Supplier Tutorial
Supplier Tutorial
Supplier Tutorial
May 2008
Rev A
The ultimate goal of any effective Supply Chain Management System is to optimize the deployment of assets to maximize fulfillment of demand (or customer service).
Rev A
Objective:
Upon review of these materials Suppliers should have an understanding of:
Supplier Performance Report Performance Categories Contested Rating Process
Supplier Rating Appeal Form
Rev A
Overview
Rev A 4
Rev A
Rev A
Rev A
Method/Criteria:
Quality acceptance is calculated by part count acceptance divided by part count received in the specified time frame Escapes are the percentage of parts rejected as a result of discovery by AMT Quality personnel Supplier Corrective Action Requests are measured and reported but not currently calculated in the Supplier Rating
Measurement Period:
Measures all receiving inspections performed from the 1st to the last day of the month
Rev A
Method/Criteria:
Delivery performance is based upon the receipt date vs. the supplier promise/commitment date on the purchase order. All deliveries measured to no more than 7 days early to 0 days late unless specified otherwise on the AMT purchase order
Measurement Period:
All deliveries received from the 1st to the last day of the month
Rev A
10
Method/Criteria:
Customer Service is measured using the following scale
0 Poor 1 Needs Improvement 2 Good 3 Excellent
Items critiqued include; Shipment, Contract/PO Review and Acknowledgement, Prior/Proactive notification of issues, Responsiveness and Pricing Customer Service is measured and reported but not currently calculated in the Supplier Rating
Measurement Period:
Measures all interactions between the supplier and AMT from the 1st to the the last day of the month
Rev A 11
Rev A
12
AMT- A Division of Senior Operations LLC Supplier Rating Formula 1/1/2009 Rev B
Raw Material Standards Purchase Complete Parts Outside Processing Outside Vending Average Days Late Quality Acceptance Rate On Time Delivery Performance Advanced Rejection
RM, ST & PC
OP & OV
13
Rev A
14
GOLD
99-100
Preferred Supplier Top Performer Consistently Exceeding Requirements Preferred Supplier Exceeds Minimum Requirements Meets Current Minimum Requirements Allows Bidding of New Work Does Not Meet Minimum Requirement Management Approval to Bid New Work Requires Written Corrective Action Trending Positive to Avoid Work Loss Probation No New Bid Opportunities Present Corrective Action Plan to AMT Management Must be Yellow Within 60 Days Work Is Being Shopped to Preferred Suppliers 15
SILVER
97-98
Minimum Requirement
90-96
Unsatisfactory
76-89
Probationary
0-75
Rev A
Rev A
16
Rev A
17
Rev A
18