Azn 2222

major project on electric energy generation.

Uploaded by

garima bh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
36 views75 pages

Azn 2222

major project on electric energy generation.

Uploaded by

garima bh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 75

A Major Project Report

Submitted in fulfilment of the Requirements

For the award Bachelor of Technology

RAJIV GANDHI PROUDYOGIKI VISHWAVIDHYALAYA,

BHOPAL (M.P.)

Submitted By:

Azan Khan

(0967EX201003)

Under the Guidance Of:

ASST. PROF. PURNANAND SINGRAUL

DEPARTMENT OF ELECTRICAL & ELECTRONICS ENGINEERING

UNIVERSITY INSTITUTE OF TECHNOLOGY, SHIVPURI


(M.P.)
(Session: 2020-2024)
UNIVERSITY INSTITUTE OF TECHNOLOGY, SHIVPURI
Department of Electrical & Electronics Engineering

CERTIFICATE

This is to certify that the work embodied in this Major Project entitled
Transmission " has been satisfactorily completed by Azan Khan , 0967EX201003.

It is a bonafide piece of work, carried out under our guidance in the Department of
Electrical and Electronics Engineering, University Institute of Technology, Shivpuri for the
partial fulfilment of the Bachelor of Technology Degree during the academic year 2024.

Signature of Internal Signature of H.O.D

Approved By

Prof. & Head of the Department of Electrical & Electronics Engineering


I

ACKNOWLEDGEMENT

It gives us immense pleasure to express our deepest sense of gratitude and


sincere thanks to our greatly respected guide ASST PROF. PURNANAND
SINGRAUL,in the Department of Electrical and Electronics Engineering,
University Institute of Technology, Shivpuri, for her valuable guidance
encouragement and help for this work.
We express our deep sense of gratitude to ASSOC. PROF. SANJEEV ,
Electrical and electronics Engineering, University Institute of Technology,
Shivpuri, for her keen interest, continued encouragement and support.
Apart from above, we would also like to thanks DR. RAKESH SINGHAI (DIRECTOR UIT
RGPV) , University Institute of Technology, Shivpuri, for his continuous support in our
college days.
We are also thankful to all the staff members of the Department of Electrical and
Electronics Engineering, University Institute of Technology, Shivpuri,for their cooperation in
our work.
Azan Khan

(0967EX201003)

II
UNIVERSITY INSTITUTE OF TECHNOLOGY, SHIVPURI
Department of Electrical & Electronics Engineering

DECLARATION

I am student of Bachelor of Technology, Electrical and Electronics Branch, University


Institute of Technology, Shivpuri hereby declare that the work presented in this dissertation
Major Project of "Power Transmission" is outcome of my own work under the
supervision ASST PROF. PURNANAND SINGRAUL Electrical and Electronics Department,
is bonafide, correct to the best of my knowledge and this work has been carried out taking
care of Engineering Ethics. The work presented does not infringe any patented work and
has not been submitted to any University for die award of any degree or any professional
diploma.

Azan Khan

(0967EX201003)

UIT- RGPV, Shivpuri

Date :
ABSTRACT

Power Transmission : Channeling Industry Power

Imagine a network stretching across vast landscapes, a silent conductor of energy coursing through

invisible channels. Towers of steel and wires, intertwined in a ballet of connectivity, channeling the

lifeblood of industry with effortless grace. This, my friend, is the abstract beauty of power

transmission a symphony of efficiency and reliability, where electrons dance along the paths of

least resistance.Gone are the clunky systems of old, replaced by a fluidity that echoes the fluid

dynamics of nature itself. Each tower stands as a sentinel, guiding the flow of power with

unwavering precision. Lines that once seemed mundane now become the veins of progress,

carrying energy to every corner of civilization.In this symphony, transformers hum in harmony,

stepping up and down the voltage with the finesse of a skilled musician. Substations act as the

grand orchestrators, directing the flow of electricity with the wisdom of experience.
TABLE OF CONTENTS

1. Introduction
2. Block Diagram
3. List of Components
4. Components Specifications
5. Experiment No. 1:
Transmission Line NO Load
6. Experiment No. 2:
Transmission Line Matching
7. Experiment No. 3:
Transmission Line Short Circuit
8. Experiment No. 4:
Transmission Line Mixed Loads
4.1 Mixed Loads - Capacitive Load
4.2 Mixed Loads - Inductive Load
4.3 Mixed Loads - Resistive Inductive Load
4.4 Mixed Loads – Reactive Power Compensation
9. Experiment No. 5:
Series Connection
5.1 Series Connection - Line 1 = 150 km ,Line 2 = 300 km
5.2 Series Connection - Line 1 = 300 km ,Line 2 = 150 km
10. Experiment No. 6:
Parallel Connection
6.1 Parallel Connection - Line 1 = 150 km ,Line 2 = 150 km
6.2 Parallel Connection - Line 1 = 300 km ,Line 2 = 150 km
11. Experiment No. 7:
Symmetric (3-pole) short circuit
12. Experiment No. 8:
Asymmetric Short Circuit
8.1 Single Pole Short Circuit Earth Fault
8.2 Two Pole Short Circuit With Earth Fault
13. Precautions
14. Limitations
15. Future Scope
16. References
Introduction

Power transmission is the vital process of delivering electrical energy from power generation sources
to end-users, ensuring the efficient and reliable distribution of electricity across vast distances. It
encompasses various technologies and systems designed to transmit electricity over long distances with
minimal loss and maximum reliability.

Introduction to Power Transmission:

Electricity, the lifeblood of modern civilization, is generated at power plants using diverse energy
sources such as fossil fuels, nuclear energy, hydroelectricity, wind, and solar power. However, the
locations of these power generation facilities are often distant from the areas where electricity is
consumed, necessitating an intricate network of power transmission infrastructure to deliver electricity
to homes, businesses, industries, and other consumers.

Power transmission begins at the power generation stage, where electricity is produced at high
voltages to minimize energy losses during transmission. High-voltage alternating current (AC) is the
most common method of long-distance power transmission due to its efficiency and the availability
of established transmission infrastructure. Direct current (DC) transmission systems are also used for
specific applications, especially in high-voltage, long- distance transmission and interconnection of
different power grids.

The transmission network comprises overhead lines, underground cables, substations, transformers, and
other equipment designed to transport electricity across vast distances. Overhead transmission lines,
supported by towers or poles, are commonly used for transmitting electricity over land, while
underground cables are preferred in urban areas and environmentally sensitive locations.

Transformers play a crucial role in power transmission by stepping up the voltage for efficient
long-distance transmission and stepping it down to safer levels for distribution to consumers.
Substations serve as hubs within the transmission network, facilitating voltage transformation, system
protection, and control.

In summary, power transmission is the backbone of the electrical grid, enabling the efficient and
reliable delivery of electricity from power plants to consumers. Advances in transmission technology,
grid integration, and renewable energy integration are shaping the future of power transmission, with
a focus on enhancing efficiency, sustainability, and resilience of the electricity infrastructure.

Block Diagram
Types Of Transmission Lines

i) Overhead Transmission Lines: These are the most traditional type of transmission lines and are commonly
seen running along tall towers or poles. Overhead lines can be further categorized based on the type of
conductor used:
(a) Conventional Conductors: Typically made of aluminum or copper.
(b) High-Temperature Conductors: Designed to carry higher currents without significant losses. Examples
include ACSR (Aluminum Conductor Steel Reinforced) and ACCC (Aluminum Conductor Composite
Core).
(c) High Voltage Direct Current (HVDC) Lines: These are a special type of overhead lines used for long-
distance transmission of high-power electrical energy in direct current (DC) form.
ii) Underground Transmission Lines: These are buried underground and are often used in urban areas or
environmentally sensitive areas where overhead lines are not feasible or desired. Underground lines offer
advantages such as reduced visual impact and lower susceptibility to weather-related disturbances but are more
expensive to install and maintain.
iii) Submarine Transmission Lines: These lines are laid on the seabed and are used to connect offshore wind
farms or to interconnect power grids across bodies of water. Submarine transmission lines are typically designed
to withstand the harsh marine environment.
iv) HVDC Transmission Lines: High Voltage Direct Current (HVDC) transmission lines are used for long-
distance transmission of electrical power. HVDC lines have lower electrical losses compared to AC lines over
long distances and can interconnect asynchronous grids.
v) Flexible AC Transmission System (FACTS) Devices: While not transmission lines in the traditional sense,
FACTS devices are installed on transmission lines to control power flow, voltage, and reactive power to
enhance the efficiency and reliability of the grid. Examples include Static VAR Compensators (SVCs) and
Thyristor-Controlled Series Capacitors (TCSCs).
vi) Multi-Circuit Transmission Lines: These are transmission lines that carry multiple circuits (conductors) on the
same set of towers or poles. Multi-circuit lines are used to increase the capacity of the transmission corridor and
reduce the footprint required for new lines.
List of Components

Devices & Software

The table below lists all the devices used in the experiments.

Article number Designation

Transmission line Model 150 km/300 km (93.2 miles/186.4 miles)


CO3301-3A

CO3301-3F Resistive load

CO3301-3E Capacitive load (3-phase, 1 kW)

CO3301-3D Inductive load (3-phase, 1 kW)

CO3301-4X Earth fault compensation unit

CO3301-5G Exciter voltage controller with de-excitation

CO3212-6V Synchronization Unit

Three-phase synchronous machine with smooth core rotor 1kW


SE2682-5Q

CO3636-6Y Servo machine test bench

CO3301-3C Cable Model 12,5 km / 37,5 km (7.8 miles / 23.3 miles)

CO3301-3M Conversion station 380 V/110 V

CO3301-3N Isolating transformer, Three-phase, 1kW

CO3301-3P Three-phase variable transformer with motor drive

CO3301-5P Power switch module

CO3301-3Z (ST8008-4S) Adjustable three-phase supply (0 - 400 V / 2 A, 72 PU)

CO5127-1S Power Quality Meter

CO5127-2A Power-Multimeter
COMPONENTS SPECIFICATIONS

CO3301-3A

Fig. 1: Transmission line model 150 km (93.2 miles) or 300 km (196.4 miles)

Three-phase line simulation of a high voltage overhead power line with different lengths for measuring various
operational states (open-line, matched, short-circuit). Scale factor 1/1000 for current and voltage. Automatic
modification of wire length as soon as the corresponding overlay is in place.

Technical data:
Transmission line length: 150 km (93.2 miles) / 300 km (186.4 miles)
Resistance per phase: 3,6 Ω / 7,2 Ω
Inductance per phase: 115 mH / 230 mH
Capacity per phase:
Line-to-line: 2 x 150 nF (300 nF)
Line-to-ground: 2 x 0,55 µF (1,1 µF) Max

power consumption: 1 kW
Voltage: 3 x 400 V; 50/60 Hz
Current: 2 A
Inputs/outputs: 4mm safety sockets
CO3301-3F

Three synchronously adjustable ring-type variable resistors (bank winding) with scale 750 Ω - 56 Ω,
and fuse in the slider connection.

Fig. 1: Adjustable resistor 750 Ω - 56 Ω

Technical data:
Resistance: 3 x 750 Ω
Current: 3 x 2 A
Suitable for parallel, series, star and delta connections Inputs
and outputs: 4 mm safety sockets
Dimensions: 297 x 456 x 125 mm (H x W x D)
CO3301-3E

Fig. 1: Capacitive load

Technical data:
Three-phase capacitive load
Power: 1 kW
for parallel, series, star and delta circuits
Capacitors: 3 x 2 µF / 4 µF / 8 µF / 30 µF, 450 V
Three groups of MP-capacitor, each consisting of four capacitors.
Inputs/outputs: 4mm safety sockets
Dimensions: 297 x 228 x 125mm (HxWxD)
Weight: 3kg
CO3301-3D

Fig. 1: Three-phase inductive load, 1 kW

Consist of three inductive loads with the following taps:

Inductive load max. Current

1.2 H 0.65 A

1.6 H 0.5 A

2H 0.45 A

2.4 H 0.35 A

2.8 H 0.30 A

3.2 H 0.25 A

for parallel, series, star and delta circuits


Inputs/outputs: 4mm safety sockets Dimensions:
297 x 456 x 125 mm (HxWxD)
Weight: 8 kg
CO3301-3N

This transformer is meant for feeding the transmission line model; scale factor 1:1000 for secondary current and
voltage.

Fig. 1: Three-phase isolating transformer, 1 kW

Technical data - CO3301-3N Isolating transformer, 3-phase


Primary: 3 x 400 V winding
Secondary: 3 x 400 V, 2 A winding and 3 x 30 V, 1.25 A winding Power
rating: 1000 VA; for a short time: 2000 VA
Switching group: Dyn5
Fuse: 1 circuit breaker 1.6 - 2.5 A, adjustable
Inputs/outputs: 4mm safety sockets Dimensions:
297 x 456 x 150 mm
CO3301-3P

The purpose of this variable transformer CO3301-3P is to compensate voltage fluctuations in the event of
changes in load by modifying the transformation ratio. The component can be used as a step-up or step-
down transformer.

Control is performed via the inputs of power quality meter CO5127-1S.

Fig. 1: Three-phase variable transformer with motor drive

Technical data - C03301-3P


Primary: 3x 400 V windings Secondary:
3x 0 ... 450 V, 2 A windings Nominal
power: 1000 VA
Frequency: 50/60 Hz Switching
group: Yan0
24V input/"Increase voltage" button 24V
input/"Decrease voltage" button
Protection: 1 automatic circuit breaker (adjustable)
Inputs/outputs: 4mm safety sockets
Dimensions: 297 x 456 x 150 mm
CO3301-5G

Fig.1: Exciter voltage controller

The exciter voltage controller is used in experiments involving synchronisation.

The de-excitation switch is used in generator protection measures and is responsible for the
disconnection of the generator from the grid and its de-excitation in the event of a fault.

Output: DC 200 V/2 A


2 Inputs for voltage boosting and decreasing 1
Input for de-excitation using a relay
1 Input for switching the DC voltage on
2 Push-buttons for switching the DC voltage on and off
Incremental rotary encoder for setting the voltage Inputs and
outputs: 4-mm safety sockets
Power supply: 230 V, 50/60 Hz Dimensions:
297 x 228 x 190 mm (HxWxD)
Weight: 5 kg

Under the following link you will find the manufacturers manual
CO3301-5P

Fig. 1: Power switch

The voltage can be switch on and off manually or automatically.

Nominal voltage: 200-400 V, 50/60 Hz Control


voltage: 24 V
Nominal operating current: 16 A, ohmic
Functions: 2 pushbutton switches and remote control for switch-off relay
Indicators: signal lamps for "on" and "off"
Contacts: 3 n.o. & 2 auxiliary Inputs/outputs:
4mm safety sockets Dimensions: 297 x 114 x
95 mm (HxWxD)
Weight: 2 kg

Under the following link you will find the manufacturers manual.
CO3212-6V*

Synchronizer unit for synchronization of synchronous generators to the mains electricity grid.

Technical data:
CO3212-6V CO3212-6V2 CO3212-6V6

Operating voltage 3 x 400 V 3 x 220 V 3 x 400 V

Current: 10 A 10 A 10 A

Frequency 47...53 Hz 57...63 Hz 57...63 Hz

Synchronizer display
(3 lamps) to display voltage and phase relationships between the generator and power supply
circuit (bright-dark display)
Zero-voltage meter Double
frequency meter Double
voltage meter Digital
synchronoscope
Synchronizer switch
Dimensions: 297 x 452 x 125mm (H x W x D)
Operation of the Synchronisation unit (with CO3212-5V)

Training content: "Synchronisation unit"


Recognising direction of rotating field
Correct reading of synchronisation unit measuring instruments
Identifying the parameters to be entered in order to connect two 3-phase power systems
together

Rotating field direction


First of all check the direction of the rotating field. A clockwise rotating field is defined in the experiment as
follows: peer along the shaft from the perspective of the black servo machine towards the orange coloured
machine, whereby rotation in the clockwise direction corresponds to a right-hand or clockwise rotating field.

Make sure that your energy source (grid side of synchronisation unit) is providing a
clockwise or right-handed rotating field.

The synchronisation unit is equipped with three lamps which are each connected between the power grid and
the generator:

A so-called dark lamp synchronising method is used. This method involves having the lamps
connected with identical phases.
If the system voltage and the generator voltage are in opposite phase all three lamps light
up as brightly as possible.
If the system voltage and the generator voltage are matched (as far as possible), all of the
lamps go out, thereby indicating that synchronisation has been achieved
Be sure to also use the synchronoscope of the synchronisation unit as an aid.

Figure 1: Setting up a dark lamp synchronisation circuit


Detecting rotating field direction using the synchronisation unit

The synchronisation unit can be used to detect when the rotating field directions between the electricity
grid and the generator differ.

As soon as the line voltage from the grid and the generator voltage are connected to the
synchronisation unit, you can detect whether the fields are rotating in the same direction by
observing the three lamp circuit. Here the generator being powered by the Lucas Nülle servo
machine test stand is being driven in the clockwise direction (positive rpm) when in speed control
mode.
When the frequencies differ slightly (between the grid and the generator), it is important to observe
the synchronoscope over an entire revolution from 12 o'clock to 12 o'clock. The three lamps of the
synchronisation unit should all complete a full dark (12 o'clock) to bright (6 o'clock) and back to
dark (12 o'clock) cycle. In this case wire the system as shown in Figure 1 under Normal.
If in contrast only 1-2 lamps are on at a time and these also move through a cycle during a
revolution of the synchronoscope, then you have fields that are rotating in opposite directions.
Then you need to interchange two of the phases on the power grid side of the synchronisation
unit, as shown in Figure 2 under Swapped:

Figure 2: Swapping of two phases between the electricity supply grid and the synchronisation unit

Operating and taking a reading from the synchronisation unit

Dual-range voltmeter

The dual-range voltmeter permits direct, rapid comparison between the grid or line
voltage and the generator voltage. At the moment of connection to the grid (mains),
both values being displayed must be equal.
Zero voltmeter

The zero voltmeter measures the voltage between L1grid and L1generator. At the
moment of connection to the grid (mains), this value should "ideally" amount to 0
volts.

Dual-range frequency meter

The dual-range frequency meter displays the grid or line frequency (I) and the
generator voltage frequency (II). Both values need to be identical. A more precise
reading of the generator frequency can be taken using the rpm indicator on the
machine test stand.

Note: for CO3212-6V2 the target frecuency would be 60 Hz

Synchronoscope

The synchronoscope indicates the difference between the phase angle of the line or grid
voltage and the phase angle of the generated voltage. The phase angle φ amounts to 0 at
the moment when the green SYNC LED lights up, indicating that connection to the grid
may proceed.
CO3636-6Y

The servo-machine test bench is a complete system for testing electrical machines and drives. It consists of a
digital control unit, a brake and the ActiveServo software. The system combines ease of use with the latest
technology.
It is also possible to carry out manual and automatic synchronisation with the help of the system.
The controller has the following features:

Dynamic and static four-quadrant operation


10 selectable operating modes/machine models (torque control, speed control, flywheel, lifting
drive, roller/calender, fan, compressor, winding gear, arbitrarily defined time- dependent load,
manual and automatic grid synchronisation)
Integrated, galvanically isolated amplifier for voltage and current measurement Display of
speed and torque
Four-quadrant monitor USB
port
Thermal monitoring of the machine under test Monitor
to detect that shaft cover is in place Supply voltage:
400 V, 50 Hz
Maximum power output: 10 kVA
Dimensions: 297 x 460 x 420 mm (H x W x D) Weight:
16.5 kg

The brake is a self-cooled asynchronous servo-brake with resolver.

The motor and sensor leads are connected via polarity-safe plugs. The machine has thermal monitoring and, in
conjunction with the controller, it constitutes a driving and braking system which is free of drift and requires no
calibration.

Maximum speed: 4000 rpm


Maximum torque: 30 Nm
Temperature monitoring: continuous temperature sensor (KTY) Resolver
resolution: 65536 pulses/revolution
Dimensions: 275 x 210 x 210 mm (W x H x D) Weight:
9 kg

ActiveServo is a program for recording characteristics of machines and for determining dynamic and static
operating points. It emulates seven different loads (flywheel, pump, calender, lifting drive, compressor,
winding gear, arbitrarily configurable time-dependent load) for which the parameters can be individually
configured.
Special features:

Measurement, calculation and display of mechanical and electrical variables (speed, torque,
mechanical power output, current, voltage, active, apparent and reactive power, efficiency, power
factor)
Simultaneous display of measured and calculated values (e.g. instant display of efficiency)
Measurement of voltage and current (including RMS values even for non-sinusoidal waveforms)
Speed- or torque-controlled operation
Recording of variables over time
Pre-set for speed or torque limits to prevent excessive loading of device under test Operation in all
four quadrants (display of generated torque)
Arbitrarily defined ramp functions for PC-controlled load experiments
Display of characteristics from several experiments to better illustrate the effect of parameter
changes
Export of graphics and measurement values 32-
bit version for Windows
Experiment No. 1

Transmission Line No-load

Objective
Simulated first in these experiments are the three operating states comprising no-load, matching and short-
circuit for the two line lengths of 150 km and 300 km. Two multimeters can be used to simultaneously
measure all voltages and currents as well as active, reactive and apparent powers at both line ends. The feed
transformer's voltage at the start of the line is to be increased in steps to the specified value in each case.

Wiring instructions

Set up the circuit as illustrated next.

Figure 1.11: Experiment circuit for measurements in the no-load, matching and short-circuit modes
Line length of 150 km:

Please put the overlay mask in place.

at line start at line end

Voltage L1-N (1) V (4) V

Voltage L2-N (2) V (5) V

Voltage L3-N (3) V (6) V

Voltage L1-L2 (7) V (8) V

Current L1 (9) A

Current L2 (10) A

Current L3 (11) A

Active power (12) W

Reactive power (13) var

Line length of 300


at line start at line end

Voltage L1-N (1) V (4) V

Voltage L2-N (2) V (5) V

Voltage L3-N (3) V (6) V

Voltage L1-L2 (7) V (8) V

Current L1 (9) A

Current L1 (10) A

Current L1 (11) A

Active power (12) W

Reactive power (13) var

Compare the measurement results with the calculated values (all calculations are carried out for single-
phases on the basis of the associated phasor diagram).

To determine the voltage rise at the line's open end, it is best to use the voltage measured there to calculate the
voltage at the line's start. The calculations shown next apply according to Figure 1.5.

For a line length of 150 km:

For a line length of 300 km:


The charging power can be ascertained with sufficient precision assuming that the voltages at the start and end
of the line are identical.

In this case:

For a line length of 150 km:

For a line length of 300 km:

The measured and calculated values thus concur quite well.


Experiment No. 2

Transmission Line Matching


Objective

Simulated first in these experiments are the three operating states comprising no-load, matching and short-
circuit for the two line lengths of 150 km and 300 km. Two multimeters can be used to simultaneously
measure all voltages and currents as well as active, reactive and apparent powers at both line ends. The feed
transformer's voltage at the start of the line is to be increased in steps to the specified value in each case.

Wiring instructions

Set up the circuit as illustrated next.

Figure 1.12: Experiment circuit for measurements with purely resistive loads

In the case of both line lengths, the nominal voltage (380 V) is to be set at the start of the line and
maintained at this value through readjustment wherever necessary.
For a line length of 150 km:

Please put the overlay mask in place.

800 100 1,5 400


P1 (L1) [W]

Q1 (L1) [var]

U2 (L1) [V]
I2 (L1) [A]

80
700 350

60 1,2
600 300
40

500 250
20 0,9

400 0 200

-20 0,6
300 150

-40
200 100
-60 0,3

100 50
-80

0 -100 0,0 0
300 400 500 600 700
P2[W]

For a line length of 300 km:

Please remove the overlay mask


150 1,5 400
P1 (L1) [W] 800

Q1 (L1) [var]

U2 (L1) [V]
I2 (L1) [A]
120
700 350

90 1,2
600 300
60

500 250
30 0,9

400 0 200

-30 0,6
300 150

-60
200 100
-90 0,3

100 50
-120

0 -150 0,0 0
300 400 500 600 700
P2[W]

What can be said about the sign of the reactive power fed into the line?

At low power levels, the line acts as an inductance (reactive power


has a negative sign). The line's behaviour is then said to be below
the natural level. At high power levels, however, the line acts as a
capacitance (reactive power has a positive sign). The line's
behaviour is then said to be above the natural level. The load itself
neither consumes nor produces reactive power.
At low power levels, the line acts as a capacitance (reactive power
has a negative sign). The line's behaviour is then said to be below
the natural level. At high power levels, however, the line acts as an
inductance (reactive power has a positive sign). The line's
behaviour is then said to be above the natural level. The load itself
neither consumes nor produces reactive power.
At low power levels, the line acts as a capacitance (reactive power
has a negative sign). The line's behaviour is then said to be above
the natural level. At high power levels, however, the line acts as an
inductance (reactive power has a positive sign). The line's
behaviour is then said to be below the natural level. The load itself
neither consumes nor produces reactive power.
Situated between these ranges is the operating state known matching. The supplied reactive power is now at its
minimum value (theoretically zero).

This operating point is to be found by slowly changing the load resistance, starting from its maximum
value.

Measurement values during matching (line length of 150 km and supply voltage of 380 V):

line start line end

PLoad (natural power in this case) -- (1) W

UL1 - L2 -- (2) V

IL1 (3) A (4) A

ΣP (5) W --

ΣQ (6) var --

Measurement values during matching (line length of 300 km and feed voltage of 380 V):
line start line end

PLoad (natural power in this case) -- (1) W

UL1 - L2 -- (2) V

IL1 (3) A (4) A

ΣP (5) W --

ΣQ (6) var --

The equation or is used to calculate the corresponding


load resistance which also represents the characteristic impedance (U2Δ is the line-to-line voltage
across the load).

Evaluate the line resistances.

For a line length of 150 km: R = ZW = Ohm

For a line length 300 km: R = ZW = Ohm

For the purpose of monitoring, this resistance can naturally also be measured by means of an ohmmeter with the
load disconnected.

Here too, a comparison is performed with the theoretically expected value for a lossless line for both line lengths
(the characteristic impedance is independent of the line length).

lossless line: ZW = √(L / CB) = Ohm


The deviation between the measured and theoretical values is explained by the fact that the nominal voltage was
not present across the load during the experiment, due to the line's active resistance.

Finally, the measured values are used to determine the efficiency during matching for both
line lengths:

Efficiency η150 = (P2 / P1) = %

Efficiency η300 = (P2 / P1) = %


Experiment No. 3

Transmission Line Short Circuit


Objective

Simulated first in these experiments are the three operating states comprising no-load, matching and short-
circuit for the two line lengths of 150 km and 300 km. Two multimeters can be used to simultaneously
measure all voltages and currents as well as active, reactive and apparent powers at both line ends. The feed
transformer's voltage at the start of the line is to be increased in steps to the specified value in each case.

Wiring instructions

Set up the circuit as illustrated next.

Figure 1.13 Experiment circuit for short-circuit measurements

To study the response in the event of a three-pole (symmetric) short circuit, the resistive load is
disconnected, and the three outer conductors connected to each other as well as the return
conductor
Increase the line-to-line voltage at the start of the line to 110 V and measure the variables indicated below.

For a line length of 150 km:

Please put the overlay mask in place.

line start at line end

UL1 - L2 (1) V --

IL1 (2) A (3) A 150 km!

ΣP (4) W --

ΣQ (5) var --

For a line length of 300 km:

Please remove the overlay mask


line start at line end

UL1 - L2 (1) V --

IL1 (2) A (3) A 300 km!

ΣP (4) W --

ΣQ (5) var --

How can the measurement results be interpreted?

The current at the start of the line is lower than at the shorted line
end. This is explained by the influence of the working capacitance.
The measurement results show that the line mainly consumes
inductive reactive power in the event of a short circuit.
As shown for a lossless line in Figure 6.7, the short-circuit current
is purely capacitive and reduced by the inductive transverse current
at the end of the line. However, the difference between the two Several answers
amperages is minimal. may be correct.
As shown for a lossless line in Figure 6.7, the short-circuit current
is purely inductive and reduced by the capacitive transverse current
at the end of the line. However, the difference between the two
amperages is minimal.

Note:
In this experiment, the currents were measured only in the steady state. The initial values
occurring on a short circuit of relatively short lines in meshed networks with multiple feeds can
be much higher. Unbalanced and earth faults, of equal importance to the design of protective
equipment, are treated in a separate experiment.
Experiment No. 4

Transmission Line Mixed loads

Objective:

The most important case in practice is a supply for mixed resistive-inductive loads. Investigated beforehand,
however, is the line response in the case of purely capacitive and inductive loads.

All the tests are conducted again at the nominal voltage of UL-L=380 V. All
experiments here are conducted with a line length of 150 km
Experiment No. 4.1

Capacitive load

Wiring instructions
For measurements with capacitive loads, assemble the circuit as shown next.

Figure 1.14: Experiment circuit for measurements with purely capacitive loads

Figure 1.14 shows a capacitive load connected in a star. However, the capacitance values
must be set according to the following description.
For a line length of 150 km:

Please put the overlay mask in place.

Connect the capacitor in star configuration, and set the voltage at the start of the line to a constant
value of 340 V; perform any readjustment necessary to avoid excess voltages at the end of the line.
Enter the values of the specified parameters in the table below. The power levels again comprise
total values.

400
U2 (L1-L2) [V]

390

380

370

360

350

340

330

320

310

300
2 4 6 8 10 12
C [µF]
How does the voltage at the line's end depend on the connected capacitance?

Evidently, the voltage at the end of the line rises


disproportionately with increasing inductive load. This can be
explained by the Ferranti effect, as already described in the
case of no-load.
Evidently, the voltage at the end of the line rises
disproportionately with increasing capacitive load. This can
be explained by the Ferranti effect, as already described in
the case of no-load.
Evidently, the voltage at the end of the line rises
disproportionately with increasing resistive load. This can be
explained by the Ferranti effect, as already described in the
case of no-load.
Experiment No. 4.2

Inductive load

Wiring instructions
For measurements with purely inductive loads, assemble the circuit as shown next.

Figure 1.15: Experiment circuit for measurements with purely inductive loads

Connect the inductive load in star configuration.


Set the voltage at the start of the line to 380 V; perform any necessary readjustments.
Enter the values of the specified parameters in the table below. The power levels again comprise total
values.
400
U2 (L1-L2) [V]

390

380

370

360

350

340

330

320

310

300
1,0 1,2 1,4 1,6 1,8 2,0 2,2 2,4 2,6 2,8 3,0 3,2
L [H]

How does the voltage at the end of the line depend on the connected inductance?

In the case of inductive loads, the voltage at the start of the


line drops as the load increases (i.e. as the inductance
increases). The line behaves similarly to a purely resistive
load.
In the case of inductive loads, the voltage at the end of the
line drops as the load decreases (i.e. as the inductance
decreases). The line behaves similarly to a purely resistive
load.
In the case of inductive loads, the voltage at the end of the
line drops as the load increases (i.e. as the inductance
decreases). The line behaves similarly to a purely resistive
load.
Experiment No. 4.3

Resistive-inductive loads

Besides purely resistive loads (lighting, process heat), operations in a real power network also involve
numerous loads of a resistive-inductive nature (transformers, electric motors). The overall power factor cos φ
in this case usually ranges between 0.8 and 0.9. These load cases are accordingly given due consideration
below. All experiments here are conducted with a line length of 150 km.

For tests involving mixed resistive-inductive loads, assemble the circuit as shown next.

Figure 1.16: Experiment circuit for measurements with mixed resistive-inductive loads

Connect the inductor and load resistor in parallel and star-configuration in each case.
Set the voltage at the start of the line to 380 V and perform any necessary readjustments.
Note the values of the exemplified variables in the table. The power levels again comprise total
values.
Measured values for L = 3.2 H and a load adjusted (starting with large values of R) so as to
consume an active power of 300 W:

at line start line end

UL1 - L2 -- (1) V

IL1 (2) A (3) A

ΣP (4) W --

ΣQ (5) var (6) var

Cos φ (Load) -- (7)

Measured values for L = 2.0 H and a load adjusted (starting with large values of R) so as to
consume an active power of 400 W:

at line start line end

UL1 - L2 -- (1) V

IL1 (2) A (3) A

ΣP (4) W --

ΣQ (5) var (6) var

Cos φ (Load) -- (7)


Measured values for L = 1.2 H and a load adjusted (starting with large values of R) so as to
consume an active power of 500 W:

at line start line end

UL1 - L2 -- (1) V

IL1 (2) A (3) A

ΣP (4) W --

ΣQ (5) var (6) var

Cos φ (Load) -- (7)

As an example, the results of the last measurement are to be checked through calculation.

Perform single-phase calculations on the basis of the phasor diagram in Figure 1.8. The load's active power
at the measured voltage results in the following active current:

The inductive load of 1.2 H results in the following reactive current:

Accordingly, the complex current at the end of the line is value of

The following applies to the load's power factor: and

The transverse current due to half the working capacitance at the end of the line is:

(star voltage U2 = 197.46 V).


The longitudinal current along the line is
Consequently,

If R = 3.6 Ω and X = 36.15 Ω (line values) are used, then and

The voltage at the start of the line is U1Δ = 379.5 V

The transverse current due to half the working capacitance at the start of the line is:

Consequently, the current flowing through the line is ; value of I1 =


0.923 A.

The (total) apparent power consumed by the line is: (I1 * is the conjugated, complex value of
I1).

After multiplication, the active power is:

P1 = 510 W and the reactive power is Q1 = 329 var.

*The minor differences compared to the measured values can be explained by component tolerances.
Experiment No. 4.4

Reactive power compensation

A load state involving a poor power factor will now be simulated in order to demonstrate the possibility
of reactive power compensation.

Measured values for L = 1.2 H and a load adjusted (starting with large values of R) so as to
consume an active power of 300 W:

at line start line end

UL1 - L2 -- (1) V

IL1 (2) A (3) A

ΣP (4) W --

ΣQ (5) var (6) var

Cos φ (Load) -- (7)

A capacitance of 3 x 4 µF is now to be star-connected in parallel with the RL load, and the


measurement repeated. The voltage at the start of the line is to be maintained at a constant
value of 380 V, and the resistive load adjusted so as to consume 300 W again.

at line start line end

UL1 - L2 -- (1) V

IL1 (2) A (3) A

ΣP (4) W --

ΣQ (5) var (6) var

Cos φ (Load) -- (7)


Repeat the experiment with a capacitance of 3 x 8 µF in a star-connection. The voltage at
the start of the line is to be maintained at a constant value of 380 V, and the resistive load
adjusted so as to consume 300 W again.

at line start line end

UL1 - L2 -- (1) V

IL1 (2) A (3) A

ΣP (4) W --

ΣQ (5) var (6) var

Cos φ (Load) -- (7)

What do the measurement results indicate?

Clearly, the load's power factor is improved by the compensation


capacitance, even nearly to a value of one in the last case.
Compensation increases the voltage across the consumer and
lowers the current flowing via the line.
This also reduces transmission losses, evident from the lower
active-power consumption of the line given a constant load at its
end.
Clearly, the load's power factor is improved by the compensation
capacitance, even nearly to a value of one in the last case.
Compensation increases the voltage across the consumer and
lowers the current flowing via the line.
This also increases transmission losses, evident from the lower
active-power consumption of the line given a constant load at its
end.

A computational verification of these capacitance values using the equations stated in section "Theoretical
Fundamentals" is somewhat complicated, because of the different voltages present at the end of the line during
the measurement series, and the need to account for the influence of the line's working capacitance.
For a line length of 300 km

Please remove the overlay mask.

As described in chapter on theoretical fundamentals, series compensation can be performed in the case of long
transmission lines to avoid excessively high voltage drops along them.

This is achieved with the circuit shown in Figure 1.15, but for a line length of 300 km this time.
First, the line is operated in the uncompensated mode. The
supply voltage is set to 400 V at the start of the line.

Measured values for L = 2.0 H and the load R adjusted so as to consume an active power of
500 W:

at line start line end

UL1 - L2 -- (1) V

IL1 (2) (3) V

ΣP (4) W --

ΣQ (5) var (6) var

Cos φ (Laoad) -- (7)

The experiment demonstrates that the load at the end of a long line causes an impermissible high voltage drop.

A series capacitor can be used to reduce this drop. Three individual capacitances with the value

are required for full compensation.


At a length of 300 km, the line model has a reactance XL = 72.3 Ω, so that C = 44 µF. In the experiment, this
value can be realized by a parallel connection of capacitors rated respectively at 30, 8, 4 and 2 µF.

The three capacitances formed in this manner are to be connected between the end of the line and
the multimeter in each case.
This permits continued measurement of the sought variables across the load.

Figure 1.17: Compensation with series capacitor


The resistive load is to be readjusted until a consumption of 500 W is achieved again, and
the same variables as those in the uncompensated state are to be measured:

at line start line end

UL1 - L2 -- (1) V

IL1 (2) (3) V

ΣP (4) W --

ΣQ (5) var (6) var

Cos φ (Laoad) -- (7)

What has changed compared with the uncompensated state?

Evidently, series compensation raises the voltage across the


load to the value of the supply voltage. At the same power
level, this causes a reduction in the line's current load.
Evidently, series compensation lowers the voltage across the
load to the value of the supply voltage. At the same power
level, this causes a reduction in the line's current load.
Experiment No. 5

Series connection

Experiment procedure
The experiments are performed with a supply voltage of 400 to 420 V (line-to-line voltage). Various
combinations of differently long lines are studied here.

Two multi-meters and one analog-digital multimeter can be used to measure the relevant parameters
comprising voltage, current as well as active and reactive power at different points of the circuit. The load is
formed by a parallel connection of an inductance and a resistive load. Set the inductance to 2 H and the
resistance to about 200 Ω before turning on the power. This prevents occurrence of an excessively high voltage
at the end of the two lines due to the Ferranti effect.

Wiring instructions
Set up the circuit as illustrated below.

A capacitance of 3 x 4 µF is now to be star-connected in parallel with the RL load, and the


measurement repeated. The voltage at the start of the line is to be maintained at a constant
value of 380 V, and the resistive load adjusted so as to consume 300 W again.
Experiment No. 5.1

Line 1 → 150 km; Line 2 → 300 km

Experiment procedure
In the next measurement, line 1 is left at a length of 150 km, and line 2 switched to 300 km.

Please remove the overlay mask from the second line model.

The voltage at the start of line 1 is to be maintained at a constant level of 242 V. The
resistive load will be re-adjusted to achieve a load current of 1 A again.
Measure the variables specified next.

650
P [W]

600

550

500

450

400

350

300

250

200

150

100

50

0
TL1 TL2 Load
Experiment No. 5.2

Line 1 → 300 km; Line 2 → 150 km

Experiment procedure
Now let us consider the reverse situation, i.e. line 1 is switched to 300 km, and line 2 to 150 km.

Please remove the mask from the first line model and place the mask on the second line
model.

The voltage at the start of line 1 is to be kept constant at 242 V.


The resistance is readjusted so as to achieve a load current of 1 A again. Measure the
parameters listed next.

650
P [W]

600

550

500

450

400

350

300

250

200

150

100

50

0
TL1 TL2 Load

These two experiments clearly indicate that the higher voltage drop occurs across the longer line.
Experiment No. 6

Parallel connection

Experiment procedure
The experiments are performed with a supply voltage of 400 to 420 V (line-to-line voltage). Various
combinations of differently long lines are studied here.

Two multi-meters and one analog-digital multimeter can be used to measure the relevant parameters
comprising voltage, current as well as active and reactive power at different points of the circuit. The load is
formed by a parallel connection of an inductance and a resistive load. Set the inductance to 1,2 H and the
resistance to about 200 Ω before turning on the power. This prevents occurrence of an excessively high voltage
at the end of the two lines due to the Ferranti effect.

Wiring instructions

Set up the circuit as illustrated next.


Figure 2.6: Experiment circuit for measurements on two parallel-connected lines
Experiment No. 6.1

Line 1 → 150 km; Line 2 → 150 km

Experiment procedure
Two lines connected in parallel exhibit a lower voltage drop, so that a lower supply voltage is sufficient here.
Furthermore, a parallel connection is capable of transmitting higher powers.

Before turning the supply voltage on, set the inductance to 1.2 H and the resistance to about 200
Ω. This prevents occurrence of an excessively high voltage at the end of the two lines due to the
Ferranti effect.
First, we will operate two lines with a length of 150 km in parallel.

Please put both overlay masks in place.

The voltage at the beginning of the two lines is to be set to 230 V (400 V / √3), and The
resistance readjusted to achieve a load current of exactly 1.6 A.
Select the current display on the power multimeter by pressing the I button.
Measure the parameters listed next.

1000
P [W]

900

800

700

600

500

400

300

200

100

0
TL1 TL2 Load
Experiment No. 6.2

Line 1 → 300 km; Line 2 → 150 km

Experiment procedure
Now lengthen the line model 1 to 300 km and repeat the test procedure from above

Please remove the overlay mask from the second line model.

The voltage at the beginning of the two lines is to be set to 230 V (400 V / √3), and The
resistance readjusted to achieve a load current of exactly 1.6 A.
Select the current display on the power multimeter by pressing the I button.
Measure the parameters listed next.

1000
P [W]

900

800

700

600

500

400

300

200

100

0
TL1 TL2 Load

As a check, the experiment can be repeated with interchanged cable lengths. The results should be identical
except for measurement inaccuracies.

As an example, the results of this measurement are to be checked in a calculation. According to the
equations derived in Section 2.3.2, the equivalent resistance R = 2.4 Ω and the equivalent reactance X =
24.1 Ω. In the case of two lines connected in parallel, their working capacitances add up to CB = 6 µF.
Performing the calculation on the basis of the phasor diagram in Figure 2.3 results in the following values:

Current at the end of the line I2 = (1.502 - j 0.591) A; value of 1.614 A.

I20 = j 0.201 A,

I2 = (1.502 - j 0.39) A,

U1 = (226.07 + j 35.27) V; value of U1 = 228.8 V,

I10 = (-0.033 + j 0.213) A,

I1 = (1.469 - j 0.178) A; value of I1 = 1.48 A

The powers are therefore determined as follows: P1 = 977.3 W and Q1 =275.8 var
Experiment No. 7
Symmetric (3-pole) short circuit

Experiment procedure
Because of the high currents occurring in the event of a failure, the line model is operated at a rated voltage of
110 V during the experiments. At this rated voltage, too, the model realistically reproduces the values R, L and
CB. The measurements are carried out at a line length of 300 km. Two multi- meters can be used to
simultaneously measure all voltages and currents at both line ends.
Increase the voltage of the feeding transformer at the start of the line in small increments to the specified value,
making sure that the maximum permissible amperage (2.5 A) is not exceeded anywhere. All short-circuit tests
should be carried out expeditiously at the specified supply voltage. The current should be switched off as soon
as the desired readings have been obtained.

Measurement of zero-sequence impedance


The line's zero-sequence impedance must be known in order to analyze the line's response to asymmetric short
circuits too. This is achieved by means of the test circuit shown below. The negative-sequence impedance need
not be determined separately, being equal to the positive- sequence impedance in the case of static systems
such as transmission lines. We will only conduct a measurement at a line length of 300 km.
Figure 3.12: Test circuit for determining zero-sequence impedance

All three phases of the line are connected to a single alternating voltage, the earth or earth wire serving as the
return conductor. This is neutral conductor N in the case of the line model. The zero sequence impedance is the
ratio between the applied voltage and measured current. Note that the zero current I0 flowing through each of
the conductors increases by a multiple of three (3 · I0) in the return conductor.

Conduct the measurement at a voltage of 110 V.

Current I0 in an outer conductor at the line's end 0.42 A

Consumed active power 3 · P0 28.2 W

Consequently, the value of the zero-sequence impedance

The power measurement can be used to determine the active component of Z0:
The active power consumed by the whole line was measured. Accordingly, P0 = 9.4 W are distributed
proportionally among each of the conductors and the return conductor.

R0 is determined from the equation and the reactive component

The result is to be compared with a calculated value:

According to section "Theoretical fundamentals", .

If and are used, then


For comparison, a three-pole short circuit is analyzed first.

Wiring instructions

Set up the circuit as illustrated below; after the right-hand multimeter, connect the three outer
conductors to each other and to the neutral conductor.

Figure 3.13: Test circuit for measurements in the event of a 3-pole short circuit

After the right multimeter the three outer conductors are connected to each other and to the
neutral conductor.
The outer conductor voltage (UL-L) at the beginning of the line is increased to the value
110 V.
The following values are then measured for a line length of 300 km:
at line start at line end

UL1 - L2 (1) V --

Isc 3pol -- (2) A

ΣP (3) W --

ΣQ (4) var --

The power measurement reveals that the reactive power component predominates in the event of a short circuit.
This is easily understandable, because any existent load resistances are bridged during the short circuit, and a
high-voltage line's reactance is always much higher than its active resistance.

What happens when the connection to the neutral conductor is removed?

Because a symmetric short circuit is involved, the measured


values do not change. In the case of a three-pole short
circuit, the return conductor remains de-energized (except for
minor asymmetries attributable to the components).
The current at the end of the line drops due to an absence of
compensation via the neutral conductor.
The voltage at the start of the line rises due to the decrease
in the load.

Compare the measurement result with the calculated value: Relationship

for the short-circuit current:

A value of is to be used for the driving voltage E’’. Moreover,


the line impedance .

Consequently, the value of the 3-pole short-circuit current is


Experiment No. 8

Asymmetric short circuit


Objective:

To determine the currents and voltages for unbalanced faults, the circuit only needs to be slightly modified. The
same types of faults as specified in the theoretical part are simulated.

Experiment No. 8.1

Single-pole short circuit (earth fault)

Wiring instructions

The circuit is to be set up according to the following diagram:

Figure 3.14: Test circuit for measurements in the event of a single-pole short circuit
After the second multimeter, connect outer conductor L1 to the neutral conductor.
The phase-to-phase voltage at the beginning of the line is increased up to the value 110 V.
Measure the following values :
at line start at line end

UL1 - L2 (1) V --

Isc 1pol -- (2) A

UL2 - E -- (3) V

UL3 - E -- (4) V

Compare the measurement results with the calculated values (ascertained using the method of symmetric
components).

Relationship for the short-circuit current:

A value of is to be used for the driving voltage E’’. Moreover,


and

Accordingly, ; with value equal 415.4 Ω.

The single-pole short-circuit current (value) is: I sc 1-pole = 0.46 A.

A detailed calculation of the intact line-to-earth voltages is dispensed with here.

According to the equations in the previous section, these voltages have the following values: U2 = 81 V and U3
= 84 V.
Experiment No. 8.2

Two-pole short circuit with earth fault

Wiring instructions

The circuit is to be set up according to the following diagram:

Figure 3.15: Test circuit for measurement in the event of a 2-pole short circuit

After the right-hand multimeter, connect outer conductors L2 and L3 together and to the neutral
conductor.
Use an additional ammeter to measure the sum I sc 2-pole of the two currents.
The phase-to-phase voltage at the beginning of the line is increased up to the value 110 V.
The following parameters are then measured:
Precaution

i. Proper Training: Ensure that personnel involved in power transmission are well-trained in safety

procedures, equipment operation, and emergency response protocols.

ii. Protective Gear: Workers should wear appropriate personal protective equipment (PPE), including

gloves, helmets, safety glasses, and flame-resistant clothing, to minimize the risk of injury.

iii. Isolation: Always isolate the transmission line before performing maintenance or repair work to prevent

accidental energization.

iv. Lockout-Tagout (LOTO): Implement LOTO procedures to securely isolate energy sources and prevent

unintentional activation of equipment while maintenance or repair work is being carried out.

v. Clearance: Maintain safe clearance distances between workers, equipment, and energized parts to

prevent electric shock or arc flash incidents.

vi. Grounding: Ensure proper grounding of equipment and structures to dissipate electrical charges and

minimize the risk of electric shock.

vii. Maintain Safe Distances: Maintain safe distances from overhead power lines and equipment to prevent

accidental contact. Be especially cautious when operating cranes, lifts, or other tall equipment near

power lines.

viii. Grounding: Ensure proper grounding of equipment and structures to prevent the buildup of static

electricity and mitigate the risk of electric shock.

ix. Weather Awareness: Be mindful of weather conditions, such as high winds, lightning, or ice

accumulation, which can increase the risk of power transmission accidents. Take appropriate

precautions, such as suspending work during storms.


Limitation

i. Distance Limitations: Electricity transmission over long distances incurs losses due to resistance
in the transmission lines. These losses increase with distance, limiting the range over which power
can be efficiently transmitted without significant loss.

ii. Grid Congestion: In densely populated areas or regions with high energy demand, the power grid
may become congested, leading to bottlenecks in transmission capacity. This can result in
inefficiencies and potential reliability issues.

iii. Voltage Drop: As electricity travels through transmission lines, there is a natural voltage drop
due to resistance. Maintaining voltage levels within acceptable limits over long distances requires
careful engineering and the use of voltage regulation equipment.

iv. Environmental Impact: The construction and operation of power transmission infrastructure
can have significant environmental impacts, including habitat disruption, deforestation, and
visual pollution. These considerations must be weighed when planning new transmission
projects.

v. Right-of-Way Challenges: Acquiring rights-of-way for new transmission lines can be


challenging due to land ownership issues, environmental regulations, and community opposition.
This can delay or hinder the expansion of transmission capacity in areas where it is needed.

vi. Intermittent Generation Sources: The integration of renewable energy sources, such as wind
and solar power, into the grid presents challenges for power transmission. These sources are
often located in remote areas far from population centers, requiring new transmission
infrastructure to connect them to the grid.

vii. Cybersecurity Risks: The increasing digitization of power transmission systems introduces
cybersecurity risks, including the potential for cyberattacks targeting critical infrastructure.
Protecting transmission networks from malicious actors requires robust cybersecurity measures
and ongoing vigilance.

viii. Aging Infrastructure: Much of the existing power transmission infrastructure is aging and
in need of upgrades or replacement. Aging infrastructure can be prone to failure and may not
be capable of meeting modern energy demands or accommodating new technologies.

ix. Cost: Building new transmission infrastructure, especially over long distances or in challenging
terrain, can be expensive. Cost considerations, along with regulatory and permitting requirements,
can delay or deter investment in new transmission projects.
FUTURE SCOPE

The future of power generation is poised to undergo transformative changes driven


by technological advancements, environmental concerns, and evolving energy
needs. Several key trends and innovations are likely to shape the landscape of
power generation in the coming decades:

1. Renewable Energy Expansion :


Renewable energy sources, particularly solar and wind, are expected to dominate
future power generation. Advances in photovoltaic technologies, such as perovskite
solar cells, and improvements in wind turbine efficiency will significantly increase the
capacity and reliability of these sources. The integration of renewable energy into the
grid will be facilitated by smart grid technologies and energy storage solutions.

2. Energy Storage Innovations :


The development of advanced energy storage systems, including lithium-ion
batteries, solid-state batteries, and flow batteries, will address the intermittent nature
of renewable energy. These storage solutions will enable the stable supply of
electricity, even when renewable sources are not actively generating power.
Furthermore, large-scale storage projects, such as pumped hydro and compressed air
energy storage, will play a crucial role in balancing supply and demand.

3. Smart Grids and Digitalization :


The implementation of smart grids will revolutionize the management and
distribution of electricity. These grids will leverage digital technologies, IoT devices,
and advanced analytics to optimize energy flow, detect and respond to faults in real-
time, and integrate distributed energy resources (DERs) more efficiently.
Consumers will benefit from greater control over their energy usage and costs
through smart meters and demand response programs.

4. Decentralized Power Generation :


Distributed energy generation, including rooftop solar panels, small-scale wind
turbines, and community energy projects, will become more prevalent. This
decentralized approach reduces transmission losses, enhances energy security,
and empowers consumers to become prosumers (producers and consumers of
energy). Microgrids, capable of operating independently from the main grid, will
support this trend by providing reliable power in remote or disaster-prone areas.
REFERENCES

1. IEEE Xplore Digital Library :


- Xu, L., & Li, H. (2011). "Research on HVDC Technology." IEEE Transactions
on Power Delivery, 26(2), 643-651.
- Available at: https://ieeexplore.ieee.org/document/5678447

2. Energy.gov (U.S. Department of Energy) :


- U.S. Department of Energy. (2015). "Quadrennial Technology Review: An
Assessment of Energy Technologies and Research Opportunities."
- Available at: https://www.energy.gov/quadrennial-technology-review-2015

3. International Energy Agency (IEA) :


- International Energy Agency. (2019). "World Energy Outlook 2019."
- Available at: https://www.iea.org/reports/world-energy-outlook-2019

4. National Renewable Energy Laboratory (NREL) :


- National Renewable Energy Laboratory. (2020). "Power Sector Transformation
Pathways: Key Concepts and International Case Studies."
- Available at: https://www.nrel.gov/docs/fy20osti/75193.pdf

5. World Bank Group :


World Bank Group. (2017). "Global Tracking Framework 2017: Progress Toward
Sustainable Energy."
Available at: https://www.worldbank.org/en/topic/energy/publication/global-
trackingframework-2017

6. International Journal of Electrical Power & Energy Systems :


- Zhang, N., & Tang, G. (2014). "Research on the Development of HVDC and VSC-
HVDC Technologies in Power Transmission Systems." International Journal of
Electrical Power & Energy Systems, 60, 1-11.
- Available at: https://www.sciencedirect.com/science/article/pii/S0142061514000660

7. Electric Power Research Institute (EPRI) :


- Electric Power Research Institute. (2016). "The Integrated Grid: A
Benefit-Cost Framework."