Assignment

Power Generation (EE-414)

Maximum Marks: 6
Submission Date: 1st week of May 2024

Instructions:
i. Submission should be in a group of 4 students maximum and should be of the same section.
ii. The name and roll number of students should be mentioned on the first page of the assignment
iii. Rubrics should be attached for every student in a group

Problem statement: Analyze the residential/commercial/industrial load and propose a solar


photovoltaic system for it for the following working modes of the inverter:
i. On-grid solar inverter
ii. Off-grid solar inverter
iii. Hybrid-grid inverter

Methodology:
i. Gather required information for analysis of solar photovoltaic system design parameters.
ii. Calculate maximum demand, load factor, demand factor, unit/energy consumption in highest
demand month, critical load, non-critical load, etc,
iii. Determine the inverter capacity and battery size
iv. Select charge controller and solar module
v. Calculate the solar panel dimension
vi. Find other parameters such as the module mount location, structure, direction of solar module,
cable size, etc.
vii. Evaluate Payback, ROR, and B/C of the proposed design
viii. Attach the energy bill of the chosen load, data sheets, specifications, and cost of all selected
equipment such as the battery, inverter, charge controller, cable, structure, etc. from the market or
website
ix. Compare results from three different studies and show them in Table and graph format

Marking Criteria:
Criteria Marks/Percentage CLO Taxonomy PLO
level
Analyze and evaluate the [4 Marks] 4 C4 2
technical/economical parameters of Power
Generating stations.

Acknowledge and value the need for [2 Marks] 2 A3 9


teamwork, leadership, diversity of ideas,
and inclusion. (CEP)
Table of Contents:
1. Introduction:
2. Demand Analysis:
3. Results and Discussion:

Residential/Commercial/Residential connected load and address


Sr.No. Parameters On-grid solar inverter Off-grid solar Hybrid grid solar
inverter inverter

1 Energy (KWh.)
2 Load factor
3 Demand factor
-
-
-

4. Conclusion/ Recommendations: