R4G-71-KA-BGLR0291-1-Summery Sheet
R4G-71-KA-BGLR0291-1-Summery Sheet
Extended Loop
*Service Total SOQ *Task Completion Total Contractor Contractor Claim Qty for *Quantity available in summary sheet *Consumption Total Consumptinon
S.No. Service Description UOM Length Declaration Difference Total BOQ Qty. Reason / Justification Remarks (if any)
Code Qty. Qty. (mConstruct) Claim Qty this bill (Incl. 15% added Qty) Reversal done (Y/N) done till date
(Auditable)
A B C D E F G I J K L M N O P Q
1 3293902 INSTALLATION LEVEL 1 (S1) SPLITTER EA 54 50 49 37 37 0 N 54 37
2 3293903 INSTALLATION LEVEL 2 (S2) SPLITTER EA 399 276 261 206 206 0 N 399 206
3 3294022 Installation of FAT EA 225 138 133 3 3 0 N 225 107
4 3294262 BLOWING / PULLING-48 F M 4793.187 5368.335 6884.2 1790.006 1790.006 2195 0 N 5512 2099
5 3294264 BLOWING / PULLING-12 F M 7940.589 7240.98 7573 4554.815 4554.815 3649 0 N 9495 6130
6 3307334 Installation of Poles - 6M EA 205 132 124 0 0 0 N 205 91
7 3355165 CHRG :T&I 5M POLE W/PRECAST FOUNDATION EA 0 9 9 0 0 0 N 0 0
8 3293884 CHRG;INSTALLATION OF POLE CLAMPS EA 410 265 124 0 0 0 N 205 100
9 3314532 CHRG TRENC, HDD,2NOS 40MM DUCT,VENDOR MC M 4812.409 3801.836 1673.5 1665.264 1665.264 0 N 19764 6863
10 3315405 CHRG TRENC,HDD,3NOS 40MM DUCT,VENDOR MC M 4599.249 5301.907 4744.1 1011.297 1011.297 0 N 4829 2486
11 3250473 OPEN TRENCHG IN ALL SOIL&MURRUM-3 DUCTS M 0 0 0 0 0 0 N 0 0
12 3314517 LAY & EXC TRENCH 40MM DUCT W/OT,2 NOS M 0 0 0 0 0 0 N 0 0
13 3316066 CHRG INST OF ACCESS CHAMBR 900X600X800MM EA 200 143 122 36 36 0 N 200 39
14 3111341 Disposal of waste debris/Materials Per Trip 0 122 122 122 122 0 N 0 0
15 3261679 MH RESTORATION : ASPHALT : 900 X 600 X800 EA 0 72 72 72 72 0 N 0 0
16 3261680 MH RESTORATION :CEMENT CONCRETE:900X600 EA 0 50 50 50 50 0 N 0 0
17 3252601 SPLICING/JOINTING & TERMINATION-48F EA 192 9220 1246 1215 1215 0 N 0 0
18 3252602 SPLICING,JOINTING & TERMINATION-96F EA 0 192 192 192 192 0 N 0 0
19 3300512 Splicing & Term OFC Fixed Cost/Day Per Day 0 28 28 28 28 0 N 0 0
20 3098777 A11102-Self Adhesive Labels EA 0 444 444 444 444 0 N 0 0
21 3295195 PREPARATION OF AS BUILT DRAWINGS DBP M 0 6402.38 6402.3 6402.38 6402.38 0 N 0 0
22 3171151 Supply and installation of 40mm PVC pipe M 0 808 808 808 808 0 N 0 0
23 3206510 SUP&LAY FLEX PVC CONDUIT DIA 40MM M 0 21 21 21 21 0 N 0 0
24 3318609 S&I 40MM PVC CONDUIT USING SCAFFOLDING M 0 36 36 36 36 0 N 0 0
25 3319691 S&I END PLUG/F/40MM HDPE DUCT EA 0 652 652 652 652 0 N 0 0
26 3319692 S&I SIMPLEX PLUG/F/40MM HDPE DUCT EA 0 782 782 782 782 0 N 0 0
27 3294065 INSTALLATION12F ADSS / FIG 8 CABLE M 646.035 1181.400879 0 0 0 0 N 0 0
28 3253782 CHRG:RESTORATION OF PITS NOS 0 0 0 0 0 0 N 0 0
29 3291944 PRO & LAY OF 10MM THICK NYLON ROPE M 0 0 0 0 0 0 N 0 0
30 3324682 DSMN OF 400X400X500MM MANHOLE EA 0 0 0 0 0 0 N 0 0
31 3324997 CHRG ADDL, HDD 1NOS 40MM DUCT,HARDSHIP M 0 0 0 0 0 0 N 0 0
32 3324565 CHRG OF LOCAL LIASONING FOR 96F BLOWING M 0 0 0 0 0 0 N 0 0
* Ensure that service code which is claimed by Contractor must be avaialble in respective K2 - WO/CO.
* Qty in K2 is with additional offset margin of 20% given to field while updating actual Qty in mConstruct (over & above design 21% loop +wastage added in design route / shape length).
I hereby declare that quantity mentioned in above format is deployed on field and is in sync with NE Asbuild.
Document number to be enter like: EINV/(State Code-2 digit)/(FSA ID)/(count of summary sheet); for example: EINV/KA/BGLR0291/01
JC Lead MP Lead State FTTx Lead SCH
(Ajay Kumar M) (Vetrimani Munusamy ) (Akula Rao) (Sudheendra C)