Proposing a Quality Inspection Process Model Using Advanced
Technologies for the Transition to Smart Building Construction
Hyeon-Ju Shin and Hee-Sung Cha *
Abstract: With advancements in new technologies in the industry, efforts have been made to adopt
various smart devices during the life cycle of building construction. However, little attention has
been paid to developing a work process model to maximize the benefits of smart technologies. While
identifying the shortcomings of conventional quality inspection, this study configures a new quality
inspection process model in collaboration with smart devices. Based on the proposal, the study
developed a new tool that effectively improves the current quality inspection practice. The final
goal of this research is to propose a novel inspection process model by developing an Application
Programming Interface (API) system using Building Information Model (BIM) software. Additionally,
to verify the applicability of the system, this study includes a case study on tile work and confirms
the effects of a prototype of the proposed system through an expert survey. The survey results reveal
that the proposed system is effective and practical. This research contributes to maximizing the
effectiveness of using smart devices and supporting effective application in smart construction.
Keywords: application programming interface (API); building information modeling (BIM); construction
quality inspection; smart building construction; smart technologies
1. Introduction
Citation: Shin, H.-J.; Cha, H.-S.
1.1. Research Background
Proposing a Quality Inspection In recent years, with advancements in new technologies in the construction industry,
Process Model Using Advanced many tasks have been digitalized and automated through the use of smart technologies
Technologies for the Transition to to improve the quality and efficiency of building projects [1–4]. Attempts have been
Smart Building Construction. made to use Building Information Modeling (BIM) with various new technologies, such as
Sustainability 2023, 15, 815. https:// Artificial Intelligence (AI), Augmented Reality (AR)/Virtual Reality (VR), Light Detection
doi.org/10.3390/su15010815 and Ranging (LiDAR) and other smart sensors [5–8]. Linking BIM with various smart
Academic Editor: Ali technologies, many construction works have shifted from a manual to a digital process.
Bahadori-Jahromi These changes are occurring in each stage of construction projects, from the planning,
design and construction to the maintenance stages [9–12]. Although many countries have
Received: 1 December 2022 established guidelines for the effective application of BIM at the planning and design stages,
Revised: 19 December 2022
the level of integration between BIM and smart technologies in construction is still lacking.
Accepted: 20 December 2022
Automated methods linking BIM with smart technologies at the construction stage have
Published: 2 January 2023
long been proposed, but even simple inspection work is still conducted using a manual
approach and paper documents [13,14].
One of the important factors hindering the application of BIM and smart technologies
Copyright: © 2023 by the authors.
in construction is the lack of a “how-to” process model in relation to the adoption of BIM and
Licensee MDPI, Basel, Switzerland. smart technologies [15,16]. Sun et al. (2017) categorized five factors impeding the adoption
This article is an open access article of new technologies: technology, cost, management, personnel and legal factors [17]. The
distributed under the terms and management factor, which includes the absence of a process model, practical application
conditions of the Creative Commons strategies and standards that change when BIM is adopted in construction, had the most
Attribution (CC BY) license (https:// significant impact compared to the other factors.
creativecommons.org/licenses/by/ A collaboration of BIM and smart technologies has been gradually introduced at
4.0/). the construction stage to address the aforementioned factors while implementing smart
technologies and raising the standard of the construction industry [18–22]. At this stage,
quality inspection is a simple and repetitious process. However, if ignored, it negatively
affects the efficiency and quality of a project. Many studies have already been conducted on
integrating BIM with smart technologies to increase performance [23–27]. However, most
of these studies have dealt with particular work items without any appropriate “how-to”
process model acceptable in current practice. This is also because of the absence of real-
world usage cases of the many technologies that can be incorporated into quality control
during the construction stage.
The obstacles to new technology adoption should be eliminated in order to integrate
BIM-based smart technologies. Consequently, it is necessary to establish a new process
model for practical application that may change with the adoption of smart technologies.
Therefore, this research aims to propose a new “how-to” process model for adopting
BIM and smart technologies to increase the performance of quality control during the
construction stage. Furthermore, this study seeks to verify the effectiveness of the proposed
model by conducting a case study to demonstrate its practical application.
approach has the potential to achieve effective quality management. Kwon et al. (2014)
suggested a defect management (DM) tool, combining the BIM and AR devices for on-site
quality control in reinforced concrete work [37]. With the development of an image-
matching process, job-site management became more effective and faults were reduced
significantly. Ma et al. (2018) conducted research on an indoor positioning algorithm,
whereby an automatic quality checklist was extracted and transmitted via a BIM, which
simplified the inspection process [38]. By including the check-listed items in the automatic
extraction process, susceptibility to omissions and mistakes in the conventional inspection
process was reduced.
In the current inspection practice, on-site quality data are obtained through various
data collection tools, i.e., tape measure, thermometer and manometer, and analyzed in
terms of whether the quality criteria are met by comparing the data with the design criteria.
Defect inspection has long been the focus of smart construction technology, and research is
now being conducted to assist defect judgment using the BIM to find any faults based on 3D
point cloud data and to configure the data set obtained by the advanced technologies [39,40].
To efficiently execute quality control using BIMs, research was conducted on the creation
of add-in software embedded in the BIM models [41–43]. However, as mentioned in the
previous section, the technological application strategy in the quality inspection process
has not been thoroughly established, despite a variety of smart technologies being actively
adopted in the construction industry.
2. Research Methods
This study consists of three main phases: Phase I: proposing a new quality inspection
process model; Phase II: developing a quality inspection-assisted system and Phase III: a
case study on the new process model and validation. Details of each phase are depicted in
Figure 1.
2. Research Methods
This study consists of three main phases: Phase I: proposing a new quality inspection
Sustainability 2023, 15, 815 process model; Phase II: developing a quality inspection-assisted system and Phase4III: a
of 21
case study on the new process model and validation. Details of each phase are depicted
in Figure 1.
Figure 1.
Figure 1. Research
Research methodology.
methodology.
Phase II of
Phase of this
this study
study involves
involves the
the adoption
adoption ofof smart
smart technologies
technologies and and proposes
proposes aa newnew
construction quality inspection process in comparison with the
construction quality inspection process in comparison with the conventional inspectionconventional inspection
process in order to
process to guarantee
guaranteethe thequality
qualitycriteria.
criteria.InIn
Phase
PhaseII, II,
thethe construction
construction quality in-
quality
spection-assisted system
inspection-assisted systemprototype
prototypewas wasdeveloped
developed using
using the construction
the established construction
quality inspection
quality inspection process.
process.AtAt present,
present,thethe
developed
developed add-in system
add-in consists
system of four
consists of func-
four
tions required
functions at each
required stage stage
at each of theofquality inspection
the quality process,
inspection including
process, “quality“quality
including inspec-
tion form,”form,”
inspection “quality data,” “quality
“quality tracking”
data,” “quality and “group
tracking” and messenger.”
“group messenger.” In PhaseIn III,Phase
after
selecting
III, a particular
after selecting work type,
a particular worksuch as tile
type, suchwork, thework,
as tile new theprocess
newmodel
process was incorpo-
model was
rated into theinto
incorporated tile work
the tileinspection process. process.
work inspection This realThis
case real
study casewas carried
study wasout basedout
carried on
based on the proposed
the proposed system. Atsystem. At this
this phase, phase, a questionnaire
a questionnaire survey wassurvey conductedwasto conducted
validate the to
validate the effectiveness
effectiveness of the proposed of the proposed
model usingmodel
the APIusing the API
system. system. Inadeveloping
In developing construction a
construction quality inspection system, both Revit TM 2019 and Visual Studio TM 2022 were
quality inspection system, both Revit 2019 and Visual Studio 2022 were used. In the
TM TM
used. In theLeica
case study, case study,
BLK360 Leica
was BLK360
used as awas used
smart as a smart
device. BLK360 device.
supports BLK360
bothsupports
high dynamic both
high
rangedynamic
(HDR) andrange (HDR)image
thermal and thermal image and
and acquires acquires
3D point 3D data
cloud pointrequired
cloud data for required
tile con-
for tile construction
struction quality inspection
quality inspection to measuretothe measure the appropriateness
appropriateness of tile installation.
of tile installation.
3.
3. Proposing
Proposing aa New
New Quality
Quality Inspection
Inspection Process
Process (Phase
(Phase I)
Ⅰ)
The
The conventional quality inspection process was scrutinized to
conventional quality inspection process was scrutinized to identify
identify the
the barriers
barriers
that
that may be removed by the adoption of smart technologies. This section proposes aa new
may be removed by the adoption of smart technologies. This section proposes new
quality inspection process in collaboration with new technologies.
quality inspection process in collaboration with new technologies.
3.1. Process Mapping of Current Construction Quality Inspection
3.1. Process Mapping of Current Construction Quality Inspection
The current work process model for construction quality inspection was recognized. At
The current work process model for construction quality inspection was recognized.
the task-planning stage, a quality inspection plan is provided. Then, the work instructions
At the
are given task-planning
to the laborersstage,
and aon-site
quality inspectionisplan
monitoring is provided.
carried Then,
out by project the workAfter
managers. instruc-
the
tions are given to the laborers and on-site monitoring is carried out by
assigned work is completed, an on-site quality check is conducted to evaluate whether the project managers.
After the
quality of assigned
the work work is completed,
is satisfactory. At thisanstage,
on-site
thequality
qualitycheck is conducted
inspection checklisttoisevaluate
used to
whether
assess thethe quality
quality of theProject
criteria. work ismanagers
satisfactory. At thisbring
typically stage, the quality
paper drawingsinspection check-
and checklists
list is used to assess the quality criteria. Project managers typically bring
to the jobsite and compare design elements with the actual installation. This process is paper drawings
and checklists
traditionally to the out
carried jobsite and compare
by on-site design
monitoring elements
with withwhen
a checklist the actual installation.
an inspection This
request
process is traditionally carried out by on-site monitoring with a checklist
occurs. When the construction quality does not meet the quality standards, the laborer when an inspec-
tiontorequest
has occurs. to
be instructed When
remedythe the
construction quality does
work. Otherwise, not meet
a quality the quality
inspection reportstandards,
has to be
presented and recorded in a paper-based format. Details of this current process, mapping
the quality inspection, are depicted in Figure 2.
Sustainability 2023, 14, x FOR PEER REVIEW 5 of 22
the laborer has to be instructed to remedy the work. Otherwise, a quality inspection report
Sustainability 2023, 15, 815 5 of 21
has to be presented and recorded in a paper-based format. Details of this current process,
mapping the quality inspection, are depicted in Figure 2.
As
Asseen
seenin inFigure
Figure2,2,the thecurrent
currentquality
qualitymanagement
managementprocess processhas
hasthree
threesteps,
steps,including
including
task
task planning, on-site construction and inspection and document management. At
planning, on-site construction and inspection and document management. At each
each
step,
step,the
the participants,
participants,i.e., i.e.,the
thesupervisor,
supervisor,inspector
inspectorand andworker,
worker,areare requested
requested to to perform
perform
their
theirtasks.
tasks.At Atthe
theconstruction
constructionjobsite,
jobsite,each
eachwork
workitem itemisisinitially
initiallycarried
carriedout outin inaccordance
accordance
with
with the
the construction
construction execution
executionplan plan during
during thethe construction
construction andand inspection
inspection phases,phases, and and
performance quality is checked and examined periodically. During
performance quality is checked and examined periodically. During the construction and the construction and in-
spection stage, the work is verified twice by the inspector and supervisor.
inspection stage, the work is verified twice by the inspector and supervisor. Once this Once this verifi-
cation is conducted,
verification is conducted,paper paper
records of the of
records work are drawn
the work up at up
are drawn theatdocumentation
the documentation step.
When comparing
step. When the constructed
comparing work with
the constructed work thewith
original plan to match
the original plan tothe quality
match thecriteria,
quality
the subject
criteria, thework item
subject is deemed
work item issatisfactory if no quality
deemed satisfactory problem
if no qualityisproblem
detected.is detected.
The
Theinspection
inspectionchecklist,
checklist, which
which isisused
usedto toverify
verifywhether
whetherthe theconstructed
constructedwork workmeetsmeets
quality standards,
quality standards, includes
includes measurement
measurementand and judgment
judgmentitems itemsininrelation
relation to to the
the design
design
drawings,specifications,
drawings, specifications,supervision
supervisionguidelines
guidelinesand and inspection
inspectionmanuals.
manuals. In Ingeneral,
general,the the
jobsiteconstruction
jobsite construction is iscarried
carriedout outaccording
according to tothis
thischecklist.
checklist.The
Theinspection
inspectionchecklist
checklistdealsdeals
with material/equipment
with material/equipmentmanagement managementand anddetailed
detailedconstruction
constructionmethods
methodsthat thatareare not
not
specified in
specified in the
the construction
construction drawings.
drawings.
Since itit includes
Since includes all all the
the details
details necessary
necessary for for construction
construction quality
quality management,
management, the the
inspection can easily be conducted during the supervision stage.
inspection can easily be conducted during the supervision stage. For instance, the inspec- For instance, the inspec-
tionchecklist
tion checklistfor for concrete
concrete formwork
formworkincludes
includesdetermining
determiningwhetherwhetherthe theform
formisis installed
installed
according to the construction guidelines as well as examining whether
according to the construction guidelines as well as examining whether it is built based on it is built based on
theformwork
the formworksafety safetyrulesrulesand andregulations.
regulations.The Theinspectors
inspectorsare arerequired
requiredto tocheck
checkwhether
whether
theintervals
the intervalsof ofthe
thesupport
supportmaterial
materialinstallation
installationand anddeflection
deflectionof ofthe
theform formare arewithin
withinthe the
quality allowance. The maximum value of the allowable deflection
quality allowance. The maximum value of the allowable deflection is specified to be three is specified to be three
millimeters(mm)
millimeters (mm)according
accordingto tothe
theguidelines
guidelinesof ofthetheconstruction
constructionformwork
formworkinstallation.
installation.
Likewise, in the case of concrete placement, a construction
Likewise, in the case of concrete placement, a construction plan must be provided so plan must be provided sothat
that
inspection items can be added in order to check whether the
inspection items can be added in order to check whether the construction was conducted construction was conducted
according to
according to the
the inspection
inspection checklist.
checklist.
The shortcomings
The shortcomingsofofthe thecurrent
currentquality
quality inspection
inspection process
process cancan be be summarized
summarized as
as follows:
follows:
(1) Many documents used in the inspection are provided in a paper-based format. Main-
(1) Many documents used in the inspection are provided in a paper-based format. Main-
taining these paper records is troublesome and error prone. Furthermore, if stakehold-
taining these paper records is troublesome and error prone. Furthermore, if stake-
ers need a particular document, they must review numerous documents to find the
holders need a particular document, they must review numerous documents to find
required one, which reduces work efficiency. As indicated in Figure 2, all documents
the required one, which reduces work efficiency. As indicated in Figure 2, all docu-
from “the task-planning stage” to “the documentation stage”, as well as the inspection
ments from “the task-planning stage” to “the documentation stage”, as well as the
documents at the on-site construction and inspection stage, must be prepared and
created in paper format. As the instructions for rework after the site inspection are
also given in paper format, it is difficult to give immediate feedback, which further
reduces work efficiency.
Sustainability 2023, 14, x FOR PEER REVIEW 6 of 22
inspection documents at the on-site construction and inspection stage, must be pre-
Sustainability 2023, 15, 815 pared and created in paper format. As the instructions for rework after the site6 of in-21
spection are also given in paper format, it is difficult to give immediate feedback,
which further reduces work efficiency.
(2) It is important to decide, based on the findings from a visual inspection, whether the
(2) It is important to decide, based on the findings from a visual inspection, whether the
final
finalinspection
inspectionstandards
standardshavehavebeen
beenmet metatatthethe time
time of
of on-site
on-site inspection.
inspection. EvenEvenifif
high-tech
high-tech measuring systems are used to check the quality level, it is still difficultto
measuring systems are used to check the quality level, it is still difficult to
avoid
avoiderroneous
erroneousmeasurement
measurementand andinaccurate
inaccuratejudgment.
judgment.AAdrawbackdrawbackof ofthe
thecurrent
current
inspection
inspectionapproach
approachisisthethepossibility
possibilityof ofcausing
causingaadefect
defectin inthe
theconstruction
constructionwork. work.
(3)
(3) Due
Due to unspecified inspection areas, it is difficult to recognize theexact
to unspecified inspection areas, it is difficult to recognize the exactamount
amountof of
construction quantity required. Moreover, it requires additional time
construction quantity required. Moreover, it requires additional time and effort. The and effort. The
laborers
laborersonly
onlycarry
carry out
out construction work that
construction work that isis called
calledfor,
for,sosothere
thereisisnonoobligation
obligation to
torework
reworkthe the parts that are not called for. Due to these aspects of the current
parts that are not called for. Due to these aspects of the current practice, practice,
the
the inspector
inspector or supervisor
or supervisor must must inspect
inspect the entire
the entire site identify
site and and identify problematic
problematic lo-
locations
cations
before making a request. If the location where the construction quality in questioninis
before making a request. If the location where the construction quality
question is not inspection
not specified, specified, inspection
of all workofquantities
all work is quantities
essential.isTherefore,
essential. Therefore,
the requestthe for
request for reconstruction
reconstruction is inefficient
is inefficient and time consuming.
and time consuming.
3.2.Process
3.2. ProcessMapping
MappingofofConstruction
ConstructionQuality
QualityInspection
InspectionUsing
UsingSmart
SmartTechnologies
Technologies
Tosolve
To solvethe
theaforementioned
aforementioned problems,
problems, the
theauthors
authorspropose
proposeaanew
newquality
qualityinspection
inspection
process using
process usingsmart
smart construction
construction technologies
technologiesthat
that support
supportvarious
varioustypes
types of
of work.
work. This
This
approach is
approach is helpful in improving
improving the
thecurrent
currentquality
qualitycontrol
controlsystem
systemthat is mainly
that depen-
is mainly de-
dent on manual inspection. Figure 3 depicts a new quality inspection process
pendent on manual inspection. Figure 3 depicts a new quality inspection process pro- proposed
in thisin
posed research.
this research.
Figure 3. A new process map of construction quality inspection using smart technologies.
Figure 3. A new process map of construction quality inspection using smart technologies.
The
Thethree-step
three-stepprocess
processisissimilar
similarto
tothe
theconventional
conventionalprocess.
process.However,
However,the thedetailed
detailed
execution
execution contents of each step are different in Figure 3. In the task-planning stage,the
contents of each step are different in Figure 3. In the task-planning stage, the
supervisor
supervisormakesmakesaaconstruction
constructionand andinspection
inspectionplanplanforforthe
thework
worktype
typein inprogress
progressand and
creates
createsan aninspection
inspectionchecklist
checklistforforthe
theBIM
BIMelements
elementsrelated
relatedto tothe
theparticular
particularsubject
subjectworkwork
type.
type. During
During thethe on-site constructionand
on-site construction andinspection
inspectionstage,
stage,the
theconstruction
construction work
work is car-
is carried
ried out according
out according to theto predetermined
the predetermined construction
construction plan. plan.
AfterAfter completing
completing execution,
execution, the
the
work work is confirmed
is confirmed asas completedusing
completed usingsmart
smarttechnologies.
technologies. The preliminary
preliminary inspection
inspection
isis performed
performed at at the
the worker
worker level.
level. Both
Both inspector-level
inspector-level and and supervisor-level
supervisor-level inspections
inspections
follow
follow once the worker-level inspection is completed. The highlighted part inFigure
once the worker-level inspection is completed. The highlighted part in Figure33
indicates
indicatesthis
thisdifference.
difference.The Theinspections
inspectionsperformed
performedby bythe
theinspector
inspectorandandsupervisor
supervisorjudgejudge
whether
whetherthe thequality
qualityof ofconstruction
constructiondeliverables
deliverablesisissatisfactory.
satisfactory.However,
However,the theworker-level
worker-level
inspection
inspectionsavessavestimetimethat
thatisiswasted
wastedin inrequesting
requestinginspections,
inspections,minorminorinspections
inspectionsand andre-re-
construction,
construction,before
beforeconfirming
confirmingthe theconstruction
constructionquality.
quality.In Incontrast
contrastto tothe
theplanning
planningstage,
stage,
smarttechnologies
smart technologiesare areused
usedin ingenerating
generatinginspection
inspectionresults
resultsandandareareautomatically
automaticallystored
stored
in the BIM server.
in the BIM server.
A new quality inspection process proposed in this research contributes to solving the
problems present in the current quality inspection process. The key elements are as follows:
(1) The vast amounts of documents used throughout the inspection process are archived
and available on the BIM server. These are easier to manage, as they are digitally
Sustainability 2023, 15, 815 7 of 21
The add-in
The add-in construction
construction quality
quality inspection
inspection thatthat works
works within
within the the BIM
BIM system
system consists
consists
of four
of four items:
items: inspection
inspection form,
form, quality
quality data,
data, quality
quality tracking
tracking and and group
group messenger.
messenger. EachEach
component in
component in the
the system
system is is developed
developedin inaapanel
panelof ofthe
theRevit
RevitTM TM. As seen in Figure 4, there
. As seen in Figure 4, there
are four functions
are functions andand each function
function consists
consists of multiple modules generated generated by the system
necessary to
buttons necessary to carry
carry outout the
the work.
work.
The blue dotted
dotted line
line indicates
indicates “Quality standard” data flow; the purple purple dotted
dotted line
line
shows “Construction
shows “Constructionsite” site”data
data flow;
flow; andandthe the red dotted
red dotted line means
line means theofflow
the flow “BIMofmodel”
“BIM
model”
data. data.three
These These three
types of types
data are of data
stored areinstored
the BIM in the BIMand
server server
usedand used
in the in the Con-
Construction
structionInspection
Quality Quality Inspection
system that system
created that
thecreated
add-in the add-invia
program program
Revit. Thevia pink
Revit. The pink
dotted line
dotted
in line inindicates
the system the system theindicates the flowinspection
flow of “quality of “quality inspection
result” result”
data that data that via
are generated are
the interaction
generated of the
via the three types
interaction of data
of the threeentered
types ofinto datathe BIM server.
entered into the BIM server.
The quality standard data in Figure 4 are used used to to create
create an an inspection
inspection form
form in the
“Create
“CreateForm”
Form”module
moduleand anddetermine
determine whether
whether thethequality
qualitystandards
standards have been
have metmet
been in the
in
“Load Data”
the “Load module.
Data” Construction-site
module. Construction-site datadata
through smart
through technologies
smart technologiesare uploaded
are uploadedinto
the
intoBIM
the through
BIM throughthe “Load
the “LoadWork WorkData”Data”module. Then, Then,
module. the data theare moved
data to the “Load
are moved to the
Data”
“Loadmodule and used
Data” module andto used
determine whetherwhether
to determine quality standards are met. The
quality standards BIM data
are met. that
The BIM
are stored in the BIM server while a model is created are matched
data that are stored in the BIM server while a model is created are matched with the con- with the construction site
data in the “Load Work Data” module and moved to the “Load
struction site data in the “Load Work Data” module and moved to the “Load Data” mod- Data” module to determine
whether the quality
ule to determine criteriathe
whether have beencriteria
quality met along havewith
been quality
met alongstandard
withdata. The
quality quality
standard
inspection result data,
data. The quality generated
inspection through
result the interaction
data, generated throughbetween the three types
the interaction betweenof data,
the
move to the of
three types “Create Form”to
data, move module when Form”
the “Create inspection
moduleresults
whenmeet the quality
inspection standards
results meetandthe
are automatically
quality standards reflected in the inspection
and are automatically form. in
reflected Then,
the they are reflected
inspection in thethey
form. Then, process
are
progress rate through the “Quality tracking” module. On
reflected in the process progress rate through the “Quality tracking” module. On thethe other hand, when quality
other
standards
hand, when arequality
not met, they move
standards are tonotthe
met,“Send
theyMessage”
move to the module
“Sendand are used
Message” to request
module and
rework by indicating the corresponding spot in the BIM.
are used to request rework by indicating the corresponding spot in the BIM.
Each
Each module
module has has aa procedural
procedural relationship
relationship with with aa different
different module,
module, butbut the
the “View
“View
Data
Data Module” and the “Load Schedule Module” consist of functions to view existing data
Module” and the “Load Schedule Module” consist of functions to view existing data
stored
stored in
in the
the BIM
BIM database,
database, indicating
indicating that that there
there isis no
no special
special procedural
procedural relationship.
relationship. The
The
construction quality inspection API is characterized by the fact that both the beginning and
ending modules are placed in the “inspection form” and the modules for “quality data”
are at the center of the system. In addition, the flow among the modules of this system
Sustainability 2023, 14, x FOR PEER REVIEW 9 of 22
construction quality inspection API is characterized by the fact that both the beginning
Sustainability 2023, 15, 815 and ending modules are placed in the “inspection form” and the modules for9 of“quality 21
data” are at the center of the system. In addition, the flow among the modules of this
system is closely related to the construction quality inspection process, after the adoption
of is
the smartrelated
closely technologies, as proposed
to the construction in Phase
quality I.
inspection process, after the adoption of the
smart technologies, as proposed in Phase I.
4.2. Developing a Quality Inspection System Prototype
4.2. Developing a Quality Inspection System Prototype
In this research, the authors used Visual Studio TM 2022 to develop an add-in-type
In this research, the authors used Visual StudioTM 2022 to develop an add-in-type
construction
constructionquality
qualityinspection systemvia
inspection system viathe
the BIM
BIM software
software Revit
Revit TM . TM . Based
Based onnew
on the the new
quality
quality inspection
inspectionwork
work procedure definedearlier,
procedure defined earlier, a new
a new toolbar
toolbar withwith
panelspanels and buttons
and buttons
was generated and applied to similar construction quality inspection
was generated and applied to similar construction quality inspection processes. In thisprocesses. In this
case,
case,the
theconstruction quality
construction quality inspection
inspection API API can
can be be customized
customized to thework
to the relevant relevant
types.work
Figure
types. 5 shows
Figure an exemplary
5 shows graphicgraphic
an exemplary user interface (GUI) developed
user interface for the casefor
(GUI) developed study
the case
described in the next section.
study described in the next section.
AsAsseen
seenininFigure
Figure5,5,the
thecorresponding
corresponding system
system prototype consists of
prototype consists of four
fourmain
main fea-
tures: (1) The
features: (1)“quality inspection
The “quality form”form”
inspection menumenu
supports the creation
supports of a new
the creation of ainspection
new
checklist necessary
inspection checklistfornecessary
post-construction quality control
for post-construction or tocontrol
quality confirm or an existing an
to confirm inspec-
existing
tion inspection
checklist. (2) Thechecklist.
“quality(2) The menu
data” “quality data” menu
enables enables the management
the management of necessaryofimage
andnecessary
sensor dataimage and sensor such
information, data information, such asRGB
as thermal images, thermal images,
images and RGB images
3D point clouds,
and 3D point clouds, collected for quality control in the BIM. (3) The “quality
collected for quality control in the BIM. (3) The “quality tracking” menu makes it possible tracking”
menu makes it possible to check the construction progress rate based on the amount
to check the construction progress rate based on the amount of work passed during qual-
of work passed during quality control and the ratio of problem-prone constructions
ityduring
controltheand the construction
entire ratio of problem-prone constructions
process, according to each workduring the (4)
item. entire
The construction
“group
process, according
messenger” menutoexpedites
each work item. (4) The among
communication “groupproject
messenger”
members menu expedites com-
by explaining
munication among
reconstruction project
areas, workmembers by explaining
details and other qualityreconstruction
issues. Under areas,
thesework
four details
menu and
other quality
bars, issues. Under
each sub-function these four
is grouped in menu bars,with
the system eachthesub-function
correspondingis grouped
buttons into the
be sys-
tem with theThe
operated. corresponding
programmingbuttonscode forto be operated.
system The programming
GUI development is shown in code for 6.system
Figure
GUI development is shown in Figure 6.
Sustainability 2023, 15, 815 10 of 21
Sustainability 2023, 14, x FOR PEER REVIEW 10 of
The add-in
The add-in system system was
was developed in developed
the form ofinan
theexternal
form ofapplication.
an external application.
Tabs and Tabs a
panels wereas
panels were programmed programmed
menus usingas Revit
menusTMusing Revit package
developer
TM developer package
code. code.
It is set thatIt is set th
the system operates at the same time TMas the RevitTM is executed. Table 1 details the fo
the system operates at the same time as the Revit is executed. Table 1 details the four
menu items and their sub-functions.
menu items and their sub-functions.
Table 1. Description of display menu and buttons in the API system.
Table 1. Description of display menu and buttons in the API system.
Menu Button Function
Menu Button
(1) Quality To createFunction
and prepare a checklist for quality control o
Create form
To create and prepare a checklist for quality control of the
Createinspection
form the corresponding work item
(1) Quality inspection form corresponding work item
form View form To archives and visualize the completed checklist dat
View form To archives
Load work data and visualize
To the completed
uploads checklistquality
BIM -linked data data
Load work data To upload
To uploads BIM quality
-linkedmeasurement
quality data into the BIM model e
(2) Quality Load data
(2) Quality data Load data
data To upload quality measurement into the BIM ments
model elements
To check the quality measurement data stored in the
View data To check
View the quality measurement data stored in the BIM mode
data
BIM mode
To check the progress of the selected work based on the quality
Quality tracking To check the progress of the selected work based on th
Quality tracking control results
(3) Quality tracking quality control results
(3) sheet
Create new Quality To create a new schedule for checking the progress
Create new sheet To create a new schedule for checking the progress
tracking
Load sheet To check the progress of the
the total project
To check progress of in
thequality control in quality co
total project
Load sheet
Send message To send a request for work among the project trol
group members
(4) Group messenger
My message To send a request for work
To review messages received from others among the project group
(4) Group Send message
members
messenger
My message To review messages received from others
In implementing the smart quality inspection process, the key functions are operated
using the “quality inspection form” and
In implementing the “quality
the smart quality data” menus.
inspection For each
process, button
the key gener-
functions are operat
ated on the system interface, the authors enabled users to check the content
using the “quality inspection form” and the “quality data” menus. For each of their work button gen
by clicking the ated
corresponding
on the systembutton under
interface, thethe menu,
authors so that
enabled theytocan
users easily
check use each
the content of their wo
command function. The detailed code to make the button work is as follows (see Figure 7).
Sustainability 2023, 14, x FOR PEER REVIEW 11 of 22
Sustainability 2023, 15, 815 by clicking the corresponding button under the menu, so that they can easily use each
11 of 21
command function. The detailed code to make the button work is as follows (see Figure
7).
Figure
Figure7.7.Detailed
Detailedcode
code of
of "Create form”and
"Create form” and"Load
"Loadwork
workdata”
data” button.
button.
Sustainability 2023, 15, 815 12 of 21
For the function requested when each button is clicked, the authors have programmed
the command code to run. For example, The “Create form” button is connected to Com-
mend1 as shown in mark 1 of Figure 7a, and the code for Commend1 is executed when
the corresponding button is clicked. Similarly, the “Load work data” button is linked to
Command2 in mark 2 of Figure 7a. Figure 7b,c show the detailed code of Command1
and 2. Command1 is programmed to generate a checklist interface when a command
is executed by linking it with the Inspection_Form document as shown in mark a (see
Figure 7b). In this way, by connecting Loadworkdata_Form document and Command2, it
is programmed to open the interface of uploading the quality data when a command is
operated as shown in mark b (see Figure 7c).
In the same way as in Figure 7, each button works by being connected to the command
with a unique function. The operating principle of the system is applicable to general types
of construction and differs in data type and the interpretation of quality standards. Since
there is a difference in the form of data that can be acquired for each smart device, the
appropriate data form and smart technologies should be defined for each type of work.
In the following section, this research conducts a case study by selecting a tile work
to apply the new process developed in this study by defining the data type and the smart
device required for qulity inspection.
thermal data to confirm the amount of mortar filled, which is a non-destructive method
Sustainability 2023, 15, 815 In addition, image data can also be obtained to check the vertical and horizontal 13 ofalignmen
21
of the tile installation. In this regard, a laser scanner is considered to be a useful tool in
providing thermal and/or image data on the surface of the tile work. Thus, by acquiring
providing thermal and/or image data on the surface of the tile work. Thus, by acquiring
image extraction and point cloud data, the tile inspection process can be improved
image extraction and point cloud data, the tile inspection process can be improved through
through the
the use of use
smartofdevices.
smart devices.
In this
In this study, tilequality
study, tile datawere
quality data werecollected
collected using
using a laser
a laser scanner,
scanner, concentrating
concentrating on on
the examination
the examination ofofthe
theadhesion testofoftiles
adhesion test tiles based
based onthermal/imaging
on the the thermal/imaging
camera.camera.
This This
was successful in checking data for the entire construction work without
was successful in checking data for the entire construction work without damaging the damaging the
existing
existing construction,which
construction, which is
is advantageous
advantageous compared
compared to the
tocurrent qualityquality
the current inspection
inspection
method. Figure 8 shows the process of acquiring tile quality data using a laser scanner as a
method. Figure 8 shows the process of acquiring tile quality data using a laser scanner as
case study.
a case study.
Figure 8. Tile
Figure 8. work result result
Tile work from laser
fromscanning work.
laser scanning work.
Figure 8a illustrates the use of the laser scanner, BLK360TM, to inspect the quality
ofFigure 8a illustrates
tile work. The devicethe
notuse
onlyofcaptures
the laser3Dscanner,
point cloudBLK360TM, to inspect
data, but also providesthe quality of
both
tile work.
thermalThe anddevice not only
HDR images captures
for quick 3D point
recognition cloud data,
of surface butFigure
defects. also 8bprovides
shows theboth ther-
mal point
and HDRcloud images for quick
data obtained recognition
by laser scanning. of Bysurface defects.
comparing Figure
the data 8b shows
set with the BIM,the point
horizontal/vertical alignments can be measured. The acquisition of quality
cloud data obtained by laser scanning. By comparing the data set with the BIM, horizon- data on mortar
filling was carried out by applying hot air and checking the thermal image temperature
tal/vertical alignments can be measured. The acquisition of quality data on mortar filling
difference in the areas where the mortar was not filled (see Figure 8c). The empty portion
waswill
carried out by applying hot air and checking the thermal image temperature differ-
have a higher temperature than the part filled with mortar. It is, thus, possible to
encedetermine
in the areas where
whether thestandards
quality mortar was not filled
are satisfied. (see in
As seen Figure
Figure8c).
8c, aThe empty portion
tile adhesion area wil
havecan a higher
easily betemperature than
identified based thethermal
on the part filled
imagewith
of themortar.
tile workItwhen
is, thus,
hot airpossible
is appliedto deter-
minetowhether
the tile surface.
quality standards are satisfied. As seen in Figure 8c, a tile adhesion area can
easily be identified based on the thermal image of the tile work when hot air is applied to
5.3. Application of a New Quality Inspection Process Using API System
the tile surface.
Based on the proposed quality inspection process (see Figure 3), a new process model
in conjunction with the Revit–API system was developed to demonstrate the case study.
5.3. Application
Figure 9ofshows
a New Quality Inspection
a step-by-step ProcessofUsing
work process API
the case System
study. As seen in Figure 9,
the tile work
Based on theand inspectionquality
proposed plan are to be prepared
inspection before
process creating
(see Figurea 3),
document via the mode
a new process
BIM. This step relates to the “quality Inspection form” menu in the API
in conjunction with the Revit–API system was developed to demonstrate the case study. system. Second,
the “quality data” menu is utilized, by gathering tile quality data using laser scanning,
Figure 9 shows a step-by-step work process of the case study. As seen in Figure 9, the
importing it into the BIM server and matching each piece with the actual intended amount
tile work
of work and
thatinspection planThird,
was completed. are toa be prepared
decision before
is made basedcreating a document
on the thermal viaofthe BIM
image data
Thisthestep
tiles regarding whether they match the quality standard. The quality standard inSecond,
relates to the “quality Inspection form” menu in the API system. this the
“quality data”is menu
case study providedis in
utilized,
Table 2. by gathering tile quality data using laser scanning, im-
porting it into the BIM server and matching each piece with the actual intended amount
of work that was completed. Third, a decision is made based on the thermal image data
of the tiles regarding whether they match the quality standard. The quality standard in
this case study is provided in Table 2.
Sustainability 2023,2023,
Sustainability 14, x15,
FOR815PEER REVIEW 14 of 22
14 of 21
Figure 9. Tile work quality management process using a laser scanner and BIM model.
Figure 9. Tile work quality management process using a laser scanner and BIM model.
records the entire history of the quality inspection, the location where a defect occurs can
occurs can be easily detected.
be easily detected.After
After all theinspection
all the inspection areas
areas havehave
beenbeen completed
completed withoutwithout
potential
potential defects, the results
defects, arearesent
the results sentto
to the supervisor,
the supervisor, andand the quality
the final final quality inspection
inspection is
is conducted
to approve the confirmation.
conducted to approve the confirmation.
It is noteworthy that the new process requires each of the three participants—workers,
It is noteworthy that the new process requires each of the three participants—work-
inspectors and supervisors—to perform a different task. A worker-level inspection is con-
ers, inspectors and
ductedsupervisors—to perform
as part of the worker’s routinea different task.
job, while an A worker-level
inspector-level inspection
inspection is performedis
conducted as part of items
on the the worker’s routine
that are difficult for job,
workerswhile an inspector-level
to identify. inspection
The supervisor-level is per-
inspection en-
dows the
formed on the items authority
that and obligation
are difficult for the quality
for workers inspection
to identify. Theprocess by confirminginspec-
supervisor-level whether
tion endows thethe tile work is
authority assured
and based onfor
obligation thethe
quality standards.
quality inspection process by confirming
The tile work quality inspection process mentioned above was applied to the typical
whether the tilequality
workinspection
is assured based
process on the
in this casequality
study. Thestandards.
purpose of the case study is to determine
The tile work quality
whether inspection
the new inspection process mentioned
work process above
is applicable andwas applied
beneficial to current
in the the typical
work
quality inspection process
practice. in thisofcase
The result study.
the case studyThe purpose
validating theof theiscase
same study
given in theis to determine
following section.
whether the new inspection work process is applicable and beneficial in the current work
6. Validation of Case Study
practice. The result of theInspection
6.1. Quality case studyUsingvalidating
the Proposedthe same is given in the following section.
System
An on-site test was performed to validate the proposed system and assess its practical
6. Validation ofapplicability.
Case Study The API quality inspection system was used to carry out the quality inspection
on the tile
6.1. Quality Inspection workthe
Using process. Figure
Proposed 11 shows the tile work installation process.
System
An on-site test was performed to validate the proposed system and assess its practical
applicability. The API quality inspection system was used to carry out the quality inspection
on the tile work process. Figure 11 shows the tile work installation process.
Sustainability 2023, 15, 815 16 of 21
Sustainability 2023, 14, x FOR PEER REVIEW 16 of
Figure 12. Tile quality dataFigure 12. Tile quality data processing in API system.
processing in API system.
Figure 12a depicts a tile work inspection checklist that is automatically created using
the “create form” button in the system. As mentioned in Phase II of this study, it is essen-
tial to input the relevant information so that a quality inspection checklist can be created
and displayed in the API system. Next, the thermal image data acquired by the laser scan-
ner are uploaded to the BIM. Figure 12b shows how the thermal images of six tiles are
uploaded into the BIM using the “load work data” button. Figure 12c shows a color pat-
Sustainability 2023, 15, 815 17 of 21
Figure 12a depicts a tile work inspection checklist that is automatically created using
the “create form” button in the system. As mentioned in Phase II of this study, it is essential
to input the relevant information so that a quality inspection checklist can be created and
displayed in the API system. Next, the thermal image data acquired by the laser scanner are
uploaded to the BIM. Figure 12b shows how the thermal images of six tiles are uploaded
into the BIM using the “load work data” button. Figure 12c shows a color pattern in the
BIM model. If one object turns red, it needs to be checked because the thermal image
indicates a low level of adhesion. This process can be operated by clicking the “load data”
button. Figure 12d shows how to use the “send message” button to request a rework
of the target element. The message box provides the relevant information regarding the
rework request.
Figure 13 depicts how the system matches the thermal image with the BIM. As
seen in Figure 13, the low-quality inspection object has turned red. The system success-
Sustainability 2023, 14, x FOR PEER REVIEW 18 of 22
fully indicates the rework area in the BIM, and the inspection was conducted using the
smart devices.
Figure
Figure13.
13.Thermal
Thermalimage
image and
and color allocationininAPI
color allocation APIsystem.
system.
Figure13a
Figure 13ashows
shows the appearance
appearance ofofthe
theindividual
individualthermal
thermalimage
imageof of
tiletile
work. TheThe
work.
colorrepresentation
color representation of
of the
the API
API system
systemisisprovided
providedininFigure
Figure13b.
13b.ToTo
perform
performthethecorrective
corrective
action,red
action, redisisassigned
assignedto tothe
the BIM
BIM object.
object. Yellow
Yellow is
is assigned
assigned where
where no
no further
further action
action is
is required.
required.
6.2. System Validation with an Expert Survey
6.2. System Validation with an Expert Survey
In Phase III of this study, project participants investigated the proposed system in
In of
terms Phase III of this
its practical study, project
applicability. participants
To verify investigated
the effectiveness of the the
newproposed system
process, the case in
terms of its practical applicability. To verify the effectiveness of the
study was established using an API system. An expert survey was conducted to validate new process, the case
study was established
the system. The surveyusing an API system.
was administered An expert
to industry survey was
practitioners conducted
using a 5-pointtoLikert
validate
the system.
scale The survey
(1: strongly was administered
disagree, 2: disagree, 3:tomoderate,
industry 4: practitioners using aagree)
agree, 5: strongly 5-point Likert
from
scale (1: strongly
26 September disagree,
2022 to 5 October2: disagree,
2022. Ten3:experts
moderate, 4: agree,
responded 5: survey.
to the strongly agree) from 26
The survey
September 2022 toresults with 2022.
5 October the questionnaire
Ten experts items are provided
responded in Table 3. The scores
to the survey.
indicate an average
The survey scorewith
results of ten responses.
the The results
questionnaire itemsreveal that the respondents
are provided in Table 3. strongly
The scores
agreed that the system is advantageous in terms of functionality, efficiency,
indicate an average score of ten responses. The results reveal that the respondents strongly applicability
and usability,
agreed that thewith an average
system score of 4.45.
is advantageous It is expected
in terms that the new
of functionality, quality inspection
efficiency, applicability
model using the API system has a significant positive effect when applied practically.
and usability, with an average score of 4.45. It is expected that the new quality inspection
In their feedback, the experts pointed out that the “quality tracking” menu needed to
model using the API system has a significant positive effect when applied practically. In
be relocated because of its low hierarchy in the system. In addition, they requested the
their feedback, the experts pointed out that the “quality tracking” menu needed to be re-
provision of motivation for the worker’s participation in the system.
located because of its low hierarchy in the system. In addition, they requested the provi-
sion of motivation for the worker’s participation in the system.
Sustainability 2023, 15, 815 18 of 21
Based on the survey results, the authors verified that the proposed process and the
API system can improve the conventional quality inspection practice using smart devices.
However, to maximize the benefit, the industry needs to train and educate construction
workers on smart technologies. In addition, the system can be more powerful when it is
linked with the existing software to expedite the user’s convenience.
7. Conclusions
This study provides a new method for the construction inspection process with the
help of innovative technologies. The proposed method was further developed using a
computerized system embedded in the BIM software. By identifying the issues with the
current quality inspection process and providing an alternative solution method, this study
proposed a new quality inspection process model that evolves as a result of the application
of smart technologies. Compared to the conventional method, the new process can reduce
simple and repetitive inspection work that causes low efficiency in the construction process.
By proactively converting the quality inspection process with the application of smart
technologies, both quality and productivity can be improved due to a digitalized inspection
process. To effectively apply the proposed process, a BIM-based quality inspection API sys-
tem was programmed. The step-by-step inspection process was analyzed and incorporated
into the system via a new control panel of RevitTM . The case study was applied and the
expert survey effectively verified the applicability of the new API system. According to the
survey results, the answerers strongly agreed that the system proposed in this study has
advantages, with an average score of 4.45. Checking the feedback on the items with lower
scores than other survey items, it is not because of factors that directly affect the inspection
task, which is the focus of this study.
In this research, the usefulness and industrial applicability of the construction quality
inspection system were proven. From an academic perspective, this research proposed
a new quality inspection process with smart technologies. The API system contributes
to filling the lack of knowledge about smart construction management, which is one of
the important factors hindering the application of other innovative technologies in the
construction domain. From the industry side, the authors solved a number of problems in
manual inspection practice in terms of accuracy and productivity. The proposed system
can facilitate the adoption of smart technologies for quality inspection. This study, ulti-
mately, transforms the conventional quality inspection process into a more reliable and
productive practice through auto-detection and accuracy enhancement in quality measure-
ment. In addition, the case study is significant in that it demonstrates the practical viability
of the system.
Although this research proposes a smart quality inspection process, the construction
type is limited to tile work and the smart technology is limited to a laser scanner. The
case study of the proposed system is also limited to a particular process of tile work.
In addition, the use of the smart device is restricted to obtaining a thermal image. In
future research, a variety of data, i.e., 3D point cloud, RGB image and multi-spectral
images, needs to be used in maximizing the benefit of new technologies. In addition, as in
various studies investigated through the literature review, other smart technologies, i.e.,
augmented reality (AR), unmanned aerial system (UAS) and internet of things (IoT) sensors,
are also applicable in current construction quality inspection practice [35–38]. Expansion
Sustainability 2023, 15, 815 19 of 21
Author Contributions: Conceptualization, H.-J.S. and H.-S.C.; methodology, H.-J.S. and H.-S.C.;
software, H.-J.S.; validation, H.-J.S. and H.-S.C.; formal analysis, H.-S.C.; investigation, H.-J.S.;
resources, H.-J.S.; data curation, H.-J.S.; writing—original draft preparation, H.-J.S.; writing—review
and editing, H.-S.C.; visualization, H.-J.S. and H.-S.C.; supervision, H.-S.C.; project administration,
H.-J.S.; funding acquisition, H.-S.C. All authors have read and agreed to the published version
of the manuscript.
Funding: This research was supported by the Korea Agency for Infrastructure Technology Ad-
vancement (KAIA), grant funded by the Ministry of Land, Infrastructure and Transport (Grant
22ORPS-B158109-03).
Institutional Review Board Statement: Not applicable.
Informed Consent Statement: Not applicable.
Data Availability Statement: Not applicable.
Conflicts of Interest: The authors declare no conflict of interest.
References
1. Xu, L.D.; Xu, E.L.; Li, L. Industry 4.0: State of the art and future trends. Int. J. Prod. Res. 2018, 56, 2941–2962. [CrossRef]
2. Hofmann, E.; Rüsch, M. Industry 4.0 and the current status as well as future prospects on logistics. Comput. Ind. 2017, 89, 23–34.
[CrossRef]
3. Cohen, Y.; Naseraldin, H.; Chaudhuri, A.; Pilati, F. Assembly systems in Industry 4.0 era: A road map to understand Assembly
4.0. Int. J. Adv. Manuf. Technol. 2019, 105, 4037–4054. [CrossRef]
4. Lasi, H.; Fettke, P.; Kemper, H.-G.; Feld, T.; Hoffmann, M. Industry 4.0. Bus. Inf. Syst. Eng. 2014, 6, 239–242. [CrossRef]
5. Bilal, M.; Oyedele, L.O.; Qadir, J.; Munir, K.; Ajayi, S.O.; Akinade, O.O.; Owolabi, H.A.; Alaka, H.A.; Pasha, M. Big Data in
the construction industry: A review of present status, opportunities, and future trends. Adv. Eng. Inform. 2016, 30, 500–521.
[CrossRef]
6. Marino, E.; Barbieri, L.; Colacino, B.; Fleri, A.K.; Bruno, F. An Augmented Reality inspection tool to support workers in Industry
4.0 environments. Comput. Ind. 2021, 127, 103412. [CrossRef]
7. Kim, M.-K.; Cheng, J.C.; Sohn, H.; Chang, C.-C. A framework for dimensional and surface quality assessment of precast concrete
elements using BIM and 3D laser scanning. Autom. Constr. 2015, 49, 225–238. [CrossRef]
8. Chen, L.; Luo, H. A BIM-based construction quality management model and its applications. Autom. Constr. 2014, 46, 64–73.
[CrossRef]
9. Sawhney, A.; Riley, M.; Irizarry, J.; Riley, M. Construction 4.0; Sawhney, A., Riley, M., Irizarry, J., Eds.; Routledge: Oxfordshire,
UK, 2020.
10. Ma, X.; Xiong, F.; Olawumi, T.O.; Dong, N.; Chan, A.P.C. Conceptual Framework and Roadmap Approach for Integrating BIM
into Lifecycle Project Management. J. Manag. Eng. 2018, 34, 05018011. [CrossRef]
11. Azhar, S.; Brown, J. BIM for Sustainability Analyses. Int. J. Constr. Educ. Res. 2009, 5, 276–292. [CrossRef]
12. Eadie, R.; Browne, M.; Odeyinka, H.; McKeown, C.; McNiff, S. BIM implementation throughout the UK construction project
lifecycle: An analysis. Autom. Constr. 2013, 36, 145–151. [CrossRef]
13. Romero, D.; Stahre, J.; Wuest, T.; Noran, O.; Bernus, P.; Fast-Berglund, Å.; Gorecky, D. Towards an operator 4.0 typology: A
human-centric perspective on the fourth industrial revolution technologies. In Proceedings of the International Conference on
Computers and Industrial Engineering (CIE46), Tianjin, China, 29–31 October 2016; pp. 29–31.
14. May, K.W.; Kc, C.; Ochoa, J.J.; Gu, N.; Walsh, J.; Smith, R.T.; Thomas, B.H. The Identification, Development, and Evaluation of
BIM-ARDM: A BIM-Based AR Defect Management System for Construction Inspections. Buildings 2022, 12, 140. [CrossRef]
Sustainability 2023, 15, 815 20 of 21
15. Manzoor, B.; Othman, I.; Gardezi, S.; Altan, H.; Abdalla, S. BIM-Based Research Framework for Sustainable Building Projects: A
Strategy for Mitigating BIM Implementation Barriers. Appl. Sci. 2021, 11, 5397. [CrossRef]
16. Liu, S.; Xie, B.; Tivendale, L.; Liu, C. Critical Barriers to BIM Implementation in the AEC Industry. Int. J. Mark. Stud. 2015, 7, 162.
[CrossRef]
17. Sun, C.; Jiang, S.; Skibniewski, M.J.; Man, Q.; Shen, L. A literature review of the factors limiting the application of BIM in the
construction industry. Technol. Econ. Dev. Econ. 2017, 23, 764–779. [CrossRef]
18. Jin, K.H.; Lee, K.S.; Park, H.P.; Lee, D.H.; Ko, H.A.; Kang, G.W. A Study on the Direction of Monitoring and Regulation Improvement to
Activate Smart Construction Technology; KICT 2019-203; Korea Institute of Construction Technology: Goyang, Republic of Korea,
2019; p. 17.
19. Ratajczak, J.; Schweigkofler, A.; Riedl, M.; Matt, D.T. Augmented reality combined with location-based management system to
improve the construction process, quality control and information flow. In Advances in Informatics and Computing in Civil and
Construction Engineering; Springer: Cham, Switzerland, 2019; pp. 289–296. [CrossRef]
20. Sheng, D.; Ding, L.; Zhong, B.; Love, P.E.; Luo, H.; Chen, J. Construction quality information management with blockchains.
Autom. Constr. 2020, 120, 103373. [CrossRef]
21. Tan, Y.; Li, G.; Cai, R.; Ma, J.; Wang, M. Mapping and modelling defect data from UAV captured images to BIM for building
external wall inspection. Autom. Constr. 2022, 139, 104284. [CrossRef]
22. Wójcik, B.; Żarski, M. The measurements of surface defect area with an RGB-D camera for a BIM-backed bridge inspection. Bull.
Pol. Acad. Sci. Tech. Sci. 2021, 69, e137123. [CrossRef]
23. Eiris, R.; Gheisari, M.; Esmaeili, B. PARS: Using Augmented 360-Degree Panoramas of Reality for Construction Safety Training.
Int. J. Environ. Res. Public Health 2018, 15, 2452. [CrossRef]
24. Carrasco, M.D.O.; Chen, P.-H. Application of mixed reality for improving architectural design comprehension effectiveness.
Autom. Constr. 2021, 126, 103677. [CrossRef]
25. Aryan, A.; Bosché, F.; Tang, P. Planning for terrestrial laser scanning in construction: A review. Autom. Constr. 2021, 125, 103551.
[CrossRef]
26. Sigalov, K.; König, M. Recognition of process patterns for BIM-based construction schedules. Adv. Eng. Informatics 2017, 33,
456–472. [CrossRef]
27. Zou, Y.; Kiviniemi, A.; Jones, S.W. A review of risk management through BIM and BIM-related technologies. Saf. Sci. 2017, 97,
88–98. [CrossRef]
28. Ratajczak, J.; Riedl, M.; Matt, D.T. BIM-based and AR Application Combined with Location-Based Management System for the
Improvement of the Construction Performance. Buildings 2019, 9, 118. [CrossRef]
29. Tran, H.; Nguyen, T.N.; Christopher, P.; Bui, D.-K.; Khoshelham, K.; Ngo, T.D. A digital twin approach for geometric quality
assessment of as-built prefabricated façades. J. Build. Eng. 2021, 41, 102377. [CrossRef]
30. Hamledari, H.; Sajedi, S.; McCabe, B.; Fischer, M. Automation of Inspection Mission Planning Using 4D BIMs and in Support of
Unmanned Aerial Vehicle–Based Data Collection. J. Constr. Eng. Manag. 2021, 147, 04020179. [CrossRef]
31. Zhang, S.; Teizer, J.; Pradhananga, N.; Eastman, C.M. Workforce location tracking to model, visualize and analyze workspace
requirements in building information models for construction safety planning. Autom. Constr. 2015, 60, 74–86. [CrossRef]
32. Wang, Z.; Hu, H.; Zhou, W. RFID Enabled Knowledge-Based Precast Construction Supply Chain. Comput. Aided Civ. Infrastruct.
Eng. 2017, 32, 499–514. [CrossRef]
33. Du, J.; Shi, Y.; Zou, Z.; Zhao, D. CoVR: Cloud-Based Multiuser Virtual Reality Headset System for Project Communication of
Remote Users. J. Constr. Eng. Manag. 2018, 144, 04017109. [CrossRef]
34. Kim, M.-K.; Wang, Q.; Park, J.-W.; Cheng, J.C.; Sohn, H.; Chang, C.-C. Automated dimensional quality assurance of full-scale
precast concrete elements using laser scanning and BIM. Autom. Constr. 2016, 72, 102–114. [CrossRef]
35. Golparvar-Fard, M.; Peña-Mora, F.; Savarese, S. Automated Progress Monitoring Using Unordered Daily Construction Pho-
tographs and IFC-Based Building Information Models. J. Comput. Civ. Eng. 2015, 29, 04014025. [CrossRef]
36. Kim, S.; Kim, S.; Lee, D.-E. Sustainable Application of Hybrid Point Cloud and BIM Method for Tracking Construction Progress.
Sustainability 2020, 12, 4106. [CrossRef]
37. Kwon, O.-S.; Park, C.-S.; Lim, C.-R. A defect management system for reinforced concrete work utilizing BIM, image-matching
and augmented reality. Autom. Constr. 2014, 46, 74–81. [CrossRef]
38. Ma, Z.; Cai, S.; Mao, N.; Yang, Q.; Feng, J.; Wang, P. Construction quality management based on a collaborative system using BIM
and indoor positioning. Autom. Constr. 2018, 92, 35–45. [CrossRef]
39. Park, C.-S.; Lee, D.-Y.; Kwon, O.-S.; Wang, X. A framework for proactive construction defect management using BIM, augmented
reality and ontology-based data collection template. Autom. Constr. 2013, 33, 61–71. [CrossRef]
40. Faraji, A.; Rashidi, M.; Agha, T.M.H.; Rahnamayiezekavat, P.; Samali, B. Quality Management Framework for Housing Construc-
tion in a Design-Build Project Delivery System: A BIM-UAV Approach. Buildings 2022, 12, 554. [CrossRef]
41. Kim, Y.S.; Oh, S.W.; Cho, Y.K.; Seo, J.W. A PDA and wireless web-integrated system for quality inspection and defect management
of apartment housing projects. Autom. Constr. 2008, 17, 163–179. [CrossRef]
42. Feng, C.W.; Chen, C.W. Using BIM and MR to improve the process of job site construction and inspection. WIT Trans. Built
Environ. 2019, 192, 21–32. [CrossRef]
Sustainability 2023, 15, 815 21 of 21
43. Hernández, J.L.; Lerones, P.M.; Bonsma, P.; van Delft, A.; Deighton, R.; Braun, J.-D. An IFC Interoperability Framework for
Self-Inspection Process in Buildings. Buildings 2018, 8, 32. [CrossRef]
44. Kim, D.H.; Lee, D.Y.; Lee, H.J.; Min, Y.G.; Park, I.S.; Cho, H.H. Analysis of Importance by Defect Type in Apartment Construction.
J. Korea Inst. Build. Constr. (JKIBC) 2020, 20, 357–365. [CrossRef]
Disclaimer/Publisher’s Note: The statements, opinions and data contained in all publications are solely those of the individual
author(s) and contributor(s) and not of MDPI and/or the editor(s). MDPI and/or the editor(s) disclaim responsibility for any injury to
people or property resulting from any ideas, methods, instructions or products referred to in the content.