0% found this document useful (0 votes)
9 views

Chapter 3 (5.3

mmsp 2

Uploaded by

myarlay17
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
0% found this document useful (0 votes)
9 views

Chapter 3 (5.3

mmsp 2

Uploaded by

myarlay17
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
You are on page 1/ 32
CHAPTER 3 ANALYSIS AND DESIGN OF TWO AND HALF STOREYED R.C BUILDING 3.1. Profile of proposed Residential Building The profile of this structure is listed as follows: Type of building Residential Building Type of occupancy Residential Shape of building Square Dimensions of building : Maximum length = 41 ft Maximum width — = 39 ft Height of building Bottom storey height= 11 ft Typical storey height= 11 ft Overall height = = 32 Height / width 0.97 3.2, Mate Properties of Proposed Residential Building Material properties used for proposed building are as follows: (1) Analysis property data Weight per unit volume of conerete = 150 pef Modulus of elasticity = 29 * 10° Ib/in? (2) Design property data Bending reinforcement yield stress (f,) = 40,000 psi Shear reinforcement yield stress () = 40,000 psi 500 psi Conerete compressive strength (f') 3.3. Loading Considerations Loading considerations are required for the structure analysis of proposed residential building, All loading considerations are based on ACI 318-08, 24 3.3.1, Dead Load In this structural analysis, dead loads are used as follows: (1) Unit weight of concrete = 150 pof (2) Finishing load =20 psf (3) Suspended load = 10 psf (4) 4% thk; brick wall weight = 50 psf 3.3.2. Live Load In this structural analysis, live loads are as follows: (1) Live load on stair case = 40 psf (2) Live load on roof =20 psf (3) Live load on residential = 40 psf 3.4, Load Combinations The design load combinations are the various combinations of the load cases for which the structure needs to be checked. These combinations are based on ACI 318-08 () 1.4L (2) 1.2 DL+1.6LL OOOO © Leto, a a © OO © © Figure 3.5 Design of Slab 25 3.5. Design Caleulation for Two-Way Slab Two-way slab design is manually calculated by ACI moment coefficient method in the following procedures, c E eazsaa” | 1, Two-way edge supported slab, S; (15"*13") Concrete Strength, f = 2Sksi Yield Strength of Steel, f, = 40ksi I Length of longer clear span, L= 15-75 = 14 ft 12 Length of shorter clear span, B= 13-55 = 12 ft 4 Bog 7 17 <2 (Two way slab) jum slab thickness according to ACI 318-08 Determination of mi Assume slab thickness = 4 in. hi For edge beam, Ip =Dxis x 12* 14 «1.5 =4116 int h’ 1 5 For interior beam, ly => *2 0 =7>* 12 14 *2 = 5488 int pana 1 For 13ft interior width, I. gx bxiax# = 832 in* 1 For 13ft interior width, I. ise i2x# = 832 in* L For 15ft interior width, le = 75 15 « 124 =960 1 For 158 interior width, Ik = 75 = 15 « 12 * a = 960 in* For ab beam, a -b SS = 6,59 i, 832 For bd beam, a a =5.72 I, 960 For ac beam, @ =» =5.72 For ed beam, a -b ss = 6.59 J i, 832 6.5945, 7245, 7246.59 Gog $6.15 > 2 (Case ID) 4 BeGohi7 s-2 ak 12 1, (08+ 36r98 14 12(08+32) aaa h =361>3Sin Therefore, consider slab thickness as 4 in, Unit weight of concrete = 150 pef Own weight of slab = Bxlso = 30 pst Superimposed dead load = 30psf Total dead load = 50430 = 80 psf Live load = 40 pst Total factored load () = 12DL+16LL = 1.280 + 1.640 Total factored load () = 160 pst The ratio of panel side, _m a Negative moment at continuous edges Coefficients are taken from Design Aids, Appendix-A Table A.7 Co = 0.059 ce = 0.032 Mase = Cala? = 0.059x0.16*12?«12 = 1630 ki Mine = CneoLn? = 0,0320.16% 1412 = 12.04 kip-in Positive moment at mid-span Coefficients are taken from Design Aids, Appendix-A Table A.8 and Table A.9 Cased = 0.024 Cave = 0.036 Masel = CarveateoLa? = 0,024%0,096«12712 = 3.98 kip-in Maivett = CasvettoLa? = 0,036%0.064%12712 = 3.98 kip-in Total Mwe = 3.98 +3.98 = 7.96 kip-in Che = 0.012 Chen = 0.02 My, = ChiveatoLa? = 0,012%0,096«14%12 = 2.71 kip-in Mpivet = Chvven oly? = 0.020.064 x 14712 = 3.01 kip-in Total Miso = 2.7143.01 =5.72 kip-in Negative moment at discontinuous edges L Mase = 5 * Mave : 5 «Ma 28 L Mave 3 * 7.96 Check for slab thickness, Maximum moment = 16.31 kip-in Pox = 0.75 py 7 0.75 «085 « B, x 2 x uy f 870004, = 0.75 0.85 x 0.85 «25 x 87000 _ 40 87000 + 40000 Prax = 0.023 Ma = $Mn=¢ pfibd? (1- 0.59 0.02340 16.31 =0.9%0.023%40%12x d?x(1- 0.59 x 4 =2.09in Assume cover = 1 in h =2.09+1=3.09in<4in Use h =4in, d=4-1=3in (.. OK) To find reinforcement, Ascmasy = = 0,023%12%3 = 0.83 in? 0,002*bxh = 0.002124 = 0.096 in? Pam b*d Aimy = Acemperture &srinkgs)= Shorter direction, 1 Mid Span (h= 4 in, d = 3 in) 2__2M, ~ 0.76586 and- 7.96 —— 0.940% = 0,07 in? < Atcmpastrinkage Asfy Cheek ———- es 8 O85?.b 0.07 «40 0.85 ~2.5* 12 = 0.11 in So, Asread = 0.096 in? Use 10 mm § @ 12"cle, As= 0.11 in?> 0.096 in? = OK 2.Continuous edge (h = 4 in, d=3 in) © 0.76567 Dees an3- 13 aesasa2 = 0.25in Ma ccs) 1631 TF 0.9%40«(3 = 0.16 in? > A tomp & stvikage Cheek 0.16 x 40 0.85% 25x12 0.25 in. So, A creqd = 0.16 in? Usel0 mm $ @ 9 in.c/c, Ay = 0.163 in? > 0.16 in OK Longer direction, 1.Mid Span (h=4 in, d= 3 in) 0.08 in © 09% 403 = 2S) = 0.054 in? < Atempastrinkage Ash, Check a oo 0.054 = 40 © 085% 25% 12 = 0.085 in So, Acread = 0.096 in? Use 10 mm $ @ 12"c/e, Ay= 0.11 in? > 0.096 in? OK in, d=3 in) 2.Continuous edge (h= 0.7658 b -3. poe ong 0.765 « 2.5» 12 = 0.18in, a5 e 12.04 0.940% 3 = 0.12 in? > Arcmpastrinkage Ash k = Check , ao 85P,b 31 _ 012 x 40 0.85% 2.512 = 0.19 in So, Asroas = 0.19 in? Use 10 mm @ 7.5 inc/e As = 0.195 in? > 0.19 in? OK Spacing Check; Saux: =2h or 18" =2% 4" or 18" =8inor 18" Choose minimum spacing, pac = Sin So, re-assume all steel spacing, As = 0.117 in*/ft (8mm @ 8" c/e) Check for Shear, From Design Aids, Appendix-A, Table A.10 Wa et 0.66 W = 034 Total load = o(Laly) = 0.16 = (12 14) = 26.88 kips Load/ft on long beam (Short direction) = aaa 26.88% 0.66 2«14 0.63 kips Load/ft on short beam (Long direction) = ne 2688 «034 22 = 038 kips $2 VFibd = 0.75 «2 ¥2500 «12 «3 = 2700 Ibs $Ve = 2.7kips> 0.63 kips The shear strength of the slab is well above the required strength under factored loads, 32 Il. Two way edge supported slab, Se (14" = 13°) QO © B12" x18" —— w —4 > 8 Conerete Strength, f° = 2.5 ksi Yield Strength of Steel, f, = 40 ksi 12 Length of longer clear span, L= 14-75 = 13 12 Length of shorter clear span, B= 13-75 = 12 ft B p> 108 <2 (Two way slab) wie Determination of minimum slab thickness according to ACI 318-08 limitation, bh? For edge beam, Iy Hay “15 12% 14 «1.5 = 4116 int . i , For interior beam, ly = D x2 = D x12 14) *2 = 5488 in* For 7.5ft edge width, I. 7.5% 12% 4% =480in* . 1 For 7ft edge width, I, nag tT xa x14 12% 43 = 896 int For 14ft interior width, Is L 3 For 13ft interior width, I, apex 12s =832int oe a 5488 ‘or ab beam, a i aan = 6.59 33 I, _ 5488 For bd beam, a. =2 = =6.12 i eon a hy, _ 4116 ‘or ac beam, a = Ro = For ed b -b LHe =9.19 ‘or cd beam, a Para 6,5946,12+8,57+9,193 a(avg) 2 = 7,62 > 2 (Case II) 1, (08 +52 In (0.8 * Sr0000 3649) 40 __ Bx 08 +355 36+ (9 *1.08) =3.41<3.5in But, consider slab thickness as 4 in. Choose thickness of slab = 4in Unit weight of concrete = 150 pet 4 Own weight of slab = x iso = 50psf Superimposed dead load = 30psf Total dead load = 30#30 = 80psf Live load = 40psf Total factored load (0) = 1.2DL + 1L6LL = 1.280 + 1.640 Total factored load () = 160 psf 1, (shorter length) The ratio of panel side, m eee 12 B Case Negative moment at continuous edges, 34 0.92 Coefficients are taken from Design Aids, Appendix-A Table A.7 Ce Cp Mave Mheve Positive moment at mid-span, 0.088 0.042 CaoL.? 0.088 « 0.16» 12? 12 16.04 ki Cros? 0,042 « 0.16 13? 12 13.63 kip-in Coefficients are taken from Design Aids, Appendix-A Table A.8 and Table A.9 Carseat Cavett Mave Maret Total Mave Cosel Covet Mb, Mb, seit Total My,-ve 0.032 0,037 ConveatoL? 0,032 = 0,096 x 12? 12 5.31 kip-in Convento? 0.037 x 0,064 » 12? 12 4.09 kip-in $3144.09 = 9.4 kip-in 0,023 0.027 CyneatoLa? 0,023 x 0.096% 13? 12 4.48 kip-in Chavet obs? 0.027 x 0.064 13? 12 3.5 kip-in 4.48+3.5~ 7.98 kip-in 35 Negative moment at discontinuous edges Mave = 7 * Mave 5 «Ma = txo4 = 3.13 kip-is ; 3 kip-in 1 Mose = 5 * Total Moise 1 = 5x798 — =2.66 kip-in Check for slab thickness, Maximum moment =16.04 kip-in f. 87000 P max = 0.75 p y= 0.75 « 0.85 * By 7000+ 87000 = 0.75 « 0.85 x 0.85 << x ———__ 40” 87000 + 40000 Pray = 0.023 Pf, M = $ Mn = 4 pfibd? (1- 0.595") 0.02340 16.04 = 0,9 x 0.023 x 40 «12 x d? x (1- 0.59 x = d= 1.44in Assume cover = lin h =144+1= 244in < 4in Use h = din, d=4-1=3in OK To find reinforcement, Axa) = Pmaxxdx d 0.023123 Ascnaxy = Asgnin) = Ademperature &strinkage) = 0.002 * b xh = 0,002 «12 « 4 = 0,096 in? Shorter direction, 1.Mid Span (h=4 in, d= 3 in) 36 pare y | emazN \" 0.7658; 2 20a > 07651225 = 0.14in 94 0.9%40%(3 = 0,09 in? < Atempaeshrink Asfy Check: Sons __0.09 «40 0.85 x 2.5% 12 = 0.14 in So, Acrega = 0.096 in? Use 10 mm @ 12"clc, As 11 in? > 0,096 in? OK in, d 2.Continuous edge (hh= _ 16.04 0.9 «40% (3 Ag =0.15 in? > Acupeatikage Asfy oO astb 0.15 x40 085%25~12 = 0.24 in Check 37 So, Assogd = 0.15 in? Use 10mm § @8in cle As = 0.17 in? > 0.15 in? OK 3.Discontinuous edge (h = 4 in, = 0.046 in _ 3.13 0.9 «40% (3 = 0.03 in? < A temp & shrinkage Asfy Cheek, Se caste _ 0.03 « 40 0.85 *2.5=12 = 0.047 in So, — Acregt = 0.096 in Use 10mm 6 @ 12in cle As = 0.11 in? > 0,096 in? OK Longer direction, 1. Mid Span (h = 4.5 in, d=3 in) = p__2My ue Oo 7658} 298 As “oh 9 _ 7.98 0.9 x 40 «(3 38 = 0,075 in? < A temp & srnkase Asfj Saas _ 0.075 x 40 085 «25% 12 =0.12in So, A s.reqé = 0.096 in? Use 10mm @ 12" cle, As =0.11 in? > 0.096 in?. OK 2.Continuous edge (h = 4 in, d = 3 in) Check 2M, 0.765876 2 2a o7es-2512 13.63 0.9 40 x ( =0. 13 in? > A temp & shrinkage As Check Seats _ 0.13 x40 0.85 «2.5% 12 = 0.204 in So, As read = 0.13 in? Use 10mm 6 @10in cle Ay = 0.13 in? = 0.13 in? » OK 3.Discontinuous edge (h= 4 in, d= 3 in) 2M, 0.765f; b 22206 ~ o76825R 39 2.66 0.9 40 «3 = 0.025 in? < A temp & shrinkage Ash, dl SL C3 O 085P.b __0.025 « 40 © 0.85 «2.5 x 12 = 0.039 in So, — Assoas = 0.096 in? Use 10mm 6 @12inc/e Ay =0.11 in? > 0.09 OK Spacing Check; S max =2h or 18” =2*4" =8in or 18" Choose minimum spacing, S mx: = 8 in. So, re-assume all steel spacing, As = 0.17 in’/ft (10mm $ @ 8" c/c) Check for Shear, From Design Aids, Appendix-A, Table A.10 W = 058 0.42 © (LaLs) = 0.16% (12 « 13) = 24.96 kips oW, 2h, 24.96 «0.58 2x13 Wo Total load Load/ft on long beam (Short direction) = = 0.56 kips oW 2k 24.96 x 0.42 212 0.44 kips Ve = 2 VR ibd = 0.75 x 2 « ¥2500 « 12 «3 Load/ft on short beam (Long direction) 40 = 27001b = 2.7kips > 0.56 kips ‘The shear strength of the slab is well above the required strength under factored loads. 3.6. Design Calculation for One-Way Slab One-way edge supported slab, S» (15°6') cc B 10x12 Is’ Blo's12" Blo's12" Concrete Strength, fe! a Yield Strength of Steel, f, = Clear span for longer direction, Li Clear span for shorter direction, La Consider by one-way slab design, Minimum thickness of slab (h) Choose thickness of slab I Unit weight of concrete - Own weight of slab - Superimposed dead load - Total dead load = Live load - Total factored load () = Total factored load (0) = Maximum moment, Mu = F?/ 12 : og ey 2.5 ksi 40 ksi Sf oft 15 FG 72522 (One-way) Lo 6x2. Hoy TBin<4in 4in 150 pef 4 qx 150 30 psf 20 psf 50+20 = 70 psf 40 psf 1.2DL + 1.6LL 1.270 + 1.6x40 148 psf 41 = 148 x 67/12 x 12/1000 = $.33 kip-in fe _ 87000 a = 0.75% By 8: Prax = 0.75 po= 0.75% 0.85 »Pricex Se 25 87000 + 070.8510 850 G0 + 40000 Poe ~ 0.023 fy Me = 9 Ma= 4 phd? (I- 0.59 ) . 2 0.02340) 5.33 = 0,9%0,023 40x12» d?x(1- 0.59% dé =0.83 in Assume, cover bh =0.83+1= 1.83 in < 4in Use; ho =4in, d=4-1=3 a- Ja -— 2M 0.76587 2 2333 tesa = 0,078 in ae of (d=3) _ 5.33 ~Jomiong .00Ts, 0.9x40xG - 25) = 0,05 in* Agmin, = 0.002%bxh = 0,00212«4 = 0,096 in?> Agog) So, Assoqd= 0.096 in? Smax = 3h or 18 in = 3x4 or 18 in = 12in or 18 in 42 Use 10 mm § @ 12"c/c, Ay = 0.122 in? > 0.096 in? For temperature & shrinkage steel, Acniay = 0.002%b%h = 0,002%12%4 = 0,096 in? Sax = Shor 18 in = 5x4 or 18 in = 20in or 18 in Use 10 mm § @ 12"c/e, As = 0.122 in?> 0.096 in? Check shear, (Max; shear shorter span) Vu = LISx@L/2 115 x 148 x 6/2 510.6 Ib = 0.51 kips gVe = g2¥Pobd 0.75%2x V2500%12%3 2700 Ibs $Ve = 2.7 kips> 0.51 kips ‘The shear strength of the slab is well above the required strength under factored loads. 3.6.1, Design Results for Slab S, described in Table 3.1 Table 3.1. Slab Thickness and Slab Steel Area of Proposed Building The slab thickness and slab steel area of proposed residential building is Type Shorter Direction Longer Direction Mid- | Discontinu span ous Continuous ‘Continuous Mid- span Discontinu ous 43 Top | l0mm@ |l0mm@] l0mm@ | l0mm@ | l0mm@ | lOmm@ S, | Stet | 8%ele | 12%ele | 12"ce | 10%ee | 12"¢le | 12" ele (3%7) [Bottom | mm @ | 1Omma@ | Omm@ | 1mm @ | Toma | 1Omma@ Steel 8" cle 12" cle 12" cle 10" cle 12" cle 12" cle Top | l0mm@ |l0mm@| l0mm@ | l0mm@ | l0mm@ | lOmma@ S2 Steel Bele 12" cle 12" cle 10" cle 12" cle 12" ele 2%7) [Bottom | Tomm@ | 1Omma@ | Tomma | 1omm@ | 1omma | 1Omma Steel 8" cle 12" cle 12" cle 10" cle 12" cle 12" cle Top | l0mm@ |10mm@| l0mm@ | lOmm@ | lOmm@ | l0mma@ Sy. Steel Bole 12" cle 12" cle 10" cle 12" cle 12" cle (1413) [Bottom | 10mm @ | l0mm@ | l0mm@ | l0mm@ | 10mm@ | 10mm@ Steel 8" ole 12" cle 12" cle 10" cle 12" cle 12" cle Top | 10mm @ | 10mm@ Tomm @ | 1omm@ Ss Steel | s"ele | 12"ele - lo" ele | 12" ele . (713) [Bottom | 10mm @ | 10mm@ Tomm @ | 10mm@ Steel B%ele | 12" le . lorele | 12" cle ° Top | lomm@ |10mm@| l0mm@ | 10mm@ | 10mm@ | 1omm@ Ss. Steel 8" cle 12" cle 12" cle 10" cle 12" cle 12" cle (123) [Bottom | 10mm @ | TOmma@ | TOmm@ | 1omm@ | 1Omma@ | 1Omme Steel 8" cle 12" cle 12" cle 10" cle 12" cle 12" cle Top | l0mm@ |10mm@ | ldmm@ | l0mm@ | 10mm@ | 10mma) Se Steel 8" cle 12" cle 12" cle 10" cle 12" cle 12" cle (1413) [Bottom | 10mm @ | 10mm@ | l0mm@ | 10mm @ | 10mm@ | 10mm@ Steel Bele 12" cle 12" cle 10" cle 12" cle 12" cle Top | 10mm 1Omma) 10mm @ | 10mm@ Sy Steel orcle | 12" ce i 75"cle | 12" ele : (1513) [Bottom | 10mm @ | 10mm@ Tomm @ | 10mm@ Steel cle | 12"ele _ 7s"cle | 2" ele : Top | l0mm@ |l0mm@| l0mm@ | l0mm@ | l0mm@ | lOmm@ Se | Steel | 8%ele | 12%cle | 12"ce | 10%ee | 12"¢le | 12"ele (1213) [Bottom | 10mm @ [TOmm@ | l0mm@ | l0mm@ | 10mm@ | lOmm@ Steel Brele | 12" ele | 12%ele | torele | 12"ele | 12" ele One-way | Top | l0mm@ |lOmm@ | l0mm@ | l0mm@ | 10mm@ | l0mma@ Slab Steel 8" cle 12" cle 12" cle 10" cle 12" cle 12" cle Sy [Bottom | 10mm @ [10mm@| 1omm@ | 10mm@ | 10mm@ | 1omm@ (156) | Steel 12" cle 12" cle 12" cle 12" cle 12" cle 12" cle 44 3.7. Design Calculation for Beam. Assumption for Beam Design: At failure the maximum strain at the extreme compression fibres is assumed equal to 0.003 by the ACI Code provision. ACI code indicates that the net tensile strain, & at nominal strength, within the transition region, shall not be less than 0.004 for reinforced concrete flexural members without or with an axial load less than 0.10 fo’ ‘Ag, where Ag = gross area of the concrete section For design strength, the shape of the compressive concrete stress distribution will be assumed to rectangular shape Tributary area of slab on beam calculation AL =1/2* 13x65 = 42.25 f? AZ =[15 + (15 - 13)]/2* (6.5) = 55.25 Try (12” x 14") for second floor beam, (frame 1, C -E) Own weight of beam = 12/12 « 14/12 «150 = 175 Ib/ft Slab weight = $5.25 x 4/12 x 150 1/15 = 184.17 Ib/ft Finishing load = 20 x $5.25 x 1/15 = 73.67 Ib/ft 4% tk wall wt = 50% (143) «1S. = 140 Ib/ft Live load =40 «$5.25 «1S = 147.33 Ibvft © =12DL+16LL = 1.2 (175 + 184,17 + 73,67 + 140) + 1.6 = 147.33 = 923.14 lb/ft oF? 923.14 1 Max; M=—— = = 18882.41 Ib-ft (control) i in 923.14 « 15? = 12981.66 Ib- 7 lb-ft 45 oP _ 923.14 «15? Max; My=— > = nm i wl 923.14 x 15 Max; Vu=—- = ——— 2 2 = 18882.41 lb-ft = 6923.55 Ib eu fe AS mac = 0.85 * Bix — x 7 SB a Sarat Od = 0,85 x 0.85 « (2500/4000) gh 2K 0.003+0.004 = 2.67 init 3yfe! Ag mins = == x bd fy 3V2500 40000 = 052 init 2x 1S Asmin =O eb xd fy 200 ~ 40000 AS min = 0,69 in'/ft x 12* 11S Stress Block depth, [2 __2M, 0.7651, ais. fips? — Zea = 0.89 in Mu =$As fy (@ 12 « 1882.41 = 0.9 « As « 40000%(11.5 -0.89/2) Ag = 0.57 in?/ ft < A, min: Use, Ag min: = 0.69 in?/ft Use, 6-12 mm 4 4, As. = 1.0! ft $ Vex § 2 /Pebd Vo = 0.85%2 ¥2500%12*11.5 46 = 11730 Ib Va = 6923.55 Ib = > = 7681 Ib : ree fe ew S mmx: = 0.85 Bix = fy aut at 0.003 = 0.85 « 0.85 « (25 x x12 Asim: = 0.85 * 0.85 * (2500/4000) « To gpg * 12 11S = 2.67 in? ree 3yfe! AS aie = x bd _ 342500 40000 = 0.52 in ft 200 AS min; === x bd fy 200 ~ 40000 = 0,69 in?/ft 12 11S 12* 115 Stress Block depth, 219806812 =115- eee i i) 0.765%250012 =0.94 in Mu= 6 As fy(d 12 « 19806.8 = 0.9 As « 40000 x (11.5 ~0.94/2) As = 0.59 in'/ft < Amin Use As = 0.69 in*/ft Use, 6-12 mm $, As = 1.05 in’/ft 6 Ve= 2 /Pebd Ve = 0.85 * 2 x ¥2500 * 12 x11.5 = 11730 Ib Vu = 7681 Ib < Ve = 11730 Ib ( .. OK) Vos Ve. S According to ACI Code requirement, minimum web reinforcement must be provided. no web reinforcement is required 48 bwS __ bwS Min Ay=0.75 JF = 507 y y If f.= 2500 psi, the first term controls bwS Min Ay=50—— Fy Min Ay = 50 « 12 x 5.5/40000 = 0.0825 in’/ft 8mm $ @ 10” ce spacing is used for web reinforcement For vertical stirrup; Sims, = (Avf)/S0bw = (0.165 * 40000)((50 * 12) = 11 in So, = W/2 = 11,5/2= 5.75 in ~ 5.5 in Soom; = 24 in 8mm 6 @ 5.5" c/e spacing (Ax = 0.17 in*/ft) Try (12 14") for first floor beam, (frame 1, CE) Own weight of beam = 12/12 « 14/12 x 150 = 175 Ibitt Slab weight = 91.25 « 4/12 « 150 * 1/15 = 304.17 Ib/ft Finishing load = 20 « 91.25 « WIS = 121.67 lb/ft 4 vot wall wt = 50 x (9.83 « 14-6 * 7) x 1/15 = 318.73 lb/ft Live load =40 x 91.25 VIS = 243.33 Ib/ft © =12DL+16LL = 1.2 x (175 + 304.17 +121.67 + 318.73 ) +1.6%243.33 = 1492.81 Ib/ft wk 1492.81 «15? Max; Mis >= ——_ = 30534.75 lb-ft. (control) @F 1492.81 x 15? Max; Mi=—— = = 20992.64 Ib-ft 16 16 ok 1492811 Max; My=——~ = = 30534.75 Ib-ft nm u wl _ 149281 x15 Max; Ve=—- = —— ——_ = 11196.08 Ib 2 2 eu AS = 0.85 = be Sma = O85 = Big ES 49 = 0.85 x 0.85 x (2500/4000) = 12*1LS - ¢ 5 503+0.004 = 2.67 in*/ft _3Nfe' 4" 3v2500 40000 0.52 in?/ft 200 y ed 200 ~ 40000 = 0.69 in?/ft bd S min x12 115 x12 1S Stress Block depth, 0.76586 “1s. = 1.48 in Mu =$Asfy(d—3) 12 x 30534.75 = 0.9 « As « 40000 » (11.5 ~ 1.48/2) As = 0.95 in*/ft > ASmin Use As =0.95 intift Use, 6-12 mm @, As = 1.05 in?/ft $ Ve= 2 V/Pebd $ Ve = 0.85 % 2 V3500 12 «11.5 11730 Ib Vu = 11196,08 Ib < 6V.= 11730 Ib ( .. OK) Va<¢ Ve. So, no web reinforcement is required According to ACI Code requirement, minimum web reinforcement must be provided bw Min A= 0.75 YR >50-—— If P.= 2500 psi, the first term controls. 50 Min A,= 50 8 Fy = 50 « 12 « 5.5/40000 = 0,0825 in? 8mm $ @ 10” c/e spacing is used for web reinforcement. For vertical stirrup; Sma; = (Avf)/S0by = (0.165 * 40000)((50 % 12) = 11 in Sms, = d/2 = 11.5/2=5.75 in ~ 5.5 in Sm; = 24 in 8mm $ @ 5.5” ce spacing (As = 0.17 in?) Try (12” x 14") for first floor beam, (frame C, 1 -2) Own weight of beam = 12/12 * 14/12 « 150 = 175 Ibift Slab weight = 84.5 x 4/12 «150 x 1/13 = 325 Ib/ft Finishing load = 20 = 84.5 « 1/13 = 130 Ib/ft 4-¥5" tk wall wt = 50 = (9.83 x 12-3 = 6.5) x 1/13 = 378.69 lb/ft Live load = 40 « 84.5 « 1/13 = 260 Ib/ft o =12DL+16LL = 1.2 * (175+325+1304378.69) + 1.6 « 260 = 1626.43 Ib/ft oF _ 1626.43 x 137 Max, Mu=——— = 11452.78 lb-f ax; Mem lb-ft z Max, Mu=—— = 19633.33 Ib-ft ol 1626.43 x 13° Max; Mi=—— =. = 27486 67 Ib-ft (control) 10 10 ol 1626.43 = 13 Max; Vu=—- == ————_ = 10571.79 lb 2 2 As mm = 0.85 x By xx x bd Sims = O85 BIE x SE 0,003 = 0.85 *0,85 * (2500/4000) » —————_ 0.003+0.004 2% 115 = 2.67 in?/ft SI = 0,52 in/ft 200 xd 8 AS mi 2 40000 1211.5 = 0.69 in?/ft Stress Block depth, 0.76586 = 11s /ips? —2-2u86e =133in Mu =$Asfy(d-5) 12 x 27486.67 = 0.9 x As « 40000 x (11.5 — 1.33/2) As =0.85 in*/ft > ASmin Use As = 0.85 in*/ft Use, 6-12 mm @, As = 1.05 in?/ft $ Ve= 2 /Pobd Ve = 0.85 * 2 x 2500 » 12 « 11.5 = 11730 Ib Vu = 10571.79 Ib < 6Ve Vu< Ve According to ACI Code requirement, minimum web reinforcement must be provided 1730 Ib ( .. OK) (0, no web reinforcement is required bws bws Min Ay=0.75 yf, 250 vf Fy Fy 2500 psi, the first term controls. bws Fy Min A. = 50 « 12 x $.5/ 40000 52 = 0.0825 int/ft 8mm § @ 10" c/c spacing is used for web reinforcement For vertical stirrup, Sms, = (Avf)/S0by = (0.165 40000)(50%12) = 11 Som; = W/2 = 11,5/2= 5.75 in~ 5.5 in Sm; = 24 in 8mm 6 @ 5.5" cle spacing (A. = 0.17 in’/ft) Try (12” x 14") for ground beam, (frame 1, CE) Own weight of beam = 12/12 « 14/12 « 150 = 175 Ibvft 4 stk wall wt = 50 « (9,83 « 14-6 7) x WIS = 318.73 lb/ft ® =14DL @ = 1.4% (175+318.73) = 691.22 lb/ft ol? 691.221 Max; i= === 14138.59 Ib-ft_(control) a _ 691.22 Max; My=> = = 9720.28 lb-ft 16 16 oF _ 691.22 «15? Max; My=——~ == = 14138.59 Ib-ft 1 1 ol _ 691.2215 Max; Vas = —— = 5184.15 1b A ee fe ew Sma: = 0.85 * Bre MW eutet 0.85 » 0.85 » (2500/4000) x —22°3 12115 5% 5 0.003+0,004 7 = 2.67 init 3yfe! AS min: = 7 5 x bd 32500 “40000 = 0.52 inte 12x11 53 200 =p x 12x 11.5 40000 = 0.69 in ft Stress Block depth, 2M, a =¢-fae-2Ms_ 0.7656" = 2 _ 22 M3859 TS = LS 76525007 12 a = 0.66 in Mu =$Asfy(d-$) 12» 14138,59 = 0,9 = As « 40000 * (11.5 ~ 0.6/2) Ag win: = 0.42 in2/

You might also like