0% found this document useful (0 votes)
5 views2 pages

Sor 5

Uploaded by

manoj
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
5 views2 pages

Sor 5

Uploaded by

manoj
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Daily Quality Observation Report-M/s.

Crescon Electrical

Project Name: MRF-TBR-PCR Expansion Project-Trichy


Date
Report No. JLL/CRESC/ Electrical /005/2023
S no Concern Area Snaps Observation Location Suggested Mitigation Compliance photographs STATUS

DS-1 Near pipe properly cable dressing


1 HT Cable dressing pending Closed - waiting for inspection
rack to be done

Earth Flat welding not done DS-2 Near pipe proper Welding and
2 Closed - waiting for inspection
rack connectivity to be done

proper Welding and


Support Welding and
3 CT-5 Vertical drop Painting to be done Closed - waiting for inspection
painting not done properly.
properly.

cable tray laying to be


cable tray and cable
4 Quituplex TBR done properly and cable Closed - waiting for inspection
dressing not completed.
dressing to be done.

Earth flat overlooping


Earth flat welding and earth
Fisher cutter body mini 50mm and welding
5 flat connectivity not Closed - waiting for inspection
ply PCR and painting to be done
proper.
properly.

Support welding and


Support welding and
support erection and Closed
6 support erection not DS-1 GF
leveling to be done 19-06-2024
properly.
properly.

Earth flat overlooping


Earth flat welding and earth
Fisher cutter body mini 50mm and welding
7 flat connectivity not Closed - waiting for inspection
ply PCR and painting to be done
proper.
properly.

Lighting cable laying and


lighting cable dressing not
8 Zone-1 dressing to be done Closed - waiting for inspection
done.
properly.

Busduct support welding


Busduct support welding Closed
9 DS-1 and painting to be done
not completed. 19-06-2024
properly.

Cable laid and dressing not cable dressing to be


10 Zone-2 Closed - waiting for inspection
properly. done properly.

Trench-2 outgoing press


tray support and leveling
11 cable tray support not done Zone-3 Closed - 25.10.2023
to be done properly.
and leveling not done.
cable tray and cable
oper tray and cable
12 Zone-4 dressing to be done Closed - waiting for inspection
dressing not done properly.
properly.

Support welding and


Support welding not
13 Curing PDB Room painting to be done Closed - waiting for inspection
properly.
properly.

Cable tray laying and


without cable tray and
14 Zone-4 dressing to be done Closed - waiting for inspection
cable dressing not done.
properly.

Earth flat laying and


Panel charged eathing not
15 Zone-3 connection to be done Closed - waiting for inspection
done.
properly.

Earth flat welding and


Earth flat welding not done
16 Compressor room. Connection to be done Closed - waiting for inspection
properly.
properly.

Properly cable uncoile


Closed - waiting for inspection MENTIONE
17 Cable twised Zone-01 and laying to be done CABLE REMOVED FROM ZONE-1
proper methods .

cable tray support


tray laid without supporting painting not done and
18 Compressor room. Closed - waiting for inspection
leve not proper primary painting to be
done properly.

Support need to change


tray laid without supporting
19 Compressor room. and providing the level of Closed - 25.10.2023
leve not proper
the tray.

cable tray need to rectify


Cable tray not proper and
20 Compressor room. and proper bend Closed - 25.10.2023
support to provide
,support to providing.

Ones work completion


Material is damaged not
balance material to be
21 proper stocking ,material Zone-3 Closed - waiting for inspection
stock properly and
scraped
proper location.