GFC Drawing Objervation
GFC Drawing Objervation
2 Plumbing layout 1st floor Plan RKGCES/VI/T1/PHASE-1/PL/DR/1st-102 T3 Show ledge wall in shower area
3 Plumbing layout TYP floor Plan RKGCES/VI/T1/PHASE-1/PL/DR/TYP-103 All objervation same as per Plumbing layout 1st floor Plan
D.W.S Pipe 80 mm dia in place of 100 dia as per BOQ 100 mm dia
Plumbing layout phase -1
4 RKGCES/VI/T1/PHASE-1/PL/DR/TP-F/104 pipe required
Terrace floor plAN
As per BOQ All G.I pipe Medium duty please mention in drawing
Servent toilet F.D point not required and not possible at site
Plumbing layout phase -1 Typical RKGCES/VI/T1/PHASE-1/PL/DR/TD&KD- in section detail Cistern filling point height and location not correct
5
toilet and kitchen detail 106 T2 and T3 Toilet counciel stop cock not mention in drg.
As per BOQ All G.I pipe Medium duty please mention in drawing
As per BOQ All G.I pipe Medium duty please mention in drawing
Plumbing layout phase -1 Water
6 RKGCES/VI/T1/PHASE-1/PL/DR/SLD-107 T2 and T3 Toilet typical toilet detail drawing and schematic diagram inlet
supply schematic diagram
connection not match
Electrical layout phase -1 Ground As per Electrical layout phase -1 Ground floor plan drawing 20 amp A.C
13 RKGCES/VI/T1/PHASE-1/EL/GF/102
floor SLD plan point with 2x4+1x4 Wire but SLD Drawing AC point 2x6+1x6
All G.I Pipe not mention Medium Class As per BOQ Item G.I Pipe
4
medium class
6 in section detail Cistern filling point height and location not correct
CONSULTANTS KY CONSULTANTS
S.NO DRAWING TITLE PURPOSE ITEM AS PER BOQ ITEM AS PER DRAWING ITEM NO
1 Plumbing Layout Plan Balconey drain 75 mm DIA Upvc Pipe Type -B 75 mm DIA Upvc Pipe Type -A 2.32 - A
2 Terrace Floor Plan Domestic water ring line 100 mm dia G.I Pipe medium duty 80 mm dia G.I Pipe medium duty 2.30 - C
3 Toilet water supply detail Flushing water supply 20 mm Dia Upvc SCH-40 Pipe 15 mm Dia Upvc SCH-40 Pipe 2.34 - B