SAMPLE Internal Audit Checklist
SAMPLE Internal Audit Checklist
COMPANY LOGO
INTERNAL AUDIT REPORT
Number of Good Practices (11) Noticed during the Audit as documented in attachement with
photos.
Auditor (Names) AUDITEEs(NAME)
MD/DMD
Branch Manager
Project Manager
Store Manager
This form to be maintained BY MR/HSE Department
OBSERVATIONS
1. Heat stress timing to be Displayed More visible for
Workers and Visitiors to See while Entering Project
site or Work Location
2. Power tools not to be stored on site, All Tools are to
be returned to Store on daily Basis.
3. All designated waste skips to be Provided With
specific Signages and not general Construction
Signages
4. Water coolers to be labelled on daily Basis to signify
washing and refilling without using previous day
water for drinking purpose
5. Cable ties to be used in tying cables on cable stands
to avoid falling off and obstructing access.
GOOD PRACTICES