URC Construction (P) Ltd DOC-EHS-002

Safe
This SWMS is a site-specific statement work
that mustmethod statement
be prepared before any high-risk construction work isRev 02/Apr15
commenced.
Person responsible for ensuring compliance with SWMS Date of
Name: prepared:
Department: Date of
Designation: commitment
High-risk job: Location:
How will hazards and risks be
What are the hazards
What are the tasks involved? controlled? (describe the control
and risks?
measures and how they will be used)
Think about the worksite and each stage of the project, including preparation and clean-up.
URC Construction (P) Ltd DOC-EHS-002

Safe work method statement Rev 02/Apr15


Steps for filling out
1. Discuss with relevant employees, contractors and EHSs what work will be high-risk, the tasks, and associated hazards, risks
and controls.
2. In the ‘What are the tasks involved?’ column, list the work tasks in sequence to how they will be carried out.
3. In the ‘What are the hazards and risks?’ column, list the hazards and risks for each work task.
4. In the ‘How will the hazards and risks be controlled?’ column, select the hazard or risk and then work through the control levels
1 – 4 from top to bottom. Choose a control measure (and how it is to be used) that is as close to level 1 as is reasonably
practicable.
Control levels
1. Eliminate any risk to health or safety associated with construction work.
2. Reduce the risk to health or safety by any one or any combination of the following:
· Substituting a new activity, procedure, plant, process or substance
· Isolating persons from the hazard, such as barricading, fencing or guardrailing, or
· Using engineering controls, such as mechanical or electrical devices.
3. Use administrative controls, such as changing the way the work is done.
4. Provide appropriate personal protective equipment.
5. Brief each team member on this SWMS before commencing work. Ensure team knows that work is to immediately stop if the
SWMS is not being followed.
6. Observe work being carried out. If controls are not adequate, stop the work, review the SWMS, adjust as required and re-brief
the team.
7. Retain this SWMS for the duration of the high-risk construction work.

Signature of Responsible Person Prepared By


Name: Name:
Department: Department:
Designation: Designation: