Inspection Request For Installation of Under Ground Electrical Duct Pipes, As Per Attached Highlighted Drawing

Uploaded by

Waqar Khan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
22 views

Inspection Request For Installation of Under Ground Electrical Duct Pipes, As Per Attached Highlighted Drawing

Uploaded by

Waqar Khan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

WORK INSPECTION REQUEST - WIR

Construction of Townhouses & semi-detached Villas


Project Name
(412) for Phase 1B & 1C WIR Ref.No: RHP1P2-BW-TGC-4TV-00-WI-EL-00014

Contract No
Request Submission
Employer Reem Hills Sole-Proprietorship LLC 25-Jun-24
(Date & Time)
PMC Royal Development Company Inspection 26-Jun-24
PMC Royal Architect Project Management (Date & Time ) 10:25AM
Engineer AECOM Middle East LLC Rev No: 0
Main Contractor Trojan General Contracting LLC WIR Submitted By: M/s.TROJAN

MEP Contractor Royal Advance Electro Mechanical Works LLC WIR Submitted To: Consultant-AECOM

Part A: By the Contractor:


B.O.Q Ref: N/A Discipline:
B.O.Q. Description of Works to be inspected and / or tested: General MCC Works
Civil Landscaping
Storm Water Architectural
Description of Works to be inspected and /or tested: Sewer Dredging
Water Highway Bridge Works
Irrigation LRT Bridge Works
Inspection Request for Installation of Under Ground Electrical Telephone MSE Wall
Signal Works Provisional Sum
Duct pipes, As per Attached Highlighted Drawing
Electrical Other (state)
Street Lighting
Works Location: Twin Villa-369, 4BR (Mirror) Landscape Lighting Drainage

Works Quantity: Gas Network

Drawing attached to show the location(s) Yes No Checklist attached Yes No


Attached Test Certificates Yes No

Shop Drawing Ref: RHP1P2-BW-TGC-4TV-FN-SD-EL-00001-Rev-01 Method Statement Ref: RHP1P2-BW-TGC-ZZ-XX-MS-EL-00001

Type of Attachment: Check list ITP Ref: ITP-01 Rev.02

Eng. Dayal Pushpakumar


(QA/QC Manager )

Date & Signature


Part B: By the Engineer:
Received by Engineer on: Date: Time: Signed by:
Engineer's Comments:

1. Only Ducts has inspected as per attached highlighted drawings.Subject to further Ducts
connection and installation approval.
2. Relevant shop drawing is still under Code-C, Contractor sole responsible for any rectification works
required upon the approval of the drawing.
3. All pipe ends to be covered to avoid pipe blockages during casting.
4. All pipes to be restrained not to dislocate during casting.
5. Pipe trench shall be compacted and clean with no stones / debris prior to laying the pipes.
6. Back-filling surrounds the pipes shall be done with clean and soft sand.
7. Attach survey report for pipe invert level and coordinates.
8. Refer to the comments on the attached checklist and shop drawings and comply with.
Note: Refer to the attached photos.

Irfan/Emad ali
26-06-2024
Name: Date & Signature
Discipline Engineer Decision:
A - Approved

B - Approved with comments

C - Revise & Resubmit

D - Rejected

Sr.Resident Engineer / Resident Engineer :

Name : Suheib Aboamir 27/06/2024


Date & Signature