GFC Drawing Objervation

Uploaded by

Sonu Nain
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
104 views

GFC Drawing Objervation

Uploaded by

Sonu Nain
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 3

MEP GFC DRAWING OBJERVATION

DRAWING RECIVING DATE- 17-04-2023

CONTRACTOR MILLENNIUM ENGINEERS

SITE - UNITECH VISTA SEC 70 GURUGRAM TOWER NO A1 to A8

S.NO DRAWING TITLE DRAWING NO OBJERVATION

T1,T2&T3 F.D Point left side of W.C in place of right side

F.T and F.D Point distance not mention in drawing


Plumbing layout Ground floor
1 RKGCES/VI/T1/PHASE-1/PL/DR/GF-101 IWC not mention in Servent toilet
Plan
T3 Show ledge wall in shower area

All G.I Pipe not mention Medium Class

Master balcony RWP show in wall

IWC not mention in Servent toilet

2 Plumbing layout 1st floor Plan RKGCES/VI/T1/PHASE-1/PL/DR/1st-102 T3 Show ledge wall in shower area

Plumbing legend point no 7 and 8 not as per BOQ

All G.I Pipe not mention Medium Class

3 Plumbing layout TYP floor Plan RKGCES/VI/T1/PHASE-1/PL/DR/TYP-103 All objervation same as per Plumbing layout 1st floor Plan

D.W.S Pipe 80 mm dia in place of 100 dia as per BOQ 100 mm dia
Plumbing layout phase -1
4 RKGCES/VI/T1/PHASE-1/PL/DR/TP-F/104 pipe required
Terrace floor plAN
As per BOQ All G.I pipe Medium duty please mention in drawing

Servent toilet F.D point not required and not possible at site

All F.T and F.D Point distance not mention in Drg.

Plumbing layout phase -1 Typical RKGCES/VI/T1/PHASE-1/PL/DR/TD&KD- in section detail Cistern filling point height and location not correct
5
toilet and kitchen detail 106 T2 and T3 Toilet counciel stop cock not mention in drg.

T1 Toilet ledge wall shoe in shower area

As per BOQ All G.I pipe Medium duty please mention in drawing

As per BOQ All G.I pipe Medium duty please mention in drawing
Plumbing layout phase -1 Water
6 RKGCES/VI/T1/PHASE-1/PL/DR/SLD-107 T2 and T3 Toilet typical toilet detail drawing and schematic diagram inlet
supply schematic diagram
connection not match

Fire fighting layout phase 1


7 RKGCES/VI/T1/PHASE-1/FF/GF/401 As per BOQ All G.I pipe Medium duty please mention in drawing
Ground floor plan

Fire fighting layout phase 1 1st


8 RKGCES/VI/T1/PHASE-1/FF/1st-F/402 As per BOQ All G.I pipe Medium duty please mention in drawing
floor plan

Fire fighting layout phase 1 2nd


9 RKGCES/VI/T1/PHASE-1/TYP-F/403 As per BOQ All G.I pipe Medium duty please mention in drawing
floor plan

Fire fighting layout phase 1


10 RKGCES/VI/T1/PHASE-1/TYP-F/404 As per BOQ All G.I pipe Medium duty please mention in drawing
Terrace floor plan
Fire fighting layout phase 1
11 RKGCES/VI/T1/PHASE-1/FF/SLD-405 Fire riser not connect with external hydrent line
Schematic diagram
Electrical layout phase -1 Ground
12 RKGCES/VI/T1/PHASE-1/EL/GF/101 Wire size not mention in drawing
floor plan

Electrical layout phase -1 Ground As per Electrical layout phase -1 Ground floor plan drawing 20 amp A.C
13 RKGCES/VI/T1/PHASE-1/EL/GF/102
floor SLD plan point with 2x4+1x4 Wire but SLD Drawing AC point 2x6+1x6

Electrical layout phase -1 Typical


14 RKGCES/VI/T1/PHASE-1/EL/TYF/101 Wire size not mention in drawing
floor plan
S.NO OBJERVATION

1 F.T and F.D Point distance not mention in drawing

2 IWC not mention in Servent toilet

3 T3 Show ledge wall in shower area

All G.I Pipe not mention Medium Class As per BOQ Item G.I Pipe
4
medium class

5 Master balcony RWP show in wall

6 in section detail Cistern filling point height and location not correct

7 T2 and T3 Toilet counciel stop cock not mention in drg.

8 Fire riser not connect with external hydrent line

9 Wire size not mention in drawing

As per Electrical layout phase -1 Ground floor plan drawing 20 amp


10
A.C point with 2x4+1x4 Wire but SLD Drawing AC point 2x6+1x6

11 Wire size not mention in drawing


DRAWING OBJERVATION

SITE UNITECH VISTA SEC 70 GURUGRAM

CONTRACTOR MILLENNIUM ENGINEERS

CONSULTANTS KY CONSULTANTS

S.NO DRAWING TITLE PURPOSE ITEM AS PER BOQ ITEM AS PER DRAWING ITEM NO

1 Plumbing Layout Plan Balconey drain 75 mm DIA Upvc Pipe Type -B 75 mm DIA Upvc Pipe Type -A 2.32 - A

2 Terrace Floor Plan Domestic water ring line 100 mm dia G.I Pipe medium duty 80 mm dia G.I Pipe medium duty 2.30 - C

3 Toilet water supply detail Flushing water supply 20 mm Dia Upvc SCH-40 Pipe 15 mm Dia Upvc SCH-40 Pipe 2.34 - B