100% found this document useful (1 vote)
131 views

DLS Survey Control Introduction

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
131 views

DLS Survey Control Introduction

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 20

RCTI

DLS –Stage 1, Term 1


Survey Control

Simon Muthee Lecture: Introduction 1


Content

1. Definition of Survey Control

2. Methods of Providing Control

3. Construction of Survey Marks/ Monuments

2
Objectives

Learners should be able to:

• Explain the meaning and purpose of survey control

• State the methods of providing control

• Describe the different methods of constructing survey marks

3
1.0 Introduction
• Surveying is the science of determining the position, in three
dimensions, of objects on, above, under or near the earth’s
surface both natural or man-made.
• Control Survey is the process of determining of horizontal
and vertical positions of arbitrary positions or stations
precisely. These stations form a control network.
• A control network is the framework of survey stations whose
coordinates have been precisely determined and are often
considered definitive.
Cont Intro…
• These stations are the reference monuments, to which
other survey work of a lesser quality is related.
• Therefore, a control survey needs to be precise, complete
and reliable and it must be possible to show that these
qualities have been achieved.
• Control Survey is done using equipment of proven
precision, and with methods and data processing capable
of giving numerical measures of their precision and
reliability.
Cont Intro…
• This principle of using control networks as the basis is
known as ‘Surveying from the whole to the part’ principle.
• Some controls may have only have the horizontal
coordinates/dimensions known i.e X,Y coordinates and are
known as horizontal controls
• Others have only the vertical dimension i.e Z coordinate
(height above a given datum).
• The purpose and nature of a project determines the
surveying specifications needed. Thus the design of the
control stations
1.1 Methods of Providing Control

Classically the methods of providing control can be divided


into two:
i. Horizontal /Planimetric Control Methods
ii. Vertical Control Methods

Figure 1: Control Network


Cont methods…
i. Horizontal Control Methods
a. Traversing- Observe adjacent horizontal angles and distances.
b. Triangulation- Observe all the horizontal angles.
c. Trilateration- Observe all horizontal distances.
d. Triangulateration- Observe all horizontal angles and distances.
e. Astronomic – Use the observable stars/celestial bodies to fix
position.
f. Space Techniques- use of global navigation satellite system to fix
position
Cont methods…
ii. Vertical Control Methods
a. Differential Levelling- measurement of the vertical
distances between points, starting from a known point
(bench mark) to determine the height of the new point.
b. Trigonometric Heighting- used where difficult terrain, such
as mountainous areas, precludes the use of conventional
differential levelling.
• It may also be used where the height difference is large but
the horizontal distance is short such as heighting up a cliff
or a tall building.
Cont methods…
• The vertical angle and the slope distance between the two
points concerned are measured.
c. Barometric Heighting-barometric readings used to
determine the approximate elevation difference in an area
1.2 Survey Marks

• These are objects used/placed to the show the position of a


boundary, control point, bench mark, change point, setting out
point. Could be temporary or permanent
• A monument- as any object, natural or artificial, which is fixed
permanently on the ground, and is referred to in a legal
document, and provides evidence of the boundaries of a parcel
of land.
• A good monument should be permanent, stable, certain in
identity and visible
Cont Survey Marks…..

• The materials/ objects used vary on the purpose.


• Monuments and their stability are integral parts of the accuracy
of each survey project.
• Inaccurate survey control monumentation can contribute to
costly errors in all phases of project design and development.
Types of Marker/Monuments:
1. Pillars
Permanently constructed monument with cement that is precisely
located. Mostly used for high order/ primary control station. Has a
provision to mount the instrument
Cont Survey Marks…..

Fig 2: Long Pillar


Cont Survey Marks…..
• Short pillar could be used for precise secondary controls
or primary controls

Fig 3: Short Pillars


Cont Survey Marks…..
2. Pipe in Concrete (PIC)

• 300 mm long pipes in concrete and mostly used in


Cadastral survey (beacons)
• Iron or PVC

Figure 4: Pipes ( Iron)


Cont Survey Marks…..
3. Angle Iron in Concrete (AIC)

Fig 4: Angle iron


Cont Survey Marks…..
4. Iron Pins
a. Iron Pin/Nails

Fig 5: Iron Pins


Cont Survey Marks…..
b. iron Pin in Concrete (IPC)
• Used in Cadastral Surveying and benchmarks
(3rd order)

Fig 6: IPC
Cont Survey Marks…..
b. iron Pin in Concrete Underground (IPCU)
• Used in Cadastral Surveying and benchmarks
(3rd order)

Fig 7: IPCU
Cont Survey Marks…..
5. Others
• Woodens pegs