0% found this document useful (0 votes)
539 views

BBS Raft Foundation

Uploaded by

Irfan Pathan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
539 views

BBS Raft Foundation

Uploaded by

Irfan Pathan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 40

Project Implementation Unit (PIU) KWSSIP, Karachi Water and Sewerage Corporation (KW&SC)

Contract Package KA-1


Rehabilitating Water Supply and Sewerage in Soba Nagar
Bar Bending Schedule of Raft Foundation

Ref construction drawings

Shop Drawings

Sr# DESCRIPTION STEEL IN KG

SUMMARY FOR STEEL

1 Total Bar # 3 in Kg………………………………………………………………………………………………………… -

2 Total Bar # 4 in Kg…………………………………………………………………………………………………………

3 Total Bar # 5 in Kg…………………………………………………………………………………………………………… -

4 Total Bar # 6 in Kg …………………………………………………………………………………………………………

5 Total Bar # 8 in Kg ………………………………………………………………………………………………………… -

TOTAL STEEL (IN KG) -

SUBMITTED BY: HSAB APPROVED BY: NESPAK

NAME: …………………………………………. NAME: .…………………………………………………..

SIGNATURE: ……………………………….. SIGNATURE: ……………………………………………


DATE: ………………………………………… DATE: ……………………………………………………..
Bar Dia Wt (lbs/ft) Wt (kg/ft)
#3 0.376 0.171
#4 0.668 0.303
#5 1.043 0.473
#6 1.502 0.681
#7 2.044 0.927
#8 2.67 1.211
Project Implementation Unit (PIU) KWSSIP, Karachi Water and Sewerage Corporation (KW&SC)
Contract Package KA-1
Rehabilitating Water Supply and Sewerage in Soba Nagar
Water Storage Tanks
Bar Bending Schedule of Slab at FFL (0'-0")

No. of Bars Total


Location Bar Nos of Bar Total Nos Cut Length
Sr. No. in each Bar Length Bar Shape
Top/Bottom Size Member C/C of Bars of each
member (ft.) (ft.)

BOTTOM BAR

8.5" 8.5"
1 B1 #4 1 6" 52 52 30.17 1,568.84 28'-9"

8.5" 8.5"
2 B2 #4 1 6" 52 52 30.17 1,568.84 28'-9"

8"
3 Extra bar #4 1 6" 208 208 9.17 1,907.36 8'-6"

TOP BAR

8.5" 8.5"
1 T1 #4 1 8" 40 40 30.17 1,206.80 28'-9"

8.5" 8.5"
2 T2 #4 1 8" 40 40 30.17 1,206.80 28'-9"

8"
3 Extra bar #4 1 8" 160 160 9.170 1,467.20 8'-6"

Size of Bar #4 Total (kgs)=

Unit Weight 0.302

Total Length 8,925.84 2,695.60

Weight (Kgs) 2,695.60

Page 4 of 40
Project Implementation Unit (PIU) KWSSIP, Karachi Water and Sewerage Corporation (KW&SC)
Contract Package KA-1
Rehabilitating Water Supply and Sewerage in Soba Nagar

Water Storage Tanks

Bar Bending Schedule of Beams at EL(14'-0")

No. of
Nos of Bar Bars in Total Nos Cut Length of Total Length
Sr. No. Location Bar Size Bar Shape
Member C/C each of Bars each Bar (ft.) (ft.)
member

Bottom Main Bar B1

17'-9" 13"
1 Bar Mark 1 #8 4 4 16 19.920 318.72 13"

13" 17'-9" 13"


2 Bar Mark 3 #8 4 4 16 19.920 318.72

13" 17'-9" 13"


3 Bar Mark 5 #8 4 4 16 19.920 318.72

4 Bar Mark 8 #4 4 2 8 17.75 142.00 17'-9"

12"
Stirrup
5 #4@4" c/c at #4 8 4" 17 136 5.00 680.00 3" 15"
(L/4)

Bottom Main Bar B2

13" 17'-9" 13"


6 Bar Mark 1 #8 2 3 6 19.920 119.52

13" 17'-9" 13"


7 Bar Mark 3 #8 2 2 4 19.920 79.68

Page 5 of 40
Project Implementation Unit (PIU) KWSSIP, Karachi Water and Sewerage Corporation (KW&SC)
Contract Package KA-1
Rehabilitating Water Supply and Sewerage in Soba Nagar

Water Storage Tanks

Bar Bending Schedule of Beams at EL(14'-0")

No. of
Nos of Bar Bars in Total Nos Cut Length of Total Length
Sr. No. Location Bar Size Bar Shape
Member C/C each of Bars each Bar (ft.) (ft.)
member

3'-7.5"
Bar Mark 4
8 #8 4 2 8 4.625 37.00

9"
@ support 13"

6'-0"
Bar Mark 4
9 #8 2 2 4 6.00 24.00
@ Mid span

12"
Stirrup
10 #3@4" c/c at #3 4 4" 11 44 5.00 220.00 3" 15"
(L/4)

12"

Stirrup 3" 15"


11 #3@6" c/c at #3 4 7 28 5.00 140.00
(L/4)

Page 6 of 40
N (PIU) KWSSIP, Karachi Water and Sewerage Corporation (KW&SC)
Project Implementation Unit
o
. Contract Package KA-1
o
Rehabilitating Water Supply and Sewerage in Soba Nagar
f
Water Storage Tanks
B
a
Bar Bending Schedule of UGWT Walls
r
s

Nos of Bar i
Sr. No. Location Bar Size Member C/C n Total Nos of Bars Cut Length of each Bar (ft.) Bar Shape

e
Walls of UGWT a
c
h

m
Main Bars e 6'-6"
Walls #6 4 7" ###
m 336 7.50
b
e
r 12"

8"
Main Bars
Walls #4 4 7" ### 336 12.25 11'-7"
11'-7"

2'-1" 27''-4"
Distribution
Inner Face #4 4 5" ### 124 29.41

Distribution 2'-1"
Outer Face #4 4 5" ### 124 30.75 28''-8"

SUMMARY OF STEEL
Size of Bar #6 #4 #3 Total (kgs)
Unit Weight 0.681 0.302 0.171
Total Length #REF! #REF! #REF!
Weight (Kgs) #REF! #REF!
Project Implementation Unit (PIU) KWSSIP, Karachi Water and Sewerage Corporation (KW&SC)
Contract Package KA-1
Rehabilitating Water Supply and Sewerage in Soba Nagar
Water Storage Tanks
STEEL SUMMARY OF PLINTH BEAM (Pages 1 & 2)

Size of Bar #6
Unit Weight 0.681
Total Length #VALUE!
Weight (Kgs) #VALUE!

SUMMARY OF STEEL
Size of Bar #4
Unit Weight 0.302
Total Length 355.72
Weight (Kgs) 107.43

SUMMARY OF STEEL
Size of Bar #3
Unit Weight 0.170
Total Length #VALUE!
Weight (Kgs) #VALUE!
orporation (KW&SC)

Total (kgs)=

#VALUE!

Total (kgs)=

107.4300

Total (kgs)=

#VALUE!
Project Implementation Unit (PIU) KWSSIP, Karachi Water and Sewerage Corporation (KW&SC)
Contract Package KA-1
Rehabilitating Water Supply and Sewerage in Soba Nagar
Water Storage Tanks
Bar Bending Schedule of Slab at FFL (0'-0")

No. of Bars Total


Location Bar Nos of Bar Total Nos Cut Length
Sr. No. in each Bar Length Bar Shape
Top/Bottom Size Member C/C of Bars of each
member (ft.) (ft.)

BOTTOM BAR

8.5" 8.5"
1 B1 #4 1 6" 52 52 30.17 1,568.84 28'-9"

8.5" 8.5"
2 B2 #4 1 6" 52 52 30.17 1,568.84 28'-9"

8"
3 Extra bar #4 1 6" 208 208 9.17 1,907.36 8'-6"

TOP BAR

8.5" 8.5"
1 T1 #4 1 8" 40 40 30.17 1,206.80 28'-9"

8.5" 8.5"
2 T2 #4 1 8" 40 40 30.17 1,206.80 28'-9"

8"
3 Extra bar #4 1 8" 160 160 9.170 1,467.20 8'-6"

Size of Bar #4 Total (kgs)=

Unit Weight 0.302

Total Length 8,925.84 2,695.60

Weight (Kgs) 2,695.60

Page 34 of 40
Project Implementation Unit (PIU) KWSSIP, Karachi Water and Sewerage Corporation (KW&SC)
Contract Package KA-1
Rehabilitating Water Supply and Sewerage in Soba Nagar
Water Storage Tanks
Bar Bending Schedule of Plinth beam 1 ( 0.00)

No. of Cut Total


Nos of Bar Bars in Total Nos Length of
Sr. No. Location Bar Size Length
Member C/C each of Bars each Bar
(ft.)
member (ft.)

PB1 (1'x1'-3") on P1 GRID A-C/1-3 & 1,3/A-C (4 NOS)

PB1 Top bar #6 4 2 8 30.25 242.00


9"

Bottom
PB1 #6 4 4 16 30.25 484.00
bar 9"

PB1 Mid bar #4 4 2 8 29.42 235.36

Top
extra bar
at
PB1 #6 12 2 24 3.25 78.00
Support
(C2) at
L/3

Top
extra bar
PB1 at Mid #6 8 2 16 6.17 98.72
Support
(P1)
Top
extra bar
PB1 at Mid #6 4 2 8 5.00 40.00
Support
(C1)

Stirrup
at
PB1 Support #3 4 4" 36 144 4.00 576.00
#3@4"
c/c

Stirrup at
Mid
PB1 #3 4 6" 18 72 4.00 288.00
#3@6"
c/c
PB1 (1'x1'-3") on C1 B-C/1-3 & 2/A-B (2 NOS)

PB1 Top bar #6 2 2 4 30.25 121.00


9"

Bottom
PB1 #6 2 4 8 30.25 242.00
bar
9"

PB1 Mid bar #4 2 2 4 29.42 117.68

Top
extra bar
PB1 at #6 4 2 8 3.25 26.00
Support
(C2)
Top
extra bar
PB1 at Mid #6 4 2 8 5.17 41.36
Support
(L/R C1)

Top
extra bar
at Mid
PB1 #6 2 2 4 6.00 24.00
Support
(Centre
C1)

Stirrup
at
PB1 Support #3 2 4 36 72 4.000 288.00
#3@4"
c/c

Stirrup
at Mid
PB1 #3 2 4 22 44 4.000 176.00
#3@6"
c/c
rage Corporation (KW&SC)

a Nagar

0.00)

Bar Shape

9" 28'-9" 9"

9" 28'-9" 9"

28'-9"
4"

4"

2'-6"
9"

6'-2"
5'

9"

3" 12"

9"

3" 12"

9" 28'-9" 9"

9" 9"

28'-9"

28'-9"
4"

4"

2'-6"
9"
9"

5'2"

6'

9"

3" 12"

9"

3" 12"