970.63
1 Data as Supply & Fixing Sadarhalli granite stone with 5 line dressing Double Patti of 5' length seating benches with
per Arm rest with back rest and its width 16'' with 3" thick and18" height with 3" thick and leg size 3'' width ,3'
Quotati height of ex showroom price . including cost and conveyance of all materials like granite , cement to site
on loading , un loading transport, sales & other taxes, incidental, operational and all labour charges overheads
& contractors profit etc., complete for finished item of work

Initial Cost for seating benches with 1 Each 11500.00 1.00 Each 11500.00
Arm rest with back rest
Fitting Charges 10% on Initial Cost 10% 11500.00 1150.00

loading , un loading & transport charges 22% 11500.00 2530.00


to site
Add unforeseen items 20.00
Rate for each 15200.00
A.P. Greening and Beautification Corporation
Name of the Work:- Detailed estimate for development of Hardscape (Civil) works for OAT with stage ,in
Kurnool City park at Dinnedevarapadu, Kurnool (Dist.)
Estimate Cost: Rs.19.00 Lakhs
Hardscape (Civil works)
Rate Per
Sl.N Item Amount
Description of Item Nos. L B D QTY Unit Unit (in Unit
o Code (in Rs.)
Rs.)
Construction of OAT 300 seating capacity and with stage 37.0 sqm

1 (BLD- Earth work excavation for foundations (Manual Means) of buildings, septic tank,
CSTN-2- sump, compound wall in ordinary soils and depositing on bank with an initial lead
1) of 10m and depth up to 3m including all operational, incidental, labour charges
such as shoring, sheeting, planking, strutting etc., and overheads & contractors
profit complete for finished item of work excluding dewatering charges etc., as per
SS 20 B(APSS 308)

For OAT step -1 9.72


1 x 1 27.00 0.60 0.60
For OAT step -2 0.60 10.44
1 x 1 29.00 0.60
For OAT step -3 0.60 11.52
1 x 1 32.00 0.60
For OAT step -4 0.60 12.24
1 x 1 34.00 0.60
For OAT step -5 0.60 13.68
1 x 1 38.00 0.60
For OAT step -6 0.60 14.76
1 x 1 41.00 0.60
For OAT step -7 0.90 38.07
1 x 1 47.00 0.90
For OAT side wall from step -1 to step -5 0.90 17.01
1 x 2 10.50 0.90
For stage wall 0.50 11.10
1 x 1 37.00 0.60
For approach steps for stage 0.20 0.80
1 x 2 2.00 1.00
For approach steps for seating area 0.20 3.36
14 x 2 1.20 0.50
142.70 Cum 271.40 Cum 38,728.78
2 (BLD- Plain Cement Concrete (1:4:8) (cement: fine aggregate: Coarse aggregate) for
CSTN-3- foundations and under flooring bed using 162.0 kgs of cement, coarse aggregate
5) 40mm size hard , machine crushed granite from approved quarry including cost
and conveyance of all materials like cement, sand, coarse aggregate, water etc., to
site, and including all charges for machine mixing, laying concrete in foundations
and under flooring bed, ramming in 15 cm layers finishing top surface to the
required level curing etc., and overheads & contractors profit complete for finished
item of work. (APSS No. 402)

1.62
For OAT step -1 1 x 1 27.0 0.60 0.10
1.74
For OAT step -2 1 x 1 29.0 0.60 0.10
1.92
For OAT step -3 1 x 1 32.0 0.60 0.10
2.04
For OAT step -4 1 x 1 34.0 0.60 0.10
2.28
For OAT step -5 1 x 1 38.0 0.60 0.10
2.46
For OAT step -6 1 x 1 41.0 0.60 0.10
4.23
For OAT step -7 1 x 1 47.0 0.90 0.10
For OAT side wall from step -1 to step -5 1.89
1 x 2 10.50 0.90 0.10
For stage wall 2.22
1 x 1 37.00 0.60 0.10
For approach steps for stage 0.40
1 x 2 2.00 1.00 0.10
For approach steps for seating area 1.68
14 x 2 1.20 0.50 0.10
For stage floor bed 7.30
1 x 1 73.00 0.10
29.78 Cum 4,556.33 Cum 135,687.51

189
3 (BLD- Masonry work in CM(1:6) prop (Cement : Screened sand) in superstructure with fly
CSTN-5- ash cement / lime solid blocks of size 290mm x 225mm x 140mm from approved
17) source having minimum crushing strength of 50 Kg/Sqcm. including cost and
conveyance of all materials like cement, sand, bricks, water etc., to site,and such
as labour charges, like mixing cement mortar, scaffolding charges, constructing
masonry, lift charges, curing, overheads and contractor profit etc., complete for
finished item of work. (APSS No. 501 & 504).

For OAT step -1 10.94


1 x 1 27.00 0.45 0.90
For OAT step -2 15.66
1 x 1 29.00 0.45 1.20
For OAT step -3 22.32
1 x 1 32.00 0.45 1.55
For OAT step -4 29.07
1 x 1 34.00 0.45 1.90
For OAT step -5 38.48
1 x 1 38.00 0.45 2.25
For OAT step -6 47.97
1 x 1 41.00 0.45 2.60
For OAT step -7 65.57
1 x 1 47.00 0.45 3.10
For OAT side wall from step -1 to step -5 23.63
1 x 2 10.50 0.45 2.50
For stage wall 14.99
1 x 1 37.00 0.45 0.90
For approach steps for stage -1 0.90
1 x 2 2.00 0.90 0.25
For approach steps for stage -2 0.36
1 x 2 2.00 0.60 0.15
For approach steps for stage -3 0.18
1 x 2 2.00 0.30 0.15
For approach steps for seating area 2.52
14 x 2 1.20 0.5 0.15
272.59 cum 7,242.08 cum 1,974,118.59
(BLD- Filling with useful available excavated earth (excluding rock) with a lead of 50 m in
CSTN-2- trenches, sides of foundations and basement with initial lead in layers not
9) & exceeding 15cm thick, watering and ramming including cost and conveyance of
4 Proc.No. water to work site and all operational, incidental, labour charges, hire charges of
20938 T&P etc., and overheads & contractors profit complete for finished item of work
(R&B)/ (APSS NO.309&310)
Dt:14-5-
2019
stage filling by using excavated Quantity 1 x 1 142.70 142.70

142.70 Cum 38.91 Cum ###


5,552.46
(BLD- Filling with carted gravel in pathways, trenches, sides of foundations and basement
CSTN-2- with initial lead in layers not exceeding 15cm thick, watering and ramming including
8) & cost and conveyance of water to work site and all operational, incidental, labour
5 Proc.No. charges, hire charges of T&P etc., and overheads & contractors profit complete for
20938 finished item of work(APSS NO.309&310)
(R&B)/
Dt:14-5-
2019
Gravel filling between steps 1&2 1 x 1 29.00 1.20 0.60 20.88
Gravel filling between steps 2&3 1 x 1 32.00 1.20 0.95 36.48
Gravel filling between steps 3&4 1 x 1 34.00 1.20 1.30 53.04
Gravel filling between steps 4&5 1 x 1 38.00 1.20 1.65 75.24
Gravel filling between steps 5&6 1 x 1 41.00 1.20 2.00 98.40
Gravel filling between steps 6&7 1 x 1 47.00 1.20 2.20 124.08
408.12 Cum 328.31 Cum ###
133,989.88
6 (BLD- Plastering 20mm thick in two coats using screened sand with base coat of 16mm
CSTN-8- thick in CM(1:6) and top coat of 4mm thick in CM(1:4) with dubara sponge finishing
9) including cost and conveyance of all materials like cement, sand, water etc., to site,
,, and all operational, incidental charges on materials and including cost of all
labour charges for mixing mortar, finishing, scaffolding, lift charges, curing,
including cutting grooves as directed by Engineer-in-charge etc., and overheads &
contractors profit complete for finished item of work .(SS 901,903 & 904)

For OAT step -1 12.15


1 x 1 27.00 0.45
For OAT step -2 13.05
1 x 1 29.00 0.45
For OAT step -3 14.40
1 x 1 32.00 0.45
For OAT step -4 15.30
1 x 1 34.00 0.45
For OAT step -5 17.10
1 x 1 38.00 0.45

190
For OAT step -6 18.45
1 x 1 41.00 0.45
For OAT step -7 122.20
1 x 1 47.00 2.60
For OAT side wall from step -1 to step -5 27.30
1 x 2 10.50 1.30
For stage wall 20.35
1 x 1 37.00 0.55
For approach steps for seating area 15.12
14 x 2 1.2 0.45
275.42 sqm 520.83 sqm 143,447.00
(BLD- Providing 0.5 wide Coping with 16 to 18mm thick High Polished granite up to 8'-00
CSTN-9- (2.43 M) other than black and regular colours with borders and design as per the
7) pattern approved by the Engineer-in-Charge , set over base coat of cement mortar
(1:5) , 12mm thick using screened sand over the stone ,Brick masonry or CC bed
already laid , including neat grey cement slurry of honey like consistency spread
3.3 Kg per sqm and jointed neatly with white cement paste mixed with pigment of
7 matching shade to full depth including cost and conveyance of all materials like
cement , sand , water , granite slabs etc., to work site and all operational, incidental
labour & lift charges, half rounding the edges of treads , polishing charges and
cost of base coat and overheads & contractors profit complete for finished item of
work for Coping (S.S.701 & special)

For OAT step -1 13.50


1 x 1 27.00 0.50
For OAT step -2 14.50
1 x 1 29.00 0.50
For OAT step -3 16.00
1 x 1 32.00 0.50
For OAT step -4 17.00
1 x 1 34.00 0.50
For OAT step -5 19.00
1 x 1 38.00 0.50
For OAT step -6 20.50
1 x 1 41.00 0.50
For OAT step -7 23.50
1 x 1 47.00 0.50
For OAT side wall from step -1 to step -5 10.50
1 x 2 10.50 0.50

134.50 Sqm 4,967.10 Sqm 668,074.95


###
8 (BLD- Supply & application of one coat water based cement primer of exterior grade II
CSTN- and two coats of acrylic exterior emulsion paint having VOC (Volatile Organic
12-2& Compound) content less than 50 grams/litre for exterior walls including cost and
Amendm conveyance of all materials to site,and all operational, incidental, labour charges
ent in etc., and overheads & contractors profit complete for finished item of work in all
SoR floors.
2011-12)

For OAT step -1 1 x 1 27.00 0.45 12.15

For OAT step -2 1 x 1 29.00 0.45 13.05

For OAT step -3 1 x 1 32.00 0.45 14.40

For OAT step -4 1 x 1 34.00 0.45 15.30

For OAT step -5 1 x 1 38.00 0.45 17.10

For OAT step -6 1 x 1 41.00 0.45 18.45

For OAT step -7 1 x 1 47.00 2.60 122.20

For OAT side wall from step -1 to step -5 1 x 2 10.50 1.30 27.30

For stage wall 1 x 1 37.00 0.55 20.35

For approach steps for seating area 14 x 2 1.20 0.45 15.12


275.42 Sqm 275.24 Sqm 75,806.60

191
9 (BLD- Flooring with 16 to 18mm thick high polished / Flame Finished / leather finished
CSTN-9- granite stone slabs other than black and regular colours (i.e. of shades like
7) paradise / bala flower / copper silk / laka red / lavender blue) with borders and
design as per the pattern approved by the Engineer-in-Charge of length not less
than 2.43 mts set over base coat of cement mortar (1:8) , 20mm thick using
screened sand over CC bed already laid or RCC roof slab including neat grey
cement slurry of honey like consistency spread @ 3.3 Kg per sqm and jointed
neatly with white cement paste mixed with pigment of matching shade to full depth
including cost and conveyance of all materials like cement , sand , water , granite
slabs etc., to work site and all operational, incidental labour & lift charges, polishing
charges and cost of base coat and overheads & contractors profit complete for
finished item of work (S.S.701 & special)

For stage flooring 73.00


1 x 1 73.00
73.00 Sqm 4,044.67 Sqm 295,260.91
10 (BLD- Providing Treads with 16 to 18mm thick high polished / Flame Finished / leather
CSTN-9- finished granite stone slabs other than black and regular colour granite with
7) borders and design as per the pattern approved by the Engineer-in-Charge of
length not less than 2.43 mts set over base coat of cement mortar (1:5) , 12mm
thick using screened sand over CC bed already laid or RCC roof slab including
neat grey cement slurry of honey like consistency spread @ 3.3 Kg per sqm and
jointed neatly with white cement paste mixed with pigment of matching shade to full
depth including cost and conveyance of all materials like cement , sand , water ,
granite slabs etc., to work site and all operational, incidental labour & lift charges,
half rounding the edges of treads , polishing charges and cost of base coat and
overheads & contractors profit complete for finished item of work for Treads
(S.S.701 & special)

For approach steps for stage 1.0 x 2.0 2.0 0.3 1.20
For approach steps for seating area 14.0 x 2.0 1.2 0.3 10.08
11.28 Sqm 5,070.60 Sqm 57,196.37
11 (BLD- Providing Risers to steps walls with 16 to 18mm thick high polished / Flame
CSTN-9- Finished / leather finished granite stone slabs other than black and regular colour
7) granite with length equal to flooring stone, set over base coat of CM(1:5) 12 mm
thick using screened sand with cement slurry of honey like consistency spread at
the rate of 3.30 kgs per sqm and jointing with white cement paste mixed with
pigment of matching shade to full depth, including cost of all materials like tiles,
cement, sand and water etc., and overheads & contractors profit complete for
finished item of work. for Risers-0.15 m(APSS No.701 &707)

For approach steps for stage 1.0 x 2.0 2.0 0.10 0.40
For approach steps for seating area 14.0 x 2.0 1.2 0.10 3.36
3.76 Sqm 4,191.88 Sqm 15,761.47
Total -I 3,543,624.52

192
A.P. Greening and Beautification Corporation

Name of the Work:- Detailed Estimate for development of Hardscape (Civil) works for
Hindu Crematorium (5.14 Acres) at Guntakal, Anantapuram (Dist.), Andhra Pradesh.
#REF!
Hardscape (Civil works)
Rate Per
Sl.N Item Amount
Description of Item QTY Unit Unit (in
o Code (in Rs.)
Rs.)

For Pathways, entrance plaza , planter boxes and


Seating benches
1 (BLD- Earth work excavation for foundations (Manual Means) of
CSTN- buildings, septic tank, sump, compound wall in ordinary
2-1) soils and depositing on bank with an initial lead of 10m
and depth up to 3m including all operational, incidental,
labour charges such as shoring, sheeting, planking,
strutting etc., and overheads & contractors profit complete
for finished item of work excluding dewatering charges
etc., as per SS 20 B(APSS 308)

#REF! Cum 271.40 #REF!


2 (BLD- Plain Cement Concrete (1:4:8) (cement: fine aggregate:
CSTN- Coarse aggregate) for foundations and under flooring bed
3-5) using 162.0 kgs of cement, coarse aggregate 40mm size
hard , machine crushed granite from approved quarry
including cost and conveyance of all materials like
cement, sand, coarse aggregate, water etc. to site,
including sales & other taxes on all materials and including
all charges for machine mixing, laying concrete in
foundations and under flooring bed, ramming in 15 cm
layers finishing top surface to the required level curing
etc., and overheads & contractors profit complete for
finished item of work. (APSS No. 402)

#REF! Cum 4,526.34 #REF!


3 As per Supply and fixing of C.C. Kerb not less than M30 strength
data of size 600 X 375 X 100 mm thick with bottom thickness of
100 mm upto height of 300 mm and top width of 50 mm
thick chamfering with 45° at starts at 300 mm height to
375 mm height as selected by the Engineer-in-charge
from approved source/ factory which is laid on existing CC
Bed jointing with C.M(1:3) including cost and conveyance
of all materials & labour charges including transportation ,
loading & unloading charges including contractor profit &
overhead charges complete for finished item of work.

#REF! Rmt 553.78 #REF!


10 As Per Supply and fixing of Kadapa slab (rough) 50mm thick and
Data size of 0.457x0.457m stone edging including excavating
trench in ordinary soil and fixing the stone in alignment
and refilling the excavated soil conveyance of all materials
and labour charges including transportation complete for
#REF! Rmt 97.80 #REF!
3 (BLD- Vibrated Plain Cement Concrete (1:3:6) nominal mix using
CSTN- 220 kg of cement and 20mm graded machine crushed
3-10 & hard granite metal (coarse aggregate) from approved
11) quarry including cost and conveyance of all materials like
cement, fine aggregate (sand), coarse aggregate, water
etc. to site, sales & other taxes on all materials, all
charges for Concrete Mixer , machine mixing, laying
concrete in position, vibrating, curing, centring charges,
overheads & contractors profit etc., for finished item of
work for footings and basement .

#REF! Cum 6,172.43 #REF!


4 (BLD- Plain Cement Concrete M 20 Nominal mix using Concrete
CSTN- MIXER, 20mm size hard granite machine crushed graded
3-13-C) metal (coarse aggregate - as per IS 383 - 1970 and IS
2386 Part 1 to Part 8) from approved quarry, using a
minimum quantity of 350 kgs. of cement per 1 cum of
concrete , including cost and conveyance of all materials
like cement, fine aggregate (Sand), coarse aggregate,
water etc., to site including steel centring, shuttering,
machine mixing, lift charges, laying concrete, vibrating,
curing, overheads & contractors profit etc., complete for
finished item of work (APSS No. 402 & 403)
#REF! Cum 6,371.09 #REF!

193
11 (BLD- Supply and placing of the V.R.C.C Nominal Mix Concrete
CSTN- M 20 grade corresponding to IS 456 with minimum cement
3-13-A) content of 350 kgs per 1 cum of concrete using
CONCRETE MIXER with 20mm size HBG graded
machine crushed hard granite metal (coarse aggregate -
as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from
approved quarry and including cost and conveyance of all
materials like cement, fine aggregate (sand) coarse
aggregate, water, etc., to site and sales & other taxes on
all materials , centring using Steel scaffolding pipes , jack
props , Waller’s , Foot plates , brackets , steel centring
plates etc., including all operational, incidental and labour
charges such as machine mixing, laying concrete, vibrator,
, curing etc., and overheads & contractors profit complete
but excluding cost of steel and its fabrication charges for
finished item of work (APSS No. 402)

Footings #REF! Cum 9,391.96 #REF!


Column pedestals #REF! Cum 10,003.50 #REF!
Plinth Beams #REF! Cum 12,047.15 #REF!

1 (BLD- Supply and placing of the V.R.C.C Nominal Mix Concrete


CSTN- M 20 grade corresponding to IS 456 with minimum cement
3-13-B) content of 350 kgs per 1 cum of concrete using
CONCRETE MIXER with 20mm size HBG graded
machine crushed hard granite metal (coarse aggregate -
as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from
approved quarry and,including cost and conveyance of all
materials like cement, fine aggregate (sand) coarse
aggregate, water etc., to site and sales & other taxes on
all materials, centring using Casurina Ballies, Bamboos,
Wooden Reapers, Runners, Wood Posts, Wall Plates etc.,
including all operational, incidental and labour charges
such as machine mixing, lifting of concrete manually,
laying concrete, vibrator, , curing , overheads &
contractors profit etc., complete but excluding cost of
steel and its fabrication charges for finished item of work
(APSS No. 402)

Pile Column #REF! Cum 8,865.95 #REF!


Columns #REF! Cum 11,806.03 #REF!
WATER TANKS 150 mm thick side walls #REF! Sqm 1,329.90 #REF!

1 (BLD- Supply and placing of the V.R.C.C Nominal Mix Concrete


CSTN- M 20 grade corresponding to IS 456 with minimum cement
3-13-C) content of 350 kgs per 1 cum of concrete using
CONCRETE MIXER with 20mm size HBG graded
machine crushed hard granite metal (coarse aggregate -
as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from
approved quarry including cost and conveyance of all
materials like cement, fine aggregate (sand) coarse
aggregate, water etc., to site and sales & other taxes on
all materials , centring using Casurina Ballies , Bamboos ,
Wooden Reapers , Runners , Wood Posts , Wall Plates
etc., including all operational, incidental and labour
charges such as machine mixing, lifting of concrete
manually, laying concrete, vibrator, , curing , overheads &
contractors profit etc., complete but excluding cost of steel
and its fabrication charges for finished item of work
(APSS No. 402)

Beam's #REF! Cum 10,255.87 #REF!


Roof Slabs 115mm thick : #REF! Sqm 1,184.30 #REF!
Foundation/Base Slabs #REF! Cum 7,667.43 #REF!
0.23mm thickside wlls #REF! Sqm 2,866.98 #REF!

194
1 (BLD- Supply and placing of the V.R.C.C Nominal Mix Concrete
CSTN- M 20 grade corresponding to IS 456 with minimum cement
3-13-C) content of 350 kgs per 1 cum of concrete using
CONCRETE MIXER with 20mm size HBG graded
machine crushed hard granite metal(coarse aggregate -
as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from
approved quarry including cost and conveyance of all
materials like cement, fine aggregate (sand) coarse
aggregate, water etc., to site and including sales & other
taxes on all materials , centring using Casurina Ballies ,
Bamboos , Wooden Reapers , Runners , Wood Posts ,
Wall Plates etc., for 60cm wide sun-shades 7.5cm thick at
fixed end and 5cm thick at free end with an average
thickness of 6.25cm including all operational, incidental
and labour charges such as , machine mixing, lifting of
concrete manually, laying concrete, curing, overheads &
contractors profit complete etc., but excluding cost of
steel and its fabrication charges for finished item of work
(APSS No. 402, 403 & 903)

for 60cm wide sun-shades 7.5cm thick at fixed end and #REF! Rmt 520.29 #REF!
5cm thick at free end
1 (BLD- Reinforced Cement Concrete Nominal Mix M 20 grade
CSTN- corresponding to IS 456 with minimum cement content of
3-13-C) 350 kgs per 1 cum of concrete using CONCRETE MIXER
with using 12mm size hard granite machine crushed
graded metal (coarse aggregate - as per IS 383 - 1970
and IS 2386 Part 1 to Part 8) from approved quarry, using
a minimum quantity of 350 kgs. of cement per 1 cum of
concrete including cost and conveyance of all materials
like cement, fine aggregate (Sand), coarse aggregate,
water etc., to site including steel centring, shuttering,
labour charges such as ,Concrete machine mixing, laying
concrete, lift charges, curing etc., and overheads &
contractors profit complete for finished item of work
(APSS No. 402 & 403) for platforms and shelves.

50mm thick platforms : #REF! Sqm 527.74 #REF!


25mm thick shelves : #REF! Sqm 263.87 #REF!

4 ( BLD- Random Rubble stone masonry in CM (1:8) prop:


CSTN- (Cement: Screened sand) using hard granite stones
6-13 ) carted from approved quarry including cost and
conveyance of all materials like cement, screened sand,
water,Rough stone Through stone, Coursed stones etc.,
from approved quarry, to site, including labour charges for
cutting stones to required size and shape, mixing, of
cement, mortar, construction, curing, charges for
scaffolding etc., and overheads & contractors profit
complete for finished item of work. (APSS No. 601 & 615)

#REF! Cum 4,511.57 #REF!


11 BLD- Coursed Rubble stone masonry 2nd sort, in CM (1:6)
CSTN- prop: (Cement: Sand) using hard granite stones from
6-6 approved quarry including cost and conveyance of all
materials like Coursed Rubble stones, Through stones 25
x 25x 45 to 60 cms, cement, sand, water, etc., to site, all
operational, incidental, and labour charges such as cutting
stones to required size and shape, mixing of cement
mortar, constructing masonry, curing etc., complete for
finished item of work. (APSS No. 601 & 612)

#REF! Cum 5,338.32 #REF!


11 (BLD- Brick masonry for panel walls in superstructure with CM
CSTN- (1:8) prop: (Cement : Screened sand) using common burnt
5-5) clay bricks of class as per Table- I of IS:1077-1992, Non-
Modular or traditional size 23 x 11 x 7 cms from approved
source having minimum crushing strength of 40 Kg/Sqcm.
including cost and conveyance of all materials like
cement, screened sand, bricks, water etc., to site,
including sales & other taxes on all materials and such as
labour charges, like mixing cement mortar, scaffolding
charges, constructing masonry, lift charges, curing, etc.,
and overheads & contractors profit complete for finished
item of work. (APSS No. 501 & 504).
Up to basement #REF! Cum 6,885.54 #REF!
Superstructure : #REF! Cum 7,461.66 #REF!

195
1 (BLD- Masonry work in CM(1:6) prop (Cement : Screened sand)
CSTN- in superstructure with fly ash cement / lime solid blocks of
5-17) size 290mm x 225mm x 140mm from approved source
having minimum crushing strength of 50 Kg/Sqcm.
including cost and conveyance of all materials like
cement, sand, bricks, water etc., to site, including sales &
other taxes on all materials and such as labour charges,
like mixing cement mortar, scaffolding charges,
constructing masonry, lift charges, curing, overheads and
contractor profit etc., complete for finished item of work.
(APSS No. 501 & 504).
Up to basement #REF! Cum 7,242.08 #REF!
Superstructure : #REF! Cum 7,831.02 #REF!
1 ( BLD- Plastering 12mm thick in two coats using screened sand
CSTN- with base coat of 8mm thick in CM (1:6) and top coat of
8-10) 4mm thick in CM (1:4) with dubara sponge finishing
including cost and conveyance of all materials like
cement, sand, water etc., to site, including sales & other
taxes on all materials, and all operational, incidental
charges on materials and including cost of all labour
Up to basement #REF! Sqm 505.33 #REF!
Superstructure : #REF! Sqm 518.58 #REF!
5 (BLD- Plastering 12mm thick single coat in CM(1:5) using
CSTN- screened sand including cost and conveyance of all
8-3) materials like cement, sand, water etc., to site, including
sales & other taxes on all materials, and all operational,
incidental charges on materials and including cost of all
labour charges for mixing mortar, finishing, curing as
directed by Engineer-in-charge etc., and overheads &
Up to basement #REF! Sqm 373.34 #REF!
Superstructure : #REF! Sqm 386.60 #REF!
1 (BLD- Ornamental ceiling plastering 12mm thick single coat in
CSTN- CM (1:5) using screened sand including cost and
8-3) conveyance of all materials like cement, sand, water etc.,
to site, including sales & other taxes on all materials, and
all operational, incidental charges on materials and
including cost of all labour charges for mixing mortar,
finishing, curing as directed by Engineer-in-charge etc.,
#REF! Sqm 400.32 #REF!
1 (BLD- Providing impervious coat to exposed RCC roof slab
CSTN- surfaces to required slopes with CM (1:3) prop. using
10-25) screened sand 20mm thick (average) mixed with integral
cement water proofing liquid confirming to IS: 2645-2003
manufactured by reputed manufacturers as approved by
Engineer-in-charge at 1 Kg per one bag of cement, laid
over roof slab when it is green, finished smooth with a
floating coat of neat cement and thread lining at regular
intervals of 45cmx45cm including cost and conveyance of
all materials like cement, sand, water proofing compound,
water etc., to site, including sales & other taxes on all
materials and operational, incidental, and labour charges
for mixing mortar, laying, lift charges, rendering smooth
and thread lining, curing including rounding off junctions of
wall and slab etc., and overheads & contractors profit
complete for finished item of work. (APSS No. 901 & 903).

#REF! Sqm 539.94 #REF!


1 (BLD- RCM facia 50mm thick in CM(1:3) using screened sand for
CSTN- drop walls, fins with rabbit wire mesh & nominal
8-11) reinforcement as directed by Engineer - In - Charge with
dubara sponge finishing, including cost and conveyance of
all materials to site, sales & other taxes on all
materials,operationals &incidental, cost and conveyance
of cement, wire mesh, water to work site, centring,
scaffolding and form work, lift charges etc., and overheads
& contractors profit complete for finished item of work but
excluding cost of steel and its fabrication charges for
finished item of work(APSS NO.403&903)

#REF! Sqm 1,933.82 #REF!


1 BLD- Raised Pointing to RR Masonry in CM (1:3) including cost
CSTN- and conveyance of all materials at site excluding
7-3 seigniorage charges on all materials and all operational,
incidental labour charges, curing etc complete for finished
item of work. (BLD-CSTN-7-3)

Up to basement #REF! Sqm 116.52 #REF!

196
1 (BLD- White washing two coats with white cement to ceiling to
CSTN- give an even shade after thoroughly brushing the surface
11-5) to remove all dirt and remains of loose powdered
materials including cost of all materials , labour charges
and incidental such as scaffolding , lift charges etc., and
overheads & contractors profit complete for finished item
of work in all floors.

#REF! Sqm 49.50 #REF!


6 (BLD- Supply & application of one coat water based cement
CSTN- primer of exterior grade II and two coats of acrylic exterior
12-2& emulsion paint having VOC (Volatile Organic Compound)
Amend content less than 50 grams/litre for exterior walls including
ment in cost and conveyance of all materials to site, sales & other
SoR taxes, incidental, operational and all labour charges etc.,
2011- and overheads & contractors profit complete for finished
12) item of work in all floors.

#REF! Sqm 275.24 #REF!


1 (BLD- Painting to new iron work with one coat of Red oxide
CSTN- primer and two coats with synthetic enamel paint Grade-II
12-7 & VOC (Volatile Organic Compound) content less than 50
12-12- grams/litre over primer coat of red oxid, including cost and
197) conveyance of all materials like Red oxide
primer ,Synthetic Enamel Paint to site, sales & other
taxes, incidental, operational and all labour charges etc.,
and overheads & contractors profit complete for finished
item of work in all floors. (SS No. 1201, 1212 & 1207).

#REF! Sqm 202.45 #REF!

8 (BLD- Flooring with polished Shahabad / Tandur stone slabs of


CSTN- 15mm to 18mm thick set over a base coat of CM (1:8) ,
9-1) 12mm thick using screened sand over already laid CC bed
/ RCC roof slab including neat cement slurry of honey like
consistency spread @ 3.3 Kgs per Sqm and jointed with
neat cement to full depth including cost and conveyance of
all materials like cement, sand, water, flooring stones etc.
complete including sales & other taxes on all materials
including all labour charges like dressing of flooring stones
to the required size, mixing of cement mortar, laying, lift
charges , cost of base coat, water charges etc., and
overheads & contractors profit complete for finished item
of work. (APSS No.703 & 701)

#REF! Sqm 724.53 #REF!


1 (BLD- Flooring with Rough Shahabad / Tandur stone slabs of 40
CSTN- mm thick set over base coat of cement mortar (1 : 8) 12
9-2) mm thick over CC bed already laid or RCC roof slab,
including pointing with cement mortar 1:3 duly filling joints
nearly, including cost of all materials like flooring stone,
cement, sand, and water etc., complete, including labour
charges for dressing of flooring stones etc., complete for
finished item of work,. (APSS No.703 & 701)

#REF! Sqm 731.89 #REF!


### (BLD- Flooring with (latoth) leather finish Tandur stone slabs of
CSTN- 18 to 22 mm thickset over a base coat of CM (1:8) ,
9-1) 12mm thick using screened sand over already laid CC bed
/ RCC roof slab including neat cement slurry of honey like
consistency spread @ 3.3 Kgs per Sqm and jointed with
neat cement to full depth including cost and conveyance of
all materials like cement, sand, water, flooring stones etc.
complete including sales & other taxes on all materials
including all labour charges like dressing of flooring stones
to the required size, mixing of cement mortar, laying, lift
charges , cost of base coat, water charges etc., and
overheads & contractors profit complete for finished item #REF! Sqm 969.08 #REF!
12 (BLD- Flooring with Polished black Kadapa slabs minimum of
CSTN- 15mm thick of size 0.457m x 0.457m set over a base coat
9-1) of CM (1:8) , 12mm thick using screened sand over
already laid CC bed / RCC roof slab including neat cement
slurry of honey like consistency spread @ 3.3 Kgs per
Sqm and jointed with neat cement to full depth including
cost and conveyance of all materials like cement, sand,
water, flooring stones etc. complete including sales &
other taxes on all materials including all labour charges
like dressing of flooring stones to the required size, mixing
of cement mortar, laying, lift charges , cost of base coat,
water charges etc., and overheads & contractors profit #REF! Sqm 705.48 #REF!
197
1 (BLD- Flooring with Rough black Kadapa slabs minimum of 50
CSTN- mm thick of size 0.457m x 0.457m set over base coat of
9-2) cement mortar (1 : 8) 12 mm thick over CC bed already
laid or RCC roof slab, including pointing with cement
mortar 1:3 duly filling joints nearly, including cost of all
materials like flooring stone, cement, sand, and water etc.,
complete, including labour charges for dressing of flooring
stones etc., complete for finished item of work,. (APSS
No.703 & 701)

#REF! Sqm 721.37 #REF!


1 (BLD- Flooring with 16 to 18mm thick high polished/leather
CSTN- finished granite stone slabs other than black and regular
9-7) colours (i.e. of shades like paradise / bala flower / copper
silk / laka red / lavender blue) with borders and
design ,finished as per the pattern approved by the
Engineer-in-Charge of length not less than 2.43 mts set
over base coat of cement mortar (1:8) , 20mm thick using
screened sand over CC bed already laid or RCC roof slab
including neat grey cement slurry of honey like
consistency spread @ 3.3 Kg per sqm and jointed neatly
with white cement paste mixed with pigment of matching
shade to full depth including cost and conveyance of all
materials like cement , sand , water , granite slabs etc., to
work site and all operational, incidental labour & lift
charges, polishing charges and all other taxes on all
materials, cost of base coat and overheads & contractors
profit complete for finished item of work (S.S.701 &
special)

#REF! Sqm 4,044.67 #REF!


### (BLD- Flooring with chequered cement concrete heavy duty tiles
CSTN- confirming to IS:13801 using aggregates, cement,
9-4) pigments of size 300mm x 300mm and thickness 25mm of
any shade as approved by Engineer - In - Charge set over
base coat of cement mortar (1:6), 12 mm thick using
screened sand over CC bed already laid or RCC roof slab
including neat cement slurry of honey like consistency
spread @ 3.3 kgs per sqm and jointed with neat white
cement to full depth mixed with pigment of matching
shade including cost and conveyance of all materials like
cement, sand, water and tiles etc., and overheads &
contractors profit complete for finished item of work.

#REF! Sqm 958.07 #REF!


1 (BLD- Providing polished Shahabad / Tandur stone slabs of
CSTN- 15mm to 18mm thick in single piece as specified set over
9-1) a base coat of CM (1:5) , 12mm thick using screened sand
over already laid CC bed / RCC roof slab including neat
cement slurry of honey like consistency spread @ 3.3 Kgs
per Sqm and jointed with neat cement to full depth
including cost and conveyance of all materials like
cement, sand, water, flooring stones etc. complete
including sales & other taxes on all materials including all
labour charges like dressing of flooring stones to the
required size, flat nosing the edges, mixing of cement
mortar, laying, lift charges , cost of base coat, water
charges etc., and overheads & contractors profit complete
for finished item of work for treads and risers. (APSS
No.703 & 701)

Treads of 0.30m wide : #REF! Sqm 962.20 #REF!


7 (BLD- Providing polished Shahabad / Tandur stone slabs of
CSTN- 15mm to 18mm thick in single piece as specified set over
9-23) a base coat of CM (1:5) , 12mm thick using screened sand
over already laid CC bed / RCC roof slab including neat
cement slurry of honey like consistency spread @ 3.3 Kgs
per Sqm and jointed with neat cement to full depth
including cost and conveyance of all materials like
cement, sand, water, flooring stones etc. complete
including sales & other taxes on all materials including all
labour charges like dressing of flooring stones to the
required size, flat nosing the edges, mixing of cement
mortar, laying, lift charges , cost of base coat, water
charges etc., and overheads & contractors profit complete
for finished item of work for treads and risers. (APSS
No.703 & 701)

Risers of 0.15m height : #REF! Sqm 788.81 #REF!

198
1 (BLD- Providing Treads with 16 to 18mm thick High Polished
CSTN- granite up to 8'-00 (2.43 M) other than black and regular
9-7) colours with borders and design as per the pattern
approved by the Engineer-in-Charge of length not less
than 2.43 mts set over base coat of cement mortar (1:5) ,
12mm thick using screened sand over CC bed already laid
or RCC roof slab including neat grey cement slurry of
honey like consistency spread @ 3.3 Kg per sqm and
jointed neatly with white cement paste mixed with pigment
of matching shade to full depth including cost and
conveyance of all materials like cement , sand , water ,
granite slabs etc., to work site and all operational,
incidental labour & lift charges, half rounding the edges of
treads , polishing charges and all other taxes on all
materials, cost of base coat and overheads & contractors
profit complete for finished item of work for Treads
(S.S.701 & special)

Treads wide : #REF! Sqm 5,588.13 #REF!

1 Cemen Providing Risers to steps walls with High Polished Granite


t for 16 to 18 mm thick up to 8'-00 (2.43 M) other than black
jointing and regular colours length equal to flooring stone, set over
base coat of CM(1:5) 12 mm thick using screened sand
with cement slurry of honey like consistency spread at the
rate of 3.30 kgs per sqm and jointing with white cement
paste mixed with pigment of matching shade to full depth,
including cost of all materials like tiles, cement, sand and
water etc., and overheads & contractors profit complete for
finished item of work. for Risers-0.15 m(APSS No.701
&707)

Risers of 0.15m height : #REF! Sqm 3,796.06 #REF!


7 (BLD- Providing Coping with 16 to 18mm thick High Polished
CSTN- granite up to 8'-00 (2.43 M) other than black and regular
9-7) colours with borders and design as per the pattern
approved by the Engineer-in-Charge of length not less
than 2.43 mts set over base coat of cement mortar (1:5) ,
12mm thick using screened sand over CC bed already laid
or RCC roof slab including neat grey cement slurry of
honey like consistency spread @ 3.3 Kg per sqm and
jointed neatly with white cement paste mixed with pigment
of matching shade to full depth including cost and
conveyance of all materials like cement , sand , water ,
granite slabs etc., to work site and all operational,
incidental labour & lift charges, half rounding the edges of
treads , polishing charges and all other taxes on all
materials, cost of base coat and overheads & contractors
profit complete for finished item of work for Coping 0.50 m
wide (S.S.701 & special)

#REF! Sqm 4,967.10 #REF!


7 (BLD- Providing skirting to internal walls to 10.00 cm height with
CSTN- Polished Shahabad/Tandur stone slabs 15mm to 18mm
9-23) thick, length equal to flooring stones set over base coat of
CM(1:5) 12 mm thick using screened sand with cement
slurry of honey like consistency spread at the rate of 3.30
kgs per sqm and jointing with white cement paste mixed
with pigment of matching shade to full depth, including
cost of all materials like tiles, cement, sand and water etc.,
Rmt 78.88
-
9 (BLD- Providing skirting to internal walls to 10.00 cm height with
CSTN- Polished Kadapa stone slabs minimum of 15mm thick,
9-22) length equal to flooring stones set over base coat of
CM(1:5) 12 mm thick using screened sand with cement
slurry of honey like consistency spread at the rate of 3.30
kgs per sqm and jointing with white cement paste mixed
with pigment of matching shade to full depth, including
cost of all materials like tiles, cement, sand and water etc.,
Rmt 76.98
2 (BLD- Providing cladding Granite to walls with High Polished
CSTN- Granite 16 to 18 mm thick up to 8'-00 (2.43 M) other than
9-19) black and regular colours, length equal to flooring slabs
set over base coat of CM(1:5) 12 mm thick using screened
sand with cement slurry of honey like consistency spread
at the rate of 3.30 kgs per sqm and jointing with white
cement paste mixed with pigment of matching shade to full
depth, including cost of all materials like tiles, cement,
Rmt 3,668.15

199
### ( BLD- Supply and fixing of cement bonded board 8 mm thick and
CSTN- laying as per the pattern approved by the Engineer-in-
10-26 ) Charge on purlins, rafters, trusses, including cost and
conveyance of all materials like approved cement bonded
board, nails, labour charges , overheads and contractors
profit etc., complete for finished item of work in all floors.
excluding the cost of purlins, rafters, trusses.

Sqm 750.50
### BLD.C Providing and laying of best tiled roofing with pressed clay
STN- (Mangalore tiles) size 250 x 150 x 15 mm thick and laying
10.9 as per the pattern approved by the Engineer-in-Charge
on roofs jointed with cement mortar 1:4 (1 cement : 4
coarse sand) mixed with 2% integral water proofing
compound, laid over a bed of 20 mm thick cement mortar
1:4 (1 cement : 4 coarse sand) including Rabbit wire mesh
(Chicken mesh) of not less than 30 gauge and jointed
Sqm 1,043.30
13 Supply & fixing of Dressed Granite cubes of size of
100x100x100 mm for Heavy traffic areas the shapes and
designs as per the specification set over the 50 mm thick
sand bed with hand roller compaction with joint neatly in
homogeneous or heterogeneous pattern as the colour
and pattern shall be as per the drawings furnished by the
architect, including cost of all materials like cement, sand
water and tiles etc., complete for finished item of work
Sqm 2,839.57
9 As Per Supply of precast concrete blocks for paving of M-30
Data grade and thickness not less than 50 mm for Non- traffic
areas conforming to IS 15658:2006 in all shapes and
designs as per the manufacturer's specification set over
the 50 mm thick sand bed with hand roller compaction with
joint neatly in homogeneous or heterogeneous pattern as
the colour and pattern shall be as per the drawings
furnished by the architect, including cost of all materials
#REF! Sqm 763.04 #REF!
2 As Per Supply of precast concrete blocks for paving of M-35
Data grade and thickness not less than 60 mm for Light traffic
areas conforming to IS 15658:2006 in all shapes and
designs as per the manufacturer's specification set over
the 50 mm thick sand bed with hand roller compaction with
joint neatly in homogeneous or heterogeneous pattern as
the colour and pattern shall be as per the drawings
furnished by the architect, including cost of all materials
#REF! Sqm 809.40 #REF!
### As Per Supply of precast concrete blocks for paving of M-40
Data grade and thickness not less than 80 mm for Medium
traffic areas conforming to IS 15658:2006 in all shapes
and designs as per the manufacturer's specification set
over the 50 mm thick sand bed with hand roller
compaction with joint neatly in homogeneous or
heterogeneous pattern as the colour and pattern shall be
as per the drawings furnished by the architect, including
#REF! Sqm 994.84 #REF!
13 As Per Supply of precast concrete blocks for paving of M-50
Data grade and thickness not less than100 mm for Heavy traffic
areas conforming to IS 15658:2006 in all shapes and
designs as per the manufacturer's specification set over
the 100 mm thick sand bed with hand roller compaction
with joint neatly in homogeneous or heterogeneous
pattern as the colour and pattern shall be as per the
drawings furnished by the architect, including cost of all
#REF! Sqm 1,103.30 #REF!
2 As Per Supply and fabrication of MS framed structure like Window
Data Grills, Compound Wall Grills, Iron Doors, Windows, Gates,
MS Frame for chain link mesh works, Roof Trusses by
using square / rectangular MS hollow section as per IS
4923 including cost of welding rods, power charges,
labour charges for cutting, placing, welding and erecting in
position and fixing, cost & convenience of all materials
including wastage to site with all taxes and duties etc
#REF! kgs 118.87 #REF!
2 As Per Supply and fabrication of MS framed structure like Window
Data Grills, Compound Wall Grills, Iron Doors, Windows, Gates,
MS Frames for Chain link mesh, Roof Trusses by using
tubes & pipes MS hollow section as per IS 1161 including
cost of welding rods, power charges, labour charges for
cutting, placing, welding and erecting in position and
fixing, cost & convenience of all materials including
wastage to site with all taxes and duties etc complete for
#REF! kgs 137.50 #REF!

200
4 CPWD Supply and laying of the C.C. pavement of V.R.C.C
16.75 & Nominal Mix Concrete M 20 grade corresponding to IS
(BLD- 456 with minimum cement content of 350 kgs per 1 cum of
CSTN- concrete using CONCRETE MIXER with 20mm size HBG
3-13-C) graded machine crushed hard granite metal (coarse
aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to
Part 8) from approved quarry including cost and
conveyance of all materials like cement, fine aggregate
(sand) coarse aggregate, water etc. including all
operational, incidental and labour charges.The design mix
concrete shall be laid and finished with screed board
vibrator , vacuum dewatering process and finally finished
by floating, brooming with wire brush etc. complete as per #REF! Cum 7,874.63 #REF!
4 (BLD- Providing casing embankment using gravel from
CSTN- approved area in layers of 25 cm with compaction
2-8) & including cost of all materials, machinery, labour, all
Amend operations such as materials transporting, spreading in
ment in layer of specified thickness, breaking clods, sectioning,
page compacting each layer without watering by Road roller 10
12 of tonne etc.,complete with initial lead up to 70.0 km and all
SoR lifts etc., include all incidental incomplete.
2014.1
5 #REF! Cum 344.07 #REF!
11 (BLD- Filling with carted gravel in trenches, sides of foundations
CSTN- and basement with initial lead in layers not exceeding
2-8) & 15cm thick, watering and ramming including cost and
Amend conveyance of water to work site and all operational,
ment in incidental, labour charges, hire charges of T&P etc., and
page overheads & contractors profit complete for finished item
12 of of work(APSS NO.309&310)
#REF! Cum 339.10 #REF!
1 (BLD- Filling with carted coarse sand in Children play area with
CSTN- initial lead in layers not exceeding 15cm thick, watering
2-8) & and ramming including cost and conveyance of water to
Amend work site and all operational, incidental ,labour charges,
ment in hire charges of T&P etc., and overheads & contractors
page profit complete for finished item of work(APSS
12 of NO.309&310)
#REF! Cum 811.24 #REF!
13 As per Supply and fixing of Vertical post 50x50x2.9mm thick M.S
data Square of 1.85m height each fixing at a distance of 2.0m
centre to centre, pit of 0.50x0.50x0.50m size in all soils ,
and PCC (1:4:8) for 0.50x0.50x0.10 m for pedestal of
0.50x0.50x0.40m size with VCC(1:3:6) using 20mm
graded metal for fixing the M.S Square Post duly welded
with 2 Nos of MS squares bar 12 mm of length 150 mm as
holdfasts for proper securing of M.S Square Post and
embedding in the VCC pedestal for 0.50m depth with clear
exposed M.S Square Post of 1.50m above bed level and
#REF! Sqm 1,697.29 #REF!
13 As Per Supply & Fixing Sadarhalli granite stone with 5 line
Lowest dressing Double Patti of 5' length seating benches with
Quotati Arm rest with back rest and its width 16'' with 3" thick
on and18" height with 3" thick and leg size 3'' width ,3' height
of ex showroom price . including cost and conveyance of
all materials like granite , cement to site loading , un
loading transport, sales & other taxes, incidental,
operational and all labour charges overheads &
contractors
For Benchesprofit etc., complete for finished item of work #REF! Nos. 15,200.00 #REF!
sub Total #REF!
### Provision for Illumination facilities @10% on sub total #REF!
### Provision for Irrigation facilities @ 7.5% on sub total #REF!
Total #REF!
Add GST @12% on Total #REF!
Add seigniorage Charges @ 0.6% on Total #REF!
Add Publication Charges @ 1% on TotaI #REF!
Provision for Third Party QC&A Charges @ 1% on TotaI #REF!
Add Tender premium / Escalation Charges @ 5% on Total #REF!
P.S and contingencies Charges @ 7.5% on Total #REF!
Add National academy of construction Charges @0.1% on Total #REF!
Unforeseen Items #REF!
Grand Total #REF!
#NAME?

201
A.P. Greening and Beautification Corporation
Name of the Work:- Detailed estimate for External electrification & illumination Rejuvenation of water body including
strengthening of bund and greenning and providing walking tracks at koppolu cheruvu in division no.9 ( 24.33 Acres) at Ongole
Municipal Coporation, Prakasam District Andhra Pradesh. Under AMRUT 2.0
Estimate Cost: Rs.22.94 Lakhs
Rate Per
Sl.N Item Amount
Description of Item Nos. L B D QTY Unit Unit (in Unit
o Code (in Rs.)
Rs.)
External electrification & illumination works

Supply and Transportation of XLPE/PVC insulated & PVC sheathed armoured cables 4 C x 4
ELEC- sq.mm of 1.1 KV grade with copper conductor as per IS 7098 Part-I -1988 etc including cost
1
4.1.6 and conveyance of all materials ,overheads & contractors profit etc., Make: Torrent /
Universal / Unicab / Havells / KEI/ Polycab/ Gloster/ Orbit/Paragon/RR Kabel/RPG/Rhino

4C x 4 sq.mm PVC sheathed armoured cables 1 x 1 800.00 − − 800.00 Rmtrs 327.21 Rmt 261,768.96
Supply and Laying of U.G cables upto 50 Sq,mm including earth work excavation of trench
BLD- 300x600mm and ,laying the cable on sand cushion of 150 mm thick ,covering the cable with
ELEC Rough Kadapa slabs minimum of 40 mm thick and refilling the trench with the excavated
2 soils[excl. rock] , including cost and conveyance of all materials ,overheads & contractors
15-6-1
at 277 profit etc., complete for finished item of work

Laying of U.G cables 1x 1 800.00 − − 800.00 Rmtrs 170.77 Rmt 136,617.68


Fabrication, Transportation and supply of hot-dip galvanized Octogonal Pole with BSEN -
10025 grade S 355 JO steel plate for shaft, IS 2062 for base plate with door opening
arrangement, including the supply of suitable boards with bakelite sheet as per IS
specification suitable to withstand the wind speed of 180 KMPH for 7.50 Mtrs heightPole
ELEC- having dimensions Bottom 130 mm,. Top 70mm with 3mm thick, base plate 220 x 220 x 12
3
6.1.4 mm and 4 Nos of M20 x 700 long 'J' bolts along with template, including cost and
conveyance of all materials ,overheads & contractors profit etc., complete for finished item of
work
Makes: Bajaj / Valmont/Laasma/Transrail/Utkarsh/ Skipper/Consoul

7.50 Mtrs height Pole 1 x 4 − − − 4.00 Nos 15,726.59 Each 62,906.36


Fabrication, Transportation and supply of hot-dip galvanized Octogonal Pole with BSEN -
10025 grade S 355 JO steel plate for shaft, IS 2062 for base plate with door opening
arrangement, including the supply of suitable boards with bakelite sheet as per IS
specification suitable to withstand the wind speed of 180 KMPH for 9 Mtrs heightPole
ELEC- having dimensions Bottom 155 mm,. Top 70mm with 3mm thick, base plate 260 x 260 x
4
6.1.5 16mm and 4 Nos of M24 x 750 long 'J' bolts along with template, including cost and
conveyance of all materials ,overheads & contractors profit etc., complete for finished item of
work
Makes: Bajaj / Valmont/Laasma/Transrail/Utkarsh/ Skipper/Consoul

9.0 Mtrs height Pole 1x 2 − − − 2.00 Nos 22,733.23 Each 45,466.46


Fabrication, Transportation and supply of 1.0 Mtr Length Single Arm Bracket made with MS
galvanized 40mm / 50mm dia Pipe. including cost and conveyance of all
ELEC- materials ,overheads & contractors profit etc., complete for finished item of work including
5
6.1.11 cost and conveyance of all materials ,overheads & contractors profit etc., complete for
finished item of work
Makes: Bajaj / Valmont/Laasma /Transrail/Utkarsh/Skipper/Consoul

1.50 Mtr Length Single Arm Bracket 1 x 12 − − − 12.00 Nos 1,738.31 Each 20,859.72
Supply and fabrication of street light poles made with medium quality MS Pipes of 88.90mm
OD for 1670mm long, 60.3mm OD Pipes of 1670 mm long and 42.4 mm OD for 1670 mm
long welded to each other for a total height of 5.0 m and providing 33.70 mm OD MS pipe
of 1000 mm long for arm bracket for Luminaires fixing welded to main pole at suitable angle,
suitable pole cap, base plate 300 x 300 x 10 mm and 4 Nos of 16 m dia 700 long 'J' bolts
As per along with template including cost of welding rods, power charges, labour charges for
6
data cutting, placing, welding and erecting in position, cost & convenience of all materials
including wastage to site, complete painting the total length of pipe with Painting to new iron
work with one coat of Red oxide primer and two coats with synthetic enamel paint Grade-II
VOC including cost of all materials ,labour charges etc for finished item of work.

5 m street light poles with Single arm bracket


1 x 40 − − − 40.00 Nos 4,918.43 Each
of 1 m length 196,737.10

Page 202 of 275


Rate Per
Sl.N Item Amount
Description of Item Nos. L B D QTY Unit Unit (in Unit
o Code (in Rs.)
Rs.)
Fabrication, Transportation of 4 m Street light pole with hot-dip galvanized as per BSEN -
10025 grade S 355 JO steel plate for shaft, IS 2062 for base plate with door opening
arrangement, including the Outdoor durable pure polyester powder coating for 4.0 Mtrs
height, Pole having 2 sections 1500 mm length 115 mm dia Bottom pipe and 2500 mm
length 75 mm dia Top pipe, base plate 250 x 250 x 12 mm, with decorative Double arm
bracket as directed by the Engineer- in-charge and 4 Nos of M16 x 450 long 'J' bolts along
As per with template, including cost and conveyance of all materials ,overheads & contractors profit
7 Quotati etc., complete for finished item of work
on

4 m street light poles with Double arm bracket


1 x 15 − − − 15.00 Nos 7,210.00 Each
of 1 m length 108,150.00
Supply and fixing of 120 W LED Street light Luminaire for existing street light pole,
Luminaire made of pressure diecast alluminium body with powder coated, having protective
toughned glass, Supply Input voltage 120 - 270 V AC, P.F > 0.90, high power LED's having
System efficacy > 100 lm/W and junction temprature < 70°C, with Ingrees protection IP66,
Luminaire performance complies to IS 10322 (Part 5 / Sec-3), Driver surge protection 4KV,
In house additional Surge protection 10 KV with optics distribution , THD<10% at 110 Volts
AC, driver efficiency >90%, CCT: 3000K - 5700K, minimum CRI>70, etc., including as
required complete as per the direction of Engineer-in-charge and including cost of all
BLD- materials to site, incidental giving connections and all labour charges overheads &
8 ELEC contractors profit etc., complete for finished item of work
7-9-5 a) Luminaire Make : Wipro(Skyline) / Philips (Greenline
Extra) /GE- Venture / Crompton(Nexus / Hawk series) / Bajaj (Edge)/ Halonix (Modular/
Lumos-Super) / Havells (EnduraSeries)/Greenlites(HILux)/Capart
(Premium)/Polycab/Keselec/ HPL(City Vision)/Jaquar (Premium) /Eveready /Surya
(Pollux) / Fortune Art (Leaf)
b) LED MAKE :PHILIPS LUMILEDS / CREE / NICHIA /OSRAM / SAMSUNG / LG.

120 W.LED Street light Luminaire 1 x 6 − − − 6.00 Nos 12,947.00 Each 77,681.99
Supply and fixing of 90 W LED Street light Luminaire for existing street light pole,
Luminaire made of pressure diecast alluminium body with powder coated, having protective
toughned glass, Supply Input voltage 120 - 270 V AC, P.F > 0.90, high power LED's having
System efficacy > 100 lm/W and junction temprature < 70°C, with Ingrees protection IP66,
Luminaire performance complies to IS 10322 (Part 5 / Sec-3), Driver surge protection 4KV,
In house additional Surge protection 10 KV with optics distribution , THD<10% at 110 Volts
BLD- AC, driver efficiency >90%, CCT: 3000K - 5700K, minimum CRI>70, etc., including as
9 ELEC required complete as per the direction of Engineer-in-charge and including cost of all
7-9-5 materials to site, incidental giving connections and all labour charges overheads &
contractors profit etc., complete for finished item of work
a) Luminaire Make : Wipro(Skyline) / Philips (Greenline
Extra) /GE- Venture / Crompton(Nexus / Hawk series) / Bajaj (Edge)/ Halonix (Modular/
Lumos-Super) / Havells (EnduraSeries)/Greenlites(HILux)/Capart
(Premium)/Polycab/Keselec/ HPL(City Vision)/Jaquar (Premium) /Eveready /Surya
(Pollux) / Fortune Art (Leaf)
b) LED MAKE :PHILIPS LUMILEDS / CREE / NICHIA /OSRAM / SAMSUNG / LG.
90 W.LED Street light Luminaire 1x 8 − − − 8.00 Nos 10,124.80 Each 80,998.41

Supply and fixing of 45 W LED Street light Luminaire for existing street light pole,
Luminaire made of pressure diecast alluminium body with powder coated, having protective
toughned glass, Supply Input voltage 120 - 270 V AC, P.F > 0.90, high power LED's having
System efficacy > 100 lm/W and junction temprature < 70°C, with Ingrees protection IP66,
Luminaire performance complies to IS 10322 (Part 5 / Sec-3), Driver surge protection 4KV,
In house additional Surge protection 10 KV with optics distribution , THD<10% at 110 Volts
AC, driver efficiency >90%, CCT: 3000K - 5700K, minimum CRI>70, etc., including as
required complete as per the direction of Engineer-in-charge and including cost of all
BLD- materials to site, incidental giving connections and all labour charges overheads &
10 ELEC contractors profit etc., complete for finished item of work.
7-9-5 a) Luminaire Make : Wipro(Skyline) / Philips (Greenline Extra) /GE- Venture /
Crompton(Nexus / Hawk series) / Bajaj (Edge)/ Halonix (Modular/ Lumos-Super) / Havells
(EnduraSeries)/Greenlites(HILux)/Capart (Premium)/Polycab/Keselec/ HPL(City
Vision)/Jaquar (Premium) /Eveready /Surya (Pollux) / Fortune Art (Leaf)
b) LED MAKE :PHILIPS LUMILEDS / CREE / NICHIA /OSRAM / SAMSUNG / LG.

45 W.LED Street light Luminaire 1x 70 − − − 70.00 Nos 5,421.14 Each 379,479.79

Page 203 of 275


Rate Per
Sl.N Item Amount
Description of Item Nos. L B D QTY Unit Unit (in Unit
o Code (in Rs.)
Rs.)
Supply and transportation of 100 W LED Flood light Luminaire made of pressure diecast
aluminium housing with powder coated, having protective toughened glass, Supply Input
voltage 120 - 270 V AC, P.F > 0.90, high power LED's System efficacy >100lm/W and
junction temperature < 70°C, with Ingress protection IP66, Luminaire performance complies
to IS 10322 (Part 5 / Sec-3), IK08, Driver surge protection 4KV, external Surge protection ≥
10KV with wide/ Narrow beam optics, THD<10% at 110 Volts AC, driver efficiency >90%, ,
CCT: 3000K - 5700K, minimum CRI>70,etc., including as required complete as per the
BLD- direction of Engineer-in-charge and including cost of all materials to site, incidental giving
11 ELEC connections and all labour charges overheads & contractors profit etc., complete for
7-9-5 finished item of work a)
LUMINAIRE MAKE : Wipro / Philips/ GE-Venture /Crompton/ Bajaj/Greenlites /
Havells/Capart(Premium) /Halonix/ Polycab/Keselec/HPL/Jaquar/Eveready / Surya
(Lumasmax / O Flood)/ FortuneArrt (Fin)
b) LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA /OSRAM / SAMSUNG.

1 8.00
100 W LED Flood light Luminaire x 8 − − − Nos 11,326.85 Each 90,614.78
Supply and transportation of 16 Watt ISA LED Bollard made of mild steel, cadmium plated
and painted body colour grey, an acrylic protector sealed & tightened to the body to achieve
an optical tightness of IP 66, Efficacy - 55 lm/W, (CCT) - 3000K, CRI - 70, Control Gear
Tightness IP 44, IK 06, L70 @50,000 Hours, Dia140 mm,1000 mm length, 17.7 Kg
including as required complete as per the direction of Engineer-in-charge and including cost
of all materials to site, incidental giving connections and all labour charges overheads &
As per contractors profit etc., complete for finished item of work
12 Quotati Make: Justled/ Keselec / Equivalent,
on

16 W ISA LED Bollard 1x 4 − − − 4.00 Nos 21,000.00 Each 84,000.00


Supply and transportation of 3 Way TRIO LED Bollard made of Aluminium die cast with
LED SMD 2835 Chip of 50 LED x 0.25 W - 12W separate optical and control gear
compartment with IP66, IK 08, size 120mm x 120 mm and 900mm length, Overall luminous
efficiency of 60lm/W, CCT of 3500K, CRI >70, 50,000 hours at L70. Surge Protection
Device Standard 6kV, Power Factor: > 0.95, Current: 600ma, Body Color Dark Grey Texture
FInish. and including as required complete as per the direction of Engineer-in-charge and
As per including cost of all materials to site, incidental giving connections and all labour charges
13 Quotati overheads & contractors profit etc., complete for finished item of work Make: Justled/
on Keselec / Equivalent

12 W 3 Way LED Bollard 1x 8 − − − 8.00 Nos 5,668.00 Each 45,344.00


Supply and transportation of 3 Way TRIO LED Bollard made of Aluminium die cast with
LED SMD 2835 Chip of 50 LED x 0.25 W - 12W separate optical and control gear
compartment with IP66, IK 08, size 120mm x 120 mm and 900mm length, Overall luminous
efficiency of 60lm/W, CCT of 3500K, CRI >70, 50,000 hours at L70. Surge Protection
Device Standard 6kV, Power Factor: > 0.95, Current: 600ma, Body Color Dark Grey Texture
FInish. and including as required complete as per the direction of Engineer-in-charge and
As per including cost of all materials to site, incidental giving connections and all labour charges
14 Quotati overheads & contractors profit etc., complete for finished item of work Make: Justled/
on Keselec / Equivalent

12 W 6 Way LED Bollard 20 W 1x 8 − − − 8.00 Nos 5,668.00 Each 45,344.00


Supply and transportation of 9 Watt KEW SPIKE made of The luminaires have a body made
of aluminium & toughened glass protector , Efficacy - 75 lm/W*, (CCT) - 3000K, CRI - 70,
Control Gear Tightness IP 65, IK 05, L70 @ 50,000 Hours, Dia 212mm x100mm x 399mm,
1.14Kg and including as required complete as per the direction of Engineer-in-charge and
As per including cost of all materials to site, incidental giving connections and all labour charges
15 Quotati overheads & contractors profit etc., complete for finished item of work Make: Justled/
on Keselec / Equivalent,

Floor recessed lights 9 w 1x 6 − − − 6.00 Nos 3,200.00 Each 19,200.00

Page 204 of 275


Rate Per
Sl.N Item Amount
Description of Item Nos. L B D QTY Unit Unit (in Unit
o Code (in Rs.)
Rs.)
16 ELEC- Foundation and erection charges with special T&P, for 7.50 Mtrs long Octagonal /Conical
6.1.31 pole duly erecting on base plate duly providing 4 Nos foundation bolts with nuts with
providing of 0.45Mtr x 0.45Mtrs x1.20 Mtr size M20 cc work vibrated concreting mixing
with necessary steel (10kgs) reinforcement and curing for 7 days as directed by the field
engineers during execution including excavation of Earth/BT all labour charges and cost and
conveyance of materials etc.complete.

7.50 Mtrs height Pole 1 x 4 4.00


4.00 Nos 6,613.53 Each 26,454.12
17 ELEC- Foundation and erection charges with special T&P, for 9.00Mtrs / 10Mtrs long Octagonal /
6.1.32 Conical pole duly erecting on base plate duly providing 4 Nos foundation bolts with nuts with
providing of 0.60Mtr x 0.60Mtrs x 1.40 Mtr size M20 cc work vibrated concreting mixing
with necessary steel (15kgs) reinforcement and curing for 7 days as directed by the field
engineers during execution including excavation of Earth/BT all labour charges and including
cost and conveyance of all materials ,overheads & contractors profit etc., complete.

9.0 Mtrs height Pole 1 x 2 2.00

2.00 Nos 8,908.55 Each 17,817.11


18 BLD- Foundation and erection charges with special T&P, for 5 Mtrs. Long MS / GI Garden pole
ELEC duly erecting on base plate duly providing 4 Nos foundation bolts with nuts with providing of
13.4.5 0.45Mtr x 0.45Mtrs x1.0 Mtr size pedestal with Vibrated Plain Cement Concrete M 20
Nominal mix with necessary steel (10kgs) reinforcement and curing for 7 days as directed by
the field engineers during execution including excavation of Earth/BT all labour charges and
cost and conveyance of materials etc including cost and conveyance of all
materials ,overheads & contractors profit etc., complete for finished item of work

4 m street light poles 1 x 55 55.00


55.00 Nos 2,714.75 Each 149,311.19

Supply and Wiring with 1 run of 3 core 1.50 Sqmm XLPE/PVC insulated & PVC sheathed
unarmoured control cables of 1.1 KV grade with copper conductor as per IS 7098 Part-I -
1988 etc in the existing pipes for main supply as required complete as per the direction of
BLD- Engineer-in-charge and including cost of all materials to site, incidental giving connections
19 ELEC- and all labour charges overheads & contractors profit etc., complete for finished item of
3.1.2 work
Make: Torrent / Universal / Unicab / Havells / KEI/Polycab/Gloster /orbit / Paragon/ RR
Kabel/ RPG

3C x 2.5 sq.mm PVC sheathed unarmoured 1 x 1 400.00 400.00


400.00 Rmtrs 154.82 Rmtrs 61,928.00
Supply of 4 core 6.0 Sqmm PVC insulated and sheathed FRLS copper round cable for
voltage up to 1100V as per IS 694/1990. including cost and conveyance of all
ELEC- materials ,overheads & contractors profit etc., complete for finished item of work Makes: V-
20
1.5.5 Guard/Bonton /Finecab/ HPL / GM / Million / Goldmedal /Fortune Art / /Sudhakar/Orbit/
Tamra/Anchor/Plaza/Vihan/Ollvin

4 core 6.0 Sq mm PVC insulated and sheathed


FRLS copper round cable 1 x 1 50.00 50.00
50.00 Rmtrs 386.29 Rmtrs 19,314.55
Supply and fixing of 1 No. 6-32A SP MCB 10KA C/D Curve ISI mark as required complete
as per the direction of Engineer-in-charge and including cost of all materials to site, incidental
BLD- giving connections and all labour charges overheads & contractors profit etc., complete for
21 ELEC- finished item of work.
4.4.1 Makes: V-Guard/Bonton /Finecab/ HPL / Million / FortuneArt /Sudhakar/Orbit/
Tamra/Anchor /Plaza/ Vihan/Spykaar/ Ollvin/Laser/Beljin/Rhino/ Standard/ Vimal

6-32A SP MCB 1 x 69 69.00 Nos 473.67 Each 32,683.39


Supply of Automatic Street Light Control System with Optical Micro Sensor, Low volatage /
High voltage trip and reset, operating voltage 150 - 280V AC per Phase, 50 HZ with suitable
SMC enclousure of IP 54 protection, MCBs and contactor suitable to control the load of 5
ELEC- KW of Three phase load with necessary clamping arrangements.
22
3.5.2 Make: Swadeep Nature Switch / Light Mate /GL/Bajaj

Automatic Street Light Control System 1 x 2 − − − 2.00 Nos 18,496.52 Each 36,993.05

Page 205 of 275


Rate Per
Sl.N Item Amount
Description of Item Nos. L B D QTY Unit Unit (in Unit
o Code (in Rs.)
Rs.)
Supply and fixing of suitable out door type feeder piller box made with 14 SWG CRCA sheet
after 7 tank process including S & F 40-63A FP MCB, 6 Nos SP MCB's, din chanel, bus
bars, 6 Sqmm 3 core copper cable for internal wiring, contactor, connectors and provision for
ELEC- energy
23
6.1.24 meter etc., complete for finished item of work..FP MCB including cost and conveyance of
all materials ,overheads & contractors profit etc., complete for finished item of work
FP MCB make :Legrand / Schnieder / L&T

suitable out door type feeder piller box 1 x 2 − − − 2.00 Nos 24,471.53 Each 48,943.07
Providing Independent earthing by excavating atrench to a depth f 2.10m in ordinary soils as
specified 1.50 X 0.6 to a depth of 0.9m and 1.2 X 0.6 to a depth of 1.20m ,using 40 mm dia
BLD- 'B' class GI Pipe of 2.5 m long with necessary accessories with 450mm x 50 mm thick hume
24 ELEC. pipe ring duly providing staggered holes including filling with 40 kg of hard coke and 20
5-1-1 kg salt providing with equal proportion of in layers etc. including cost and conveyance of all
materials ,overheads & contractors profit etc., complete for finished item of work

Independent earthing 0 x 3 − − − 0.00 Nos 4,204.89 Job -


Provisions for under water fountain light , focus light for statue
25 LS

Total 2,048,613.73

Add GST @12% on SubTotal 245,833.65


Add unforeseen items
Grand Total 2,294,447.38
#NAME?

Page 206 of 275


A.P. Greening & Beautification Corporation, Vijayawada

Name of the Work:- Rejuvenation of water body including strengthening of bund and greenning and providing walking tracks at koppolu
cheruvu in division no.9 ( 24.33 Acres) at Ongole Municipal Coporation, Prakasam District Andhra Pradesh. Under AMRUT 2.0

Bill of Quantities
Estimate Contract Value: Rs.35,96,490.00
S. Amount
Qty Unit Description of item Item code Rate words Unit
No. in Rs.
Clearing and grubbing the land including uprooting wild vegetation, grass, bushes, shrubs,
saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and
disposal of unserviceable materials and stacking of serviceable material to be used or
auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not Rupees two and fifty four paisa
1 25000.00 Sqm RBR-STCL-2 2.54 Sqm 63500
exceeding 150 mm in thickness as per Technical Specification Clause 201 MORD / MORTH. only
By Mechanical Means

Clearing thick jungle growth ( less than 50 percent open space ) including bushes upto 30 cm /
parthenium and other weeds including burning or disposing off the same as directed etc.,
complete.and it including all operational, incidental, labour charges, required tools, overheads Rupees four and twenty one
2 25000.00 Sqm & contractors profit complete for finished item of work IRR-PMW-1-2 4.21 Sqm 105250
paisa only

Eradication of Weed growth by spraying chemicals from drain beds and water bodys etc.,
complete for finished item of work and as directed by the engineer-in Charge and it including
all operational, incidental, labour charges, required tools, overheads & contractors profit Rupees four and twenty six paisa
3 10000.00 Sqm MAT-00342 4.26 Sqm 42600
complete for finished item of work only

Removal of Water Hyacinth beyond 30 cm thick and it including all operational, incidental,
labour charges, required tools, overheads & contractors profit complete for finished item of Rupees sixteen and sixty paisa
4 10000.00 Sqm IRR-PMW-3-25 (a) 16.6 Sqm 166000
work only

Earth work excavation for foundations (Manual Means) of buildings, septic tank, sump,
compound wall in ordinary soils and depositing on bank with an initial lead of 10m and depth
up to 3m including all operational, incidental, labour charges such as shoring, sheeting,
planking, strutting etc., and overheads & contractors profit complete for finished item of work Rupees two hundred seventy
5 112.50 Cum (BLD-CSTN-2-1) 271.40 Cum 30532.5
excluding dewatering charges etc., as per SS 20 B(APSS 308) one and forty paisa only

Plain Cement Concrete (1:4:8) (cement: fine aggregate: Coarse aggregate) for foundations and
under flooring bed using 162.0 kgs of cement, coarse aggregate 40mm size hard , machine
crushed granite from approved quarry including cost and conveyance of all materials like
cement, sand, coarse aggregate, water etc., to site, and including all charges for machine
mixing, laying concrete in foundations and under flooring bed, ramming in 15 cm layers Rupees four thousand five
6 28.50 Cum finishing top surface to the required level curing etc., and overheads & contractors profit (BLD-CSTN-3-5) 4,556.33 hundred fifty six and thirty three Cum 129855.41
complete for finished item of work. (APSS No. 402) paisa only

Random Rubble stone masonry in CM (1:8) prop: (Cement: Screened sand) using hard granite
stones carted from approved quarry including cost and conveyance of all materials like
cement, screened sand, water,Rough stone Through stone, Coursed stones etc., from
approved quarry, to site, including labour charges for cutting stones to required size and Rupees four thousand five
7 94.50 Cum shape, mixing, of cement, mortar, construction, curing, charges for scaffolding etc., and ( BLD-CSTN-6-13 ) 4511.57 hundred eleven and fifty seven Cum 426343.37
overheads & contractors profit complete for finished item of work. (APSS No. 601 & 615) paisa only
Filling with carted gravel in pathways, trenches, sides of foundations and basement with initial
lead in layers not exceeding 15cm thick, watering and ramming including cost and conveyance (BLD-CSTN-2-8) &
of water to work site and all operational, incidental, labour charges, hire charges of T&P etc., Proc.No.20938 Rupees three hundred twenty
8 450.00 Cum and overheads & contractors profit complete for finished item of work(APSS NO.309&310) 328.31 Cum 147739.5
(R&B)/ Dt:14-5- eight and thirty one paisa only
2019

Providing and constructing 30 cm thick dry rubble stone pitching with pin headers at 2 per
sqm, complete with initial lead upto 50 m and all lifts including cost and conveyance to site
including all operational, incidental, labour charges, hand packing, laying to required slope
hand packing, finishing as directed by the Engineer- in-charge etc., and overheads &
contractors profit complete for finished item of work Rupees four hundred seventy
9 1350.00 Cum IRR-CAW-8-3 479.35 Cum 647120.48
nine and thirty four paisa only
( rubble stones : 0.275 cum/sqm, Stone Chips : 0.045cum/sqm, Pin Headers 30cm : 2/sqm)

Supply and fixing of Kadapa stone Kerb of size 450 X 450 X 50 mm thick as selected by the
Engineer-in-charge from approved source/ factory which is laid on existing CC Bed in position
to the required line, level and curvature jointed with cement mortar 1:3 (1 cement : 3 coarse
sand), including making joints with or without grooves (thickness of joints except at sharp
curve shall not to more than 5 mm), including making drainage opening wherever required
and including cost and conveyance of all materials & labour charges including transportation Rupees one hundred forty eight
10 500.00 Rmt (IRR-CAW-2-8) 148.92 Rmt 74460
from approved source, loading & unloading charges, contractor profit & overhead charges and ninety two paisa only
complete for finished item of work.

Providing casing embankment using gravel from approved area in layers of 25 cm with
compaction including cost of all materials, machinery, labour, all operations such as materials
transporting, spreading in layer of specified thickness, breaking clods, sectioning, compacting
each layer without watering by Road roller 10 tonne etc.,complete with 8 km transportation Rupees three hundred forty four
11 4200.00 Cum (IRR-CAW-2-8) 344.07 Cum 1445094
with loading & unloading and complete for finished item of work. and seven paisa only

Softscape
Bed preparation for Dibbling for Bermuda/Doob/ Shade Grass :-Dressing the surface to the
desired shape, laying 150 mm (6”) thick fine red garden soil, covered with a thin layer of 10
mm thick sand, watering, compacting to 4" thickness by hand roller including cost of red
garden soil, sand and labour charges etc. complete for bed preparation and dibbling rooted
slips of grass @2" apart and ramming including slipping of grass, racking the soil before
dibbling, watering and ramming complete etc., and it including all operational, incidental,
labour charges, required tools, overheads & contractors profit complete for finished item of
work excluding cost of dibbling grass and fertilizer for 1 sqm Rupees two hundred eighty five
12 280.00 Sqm Red garden soil in this context it is defined as sandy loamy garden soil congenial for plant As per Data 285.05 Sqm 79814
and five paisa only
growth which shall be of light textured, crystaline, porous and friable, fertlie, slightly acidic or
neutral

Maintenance of lawns: Lawn mowing with electric motor / portable cutter machine and edging
& weeding of the lawns (once in 30 days) and application of fertilizers, insecticides, Fungicides
(once in a month) by manual excluding cost of fertilizers including all operational, 100 Sqm/
13 280.00 Sqm As per Data 105.00 Rupees one hundred five only 294
incidental ,labour charges for complete item of work, month

Maintenance of lawns: watering to the lawn once in 2 days @ 10 to 15 ltrs /per Sqmt basing
on season and weather conditions (15 watering is required in a month to maintain sub-soil
moisture continuously), excluding cost of water including all operational, incidental ,labour Rupees three hundred ninety 100 Sqm/
14 280.00 Sqm As per Data 393.75 1102.5
charges for complete of work, three and seventy five paisa only month
Digging of 0.75x0.75x0.75 mtrs. pit, filling with soil mixture of red garden soil, farmyard
manure at 4:1 ratio including internal transport, application of fertilizers and chemicals (@ 20
gms/pit/sqmt), internal transportation of plants, planting the plants etc., and it including all
operational, incidental, labour charges, required tools, overheads & contractors profit
complete for finished item of work. (excluding cost of plant material, fertilizers and chemicals
(@ 20 gms / pit/ sqmt) Rupees six hundred ninety two
15 315.00 Nos (Red garden soil in this context it is defined as sandy loamy garden soil congenial for plant As per Data 692.92 Each 218269.8
and ninety two paisa only
growth which shall be of light textured, crystalline, porous and friable, fertile, slightly acidic or
neutral)

Maintenance of Palms/Tree planting: Trimming (once in month) and application of fertilizers,


insecticides, Fungicides @ 20 gms/pit/sqmt) (once in quarterly) by manually excluding cost of
fertilizers, it including all operational, incidental ,labour charges, for complete of work for one 100 Nos/
16 315.00 Nos As per Data 609.00 Rupees six hundred nine only 1918.35
month maintenance. month

Maintenance of Palms/Tree planting: formation of basins 0.30m . away from the edges of
plant (once in a month) it including all operational, incidental ,labour charges for complete of Rupees one thousand ninety two 100 Nos/
17 315.00 Nos As per Data 1092.00 3439.8
work for one month maintenance. only month

Maintenance of Palms/Tree planting: watering (once in three days @ 5 Lts/per plant shall be
provide to maintain sub soil moisture continuously) by manually, but excluding cost of water
including all operational, incidental ,labour charges for complete of work. for one month Rupees nine hundred forty five 100 Nos/
18 315.00 Nos As per Data 945.00 2976.75
maintenance. only month

Supply & Delivery of topiary/trees/Palms/shrubs/lawn/ ground covers and specified plants as


per directions of officer in charge at site including cost of plants
plants of bag size
7" x 8" of plant height not less than 1.0 feet,
8" x 10" of plant height not less than 3.0 feet,
13" x 13" of Tree/Palm height not less than 5 feet,
13" x 13" of plant (Hedges & Shrub) height not less than 2 feet,
15" x 16" of plant (Tree/Palm/Topiary) height not less than 5 feet,
18" x 18" plant (Tree/Palm/Topiary) height not less than 6 feet, bottom dia of the stem is
0.75'' and above,
21" x 21" and above plant (Tree/Palm/Topiary) height not less than 7 feet, bottom dia of the
stem is 1'' and above.
Heights mentioned above are excluding bag height.
All the plants supplied shall be with sturdy stem, well formed crown, vigorously growing tip,
healthy foliage without any infestation and the plants shall be supplied after proper hardening
off.
the rates inclusive of cost of plants and labour charges for handling & complete for finished
item of work.

department
19 280 Sqm Perennial Rye Grasses Sqm
supply
department
20 157.00 Nos syzygium cumini 21" x 21"
supply
department
21 158.00 Nos Tabeuia roses 21" x 21"
supply
department
22 180 Nos Horn wort small pot
supply
Loading and unloading of plants bag size (21"X21") at site of work and stacking for lead less Rupees three thousand one
upto 50 m and including labour charges, T&P etc.,and overheads & contractors profit Plants bag size 21"
23 315.00 Nos 3198.61 hundred ninety eight and sixty 100 Nos 10075.62
complete for finished item of work (excluding cost of plant bag) X 21"
one paisa only
unloading of plants bag size (7"X8") at site of work and stacking for lead less upto 50 m and
including labour charges, T&P etc.,and overheads & contractors profit complete for finished Plants bag size 7" Rupees fifty seven and seventy
24 180.00 Nos 57.72 100 Nos 103.9
item of work (excluding cost of plant bag) X 8" two paisa only

Total 3,596,489.98

Say 3,596,490.00

Rupees thirty five lakh ninety six thousand four hundred ninety only
* The above rates are exciusive of GST & Seigniorage charges
A.P. Greening and Beautification Corporation
D A T A ( SOR 2022-23)
Name of the Work:- Rejuvenation of water body including strengthening of bund and greenning and
providing walking tracks at koppolu cheruvu in division no.9 ( 24.33 Acres) at Ongole Municipal
Coporation, Prakasam District Andhra Pradesh. Under AMRUT 2.0
Sl.
CFMS CODE Description Quantity Unit Rate (Rs.) Per Unit Amount (Rs.)
No.
Supply and Transportation of XLPE/PVC insulated & PVC sheathed armoured cables 4 C x 4 sq.mm of 1.1
KV grade with copper conductor as per IS 7098 Part-I -1988 etc including cost and conveyance of all
1 ELEC-4.1.6 materials ,overheads & contractors profit etc., Make: Torrent / Universal / Unicab / Havells / KEI/ Polycab/
Gloster/ Orbit/Paragon/RR Kabel/RPG/Rhino

Rate as per SOR 1.00 Rmt 288.00 1.00 Rmt 288.00


Overheads & Contractors Profit 0.13615
@13.615%
288.00 39.21
Rate for 1 Rmt 327.21
Supply and Laying of U.G cables upto 50 Sq,mm including earth work excavation of trench 300x600mm
and ,laying the cable on sand cushion of 150 mm thick ,covering the cable with Rough Kadapa slabs
BLD-ELEC minimum of 40 mm thick and refilling the trench with the excavated soils[excl. rock] , including cost and
2
15-6-1 at 277 conveyance of all materials ,overheads & contractors profit etc., complete for finished item of work

Data for 100 Rm


A. MATERIALS :
(BLD-CSTN-2-1)Earth work 100*0.3*0.6 18.00 cum 238.88 1 cum 4299.84
BMT-B.01 Rough Kadapa slabs minimum of 40
mm thick 30.0 Sqm 1250.00 10 sqm 3750.00
Sand for cushion 4.50 cum 678.40 1 cum 3052.80
B. LABOUR
Mazdoor for sand filling, refilling 2.5 Nos. 525.00 1 Each 1312.50
skilled electrician 1 Nos. 700.00 1 Each 700.00
helper 2.00 Nos. 565.00 1 Each 1130.00
MA @ 25% 0.25 3142.50 785.63
15030.77
Overheads & Contractors Profit 0.13615 15030.77 2046.44
@13.615%

Rate for 100 RM 17077.21


Rate for 1 RM 170.77
Fabrication, Transportation and supply of hot-dip galvanized Octogonal Pole with BSEN - 10025 grade S
355 JO steel plate for shaft, IS 2062 for base plate with door opening arrangement, including the supply of
suitable boards with bakelite sheet as per IS specification suitable to withstand the wind speed of 180
KMPH for 7.50 Mtrs heightPole having dimensions Bottom 130 mm,. Top 70mm with 3mm thick, base
3 ELEC-6.1.4 plate 220 x 220 x 12 mm and 4 Nos of M20 x 700 long 'J' bolts along with template, including cost and
conveyance of all materials ,overheads & contractors profit etc., complete for finished item of work
Makes: Bajaj / Valmont/Laasma/Transrail/Utkarsh/ Skipper/Consoul

Rate as per SoR 1.00 Nos 13,842.00 1.00 Nos 13,842.00


Overheads & Contractors Profit 0.13615
@13.615% 13842.00 1884.59
Rate for 1 Nos 15,726.59
Fabrication, Transportation and supply of hot-dip galvanized Octogonal Pole with BSEN - 10025 grade S
355 JO steel plate for shaft, IS 2062 for base plate with door opening arrangement, including the supply of
suitable boards with bakelite sheet as per IS specification suitable to withstand the wind speed of 180
KMPH for 9 Mtrs heightPole having dimensions Bottom 155 mm,. Top 70mm with 3mm thick, base plate
4 ELEC-6.1.5 260 x 260 x 16mm and 4 Nos of M24 x 750 long 'J' bolts along with template, including cost and
conveyance of all materials ,overheads & contractors profit etc., complete for finished item of work
Makes: Bajaj / Valmont/Laasma/Transrail/Utkarsh/ Skipper/Consoul

Rate as per SoR 1.00 Nos 20,009.00 1.00 Nos 20,009.00


Overheads & Contractors Profit 0.13615
@13.615% 20009.00 2724.23
Rate for 1 Nos 22733.23
Foundation and erection charges with special T&P, for 7.50 Mtrs long Octagonal /Conical pole duly
erecting on base plate duly providing 4 Nos foundation bolts with nuts with providing of 0.45Mtr x
0.45Mtrs x1.20 Mtr size M20 cc work vibrated concreting mixing with necessary steel (10kgs)
5 ELEC-6.1.31 reinforcement and curing for 7 days as directed by the field engineers during execution including excavation
of Earth/BT all labour charges and cost and conveyance of materials etc.complete.

Rate as per sor 1.00 Nos 5,821.00 1.00 Job 5,821.00


Overheads & Contractors Profit 0.13615
@13.615% 5821.00 792.53
Rate for 1 Job 6613.53
Foundation and erection charges with special T&P, for 9.00Mtrs / 10Mtrs long Octagonal / Conical pole
duly erecting on base plate duly providing 4 Nos foundation bolts with nuts with providing of 0.60Mtr x
0.60Mtrs x 1.40 Mtr size M20 cc work vibrated concreting mixing with necessary steel (15kgs)
6 ELEC-6.1.32 reinforcement and curing for 7 days as directed by the field engineers during execution including excavation
of Earth/BT all labour charges and including cost and conveyance of all materials ,overheads & contractors
profit etc., complete.
Rate as per SoR ELEC-6.1.31 1.00 Nos 7,841.00 1.00 Job 7,841.00
Overheads & Contractors Profit 0.13615
@13.615%
7841.00 1067.55
Rate for 1 Job 8908.55
Fabrication, Transportation and supply of 1.0 Mtr Length Single Arm Bracket made with MS galvanized
40mm / 50mm dia Pipe. including cost and conveyance of all materials ,overheads & contractors profit etc.,
complete for finished item of work including cost and conveyance of all materials ,overheads & contractors
7 ELEC-6.1.11 profit etc., complete for finished item of work
Makes: Bajaj / Valmont/Laasma /Transrail/Utkarsh/Skipper/Consoul

Rate as per SoR 1.00 Nos 1,530.00 1.00 Nos 1,530.00


Overheads & Contractors Profit 0.13615
@13.615% 1530.00 208.31
Rate for 1 Nos 1738.31
Fabrication, Transportation and supply of 1.0 Mtr Length Double Arm Bracket made with MS galvanized
40mm / 50mm dia Pipe. including cost and conveyance of all materials ,overheads & contractors profit etc.,
8 ELEC-6.1.13 complete for finished item of work including cost and conveyance of all materials ,overheads & contractors
profit etc., complete for finished item of work
Makes: Bajaj / Valmont/Laasma /Transrail/Utkarsh/Skipper/Consoul

Rate as per SoR 1.00 Nos 1,895.00 1.00 Nos 1,895.00


Overheads & Contractors Profit 0.13615
@13.615% 1895.00 258.00
Rate for 1 Nos 2153.00
Supply and Fixing street light poles made with medium quality MS Pipes of 76.1mm OD for 1.20 m long,
60.3mm OD Pipes of 1.30 m long and 48.3mm OD for 1.50 m long welded to each other for a total height
of 4.0 Rmt and providing 48.3mm OD MS pipe of 0.450 m long for arm bracket for Luminaires fixing
9 As per data welded to main pole at suitable angle ,including base plat of 0.15m x 0.15 m with 5 mm thick along with 4
No’s of J- bolt 0.3 m length and painting the total length of pipe with two coats of synthetic enamel paint
over red oxide primer coat including cost of all materials ,labour charges etc complete.

Unit : 1 Job
MS Pipes
MS Pipe section OD 76.1mm with 3.6 7.72 Kg
mm thick @ 6.44 kg/Rmt for (1.12 m x
6.44 =7.72 Kgs )
MS Pipe section OD 60.3 mm with 3.6 6.54 Kg
mm thick @ 5.03 kg/Rmt for (1.30 m x
5.03 =6.54 Kgs )
MS Pipe section OD 48.3 mm with 3.2 5.34 Kg
mm thick @ 3.56 kg/Rmt for (1.5 m x
3.56 =5.34 Kgs)
MS Pipe section OD 48.3 mm with 3.2 1.60 Kg
mm thick @ 3.56 kg/Rmt for arm
bracket (0.45 m x 3.56 =5.34 Kgs)
BMT-F-04 Total kgs for 4.0 m pole 21.20 Kg 76.00 1.00 Kg 1611.20
Part-I (46) J- Bolts 30 cm long 4.00 Nos 37.00 1 Nos 148.00
Base plat 150 x 150 x 5 mm thick @ 0.86 Kg 70.00 1 Kg 60.20
39.2 kg / sqm (0.150x 0.150 = 0.22 x
39.2 =0.86 kg
BMM-V.16 Fabrication charges 21.20 Kg 30.00 1.00 Kg 636.00
BMM-V.15 Erections charges 21.20 Kg 6.00 1.00 Kg 127.20
MA @ 25% 0.25 127.20 31.80
Painting to new iron work with one
(BLD-CSTN- coat of Red oxide primer and two coats
12-7 & 12-12- with synthetic enamel paint Grade-II
197) VOC for Pole
MS Pipe section OD 76.1mm for (1.06 0.29 Sqm
m x 3.141 x 0.0761 =0.250 sqm)
MS Pipe section OD 60.3 mm for (1.37 0.25 Sqm
m x 3.141 x 0.0603 =0.260 sqm )
MS Pipe section OD 48.3 mm for (1.5 0.23 Sqm
m x 3.141 x 0.0483 =0.253 sqm )
MS Pipe section OD 48.3 mm for (0.45 0.11 Sqm
m x 3.141 x 0.0483 =0.11 sqm )
Total painting area 0.88 Sqm 178.19 1.00 Sqm 156.81
2771.21
Overheads & Contractors Profit 0.13615 2771.21 377.30
@13.615%
Rate per Job 3148.51

Supply and transportation of 120 W LED Flood light Luminaire made of pressure diecast alluminium
housing with powder coated,having protective toughned glass, Supply Input voltage 120 - 270 V AC, P.F >
0.90, high power LED's System efficacy >100lm/W and junction temprature < 70°C, with Ingrees
protection IP66, Luminaire performance complies to IS 10322 (Part 5 / Sec-3), IK05, Driver surge
protection 4KV, In house additional Surge protection ≥ 10KV with wide/ Narrow beam optics, THD<10%
at 110 Volts AC, driver efficiency >90%, , CCT: 3000K - 5700K, minimum CRI>70, etc., complete
10 ELEC-3.8.27 including cost and conveyance of all materials ,overheads & contractors profit etc., complete for finished
item of work a) LUMINAIRE MAKE : Wipro / Philips/ GE-
Venture / Crompton/ Bajaj/Greenlites / Havells/Capart(Premium) /Halonix/
Polycab/Keselec/HPL/Jaquar/Eveready / Surya (Lumasmax / O Flood)/ FortuneArrt (Fin)
b) LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA /OSRAM / SAMSUNG..

Rate as per SOR 1.00 Nos 12337.00 1.00 Each 12337.00


Overheads & Contractors Profit 0.13615
@13.615% 12337.00 1679.68
14016.68
Supply and transportation of 100 W LED Flood light Luminaire made of pressure diecast alluminium
housing with powder coated,having protective toughned glass, Supply Input voltage 120 - 270 V AC, P.F >
0.90, high power LED's System efficacy >100lm/W and junction temprature < 70°C, with Ingrees
protection IP66, Luminaire performance complies to IS 10322 (Part 5 / Sec-3), IK05, Driver surge
protection 4KV, In house additional Surge protection ≥ 10KV with wide/ Narrow beam optics, THD<10%
at 110 Volts AC, driver efficiency >90%, , CCT: 3000K - 5700K, minimum CRI>70, etc., complete
8 ELEC-3.8.27 including cost and conveyance of all materials ,overheads & contractors profit etc., complete for finished
item of work a) LUMINAIRE MAKE : Wipro / Philips/ GE-
Venture / Crompton/ Bajaj/Greenlites / Havells/Capart(Premium) /Halonix/
Polycab/Keselec/HPL/Jaquar/Eveready / Surya (Lumasmax / O Flood)/ FortuneArrt (Fin)
b) LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA /OSRAM / SAMSUNG..

Rate as per SOR 1.00 Nos 9522.00 1.00 Each 9522.00


Overheads & Contractors Profit 0.13615
@13.615% 9522.00 1296.42
10818.42
Supply and transportation of 20 LED Street light Luminaire made of pressure diecast alluminium body
with powder coated, having protective toughned glass, Supply Input voltage 120 - 270 V AC, P.F >
0.90, high power LED's having System efficacy > 100 lm/W and junction temprature < 70°C, with Ingrees
protection IP66, Luminaire performance complies to IS 10322 (Part 5 / Sec-3), Driver surge protection
4KV, In house additional Surge protection 10 KV with optics distribution , THD<10% at 110 Volts AC,
driver efficiency >90%, CCT: 3000K - 5700K, minimum CRI>70, etc., including cost and conveyance of
all materials ,overheads & contractors profit etc., complete for finished item of work
9 ELEC-3.8.23 a) LUMINAIRE MAKE : Wipro(Skyline) / Philips (Green
line) /GE-Venture / Crompton(Neo Series) / Bajaj (Edge) /Halonix(Lumos - Super) / Havells (Endura
Series)/Capart(Premium)/Greenlites(Hi-Lux)/Polycab/Keselec/HPL(City Vision)/Jaquar
(Premium)/Eveready/ Surya (Pollux) / FortuneArrt (Leaf)
b) LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA /OSRAM / SAMSUNG / LG

Rate as per SOR 1.00 Nos 1822.00 1.00 Each 1822.00


Overheads & Contractors Profit 0.13615
@13.615% 1822.00 248.07
Rate for 1 Each 2070.07
Supply and transportation of 45 LED Street light Luminaire made of pressure diecast alluminium body
with powder coated, having protective toughned glass, Supply Input voltage 120 - 270 V AC, P.F >
0.90, high power LED's having System efficacy > 100 lm/W and junction temprature < 70°C, with Ingrees
protection IP66, Luminaire performance complies to IS 10322 (Part 5 / Sec-3), Driver surge protection
4KV, In house additional Surge protection 10 KV with optics distribution , THD<10% at 110 Volts AC,
driver efficiency >90%, CCT: 3000K - 5700K, minimum CRI>70, etc., including cost and conveyance of
10 ELEC-3.8.23 all materials ,overheads & contractors profit etc., complete for finished item of work
a) LUMINAIRE MAKE : Wipro(Skyline) / Philips (Green
line) /GE-Venture / Crompton(Neo Series) / Bajaj (Edge) /Halonix(Lumos - Super) / Havells (Endura
Series)/Capart(Premium)/Greenlites(Hi-Lux)/Polycab/Keselec/HPL(City Vision)/Jaquar
(Premium)/Eveready/ Surya (Pollux) / FortuneArrt (Leaf)
b) LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA /OSRAM / SAMSUNG / LG

Rate as per SOR 1.00 Nos 4324.00 1.00 Each 4324.00


Overheads & Contractors Profit 0.13615
@13.615% 4324.00 588.71
Rate for 1 Each 4912.71
Supply and transportation of 60 LED Street light Luminaire made of pressure diecast alluminium body
with powder coated, having protective toughned glass, Supply Input voltage 120 - 270 V AC, P.F >
0.90, high power LED's having System efficacy > 100 lm/W and junction temprature < 70°C, with Ingrees
protection IP66, Luminaire performance complies to IS 10322 (Part 5 / Sec-3), Driver surge protection
4KV, In house additional Surge protection 10 KV with optics distribution , THD<10% at 110 Volts AC,
driver efficiency >90%, CCT: 3000K - 5700K, minimum CRI>70, etc., including cost and conveyance of
10 ELEC-3.8.23 all materials ,overheads & contractors profit etc., complete for finished item of work
a) LUMINAIRE MAKE : Wipro(Skyline) / Philips (Green
line) /GE-Venture / Crompton(Neo Series) / Bajaj (Edge) /Halonix(Lumos - Super) / Havells (Endura
Series)/Capart(Premium)/Greenlites(Hi-Lux)/Polycab/Keselec/HPL(City Vision)/Jaquar
(Premium)/Eveready/ Surya (Pollux) / FortuneArrt (Leaf)
b) LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA /OSRAM / SAMSUNG / LG

Rate as per SOR 1.00 Nos 5428.00 1.00 Each 5428.00


Overheads & Contractors Profit 0.13615
@13.615% 5428.00 739.02
Rate for 1 Each 6167.02
Supply and transportation of 90 LED Street light Luminaire made of pressure diecast alluminium body
with powder coated, having protective toughned glass, Supply Input voltage 120 - 270 V AC, P.F > 0.90,
high power LED's System efficacy >110 lm/W and junction temprature < 70°C, with Ingrees protection
IP66, Luminaire performance complies to IS 10322 (Part 5 / Sec-3), Driver surge protection
4KV, In house additional Surge protection 10 KV with optics distribution , THD<10% at 110 Volts AC,
driver efficiency >90%, CCT: 3000K - 5700K, minimum CRI>70, etc., complete including cost and
conveyance of all materials ,overheads & contractors profit etc., complete for finished item of work
11 ELEC-3.8.24 a) Luminaire Make : Wipro(Skyline) / Philips
(Greenline Extra) /GE- Venture / Crompton(Nexus / Hawk series) / Bajaj (Edge)/ Halonix (Modular/
Lumos-Super) / Havells (EnduraSeries)/Greenlites(HILux)/Capart (Premium)/Polycab/Keselec/ HPL(City
Vision)/Jaquar (Premium) /Eveready /Surya (Pollux) / Fortune Art (Leaf)
b) LED MAKE :PHILIPS LUMILEDS / CREE / NICHIA /OSRAM / SAMSUNG / LG.
Rate as per SOR 1.00 Nos 8464.00 1.00 Each 8464.00
Overheads & Contractors Profit 0.13615
@13.615% 8464.00 1152.37
Rate for 1 Each 9616.37
Supply and fixing of suitable out door type feeder piller box made with 14 SWG CRCA sheet after 7 tank
process including S & F 40-63A FP MCB, 6 Nos SP MCB's, din chanel, bus bars, 6 Sqmm 3 core copper
cable for internal wiring, contactor, connectors and provision for energy
12 ELEC-6.1.24 meter etc., complete for finished item of work..FP MCB including cost and conveyance of all
materials ,overheads & contractors profit etc., complete for finished item of work
FP MCB make :Legrand / Schnieder / L&T

Rate as per SOR 1.00 Nos 21,539.00 1.00 Job 21,539.00


Overheads & Contractors Profit 0.13615
@13.615% 21539.00 2932.53
Rate for 1 each 24471.53
Providing Independent earthing by excavating atrench to a depth f 2.10m in ordinary soils as specified
1.50 X 0.6 to a depth of 0.9m and 1.2 X 0.6 to a depth of 1.20m ,using 40 mm dia 'B' class GI Pipe of 2.5 m
long with necessary accessories with 450mm x 50 mm thick hume pipe ring duly providing staggered
BLD-ELEC. 5- holes including filling with 40 kg of hard coke and 20 kg salt providing with equal proportion of in layers
13
1-1 etc. including cost and conveyance of all materials ,overheads & contractors profit etc., complete for
finished item of work

Unit : 1 Job

(BLD-CSTN- Earth work [1.5*0.6*0.9]=0.85 0.85 cum 238.88 1 cum 203.05


2-1)
(BLD-CSTN- Earth work [1.2*0.6*1.2]=0.9 0.90 cum 238.88 1 cum 214.99
2-1)
Add 25% extra for narrow trench & pit 0.25 418.04 104.51

a) Material
Part I-Basic G I pipe 40 mm dia B class 2.5 Rm 248.00 1 Rm 620.00
rate Item 35
25mm x 6mm GI Flat (1.18Kgs/1Mtr) 0.2 Rm 91.00 1 Rm 18.20
ELEC-6.7.6 . I
ELEC-8.4.20 12mm dia holes [ 4+16=20] 20 Nos 8.00 1 Nos 160.00
ELEC-8.4.21 G.I Nuts, Bolts and Washers 4 set 14.00 1 set 56.00
450mm x 50 mm (18" dia 2" )thick 1 Nos 303.00 1 Nos 303.00
ELEC-8.4.22 hume pipe ring
ELEC-8.1.10 Hard coke 40 kg 24.00 1 kg 960.00
ELEC-8.1.11 Salt 20 kg 19.00 1 kg 380.00
b) labour charges for fixing pipe ring
and connections
semi skilled electrician 0.50 565.00 1 Day 282.50
helper 0.50 525.00 1 Day 262.50
MA @ 25% 0.25 545.00 136.25
3701.00
Overheads & Contractors Profit 0.13615 3701.00 503.89
@13.615%
Rate per Job 4204.89
Supply and transportation of 4.00 Mtrs height, Bottom dia 143mm, Top 76mm, AV thickness 6mm and to
withstand maximum wind velocity 180Km/ Hr glass reinforced polymer (GRP) composite type Conical
pole with single arm bracket of length 1Mtr and internal junction box including cost and conveyance of all
### ELEC-6.1.34
materials ,overheads & contractors profit etc., complete for finished item of work
Makes: Bajaj / Kemrock / Sumip/Helipole

Rate as per SoR 1.00 Nos 12712.00 1.00 Nos 12,712.00


Overheads & Contractors Profit 0.13615
@13.615% 12712.00 1730.74
Rate for 1each 14442.74
Supply of 155 X 210 X 92 MM Size thermo plastic cable junction boxes with IP66/67 weather proof, for
outdoor installation with konckouts for cable entry including terminals etc., complete (sizes in mm) Make :
Hensel/Sadhrish including cost and conveyance of all materials ,overheads & contractors profit etc.,
### ELEC-6.1.29
complete for finished item of work
Make : Hensel/Sadhrish

Rate as per SoR 1.00 Nos 1893.00 1.00 Nos 1,893.00


Overheads & Contractors Profit 0.13615
@13.615% 1893.00 257.73
Rate for 1each 2150.73
Supply of 3 core 4.0 Sqmm PVC insulated and sheathed FRLS copper round cable for voltage up to 1100V
as per IS 694/1990. including cost and conveyance of all materials ,overheads & contractors profit etc.,
14 ELEC-1.5.4 complete for finished item of work
Makes: Finolex / RR kabel / Havells /KEI/Polycab/ Gloster/Goldmedal/GM
Rate as per SoR 1.00 Rmt 79.00 1.00 Rmt 79.00
Overheads & Contractors Profit 0.13615
@13.615% 79.00 10.76
Rate for 1 Rmt 89.76
Supply and laying of 8 SWG Copper wire(0.1155Kgs/1Mtr) sizes Earth wire/Strip in horizontal /Vertical
run in Ground/surface/Recess including, riveting , soldering, saddles ,making connection etc as required
15 ELEC-6.7.6
including cost and conveyance of all materials ,overheads & contractors profit etc., complete for finished
item of work
Rate as per SoR 1.00 Rmt 86.00 1.00 Rmt 86.00
Overheads & Contractors Profit 0.13615
@13.615% 86.00 11.71

Rate for 1 Rmt 97.71


Supply and fixing of 1 No. 6-32A SP MCB 10KA C/D Curve ISI mark including cost and conveyance of
all materials ,overheads & contractors profit etc.,
16 ELEC-2.10.1 Makes: Legrand-DX3 / Schneider-A9/Hager-h3/ Siemens- 5SX4/ Havells STADx /L&T-AU/Indo Asian-
Opti pro/ HPL (Techno)

Rate as per SoR ELEC-2.10.1 1.00 Nos 240.00 1.00 Each 240.00
Overheads & Contractors Profit 0.13615
@13.615% 240.00 32.68
Rate for 1 each 272.68
Supply and making end termination with heavy Aluminium lugs up to 16 sqmm (pin/ ring type) as per IS
specification duly crimped with crimping tool, PVC tape etc., including cost and conveyance of all
17 ELEC-4.1.13 materials ,overheads & contractors profit etc., complete for finished item of work
Makes:Dowels/Jainson/Comet

Rate as per SOR 17-18 ELEC-4.1.13 1.00 Nos 12.00 1.00 Each 12.00
Overheads & Contractors Profit 0.13615
@13.615%
12.00 1.63

Rate for 1 Each 13.63


Fabrication, Transportation of 4 m Street light pole with hot-dip galvanized as per BSEN - 10025
grade S 355 JO steel plate for shaft, IS 2062 for base plate with door opening arrangement,
including the Outdoor durable pure polyester powder coating for 4.0 Mtrs height, Pole having 2
sections 1500 mm length 115 mm dia Bottom pipe and 2500 mm length 75 mm dia Top pipe, base
plate 250 x 250 x 12 mm,with decorative Single arm bracket as directed by the Engineer- in-
charge and 4 Nos of M16 x 450 long 'J' bolts along with template, including cost and
As per
18 conveyance of all materials ,overheads & contractors profit etc., complete for finished item
Quotation
of work

Rate per each 6,678.00


Fabrication, Transportation of 4 m Street light pole with hot-dip galvanized as per BSEN - 10025
grade S 355 JO steel plate for shaft, IS 2062 for base plate with door opening arrangement,
including the Outdoor durable pure polyester powder coating for 4.0 Mtrs height, Pole having 2
sections 1500 mm length 115 mm dia Bottom pipe and 2500 mm length 75 mm dia Top pipe, base
plate 250 x 250 x 12 mm, with decorative Double arm bracket as directed by the Engineer-
in-charge and 4 Nos of M16 x 450 long 'J' bolts along with template, including cost and
As per conveyance of all materials ,overheads & contractors profit etc., complete for finished item
19
Quotation of work

Rate per each 7,210.00


Supply and fabrication of street light poles made with medium quality MS Pipes of 88.90mm OD for 1670mm long,
60.3mm OD Pipes of 1670 mm long and 42.4 mm OD for 1670 mm long welded to each other for a total height of
5.0 m and providing 33.70 mm OD MS pipe of 1000 mm long for arm bracket for Luminaires fixing welded to main
pole at suitable angle, suitable pole cap, base plate 300 x 300 x 10 mm and 4 Nos of 16 m dia 700 long 'J' bolts
along with template including cost of welding rods, power charges, labour charges for cutting, placing, welding and
19 As per data erecting in position, cost & convenience of all materials including wastage to site, complete painting the total length
of pipe with Painting to new iron work with one coat of Red oxide primer and two coats with synthetic enamel paint
Grade-II VOC including cost of all materials ,labour charges etc for finished item of work.

Unit : 1 Job

MS Pipes

MS Pipe section OD 88.90 mm with 4.0 13.96 Kg


mm thick @ 8.36 kg/Rmt for (1.67 m x
8.36 =13.96 Kgs )
MS Pipe section OD 60.3 mm with 3.6 mm 8.40 Kg
thick @ 5.03 kg/Rmt for (1.67 m x 5.03 =
8.40 Kgs )
MS Pipe section OD 42.4 mm with 3.2 mm 5.03 Kg
thick @ 3.01 kg/Rmt for (1.67 m x 3.01
=5.03 Kgs)
MS Pipe section OD 33.7 mm with 3.2 mm 2.41 Kg
thick @ 2.41 kg/Rmt for (1 m x 2.41 = 2.41
Kgs) 1.0 Mtr Length Single Arm Bracket

MS plate of 300 x 300 x 10 mm thick @ 2.12 Kg


78.50 Kg/Sqmt for poles base plate

BMT-F-04 Total kgs 31.92 Kg 76.00 1.00 Kg 2425.92

BMT-F-04 Add 2.5% wastage on 29.80 kgs 0.800 Kg 76.00 1.00 Kg 60.80

BMM-V.16 Fabrication charges 31.92 Kg 30.00 1.00 Kg 957.60

BMM-V.15 Erections charges 31.92 Kg 6.00 1.00 Kg 191.52

191.52 47.88
MA @ 25% 0.25
700 long 'J' bolts along (16 dia 1.56 kg/m x 4.37 Kg 102.00 1.00 Kg 445.74
MAT-00284 0.70 m =1.09 x 4 nos = 4.37 kgs

Painting to new iron work with one coat of


Red oxide primer and two coats with
synthetic enamel paint Grade-II VOC for
Pole

MS Pipe section OD 88.90 mm with 4.0 0.470 Sqm


mm thick @ 8.36 kg/Rmt for (1.67 m x
8.36 =13.96 Kgs )
MS Pipe section OD 60.3 mm with 3.6 mm 0.32 Sqm
thick @ 5.03 kg/Rmt for (1.67 m x 5.03 =
8.40 Kgs )
MS Pipe section OD 42.4 mm with 3.2 mm 0.22 Sqm
thick @ 3.01 kg/Rmt for (1.67 m x 3.01
=5.03 Kgs)
MS Pipe section OD 33.7 mm with 3.2 mm 0.11 Sqm
thick @ 2.41 kg/Rmt for (1 m x 2.41 = 2.41
(BLD-CSTN- Kgs) 1.0 Mtr Length Single Arm Bracket
12-7 & 12-12-
197)
Total painting area 1.12 Sqm 178.19 1.00 Sqm 199.57

4329.03

4329.03 589.40
Overheads & Contractors Profit 0.13615
@13.615%
Rate per Job 4918.43

BLD-ELEC Foundation and erection charges with special T&P, for 5 Mtrs. Long MS / GI Garden pole duly erecting on base
13.4.5 plate duly providing 4 Nos foundation bolts with nuts with providing of 0.45Mtr x 0.45Mtrs x1.0 Mtr size pedestal
with Vibrated Plain Cement Concrete M 20 Nominal mix with necessary steel (10kgs) reinforcement and curing for
7 days as directed by the field engineers during execution including excavation of Earth/BT all labour charges and
20 cost and conveyance of materials etc including cost and conveyance of all materials ,overheads & contractors profit
etc., complete for finished item of work

Unit = 1 No.
A. MATERIALS :
(BLD-CSTN-
2-1) Pit excavation (0.45x0.45x1.0 mtr) 0.20 Cum 238.88 1.00 Cum 47.78
(BLD-CSTN-
3-13-C)
(BLD-CSTN- V.P.C.C M 20 pedestal 0.20 Cum 5634.01 1.00 Cum 1126.80
4.2)&
Amendment in
Steel (HYSD) 10.00 Kgs 81.11 1.00 Kgs 811.10
SoR 2011-12
page No. 392 B. LABOUR
2nd class mason 0.20 Nos. 565.00 1.00 Each 113.00
helper 0.40 Nos. 525.00 1.00 Each 210.00
MA @ 25% 0.25 323.00 80.75
2389.43

Overheads & Contractors Profit


@13.615% 0.13615 2389.43 325.32
Rate for 1 Each 2714.75
Supply and fixing of 45 W LED Street light Luminaire for existing street light pole, Luminaire made of pressure
diecast alluminium body with powder coated, having protective toughned glass, Supply Input voltage 120 - 270 V
AC, P.F > 0.90, high power LED's having System efficacy > 100 lm/W and junction temprature < 70°C, with Ingrees
protection IP66, Luminaire performance complies to IS 10322 (Part 5 / Sec-3), Driver surge protection 4KV, In
house additional Surge protection 10 KV with optics distribution , THD<10% at 110 Volts AC, driver efficiency
>90%, CCT: 3000K - 5700K, minimum CRI>70, etc., including as required complete as per the direction of
Engineer-in-charge and including cost of all materials to site, incidental giving connections and all labour charges
overheads & contractors profit etc., complete for finished item of work.
21 a) Luminaire Make : Wipro(Skyline) / Philips (Greenline Extra) /GE- Venture / Crompton(Nexus / Hawk series) /
Bajaj (Edge)/ Halonix (Modular/ Lumos-Super) / Havells (EnduraSeries)/Greenlites(HILux)/Capart
(Premium)/Polycab/Keselec/ HPL(City Vision)/Jaquar (Premium) /Eveready /Surya (Pollux) / Fortune Art (Leaf)
b) LED MAKE :PHILIPS LUMILEDS / CREE / NICHIA /OSRAM / SAMSUNG / LG.

BLD-ELEC 7-9-5
Unit = 1 No.
A. MATERIALS :
ELEC-3.8.23 45 W LED Street light Luminaire
1.00 Nos 4324.00 1.00 Each 4324.00
B. LABOUR
LAB-00005 skilled electrician 0.20 Nos. 700.00 1 Each 140.00
LAB-00079 semi skilled electrician 0.20 Nos. 565.00 1 Each 113.00
LAB-00120, helper 0.20 Nos. 525.00 1 Each 105.00
LAB-00121 MA @ 25% 0.25 358.00 89.50
4771.50
Overheads & Contractors Profit 0.13615
@13.615% 4771.50 649.64
Rate for 1 Each 5421.14
Supply and fixing of 90 W LED Street light Luminaire for existing street light pole, Luminaire made of pressure
diecast alluminium body with powder coated, having protective toughned glass, Supply Input voltage 120 - 270 V
AC, P.F > 0.90, high power LED's having System efficacy > 100 lm/W and junction temprature < 70°C, with Ingrees
protection IP66, Luminaire performance complies to IS 10322 (Part 5 / Sec-3), Driver surge protection 4KV, In
house additional Surge protection 10 KV with optics distribution , THD<10% at 110 Volts AC, driver efficiency
>90%, CCT: 3000K - 5700K, minimum CRI>70, etc., including as required complete as per the direction of
Engineer-in-charge and including cost of all materials to site, incidental giving connections and all labour charges
overheads & contractors profit etc., complete for finished item of work
1 a) Luminaire Make : Wipro(Skyline) / Philips (Greenline Extra) /GE- Venture /
Crompton(Nexus / Hawk series) / Bajaj (Edge)/ Halonix (Modular/ Lumos-Super) / Havells
(EnduraSeries)/Greenlites(HILux)/Capart (Premium)/Polycab/Keselec/ HPL(City Vision)/Jaquar (Premium)
/Eveready /Surya (Pollux) / Fortune Art (Leaf)
b) LED MAKE :PHILIPS LUMILEDS / CREE / NICHIA /OSRAM / SAMSUNG / LG.

BLD-ELEC 7-9-5
Unit = 1 No.
A. MATERIALS :
ELEC-3.8.24 90 W LED Street light Luminaire 1.00 Nos 8464.00 1.00 Each 8464.00
B. LABOUR
LAB-00005 skilled electrician 0.20 Nos. 700.00 1 Each 140.00
LAB-00079 semi skilled electrician 0.20 Nos. 565.00 1 Each 113.00
LAB-00120, helper 0.20 Nos. 525.00 1 Each 105.00
LAB-00121 MA @ 25% 0.25 358.00 89.50
8911.50
Overheads & Contractors Profit 0.13615
@13.615% 8911.50 1213.30
Rate for 1 Each 10124.80
Supply and fixing of 120 W LED Street light Luminaire for existing street light pole, Luminaire made of pressure
diecast alluminium body with powder coated, having protective toughned glass, Supply Input voltage 120 - 270 V
AC, P.F > 0.90, high power LED's having System efficacy > 100 lm/W and junction temprature < 70°C, with Ingrees
protection IP66, Luminaire performance complies to IS 10322 (Part 5 / Sec-3), Driver surge protection 4KV, In
house additional Surge protection 10 KV with optics distribution , THD<10% at 110 Volts AC, driver efficiency
>90%, CCT: 3000K - 5700K, minimum CRI>70, etc., including as required complete as per the direction of
Engineer-in-charge and including cost of all materials to site, incidental giving connections and all labour charges
overheads & contractors profit etc., complete for finished item of work
22 a) Luminaire Make : Wipro(Skyline) / Philips (Greenline Extra) /GE- Venture /
Crompton(Nexus / Hawk series) / Bajaj (Edge)/ Halonix (Modular/ Lumos-Super) / Havells
(EnduraSeries)/Greenlites(HILux)/Capart (Premium)/Polycab/Keselec/ HPL(City Vision)/Jaquar (Premium)
/Eveready /Surya (Pollux) / Fortune Art (Leaf)
b) LED MAKE :PHILIPS LUMILEDS / CREE / NICHIA /OSRAM / SAMSUNG / LG.

BLD-ELEC 7-9-5
Unit = 1 No.
A. MATERIALS :
ELEC-3.8.24 120 W LED Street light Luminaire 1.00 Nos 10948.00 1.00 Each 10948.00
B. LABOUR
LAB-00005 skilled electrician 0.20 Nos. 700.00 1 Each 140.00
LAB-00079 semi skilled electrician 0.20 Nos. 565.00 1 Each 113.00
LAB-00120, helper 0.20 Nos. 525.00 1 Each 105.00
LAB-00121 MA @ 25% 0.25 358.00 89.50
11395.50
Overheads & Contractors Profit 0.13615
@13.615% 11395.50 1551.50
Rate for 1 Each 12947.00
Supply and transportation of 100 W LED Flood light Luminaire made of pressure diecast aluminium housing with
powder coated, having protective toughened glass, Supply Input voltage 120 - 270 V AC, P.F > 0.90, high power
LED's System efficacy >100lm/W and junction temperature < 70°C, with Ingress protection IP66, Luminaire
performance complies to IS 10322 (Part 5 / Sec-3), IK08, Driver surge protection 4KV, external Surge protection ≥
10KV with wide/ Narrow beam optics, THD<10% at 110 Volts AC, driver efficiency >90%, , CCT: 3000K - 5700K,
minimum CRI>70,etc., including as required complete as per the direction of Engineer-in-charge and including cost
of all materials to site, incidental giving connections and all labour charges overheads & contractors profit etc.,
2 complete for finished item of work a)
LUMINAIRE MAKE : Wipro / Philips/ GE-Venture /Crompton/ Bajaj/Greenlites / Havells/Capart(Premium)
/Halonix/ Polycab/Keselec/HPL/Jaquar/Eveready / Surya (Lumasmax / O Flood)/ FortuneArrt (Fin)
b) LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA /OSRAM / SAMSUNG.

BLD-ELEC 7-9-5
Unit = 1 No.
A. MATERIALS :
ELEC-3.8.27 100 W LED Flood light Luminaire 1.00 Nos 9522.00 1.00 Each 9522.00
B. LABOUR
LAB-00005 skilled electrician 0.20 Nos. 700.00 1 Each 140.00
LAB-00079 semi skilled electrician 0.20 Nos. 565.00 1 Each 113.00
LAB-00120, helper 0.20 Nos. 525.00 1 Each 105.00
LAB-00121 MA @ 25% 0.25 358.00 89.50
9969.50
Overheads & Contractors Profit 0.13615
@13.615% 9969.50 1357.35
Rate for 1 Each 11326.85
22 Supply and Wiring with 1 run of 3 core 1.50 Sqmm XLPE/PVC insulated & PVC sheathed unarmoured control
cables of 1.1 KV grade with copper conductor as per IS 7098 Part-I -1988 etc in the existing pipes for main supply as
required complete as per the direction of Engineer-in-charge and including cost of all materials to site, incidental
giving connections and all labour charges overheads & contractors profit etc., complete for finished item of work

Make: Torrent / Universal / Unicab / Havells / KEI/Polycab/Gloster /orbit / Paragon/ RR Kabel/ RPG

BLD-ELEC-3.1.2
Unit = 1 Rmt
Taking output = 100 Rmt
A. MATERIALS :
ELEC-4.1.5 b 3 core 1.50 Sqmm XLPE/PVC insulated
& PVC sheathed unarmoured control 100.00 Rmt 124.00 1 Rmt 12400.00
cables
B. LABOUR
LAB-00005 skilled electrician 0.34 Nos. 700.00 1 Each 238.00
LAB-00079 semi skilled electrician 1.00 Nos. 565.00 1 Each 565.00
LAB-00120, helper 0.34 Nos. 525.00 1 Each 178.50
LAB-00121 MA @ 25% 0.25 981.50 245.38
13626.88
Overheads & Contractors Profit 0.13615
@13.615% 13626.88 1855.30

Rate per 100 rmt. 15482.18

Rate per 1 rmt. 154.82


Supply of 4 core 6.0 Sqmm PVC insulated and sheathed FRLS copper round cable for voltage up to 1100V as per IS
694/1990. including cost and conveyance of all materials ,overheads & contractors profit etc., complete for finished
23 ELEC-1.5.5 item of work Makes: V-Guard/Bonton /Finecab/ HPL / GM / Million / Goldmedal /Fortune Art / /Sudhakar/Orbit/
Tamra/Anchor/Plaza/Vihan/Ollvin

Rate as per SoR 1.00 Rmt 340.00 1.00 Rmt 340.00


Overheads & Contractors Profit 0.13615
@13.615% 340.00 46.29
Rate for 1 Rmt 386.29
Supply and fixing of 1 No. 6-32A SP MCB 10KA C/D Curve ISI mark as required complete as per the direction of
Engineer-in-charge and including cost of all materials to site, incidental giving connections and all labour charges
overheads & contractors profit etc., complete for finished item of work.
24 Makes: V-Guard/Bonton /Finecab/ HPL / Million / FortuneArt /Sudhakar/Orbit/ Tamra/Anchor /Plaza/
Vihan/Spykaar/ Ollvin/Laser/Beljin/Rhino/ Standard/ Vimal

BLD-ELEC-4.4.1
Taking output = Each
A.MATERIALS :
ELEC-2.10.1 6-32A SP MCB 1.00 Nos 240.00 1 Each 240.00
B. LABOUR
LAB-00005 skilled electrician 0.06 Nos. 700.00 1 Each 42.00
LAB-00079 semi skilled electrician 0.06 Nos. 565.00 1 Each 33.90
LAB-00120, helper 0.125 Nos. 525.00 1 Each 65.63
LAB-00121 MA @ 25% 0.25 141.53 35.38
416.91
Overheads & Contractors Profit 0.13615
@13.615% 416.91 56.76
Rate for 1 each 473.67
Supply of Automatic Street Light Control System with Optical Micro Sensor, Low volatage / High voltage trip and
reset, operating voltage 150 - 280V AC per Phase, 50 HZ with suitable SMC enclousure of IP 54 protection, MCBs
and contactor suitable to control the load of 5 KW of Three phase load with necessary clamping arrangements.
1 ELEC-3.5.2 Make: Swadeep Nature Switch / Light Mate /GL/Bajaj

Rate as per SOR 1.00 Nos 16280.00 1.00 Each 16280.00


Overheads & Contractors Profit 0.13615
@13.615%
16280.00 2216.52

Rate for 1 Each 18496.52

Supply and transportation of 9 Watt KEW SPIKE made of The luminaires have a body made of
aluminium & toughened glass protector , Efficacy - 75 lm/W*, (CCT) - 3000K, CRI - 70, Control
Gear Tightness IP 65, IK 05, L70 @ 50,000 Hours, Dia 212mm x100mm x 399mm, 1.14Kg and
including as required complete as per the direction of Engineer-in-charge and including cost of all
materials to site, incidental giving connections and all labour charges overheads & contractors
profit etc., complete for finished item of work Make: Justled/ Keselec / Equivalent,
As per
25
Quotation

Rate per each 3,200.00


Supply and transportation of 3 Way TRIO LED Bollard made of Aluminium die cast with LED
SMD 2835 Chip of 50 LED x 0.25 W - 12W separate optical and control gear compartment with
IP66, IK 08, size 120mm x 120 mm and 900mm length, Overall luminous efficiency of 60lm/W,
CCT of 3500K, CRI >70, 50,000 hours at L70. Surge Protection Device Standard 6kV, Power
Factor: > 0.95, Current: 600ma, Body Color Dark Grey Texture FInish. and including as required
complete as per the direction of Engineer-in-charge and including cost of all materials to site,
incidental giving connections and all labour charges overheads & contractors profit etc., complete
As per for finished item of work Make: Justled/ Keselec / Equivalent
2
Quotation

Rate per each 5,668.00


Supply and transportation of 3 Way TRIO LED Bollard made of Aluminium die cast with LED
SMD 2835 Chip of 50 LED x 0.25 W - 12W separate optical and control gear compartment with
IP66, IK 08, size 120mm x 120 mm and 900mm length, Overall luminous efficiency of 60lm/W,
CCT of 3500K, CRI >70, 50,000 hours at L70. Surge Protection Device Standard 6kV, Power
Factor: > 0.95, Current: 600ma, Body Color Dark Grey Texture FInish. and including as required
complete as per the direction of Engineer-in-charge and including cost of all materials to site,
incidental giving connections and all labour charges overheads & contractors profit etc., complete
As per for finished item of work Make: Justled/ Keselec / Equivalent
26
Quotation

Rate per each 5,668.00


Supply and transportation of 16 Watt ISA LED Bollard made of mild steel, cadmium plated and
painted body colour grey, an acrylic protector sealed & tightened to the body to achieve an optical
tightness of IP 66, Efficacy - 55 lm/W, (CCT) - 3000K, CRI - 70, Control Gear Tightness IP 44, IK
06, L70 @50,000 Hours, Dia140 mm,1000 mm length, 17.7 Kg including as required complete as
per the direction of Engineer-in-charge and including cost of all materials to site, incidental giving
connections and all labour charges overheads & contractors profit etc., complete for finished item
of work
As per Make: Justled/ Keselec / Equivalent,
27
Quotation

Rate per each 21,000.00


Supply and fabrication of street light poles made with medium quality MS Pipes of 76.1mm OD for 1120mm long,
60.3mm OD Pipes of 1380mm long and 48.3mm OD for 1500mm long welded to each other for a total height of 4.0
m and providing 48.3mm OD MS pipe of 450mm long for arm bracket for Luminaires fixing welded to main pole at
suitable angle ,including cost of welding rods, power charges, labour charges for cutting, placing, welding and
erecting in position and fixing, cost & convenience of all materials including wastage to site, complete painting the
### total length of pipe with Painting to new iron work with one coat of Red oxide primer and two coats with synthetic
enamel paint Grade-II VOC including cost of all materials ,labour charges etc for finished item of work.

Unit : 1 Job

MS Pipes

MS Pipe section OD 76.1mm with 3.6 mm 7.21 Kg


thick @ 6.44 kg/Rmt for (1.12 m x 6.44
=7.21 Kgs )
MS Pipe section OD 60.3 mm with 3.6 mm 6.94 Kg
thick @ 5.03 kg/Rmt for (1.38 m x 5.03
=6.94 Kgs )
MS Pipe section OD 48.3 mm with 3.2 mm 5.34 Kg
thick @ 3.56 kg/Rmt for (1.5 m x 3.56
=5.34 Kgs)
MS Pipe section OD 48.3 mm with 3.2 mm 1.60 Kg
thick @ 3.56 kg/Rmt for arm bracket (0.45
m x 3.56 =5.34 Kgs)

BMT-F-04 Total kgs 21.09 Kg 76.00 1.00 Kg 1602.84

BMT-F-04 Add 2.5% wastage on 20.66 kgs 0.520 Kg 76.00 1.00 Kg 39.52

BMM-V.16 Fabrication charges 21.09 Kg 30.00 1.00 Kg 632.70

BMM-V.15 Erections charges 21.09 Kg 6.00 1.00 Kg 126.54

MA @ 25% 0.25 126.54 31.64


Painting to new iron work with one coat of
Red oxide primer and two coats with
synthetic enamel paint Grade-II VOC for
Pole

MS Pipe section OD 76.1mm for (1.12 m x 0.270 Sqm


3.141 x 0.0761 =0.270 sqm )
MS Pipe section OD 60.3 mm for (1.38 m x 0.26 Sqm
3.141 x 0.0603 =0.260 sqm )
MS Pipe section OD 48.3 mm for (1.5 m x 0.23 Sqm
3.141 x 0.0483 =0.253 sqm )
MS Pipe section OD 48.3 mm for (0.45 m x 0.11 Sqm
3.141 x 0.0483 =0.11 sqm )

(BLD-CSTN- Total painting area 0.87 Sqm 178.19 1.00 Sqm 155.03
12-7 & 12-12-
197)
2588.27

Overheads & Contractors Profit 0.13615 2588.27 352.39


@13.615%
Rate per Job 2940.66

Supply and fabrication of street light poles made with G I pipe 50 mm dia B class of 2.0 m long ,G I pipe 40 mm dia
B class of 2.0 m long welded to each other for a total height of 4.0 m and providing 25 mm dia B class of 1200 mm
long for arm bracket for Luminaires fixing welded to main pole at suitable angle , including cost of J- Bolts 30 cm
### long , bes plat welding rods, power charges, labour charges for cutting, placing, welding and erecting in position and
fixing, cost & convenience of all materials including wastage to site etc complete for finished item of work.

Unit : 1 Job
G I pipe 50 mm dia B class 2.00 Rmt 48.00 1 Rmt 96.00
BMW-F.89
G I pipe 40 mm dia B class 2.00 Rmt 444.00 1 Rmt 888.00
BMW-F.87
G I pipe 25 mm dia B class for arm bracket 1.20 Rmt 286.00 1 Rmt 343.20
BMW-F.83

Part-I (46) J- Bolts 30 cm long 4.00 Nos 37.00 1 Nos 148.00


Total 1475.20
Overheads & Contractors Profit 0.13615 1475.20 200.85
@13.615%
Rate per Job 1676.05

Supply and Laying of U.G cables upto 50 Sq,mm including earth work excavation of trench 300x900mm
and ,laying the cable on sand cushion of 200 mm thick ,covering the cable with Bricks and refilling the
BLD-ELEC trench with the excavated soils[excl. rock] , including cost and conveyance of all materials ,overheads &
###
15-6-1 at 277 contractors profit etc., complete for finished item of work

Data for 100 Rm


A. MATERIALS :
Earth work 100*0.3*0.9 27 cum 238.88 1 cum 6449.76
Bricks 920 no. 7500.00 1000 no 6900.00
Sand for cushion 6.00 cum 678.40 1 cum 4070.40
B. LABOUR
Mazdoor for sand filling, refilling 2.5 Nos. 525.00 1 Each 1312.50
skilled electrician 1 Nos. 700.00 1 Each 700.00
helper 2.00 Nos. 565.00 1 Each 1130.00
MA @ 25% 0.25 3142.50 785.63
21348.29
Overheads & Contractors Profit 0.13615 21348.29 2906.57
@13.615%
Rate for 100 RM 24254.86
Rate for 1 RM 242.55
BLD-ELEC Supply and Transportation and erecting of 7.50HP, 5-10 Stage ,5star rated submersible motor pumpset, confirming
13.4.5 to IS 8034 and motor confirming to IS 9283 with water proof winding,Pump shall be suitable for various delivery
head and discharge with stainless steel shaft.Motor suitable for working on 415V ±
10% , Three Phase 50 Hz AC supply,etc complete for 6" Bore well. with high quality wear resistance and
dynamically balanced bronze impeller with stainless steel shaft sleeves, pump coupling and pivot of 3 phase 415V ,
50Hz.. A.C. power supply copper winding with water proof insulation and high precision strength not to be effected
1 by chemical in water and suitable bronze bearings with nut and bolts etc., with necessary H-type clamp of suitable
size and strength and including cost and conveyance of all materials ,overheads & contractors profit etc., complete
for finished item of work.
Makes : Kirloskar / Crompton / Texmo / CRI / KSB/Lubi/ PSG/AryenVarsha/Falcon

Unit = 1 No.
b) Labour charges for erection of
pump set including pipe connection
for suction & delivery

Skilled Fitter 2.00 Nos. 615.00 1.00 Each 1230.00


helper 3.00 Nos. 525.00 1.00 Each 1575.00
Plumber 1.00 Nos. 655.00 1.00 Each 655.00
MA @ 25% 0.25 3460.00 865.00
Hire charges of tripod with winch 50%
of Labour charges 0.50 Nos. 3460.00 1.00 Each 1730.00
6055.00

Overheads & Contractors Profit


@13.615% 0.13615 6055.00 824.39
Rate for 1 Each 6879.39
BLD-ELEC Supply and erecting, ISI mark submersible 7.5 HP, 3 Phase,12-16 stages pumpset suitable for 156 mm dia borewell
11.3.13 with high quality wear resistance and dynamically balanced bronze impeller with stainless steel shaft sleeves, pump
coupling and pivot of 3 phase 415V , 50Hz.. A.C. power supply copper winding with water proof insulation and high
1 precision strength not to be effected by chemical in water and suitable bronze bearings with nut and bolts etc., with
necessary H-type clamp of suitable size and strength and including cost and conveyance of all materials ,overheads
& contractors profit etc., complete for finished item of work.

Unit = 1 No.
A.MATERIALS :

ELEC-5.4.5 E. 1.00 Nos 1 Each 46200.00


7.5 HP, 3 Phase,12-16 stages pumpset 46,200.00
B) Labour charges for erection of
pump set including pipe connection
for suction & delivery
LAB-00006 Skilled Fitter 2.00 Nos. 615.00 1.00 Each 1230.00
LAB-00079 Helper Fitter 3.00 Nos. 525.00 1.00 Each 1575.00
LAB-00036 Plumber 1.00 Nos. 655.00 1.00 Each 655.00
MA @ 25% 0.20 3460.00 692.00
Hire charges of tripod with winch 50%
of Labour charges 0.50 Nos. 3460.00 1.00 Each 1730.00
52082.00

Overheads & Contractors Profit


@13.615% 0.13615 52082.00 7090.96
Rate for 1 Each 59172.96
CIVIL DATA : Page-3

A.P.URBAN GREENING AND BEAUTIFICATION CORPORATION

DATA SoR 2017-2018

Chain-link mesh fencing including digging and fixing

Sl. Item Weight/ Total Amount (In


Description Nos L B D Qty Unit Rate Unit
No. Index Metre weight Rs.)
25 Supply and fixing of Vertical post 50x50x2.9mm thick M.S Square of 1.85m height each fixing at a distance of 2.0m
centre to centre, pit of 0.50x0.50x0.50m size in all soils , and PCC (1:4:8) for 0.50x0.50x0.10 m for pedestal of
0.50x0.50x0.40m size with VCC(1:3:6) using 20mm graded metal for fixing the M.S Square Post duly welded with 2 Nos
of MS squares bar 12 mm of length 150 mm as holdfasts for proper securing of M.S Square Post and embedding in the
VCC pedestal for 0.50m depth with clear exposed M.S Square Post of 1.50m above bed level and MS squares bar of 12
mm at top along the direction of mesh , fixing a G.I. Chainlink fabric fencing of required width in mesh size 50x50 mm
As per
data opening of 4 mm dia GI wire and fixing with welding/ fitted with suitable bolts and nuts/ 1numbers of 1.5 m long MS flat
25 x 5mm thick for fixing chain-link mesh to vertical post to the M.S Square Post and fixing a MS dummy cap on top of the
post for closing hollow vertical post, Painting to new iron work with one coat of Red oxide primer and two coats with
synthetic enamel paint Grade-II VOC, including cost of all materials to site with taxes and fixing labour charges etc., for
complete the work.

Data for 10 m x 1.5 m= 15 Sqm


A.MATERIALS :
(BLD- Earth work for pit size is 0.50 5 0.50 0.50 0.50 0.630 Cum 238.88 Cum 150.49
CSTN-2-1) x 0.50 x 0.50 m

(BLD- PCC (1:4:8) for 0.50x0.50x0.10 5 0.50 0.50 0.10 0.130 Cum 3983.93 Cum 517.91
CSTN-3-5) m

(BLD- VCC(1:3:6) for fixing MS 5 0.50 0.50 0.40 0.500 Cum 4912.01 Cum 2456.01
CSTN-3-10 Square 0.50x0.50x0.40 m
& 11)
As per MS Square hollow section 5 1.85 9.250 Rmt 4.12 38.11 60.00 kg 2286.60
Monthly 50mm X 50mm with 2.9mm
rates thick @ 4.12 kg/Rmt for vertical
post

As per MS squares bar 12 mm @ 1.13 1 10.00 10.000 Rmt 1.13 11.30 60.00 kg 678.00
Monthly 0kg/Rmt fix at top and along
rates the direction for fixing of
Chain-link fencing

As per MS squares bar 12 mm @ 1.13 10 0.15 1.500 Rmt 1.13 1.70 60.00 kg 102.00
Monthly 0kg/Rmt for holdfasts
rates
As per MS flat 25 x 5mm thick mm @ 5 1.50 7.500 Rmt 1.00 7.50 60.00 kg 450.00
Monthly 1.0kg/Rmt for fixing chain-link
rates mesh to vertical post

BMT F.20 Chainlink mesh [50x50mm 10 1.50 15.000 Sqm 854.31 Sqm 12814.67
opening] of 4mm dia

(BLD- Painting to new iron work with 5 1.50 0.20 1.500 Sqm 202.45 Sqm 303.67
CSTN-12-7 one coat of Red oxide primer
& 12-12- and two coats with synthetic
197) enamel paint Grade-II VOC for
M.S.Square hollow section
(BLD- Painting to new iron work with 1 10 0.060 0.600 Sqm 202.45 Sqm 121.47
CSTN-12-7 one coat of Red oxide primer
& 12-12- and two coats with synthetic
197) enamel paint Grade-II VOC for
M.S. flat

LABOUR :
BMM-V.16 Fabrication charges 58.61 Kg 30.00 Kg 1758.30

MA@ 25% on 75% of 0.25 1318.73 329.68


fabrication after deduction of
power charges and welding
rods and welding machine

BMM-V.15 Erections charges 58.61 Kg 6.00 Kg 351.66

MA @ 25% 0.25 351.66 87.92


Overheads & Contractors Profit 0.13615 22408.38 3050.90
@13.615%
Rate for fixing 10 Rmt x 1.5m =15sqm 25459.28
Rate for fixing 1sqm 1697.29
2545.93

You might also like