CAL Solar EN
CAL Solar EN
com
User's manual
SOLAR COLLECTOR
Page 1 of 15
content
CAREFUL------------------------------------------------- -------------------------3
Who should read the instructions
Symbols
recommendation
Applicable standards
Cautions
Transport, unpacking and inspection
INTRODUCTION------------------------------------------------- -----------------5
Description
Construction
INSTALLATION------------------------------------------------- ---------------------- 8
Location of the solar collector
Minimum space required
Installation of solar collectors
Hydraulic connections
Heat transfer pipes
Training
Starting
Commissioning and maintenance
Page 2 of 15
installation, commissioning, maintenance
and repair of the system in accordance with
CAREFUL current standards.
Who should read these instructions Fornello will not be held liable in the event of
These instructions should be read by: damage caused by improper system
- technical engineer placement or the use of parts or fittings not
- installer approved by Fornello for such use.
- user
- service engineer
symbols
The following symbols are used in this manual
Basic instructions for the correct
installation The manufacturer reserves the right to
without notice.
people and the environment.
It is forbidden to make changes inside the Whenever possible, move the vacuum tubes
appliance without the prior consent of the upright, taking into account the arrows with
The product must be installed and repaired by qualified be placed in a horizontal position, always
Failure to follow the test instructions and test pressed wooden board. If you stack
To ensure the safe and proper operation of you should make sure that they are securely
your device, it is important that it is serviced fastened to avoid moving. Fastening straps
engineer.
Please familiarize yourself with the
Page 3 of 15
Tube and heating element inspection
a] Open the box (s) containing the vacuum tubes with the heating elements inserted. Check to make
sure that the vacuum tubes are intact and that the bottom of the tube is still silver. If a pipe has a
white or transparent base, it is damaged and needs to be replaced. The heating element must be
removed and inserted into a replacement pipe.
b] Do not remove and / or expose the tubes to sunlight until installation is complete;
Otherwise, the tip of the heater will become very hot enough to cause severe skin burns. The
outer surface of the glass will not heat up.
NEVER TOUCH THE INSIDE OF THE EMPTY TUBE OR THE TOP OF THE HEATING ELEMENT
AFTER EXPOSURE TO SUNLIGHT
WHEN HANDLING THE HEATER, WEAR THICK LEATHER GLOVES. ALWAYS WEAR PROTECTIVE
GLASSES WHEN HANDLING GLASS TUBES.
c] Fornello makes no warranty for pipes or heating elements damaged as a result of transport
or installation.
Framework
a) Unpack the standard frame that came with the manifold. If you use a frame kit, those
components will be packed separately from the manifold.
b) Depending on the roof surface, rubber mats, roof attachment straps or round feet can be
used to attach the standard roof frame. These components are supplied separately from the
standard frame.
Page 4 of 15
INTRODUCTION
USE OF SOLAR ENERGY fixed with high quality silicone adhesive.
The principle of operation of a solar heating There is no need for a seal between the glass
system can be easily explained. A collector pipe and the heating element, in fact, the air
receives solar radiation and therefore heats must be able to circulate in and out of the
up. This heat is channeled as much as pipe as the air inside heats up and cools
possible to a hot water tank. No fuels are down.
required during this process and therefore The heating element transfers heat to the
there is no CO2 emissions, so there is no manifold by a very simple method. The
environmental pollution. The quality of the copper heater is hollow on the inside and
solar energy that the collector can transfer contains acetone. the empty center of the
to the home depends mainly on its ability heating element is vacuumed, so that the
to absorb light, but also on the insulation acetone will heat up to 40ºC and evaporate
from (boil). The vapors will rise to the top
(condenser) of the heating pipe, where the
heat will be transferred to the water flowing
through the manifold. The heat loss causes
the vapors to condense and return to the
heating element where the process will be
resumed. This method of heating is thousands
of times more efficient than a solid copper
rod. Therefore, heat is transferred very
efficiently from the vacuum glass tube to the
water.
Page 5 of 15
excellent in solar heat absorption and minimal
reflection. The air is emptied from the space
adsorbent
between the two glass tubes to form a vacuum,
outer tube
which eliminates the loss of conductive and
convective heat.
inside tube
Manifold
2.Vid
3. Adsorption layer
Framework
4. Table round
There are two types of frame: flat roof
aluminum
and sloping roof.
5. Heating element
Page 6 of 15
specifytechnical requirements
Size L * l * h
Model Number of pipes Weight (kg)
(mm)
SPA-58 / 1800-12 12 1056 * 1983 * 130 51
SPA-58 / 1800-15 15 1296 * 1983 * 130 65
SPA-58 / 1800-18 18 1536 * 1983 * 130 68
SPA-58 / 1800-20 20 1696 * 1983 * 130 76
SPA-58 / 1800-22 22 1856 * 1983 * 130 84
SPA-58 / 1800-24 24 2016 * 1983 * 130 92
SPA-58 / 1800-30 30 2496 * 1983 * 130 112
Page 7 of 15
Pressure drop⁇
INSTALLATION
based on the size of the solar collector and the manifold and the profile
Page 8 of 15
- the ends of the heating element - pay attention to the position of the tubes -
(condenser) must be covered with keep them upright on the profile and
thermal adhesive before putting them manifold and tighten them tightly
in the manifold (fig 4)
Sloping roof installation⁇see page 14
Profile U -for mounting the manifold and the vacuum tubes
Aluminum profile -Used at the bottom to install plastic supports for vacuum tubes. Must be
combined with U profiles.
The connection to the roof - the feet are installed with U-profiles on the roof
Flat roof installation - see page 15
Profile U -for mounting the manifold and vacuum tubes, the angle can be changed
Aluminum profile -Used at the bottom to install plastic supports for vacuum tubes. Must be
combined with U profiles.
The connection to the roof - the feet are installed with U-profiles on the roof
INSTALLATION
HYDRAULIC CONNECTION
The connection between the collectors
After attaching the temperature sensor to the temperature in the solar collector can reach 200
Page 9 d
external / internal⁇20/18 m⁇depending on the length Pipe installation
⼀Recommended flow rate: 0.1 -0.251 / min for a glass All pipes should be installed as close as possible
tube; for 22 tubes: 2.2⁇5.5 l / min to the water tank, with the inclination towards it
to avoid the accumulation of air in the pipes. If
⁇Pipe connection - fixed welding this is not possible, use manual ventilation.
For the active surface [opening] of about 20 m2, the
INSTALLATION
isolation
ducts
depth
insulation must
to or of
approximate a
pipe diameter
D (for lambda Ventilation installation
approx. 0, 04 W /
mx K⁇Through the wall or roof can be
reduced to 50% Thermal insulation should
withstand
⁇temperature not less than 150 ℃, FIG. 8. Recommended items for tubes with
- UV radiation, thermal liquid around the water tank
- weather
For flat roofs, the insulation should be
If the volume of the transfer fluid
protected with aluminum sheets - to avoid
thermal is higher than 20 l, se
mechanical damage or weathering.
recommends the installation of a
greater expansion.
Boiler connection
It must be carried out according to the instructions of the
Solar station
Must be installed in a place with easy access, close to
Page 10 of 15
- 3 working intervals for the flow regulator:
0.3-6 1 / min, 2-15 1 / min and 10-30 l / min
The system cannot be washed and filled if The test is passed if after 1 hour the test pressure will
the collectors have been exposed to direct not drop more than 0.05 bar (0.005 MPa)
sunlight or if they are still exposed to If the test pressure in the solar circuit
sunlight or if the sky is very clear or at a tank is less than 5 bar, the leak test
temperature of less than 3-5 ℃. Washing must be performed without connecting
should be done through the lowest drain the tank.
valve.It must be open until it is full of
water.
Page 11 of 15
Flow rate (l / min] = 0.1-0.25 l / min for a heating
STARTING tube. For solar collectors with 30 tubes, this is
VENT about 3⁇7 l / min, for 22 tubes of approx. 2.2⁇5.5
Turn on the solar unit for 3 minutes. Stop. l / min Commissioning and maintenance The
Start again for the next 2⁇3 minutes. Open installation of solar panels must be carried out
all vents and close after venting. Do it in such a way that no intervention is required
again, if necessary. for 1 year. The installation must also be done in
the summer.
Recommended pressure after ventilation: min 25
bar. If possible (every 2-3 weeks) it is recommended
Starting the heat transfer circuit to check the pressure in the solar unit and the
Check all heat transfer valves - they must be capacity of the solar unit and the exhaust valve,
closed. The shut-off valve must be open. located at 3/4 "from the safety valve. The
pressure must be 2.5⁇4.5 bar. After 1 year of
Check the pressure in the expansion vessel - use, authorized personnel must check the
it must be about 0.5 bar higher than the installation (immediately after the first summer
pressure in the cold circuit of the heat of use]
transfer fluid. Any work around the heat transfer fluid circuit
Start the pump at level 1. If the required flow is must be performed after the system has cooled
not received, increase the level. The flow rate down.
should be the equivalent of the temperature The heat transfer fluid must be checked at
difference between 10-15 ºC and the strong least every 2 years. If necessary, it must be
afternoon sunlight. changed. This must be done by authorized
Approximate value: personnel.
Page 12 of 15
FIG. 10th solar heating with Smart Multi Energy and SD3 control unit
FIG. 10th solar heating with Smart Multi Energy, fireplace, SD3 control unit. Heating
FIG. 10th solar heating with Smart Multi Energy and Prestige Solo condensing boiler and unit
SD3 control.
Page 13 of 15
MOUNTING FRAMES ⼀ INCLINED ROOF
Given the similar installation, we will describe the installation of
Using the same 17J connections, the P30 profile is mounted with front profiles (Fig. 14) There you have to install the
Vacuum tubes must be inserted into the manifold holes (Fig. 11). During installation, the pipes must be screwed
on. The supports at their base must be open. After placing the tube, the support must be closed. Tighten the
screws to secure the tube.
Careful:
- the ends of the heating element (condenser) must be covered with thermal adhesive before inserting them
into the manifold
- monitor the position of the pipes - keep them in a high position in front of the profile and the manifold ⁇
screw in well
Page 14 of 15
Importer in Romania
DN 2 National Road 5
Tel: 0337.401.822
www.fornello.ro
Page 15 of 15