Order No 21
Order No 21
Subject: Invoking Force Maj eure for covid-l9 Pandemic second wave for a period of
extension of project registration by 6 months w.e.f.15'04.2021.
Whereas Ministry of Housing and Urban Affairs had issued Advisory regarding
extension of registration ofreal estate projects and concurrently extending timelines of
all statutory compliances due to 'Force Majeure' under the provisions of Real Estate
(Regulation and Development) Act, 2016 (RERA), on 13'h May 2020 and subsequently
MahaRERA had revised project registration validity by 6 months'
Whereas,manypromoterorganizationhaverepresentedtoMahaRERAto
extend timeline by at least another six months due lo second wave crippling the
enlire
construction industry.
MAHARE RA HEADQUARTERS 1
Housefin Bhavan, Plot No. C-21,E. Block, Bandra Kurla Gomplex, Bandra (E), Mumbai 40005{
Tel. No.: 022 68 111 600 . E mail : [email protected]
c-6furgEqrdq
rrorfu< rr< rrta.t fr- rr {-{5, qA- Ed sffift,
EA (10, td- yo o o\1.
drtt: "n - qa lfi qao. {frq: [email protected]
t-lIs
Whereas Second wave was much more devastating than first wave and has caused great loss to human lives as
well as economy. And consequent lockdowns have caused disruption of supply chains for obtaining construction
material, Labour work force migration and slowdown in pace of construction'
Therefore, in order to aid govemment efforts in controlling the damage coused due to COVID-19 and ensure
that completion of MahaRERA registered projects does not get adversely affected, it has been decided to issue
this order.
In exercise of the powers under section 37 readwith Section 34(a),34(f) and 34(g), a force majeure period of
six months, from i5,h April to l4'h October ,2OZl is being declared and the following directions are issued with
immediate effect:
a For all MahaRERA Registered projects where completion date, revised completion date or extended
completion date expires on or after l5th April 202l,the period of validity for registration of such projects
shall be extended by six months. MahaRERA shall accordingly issue project registration certificates,
with revised timelines for such projects, at the earliest. The above automatic extension shall not apply
to projects that was to be completed before 15'h April, 2021'
a The time limits for compliances under Section 11, which become due anytime during force majeure
period, shall stand automatically extended for a period till the expiry of force majeure period-
a The above extensions shall not affect the rights of the allottees as may be available to the allottees under
the provisions of the Real Estate (Regulation and Development) Act,20l6, the Rules and Regulation
made thereunder.
As approved by Authority