Block Work Risk Assessment
Block Work Risk Assessment
Work Details
ARJAN
PROJECT NO. 165 Project Name PLOT NO - 6731311
Risk Matrix
Consequences
Likelihood Rarely Unlikely Possible Likely Highly Likely
Severity People Assets
(1) (2) (3) (4) (5)
Very High (5) 5 10 15 20 25 Death Severe Damage
High (4) 4 8 12 16 20 Major Injury Major Damage
Medium (3) 3 6 9 12 15 Over 3 Day Injury Moderate Damage
Low (2) 2 4 6 8 10 Under 3 Day Injury Slight Damage
Very Low (1) 1 2 3 4 5 Minor Injury (no lost time) No Damage