AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
PRELIMINARIES
GENERAL REQUIREMENTS
Pricing Generally
Page 3 of 258
AL MIRFA BEACH PROJECT - 410 VILLAS Preliminaries
INFRASTRUCTURE
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
Page 4 of 258
AL MIRFA BEACH PROJECT - 410 VILLAS Preliminaries
INFRASTRUCTURE
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
Preliminaries (cont'd)
The prices shall include for all materials and labor and for the
provision and use of all plant whether mechanical or non
mechanical required for the expeditious carrying out of the
Works in their proper sequence- for shifting, altering and
adapting such temporary work and plant as may be required
during the progress of the Works and removing at completion
and making good any surfaces disturbed and if not included in
Note
the prices inserted against the Conditions of Contract clauses
above; for the guarantees, insurances and bonds required; for
the costs of preparing a tender; for the work in connection with
measurements and the final account, for profit and for all other
establishment charges and on costs of whatever nature. No
claim for additional payment will be allowed for any error or
misunderstanding by the contractor in these respects.
Instructions to Tenderers
Letter of Tender
Page 5 of 258
AL MIRFA BEACH PROJECT - 410 VILLAS Preliminaries
INFRASTRUCTURE
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
Page 6 of 258
AL MIRFA BEACH PROJECT - 410 VILLAS Preliminaries
INFRASTRUCTURE
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
Preliminaries (cont'd)
Letter of Tender
Bonds
Guarantees / Warranties
Specification
CARRIED TO COLLECTION
Page 7 of 258
AL MIRFA BEACH PROJECT - 410 VILLAS Preliminaries
INFRASTRUCTURE
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
Page 8 of 258
AL MIRFA BEACH PROJECT - 410 VILLAS Preliminaries
INFRASTRUCTURE
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
Preliminaries (cont'd)
Access to Site
CARRIED TO COLLECTION
Page 9 of 258
AL MIRFA BEACH PROJECT - 410 VILLAS Preliminaries
INFRASTRUCTURE
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
Preliminaries (cont'd)
Site Visiting
Shop Drawings
Page 10 of 258
AL MIRFA BEACH PROJECT - 410 VILLAS Preliminaries
INFRASTRUCTURE
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
CARRIED TO COLLECTION
Preliminaries (cont'd)
Page 11 of 258
AL MIRFA BEACH PROJECT - 410 VILLAS Preliminaries
INFRASTRUCTURE
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
CARRIED TO COLLECTION
Preliminaries (cont'd)
Page 12 of 258
AL MIRFA BEACH PROJECT - 410 VILLAS Preliminaries
INFRASTRUCTURE
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
CARRIED TO COLLECTION
Preliminaries (cont'd)
HSE Certificates
Page 13 of 258
AL MIRFA BEACH PROJECT - 410 VILLAS Preliminaries
INFRASTRUCTURE
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
CARRIED TO COLLECTION
Preliminaries (cont'd)
Page 14 of 258
AL MIRFA BEACH PROJECT - 410 VILLAS Preliminaries
INFRASTRUCTURE
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
H Removal charge (fixed cost) 1 Item
CARRIED TO COLLECTION
Preliminaries (cont'd)
Protection
The Contractor shall take all reasonable and proper steps for
the protection of all places on or about the Works which may
be dangerous to his workmen or any other persons or to
B 1 Item
traffic. The Contractor shall provide and maintain signs, red
warning lamps, barricades, etc. as necessary in such places
and clear away the same on completion.
Page 15 of 258
AL MIRFA BEACH PROJECT - 410 VILLAS Preliminaries
INFRASTRUCTURE
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
CARRIED TO COLLECTION
Preliminaries (cont'd)
Site Hoarding
Page 16 of 258
AL MIRFA BEACH PROJECT - 410 VILLAS Preliminaries
INFRASTRUCTURE
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
CARRIED TO COLLECTION
Preliminaries (cont'd)
Tests
Page 17 of 258
AL MIRFA BEACH PROJECT - 410 VILLAS Preliminaries
INFRASTRUCTURE
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
CARRIED TO COLLECTION
Preliminaries (cont'd)
The Contractor is responsible for all the setting out of line and
levels of the Works and shall employ adequate qualified staff
to carry this out. Where survey markers have been
established by the Engineer, the Contractor shall check the
accuracy of their position and level and shall immediately
notify the Engineer of any discrepancies. All setting out
throughout the Works must be related to the Abu Dhabi
Municipality Datum Levels and Survey Stations and values of
Abu Dhabi Municipality Bench Marks and survey stations shall
be obtained by the Contractor from the Abu Dhabi
Municipality. Any Temporary Bench Mark (T.B.M) to be fixed
B on the site shall be tied in to the Abu Dhabi Municipality 1 Item
Datum. The Contractor shall, as soon as practicable, supply
the Engineer with records in approved form relating to all
reference pegs and bench marks and shall keep such records
up to date by formal notice to the Engineer. Before
commencing work on any section of the Works, the
Contractor, jointly with the Engineer, shall level survey the
original ground surface and shall prepare plans and cross-
sections accordingly. The Contractor shall be responsible
for ,and make allowances, for all necessary earthworks
including those measured separately under the various
section of the Bill of Quantities
Surveying Equipment
Page 18 of 258
AL MIRFA BEACH PROJECT - 410 VILLAS Preliminaries
INFRASTRUCTURE
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
The Contractor shall provide at all times for the duration of the
Contract, all such chainmen, staff and survey instruments as
C 1 Item
may be required for the proper construction of and completion
of the works.
CARRIED TO COLLECTION
Preliminaries (cont'd)
Scaffolding
Page 19 of 258
AL MIRFA BEACH PROJECT - 410 VILLAS Preliminaries
INFRASTRUCTURE
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
CARRIED TO COLLECTION
Page 20 of 258
AL MIRFA BEACH PROJECT - 410 VILLAS Preliminaries
INFRASTRUCTURE
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
Preliminaries (cont'd)
General Obligations
Temporary Roads
The Contractor shall take all reasonable and proper steps for
protection and maintenance of all public and private roads
adjacent to the Site which can be affected due to the
performance of the Works in accordance with the Engineer's
instructions. The roads shall be kept free for access at all
times.
CARRIED TO COLLECTION
Page 21 of 258
AL MIRFA BEACH PROJECT - 410 VILLAS Preliminaries
INFRASTRUCTURE
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
Preliminaries (cont'd)
Traffic Regulations
Program of Works
Page 22 of 258
AL MIRFA BEACH PROJECT - 410 VILLAS Preliminaries
INFRASTRUCTURE
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
CARRIED TO COLLECTION
Preliminaries (cont'd)
Method Statements
Progress Photographs
Estidama Compliance
Estidama Commissioning
Documents
Reports
Page 23 of 258
AL MIRFA BEACH PROJECT - 410 VILLAS Preliminaries
INFRASTRUCTURE
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
CARRIED TO COLLECTION
Preliminaries (cont'd)
Records
Contract Documents
Page 24 of 258
AL MIRFA BEACH PROJECT - 410 VILLAS Preliminaries
INFRASTRUCTURE
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
CARRIED TO COLLECTION
Page 25 of 258
AL MIRFA BEACH PROJECT - 410 VILLAS Preliminaries
INFRASTRUCTURE
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
Preliminaries (cont'd)
ADDITIONAL ITEMS
The Contractor may price here any items which has been
shown in the Contract drawings or any other Contract
Documents but overlooked or not specifically mentioned in the
schedule of items and is necessary for the satisfactory
completion of the Works. Should the Contractor fail to insert
any item here, it will be deemed that lump sum Contract Price
includes all such items and no claims for additional items will
be entertained.
Note:
Page 26 of 258
AL MIRFA BEACH PROJECT - 410 VILLAS Preliminaries
INFRASTRUCTURE
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
Page 27 of 258
AL MIRFA BEACH PROJECT - 410 VILLAS Preliminaries
INFRASTRUCTURE
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
PRELIMINARIES
COLLECTION
DIVISION 01 - PRELIMINARIES
AED
CARRIED TO SUMMARY
Page 28 of 258
AL MIRFA BEACH PROJECT - 410 VILLAS Preliminaries
INFRASTRUCTURE
AMOUNT
ITEM DESCRIPTION
DIVISION 01 - PRELIMINARIES QTY UNIT RATE
AED
CARRIED TO SUMMARY
Page 29 of 258
AL MIRFA BEACH PROJECT - 410 VILLAS Ground Investigation
INFRASTRUCTURE
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
GROUND INVESTIGATION
Page 30 of 258
AL MIRFA BEACH PROJECT - 410 VILLAS Ground Investigation
INFRASTRUCTURE
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
ADDITIONAL ITEMS
Page 31 of 258
AL MIRFA BEACH PROJECT - 410 VILLAS Ground Investigation
INFRASTRUCTURE
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
CARRIED TO COLLECTION AED
GROUND INVESTIGATION
COLLECTION
Page 32 of 258
AL MIRFA BEACH PROJECT - 410 VILLAS Ground Investigation
INFRASTRUCTURE
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
GROUND INVESTIGATION
AED 4,050,000.00
CARRIED TO SUMMARY
Page 33 of 258
AL MIRFA BEACH PROJECT - 410 VILLAS Geotechnical and Other Specialist Processes
INFRASTRUCTURE
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
A Provision for geotechnical and other specialist processes 1 item 20,250,000 20,250,000.00
Page 34 of 258
AL MIRFA BEACH PROJECT - 410 VILLAS Geotechnical and Other Specialist Processes
INFRASTRUCTURE
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
ADDITIONAL ITEMS
Page 35 of 258
AL MIRFA BEACH PROJECT - 410 VILLAS Geotechnical and Other Specialist Processes
INFRASTRUCTURE
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
CARRIED TO COLLECTION AED
COLLECTION
Page 36 of 258
AL MIRFA BEACH PROJECT - 410 VILLAS Geotechnical and Other Specialist Processes
INFRASTRUCTURE
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
Page 37 of 258
AL MIRFA BEACH PROJECT - 410 VILLAS Demolition and Site Clearance
INFRASTRUCTURE
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
Page 38 of 258
AL MIRFA BEACH PROJECT - 410 VILLAS Demolition and Site Clearance
INFRASTRUCTURE
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
ADDITIONAL ITEMS
Page 39 of 258
AL MIRFA BEACH PROJECT - 410 VILLAS Demolition and Site Clearance
INFRASTRUCTURE
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
CARRIED TO COLLECTION AED
COLLECTION
Page 40 of 258
AL MIRFA BEACH PROJECT - 410 VILLAS Demolition and Site Clearance
INFRASTRUCTURE
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
Page 41 of 258
AL MIRFA BEACH PROJECT - 410 VILLAS Earthworks
INFRASTRUCTURE
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
EARTHWORKS
Page 42 of 258
AL MIRFA BEACH PROJECT - 410 VILLAS Earthworks
INFRASTRUCTURE
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
Earthworks (cont'd)
Excavation Works
For Chambers
Filling
For Chambers
A - Irrigation Network
Excavation Works
For Chambers
Page 43 of 258
AL MIRFA BEACH PROJECT - 410 VILLAS Earthworks
INFRASTRUCTURE
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
CARRIED TO COLLECTION AED 3,129,375.00
Earthworks (cont'd)
Filling
For Chambers
Filling
Page 44 of 258
AL MIRFA BEACH PROJECT - 410 VILLAS Earthworks
INFRASTRUCTURE
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
Earthworks (cont'd)
Page 45 of 258
AL MIRFA BEACH PROJECT - 410 VILLAS Earthworks
INFRASTRUCTURE
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
Earthworks (cont'd)
Page 46 of 258
AL MIRFA BEACH PROJECT - 410 VILLAS Earthworks
INFRASTRUCTURE
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
Earthworks (cont'd)
Page 47 of 258
AL MIRFA BEACH PROJECT - 410 VILLAS Earthworks
INFRASTRUCTURE
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
Earthworks (cont'd)
Manholes
Fillings
Manholes
Page 48 of 258
AL MIRFA BEACH PROJECT - 410 VILLAS Earthworks
INFRASTRUCTURE
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
Earthworks (cont'd)
Excavation Works
For Foundation
For Pipes
uPVC Pipe
300mm diameter
Page 49 of 258
AL MIRFA BEACH PROJECT - 410 VILLAS Earthworks
INFRASTRUCTURE
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
Earthworks (cont'd)
GRP Pipe
400mm diameter
500mm diameter
600mm diameter
700mm diameter
Page 50 of 258
AL MIRFA BEACH PROJECT - 410 VILLAS Earthworks
INFRASTRUCTURE
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
N In trenches average depth; 2.50 - 3.00m 5,880 m3 45 264,600.00
Earthworks (cont'd)
800mm diameter
900mm diameter
1000mm diameter
1200mm diameter
1400mm diameter
Page 51 of 258
AL MIRFA BEACH PROJECT - 410 VILLAS Earthworks
INFRASTRUCTURE
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
Earthworks (cont'd)
as specified
Page 52 of 258
AL MIRFA BEACH PROJECT - 410 VILLAS Earthworks
INFRASTRUCTURE
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
Q 900mm diameter pipe 3,785 m3 45 170,325.00
Earthworks (cont'd)
For Manholes
Page 53 of 258
AL MIRFA BEACH PROJECT - 410 VILLAS Earthworks
INFRASTRUCTURE
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
L Depth; 2.91 - 3.50m 270 m3 45 12,150.00
Earthworks (cont'd)
Page 54 of 258
AL MIRFA BEACH PROJECT - 410 VILLAS Earthworks
INFRASTRUCTURE
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
K Depth; 3.51 - 4.00m 100 m3 45 4,500.00
Earthworks (cont'd)
Page 55 of 258
AL MIRFA BEACH PROJECT - 410 VILLAS Earthworks
INFRASTRUCTURE
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
H (Depth; not exceeding 2.00m) 3,370 m3 45 151,650.00
Filling
Earthworks (cont'd)
ADDITIONAL ITEMS
Page 56 of 258
AL MIRFA BEACH PROJECT - 410 VILLAS Earthworks
INFRASTRUCTURE
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
EARTHWORKS
COLLECTION
Page 57 of 258
AL MIRFA BEACH PROJECT - 410 VILLAS Earthworks
INFRASTRUCTURE
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
EARTHWORKS
AED 34,638,490.00
CARRIED TO SUMMARY
Page 58 of 258
AL MIRFA BEACH PROJECT - 410 VILLAS Roads and Paving
INFRASTRUCTURE
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
Concrete
Reinforcing Steel
Cast-In-Place Concrete
Page 59 of 258
AL MIRFA BEACH PROJECT - 410 VILLAS Roads and Paving
INFRASTRUCTURE
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
Exterior Improvement
Asphalt Works
I Saw Cutting Existing Asphalt and Gap Filling 100 l.m 25 2,500.00
Page 60 of 258
AL MIRFA BEACH PROJECT - 410 VILLAS Roads and Paving
INFRASTRUCTURE
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
CARRIED TO COLLECTION AED 19,789,425.00
PAVING
Page 61 of 258
AL MIRFA BEACH PROJECT - 410 VILLAS Roads and Paving
INFRASTRUCTURE
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
PAVEMEMT MARKINGS
Page 62 of 258
AL MIRFA BEACH PROJECT - 410 VILLAS Roads and Paving
INFRASTRUCTURE
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
ADDITIONAL ITEMS
Page 63 of 258
AL MIRFA BEACH PROJECT - 410 VILLAS Roads and Paving
INFRASTRUCTURE
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
COLLECTION
Page 64 of 258
AL MIRFA BEACH PROJECT - 410 VILLAS Roads and Paving
INFRASTRUCTURE
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
Page 65 of 258
AL MIRFA BEACH PROJECT - 410 VILLAS Structural Metal Work
INFRASTRUCTURE
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
Shade Structure
Handrail / Railing
B Provision for handrail / railing along beach and park area 1 item 2,150,000 2,150,000.00
Page 66 of 258
AL MIRFA BEACH PROJECT - 410 VILLAS Structural Metal Work
INFRASTRUCTURE
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
ADDITIONAL ITEMS
Page 67 of 258
AL MIRFA BEACH PROJECT - 410 VILLAS Structural Metal Work
INFRASTRUCTURE
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
CARRIED TO COLLECTION AED
COLLECTION
Page 68 of 258
AL MIRFA BEACH PROJECT - 410 VILLAS Structural Metal Work
INFRASTRUCTURE
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
Page 69 of 258
AL MIRFA BEACH PROJECT - 410 VILLAS Street Lighting Works
INFRASTRUCTURE
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
Concrete
A Class K140 Concrete for Conduit and Duct Encasement 490 m3 750 367,500.00
F Additional depth for Light pole Foundation (Provisional Item) 10 nr 1,300 13,000.00
Page 70 of 258
AL MIRFA BEACH PROJECT - 410 VILLAS Street Lighting Works
INFRASTRUCTURE
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
A Supply 10m High single arm Street Light pole 351 nr 3,800 1,333,800.00
B Install 10m High single arm Street Light pole 351 nr 1,100 386,100.00
C Supply 14m High single arm Street Light pole 89 nr 5,600 498,400.00
D Install 14m High single arm Street Light pole 89 nr 600 53,400.00
LED Luminaire
Flag Holder
Page 71 of 258
AL MIRFA BEACH PROJECT - 410 VILLAS Street Lighting Works
INFRASTRUCTURE
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
CARRIED TO COLLECTION AED 4,740,310.00
Base Plate
Anchor Bolts
Light Poles
Pull Box
Page 72 of 258
AL MIRFA BEACH PROJECT - 410 VILLAS Street Lighting Works
INFRASTRUCTURE
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
Cabinet
uPVC Conduit
uPVC Duct
H Install uPVC Duct , 2-WAY 100mm . Concrete Encased 545 l.m 30 16,350.00
PVC Cu Cable
I Supply Low Voltage 10mm2 4 Core PVC Cu Cable 23,165 l.m 30 694,950.00
J Install Low Voltage 10mm2 4 Core PVC Cu Cable 23,165 l.m 20 463,300.00
PVC Cable
K Supply 2.5mm2, Two Core, and Earth , PVC Cable 5,235 l.m 20 104,700.00
L Install 2.5mm2, Two Core, and Earth , PVC Cable 5,235 l.m 10 52,350.00
Page 73 of 258
AL MIRFA BEACH PROJECT - 410 VILLAS Street Lighting Works
INFRASTRUCTURE
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
Cable Glands
Earth Lug
Earth System
Page 74 of 258
AL MIRFA BEACH PROJECT - 410 VILLAS Street Lighting Works
INFRASTRUCTURE
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
ADDITIONAL ITEMS
The Contractor may price here any items which has been
shown in the Contract drawings or any other Contract
Documents but overlooked or not specifically mentioned in the
schedule of items and is necessary for the satisfactory
completion of the Works. Should the Contractor fail to insert
any item here, it will be deemed that lump sum Contract Price
includes all such items and no claims for additional items will
be entertained.
Page 75 of 258
AL MIRFA BEACH PROJECT - 410 VILLAS Street Lighting Works
INFRASTRUCTURE
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
COLLECTION
Page 76 of 258
AL MIRFA BEACH PROJECT - 410 VILLAS Street Lighting Works
INFRASTRUCTURE
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
Page 77 of 258
AL MIRFA BEACH PROJECT - 410 VILLAS Traffic Control System
INFRASTRUCTURE
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
Page 78 of 258
AL MIRFA BEACH PROJECT - 410 VILLAS Traffic Control System
INFRASTRUCTURE
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
ADDITIONAL ITEMS
Page 79 of 258
AL MIRFA BEACH PROJECT - 410 VILLAS Traffic Control System
INFRASTRUCTURE
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
CARRIED TO COLLECTION AED
COLLECTION
Page 80 of 258
AL MIRFA BEACH PROJECT - 410 VILLAS Traffic Control System
INFRASTRUCTURE
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
Page 81 of 258
AL MIRFA BEACH PROJECT - 410 VILLAS Potable Water Supply System Installation
INFRASTRUCTURE
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
Concrete Works
For Walls
For Base
Reinforcement
Page 82 of 258
AL MIRFA BEACH PROJECT - 410 VILLAS Potable Water Supply System Installation
INFRASTRUCTURE
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
Waterproofing
Pipe Work
HDPE Pipe
Page 83 of 258
AL MIRFA BEACH PROJECT - 410 VILLAS Potable Water Supply System Installation
INFRASTRUCTURE
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
CARRIED TO COLLECTION AED 7,409,800.00
Fittings
HDPE Bends
HDPE Tee
Page 84 of 258
AL MIRFA BEACH PROJECT - 410 VILLAS Potable Water Supply System Installation
INFRASTRUCTURE
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
HDPE Reducer
Valves
Air Valves
Isolation Valves
Washout Valves
Flow Meter
Page 85 of 258
AL MIRFA BEACH PROJECT - 410 VILLAS Potable Water Supply System Installation
INFRASTRUCTURE
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
Page 86 of 258
AL MIRFA BEACH PROJECT - 410 VILLAS Potable Water Supply System Installation
INFRASTRUCTURE
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
Page 87 of 258
AL MIRFA BEACH PROJECT - 410 VILLAS Potable Water Supply System Installation
INFRASTRUCTURE
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
ADDITIONAL ITEMS
The Contractor may price here any items which has been
shown in the Contract drawings or any other Contract
Documents but overlooked or not specifically mentioned in the
schedule of items and is necessary for the satisfactory
completion of the Works. Should the Contractor fail to insert
any item here, it will be deemed that lump sum Contract Price
includes all such items and no claims for additional items will
be entertained.
Page 88 of 258
AL MIRFA BEACH PROJECT - 410 VILLAS Potable Water Supply System Installation
INFRASTRUCTURE
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
COLLECTION
Page 89 of 258
AL MIRFA BEACH PROJECT - 410 VILLAS Potable Water Supply System Installation
INFRASTRUCTURE
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
Page 90 of 258
AL MIRFA BEACH PROJECT - 410 VILLAS Irrigation System Installation
INFRASTRUCTURE
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
A - IRRIGATION NETWORK
Concrete Works
For Walls
For Base
Reinforcement
Page 91 of 258
AL MIRFA BEACH PROJECT - 410 VILLAS Irrigation System Installation
INFRASTRUCTURE
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
Irrigation (cont'd)
Waterproofing
Pipe Work
Page 92 of 258
AL MIRFA BEACH PROJECT - 410 VILLAS Irrigation System Installation
INFRASTRUCTURE
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
CARRIED TO COLLECTION AED 3,856,775.00
Irrigation (cont'd)
HDPE
HDPE TEE
Page 93 of 258
AL MIRFA BEACH PROJECT - 410 VILLAS Irrigation System Installation
INFRASTRUCTURE
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
Irrigation (cont'd)
Valves
Chambers
Page 94 of 258
AL MIRFA BEACH PROJECT - 410 VILLAS Irrigation System Installation
INFRASTRUCTURE
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
Irrigation (cont'd)
Page 95 of 258
AL MIRFA BEACH PROJECT - 410 VILLAS Irrigation System Installation
INFRASTRUCTURE
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
Irrigation (cont'd)
Concrete Works
A Design Mix - Type A, Blinding & Benching concrete 115 m3 1,000 115,000.00
Benching Concrete
Reinforced Concrete
For Base
For Wall
For Piles
Page 96 of 258
AL MIRFA BEACH PROJECT - 410 VILLAS Irrigation System Installation
INFRASTRUCTURE
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
J Thickness : 150 - 300 mm 3 m3 3,000 9,000.00
Irrigation (cont'd)
Reinforcement
Water Bar
Waterproofing
Page 97 of 258
AL MIRFA BEACH PROJECT - 410 VILLAS Irrigation System Installation
INFRASTRUCTURE
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
M Internal Protection Coating to underground reservoir 1,430 m2 150 214,500.00
Irrigation (cont'd)
Valves
Fittings
Page 98 of 258
AL MIRFA BEACH PROJECT - 410 VILLAS Irrigation System Installation
INFRASTRUCTURE
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
Irrigation (cont'd)
Page 99 of 258
AL MIRFA BEACH PROJECT - 410 VILLAS Irrigation System Installation
INFRASTRUCTURE
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
S DI Blind Flange, 150 mm Diameter 2 nr 1,200 2,400.00
Irrigation (cont'd)
ADDITIONAL ITEMS
The Contractor may price here any items which has been
shown in the Contract drawings or any other Contract
Documents but overlooked or not specifically mentioned in the
schedule of items and is necessary for the satisfactory
completion of the Works. Should the Contractor fail to insert
any item here, it will be deemed that lump sum Contract Price
includes all such items and no claims for additional items will
be entertained.
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
Irrigation (cont'd)
COLLECTION
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
Concrete Works
Manholes
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
Sewerage (cont'd)
Manholes
Waterproofing
Manholes
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
CARRIED TO COLLECTION AED 39,300.00
Sewerage (cont'd)
Insulation
Manholes
Manholes
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
Sewerage (cont'd)
Pipe Work
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
Sewerage (cont'd)
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
Sewerage (cont'd)
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
Sewerage (cont'd)
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
Sewerage (cont'd)
Manholes
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
I Depth; 2.51 - 3.00m 16 nr 22,967 367,472.00
Sewerage (cont'd)
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
Sewerage (cont'd)
ADDITIONAL ITEMS
The Contractor may price here any items which has been
shown in the Contract drawings or any other Contract
Documents but overlooked or not specifically mentioned in the
schedule of items and is necessary for the satisfactory
completion of the Works. Should the Contractor fail to insert
any item here, it will be deemed that lump sum Contract Price
includes all such items and no claims for additional items will
be entertained.
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
COLLECTION
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
CONCRETE WORKS
Provision of Concrete
Place of Concrete
Benching Concrete
Reinforced Concrete
For Base
For Wall
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
Mass Binding
Reinforced Concrete
For Base
For Wall
Reinforcement
Wash Bar
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
CARRIED TO COLLECTION AED 3,532,560.00
Supply and install approved heavy duty cover & frame of the
following sizes as shown on drawing and as per specification
or/as instructed by the Engineer
Waterproofing
Painting
Normal epoxy paint 300 micron thick to walls & floor & roof
H 266 m2 150 39,900.00
base cement insulation
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
Supply, install and joint ductile iron pipes just before outfall
including excavation, testing, supporting, backfilling with
approved material, compaction etc complete all as per
specification or/as instructed by the Engineer
Flap Valve
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
uPVC Pipe
300mm diameter
GRP Pipe
400mm diameter
500mm diameter
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
600mm diameter
700mm diameter
800mm diameter
900mm diameter
1000mm diameter
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
1200mm diameter
1400mm diameter
Extra to Excavation
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
Q 900mm diamter pipe 54 m 500 27,000.00
Manholes
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
Top entry Catch basin - 2.00 x 1.40m
H (Depth; 2.01 - 2.80m) 12 nr 4,300 51,600.00
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
ADDITIONAL ITEMS
The Contractor may price here any items which has been
shown in the Contract drawings or any other Contract
Documents but overlooked or not specifically mentioned in the
schedule of items and is necessary for the satisfactory
completion of the Works. Should the Contractor fail to insert
any item here, it will be deemed that lump sum Contract Price
includes all such items and no claims for additional items will
be entertained.
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
COLLECTION
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
200 mm dia. HDPE pipe with all necessary fittings and civil
D 4,200 m 1,000 4,200,000.00
work
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
ADDITIONAL ITEMS
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
CARRIED TO COLLECTION AED
COLLECTION
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
A - SNG PLANT
Engineering Phase
Construction Phase
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
SNG Station
Steel Pipe
Ball Valves
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
CARRIED TO COLLECTION AED 975,000.00
Gas Station
Air compressor 100 M3/HR complete with Air filter ,Air Dryer
D and all accessories, valves, local control panel and guages as 2 nr 300,000 600,000.00
shown on drawings and described in specification
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
Heat tracing system for the LPG Vapour lines and the SNG
Vapour pipelines complete with Thermostats ,Power and heat
B circuits, special double heating wiring /cable C/w all necessary 1 Item 170,000 170,000.00
fittings and full piping insulation and integrity with the PLC
control panel
X-ray RT Testing
Earthing System
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
Lighting Protection
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
Engineering Phase
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
PIPEWORK - PIPES
D 125 mm dia. pipe with all necessary fittings 400 m 250 100,000.00
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
D Isolation valve chamber for 32 mm diameter SNG pipe 411 nr 2,000 822,000.00
G Isolation valve chamber for 125 mm diameter SNG pipe 4 nr 3,500 14,000.00
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
Builder's Work
D All other builder's work in connection with mechanical work LS 250,000 250,000.00
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
ADDITIONAL ITEMS
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
COLLECTION
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
ELECTRICAL WORKS
General Note:
Concrete
Pre-cast Concrete
Slabs
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
Electrical (cont'd)
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
CARRIED TO COLLECTION AED 588,700.00
Electrical (cont'd)
Cable Installation
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
Electrical (cont'd)
Substation
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
Electrical (cont'd)
EARTHING WORKS
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
Electrical (cont'd)
DMS Equipment
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
Electrical (cont'd)
Trench
Warning tape (30cm width, 150 microns thick) for cables in the
G trench all as per specifications, drawings and latest authority 16,448 m 100 1,644,800.00
requirments
H 200mm Diameter uPVC for plot entry road crossing sleeves 522 m 150 78,300.00
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
Electrical (cont'd)
ADDITIONAL ITEMS
The Contractor may price here any items which has been
shown in the Contract drawings or any other Contract
Documents but overlooked or not specifically mentioned in the
schedule of items and is necessary for the satisfactory
completion of the Works. Should the Contractor fail to insert
any item here, it will be deemed that lump sum Contract Price
includes all such items and no claims for additional items will
be entertained.
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
ELECTRICAL
COLLECTION
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
DIVISION 26 - ELECTRICAL
AED 81,358,725.00
CARRIED TO SUMMARY
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
General Note:
DEMOLITION WORK
DEVELOPMENT WORK
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
Telecommunication (cont'd)
Ducts
Supply lay and joint core cable ducts in trenches for plot
connection
A D-54, 6 way duct depth not exceeding 1.5m 5,520 l.m 400 2,208,000.00
B D-54, 4 way duct depth not exceeding 1.5m 19,514 l.m 300 5,854,200.00
C D-56, 2 way duct depth not exceeding 1.5m 18,049 l.m 200 3,609,800.00
D D-54, 2 way duct depth not exceeding 1.5m 20 l.m 200 4,000.00
E D-54, 6 way duct depth not exceeding 1.5m 5,305 l.m 400 2,122,000.00
F D-54, 4 way duct depth not exceeding 1.5m 18,833 l.m 300 5,649,900.00
G D-56, 2 way duct depth not exceeding 1.5m 18,049 l.m 200 3,609,800.00
H D-54, 2 way duct depth not exceeding 1.5m 20 l.m 200 4,000.00
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
CARRIED TO COLLECTION AED 23,283,900.00
Telecommunication (cont'd)
SERVICE CONNECTION
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
Telecommunication (cont'd)
ADDITIONAL ITEMS
The Contractor may price here any items which has been
shown in the Contract drawings or any other Contract
Documents but overlooked or not specifically mentioned in the
schedule of items and is necessary for the satisfactory
completion of the Works. Should the Contractor fail to insert
any item here, it will be deemed that lump sum Contract Price
includes all such items and no claims for additional items will
be entertained.
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
COLLECTION
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
LANDSCAPING WORK
A - HARDSCAPE WORK
Beach Park
N Seating Area 38 nr -
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
Viewing Deck 1
E Seating Area 4 nr -
Viewing Deck 2
J Seating Area 4 nr -
Beach Access
O Seating Area 2 nr -
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
CARRIED TO COLLECTION AED 203,200.00
H Seating Area 9 nr -
J Accessible Ramp 4 nr -
Retail Area
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
A Seating Area 9 nr
Ladies Beach
H Seating Area 4 nr
Mosque Landscape
O Seating Area 13 nr -
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
Parks
Linear Park
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
Neighbourhood Park
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
Pocket Park 1
N Seating Area 10 nr -
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
Pocket Park 2
N Seating Area 14 nr -
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
Pocket Park 3
N Seating Area 16 nr -
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
Pocket Park 4
N Seating Area 7 nr -
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
Pocket Park 5
N Seating Area 11 nr -
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
Pocket Park 6
N Seating Area 8 nr -
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
Pocket Park 7
N Seating Area 7 nr -
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
Pocket Park 8
O Seating Area 8 nr -
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
Pocket Park 9
N Seating Area 8 nr -
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
Pocket Park 10
N Seating Area 22 nr -
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
Open Area - 1
Open Area - 2
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
B - SOFTSCAPE WORK
Beach Park
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
Jasminum Sambac (Arabian Jasmine)
6 nr
Height (5 - 8m) ; Max M / Span (3 - 5)
GRASS
Viewing Deck 1
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
Phoenix Dactylifera (Date Palm)
25 nr
Height (20 - 23m) ; Max M / Span (6 - 10)
Viewing Deck 2
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
Peltophorum Pterocarpum (Yellow Poinciana)
2 nr
Height (10 - 15m) ; Max M / Span (10 - 15)
GRASS
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
Delonix Regia (Flamboyant Tree)
2 nr
Height (5 - 12m) ; Max M / Span (10 - 15)
GRASS
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
9 m2 AED
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
Cordyline Fruticosa (Evergreen Plant)
6 nr
Height (2 - 5m) ; Max M / Span (1 - 3)
GRASS
Retail Area
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
GRASS
Ladies Beach
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
Phoenix Dactylifera (Date Palm)
25 nr
Height (20 - 23m) ; Max M / Span (6 - 10)
GRASS
Mosque Landscape
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
GRASS
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
Mangroove Viewing Deck
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
Cordyline Fruticosa (Evergreen Plant)
6 nr
Height (2 - 5m) ; Max M / Span (1 - 3)
GRASS
Parks
LINEAR PARK
Grass Area
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
Peltophorum Pterocarpum (Yellow Poinciana)
6 nr
Height (10 - 15m) ; Max M / Span (10 - 15)
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
Neighbourhood Park
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
Caesalpinia Pulcherrima (Peacock Flower Tree)
98 nr
Height (3 - 5m) ; Max M / Span (1 - 3)
GRASS
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
GRASS
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
Jasminum Sambac (Arabian Jasmine)
25 nr
Height (5 - 8m) ; Max M / Span (3 - 5)
GRASS
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
Phoenix Dactylifera (Date Palm)
nr
Height (20 - 23m) ; Max M / Span (6 - 10)
GRASS
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
GRASS
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
GRASS
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
GRASS
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
Landscaping Work (cont'd)
GRASS
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
GRASS
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
GRASS
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
CARRIED TO COLLECTION AED -
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
GRASS
Open Area 1
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
GRASS
Open Area 2
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
GRASS
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
ADDITIONAL ITEMS
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
LANDSCAPING WORK
COLLECTION
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
LANDSCAPING WORK
AED 7,460,590.00
CARRIED TO SUMMARY
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
LANDSCAPING WORK
A - HARDSCAPE WORK
Pocket Park 1
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
Pocket Park 2
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
CARRIED TO COLLECTION AED 597,310.00
Pocket Park 3
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
Pocket Park 4
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
Pocket Park 5
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
Pocket Park 6
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
Pocket Park 7
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
Pocket Park 8
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
Pocket Park 9
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
Pocket Park 10
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
Open Area - 1
Open Area - 2
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
Neighbourhood Park
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
Linear Park
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
Beach Park
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
L Signage & Wayfinding 6 nr 150 900.00
Ladies Beach
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
Mosque Landscape
Retail Area
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
L Board Walk (Wood Satin Finish) 245 m2 250 61,250.00
Viewing Deck 1
Viewing Deck 2
Beach Access
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
K Paving Tiles 103 m2 200 20,600.00
B - SOFTSCAPE WORK
Pocket Park 1
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
Cordyline Fruticosa (Evergreen Plant)
G 6 nr
Height (2 - 5m) ; Max M / Span (1 - 3)
GROUND COVER
Pocket Park 2
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
Dodonaea Viscosa (Hopbush)
G 42 nr
Height (1 - 3m) ; Max M / Span (1 - 3)
GROUND COVER
Pocket Park 3
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
GROUND COVER
Pocket Park 4
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
Nerium Oleander (Laurier Rose)
F 6 nr
Height (3 - 5m) ; Max M / Span (3 - 5)
GROUND COVER
Pocket Park 5
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
Caesalpinia Pulcherrima (Peacock Flower Tree)
F 13 nr
Height (3 - 5m) ; Max M / Span (1 - 3)
GROUND COVER
Pocket Park 6
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
GROUND COVER
Pocket Park 7
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
Delonix Regia (Flamboyant Tree)
E 1 nr
Height (5 - 12m) ; Max M / Span (10 - 15)
GROUND COVER
Pocket Park 8
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
GROUND COVER
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
Pocket Park 9
GROUND COVER
480 m2
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
E Sesuvium Maritimum (Sea Purslane) 480 m2
Pocket Park 10
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
Atriplex Canescens (Fourwing Saltbush)
D 25 nr
Max M / Span (1 - 3)
GROUND COVER
Open Area - 1
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
GROUND COVER
Open Area - 2
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
Dodonaea Viscosa (Hopbush)
C 78 nr
Height (1 - 3m) ; Max M / Span (1 - 3)
GROUND COVER
Neighbourhood Park
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
GROUND COVER
Linear Park
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
GROUND COVER
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
8,986 m2 AED
Beach Park
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
Cordyline Fruticosa (Evergreen Plant)
B 45 nr
Height (2 - 5m) ; Max M / Span (1 - 3)
GROUND COVER
Ladies Beach
GROUND COVER
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
A Cynodon Dactylon (Bermuda Grass)
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
Atriplex Canescens (Fourwing Saltbush)
A 10 nr
Max M / Span (1 - 3)
GROUND COVER
Mosque Landscape
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
GROUND COVER
Retail Area
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
Landscaping Work (cont'd)
GROUND COVER
GROUND COVER
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
Viewing Deck 2
GROUND COVER
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
Viewing Deck 3
GROUND COVER
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
CARRIED TO COLLECTION AED -
ADDITIONAL ITEMS
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
LANDSCAPING WORK
COLLECTION
AMOUNT
ITEM DESCRIPTION QTY UNIT RATE
AED
LANDSCAPING WORK
AED 18,485,800.00
CARRIED TO SUMMARY
DAYWORKS _______