3 Road Safety Report Porbandar-Jetpur NH-27 230607 192152 March 2023

Uploaded by

deepanshi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
35 views401 pages

3 Road Safety Report Porbandar-Jetpur NH-27 230607 192152 March 2023

Uploaded by

deepanshi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 401

Safety Consultancy Services during Operation and

Maintenance period for Porbandar - Jetpur section


from Km. 1+960 to 117+600 of NH-27 in the State
of Gujarat

Draft Road Safety Audit Report


Submitted By: March 2023

HIGHWAY DIVISION, RITES BHAWAN, 4TH FLOOR,


PLOT NO.1, SECTOR 29, GURUGRAM, HARYANA 122001
Safety Consultancy Services during Operation and Maintenance period for
Porbandar - Jetpur section from Km. 1+960 to 117+600 of NH-27 (Design
Length = 115.64 Km) in the State of Gujarat Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

DRAFT ROAD SAFETY REPORT ON


PORBANDAR ‐ JETPUR SECTION OF NH‐27 FROM CHAINAGE 1+960 TO 117+600

Contents
CHAPTER 1 .............................................................................................................................................................. 3

1. INTRODUCTION .................................................................................................................................. 3
1.1 Background .......................................................................................................................................... 3
1.2 The Salient Features/Details of Project Highway: ................................................................. 4
1.3 The approach of the audit ............................................................................................................... 4
1.4 Audit Team: .......................................................................................................................................... 5
1.5 The Audit Principles ......................................................................................................................... 5
CHAPTER 2 .............................................................................................................................................................. 6

2 AUDIT METHODOLOGY .................................................................................................................... 6


2.1 The Audit Process .............................................................................................................................. 6
2.2 Collection of Project details and understanding the design mandate ............................ 6
2.3 Preparation of checklists and Undertaking of the audit...................................................... 6
CHAPTER 3 .............................................................................................................................................................. 7

3.0 Summary of Road Safety Audit Observations .......................................................................... 7


1.1 Audit of Sight Distance .................................................................................................................... 7
1.2 Audit of Intersections ....................................................................................................................... 7
1.3 Audit of Interchanges ....................................................................................................................... 9
1.4 Audit of Cross sections ................................................................................................................... 14
1.5 Audit of Roadside Hazards ........................................................................................................... 15
1.6 Audit of Drainage ............................................................................................................................. 17
1.7 Audit of Road side Furniture & Pavement Marking ............................................................ 20
1.8 Vulnerable road users (pedestrians, bicyclists, two wheelers and three wheelers,
and animal drawn carts) ......................................................................................................................... 23
1.9 Audit of Median Opening ............................................................................................................... 26
1.10 Audit of Road Side Hazards and Safety Barrier/Railing .................................................... 28
1.11 Audit of Lighting and night time issues.................................................................................... 29
1.12 Audit of Toll Plaza ............................................................................................................................ 30
1.13 Audit of General road safety considerations ......................................................................... 31
CHAPTER 4 ............................................................................................................................................................ 33

4 DESIGN AUDIT CHECKLIST & AUDIT, OBSERVATIONS, AND RECOMMENDATIONS . 33


4.1 AUDIT OF SIGHT DISTANCES ....................................................................................................... 33
4.2 AUDIT OF INTERSECTIONS .......................................................................................................... 34
4.3 AUDIT OF INTERCHANGES ........................................................................................................... 42
4.4 AUDIT OF CROSS SECTION ........................................................................................................... 72

Revision Level: R0 March - 2023 Page 1 of 399


Safety Consultancy Services during Operation and Maintenance period for
Porbandar - Jetpur section from Km. 1+960 to 117+600 of NH-27 (Design
Length = 115.64 Km) in the State of Gujarat Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

4.5 AUDIT OF ROAD HAZARDS ........................................................................................................... 73


4.6 AUDIT OF DRAINAGE ................................................................................................................... 266
4.7 AUDIT OF ROAD SIDE FURNITURE & PAVEMENT MARKING ....................................... 288
4.8 AUDIT OF VULNERABLE ROAD USERS ................................................................................... 355
4.9 AUDIT OF ACCESS TO PROPOERTY AND DEVELOPMENTS ........................................... 381
4.10 AUDIT OF LIGHTING AND NIGHT TIME ISSUES ................................................................ 382
4.11 AUDIT OF TOLL PLAZA ............................................................................................................... 385
ANNEXURE‐1 ............................................................................................................................................. 391
ANNEXURE‐2 ............................................................................................................................................. 392
ANNEXURE‐3 ............................................................................................................................................. 393
ANNEXURE‐4 ............................................................................................................................................. 394
ANNEXURE‐5 ............................................................................................................................................. 395
ANNEXURE‐6 ............................................................................................................................................. 396
ANNEXURE‐7 ............................................................................................................................................. 397
ANNEXURE‐8 ............................................................................................................................................. 398
ANNEXURE‐9 ............................................................................................................................................. 399

Revision Level: R0 March - 2023 Page 2 of 399


Safety Consultancy Services during Operation and Maintenance period for
Porbandar - Jetpur section from Km. 1+960 to 117+600 of NH-27 (Design
Length = 115.64 Km) in the State of Gujarat Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

CHAPTER 1
1. INTRODUCTION
National Highways Authority of India (NHAI) has taken up development of some of the
highways entrusted by Ministry of Road Transport & Highways through Public Private
Partnership (PPP) on Design, Build, Finance and Operate (DBFO) basis / HAM / O&M, OMT
and EPC Basis.
It is stipulated in the Model Concession Agreements (MCA)/Contract Agreements of the PPP
projects that the Concessionaire shall develop, implement and administer a surveillance and
safety programme for providing a safe environment on or about the Project Highways and/or
shall comply with the safety requirements set forth in Schedules/Clauses of the
Concession/Contract Agreement in Development, Construction and Operation &
Maintenance Phases of the Project.
As per Modal Concession Agreement, NHAI will appoint an experienced and qualified firm or
organization for carrying out safety audit of the project highway in accordance with the safety
requirements set forth in Schedule “L” of Concession agreement.
In this regard RITES has been entrusted with the appointment of Safety Consultant for Road
Safety Audit during Operation and Maintenance period for Porbandar – Jetpur section
from Km 1+960 to Km 117+600 of NH‐27 (design length = 115.64 km) in the State of
Gujarat.
The Road Safety Audit has been carried out to identify the road environmental factors of the
project road with reference IRC: SP: 88 checklists pertaining to Safety Audit of Existing roads
and submit the Road Safety Report.

1.1 Background

An audit involves one set of professionals reviewing the work of other professionals, and this
calls for much diplomacy and respect. Highway designers whose work is being audited
should keep an open mind and accept that the audit team may be able to improve on the
safety aspect of the design to the benefit of road users.

 State: Gujarat
 Total Length: 115.64 Km (4- Lane).
a) Client: - NHAI
b) Project plan- The existing road has been upgraded from two lanes to four lanes.
c) Documents used in the audit-
i. IRC: SP:84-2014 Manual of Specifications & Standards for four laning
ii. IRC: SP:88-2019 Manual on Road Safety Audit
iii. IRC:35: -2015 Code of practice for Road Markings
iv. IRC:67: -2012 Code of practice for Road Signs
v. IRC: 119-2015 Guidelines for Traffic Safety Barriers
vi. IRC: 58-2015 Guidelines for The Design of Plain and Jointed Rigid
Pavements for Highways
vii. IRC:73-1980 Geometric Design of Rural Highways
viii. IRC: SP-23-1993 Vertical Curves for Highways
ix. IRC SP/publication 35 G/L for inspection and Maintenance of Bridges
x. Approved Inception report
xi. Submitted drawings related to Project by Concessioner
xii. Concession Agreement of Project

Revision Level: R0 March - 2023 Page 3 of 399


Safety Consultancy Services during Operation and Maintenance period for
Porbandar - Jetpur section from Km. 1+960 to 117+600 of NH-27 (Design
Length = 115.64 Km) in the State of Gujarat Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

xiii. Other relevant IRC, IS, and BS Codes

1.2 The Salient Features/Details of Project Highway:

a. The salient features of the road are as follows:

 State: Gujarat

 Total Length: 115.64 Km.

1. Name of the Project: Projects comprising of 9 national highway stretches


(Bundle-1) on Toll Operate Transfer mode Porbandar -
Jetpur section (From Km 001+960 to Km.117+600) of NH-
27 in the state of Gujarat.
2. Project No. 4

3. Length (km) 115.64 m

4. Date of Appointment 29.08.2019

5. Date of signing of Concession 25.07.2011


Agreement
6. Name of Concessionaire M/s. Safeway Concesssions Pvt Ltd.
7. Concession period 30 Years

8. Project Status The project is under Maintenance under TOT


Concessionaire.
9. Name of Independent M/s. Theme Engineering Services Pvt. Ltd
Engineer/ Authority’s Engineer
10 Status of IE/AE Mobilized at Site

11. Name of the concerned Shri Sujeet Kumar, GM(Tech), Gujarat Division, RO-NHAI-
GM/DGM at RO, Mobile No. Gandhinagar

12. Name of the Project Director, Shri Sanjay Kumar Yadav, Mobile no. +91-8980988999
Mobile no. Email: [email protected]

1.3 The approach of the audit

The concessioner has to provide drawings to Safety Consultant as consented by IE to the


auditor with relevant background information as follows:
 A project description
 An account of the design principles and standards that were used (e.g., design speed, radii of
curves, superelevation, standards for crest and sag curves, stopping sight distance, etc.).
 Reasons for any departure from the road standards

Revision Level: R0 March - 2023 Page 4 of 399


Safety Consultancy Services during Operation and Maintenance period for
Porbandar - Jetpur section from Km. 1+960 to 117+600 of NH-27 (Design
Length = 115.64 Km) in the State of Gujarat Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

 Set of detailed drawings still not received from Concessionaire

1.4 Audit Team:

The safety audit team comprising Sr. Road Safety Auditor, Traffic Planner/Engineer and Road
Safety Auditor to carry out the safety audit for Porbandar - Jetpur Section of NH-27 from Km
001+960 to Km.117+600 in the State of Gujarat. A joint site inspection has been carried out
with the representatives of Authority, Independent Engineer, Concessionaire, and Safety
Consultant from 01st to 02nd February 2023.
RITES safety team has discussed mitigation measures to enhance safety during the audit
completion meeting on February 03, 2023, chaired by PD-PIU Rajkot and attended by
representative of Team Leader of IE, Project Manager of Concessionaire and RITES safety
team.

1.5 The Audit Principles

The key principles for a good safety audit are:


 Consider the needs of all road users including pedestrians (especially children), cyclists, and
motorcyclists in all weathers and lighting conditions

 Be thorough and comprehensive

 Be realistic and practical, but do not rule out options on cost grounds

 Stick to road safety aspects

 Check compliance with relevant standards and guidelines (while remembering that
compliance with standards does not guarantee that the road will be safe)

Note:
1. The above observations/recommendations are based on the minimum requirement as
per IRC/MORTH and other relevant codes.
2. Any Departure from IRC Standards, Concessionaire shall be held responsible and legal
action may be initiated as per The Motor Vehicles (Amendment) Act 2019.
Disclaimer:
The audit covers physical features of the highway that may affect road user safety and it has
sought to identify potential safety hazards. However, the auditors point out that no guarantee
is made that every deficiency has been identified. Further, if all recommendations in this report
are to be followed, this would not confirm that the highway is “safe”, rather an adoption of the
recommendation should improve or increase the level of safety of the facility.

Revision Level: R0 March - 2023 Page 5 of 399


Safety Consultancy Services during Operation and Maintenance period for
Porbandar - Jetpur section from Km. 1+960 to 117+600 of NH-27 (Design
Length = 115.64 Km) in the State of Gujarat Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

CHAPTER 2
2 AUDIT METHODOLOGY

2.1 The Audit Process

2.2 Collection of Project details and understanding the design mandate

The base details were collected from the site office of the concessionaire.

2.3 Preparation of checklists and Undertaking of the audit

It has been found that the use of checklists is a valuable tool while conducting an audit. The
detailed checklist as per IRC: SP: 88-2019 was given in the inception report.

Revision Level: R0 March - 2023 Page 6 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600
of NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

CHAPTER 3
3.0 Summary of Road Safety Audit Observations

Summary of Road Safety Audit Observations for Porbandar to Jetpur of NH‐27


S. Observations Reason for Concern Recommendations/Mitigation Measures
No.

1.1 Audit of Sight Distance


1. As per naked eyes, generally sight distances The desirable values of sight  Sight Distance are generally available along the
are adequately available for the Project distance has been adopted Project Highway.
Highway.  Thick bushes and untrimmed plants on median
strips, shoulders creates hindrance to drivers'
visibility. Trimming and Clear the vegetation on
shoulder and median to provide clear visibility to
drivers as per clause 10.3 & 11.22 of IRC:SP-21.

1.2 Audit of Intersections


1.  At Km 34+370 (RHS) , cross road towards Unauthorized median  Unauthorized median opening should be closed.
village on RHS and unauthorized median opening may lead to major  Provide LVUP at 34+250 with service road
opening may lead to major accidents. accidents. considering the site condition.
 Conduct a turning movement survey and analyze the
traffic at this location for requirement of LVUP

2.  At Km 115+550 , Built up section on both Due to built up section on  Provide VUP at this location and junction shall be
sides and cross road towards village on both sides, requirement of designed with an island for proper channelization of
both sides. traffic at the crossroad.

Revision Level: R0 March - 2023 Page 7 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600
of NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

S. Observations Reason for Concern Recommendations/Mitigation Measures


No.
Vehicular underpass is  Provide speed breaker/Speed table as per clause 3.1
desirable. of IRC-99-2018 on both sides of the cross road.
 Signages at cross road should be provided as per
IRC:67-2012, Fig. V.5 Minor side road with speed
breaker of page 131 (Annexure ‐5).

 Underpass available at Km 115+575.

Revision Level: R0 March - 2023 Page 8 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600
of NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

S. Observations Reason for Concern Recommendations/Mitigation Measures


No.
3.  At Km 13+900 (LHS), 20+700 (LHS/RHS), Vehicles coming from cross  Provide speed breaker/rumble strip on the side road
23+970 (LHS), 25+200 (LHS), 34+370 road needs to reduce speed at 5-6 m from a major road as per clause 3.1 of IRC-
(RHS), 43+300 (RHS), 103+600 (RHS) & while entering the main 99-2018 on cross road
116+700 (RHS), Rumble strip on cross carriageway.  Signages at cross road should be provided as per
road not provided IRC:67-2012, Fig. V.5 Minor side road with speed
breaker of page 131 (Annexure – 5).
 Repair poor pavement surface for smooth movement
of traffic.
 Provide pavement marking on service road as per
IRC:35-2015.
 Provide road studs as per clause 9.5 and table 9.1 of
IRC:SP:84-2014.
 Provide Thermoplastic Traverse Bar Marking (3 sets)
on both sides of Hazardous Reach as per Fig 11.2 of
IRC-35-2015 to alert the drivers to reduce the speed
of vehicle on main carriageway (Annexure‐1).

1.3 Audit of Interchanges


1. Major junction at Km 111+000 towards Vehicles coming from cross Short Term Measure:
Somnath/Junagadh(NH-151), Porbandar road needs to reduce speed
/Dhoraji (NH-27) and Jetpur City (SH-351). while entering the main  Direction Information sign should be provided as per
carriageway. Clause 9.2.9 and Fig. 9.2 of page 83 of IRC:84-2014.
Gantry and shoulder mounted Advance Direction
Sign shall be provided in advance of an interchange/
Flyover/ VUP or any urban reach. Flag type direction
information sign shall be installed at the start of
deceleration length or gorge indicating the
destinations of the side roads. (Annexure – 7)

Revision Level: R0 March - 2023 Page 9 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600
of NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

S. Observations Reason for Concern Recommendations/Mitigation Measures


No.
 Provide speed breaker/Speed table as per clause 3.1
of IRC-99-2018 on cross road.
 Signages at cross road should be provided as per
IRC:67-2012, Fig. V.5 Minor side road with speed
breaker of page 131 (Annexure ‐5).
 Provide Thermoplastic Traverse Bar Marking (3 sets)
on both sides of Hazardous Reach as per Fig 11.2 of
IRC-35-2015 to alert the drivers to reduce the speed
of vehicle on main carriageway (Annexure‐1).
 Restrict vehicular speeds to 40 km/h for cars and 30
kmph for heavy vehicles on these roads along with
traffic calming measures as per IRC: 99-2018.
Long Term Measure:
 Provide VUP at NH to NH Crossing as per traffic
requirement,
2. Junctions below all VUPs, LVUPs/Flyovers at Proper flaring and  Develop Entry/Exit Arrangement with Service/Slip
Km 2+600, 7+900, 15+100, 17+500, 24+990, channelization of traffic has road as per fig 2.1A of IRC:SP-84-2014 (Annexure‐
45+900, 47+695, 53+350, 62+200, 72+500, been done. However, proper 2).
76+100, 78+200, 79+900, 87+600, 96+100, entry/exit arrangement with  Provide speed breaker/Speed table as per clause 3.1
97+450 & 105+800 are developed as per IRC service/slip road has not be of IRC-99-2018 on cross road.
standards. done as per IRC standards,  Signages at cross road should be provided as per
Also, pavement marking, IRC:67-2012, Fig. V.5 Minor side road with speed
Detailed observation given in Audit Spot directional signboards has breaker of page 131 (Annexure ‐5).
Observations. not been provided as per IRC  Provide facilities for pedestrian such as footpath,
guidelines. lighting, solar blinkers, side drain, road markings and
traffic signs etc.

Revision Level: R0 March - 2023 Page 10 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600
of NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

S. Observations Reason for Concern Recommendations/Mitigation Measures


No.
 Direction Information sign should be provided as per
Clause 9.2.9 and Fig. 9.2 of page 83 of IRC:84-2014.
Gantry and shoulder mounted Advance Direction
Sign shall be provided in advance of an interchange/
Flyover/ VUP or any urban reach. Flag type direction
information sign shall be installed at the start of
deceleration length or gorge indicating the
destinations of the side roads. (Annexure – 7)
 Chevron/diagonal marking with red color road studs
shall be provided at Entry/Exit as per IRC: 35-2015
as per Clause 5.5.5, page 30 and Clause 7.2, Table 7.1:
Spacing between Diagonals / Chevrons, at page 36.

 Provide kerb and pavement marking on service road


as per IRC:35-2015.
 Provide Vertical clearance sign board.
 Provide black and yellow stripes sloping downwards
at an angle of 45 degrees towards traffic on face of
underpass as per Clause 14.2 of IRC:35-2015, page
90.
 Cleaning is required at LVUP location.
 Provide drainage cum footpath as per IRC: SP:42-
2014.

Revision Level: R0 March - 2023 Page 11 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600
of NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

S. Observations Reason for Concern Recommendations/Mitigation Measures


No.
 Provide traffic Impact Attenuators as per Clause 9.6
of IRC: SP:84 (Manual of Specifications and Standards
for four laning of highways), page 92 and per MoRTH
Technical Specification clause 814.3 at gore area
locations, start & end of service road locations where
structures concrete crash barrier ends or where the
lane changing menoeuvring of vehicle is substantial.

3. Entry and Exit of Interchanges to service road High speed traffic exit/entry Traffic approaching the grade-separated intersections has to
are not developed as per IRC :SP-84-2014 from main carrigeway to change lane from the main carriageway to the auxiliary lanes
standards. service road or vice versa. or vice versa.
Accident may take place due  The nose length shall be determined based on the
to high speed vehicles coming speed and actual lateral shift of traffic. Accordingly
from main carriageway. provide the length of auxiliary lane and taper as per
the design or as per clause 2.13.1 and Fig 2.1A of IRC:
SP:84-2014 (Attached Annexure‐2). This is to
enable the driver to distinguish clearly between
through traffic lanes and the auxiliary lanes.

Revision Level: R0 March - 2023 Page 12 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600
of NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

S. Observations Reason for Concern Recommendations/Mitigation Measures


No.
4. Pavement Marking is not provided as per Lack of Pavement Marking Merging and Diverging Pavement marking with arrows
IRC:35-2015 at Entry and Exit of Interchanges and arrow signs on pavement should be provided as per 8.7 of IRC: 35-2015.
ramps (Merging and Diverging with lane confusing the driver and
gain/drop) conflicting with main
carriageway traffic

5. Informatory signboards are missing at nose of Lack of Information sign at  Provide Information sign board at nose of entry/exit to
exit/entry locations at Km 2+600 (LHS) , entry/exit location lead to guide the driver for safe movement of traffic.
3+500 (RHS), 4+00 (LHS), 4+800 (RHS), confuse the driver and vehicle  Provide direction information signs such as Gantry and
8+400 (LHS), 8+900 (RHS), 12+400 (LHS), may enter in wrong direction. shoulder mounted Advance Direction Sign shall be
13+200 (RHS), 14+800 (LHS), 15+400 (RHS), provided in advance of an interchange/Flyover/VUP or
17+200 (LHS), 18+000 (RHS), 24+700 (LHS), any urban reach. Flag type direction information sign
25+300 (RHS), 29+400 (LHS), 31+000 (RHS), shall be installed at the start of deceleration length or
45+400 (LHS), 46+400 (RHS), 47+300 (LHS), gorge indicating the destinations of the side roads as per
48+000 (RHS), 52+800 (LHS), 53+700 (RHS), clause 9.2.9 and fig 9.2 sign plan for a flyover/ VUP
61+800 (LHS), 62+600 (RHS), 72+100 (LHS), Approach of IRC:SP-84-2014 (Attached Annexure‐6).
72+900 (RHS), 75+700 (LHS), 77+600 (RHS),
 Provide Thermoplastic Traverse Bar Marking (3 sets) on
77+900 (LHS), 80+200 (RHS), 87+200 (LHS),
both sides of Hazardous Reach as per Fig 11.2 of IRC-35-
87+900 (RHS), 95+700 (LHS), 96+300 (RHS),
2015 to alert the drivers to reduce the speed of vehicle on
96+900 (LHS), 97+700 (RHS), 105+200 (LHS)
main carriageway (Attached Annexure‐1).
and 106+000 (RHS).

Revision Level: R0 March - 2023 Page 13 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600
of NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

S. Observations Reason for Concern Recommendations/Mitigation Measures


No.

1.4 Audit of Cross sections


1. Open drain on service road in built up Covered drain cum footpath Provide cover on RCC drain as per IRC: SP:42-2014.
sections. should be provided for
vulnerable road users in built
up section.

2. Plan and Profile Its seem in order Super elevation is generally provided as per the curve
direction

Revision Level: R0 March - 2023 Page 14 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600
of NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

S. Observations Reason for Concern Recommendations/Mitigation Measures


No.
3. Median Plantation Ornamental flowery type The median and Ornamental flowery type shrubs shall be
shrubs have been provided to provided as per Clause 5.3.4 of IRC: SP-21. Shrubs in median
break monotony of driver should normally not exceed 1.0 to 1.5 m in height; otherwise,
during driving on the Project visibility of second carriageway will be considerably affected
Highway. as per Clause A 4.3 of IRC:SP-21.

Drip irrigation/sprinkler system for median plantation by


gravity/pressure source with all necessary
components/system and emitting devices at plants shall be
provided.

1.5 Audit of Roadside Hazards


1. The methodology for fixing of Metal Beam If the end treatment is not The methodology for fixing of Metal Beam Crash Barrier and
Crash Barrier (MBCB) for Start/End done properly, it may vehicles the end treatment for start/ end of MBCB shall be as per
treatments of MBCB are not provided as per hits and lead to serious clause 4.10 & 4.11 fig 13 , 14 and page no 13-15 of IRC:119-
IRC. accident due to high impact
2015 “Guideline of Traffic Safety Barriers” (Attached
on barrier.
Detailed observation given in Audit spot Annexure‐3).
Observations.
2. W-beam type Metal Crash Barrier have been High speed corridors have a As per MoRTH circular RW/NH-29023/02/2019-S & R (P &
provided on median side where “Manual of more impact on safety B) dated January 01, 2020, In already developed multi lane
Specifications and Standards for Four Lane barriers as compared to other highways with raised median especially in open
Highways” recommended that the Meal Crash roads and Thrie beam type country/rural area crash barrier along median in such way
Barrier shall be of ‘Thrie’ beam type as per beam can protect the vehicles that the face of crash barrier is flushed with face of raised
MoRTH circular RW/NH-29023/02/2019-S & effectively due to high speed median.
R (P & B) dated January 01, 2020. especially Trucks and buses.
It is recommended to replace the W-Beam Metal Crash
Barrier to Thrie Beam on median side also, Type Metal Crash
Barrier on road side throughout the Highway

Revision Level: R0 March - 2023 Page 15 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600
of NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

S. Observations Reason for Concern Recommendations/Mitigation Measures


No.
Detailed observation given in Audit spot
Observations.
3. Metal beam crash barrier(MBCB) has been Vehicle hitting the damaged Damaged MBCB both posts and rails shall be repaired
damaged at many locations of Project beams can cause the W-beam immediately.
Highway km rails pierce into vehicle
4. MBCB start/ends are not fixed to RCC crash If hit, an untreated end of the At this location, abrupt ending of MCB without integrating
barrier/parapet wall at all the locations. roadside barrier can be with CCB created hazardous situation for the errant vehicle.
Detailed observation given in Audit Spot hazardous, because the MCB shall be extended up to parapet wall as per IRC: 119, by
Observations barrier beam can penetrate overlapping for at least 60cm over the parapet wall/CC
the vehicle and causes the Barrier as per clause 4.11 and Fig 16 (W Beam to Concrete
impact vehicle to stop Connection Details) of IRC 119-2015 (Annexure‐4).
abruptly.
5. Traffic Impact Attenuators not provided at all If hit, an untreated end of the Traffic Impact Attenuators should be provided at
the hazardous locations such as gore area, roadside barrier can be approaching traffic island of toll plaza and gore area between
start of concrete barrier, etc. as per clause 9.6 hazardous, because the diverging roadways and other hazardous locations so as to
vehicle come to stop abruptly,
of IRC: SP: 84-2014. act as energy absorber in accordance with Manual of
and serious accident can take
Detailed observation given in Audit spot place. Specification and Standards for Four Laning of Highways of
Observations. IRC: SP: 84-2014. Following are the general criteria for
The exit/entry locations at Km 80+200 (RHS), providing crash attenuators as per clause 9.6 & fig. 9.6 of IRC:
87+300 (LHS), 87+800 (RHS), 96+300 (RHS) SP: 84-2014.:
and 114+500 (RHS).  The location where there is a history of more than
average number of accidents involving vehicles
impacting obstruction
 The 85th percentile speed of traffic plying through the
traffic lane adjacent to obstruction in diverge area is
greater than 70 kmph.

Revision Level: R0 March - 2023 Page 16 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600
of NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

S. Observations Reason for Concern Recommendations/Mitigation Measures


No.
 At location where the lane changing manoeuvering of
vehicles are substantial.
 Traffic is required to travel in close proximity to the
potential obstruction where it is not feasible to install
safety barrier in front of it.
 The obstruction with high value and if damaged by
vehicle impact will have serious consequences.
 The gore areas of all diverging which are one level
above ground.

(Fig 9.6 attached)

1.6 Audit of Drainage


1. Open drain has been provided at 12+700 (LHS) Covered RCC/Cement Provided RCC covered drain as per clause 6.2 of IRC: SP: 84-
on service road: Concrete or piped drains, 2014.
with manholes at suitable
intervals to de-silt the drains
shall be provided.

Revision Level: R0 March - 2023 Page 17 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600
of NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

S. Observations Reason for Concern Recommendations/Mitigation Measures


No.

2. At Km 105+800 (RHS), Hook on the slab of It is not safe for vulnerable Hook of the covered drain needs to be removed.
covered drain at service road location at LVUP road users.
can create discomfort to pedestrians.

3. Open median drain has been provided on the Vehicle might topple if Load carrying capacity slab should be used to cover the kerb
kerb edge, which will lead to accident if the accidently the wheels of the side drain.
vehicle accidentally topple over open drain. vehicle run over open drain.

Revision Level: R0 March - 2023 Page 18 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600
of NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

S. Observations Reason for Concern Recommendations/Mitigation Measures


No.

4. At the Super elevated portion median drain not It will lead to accident and Provide median drain to collect the water in the super-
provided and water flowing from one damage the pavement. elevated portion in the curve portion and drain off the
carriageway to another carriageway may stormwater near to culverts/bridge location. As per IRC: SP:
damage the pavement and create slippery 42 (Guidelines for Road Drainage), at page 32.
conditions during the rainy season.
Following locations require median drain as
per IRC guidelines:
6+600 – 6+800, 7+600 – 7+800, 17+900 -
18+100, 19+200 - 19+500, 19+800 - 20+200,
23+300 - 23+800, 25+100 - 25+450, 25+600 -
26+100, 28+100 - 28+300, 30+100 - 30+300,
38+700 - 38+900, 41+400 - 41+700, 44+700 -
44+900, 46+900 - 47+000, 55+500 - 57+700,
68+600 - 68+900, 69+900 - 70+200, 72+700 -
72+900, 74+800 - 75+400, 90+500 - 90+700,
92+100 - 92+450, 93+200 - 93+400, 102+900
-103+100, 103+500 - 103+700 & 104+800 -
105+300.

Revision Level: R0 March - 2023 Page 19 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600
of NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

S. Observations Reason for Concern Recommendations/Mitigation Measures


No.

1.7 Audit of Road side Furniture & Pavement Marking


1. Pavement marking has been provided on both Absence of pavement Provide Lane & Edge marking as per IRC:35-2015.
side of carriageway except at some sections marking cause confusion to
the pavement marking has faded. the driver and conflict with
main carriageway traffic.

2. Pavement Marking is not provided as per Lack of Pavement Marking Provide Lane change and Merging and Diversion Markings
IRC:35-2015 at Entry and Exit of Interchanges and arrow sign on pavement as per clause 10.2 &10.3 and fig 10.1 & 10.2 of IRC:35-2015 .
ramps (Merging and Diverging with lane cause confusion to the driver
gain/drop) and conflict with main
carriageway traffic

Revision Level: R0 March - 2023 Page 20 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600
of NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

S. Observations Reason for Concern Recommendations/Mitigation Measures


No.

3. Informatory signboards are missing at nose of Due to lack of Informatory Provide Informatory sign board as per clause 16 and 21.8 of
exit/entry locations of Interchanges and Toll sign board road, user may IRC: 67-2012.
Plaza Locations. miss their exit and will travel
in wrong direction and cause
head on collision
4. Object Hazard marker signs are missing along Absence of hazard marker Provide object hazard marker sign board like in front of
the Project Highway. signboard may cause the structures parapet wall, islands as per clause 15.64 of IRC:
Detailed observation given in Audit spot vehicle hits to the roadside 67-2012.
Observations. object during night time.

Revision Level: R0 March - 2023 Page 21 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600
of NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

S. Observations Reason for Concern Recommendations/Mitigation Measures


No.

5. The bus bay and truck lay marking should be Absence of Hazard marker Provide pavement marking as per IRC: 35-2015 and road
provided with proper chevron marking and sign and proper chevron signs as per IRC: 67-2012.
with advanced informatory signs. marking is required to alert
the drivers during night time.

6. Road Studs is not provided at median side and These are helpful in night  Provide Road studs as per IRC-35-2015 and Fig. 5.2 Road
shoulder side of both of carriageways. travel and foggy weather studs for a Divided carriageway, at page 28-29.

Revision Level: R0 March - 2023 Page 22 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600
of NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

S. Observations Reason for Concern Recommendations/Mitigation Measures


No.
 Solar Stud shall be provided on gore of all road diverging
roads.

7. Yellow light Blinkers not provided on the gore This is required to warn the Provide Yellow light Blinkers on the gore areas of all
areas of all diverging roads. driver about the hazard on diverging roads
diverging locations

1.8 Vulnerable road users (pedestrians, bicyclists, two wheelers and three wheelers, and animal drawn carts)
1. Debris on service road at Km 14+900 (LHS) This will create discomfort to Remove the debris.
road users.

Revision Level: R0 March - 2023 Page 23 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600
of NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

S. Observations Reason for Concern Recommendations/Mitigation Measures


No.
2. Poor pavement surface requires immediate This will create discomfort to Repair the poor pavement.
attention on service road at Km 72+500 (VUP) road users.
and 79+900 (LVUP).

3. Cleaning not done on service road at Km This will create discomfort to Cleaning is required and ensured that cleaning is done
47+500 (LHS) road users. regularly to provide safe and clean user experience to road
users.

4. Cracks has developed along the main The main carriageway which Repair the road surface to provide better user friendly
carriageway which will further deteriorate will further deteriorate and experience to road users.
and create discomfort to road users. create discomfort to road
Following locations has been identified: users.

Revision Level: R0 March - 2023 Page 24 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600
of NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

S. Observations Reason for Concern Recommendations/Mitigation Measures


No.
26+900 (LHS), 35+400 – 36+700 (LHS),
40+200 (RHS), 48+800 (RHS), 61+400 (RHS),
61+700 – 61+900 (LHS), 69+700 (RHS),
71+900 (RHS) and 76+400 – 76+500 (RHS).

5. Barbed wire fencing done near paved Wire fencing done near paved Remove the barbed wire fencing.
shoulder can create safety hazards to shoulder can create safety
vulnerable road users. hazards to vulnerable road
Following locations has been identified where users
barbed wire fencing is done:
33+500 – 34+000 (LHS), 36+400 – 36+700
(LHS), 37+100 – 37+800 (LHS), 36+400 –
36+70 (LHS) and 48+200 (RHS).

Revision Level: R0 March - 2023 Page 25 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600
of NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

S. Observations Reason for Concern Recommendations/Mitigation Measures


No.

1.9 Audit of Median Opening


1. Median opening at Km 13+800, 22+600, Solar Blinker not provided at  Provide Solar Traffic LED Blinker Light at the nose of
26+000, 29+500, 31+500, 36+000, 39+900, median opening will alert the median opening on both sides to alert the drivers of
40+700, 42+600, 51+300, 54+100, 55+200, driver during night time. median opening during night.
58+100, 64+900, 68+900, 70+500, 71+350,
83+400, 84+500, 86+200, 89+900, 92+450,
94+800, 98+800, 102+600, 107+600,
109+400, 109+600, 115+200, 115+900 and
116+800.

Revision Level: R0 March - 2023 Page 26 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600
of NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

S. Observations Reason for Concern Recommendations/Mitigation Measures


No.

2. Unauthorized median cut at Km 16+500, Unauthorized median cut  Close the unauthorized median cut immediately to
26+500, 27+300, 28+300, 30+970, 31+000, creates situations of accidents enhance the safety and avoid the accident at these
32+600, 34+900, 40+700, 41+300, 41+700, for vehicles travelling along locations.
44+200, 45+300, 50+300, 50+300, 56+400, the project road.
59+000, 61+9000, 62+200, 66+600, 67+380,
72+100, 109+000, 111+7000, 113+000,
114+7000 and 116+200

Revision Level: R0 March - 2023 Page 27 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600
of NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

S. Observations Reason for Concern Recommendations/Mitigation Measures


No.

1.10 Audit of Road Side Hazards and Safety Barrier/Railing


1. Footpath damaged on Major bridge of Bhadar Repair the footpath.  Footpath should be repaired and raised to provide
river at Km 114+900 and Km 97+400 ease and safe environment to pedestrians.
 Paint the kerb as per IRC:35 to alert the driver of
carriageway edge during night time.

2. Damaged Pedestrian Guard Railing damaged Damaged pedestrian guard Repair the pedestrian guard railing to avoid crossing of
at km 99+900 (median), 112+600 – 112+700 railing can become a hazard pedestrian on main carriageway.
(median), 113+200 (median) and 113+700 and lead to accident.
(RHS),

Revision Level: R0 March - 2023 Page 28 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600
of NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

S. Observations Reason for Concern Recommendations/Mitigation Measures


No.
3. Bridge railing damaged at km 101+600 (LHS) Vehicle may fall down in the Repair the Bridge railing immediately.
drain.

4. Detailed observation already given Audit of - Provide retro reflecting taps on MCB wherever is missing to
Hazards and in Audit spot Observations. enhance the night visibility.

1.11 Audit of Lighting and night time issues


1. During night audit pavement markings and -
road signs are visible.
2. Lighting has been provided below the grade - Regular inspection need to observe the visibility of
separator/underpass pavement marking on entire stretch of Highway Project
3. Lighting is proper at tollbooths of Toll Plaza at -
Km 10+750 (Vahana Toll Plaza) and Km
82+200 (Dumiyani Toll Plaza)
4. During night audit highway lighting is Absence of lighting on The minimum level of illumination on the stretches of the
working, wherever is provided. Highway give less visibility to Project Highway including Truck lay byes, Interchanges etc.
road user and Highway shall be 40 lux as per clause 12.3 of IRC: SP: 84-2014.
Project will become accident-
prone.

Revision Level: R0 March - 2023 Page 29 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600
of NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

S. Observations Reason for Concern Recommendations/Mitigation Measures


No.
5. High mast light is installed at toll plaza - Make lighting operational and lighting arrangement should
locations. be as per clause 10.4.17 of IRC: SP: 84-2014.

1.12 Audit of Toll Plaza

1. Toll Plaza at Km 10+750 (Vahana Toll Plaza) - Toll plaza should be maintained as per section 10 of IRC: SP:
and Km 82+200 (Dumiyani Toll Plaza) should 84-2014.
have all arrangements as per IRC guidelines
such as CCTV, user fare display units,
integrated toll management software, Fastag
facilities in all lane etc.
2. Toll rates related signboards rates are Information to road user -
displayed. regarding toll fee at toll plaza
location provided.

Detailed observation given in Audit spot


Observations.
3. Road marking at toll plaza is has been faded Road markings are required Provide road marking as per as accordance of clause 10.4.16
out such as lane marking, diagonals, chevron to facilitate smooth and safe of IRC: SP: 84-2014

Revision Level: R0 March - 2023 Page 30 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600
of NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

S. Observations Reason for Concern Recommendations/Mitigation Measures


No.
marking, transverse bar marking, diagonal movement of traffic on toll
marking for central traffic island. plaza
4. High mast light is working at toll plazas, - The minimum level of illumination of highway lighting on
locations. road surface at Toll Plaza as per clause 10.4.7 of IRC: SP: 84-
2014
5. HTMS/ATMS has observed on Project The Project Highway with Advance Traffic Management System (ATMS) should be
Highway such as 16 nos. of Vehicle Activated Highways Traffic maintained as per clause 816 of MORTH Specification and
Speed Cameras (VAS), 6 nos. of PTZ cameras Management System (HTMS/ Clause 12.12 of IRC : SP: 84-2014 for Highway Project
and 134 nos. of Video incident Detection ATMS)
System (VIDS) at Dumiyani Toll Plaza at Km ATMS shall have the following sub system:
82+200. 1. Variable Massage Signs System
2. Metrological Data System
3. Automatic Traffic Counter and Vehicle Classification
4. CCTV Surveillance System
5. Spot Speed detection systems
6. Video incident Detection System (VIDS) at all entry /exit
locations of interchanges/ Intersection, Black spot
locations, toll plaza locations

1.13 Audit of General road safety considerations


1. Truck lay bye has been provided on Project Absence of truck lay bye and Regular Highway patrol need to be strengthened to avoid
Highway. its facilities; it has been parking of trucks other places.
observed that other locations
trucks parked on Project
Highway and occupied the
carriageway space and

Revision Level: R0 March - 2023 Page 31 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600
of NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

S. Observations Reason for Concern Recommendations/Mitigation Measures


No.
shoulders leading to rear end
accidents.
2. Wayside amenities areas are not developed on Due to absence of Rest Area, Rest area should be developed and provide facilities as per
the project Highway (Both Side). driver could not take rest and clause 12.6 of IRC: SP: 84-2014.
refresh themselves so as to
ease their fatigue

Revision Level: R0 March - 2023 Page 32 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600
of NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

CHAPTER 4
4 DESIGN AUDIT CHECKLIST & AUDIT, OBSERVATIONS, AND RECOMMENDATIONS

4.1 AUDIT OF SIGHT DISTANCES

Safety Concern of Audit Findings Recommendations IE


ID No. Description Risk Description Priority Concessionaire Response
Chainage
(With Image if any) (With Image if any) Compliance and
Compliance
230201 Entire - Sight Distance are generally -
Project available along the Project
Stretch Highway.

 As per naked eyes, generally


sight distances are adequately
available for the Project
Highway.
 The desirable values of sight
distance has been adopted

Revision Level: R0 March - 2023 Page 33 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600
of NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

4.2 AUDIT OF INTERSECTIONS

Safety Concern of Audit Findings Recommendations IE


Concessionaire Response
ID No. Chainage Description Risk Description Priority Compliance and
(With Image if any) (With Image if any) Compliance
230202 13+900 High 1. Provide speed Essential
(LHS) breaker/Speed table as
per clause 3.1 of IRC-99-
2018 on both sides of the
cross road.
2. Signages at cross road
should be provided as per
IRC:67-2012, Fig. V.5
Minor side road with
speed breaker of page
Cross road towards village 131 (Annexure ‐5).
230203 20+700 High 1. Provide speed Essential
(LHS/RHS) breaker/Speed table as
per clause 3.1 of IRC-99-
2018 on both sides of the
cross road.
2. Signages at cross road
should be provided as per
IRC:67-2012, Fig. V.5
Minor side road with
speed breaker of page
Cross road on both sides towards 131 (Annexure ‐5).
village 3. Provide Solar Traffic LED
Blinker Light at the nose
of median opening on

Revision Level: R0 March - 2023 Page 34 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600
of NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

Safety Concern of Audit Findings Recommendations IE


Concessionaire Response
ID No. Chainage Description Risk Description Priority Compliance and
(With Image if any) (With Image if any) Compliance
both sides to alert the
drivers of median
opening during night.
4. Remove Electric pole
immediately and shifted
in utility corridor at end
of RoW with consultation
with concern department.
230204 23+970 High 1. Provide speed Essential
(LHS) breaker/Speed table as
per clause 3.1 of IRC-99-
2018 on both sides of the
cross road.
2. Signages at cross road
should be provided as per
IRC:67-2012, Fig. V.5
Minor side road with
speed breaker of page
Cross road on LHS towards village 131 (Annexure ‐5).
3. Provide Solar Traffic LED
Blinker Light at the nose
of median opening on
both sides to alert the
drivers of median
opening during night.

Revision Level: R0 March - 2023 Page 35 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600
of NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

Safety Concern of Audit Findings Recommendations IE


Concessionaire Response
ID No. Chainage Description Risk Description Priority Compliance and
(With Image if any) (With Image if any) Compliance
230205 25+200 High 1. Provide speed
(LHS) breaker/Speed table as
per clause 3.1 of IRC-99-
2018 on both sides of the
cross road.
2. Signages at cross road
should be provided as per
IRC:67-2012, Fig. V.5
Minor side road with
speed breaker of page
Cross road towards village 131 (Annexure ‐5).
230206 34+370 High 1. Close unauthorized Essential
(RHS) median cut.
2. LVUP is require at
34+250 with service road
considering the site
condition.
3. It is recomanaded that
traffic survey shall be
conducted at cross road
and analyzed the
Cross road towards village on RHS. requirement of LVUP.

Revision Level: R0 March - 2023 Page 36 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600
of NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

Safety Concern of Audit Findings Recommendations IE


Concessionaire Response
ID No. Chainage Description Risk Description Priority Compliance and
(With Image if any) (With Image if any) Compliance
230207

Unauthorized median cut.


230208 43+300 High 1. Provide speed Essential
(RHS) breaker/Speed table as
per clause 3.1 of IRC-99-
2018 on both sides of the
cross road.
2. Signages at cross road
should be provided as per
IRC:67-2012, Fig. V.5
Minor side road with
speed breaker of page
Minor junction towards village 131 (Annexure ‐5).
3. Provide Solar Traffic LED
Blinker Light at the nose
of median opening on
both sides to alert the

Revision Level: R0 March - 2023 Page 37 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600
of NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

Safety Concern of Audit Findings Recommendations IE


Concessionaire Response
ID No. Chainage Description Risk Description Priority Compliance and
(With Image if any) (With Image if any) Compliance
drivers of median
opening during night.
4. Remove Electric pole
immediately and shifted
in utility corridor at end
of RoW with consultation
with concern department.
230209 103+600 High 1. Provide speed Essential
(RHS) breaker/Speed table as
per clause 3.1 of IRC-99-
2018 on both sides of the
cross road.
2. Signages at cross road
should be provided as per
IRC:67-2012, Fig. V.5
Minor side road with
speed breaker of page
Minor junction towards village 131 (Annexure ‐5).

Revision Level: R0 March - 2023 Page 38 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600
of NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

Safety Concern of Audit Findings Recommendations IE


Concessionaire Response
ID No. Chainage Description Risk Description Priority Compliance and
(With Image if any) (With Image if any) Compliance
230210 115+550 1. Requirement of VUP can
(RHS) be provided after traffic
analysis at this location as
long term mitigation
measures .
2. It is recommended to
conduct a traffic survey to
analyze the traffic.
3. Provide speed
breaker/Speed table as
Built up section on both sides. per clause 3.1 of IRC-99-
230211 2018 on both sides of the
cross road.
4. Signages at cross road
should be provided as per
IRC:67-2012, Fig. V.5
Minor side road with
speed breaker of page
131 (Annexure ‐5).

Cross road towards village. High


mast light available at junction.

Revision Level: R0 March - 2023 Page 39 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600
of NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

Safety Concern of Audit Findings Recommendations IE


Concessionaire Response
ID No. Chainage Description Risk Description Priority Compliance and
(With Image if any) (With Image if any) Compliance
230213

Underpass available at Km 115+575.


230213 116+700 High 1. Provide speed Essential
(RHS) breaker/Speed table as
per clause 3.1 of IRC-99-
2018 on both sides of the
cross road.
2. Signages at cross road
should be provided as per
IRC:67-2012, Fig. V.5
Minor side road with
speed breaker of page
Cross road towards Jeptur. Signages 131 (Annexure ‐5).
on cross road is missing.

Revision Level: R0 March - 2023 Page 40 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600
of NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

Intersections & Approaches


General Observation & Recommendations:

 The entire crossroads joining the main road should be developed with a 15 m flat gradient at the junction and thereafter 1% vertical gradient, Flaring
is also to be done with island on junctions as per CA.
 Speed table/Speed hump on the crossroad should be provided before joining with the main carriageway on the flat portion.
 Y-junctions should be meet with the main carriageway at less than 600. This is required to encourage slow controlling speed on the crossroad before
traffic enters the main road
 On major junctions, Pedestrian’s safety shall be ensured by providing footpath, railing, etc. as according to IRC clause 7.2.4 fig. 2 of IRC 103-1988.
 The paved shoulder should be constructed on Junctions.
 Provide cat’s eyes or road studs as per clause 9.5, table 9.1-page no. 89 & 90 of IRC: SP: 84-2014.
 Provide zebra crossing at all the junctions as per clause 12.2-page no. 131 of IRC: SP: 84-2014.
 Traffic Light Blinker (L.E.D.) shall be provided at all the intersections

Revision Level: R0 March - 2023 Page 41 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600
of NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

4.3 AUDIT OF INTERCHANGES

Safety Concern of Audit Findings Recommendations IE


Concessionaire Response
ID No. Chainage Description Risk Description Priority Compliance and
(With Image if any) (With Image if any) Compliance
230214 2+600 High 1. Direction Information sign Essential
(Underpa should be provided as per
ss) Clause 9.2.9 and Fig. 9.2 of
page 83 of IRC:84-2014.
Gantry and shoulder mounted
Advance Direction Sign shall
be provided in advance of an
interchange/ Flyover/ VUP or
any urban reach. Flag type
direction information sign
Traverse bar marking has been shall be installed at the start
provided. of deceleration length or
230215 gorge indicating the
destinations of the side roads.
(Annexure – 7).
2. Repair the potholes for safe
traffic movement.

Potholes on road surface.

Revision Level: R0 March - 2023 Page 42 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600
of NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

Safety Concern of Audit Findings Recommendations IE


Concessionaire Response
ID No. Chainage Description Risk Description Priority Compliance and
(With Image if any) (With Image if any) Compliance
230216 7+900 High 1. Provide Vertical clearance Essential
(Underpa sign board.
ss) 2. Provide black and yellow
stripes sloping downwards at
an angle of 45 degrees
towards traffic on face of
underpass as per Clause 14.2
of IRC:35-2015, page 90.

1. Vertical Clearance sign board


not provided.
230217

2. Direction sign provided.


3. Traverse bar marking has been
provided.

Revision Level: R0 March - 2023 Page 43 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600
of NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

Safety Concern of Audit Findings Recommendations IE


Concessionaire Response
ID No. Chainage Description Risk Description Priority Compliance and
(With Image if any) (With Image if any) Compliance
230218 15+100 High 1. Provide speed breaker/Speed Essential
(PUP) table as per clause 3.1 of IRC-
99-2018 on cross road.
2. Signages at cross road should
be provided as per IRC:67-
2012, Fig. V.5 Minor side road
with speed breaker of page
131 (Annexure ‐5).
3. Provide Vertical clearance
sign board.
1. Vertical Clearance sign board 4. Provide kerb and pavement
not provided. marking on service road as
2. Kerb and pavement marking per IRC:35-2015.
has been faded out. 5. Provide black and yellow
3. Direction sign not provided. stripes sloping downwards at
an angle of 45 degrees
towards traffic on face of
underpass as per Clause 14.2
of IRC:35-2015, page 90.
6. Direction Information sign
should be provided as per
Clause 9.2.9 and Fig. 9.2 of
page 83 of IRC:84-2014.
Gantry and shoulder mounted
Advance Direction Sign shall
be provided in advance of an
interchange/ Flyover/ VUP or

Revision Level: R0 March - 2023 Page 44 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600
of NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

Safety Concern of Audit Findings Recommendations IE


Concessionaire Response
ID No. Chainage Description Risk Description Priority Compliance and
(With Image if any) (With Image if any) Compliance
any urban reach. Flag type
direction information sign
shall be installed at the start
of deceleration length or
gorge indicating the
destinations of the side roads.
(Annexure – 7)
7. Cleaning is required on
regular interval .
230219 17+500 High 1. Provide speed breaker/Speed Essential
(VUP) table as per clause 3.1 of IRC-
99-2018 on cross road.
2. Signages at cross road should
be provided as per IRC:67-
2012, Fig. V.5 Minor side road
with speed breaker of page
131 (Annexure ‐5).
3. Provide Vertical clearance
sign board.
1. Vertical Clearance sign board 4. Provide kerb and pavement
not provided. marking on service road as
2. Kerb and pavement marking per IRC:35-2015.
has been faded out. 5. Provide black and yellow
3. Direction sign not provided. stripes sloping downwards at
an angle of 45 degrees
towards traffic on face of

Revision Level: R0 March - 2023 Page 45 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600
of NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

Safety Concern of Audit Findings Recommendations IE


Concessionaire Response
ID No. Chainage Description Risk Description Priority Compliance and
(With Image if any) (With Image if any) Compliance
underpass as per Clause 14.2
of IRC:35-2015, page 90.
6. Direction Information sign
should be provided as per
Clause 9.2.9 and Fig. 9.2 of
page 83 of IRC:84-2014.
Gantry and shoulder mounted
Advance Direction Sign shall
be provided in advance of an
interchange/ Flyover/ VUP or
any urban reach. Flag type
direction information sign
shall be installed at the start
of deceleration length or
gorge indicating the
destinations of the side roads.
(Annexure – 7).
230220 24+990 High 1. Provide speed breaker/Speed Essential
(LVUP) table as per clause 3.1 of IRC-
99-2018 on cross road.
2. Signages at cross road should
be provided as per IRC:67-
2012, Fig. V.5 Minor side road
with speed breaker of page
131 (Annexure ‐5).
3. Provide Vertical clearance
sign board.

Revision Level: R0 March - 2023 Page 46 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600
of NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

Safety Concern of Audit Findings Recommendations IE


Concessionaire Response
ID No. Chainage Description Risk Description Priority Compliance and
(With Image if any) (With Image if any) Compliance
1. Vertical Clearance sign board 4. Provide kerb and pavement
not provided. marking on service road as
2. Kerb and pavement marking per IRC:35-2015.
has been faded out. 5. Provide black and yellow
3. Direction sign not provided. stripes sloping downwards at
an angle of 45 degrees
towards traffic on face of
underpass as per Clause 14.2
of IRC:35-2015, page 90.
6. Direction Information sign
should be provided as per
Clause 9.2.9 and Fig. 9.2 of
page 83 of IRC:84-2014.
Gantry and shoulder mounted
Advance Direction Sign shall
be provided in advance of an
interchange/ Flyover/ VUP or
any urban reach. Flag type
direction information sign
shall be installed at the start
of deceleration length or
gorge indicating the
destinations of the side roads.
(Annexure – 7)

Revision Level: R0 March - 2023 Page 47 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600
of NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

Safety Concern of Audit Findings Recommendations IE


Concessionaire Response
ID No. Chainage Description Risk Description Priority Compliance and
(With Image if any) (With Image if any) Compliance
230221 45+900 High 1. Provide speed breaker/Speed Essential
(VUP) table as per clause 3.1 of IRC-
99-2018 on cross road.
2. Signages at cross road should
be provided as per IRC:67-
2012, Fig. V.5 Minor side road
with speed breaker of page
131 (Annexure ‐5).
3. Provide Vertical clearance
sign board.
1. Vertical Clearance sign board 4. Provide kerb and pavement
not provided. marking on service road as
230222 per IRC:35-2015.
5. Provide black and yellow
stripes sloping downwards at
an angle of 45 degrees
towards traffic on face of
underpass as per Clause 14.2
of IRC:35-2015, page 90.
6. Direction Information sign
should be provided as per
Clause 9.2.9 and Fig. 9.2 of
2. Kerb and pavement marking page 83 of IRC:84-2014.
has been faded out. Gantry and shoulder mounted
3. Direction sign not provided. Advance Direction Sign shall
be provided in advance of an
interchange/ Flyover/ VUP or

Revision Level: R0 March - 2023 Page 48 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600
of NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

Safety Concern of Audit Findings Recommendations IE


Concessionaire Response
ID No. Chainage Description Risk Description Priority Compliance and
(With Image if any) (With Image if any) Compliance
any urban reach. Flag type
direction information sign
shall be installed at the start
of deceleration length or
gorge indicating the
destinations of the side roads.
(Annexure – 7).

230223 47+695 High 1. Provide speed breaker/Speed Essential


(LVUP) table as per clause 3.1 of IRC-
99-2018 on cross road.
2. Signages at cross road should
be provided as per IRC:67-
2012, Fig. V.5 Minor side road
with speed breaker of page
131 (Annexure ‐5).
3. Provide Vertical clearance
sign board.
1. Vertical Clearance sign board 4. Provide kerb and pavement
not provided. marking on service road as
per IRC:35-2015.
5. Provide black and yellow
stripes sloping downwards at
an angle of 45 degrees
towards traffic on face of

Revision Level: R0 March - 2023 Page 49 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600
of NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

Safety Concern of Audit Findings Recommendations IE


Concessionaire Response
ID No. Chainage Description Risk Description Priority Compliance and
(With Image if any) (With Image if any) Compliance
230224 underpass as per Clause 14.2
of IRC:35-2015, page 90.
6. Direction Information sign
should be provided as per
Clause 9.2.9 and Fig. 9.2 of
page 83 of IRC:84-2014.
Gantry and shoulder mounted
Advance Direction Sign shall
be provided in advance of an
interchange/ Flyover/ VUP or
2. Kerb and pavement marking any urban reach. Flag type
has been faded out. direction information sign
3. Direction sign not provided. shall be installed at the start
of deceleration length or
gorge indicating the
destinations of the side roads.
(Annexure – 7).
230225 53+350 High 1. Provide Vertical clearance Essential
(PUP) sign board.
2. Provide kerb and pavement
marking on service road as
per IRC:35-2015.
3. Provide black and yellow
stripes sloping downwards at
an angle of 45 degrees
towards traffic on face of

Revision Level: R0 March - 2023 Page 50 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600
of NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

Safety Concern of Audit Findings Recommendations IE


Concessionaire Response
ID No. Chainage Description Risk Description Priority Compliance and
(With Image if any) (With Image if any) Compliance
1. Vertical Clearance sign board underpass as per Clause 14.2
is provided but markings has of IRC:35-2015, page 90.
been faded out. 4. Provide kerb and pavement
2. Kerb and pavement marking marking on service road as
has been faded out. per IRC:35-2015.

230226 62+200 High 1. Provide speed breaker/Speed Essential


(VUP) table as per clause 3.1 of IRC-
99-2018 on cross road.
2. Signages at cross road should
be provided as per IRC:67-
2012, Fig. V.5 Minor side road
with speed breaker of page
131 (Annexure ‐5).
3. Provide Vertical clearance
sign board.
1. Vertical Clearance sign board
message has been faded out.

Revision Level: R0 March - 2023 Page 51 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600
of NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

Safety Concern of Audit Findings Recommendations IE


Concessionaire Response
ID No. Chainage Description Risk Description Priority Compliance and
(With Image if any) (With Image if any) Compliance
230227 4. Provide kerb and pavement
marking on service road as
per IRC:35-2015.
5. Provide black and yellow
stripes sloping downwards at
an angle of 45 degrees
towards traffic on face of
underpass as per Clause 14.2
of IRC:35-2015, page 90.
6. Provide Object hazard marker
2. Kerb and pavement marking sign board as per Clause 15.64
has been faded out on service of IRC:67:2012.
230228 road. 7. Direction Information sign
should be provided as per
Clause 9.2.9 and Fig. 9.2 of
page 83 of IRC:84-2014.
Gantry and shoulder mounted
Advance Direction Sign shall
be provided in advance of an
interchange/ Flyover/ VUP or
any urban reach. Flag type
direction information sign
shall be installed at the start
3. Hazard marker not provided. of deceleration length or
gorge indicating the
destinations of the side roads.
(Annexure – 7).

Revision Level: R0 March - 2023 Page 52 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600
of NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

Safety Concern of Audit Findings Recommendations IE


Concessionaire Response
ID No. Chainage Description Risk Description Priority Compliance and
(With Image if any) (With Image if any) Compliance
230229

4. Direction sign not provided.


230230 72+500 High 1. Provide speed breaker/Speed Essential
(VUP) table as per clause 3.1 of IRC-
99-2018 on cross road.
2. Signages at cross road should
be provided as per IRC:67-
2012, Fig. V.5 Minor side road
with speed breaker of page
131 (Annexure ‐5).
3. Provide Vertical clearance
sign board.
1. Vertical Clearance sign board 4. Provide kerb and pavement
message has been faded out. marking on service road as
per IRC:35-2015.
5. Provide black and yellow
stripes sloping downwards at
an angle of 45 degrees

Revision Level: R0 March - 2023 Page 53 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600
of NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

Safety Concern of Audit Findings Recommendations IE


Concessionaire Response
ID No. Chainage Description Risk Description Priority Compliance and
(With Image if any) (With Image if any) Compliance
230231 towards traffic on face of
underpass as per Clause 14.2
of IRC:35-2015, page 90.
6. Direction Information sign
should be provided as per
Clause 9.2.9 and Fig. 9.2 of
page 83 of IRC:84-2014.
Gantry and shoulder mounted
Advance Direction Sign shall
be provided in advance of an
2. Kerb and pavement marking interchange/ Flyover/ VUP or
has been faded out on service any urban reach. Flag type
230232 road. direction information sign
shall be installed at the start of
deceleration length or gorge
indicating the destinations of
the side roads. (Annexure –
7).
7. Repair the pavement surface
on service road.

3. Poor pavement surface on


service road.
4. Direction sign not provided.

Revision Level: R0 March - 2023 Page 54 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600
of NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

Safety Concern of Audit Findings Recommendations IE


Concessionaire Response
ID No. Chainage Description Risk Description Priority Compliance and
(With Image if any) (With Image if any) Compliance
230233 76+100 High 1. Provide speed breaker/Speed Essential
(VUP) table as per clause 3.1 of IRC-
99-2018 on cross road.
2. Signages at cross road should
be provided as per IRC:67-
2012, Fig. V.5 Minor side road
with speed breaker of page
131 (Annexure ‐5).
3. Provide Vertical clearance
sign board.
1. Vertical Clearance sign board 4. Provide kerb and pavement
not provided. marking on service road as
2. Kerb and pavement marking per IRC:35-2015.
has been faded out. 5. Provide black and yellow
3. Direction sign provided. stripes sloping downwards at
an angle of 45 degrees
towards traffic on face of
underpass as per Clause 14.2
of IRC:35-2015, page 90.

Revision Level: R0 March - 2023 Page 55 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600
of NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

Safety Concern of Audit Findings Recommendations IE


Concessionaire Response
ID No. Chainage Description Risk Description Priority Compliance and
(With Image if any) (With Image if any) Compliance
230234 78+200 High 1. Provide speed breaker/Speed Essential
(VUP) table as per clause 3.1 of IRC-
99-2018 on cross road.
2. Signages at cross road should
be provided as per IRC:67-
2012, Fig. V.5 Minor side road
with speed breaker of page
131 (Annexure ‐5).
3. Provide Vertical clearance
sign board.
1. Vertical Clearance sign board 4. Provide kerb and pavement
not provided. marking on service road as
2. Kerb and pavement marking per IRC:35-2015.
230235 has been faded out. 5. Chevron/diagonal marking
with red color road studs shall
be provided as per IRC: 35-
2015 as per Clause 5.5.5, page
30 and Clause 7.2, Table 7.1:
Spacing between Diagonals /
Chevrons, at page 36.

3. Direction sign not provided.

Revision Level: R0 March - 2023 Page 56 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600
of NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

Safety Concern of Audit Findings Recommendations IE


Concessionaire Response
ID No. Chainage Description Risk Description Priority Compliance and
(With Image if any) (With Image if any) Compliance
230236

4. Unauthorized encroachment.
230237
6. Provide black and yellow
stripes sloping downwards at
an angle of 45 degrees
towards traffic on face of
underpass as per Clause 14.2
of IRC:35-2015, page 90.
7. Direction Information sign
should be provided as per
Clause 9.2.9 and Fig. 9.2 of
5. Chevron marking not
page 83 of IRC:84-2014.
provided.
Gantry and shoulder mounted
Advance Direction Sign shall
be provided in advance of an
interchange/ Flyover/ VUP or
any urban reach. Flag type

Revision Level: R0 March - 2023 Page 57 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600
of NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

Safety Concern of Audit Findings Recommendations IE


Concessionaire Response
ID No. Chainage Description Risk Description Priority Compliance and
(With Image if any) (With Image if any) Compliance
direction information sign
shall be installed at the start
of deceleration length or
gorge indicating the
destinations of the side roads.
(Annexure – 7).
230238 79+900 High 1. Provide speed breaker/Speed Essential
(LVUP) table as per clause 3.1 of IRC-
99-2018 on cross road.
2. Signages at cross road should
be provided as per IRC:67-
2012, Fig. V.5 Minor side road
with speed breaker of page
131 (Annexure ‐5).
3. Provide Vertical clearance
sign board.
1. Vertical Clearance sign board 4. Provide kerb and pavement
not provided. marking on service road as
2. Kerb and pavement marking per IRC:35-2015.
has been faded out. 5. Chevron/diagonal marking
with red color road studs shall
be provided as per IRC: 35-
2015 as per Clause 5.5.5, page
30 and Clause 7.2, Table 7.1:
Spacing between Diagonals /
Chevrons, at page 36.

Revision Level: R0 March - 2023 Page 58 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600
of NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

Safety Concern of Audit Findings Recommendations IE


Concessionaire Response
ID No. Chainage Description Risk Description Priority Compliance and
(With Image if any) (With Image if any) Compliance
230239

3. Poor condition of pavement on


230240 service road.
6. Provide black and yellow
stripes sloping downwards at
an angle of 45 degrees
towards traffic on face of
underpass as per Clause 14.2
of IRC:35-2015, page 90.
7. Repair the poor pavement of
service road.
8. Direction Information sign
should be provided as per
4. Direction sign provided. Clause 9.2.9 and Fig. 9.2 of
page 83 of IRC:84-2014.
Gantry and shoulder mounted
Advance Direction Sign shall
be provided in advance of an

Revision Level: R0 March - 2023 Page 59 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600
of NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

Safety Concern of Audit Findings Recommendations IE


Concessionaire Response
ID No. Chainage Description Risk Description Priority Compliance and
(With Image if any) (With Image if any) Compliance
interchange/ Flyover/ VUP or
any urban reach. Flag type
direction information sign
shall be installed at the start
of deceleration length or
gorge indicating the
destinations of the side roads.
(Annexure – 7).
230241 87+600 High 1. Develop Entry/Exit Essential
(LVUP) Arrangement with
Service/Slip road as per fig
2.1A of IRC:SP-84-2014
(Attached Annexure‐2).
2. Provide speed breaker/Speed
table as per clause 3.1 of IRC-
99-2018 on cross road.
3. Signages at cross road should
be provided as per IRC:67-
1. Vertical Clearance sign board 2012, Fig. V.5 Minor side road
not provided. with speed breaker of page
2. Kerb and pavement marking 131 (Annexure ‐5).
has been faded out. 4. Provide Vertical clearance
sign board.
5. Provide kerb and pavement
marking on service road as
per IRC:35-2015.

Revision Level: R0 March - 2023 Page 60 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600
of NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

Safety Concern of Audit Findings Recommendations IE


Concessionaire Response
ID No. Chainage Description Risk Description Priority Compliance and
(With Image if any) (With Image if any) Compliance
230242 6. Chevron/diagonal marking
with red color road studs shall
be provided as per IRC: 35-
2015 as per Clause 5.5.5, page
30 and Clause 7.2, Table 7.1:
Spacing between Diagonals /
Chevrons, at page 36.

3. Metal beam crash barrier needs


to be extended at service road
due to high embankment.
4. Chevron marking not provided
at exit location at Km 87+300.

7. Provide black and yellow


stripes sloping downwards at
an angle of 45 degrees
towards traffic on face of
underpass as per Clause 14.2
of IRC:35-2015, page 90.
8. Direction Information sign
should be provided as per

Revision Level: R0 March - 2023 Page 61 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600
of NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

Safety Concern of Audit Findings Recommendations IE


Concessionaire Response
ID No. Chainage Description Risk Description Priority Compliance and
(With Image if any) (With Image if any) Compliance
Clause 9.2.9 and Fig. 9.2 of
page 83 of IRC:84-2014.
Gantry and shoulder mounted
Advance Direction Sign shall
be provided in advance of an
interchange/ Flyover/ VUP or
any urban reach. Flag type
direction information sign
shall be installed at the start
of deceleration length or
gorge indicating the
destinations of the side roads.
(Annexure – 7)
230243 96+100 High 1. Develop Entry/Exit Essential
(VUP) Arrangement with
Service/Slip road as per fig
2.1A of IRC:SP-84-2014
(Annexure‐2).
2. Provide speed breaker/Speed
table as per clause 3.1 of IRC-
99-2018 on cross road.
3. Signages at cross road should
be provided as per IRC:67-
1. Vertical Clearance sign board 2012, Fig. V.5 Minor side road
not provided. with speed breaker of page
131 (Annexure ‐5).

Revision Level: R0 March - 2023 Page 62 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600
of NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

Safety Concern of Audit Findings Recommendations IE


Concessionaire Response
ID No. Chainage Description Risk Description Priority Compliance and
(With Image if any) (With Image if any) Compliance
230244 4. Provide Vertical clearance
sign board.
5. Provide kerb and pavement
marking on service road as
per IRC:35-2015.
6. Chevron/diagonal marking
with red color road studs shall
be provided as per IRC: 35-
2015 as per Clause 5.5.5, page
30 and Clause 7.2, Table 7.1:
2. Kerb and pavement marking Spacing between Diagonals /
230245 has been faded out. Chevrons, at page 36.

3. Chevron marking not provided


at exit location at Km 95+800.
7. Provide black and yellow
stripes sloping downwards at
an angle of 45 degrees

Revision Level: R0 March - 2023 Page 63 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600
of NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

Safety Concern of Audit Findings Recommendations IE


Concessionaire Response
ID No. Chainage Description Risk Description Priority Compliance and
(With Image if any) (With Image if any) Compliance
towards traffic on face of
underpass as per Clause 14.2
of IRC:35-2015, page 90.
8. Direction Information sign
should be provided as per
Clause 9.2.9 and Fig. 9.2 of
page 83 of IRC:84-2014.
Gantry and shoulder mounted
Advance Direction Sign shall
be provided in advance of an
interchange/ Flyover/ VUP or
any urban reach. Flag type
direction information sign
shall be installed at the start
of deceleration length or
gorge indicating the
destinations of the side roads.
(Annexure – 7)

Revision Level: R0 March - 2023 Page 64 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600
of NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

Safety Concern of Audit Findings Recommendations IE


Concessionaire Response
ID No. Chainage Description Risk Description Priority Compliance and
(With Image if any) (With Image if any) Compliance
230246 97+450 High 1. Provide speed breaker/Speed Essential
(LVUP) table as per clause 3.1 of IRC-
99-2018 on cross road.
2. Signages at cross road should
be provided as per IRC:67-
2012, Fig. V.5 Minor side road
with speed breaker of page
131 (Annexure ‐5).
3. Provide Vertical clearance
sign board.
1. Vertical Clearance sign board 4. Provide kerb and pavement
not provided. marking on service road as
230247 per IRC:35-2015.
5. Provide black and yellow
stripes sloping downwards at
an angle of 45 degrees
towards traffic on face of
underpass as per Clause 14.2
of IRC:35-2015, page 90.
6. Direction Information sign
should be provided as per
Clause 9.2.9 and Fig. 9.2 of
2. Kerb and pavement marking page 83 of IRC:84-2014.
has been faded out. Gantry and shoulder mounted
3. Cleaning is required at LVUP Advance Direction Sign shall
location. be provided in advance of an
interchange/ Flyover/ VUP or

Revision Level: R0 March - 2023 Page 65 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600
of NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

Safety Concern of Audit Findings Recommendations IE


Concessionaire Response
ID No. Chainage Description Risk Description Priority Compliance and
(With Image if any) (With Image if any) Compliance
230248 any urban reach. Flag type
direction information sign
shall be installed at the start
of deceleration length or
gorge indicating the
destinations of the side roads.
(Annexure – 7)
7. Cleaning is required at LVUP
location.
8. Channelizing island needs to
4. Channelizing island needs to be repaired.
230249 be repaired. 9. Chevron/diagonal marking
with red color road studs shall
be provided as per IRC: 35-
2015 as per Clause 5.5.5, page
30 and Clause 7.2, Table 7.1:
Spacing between Diagonals /
Chevrons, at page 36.

5. Chevron marking not


provided.

Revision Level: R0 March - 2023 Page 66 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600
of NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

Safety Concern of Audit Findings Recommendations IE


Concessionaire Response
ID No. Chainage Description Risk Description Priority Compliance and
(With Image if any) (With Image if any) Compliance

230250 105+800 High 1. Develop Entry/Exit Essential


(LVUP) Arrangement with
Service/Slip road as per fig
2.1A of IRC:SP-84-2014
(Attached Annexure‐2).
2. Provide speed breaker/Speed
table as per clause 3.1 of IRC-
99-2018 on cross road.
3. Signages at cross road should
be provided as per IRC:67-
1. Vertical Clearance sign board 2012, Fig. V.5 Minor side road
not provided. with speed breaker of page
2. Kerb and pavement marking 131 (Annexure ‐5).
has been faded out. 4. Provide Vertical clearance
sign board.

Revision Level: R0 March - 2023 Page 67 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600
of NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

Safety Concern of Audit Findings Recommendations IE


Concessionaire Response
ID No. Chainage Description Risk Description Priority Compliance and
(With Image if any) (With Image if any) Compliance
230251 5. Provide kerb and pavement
marking on service road as
per IRC:35-2015.
6. Down take pipe is open under
VUP. Repair down take
drainage pipe and drainage
pipe shall be connected to
nearest drain.
7. Provide black and yellow
stripes sloping downwards at
3. Entry to slip road not proper. an angle of 45 degrees
230252 towards traffic on face of
underpass as per Clause 14.2
of IRC:35-2015, page 90.
8. Direction Information sign
should be provided as per
Clause 9.2.9 and Fig. 9.2 of
page 83 of IRC:84-2014.
Gantry and shoulder mounted
Advance Direction Sign shall
be provided in advance of an
4. Damaged Down take pipe interchange/ Flyover/ VUP or
under PUP. any urban reach. Flag type
direction information sign
shall be installed at the start
of deceleration length or
gorge indicating the

Revision Level: R0 March - 2023 Page 68 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600
of NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

Safety Concern of Audit Findings Recommendations IE


Concessionaire Response
ID No. Chainage Description Risk Description Priority Compliance and
(With Image if any) (With Image if any) Compliance
230253 destinations of the side roads.
(Annexure – 7)

5. Cross road towards village.


230254 111+000 High Short Term Measure: Essential
(Major 1. Direction Information sign
Junction) should be provided as per
Clause 9.2.9 and Fig. 9.2 of
page 83 of IRC:84-2014.
Gantry and shoulder mounted
Advance Direction Sign shall
be provided in advance of an
interchange/ Flyover/ VUP or
any urban reach. Flag type
1. Major junction at Km 111+000 direction information sign
towards Somnath/Junagadh shall be installed at the start
(NH-151), Porbandar/Dhoraji of deceleration length or
(NH-27) and Jetpur City (SH- gorge indicating the
351). destinations of the side roads.
(Annexure – 7)

Revision Level: R0 March - 2023 Page 69 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600
of NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

Safety Concern of Audit Findings Recommendations IE


Concessionaire Response
ID No. Chainage Description Risk Description Priority Compliance and
(With Image if any) (With Image if any) Compliance
230255 2. Provide speed breaker/Speed
table as per clause 3.1 of IRC-
99-2018 on cross road.
3. Signages at cross road should
be provided as per IRC:67-
2012, Fig. V.5 Minor side road
with speed breaker of page
131 (Annexure ‐5).
4. Provide Thermoplastic
Traverse Bar Marking (3 sets)
2. High mast light provided at on both sides of Hazardous
junction. Reach as per Fig 11.2 of IRC-
3. Traverse bar marking has been 35-2015 to alert the drivers to
provided on only half width of reduce the speed of vehicle on
carriageway. main carriageway
230256 (Annexure‐1).
5. Restrict vehicular speeds to
40 km/h for cars and 30 kmph
for heavy vehicles on these
roads along with traffic
calming measures as per IRC:
99-2018.
Long Term Measure:
1. Provide VUP with service
road as NH to NH Crossing
4. Zebra crossing along with road
studs has been provided.

Revision Level: R0 March - 2023 Page 70 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600
of NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

Intersections & Approaches


General Observation & Recommendations:

 The entire crossroads joining the main road should be developed with a 15 m flat gradient at the junction and thereafter 1% vertical gradient, Flaring
is also to be done with island on junctions as per CA.
 Speed table/Speed hump on the crossroad should be provided before joining with the main carriageway on the flat portion.
 Y-junctions should be meet with the main carriageway at less than 600. This is required to encourage slow controlling speed on the crossroad before
traffic enters the main road
 On major junctions, Pedestrian’s safety shall be ensured by providing footpath, railing, etc. as according to IRC clause 6.1.9.3 fig. 3 of IRC 103-2012.
 The paved shoulder should be constructed on Junctions.
 Provide cat’s eyes or road studs as per clause 9.5, table 9.1-page no. 89 & 90 of IRC: SP: 84-2014.
 Provide zebra crossing at all the junctions as per clause 12.2-page no. 131 of IRC: SP: 84-2014.
 Traffic Light Blinker (L.E.D.) shall be provided at all the Median opening location and all the intersections .

Revision Level: R0 March - 2023 Page 71 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

4.4 AUDIT OF CROSS SECTION

Safety Concern of Audit Findings Recommendations IE Response


Concessionaire
ID No. Chainage Description (With Image if any) Risk Description Priority and
Compliance
(With Image if any) Compliance
230257 13+900 – Very Provide Safety Barrier on main Essential
14+500 High carriageway portion as per
(LHS/RHS) clause 5.10 of IRC:119-2015.

4 lane section with service road


Level difference in between service
road and main carriageway.
230258 15+300 – Very Provide Safety Barrier on main Essential
17+130 High carriageway portion as per
(LHS/RHS) clause 5.10 of IRC:119-2015.

4 lane section with service road


Level difference in between service
road and main carriageway.

Revision Level: R0 March - 2023 Page 72 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

4.5 AUDIT OF ROAD HAZARDS

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
230259 2+400 High Chevron/diagonal marking Essential
(LHS) with red color road studs shall
be provided as per IRC: 35-
2015 as per Clause 5.5.5, page
30 and Clause 7.2, Table 7.1:
Spacing between Diagonals /
Chevrons, at page 36.

Chevron marking not provided

Revision Level: R0 March - 2023 Page 73 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
230260 3+500 High Chevron/diagonal marking Essential
(RHS) with red color road studs shall
be provided as per IRC: 35-
2015 as per Clause 5.5.5, page
30 and Clause 7.2, Table 7.1:
Spacing between Diagonals /
Chevrons, at page 36.

Chevron marking not provided

Revision Level: R0 March - 2023 Page 74 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
230261 4+800 Very 1. Develop Entry/Exit Essential
(RHS) High Arrangement with
Service/Slip road as per fig
2.1A of IRC:SP-84-2014
(Annexure‐2).
2. Chevron/diagonal marking
with red color road studs
shall be provided as per
IRC: 35-2015 as per Clause
5.5.5, page 30 and Clause
Entry/Exit is not as per IRC 7.2, Table 7.1: Spacing
standards. between Diagonals /
Chevrons, at page 36.

Revision Level: R0 March - 2023 Page 75 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
230262 5+900 High 1. Provide Metal Beam Crash
(Median) barrier.
2. The minimum length of
safety barriers shall be
50m as per Clause 4.9 of
IRC: 119-2015 (Guidelines
for Traffic Safety Barriers).
For barriers at hazardous
location 2/3rd of length
shall be before the hazard
Hazard marker not provided along and 1/3rd after hazard.
with Metal beam crash barrier. 3. Provide Object hazard
marker sign board as per
Clause 15.64 of
IRC:67:2012.
230263 9+000 High Remove Electric pole Essential
(Median) immediately and shifted in
utility corridor at end of RoW
with consultation with concern
department.

Electric pole on median.

Revision Level: R0 March - 2023 Page 76 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
230264 10+100 High Repair damaged Metal beam Essential
(LHS) crash barrier.

Damaged Metal beam crash barrier.


230265 11+500 High 1. Provide Thermoplastic Essential
(Median) Traverse Bar Marking (3
sets) on both sides of
Hazardous Reach as per Fig
11.2 of IRC-35-2015 to
alert the drivers to reduce
the speed of vehicle on
main carriageway
(Annexure‐1).
2. Provide Metal Beam Crash
1. Narrow Bridge. barrier.
2. Hazard marker not provided 3. The minimum length of
along with Metal beam crash safety barriers shall be
barrier. 50m as per Clause 4.9 of
IRC: 119-2015 (Guidelines

Revision Level: R0 March - 2023 Page 77 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
for Traffic Safety Barriers).
For barriers at hazardous
location 2/3rd of length
shall be before the hazard
and 1/3rd after hazard.
4. Provide Object hazard
marker sign board as per
Clause 15.64 of
IRC:67:2012.
230266 12+300 High Provide Hazard Marker sign Essential
(LHS) board as per IRC: 67.

Hazard marker not provided.

Revision Level: R0 March - 2023 Page 78 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
230267 12+400 Very 1. Develop Entry/Exit Essential
(RHS) High Arrangement with
Service/Slip road as per fig
2.1A of IRC:SP-84-2014
(Attached Annexure‐2).
2. Chevron/diagonal marking
with red color road studs
shall be provided as per
IRC: 35-2015 as per Clause
5.5.5, page 30 and Clause
Entry/Exit is not as per IRC 7.2, Table 7.1: Spacing
standards. between Diagonals /
Chevrons, at page 36.

Revision Level: R0 March - 2023 Page 79 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
230268 12+700 High 1. Provide Metal beam crash Essential
(Median) barrier at hazards
locations.
2. The minimum length of
safety barriers shall be
50m as per Clause 4.9 IRC:
119-2015 (Guidelines for
Traffic Safety Barriers).
3. Provide Hazard Marker
sign board as per IRC: 67.
Safety barriers are not provided on 4. The methodology for fixing
Median side at hazards location. of Safety Barrier and the
end treatment for the
start/end of the Safety
Barrier shall be as per
clause 4.10, fig 13 and 14
page no 13-15 of IRC:
119:2015 (Annexure‐3).

Revision Level: R0 March - 2023 Page 80 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
230269 13+100 High 1. Provide Metal beam crash Essential
(LHS) barrier on main
carriageway side.
2. The methodology for fixing
of Safety Barrier and the
end treatment for the
start/end of the Safety
Barrier shall be as per
clause 4.10, fig 13 and 14
page no 13-15 of IRC:
Metal beam crash barrier not 119:2015 (Attached
provided on service road where level Annexure‐3).
difference inbetween main
carrigeway and service raod.
230270 13+200 – High 1. Provide Thrie Metal beam Essential
13+600 crash barrier on both sides
(LHS/RHS) between main carriageway
and service road.
2. The methodology for fixing
of Safety Barrier and the
end treatment for the
start/end of the Safety
Barrier shall be as per
clause 4.10, fig 13 and 14
Metal beam crash barrier not page no 13-15 of IRC:
provided as there is level difference 119:2015 (Annexure‐3).

Revision Level: R0 March - 2023 Page 81 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
between service road and
carriageway on both sides.

230271 14+100 – High 1. Provide Thrie Metal beam Essential


14+700 crash barrier on both sides
(LHS/RHS) between main carriageway
and service road.
2. The methodology for fixing
of Safety Barrier and the
end treatment for the
start/end of the Safety
Barrier shall be as per
clause 4.10, fig 13 and 14
Metal beam crash barrier not page no 13-15 of IRC:
provided as there is level difference 119:2015 (Annexure‐3).
between service road and
carriageway on both sides.

Revision Level: R0 March - 2023 Page 82 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
230272 14+800 High 1. Provide Metal beam crash Essential
(Median) barrier at median location.
2. The minimum length of
safety barriers shall be
50m as per Clause 4.9 IRC:
119-2015 (Guidelines for
Traffic Safety Barriers).
3. Provide Hazard Marker
sign board as per IRC: 67.
4. The methodology for fixing
Safety barriers are not provided on of Safety Barrier and the
Median at hazards location. end treatment for the
start/end of the Safety
Barrier shall be as per
clause 4.10, fig 13 and 14
page no 13-15 of IRC:
119:2015 (Annexure‐3).

Revision Level: R0 March - 2023 Page 83 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
230273 15+400 High 1. Provide Thrie Metal beam Essential
15+800 crash barrier on both sides
(LHS/RHS) between main carriageway
and service road.
2. The methodology for fixing
of Safety Barrier and the
end treatment for the
start/end of the Safety
Barrier shall be as per
clause 4.10, fig 13 and 14
Metal beam crash barrier not page no 13-15 of IRC:
provided as there is level difference 119:2015 (Annexure‐3).
between service road and
carriageway on both sides.
230274 16+200 High 1. Provide Thrie Metal beam Essential
16+500 crash barrier.
(RHS) 2. The methodology for fixing
of Safety Barrier and the
end treatment for the
start/end of the Safety
Barrier shall be as per
clause 4.10, fig 13 and 14
page no 13-15 of IRC:
119:2015 (Annexure‐3).
Metal beam crash barrier not
provided as there is level difference

Revision Level: R0 March - 2023 Page 84 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
between service road and
carriageway.

230275 17+600 High 1. Provide Metal beam crash Essential


(Median) barrier at median
locations.
2. The minimum length of
safety barriers shall be
50m as per Clause 4.9 IRC:
119-2015 (Guidelines for
Traffic Safety Barriers).
3. Provide Hazard Marker
sign board as per IRC: 67.
Safety barriers are not provided on 4. The methodology for fixing
Median at hazards location. of Safety Barrier and the
end treatment for the
start/end of the Safety
Barrier shall be as per
clause 4.10, fig 13 and 14
page no 13-15 of IRC:
119:2015 (Annexure‐3).

Revision Level: R0 March - 2023 Page 85 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
230276 18+500 High 1. Provide Hazard Markers as Essential
(RHS) per IRC-67.
2. Provide Thermoplastic
Traverse Bar Marking (3
sets) on both sides of
Hazardous Reach as per Fig
11.2 of IRC-35-2015 to
alert the drivers to reduce
the speed of vehicle on
main carriageway
1. Narrow Bridge (Annexure‐1).
2. Hazard marker not provided
before Metal beam crash
barrier.
230277 18+900 High Remove Electric pole Essential
(Median) immediately and shifted in
utility corridor at end of RoW
with consultation with concern
department.

Electric pole on median.

Revision Level: R0 March - 2023 Page 86 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
230278 19+500 High 1. Provide Thermoplastic Essential
(Median) Traverse Bar Marking (3
sets) on both sides of
Hazardous Reach as per Fig
11.2 of IRC-35-2015 to
alert the drivers to reduce
the speed of vehicle on
main carriageway
(Annexure‐1).
2. Provide Metal beam crash
1. Narrow Bridge. barrier at median side.
2. Safety barriers are not provided 3. The minimum length of
on Median side. safety barriers shall be
50m as per Clause 4.9 IRC:
119-2015 (Guidelines for
Traffic Safety Barriers).
4. Provide Hazard Marker
sign board as per IRC: 67.
5. The methodology for fixing
of Safety Barrier and the
end treatment for the
start/end of the Safety
Barrier shall be as per
clause 4.10, fig 13 and 14
page no 13-15 of IRC:
119:2015 (Annexure‐3).

Revision Level: R0 March - 2023 Page 87 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
230279 19+900 High Remove Electric pole Essential
(Median) immediately and shifted in
utility corridor at end of RoW
with consultation with concern
department.

Electric pole on median.


230280 20+400 High 1. Provide Thermoplastic Essential
(LHS) Traverse Bar Marking (3
sets) on both sides of
Hazardous Reach as per Fig
11.2 of IRC-35-2015 to
alert the drivers to reduce
the speed of vehicle on
main carriageway
(Annexure‐1).
2. At this location, abrupt
1. Narrow Bridge ending of MCB without
2. Metal beam crash barrier end integrating with CCB
treatment not done with CC created hazardous
barrier situation for the errant
vehicle. MCB shall be

Revision Level: R0 March - 2023 Page 88 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
3. If End treatment is not proper extended up to parapet
with faring of 17:1/14:1 for a wall as per IRC: 119, by
design speed of project overlapping for at least
highway, the vehicle may hit 60cm over the parapet
and an untreated end of the wall/CC Barrier as per
roadside barrier can be clause 4.11 and Fig 16 (W
hazardous and the beam barrier Beam to Concrete
can penetrate in to the vehicle Connection Details) of IRC
and lead to fatal accident. 119-2015 (Annexure‐2).
3. The methodology for fixing
of Safety Barrier and the
end treatment for the
start/end of the Safety
Barrier shall be as per
clause 4.10, fig 13 and 14
page no 13-15 of IRC:
119:2015 (Annexure‐3).

Revision Level: R0 March - 2023 Page 89 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
230281 20+500 High Provide Hazard Markers as per Essential
(LHS) IRC-67.

Hazard marker not provided before


Metal beam crash barrier.
230282 21+200 High 1. Remove Electric pole Essential
(Median) immediately and shifted in
utility corridor at end of
RoW with consultation
with concern department.
2. Provide Hazard Markers as
per IRC-67.

1. Electric pole on median.


2. Hazard marker not provided
before Metal beam crash
barrier.

Revision Level: R0 March - 2023 Page 90 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
230283 21+300 – High 1. Provide Thrie Metal beam Essential
21+600 crash barrier.
(Median) 2. The methodology for fixing
of Safety Barrier and the
end treatment for the
start/end of the Safety
Barrier shall be as per
clause 4.10, fig 13 and 14
page no 13-15 of IRC:
119:2015 (Annexure‐3).
Metal beam crash barrier not
provided as there is level difference
between both LHS and RHS
carriageway.
230284 21+800 High Remove Electric pole Essential
(Median) immediately and shifted in
utility corridor at end of RoW
with consultation with concern
department.

Electric pole on median.

Revision Level: R0 March - 2023 Page 91 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
230285 22+100 High Remove Electric pole Essential
(Median) immediately and shifted in
utility corridor at end of RoW
with consultation with concern
department.

Electric pole on median.


230286 22+400 High Provide Hazard Markers as per Essential
(LHS) IRC-67.

Hazard marker not provided before


Metal beam crash barrier.

Revision Level: R0 March - 2023 Page 92 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
230287 24+400 High Provide Hazard Markers as per Essential
(LHS) IRC-67.

Hazard marker not provided before


Metal beam crash barrier.
230288 25+600 High Provide Hazard Markers as per Essential
(RHS) IRC-67.

Hazard marker not provided before


Metal beam crash barrier.

Revision Level: R0 March - 2023 Page 93 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
230289 26+400 High Provide Hazard Markers as per Essential
(RHS) IRC-67.

Hazard marker not provided before


Metal beam crash barrier.
230290 26+800 High Provide Hazard Markers as per Essential
(LHS) IRC-67.

Hazard marker not provided before


Metal beam crash barrier.

Revision Level: R0 March - 2023 Page 94 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
230291 26+800 High 1. Provide Thermoplastic Essential
(Median) Traverse Bar Marking (3
sets) on both sides of
Hazardous Reach as per Fig
11.2 of IRC-35-2015 to
alert the drivers to reduce
the speed of vehicle on
main carriageway
(Annexure‐1).
2. Provide Metal beam crash
1. Narrow bridge. barrier at before railing of
2. Safety barriers are not provided bridges.
before railing of bridges. 3. The minimum length of
3. End treatment of metal beam safety barriers shall be
crash barrier not done on LHS. If 50m as per Clause 4.9 IRC:
End treatment is not proper 119-2015 (Guidelines for
with faring of 17:1/14:1 for a Traffic Safety Barriers).
design speed of project 4. Provide Hazard Marker
highway, the vehicle may hit sign board as per IRC: 67.
and an untreated end of the 5. The methodology for fixing
roadside barrier can be of Safety Barrier and the
hazardous and the beam barrier end treatment for the
can penetrate in to the vehicle start/end of the Safety
and lead to fatal accident. Barrier shall be as per
clause 4.10, fig 13 and 14

Revision Level: R0 March - 2023 Page 95 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
page no 13-15 of IRC:
119:2015 (Annexure‐3).
6. On LHS, at this location
abrupt ending of MCB
without integrating with
CCB created hazardous
situation for the errant
vehicle. MCB shall be
extended up to CC barrier
as per IRC: 119, by
overlapping for at least
60cm over the parapet
wall/CC Barrier as per
clause 4.11 and Fig 16 (W
Beam to Concrete
Connection Details) of IRC
119-2015 (Annexure‐2).

Revision Level: R0 March - 2023 Page 96 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
230292 27+600 High 5. Provide Thermoplastic Essential
(Median) Traverse Bar Marking (3
sets) on both sides of
Hazardous Reach as per Fig
11.2 of IRC-35-2015 to
alert the drivers to reduce
the speed of vehicle on
main carriageway
(Annexure‐1).
6. Provide Metal beam crash
1. Narrow Bridge. barrier on median.
2. Median wall not provided. 7. The minimum length of
3. Safety barriers are not provided safety barriers shall be
on median. 50m as per Clause 4.9 IRC:
4. End treatment of metal beam 119-2015 (Guidelines for
crash barrier not done on LHS. If Traffic Safety Barriers).
End treatment is not proper 8. Provide Hazard Marker
with faring of 17:1/14:1 for a sign board as per IRC: 67.
design speed of project 9. Provide median wall.
highway, the vehicle may hit 10. The methodology for fixing
and an untreated end of the of Safety Barrier and the
roadside barrier can be end treatment for the
hazardous and the beam barrier start/end of the Safety
can penetrate in to the vehicle Barrier shall be as per
and lead to fatal accident. clause 4.10, fig 13 and 14

Revision Level: R0 March - 2023 Page 97 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
page no 13-15 of IRC:
119:2015 (Annexure‐3).
11. On LHS, at this location
abrupt ending of MCB
without integrating with
CCB created hazardous
situation for the errant
vehicle. MCB shall be
extended up to CC barrier
as per IRC: 119, by
overlapping for at least
60cm over the parapet
wall/CC Barrier as per
clause 4.11 and Fig 16 (W
Beam to Concrete
Connection Details) of IRC
119-2015 (Annexure‐2).

Revision Level: R0 March - 2023 Page 98 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
230293 28+400 High Remove Electric pole Essential
(Median) immediately and shifted in
utility corridor at end of RoW
with consultation with concern
department.

Electric pole on median.


230294 28+600 High 1. Provide Metal Beam Crash Essential
(Median) barrier to protect the
pedestal of cantilever sign
board.
2. The minimum length of
safety barriers shall be
50m as per Clause 4.9 of
IRC: 119-2015 (Guidelines
for Traffic Safety Barriers).
For barriers at hazardous
Metal beam crash barrier not location 2/3rd of length
provided to shield the pedestal of shall be before the hazard
Cantilever sign board. and 1/3rd after hazard.
Also, Hazard marker not provided. 3. Provide Object hazard
marker sign board as per

Revision Level: R0 March - 2023 Page 99 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
Clause 15.64 of
IRC:67:2012.

230295 28+700 High 1. Provide Metal Beam Crash Essential


(LHS) barrier to protect the
pedestal of cantilever sign
board.
2. The minimum length of
safety barriers shall be
50m as per Clause 4.9 of
IRC: 119-2015 (Guidelines
for Traffic Safety Barriers).
For barriers at hazardous
1. Metal beam crash barrier not location 2/3rd of length
provided to shield the pedestal shall be before the hazard
of Cantilever sign board. and 1/3rd after hazard.
2. Hazard marker not provided. 3. Provide Object hazard
marker sign board as per
Clause 15.64 of
IRC:67:2012.

Revision Level: R0 March - 2023 Page 100 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
230296 28+800 High 1. Provide Thermoplastic Essential
(Median) Traverse Bar Marking (3
sets) on both sides of
Hazardous Reach as per Fig
11.2 of IRC-35-2015 to
alert the drivers to reduce
the speed of vehicle on
main carriageway
(Annexure‐1).
2. Provide Metal beam crash
1. Narrow Bridge. barrier before railing of
2. Safety barriers are not provided bridges.
on Median and LHS. 3. The minimum length of
safety barriers shall be
50m as per Clause 4.9 IRC:
119-2015 (Guidelines for
Traffic Safety Barriers).
4. Provide Hazard Marker
sign board as per IRC: 67.
5. The methodology for fixing
of Safety Barrier and the
end treatment for the
start/end of the Safety
Barrier shall be as per
clause 4.10, fig 13 and 14

Revision Level: R0 March - 2023 Page 101 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
page no 13-15 of IRC:
119:2015 (Annexure‐3).

230297 28+800 High 1. At this location, abrupt Essential


(LHS) ending of MCB without
integrating with CCB
created hazardous
situation for the errant
vehicle. MCB shall be
extended up to parapet
wall as per IRC: 119, by
overlapping for at least
60cm over the parapet
1. Damaged MCB and without end wall/CC Barrier as per
treatment with CC barrier clause 4.11 and Fig 16 (W
2. If End treatment is not proper Beam to Concrete
with faring of 17:1/14:1 for a Connection Details) of IRC
design speed of project 119-2015 (Annexure‐2).
highway, the vehicle may hit 2. The methodology for fixing
and an untreated end of the of Safety Barrier and the
roadside barrier can be end treatment for the
hazardous and the beam barrier start/end of the Safety
can penetrate in to the vehicle Barrier shall be as per
and lead to fatal accident. clause 4.10, fig 13 and 14

Revision Level: R0 March - 2023 Page 102 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
page no 13-15 of IRC:
119:2015 (Annexure‐3).

230298 28+800 – High 1. Provide Metal beam crash Essential


29+000 barrier.
(LHS) 2. The methodology for fixing
of Safety Barrier and the
end treatment for the
start/end of the Safety
Barrier shall be as per
clause 4.10, fig 13 and 14
page no 13-15 of IRC:
119:2015 (Annexure‐3).
Metal Beam crash barrier should be
provided.
230299 29+200 High Remove Electric pole Essential
(Median) immediately and shifted in
utility corridor at end of RoW
with consultation with concern
department.

Revision Level: R0 March - 2023 Page 103 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
Electric pole on median.
2302100 29+800 Very 1. Develop Entry/Exit Essential
(LHS) High Arrangement with
Service/Slip road as per fig
2.1A of IRC:SP-84-2014
(Attached Annexure‐2).
2. Chevron/diagonal marking
with red color road studs
shall be provided as per
IRC: 35-2015 as per Clause
5.5.5, page 30 and Clause
1. Sharp Entry/Exit. 7.2, Table 7.1: Spacing
2. Painting of CC barrier has faded. between Diagonals /
Chevrons, at page 36.

Revision Level: R0 March - 2023 Page 104 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
3. Painting of CC barrier is
required.
2302101 29+900 High 1. Provide Metal Beam Crash Essential
(RHS) barrier at ends of railing.
2. The minimum length of
safety barriers shall be
50m as per Clause 4.9 of
IRC: 119-2015 (Guidelines
for Traffic Safety Barriers).
For barriers at hazardous
location 2/3rd of length
shall be before the hazard
Metal beam crash barrier not and 1/3rd after hazard.
provided ends of railing. 3. Provide Object hazard
marker sign board as per
Clause 15.64 of
IRC:67:2012.

Revision Level: R0 March - 2023 Page 105 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
2302102 30+200 High 1. At this location, abrupt Essential
Minsar ending of MCB without
River integrating with CCB
(LHS) created hazardous
situation for the errant
vehicle. MCB shall be
extended up to parapet
wall as per IRC: 119, by
overlapping for at least
60cm over the parapet
1. MCB end treatment with CC wall/CC Barrier as per
barrier not done. clause 4.11 and Fig 16 (W
2. If End treatment is not proper Beam to Concrete
with faring of 17:1/14:1 for a Connection Details) of IRC
design speed of project 119-2015 (Annexure‐2).
highway, the vehicle may hit 2. The methodology for fixing
and an untreated end of the of Safety Barrier and the
roadside barrier can be end treatment for the
hazardous and the beam barrier start/end of the Safety
can penetrate in to the vehicle Barrier shall be as per
and lead to fatal accident. clause 4.10, fig 13 and 14
page no 13-15 of IRC:
119:2015 (Annexure‐3).

Revision Level: R0 March - 2023 Page 106 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
2302103 30+400 High 1. Provide median wall. Essential
(Median) 2. Provide Metal beam crash
barrier at end of bridges
railing at median side.
3. The minimum length of
safety barriers shall be
50m as per Clause 4.9 IRC:
119-2015 (Guidelines for
Traffic Safety Barriers).
4. Provide Hazard Marker
Median wall not provided. sign board as per IRC: 67.
5. The methodology for fixing
of Safety Barrier and the
end treatment for the
start/end of the Safety
Barrier shall be as per
clause 4.10, fig 13 and 14
page no 13-15 of IRC:
119:2015 (Annexure‐3).

Revision Level: R0 March - 2023 Page 107 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
2302104 30+700 High 1. Provide Metal Beam Crash Essential
(Median) barrier to protect the
pedestal of cantilever sign
board.
2. The minimum length of
safety barriers shall be
50m as per Clause 4.9 of
IRC: 119-2015 (Guidelines
for Traffic Safety Barriers).
For barriers at hazardous
Metal beam crash barrier not location 2/3rd of length
provided to shield the pedestal of shall be before the hazard
Cantilever sign board. and 1/3rd after hazard.
Also, Hazard marker not provided. 3. Provide Object hazard
marker sign board as per
Clause 15.64 of
IRC:67:2012.

Revision Level: R0 March - 2023 Page 108 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
2302105 31+200 High Provide Hazard Marker sign Essential
(LHS) board as per IRC: 67.

Hazard marker not provided.


2302106 31+600 – High Provide Metal beam crash Essential
31+800 barrier where embankment
(LHS) seems to be high.

Crash barrier not provided.

Revision Level: R0 March - 2023 Page 109 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
2302107 32+400 High Provide Hazard Markers as per Essential
(LHS) IRC-67.

Hazard marker not provided before


Metal beam crash barrier.
2302108 34+800 High Remove Electric pole Essential
(Median) immediately and shifted in
utility corridor at end of RoW
with consultation with concern
department.

Electric pole on median.

Revision Level: R0 March - 2023 Page 110 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
2302109 35+100 High Remove Electric pole Essential
(Median) immediately and shifted in
utility corridor at end of RoW
with consultation with concern
department.

Electric pole on median.


2302110 36+800 High 1. Provide Thermoplastic Essential
(Median) Traverse Bar Marking (3
sets) on both sides of
Hazardous Reach as per Fig
11.2 of IRC-35-2015 to
alert the drivers to reduce
the speed of vehicle on
main carriageway
(Annexure‐1).
2. Provide Metal beam crash
1. Narrow bridge. barrier at end of bridge
2. Safety barriers are not provided railing on median side.
at ends of railing. 3. The minimum length of
safety barriers shall be
50m as per Clause 4.9 IRC:

Revision Level: R0 March - 2023 Page 111 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
119-2015 (Guidelines for
Traffic Safety Barriers).
4. Provide Hazard Marker
sign board as per IRC: 67.
5. The methodology for fixing
of Safety Barrier and the
end treatment for the
start/end of the Safety
Barrier shall be as per
clause 4.10, fig 13 and 14
page no 13-15 of IRC:
119:2015 (Annexure‐3).
2302111 38+800 - Safety measures taken while -
(LHS) slab change of Minor bridge is
under progress.

Work under progress.

Revision Level: R0 March - 2023 Page 112 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
2302112

Repair work in progress.


2302113 38+900 High 1. Provide Thermoplastic Essential
(Median) Traverse Bar Marking (3
sets) on both sides of
Hazardous Reach as per Fig
11.2 of IRC-35-2015 to
alert the drivers to reduce
the speed of vehicle on
main carriageway
(Annexure‐1).
2. Provide Metal beam crash
1. Narrow Bridge barrier.
2. Safety barriers are not provided 3. The minimum length of
at end of bridge railing. safety barriers shall be
3. End treatment of metal beam 50m as per Clause 4.9 IRC:
crash barrier not done on LHS. If

Revision Level: R0 March - 2023 Page 113 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
End treatment is not proper 119-2015 (Guidelines for
with faring of 17:1/14:1 for a Traffic Safety Barriers).
design speed of project 4. Provide Hazard Marker
highway, the vehicle may hit sign board as per IRC: 67.
and an untreated end of the 5. The methodology for fixing
roadside barrier can be of Safety Barrier and the
hazardous and the beam barrier end treatment for the
can penetrate in to the vehicle start/end of the Safety
and lead to fatal accident. Barrier shall be as per
clause 4.10, fig 13 and 14
page no 13-15 of IRC:
119:2015 (Annexure‐3).
6. On LHS, at this location
abrupt ending of MCB
without integrating with
CCB created hazardous
situation for the errant
vehicle. MCB shall be
extended up to CC barrier
as per IRC: 119, by
overlapping for at least
60cm over the parapet
wall/CC Barrier as per
clause 4.11 and Fig 16 (W
Beam to Concrete

Revision Level: R0 March - 2023 Page 114 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
Connection Details) of IRC
119-2015 (Annexure‐2).
2302114 39+700 High Remove Electric pole Essential
(Median) immediately and shifted in
utility corridor at end of RoW
with consultation with concern
department.

Electric pole on median.


2302115 40+400 High Provide Hazard Marker sign Essential
(RHS) board as per IRC: 67.

Hazard marker not provided.

Revision Level: R0 March - 2023 Page 115 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
2302116 42+400 High Provide Hazard Marker sign Essential
(LHS) board as per IRC: 67.

Hazard marker not provided before


metal beam crash barrier at SoS.
2302117 42+400 High Provide Hazard Marker sign Essential
(RHS) board as per IRC: 67.

Hazard marker not provided before


metal beam crash barrier at SoS.

Revision Level: R0 March - 2023 Page 116 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
2302118 43+700 High 1. Provide Metal beam crash Essential
(Median) barrier at ends of railing on
median side.
2. The minimum length of
safety barriers shall be
50m as per Clause 4.9 IRC:
119-2015 (Guidelines for
Traffic Safety Barriers).
3. Provide Hazard Marker
sign board as per IRC: 67.
Safety barriers are not provided at 4. The methodology for fixing
ends of railing. of Safety Barrier and the
end treatment for the
start/end of the Safety
Barrier shall be as per
clause 4.10, fig 13 and 14
page no 13-15 of IRC:
119:2015 (Annexure‐3).

Revision Level: R0 March - 2023 Page 117 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
2302119 44+400 High Provide Hazard Marker sign Essential
(LHS) board as per IRC: 67.

Hazard marker not provided before


metal beam crash barrier at SoS.
2302120 45+600 – High 1. Provide Metal beam crash Essential
46+200 barrier and Hazard sign.
(LHS) 2. The methodology for fixing
of Safety Barrier and the
end treatment for the
start/end of the Safety
Barrier shall be as per
clause 4.10, fig 13 and 14
page no 13-15 of IRC:
119:2015 (Attached
1. Metal beam crash barrier not Annexure-3).
provided on service road. 3. Provide Object hazard
2. Pavement marking has not been marker sign board as per
provided.

Revision Level: R0 March - 2023 Page 118 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
Clause 15.64 of
IRC:67:2012.
4. Provide pavement marking
as per IRC:35.
2302121 46+800 High 1. Provide Metal beam crash Essential
(Median) barrier at median side
where hazards.
2. The minimum length of
safety barriers shall be
50m as per Clause 4.9 IRC:
119-2015 (Guidelines for
Traffic Safety Barriers).
3. Provide Hazard Marker
sign board as per IRC: 67.
Safety barriers are not provided at 4. The methodology for fixing
median side. of Safety Barrier and the
end treatment for the
start/end of the Safety
Barrier shall be as per
clause 4.10, fig 13 and 14
page no 13-15 of IRC:
119:2015 (Annexure‐3).

Revision Level: R0 March - 2023 Page 119 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
2302122 47+000 & High 1. Provide median wall. Essential
47+100 2. Provide Metal beam crash
(Median) barrier.
3. The minimum length of
safety barriers shall be
50m as per Clause 4.9 IRC:
119-2015 (Guidelines for
Traffic Safety Barriers).
4. Provide Hazard Marker
sign board as per IRC: 67.
Median wall not provided. 5. The methodology for fixing
of Safety Barrier and the
end treatment for the
start/end of the Safety
Barrier shall be as per
clause 4.10, fig 13 and 14
page no 13-15 of IRC:
119:2015 (Annexure‐3).

Revision Level: R0 March - 2023 Page 120 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
2302123 47+400 1. Provide Hazard Marker Essential
(LHS) sign board as per IRC: 67.
2. Painting of railing should
be done.

1. Hazard marker not provided.


2. Painting of railing not done.
2302124 47+500 High 1. Provide Metal beam crash Essential
(Median) barrier at hazards location
before CC barrier of
structures.
2. The minimum length of
safety barriers shall be
50m as per Clause 4.9 IRC:
119-2015 (Guidelines for
Traffic Safety Barriers).
3. Provide Hazard Marker
Safety barriers are not provided at sign board as per IRC: 67.
median side before CC barrier of 4. The methodology for fixing
structure. of Safety Barrier and the
end treatment for the

Revision Level: R0 March - 2023 Page 121 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
start/end of the Safety
Barrier shall be as per
clause 4.10, fig 13 and 14
page no 13-15 of IRC:
119:2015 (Annexure‐3).
2302125 48+000 High 1. Provide Metal beam crash Essential
(Median) barrier at median side.
2. The minimum length of
safety barriers shall be
50m as per Clause 4.9 IRC:
119-2015 (Guidelines for
Traffic Safety Barriers).
3. Provide Hazard Marker
sign board as per IRC: 67.
4. The methodology for fixing
Safety barriers are not provided at of Safety Barrier and the
hazards locations. end treatment for the
start/end of the Safety
Barrier shall be as per
clause 4.10, fig 13 and 14
page no 13-15 of IRC:
119:2015 (Annexure‐3).

Revision Level: R0 March - 2023 Page 122 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
2302126 48+500 High 1. Provide Thermoplastic Essential
(RHS) Traverse Bar Marking (3
sets) on both sides of
Hazardous Reach as per Fig
11.2 of IRC-35-2015 to
alert the drivers to reduce
the speed of vehicle on
main carriageway
(Annexure‐1).
2. Provide Metal beam crash
1. Narrow Bridge. barrier at ends of railing.
2. Metal beam crash barrier not 3. End treatment of metal
provided before railing of beam crash barrier should
bridge. be done as per IRc
guidelines. If End
treatment is not proper
with faring of 17:1/14:1
for a design speed of
project highway, the
vehicle may hit and an
untreated end of the
roadside barrier can be
hazardous and the beam
barrier can penetrate in to
the vehicle and lead to fatal
accident

Revision Level: R0 March - 2023 Page 123 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
4. The methodology for fixing
of Safety Barrier and the
end treatment for the
start/end of the Safety
Barrier shall be as per
clause 4.10, fig 13 and 14
page no 13-15 of IRC:
119:2015 (Annexure‐3).
2302127 48+600 High 1. Provide median wall. Essential
(Median) 2. Provide Metal beam crash
barrier at median side
before railing of bridge.
3. The minimum length of
safety barriers shall be
50m as per Clause 4.9 IRC:
119-2015 (Guidelines for
Traffic Safety Barriers).
4. Provide Hazard Marker
1. Median wall not provided. sign board as per IRC: 67.
2. Safety barriers are not provided 5. The methodology for fixing
at end of bridge railing. of Safety Barrier and the
end treatment for the
start/end of the Safety
Barrier shall be as per
clause 4.10, fig 13 and 14

Revision Level: R0 March - 2023 Page 124 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
page no 13-15 of IRC:
119:2015 (Annexure‐3).

2302128 48+900 High 1. Provide Metal beam crash Essential


(Median) barrier at end of cc barrier
of structure on median
side.
2. The minimum length of
safety barriers shall be
50m as per Clause 4.9 IRC:
119-2015 (Guidelines for
Traffic Safety Barriers).
3. Provide Hazard Marker
Safety barriers are not provided at sign board as per IRC: 67.
end of CC Barrier of structure. 4. The methodology for fixing
of Safety Barrier and the
end treatment for the
start/end of the Safety
Barrier shall be as per
clause 4.10, fig 13 and 14
page no 13-15 of IRC:
119:2015 (Annexure‐3).

Revision Level: R0 March - 2023 Page 125 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
2302129 49+100 High 1. Provide Thermoplastic Essential
(RHS) Traverse Bar Marking (3
sets) on both sides of
Hazardous Reach as per Fig
11.2 of IRC-35-2015 to
alert the drivers to reduce
the speed of vehicle on
main carriageway
(Annexure‐1).
2. On LHS, at this location
1. Narrow Bridge abrupt ending of MCB
2. End treatment of metal beam without integrating with
crash barrier not done on LHS. If CCB created hazardous
End treatment is not proper situation for the errant
with faring of 17:1/14:1 for a vehicle. MCB shall be
design speed of project extended up to CC barrier
highway, the vehicle may hit as per IRC: 119, by
and an untreated end of the overlapping for at least
roadside barrier can be 60cm over the parapet
hazardous and the beam barrier wall/CC Barrier as per
can penetrate in to the vehicle clause 4.11 and Fig 16 (W
and lead to fatal accident Beam to Concrete
Connection Details) of IRC
119-2015 (Annexure‐2).
3. The methodology for fixing
of Safety Barrier and the

Revision Level: R0 March - 2023 Page 126 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
end treatment for the
start/end of the Safety
Barrier shall be as per
clause 4.10, fig 13 and 14
page no 13-15 of IRC:
119:2015 (Annexure‐3).
2302130 49+900 High 1. Provide Metal beam crash Essential
(Median) barrier at end of cc barrier
at median side.
2. The minimum length of
safety barriers shall be
50m as per Clause 4.9 IRC:
119-2015 (Guidelines for
Traffic Safety Barriers).
3. Provide Hazard Marker
sign board as per IRC: 67.
Safety barriers are not provided at 4. The methodology for fixing
median side hazards locations. of Safety Barrier and the
end treatment for the
start/end of the Safety
Barrier shall be as per
clause 4.10, fig 13 and 14
page no 13-15 of IRC:
119:2015 (Annexure‐3).

Revision Level: R0 March - 2023 Page 127 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
2302131 50+100 High 1. Provide Thermoplastic Essential
(Median) Traverse Bar Marking (3
sets) on both sides of
Hazardous Reach as per Fig
11.2 of IRC-35-2015 to
alert the drivers to reduce
the speed of vehicle on
main carriageway
(Annexure‐1).
2. Provide Metal beam crash
1. Narrow Bridge. barrier on median.
2. Metal beam crash barrier not 3. The minimum length of
provided on median. safety barriers shall be
3. End treatment of metal beam 50m as per Clause 4.9 of
crash barrier not done on LHS. If IRC: 119-2015 (Guidelines
End treatment is not proper for Traffic Safety Barriers).
with faring of 17:1/14:1 for a For barriers at hazardous
design speed of project location 2/3rd of length
highway, the vehicle may hit shall be before the hazard
and an untreated end of the and 1/3rd after hazard.
roadside barrier can be 4. The methodology for fixing
hazardous and the beam barrier of Safety Barrier and the
can penetrate in to the vehicle end treatment for the
and lead to fatal accident start/end of the Safety
Barrier shall be as per
clause 4.10, fig 13 and 14

Revision Level: R0 March - 2023 Page 128 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
page no 13-15 of IRC:
119:2015 (Annexure‐3).
5. Provide Object hazard
marker sign board as per
Clause 15.64 of
IRC:67:2012.
6. On LHS, at this location
abrupt ending of MCB
without integrating with
CCB created hazardous
situation for the errant
vehicle. MCB shall be
extended up to CC barrier
as per IRC: 119, by
overlapping for at least
60cm over the parapet
wall/CC Barrier as per
clause 4.11 and Fig 16 (W
Beam to Concrete
Connection Details) of IRC
119-2015 (Annexure‐2).

Revision Level: R0 March - 2023 Page 129 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
2302132 50+700 High 1. Provide Thermoplastic Essential
(Median) Traverse Bar Marking (3
sets) on both sides of
Hazardous Reach as per Fig
11.2 of IRC-35-2015 to
alert the drivers to reduce
the speed of vehicle on
main carriageway
(Annexure‐1).
2. Provide Metal beam crash
1. Narrow Bridge. barrier on median.
2. Metal beam crash barrier not 3. The minimum length of
provided on median. safety barriers shall be
3. End treatment of metal beam 50m as per Clause 4.9 of
crash barrier not done on LHS. If IRC: 119-2015 (Guidelines
End treatment is not proper for Traffic Safety Barriers).
with faring of 17:1/14:1 for a For barriers at hazardous
design speed of project location 2/3rd of length
highway, the vehicle may hit shall be before the hazard
and an untreated end of the and 1/3rd after hazard.
roadside barrier can be 4. The methodology for fixing
hazardous and the beam barrier of Safety Barrier and the
can penetrate in to the vehicle end treatment for the
and lead to fatal accident start/end of the Safety
Barrier shall be as per
clause 4.10, fig 13 and 14

Revision Level: R0 March - 2023 Page 130 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
page no 13-15 of IRC:
119:2015 (Annexure‐3).
5. Provide Object hazard
marker sign board as per
Clause 15.64 of
IRC:67:2012.
6. On LHS, at this location
abrupt ending of MCB
without integrating with
CCB created hazardous
situation for the errant
vehicle. MCB shall be
extended up to CC barrier
as per IRC: 119, by
overlapping for at least
60cm over the parapet
wall/CC Barrier as per
clause 4.11 and Fig 16 (W
Beam to Concrete
Connection Details) of IRC
119-2015 (Annexure‐2).

Revision Level: R0 March - 2023 Page 131 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
2302133 52+400 High Provide Hazard Markers as per Essential
(LHS) IRC-67.

Hazard marker not provided before


Metal beam crash barrier.
2302134 52+300 – High 1. Provide Thrie Metal beam Essential
52+600 crash barrier on main
(RHS) carrigeway side.
2. The methodology for fixing
of Safety Barrier and the
end treatment for the
start/end of the Safety
Barrier shall be as per
clause 4.10, fig 13 and 14
page no 13-15 of IRC:
Metal beam crash barrier not 119:2015 (Annexure‐3).
provided as there is level difference
between main carriageway and
service road.

Revision Level: R0 March - 2023 Page 132 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
2302135 52+600 – High 1. Provide Thrie Metal beam Essential
52+800 crash barrier on main
(LHS) carrigeway side.
2. The methodology for fixing
of Safety Barrier and the
end treatment for the
start/end of the Safety
Barrier shall be as per
clause 4.10, fig 13 and 14
page no 13-15 of IRC:
Metal beam crash barrier not 119:2015 (Annexure‐3).
provided as there is level difference
between main carriageway and
service road.
2302136 52+900 High 1. Provide Thermoplastic Essential
(RHS) Traverse Bar Marking (3
sets) at Hazardous Reach
as per Fig 11.2 of IRC-35-
2015 to alert the drivers to
reduce the speed of vehicle
on main carriageway
(Annexure‐1).
2. Provide Metal Beam Crash
barrier to protect the
pedestal of cantilever sign
board.

Revision Level: R0 March - 2023 Page 133 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
Metal beam crash barrier not 3. The minimum length of
provided to shield the pedestal of safety barriers shall be
Cantilever sign board. 50m as per Clause 4.9 of
Also, Hazard marker not provided. IRC: 119-2015 (Guidelines
for Traffic Safety Barriers).
For barriers at hazardous
location 2/3rd of length
shall be before the hazard
and 1/3rd after hazard.
4. Provide Object hazard
marker sign board as per
Clause 15.64 of
IRC:67:2012.
2302137 53+600 – High 1. Provide Thrie Metal beam Essential
53+700 crash barrier on main
(LHS/RHS) carrigeway side.
& 2. The methodology for fixing
53+000 – of Safety Barrier and the
53+100 end treatment for the
(LHS/RHS) start/end of the Safety
Barrier shall be as per
clause 4.10, fig 13 and 14
page no 13-15 of IRC:
Metal beam crash barrier not 119:2015 (Annexure‐3).
provided as there is level difference

Revision Level: R0 March - 2023 Page 134 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
between main carriageway and
service road.

2302138 54+400 High Provide Hazard Marker sign Essential


(RHS) board as per IRC: 67.

Hazard marker not provided.


2302139 54+400 – High 1. Provide Thrie Metal beam Essential
55+100 crash barrier on main
(LHS) carriageway side.
2. The methodology for fixing
of Safety Barrier and the
end treatment for the
start/end of the Safety
Barrier shall be as per
clause 4.10, fig 13 and 14
page no 13-15 of IRC:
119:2015 (Annexure‐3).

Revision Level: R0 March - 2023 Page 135 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
Metal beam crash barrier not
provided as there is level difference
between main carriageway and
service road.
2302140 55+700 High Provide Hazard Marker sign Essential
(RHS) board as per IRC: 67.

Hazard marker not provided.


2302141 57+000 - Work in progress with proper -
(RHS) safety measures.

Revision Level: R0 March - 2023 Page 136 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
Work in progress with proper safety
measures.

2302142 57+200 High 1. Provide Metal beam crash Essential


(LHS/RHS) barrier to shield the
pedestal of Gantry
mounted sign board.
2. The methodology for fixing
of Safety Barrier and the
end treatment for the
start/end of the Safety
Barrier shall be as per
clause 4.10, fig 13 and 14
Pedestal of Gantry mounted sign page no 13-15 of IRC:
board not shielded. 119:2015 (Annexure‐3).
3. The minimum length of
safety barriers shall be
50m as per Clause 4.9 of
IRC: 119-2015 (Guidelines
for Traffic Safety Barriers).
For barriers at hazardous
location 2/3rd of length
shall be before the hazard
and 1/3rd after hazard.

Revision Level: R0 March - 2023 Page 137 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
4. Provide Hazard Marker
sign board as per IRC: 67.

2302143 57+850 High 1. At this location, abrupt Essential


(Median) ending of MCB without
integrating with CCB
created hazardous
situation for the errant
vehicle. MCB shall be
extended up to CC barrier
as per IRC: 119, by
overlapping for at least
60cm over the parapet
End treatment of metal beam crash wall/CC Barrier as per
barrier not done. If End treatment is clause 4.11 and Fig 16 (W
not proper with faring of 17:1/14:1 Beam to Concrete
for a design speed of project Connection Details) of IRC
highway, the vehicle may hit and an 119-2015 (Annexure‐2).
untreated end of the roadside 2. The methodology for fixing
barrier can be hazardous and the of Safety Barrier and the
beam barrier can penetrate in to the end treatment for the
vehicle and lead to fatal accident start/end of the Safety
Barrier shall be as per
clause 4.10, fig 13 and 14

Revision Level: R0 March - 2023 Page 138 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
page no 13-15 of IRC:
119:2015 (Annexure‐3).

2302144 58+000 High Provide Hazard Markers as per Essential


(Median) IRC-67.

Hazard marker not provided before


Metal beam crash barrier.
2302145 58+600 High 1. Provide Metal Beam Crash Essential
(LHS) barrier at ends of railing.
2. The minimum length of
safety barriers shall be
50m as per Clause 4.9 of
IRC: 119-2015 (Guidelines
for Traffic Safety Barriers).
For barriers at hazardous
location 2/3rd of length

Revision Level: R0 March - 2023 Page 139 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
Metal beam crash barrier not shall be before the hazard
provided. and 1/3rd after hazard.
3. Provide Object hazard
marker sign board as per
Clause 15.64 of
IRC:67:2012.
2302146 58+700 High 1. At this location, abrupt Essential
(Median) ending of MCB without
integrating with CCB
created hazardous
situation for the errant
vehicle. MCB shall be
extended up to CC barrier
as per IRC: 119, by
overlapping for at least
60cm over the parapet
End treatment of metal beam crash wall/CC Barrier as per
barrier not done. If End treatment is clause 4.11 and Fig 16 (W
not proper with faring of 17:1/14:1 Beam to Concrete
for a design speed of project Connection Details) of IRC
highway, the vehicle may hit and an 119-2015 (Annexure‐2).
untreated end of the roadside 2. The methodology for fixing
barrier can be hazardous and the of Safety Barrier and the
beam barrier can penetrate in to the end treatment for the
vehicle and lead to fatal accident start/end of the Safety
Barrier shall be as per

Revision Level: R0 March - 2023 Page 140 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
clause 4.10, fig 13 and 14
page no 13-15 of IRC:
119:2015 (Annexure‐3).
2302147 59+100 High 1. Provide Metal Beam Crash Essential
(LHS) barrier at end of bridge
railing.
2. The minimum length of
safety barriers shall be
50m as per Clause 4.9 of
IRC: 119-2015 (Guidelines
for Traffic Safety Barriers).
For barriers at hazardous
location 2/3rd of length
Metal beam crash barrier not shall be before the hazard
provided at ends of railing of bridge. and 1/3rd after hazard.
3. Provide Object hazard
marker sign board as per
Clause 15.64 of
IRC:67:2012.

Revision Level: R0 March - 2023 Page 141 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
2302148 59+300 High Provide Hazard Marker sign Essential
(Median) board as per IRC: 67.

Hazard marker not provided.


2302149 59+500 High 1. At this location, abrupt Essential
(Median) ending of MCB without
integrating with CCB
created hazardous
situation for the errant
vehicle. MCB shall be
extended up to CC barrier
as per IRC: 119, by
overlapping for at least
60cm over the parapet
End treatment of metal beam crash wall/CC Barrier as per
barrier not done. If End treatment is clause 4.11 and Fig 16 (W
not proper with faring of 17:1/14:1 Beam to Concrete
for a design speed of project Connection Details) of IRC
highway, the vehicle may hit and an 119-2015 (Annexure‐2).

Revision Level: R0 March - 2023 Page 142 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
untreated end of the roadside 2. The methodology for fixing
barrier can be hazardous and the of Safety Barrier and the
beam barrier can penetrate in to the end treatment for the
vehicle and lead to fatal accident start/end of the Safety
Barrier shall be as per
clause 4.10, fig 13 and 14
page no 13-15 of IRC:
119:2015 (Annexure‐3).
2302150 59+600 High 1. Provide Metal beam crash Essential
(Median) barrier at ends of CC
barrier on median side.
2. The minimum length of
safety barriers shall be
50m as per Clause 4.9 IRC:
119-2015 (Guidelines for
Traffic Safety Barriers).
3. Provide Hazard Marker
sign board as per IRC: 67.
Safety barriers are not provided at 4. The methodology for fixing
before of CC barrier on median sdie. of Safety Barrier and the
end treatment for the
start/end of the Safety
Barrier shall be as per
clause 4.10, fig 13 and 14
page no 13-15 of IRC:
119:2015 (Annexure‐3).

Revision Level: R0 March - 2023 Page 143 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
2302151 60+200 High 1. Extend the Metal beam Essential
(Median) crash barrier.
2. The minimum length of
safety barriers shall be
50m as per Clause 4.9 IRC:
119-2015 (Guidelines for
Traffic Safety Barriers).
3. Provide Hazard Marker
sign board as per IRC: 67.
4. The methodology for fixing
1. Extend the Metal Beam Safety of Safety Barrier and the
barriers. end treatment for the
start/end of the Safety
Barrier shall be as per
clause 4.10, fig 13 and 14
page no 13-15 of IRC:
119:2015 (Annexure‐3).

Revision Level: R0 March - 2023 Page 144 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
2302152 60+600 High 1. Provide Metal beam crash Essential
(Median) barrier at end of CC barrier
at median sides.
2. The minimum length of
safety barriers shall be
50m as per Clause 4.9 IRC:
119-2015 (Guidelines for
Traffic Safety Barriers).
3. Provide Hazard Marker
sign board as per IRC: 67.
Safety barriers are not provided at 4. The methodology for fixing
ends of CC Barrier at median side. of Safety Barrier and the
end treatment for the
start/end of the Safety
Barrier shall be as per
clause 4.10, fig 13 and 14
page no 13-15 of IRC:
119:2015 (Annexure‐3).

Revision Level: R0 March - 2023 Page 145 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
2302153 60+800 High Remove Electric pole Essential
(Median) immediately and shifted in
utility corridor at end of RoW
with consultation with concern
department.

Electric pole on median.


2302154 61+6100 High 1. Provide Thermoplastic Essential
(Median) Traverse Bar Marking (3
sets) on both sides of
Hazardous Reach as per Fig
11.2 of IRC-35-2015 to
alert the drivers to reduce
the speed of vehicle on
main carriageway
(Annexure‐1).
2. Provide Metal beam crash
1. Narrow Bridge. barrier on median.
2. Metal beam crash barrier not 3. The minimum length of
provided on median. safety barriers shall be
3. End treatment of metal beam 50m as per Clause 4.9 of
crash barrier not done on LHS. If IRC: 119-2015 (Guidelines

Revision Level: R0 March - 2023 Page 146 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
End treatment is not proper for Traffic Safety Barriers).
with faring of 17:1/14:1 for a For barriers at hazardous
design speed of project location 2/3rd of length
highway, the vehicle may hit shall be before the hazard
and an untreated end of the and 1/3rd after hazard.
roadside barrier can be 4. The methodology for fixing
hazardous and the beam barrier of Safety Barrier and the
can penetrate in to the vehicle end treatment for the
and lead to fatal accident start/end of the Safety
Barrier shall be as per
clause 4.10, fig 13 and 14
page no 13-15 of IRC:
119:2015 (Annexure‐3).
5. Provide Object hazard
marker sign board as per
Clause 15.64 of
IRC:67:2012.
6. On LHS, at this location
abrupt ending of MCB
without integrating with
CCB created hazardous
situation for the errant
vehicle. MCB shall be
extended up to CC barrier
as per IRC: 119, by
overlapping for at least

Revision Level: R0 March - 2023 Page 147 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
60cm over the parapet
wall/CC Barrier as per
clause 4.11 and Fig 16 (W
Beam to Concrete
Connection Details) of IRC
119-2015 (Annexure‐2).
2302155 61+800 High Remove Electric pole Essential
(Median) immediately and shifted in
utility corridor at end of RoW
with consultation with concern
department.

Electric pole on median.

Revision Level: R0 March - 2023 Page 148 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
2302156 62+300 High 1. Provide Metal beam crash Essential
(Median) barrier at ends of CC
barrier.
2. The minimum length of
safety barriers shall be
50m as per Clause 4.9 IRC:
119-2015 (Guidelines for
Traffic Safety Barriers).
3. Provide Hazard Marker
sign board as per IRC: 67.
Safety barriers are not provided at 4. The methodology for fixing
median side. of Safety Barrier and the
end treatment for the
start/end of the Safety
Barrier shall be as per
clause 4.10, fig 13 and 14
page no 13-15 of IRC:
119:2015 (Annexure‐3).

Revision Level: R0 March - 2023 Page 149 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
2302157 62+500 Very 1. Develop Entry/Exit Essential
(RHS) High Arrangement with
Service/Slip road as per fig
2.1A of IRC:SP-84-2014
(Attached Annexure‐2).
2. Chevron/diagonal marking
with red color road studs
shall be provided as per
IRC: 35-2015 as per Clause
5.5.5, page 30 and Clause
Chevron marking has been faded 7.2, Table 7.1: Spacing
out. between Diagonals /
Chevrons, at page 36.

Revision Level: R0 March - 2023 Page 150 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
2302158 62+700 High Remove Electric pole Essential
(Median) immediately and shifted in
utility corridor at end of RoW
with consultation with concern
department.

Electric pole on median.


2302159 63+700 High Remove Electric pole Essential
(Median) immediately and shifted in
utility corridor at end of RoW
with consultation with concern
department.

Electric pole on median.

Revision Level: R0 March - 2023 Page 151 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
2302160 64+400 High Provide Hazard Markers as per Essential
(LHS) IRC-67.

Hazard marker not provided before


Metal beam crash barrier.
2302161 65+000 High 1. Provide Thermoplastic Essential
(LHS) Traverse Bar Marking (3
sets) at Hazardous Reach
as per Fig 11.2 of IRC-35-
2015 to alert the drivers to
reduce the speed of vehicle
on main carriageway
(Attached Annexure-1).
2. Provide Metal beam crash
barrier at ends of bridge
1. Narrow Bridge railing.
2. Metal beam crash barrier is not 3. The methodology for fixing
provided at ends of bridge of Safety Barrier and the
railing. end treatment for the

Revision Level: R0 March - 2023 Page 152 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
start/end of the Safety
Barrier shall be as per
clause 4.10, fig 13 and 14
page no 13-15 of IRC:
119:2015 (Attached
Annexure-3).
4. The minimum length of
safety barriers shall be
50m as per Clause 4.9 of
IRC: 119-2015 (Guidelines
for Traffic Safety Barriers).
For barriers at hazardous
location 2/3rd of length
shall be before the hazard
and 1/3rd after hazard.
5. Provide Object hazard
marker sign board as per
Clause 15.64 of
IRC:67:2012.

Revision Level: R0 March - 2023 Page 153 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
2302162 65+300 – High Provide Metal beam crash Essential
65+600 barrier on high embankment as
(LHS) per site condition as per IRC
guidelines.

Metal beam crash should be


provided on high embankment.
2302163 66+400 High Provide Hazard Marker sign Essential
(LHS) board as per IRC: 67.

Hazard marker not provided.

Revision Level: R0 March - 2023 Page 154 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
2302164 65+300 High 1. At this location, abrupt Essential
(Median) ending of MCB without
integrating with CCB
created hazardous
situation for the errant
vehicle. MCB shall be
extended up to CC barrier
as per IRC: 119, by
overlapping for at least
60cm over the parapet
End treatment of metal beam crash wall/CC Barrier as per
barrier not done. If End treatment is clause 4.11 and Fig 16 (W
not proper with faring of 17:1/14:1 Beam to Concrete
for a design speed of project Connection Details) of IRC
highway, the vehicle may hit and an 119-2015 (Annexure‐2).
untreated end of the roadside 2. The methodology for fixing
barrier can be hazardous and the of Safety Barrier and the
beam barrier can penetrate in to the end treatment for the
vehicle and lead to fatal accident start/end of the Safety
Barrier shall be as per
clause 4.10, fig 13 and 14
page no 13-15 of IRC:
119:2015 (Annexure‐3).

Revision Level: R0 March - 2023 Page 155 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
2302165 66+200 High 1. Provide Metal beam crash Essential
(Median) barrier at ends of CC
barrier on median side.
2. The minimum length of
safety barriers shall be
50m as per Clause 4.9 IRC:
119-2015 (Guidelines for
Traffic Safety Barriers).
3. Provide Hazard Marker
sign board as per IRC: 67.
Safety barriers are not provided at 4. The methodology for fixing
ends of CC Barrier on median side. of Safety Barrier and the
end treatment for the
start/end of the Safety
Barrier shall be as per
clause 4.10, fig 13 and 14
page no 13-15 of IRC:
119:2015 (Annexure‐3).

Revision Level: R0 March - 2023 Page 156 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
2302166 66+900 High 1. Provide Thermoplastic Essential
(LHS) Traverse Bar Marking (3
sets) at Hazardous Reach
as per Fig 11.2 of IRC-35-
2015 to alert the drivers to
reduce the speed of vehicle
on main carriageway
(Attached Annexure-1).
2. Provide Metal beam crash
barrier at median side.
1. Narrow Bridge 3. The methodology for fixing
2. Metal beam crash barrier is not of Safety Barrier and the
provided at ends of railing on end treatment for the
median side. start/end of the Safety
Barrier shall be as per
clause 4.10, fig 13 and 14
page no 13-15 of IRC:
119:2015 (Attached
Annexure-3).
4. The minimum length of
safety barriers shall be
50m as per Clause 4.9 of
IRC: 119-2015 (Guidelines
for Traffic Safety Barriers).
For barriers at hazardous
location 2/3rd of length

Revision Level: R0 March - 2023 Page 157 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
shall be before the hazard
and 1/3rd after hazard.
5. Provide Object hazard
marker sign board as per
Clause 15.64 of
IRC:67:2012.
2302167 66+800 – High 1. Provide Thrie Metal beam Essential
67+000 crash barrier on higher
(RHS) carrigeway side.
2. The methodology for fixing
of Safety Barrier and the
end treatment for the
start/end of the Safety
Barrier shall be as per
clause 4.10, fig 13 and 14
page no 13-15 of IRC:
Metal beam crash barrier not 119:2015 (Annexure‐3).
provided as there is level difference
between main carriageway and
service road.

Revision Level: R0 March - 2023 Page 158 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
2302168 67+200 1. Provide Metal beam crash Essential
(Median) barrier at ends of CC
barrier at median side.
2. The minimum length of
safety barriers shall be
50m as per Clause 4.9 IRC:
119-2015 (Guidelines for
Traffic Safety Barriers).
3. MCB shall be extended up
to CCB as per IRC: 119, by
Provide metal beam crash barrier overlapping for at least
including end treatment with CC 60cm over the CC Barrier
barrier. as per clause 4.11 and Fig
16 (W Beam to Concrete
Connection Details) of IRC
119-2015 (Annexure‐2).
4. Provide Hazard Marker
sign board as per IRC: 67.
5. The methodology for fixing
of Safety Barrier and the
end treatment for the
start/end of the Safety
Barrier shall be as per
clause 4.10, fig 13 and 14
page no 13-15 of IRC:
119:2015 (Annexure‐3).

Revision Level: R0 March - 2023 Page 159 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
2302169 67+500 High Provide Hazard Marker sign Essential
(LHS) board as per IRC: 67.

Hazard marker not provided before


metal beam crash barrier.
2302170 67+800, High 1. Provide Metal beam crash Essential
68+200 & barrier on median.
69+400 2. The minimum length of
(Median) safety barriers shall be
50m as per Clause 4.9 of
IRC: 119-2015 (Guidelines
for Traffic Safety Barriers).
For barriers at hazardous
location 2/3rd of length
shall be before the hazard
Metal beam crash barrier is not and 1/3rd after hazard.
provided at end of CC barrier at 3. The methodology for fixing
median side. of Safety Barrier and the
end treatment for the

Revision Level: R0 March - 2023 Page 160 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
2302171 start/end of the Safety
Barrier shall be as per
clause 4.10, fig 13 and 14
page no 13-15 of IRC:
119:2015 (Attached
Annexure-3).
4. At this location, abrupt
ending of MCB without
integrating with CCB
created hazardous
Metal beam crash barrier not situation for the errant
provided on median. vehicle. MCB shall be
2302172 extended up to parapet
wall as per IRC: 119, by
overlapping for at least
60cm over the parapet
wall/CC Barrier as per
clause 4.11 and Fig 16 (W
Beam to Concrete
Connection Details) of IRC
119-2015 (Attached
Annexure-2).
End treatment of metal beam not 5. Provide Object hazard
done on LHS. marker sign board as per
Clause 15.64 of
IRC:67:2012.

Revision Level: R0 March - 2023 Page 161 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
2302173

End treatment of Metal beam crash


barrier not done at Km 70+000.
2302174 68+100 High 1. At this location, abrupt Essential
(Median) ending of MCB without
integrating with CCB
created hazardous
situation for the errant
vehicle. MCB shall be
extended up to parapet
wall as per IRC: 119, by
overlapping for at least
60cm over the parapet
If End treatment is not proper with wall/CC Barrier as per
faring of 17:1/14:1 for a design clause 4.11 and Fig 16 (W
speed of project highway, the vehicle Beam to Concrete
may hit and an untreated end of the

Revision Level: R0 March - 2023 Page 162 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
roadside barrier can be hazardous Connection Details) of IRC
and the beam barrier can penetrate 119-2015 (Annexure‐2).
in to the vehicle and lead to fatal 2. The methodology for fixing
accident of Safety Barrier and the
end treatment for the
start/end of the Safety
Barrier shall be as per
clause 4.10, fig 13 and 14
page no 13-15 of IRC:
119:2015 (Annexure‐3).
2302175 68+400 High 1. The minimum length of Essential
(Median) safety barriers shall be
50m as per Clause 4.9 IRC:
119-2015 (Guidelines for
Traffic Safety Barriers).
2. Provide Hazard Marker
sign board as per IRC: 67.
3. The methodology for fixing
of Safety Barrier and the
end treatment for the
Safety barriers are not provided at start/end of the Safety
ends of CC barrier on median side. Barrier shall be as per
clause 4.10, fig 13 and 14
page no 13-15 of IRC:
119:2015 (Annexure‐3).

Revision Level: R0 March - 2023 Page 163 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
2302176 69+300 High Remove Electric pole Essential
(Median) immediately and shifted in
utility corridor at end of RoW
with consultation with concern
department.

Electric pole on median.


2302177 69+500 High 1. The minimum length of Essential
(Median) safety barriers shall be
50m as per Clause 4.9 IRC:
119-2015 (Guidelines for
Traffic Safety Barriers).
2. Provide Hazard Marker
sign board as per IRC: 67.
3. The methodology for fixing
of Safety Barrier and the
end treatment for the
Safety barriers are not provided at start/end of the Safety
ends of CC barrier. Barrier shall be as per
clause 4.10, fig 13 and 14
page no 13-15 of IRC:
119:2015 (Annexure‐3).

Revision Level: R0 March - 2023 Page 164 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
2302178 69+700 High 1. Extend the Metal Beam Essential
(RHS) Crash barrier due to high
embankment as per site
requirement.
2. The methodology for fixing
of Safety Barrier and the
end treatment for the
start/end of the Safety
Barrier shall be as per
clause 4.10, fig 13 and 14
Metal beam crash barrier needs to be page no 13-15 of IRC:
extended due to high embankment. 119:2015 (Annexure‐3).
3. Provide Object hazard
marker sign board as per
Clause 15.64 of
IRC:67:2012.

Revision Level: R0 March - 2023 Page 165 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
2302179 70+200 High Provide Object hazard marker Essential
(Median) sign board as per Clause 15.64
of IRC:67:2012.

Hazard marker not provided.


2302180 70+400 High 1. Provide Thermoplastic Essential
(RHS) Traverse Bar Marking (3
sets) at Hazardous Reach
as per Fig 11.2 of IRC-35-
2015 to alert the drivers to
reduce the speed of vehicle
on main carriageway
(Annexure‐1).
2. Provide Metal Beam Crash
barrier to protect the
Metal beam crash barrier not pedestal of cantilever sign
provided to shield the pedestal of board.
Cantilever sign board. 3. The minimum length of
Also, Hazard marker not provided. safety barriers shall be
50m as per Clause 4.9 of

Revision Level: R0 March - 2023 Page 166 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
IRC: 119-2015 (Guidelines
for Traffic Safety Barriers).
For barriers at hazardous
location 2/3rd of length
shall be before the hazard
and 1/3rd after hazard.
4. Provide Object hazard
marker sign board as per
Clause 15.64 of
IRC:67:2012.
2302181 71+200 High Remove Electric pole Essential
(Median) immediately and shifted in
utility corridor at end of RoW
with consultation with concern
department.

Electric pole on median.

Revision Level: R0 March - 2023 Page 167 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
2302182 72+200 High 1. Chevron/diagonal marking Essential
(LHS) with red color road studs
shall be provided as per
IRC: 35-2015 as per Clause
5.5.5, page 30 and Clause
7.2, Table 7.1: Spacing
between Diagonals /
Chevrons, at page 36.

Chevron marking not provided.


Pavement marking not provided on
service road

2. Provide pavement marking


as per IRC:35.

Revision Level: R0 March - 2023 Page 168 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
2302183 72+200 – High 1. Provide Thrie Metal beam Essential
72+400 crash barrier on main
& carrigeway side.
72+800 – 2. MCB shall be extended up
72+900 to CC barrier as per IRC:
(LHS/RHS) 119, by overlapping for at
least 60cm over the
parapet wall/CC Barrier as
per clause 4.11 and Fig 16
(W Beam to Concrete
Metal beam crash barrier not Connection Details) of IRC
provided as there is level difference 119-2015 (Annexure‐2).
between main carriageway and 3. The methodology for fixing
service road. of Safety Barrier and the
2302184 end treatment for the
start/end of the Safety
Barrier shall be as per
clause 4.10, fig 13 and 14
page no 13-15 of IRC:
119:2015 (Annexure‐3).

Revision Level: R0 March - 2023 Page 169 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
2302185 72+900 – High 1. Provide Thrie Metal beam Essential
73+100 crash barrier on main
(LHS/RHS) carrigeway side.
2. MCB shall be extended up
to parapet wall as per IRC:
119, by overlapping for at
least 60cm over the
parapet wall/CC Barrier as
per clause 4.11 and Fig 16
(W Beam to Concrete
Metal beam crash barrier not Connection Details) of IRC
provided as there is level difference 119-2015 (Annexure‐2).
between main carriageway and 3. The methodology for fixing
service road. of Safety Barrier and the
end treatment for the
start/end of the Safety
Barrier shall be as per
clause 4.10, fig 13 and 14
page no 13-15 of IRC:
119:2015 (Annexure‐3).

Revision Level: R0 March - 2023 Page 170 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
2302186 73+100 – High 1. Provide Thrie Metal beam Essential
73+600 crash barrier on main
& carrigeway side.
73+800 – 2. The methodology for fixing
74+300 of Safety Barrier and the
& end treatment for the
74+500 – start/end of the Safety
75+450 Barrier shall be as per
(LHS) clause 4.10, fig 13 and 14
page no 13-15 of IRC:
Metal beam crash barrier not 119:2015 (Annexure‐3).
provided as there is level difference
between main carriageway and
service road.
2302187 73+400 High Remove Electric pole Essential
(Median) immediately and shifted in
utility corridor at end of RoW
with consultation with concern
department.

Electric pole on median.

Revision Level: R0 March - 2023 Page 171 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
2302188 74+500 High 1. The minimum length of Essential
(Median) safety barriers shall be
50m as per Clause 4.9 IRC:
119-2015 (Guidelines for
Traffic Safety Barriers).
2. Provide Hazard Marker
sign board as per IRC: 67.
3. The methodology for fixing
of Safety Barrier and the
end treatment for the
Safety barriers and Hazard marker start/end of the Safety
are not provided. Barrier shall be as per
clause 4.10, fig 13 and 14
page no 13-15 of IRC:
119:2015 (Annexure‐3).
2302189 73+900 – High 1. Provide Thrie Metal beam Essential
74+500 crash barrier on main
(RHS) carrigeway side.
2. MCB shall be extended up
to parapet wall as per IRC:
119, by overlapping for at
least 60cm over the
parapet wall/CC Barrier as
per clause 4.11 and Fig 16
(W Beam to Concrete

Revision Level: R0 March - 2023 Page 172 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
Metal beam crash barrier not Connection Details) of IRC
provided as there is level difference 119-2015 (Annexure‐2).
between main carriageway and 3. The methodology for fixing
service road. of Safety Barrier and the
end treatment for the
start/end of the Safety
Barrier shall be as per
clause 4.10, fig 13 and 14
page no 13-15 of IRC:
119:2015 (Annexure‐3).
2302190 75+600 High Remove Electric pole Essential
(Median) immediately and shifted in
utility corridor at end of RoW
with consultation with concern
department.

Electric pole on median.

Revision Level: R0 March - 2023 Page 173 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
2302191 76+100 High 1. The minimum length of
(Median) safety barriers shall be
50m as per Clause 4.9 IRC:
119-2015 (Guidelines for
Traffic Safety Barriers).
2. Provide Hazard Marker
sign board as per IRC: 67
3. The methodology for fixing
of Safety Barrier and the
end treatment for the
Safety barrier not provided at start/end of the Safety
median side. Barrier shall be as per
clause 4.10, fig 13 and 14
page no 13-15 of IRC:
119:2015 (Annexure‐3).
2302192 76+300 - Repair of Bridge work in -
(RHS) progress.

Repair of Bridge work in progress.

Revision Level: R0 March - 2023 Page 174 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
2302193 76+500 High 1. Provide Metal Beam Crash Essential
(Median) barrier on median side.
2. The minimum length of
safety barriers shall be
50m as per Clause 4.9 of
IRC: 119-2015 (Guidelines
for Traffic Safety Barriers).
For barriers at hazardous
location 2/3rd of length
shall be before the hazard
Metal beam crash barrier not and 1/3rd after hazard.
provided on median side. 3. Provide Object hazard
marker sign board as per
Clause 15.64 of
IRC:67:2012.
2302194 76+300 – High 1. Provide Thrie Metal beam Essential
77+200 crash barrier on main
(RHS) carrigeway side.
2. The methodology for fixing
of Safety Barrier and the
end treatment for the
start/end of the Safety
Barrier shall be as per
clause 4.10, fig 13 and 14
page no 13-15 of IRC:
119:2015 (Annexure‐3).

Revision Level: R0 March - 2023 Page 175 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
Metal beam crash barrier not
provided as there is level difference
between main carriageway and
service road.
2302195 76+500 – High 1. Provide Thrie Metal beam Essential
77+500 crash barrier on main
& carrigeway side.
77+800 – 2. The methodology for fixing
77+900 of Safety Barrier and the
(LHS) end treatment for the
start/end of the Safety
Barrier shall be as per
clause 4.10, fig 13 and 14
page no 13-15 of IRC:
Metal beam crash barrier not 119:2015 (Annexure‐3).
provided as there is level difference
between main carriageway and
service road.

Revision Level: R0 March - 2023 Page 176 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
2302196 78+600 High 1. Provide Metal beam crash Essential
(Median) barrier.
Moji River 2. The minimum length of
safety barriers shall be
50m as per Clause 4.9 IRC:
119-2015 (Guidelines for
Traffic Safety Barriers).
3. Provide Hazard Marker
sign board as per IRC: 67.
4. The methodology for fixing
Safety barriers are not provided on of Safety Barrier and the
median. end treatment for the
start/end of the Safety
Barrier shall be as per
clause 4.10, fig 13 and 14
page no 13-15 of IRC:
119:2015 (Annexure‐3).

Revision Level: R0 March - 2023 Page 177 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
2302197 78+800 – High 1. Provide Thrie Metal beam Essential
79+500 crash barrier on higher
(Both carrigeway side.
Sides) 2. The methodology for fixing
of Safety Barrier and the
end treatment for the
start/end of the Safety
Barrier shall be as per
clause 4.10, fig 13 and 14
page no 13-15 of IRC:
Metal beam crash barrier not 119:2015 (Annexure‐3).
provided as there is level difference
between main carriageway and
service road on both sides.
2302198 78+800 High 1. The minimum length of Essential
(Median) safety barriers shall be
50m as per Clause 4.9 IRC:
119-2015 (Guidelines for
Traffic Safety Barriers).
2. Provide Hazard Marker
sign board as per IRC: 67
3. Painting of CCB should be
done.
4. The methodology for fixing
1. Safety barriers and Hazard of Safety Barrier and the
marker are not provided. end treatment for the

Revision Level: R0 March - 2023 Page 178 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
1. Painting of CCB not done. start/end of the Safety
Barrier shall be as per
clause 4.10, fig 13 and 14
page no 13-15 of IRC:
119:2015 (Annexure‐3).
2302199 79+550 Very 1. Develop Entry/Exit Essential
(LHS) High Arrangement with
Service/Slip road as per fig
2.1A of IRC:SP-84-2014
(Attached Annexure‐2).
2. Chevron/diagonal marking
with red color road studs
shall be provided as per
IRC: 35-2015 as per Clause
5.5.5, page 30 and Clause
1. Entry/Exit to service road is not 7.2, Table 7.1: Spacing
as per IRC Standards. between Diagonals /
2. Chevron marking has been Chevrons, at page 36.
faded.

Revision Level: R0 March - 2023 Page 179 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)

2302200 78+900 – High 1. Provide Thrie Metal beam Essential


79+700 crash barrier on main
(RHS) carrigeway side.
2. The methodology for fixing
of Safety Barrier and the
end treatment for the
start/end of the Safety
Barrier shall be as per
clause 4.10, fig 13 and 14
page no 13-15 of IRC:
Metal beam crash barrier not 119:2015 (Annexure‐3).
provided as there is level difference
between main carriageway and
service road.

Revision Level: R0 March - 2023 Page 180 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
2302201 80+200 Very 1. Develop Entry/Exit Essential
(RHS) High Arrangement with
Service/Slip road as per fig
2.1A of IRC:SP-84-2014
(Attached Annexure‐2).
2. Chevron/diagonal marking
with red color road studs
shall be provided as per
IRC: 35-2015 as per Clause
5.5.5, page 30 and Clause
1. Chevron marking has been 7.2, Table 7.1: Spacing
faded out. between Diagonals /
2. Traffic Impact Attenuators are Chevrons, at page 36.
not provided, Gore areas need
traffic impact attenuators for
the safety of road users, where
the lane-changing menoeuvring
of the vehicle is substantial.
3. If Traffic Impact Attenuators is
not provided at these locations
vehicle may hit the Concrete
Crash Barrier and a serious
accident will take place.

Revision Level: R0 March - 2023 Page 181 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
3. Provide traffic Impact
Attenuators as per Clause
9.6 of IRC: SP:84 (Manual
of Specifications and
Standards for four laning of
highways), page 92 and per
MOST Technical
Specification clause 814.3
at gore area locations,
start & end of service road
locations where structures
concrete crash barrier
ends or where the lane
changing menoeuvring of
vehicle is substantial.

Revision Level: R0 March - 2023 Page 182 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)

Revision Level: R0 March - 2023 Page 183 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
2302202 80+400 High Repair the damaged Metal Essential
(RHS) beam crash barrier.

Damaged Metal beam crash barrier.


2302203 80+800 High Remove Electric pole Essential
(Median) immediately and shifted in
utility corridor at end of RoW
with consultation with concern
department.

Electric pole on median.

Revision Level: R0 March - 2023 Page 184 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
2302204 81+000 High Remove Electric pole Essential
(Median) immediately and shifted in
utility corridor at end of RoW
with consultation with concern
department.

Electric pole on median.


2302205 82+000 High Remove the debris to provide Essential
(RHS) safe movement of road users.

Debris on carriageway edge.

Revision Level: R0 March - 2023 Page 185 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
2302206 83+700 High Remove Electric pole Essential
(Median) immediately and shifted in
utility corridor at end of RoW
with consultation with concern
department.

Electric pole on median.


2302207 83+900 High 1. Provide Metal Beam Crash Essential
(LHS) barrier.
2. The minimum length of
safety barriers shall be
50m as per Clause 4.9 of
IRC: 119-2015 (Guidelines
for Traffic Safety Barriers).
For barriers at hazardous
location 2/3rd of length
shall be before the hazard
Metal beam crash barrier not and 1/3rd after hazard.
provided. 3. Provide Object hazard
marker sign board as per
Clause 15.64 of
IRC:67:2012.

Revision Level: R0 March - 2023 Page 186 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
2302208 84+400 High Provide Object hazard marker Essential
(LHS) sign board as per Clause 15.64
of IRC:67:2012.

Hazard marker not provided before


Metal beam crash barrier.
2302209 85+300 High Provide Object hazard marker Essential
(Median) sign board as per Clause 15.64
of IRC:67:2012.

Hazard marker not provided before


Metal beam crash barrier.

Revision Level: R0 March - 2023 Page 187 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
2302210 86+400 High 1. Provide Metal Beam Crash Essential
(Median) barrier to protect the
pedestal of cantilever sign
board.
2. The minimum length of
safety barriers shall be
50m as per Clause 4.9 of
IRC: 119-2015 (Guidelines
for Traffic Safety Barriers).
For barriers at hazardous
Metal beam crash barrier not location 2/3rd of length
provided to shield the pedestal of shall be before the hazard
Cantilever sign board. and 1/3rd after hazard.
3. Provide Object hazard
marker sign board as per
Clause 15.64 of
IRC:67:2012.

Revision Level: R0 March - 2023 Page 188 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
2302211 86+500 High 1. Provide Metal Beam Crash Essential
(LHS) barrier to protect the
pedestal of cantilever sign
board.
2. The minimum length of
safety barriers shall be
50m as per Clause 4.9 of
IRC: 119-2015 (Guidelines
for Traffic Safety Barriers).
For barriers at hazardous
Metal beam crash barrier not location 2/3rd of length
provided to shield the pedestal of shall be before the hazard
Cantilever sign board. and 1/3rd after hazard.
3. Provide Object hazard
marker sign board as per
Clause 15.64 of
IRC:67:2012.

Revision Level: R0 March - 2023 Page 189 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
2302212 87+100 High 1. The minimum length of Essential
(Median) safety barriers shall be
50m as per Clause 4.9 IRC:
119-2015 (Guidelines for
Traffic Safety Barriers).
2. Provide Hazard Marker
sign board as per IRC: 67
3. Painting of CCB should be
done.
4. The methodology for fixing
1. Safety barriers and Hazard of Safety Barrier and the
marker are not provided. end treatment for the
2. Painting of CCB not done. start/end of the Safety
Barrier shall be as per
clause 4.10, fig 13 and 14
page no 13-15 of IRC:
119:2015 (Annexure‐3).

Revision Level: R0 March - 2023 Page 190 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
2302213 87+300 Very 1. Develop Entry/Exit Essential
(LHS) High Arrangement with
Service/Slip road as per fig
2.1A of IRC:SP-84-2014
(Attached Annexure‐2).
2. Chevron/diagonal marking
with red color road studs
shall be provided as per
IRC: 35-2015 as per Clause
5.5.5, page 30 and Clause
1. Chevron marking has been 7.2, Table 7.1: Spacing
faded out. between Diagonals /
2302214 Chevrons, at page 36.

2. Entry/Exit not provided as per


IRC standards
3. Traffic Impact Attenuators are
not provided, Gore areas need

Revision Level: R0 March - 2023 Page 191 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
traffic impact attenuators for 3. Provide traffic Impact
the safety of road users, where Attenuators as per Clause
the lane-changing menoeuvring 9.6 of IRC: SP:84 (Manual
of the vehicle is substantial. of Specifications and
4. If Traffic Impact Attenuators is Standards for four laning of
not provided at these locations highways), page 92 and per
vehicle may hit the Concrete MOST Technical
Crash Barrier and a serious Specification clause 814.3
accident will take place. at gore area locations,
start & end of service road
locations where structures
concrete crash barrier
ends or where the lane
changing menoeuvring of
vehicle is substantial.

Revision Level: R0 March - 2023 Page 192 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)

Revision Level: R0 March - 2023 Page 193 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
2302215 87+800 Very 1. Develop Entry/Exit Essential
(RHS) High Arrangement with
Service/Slip road as per fig
2.1A of IRC:SP-84-2014
(Attached Annexure‐2).
2. Chevron/diagonal marking
with red color road studs
shall be provided as per
IRC: 35-2015 as per Clause
5.5.5, page 30 and Clause
1. Chevron marking has been 7.2, Table 7.1: Spacing
faded out. between Diagonals /
2302216 Chevrons, at page 36.

2. Traffic Impact Attenuators are


not provided, Gore areas need
traffic impact attenuators for
the safety of road users, where

Revision Level: R0 March - 2023 Page 194 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
the lane-changing menoeuvring 3. Provide traffic Impact
of the vehicle is substantial. Attenuators as per Clause
3. If Traffic Impact Attenuators is 9.6 of IRC: SP:84 (Manual
not provided at these locations of Specifications and
vehicle may hit the Concrete Standards for four laning of
Crash Barrier and a serious highways), page 92 and per
accident will take place. MOST Technical
Specification clause 814.3
at gore area locations,
start & end of service road
locations where structures
concrete crash barrier
ends or where the lane
changing menoeuvring of
vehicle is substantial.

Revision Level: R0 March - 2023 Page 195 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)

Revision Level: R0 March - 2023 Page 196 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
2302217 88+000 High 1. The minimum length of Essential
(Median) safety barriers shall be
50m as per Clause 4.9 IRC:
119-2015 (Guidelines for
Traffic Safety Barriers).
2. Provide Hazard Marker
sign board as per IRC: 67
3. Painting of CCB should be
done.
4. The methodology for fixing
1. Safety barriers and Hazard of Safety Barrier and the
marker are not provided. end treatment for the
2. Painting of CCB not done. start/end of the Safety
Barrier shall be as per
clause 4.10, fig 13 and 14
page no 13-15 of IRC:
119:2015 (Annexure‐3).

Revision Level: R0 March - 2023 Page 197 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
2302218 88+400 High 1. Provide Metal Beam Crash Essential
(RHS) barrier to protect the
pedestal of cantilever sign
board.
2. The minimum length of
safety barriers shall be
50m as per Clause 4.9 of
IRC: 119-2015 (Guidelines
for Traffic Safety Barriers).
For barriers at hazardous
Metal beam crash barrier not location 2/3rd of length
provided to shield the pedestal of shall be before the hazard
Cantilever sign board. and 1/3rd after hazard.
3. Provide Object hazard
marker sign board as per
Clause 15.64 of
IRC:67:2012.

Revision Level: R0 March - 2023 Page 198 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
2302219 88+900 High 1. Provide Metal Beam crash Essential
(Median) barrier on median side
where police post.
2. The minimum length of
safety barriers shall be
50m as per Clause 4.9 IRC:
119-2015 (Guidelines for
Traffic Safety Barriers).
3. Provide Hazard Marker
sign board as per IRC: 67
1. Safety barriers and Hazard 4. The methodology for fixing
marker are not provided on of Safety Barrier and the
Police Booths. end treatment for the
start/end of the Safety
Barrier shall be as per
clause 4.10, fig 13 and 14
page no 13-15 of IRC:
119:2015 (Annexure‐3).

Revision Level: R0 March - 2023 Page 199 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
2302220 89+000 High Provide Hazard Marker sign Essential
(LHS) board as per IRC: 67.

Hazard marker are not provided.

2302221 89+500 High 1. Provide Metal Beam Crash Essential


(Median) barrier to protect the
pedestal of cantilever sign
board.
2. The minimum length of
safety barriers shall be
50m as per Clause 4.9 of
IRC: 119-2015 (Guidelines
for Traffic Safety Barriers).
For barriers at hazardous
Metal beam crash barrier not location 2/3rd of length
provided to shield the pedestal of shall be before the hazard
Cantilever sign board. and 1/3rd after hazard.

Revision Level: R0 March - 2023 Page 200 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
3. Provide Object hazard
marker sign board as per
Clause 15.64 of
IRC:67:2012.
2302222 89+000 High Remove Electric pole Essential
(Median) immediately and shifted in
utility corridor at end of RoW
with consultation with concern
department.

Electric pole on median.

Revision Level: R0 March - 2023 Page 201 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
2302223 89+200 High 1. The minimum length of Essential
(LHS/RHS) safety barriers shall be
50m as per Clause 4.9 IRC:
119-2015 (Guidelines for
Traffic Safety Barriers).
2. The methodology for fixing
of Safety Barrier and the
end treatment for the
start/end of the Safety
Barrier shall be as per
Metal beam crash barrier not clause 4.10, fig 13 and 14
provided on RHS. page no 13-15 of IRC:
119:2015 (Annexure‐3).
2302224

MCB not provided on LHS.

Revision Level: R0 March - 2023 Page 202 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
2302225 89+400 High 1. The minimum length of Essential
(Median) safety barriers shall be
50m as per Clause 4.9 IRC:
119-2015 (Guidelines for
Traffic Safety Barriers).
2. Provide Hazard Marker
sign board as per IRC: 67
3. Painting of CCB should be
done.
4. The methodology for fixing
1. Safety barriers and Hazard of Safety Barrier and the
marker are not provided. end treatment for the
2. Painting of CCB not done. start/end of the Safety
Barrier shall be as per
clause 4.10, fig 13 and 14
page no 13-15 of IRC:
119:2015 (Annexure‐3).

Revision Level: R0 March - 2023 Page 203 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
2302226 89+800 Very 1. At this location, abrupt Essential
(RHS) High ending of MCB without
integrating with CCB
created hazardous
situation for the errant
vehicle. MCB shall be
extended up to parapet
wall as per IRC: 119, by
overlapping for at least
60cm over the parapet
1. Roadside concrete barrier end wall/CC Barrier as per
treatment not done. clause 4.11 and Fig 16 (W
2. If End treatment is not proper Beam to Concrete
with faring of 17:1/14:1 for a Connection Details) of IRC
design speed of project 119-2015 (Annexure‐2).
highway, the vehicle may hit 2. The methodology for fixing
and an untreated end of the of Safety Barrier and the
roadside barrier can be end treatment for the
hazardous because of the beam start/end of the Safety
barrier can penetrate in to the Barrier shall be as per
vehicle and lead to fatal clause 4.10, fig 13 and 14
accident. page no 13-15 of IRC:
119:2015 (Annexure‐3).

Revision Level: R0 March - 2023 Page 204 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
2302227 90+100 High Remove Electric pole Essential
(Median) immediately and shifted in
utility corridor at end of RoW
with consultation with concern
department.

Electric pole on median.


2302228 91+100 High Provide Hazard Marker sign Essential
(LHS) board as per IRC: 67.

Hazard marker are not provided.

Revision Level: R0 March - 2023 Page 205 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
2302229 91+800 Very 1. At this location, abrupt Essential
(RHS) High ending of MCB without
Aadar integrating with CCB
River created hazardous
situation for the errant
vehicle. MCB shall be
extended up to parapet
wall as per IRC: 119, by
overlapping for at least
60cm over the parapet
1. Roadside concrete barrier end wall/CC Barrier as per
treatment not done. clause 4.11 and Fig 16 (W
2. If End treatment is not proper Beam to Concrete
with faring of 17:1/14:1 for a Connection Details) of IRC
design speed of project 119-2015 (Annexure‐2).
highway, the vehicle may hit 2. The methodology for fixing
and an untreated end of the of Safety Barrier and the
roadside barrier can be end treatment for the
hazardous because of the beam start/end of the Safety
barrier can penetrate in to the Barrier shall be as per
vehicle and lead to fatal clause 4.10, fig 13 and 14
accident. page no 13-15 of IRC:
119:2015 (Annexure‐3).

Revision Level: R0 March - 2023 Page 206 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
2302230 92+400 High Provide Hazard Marker sign Essential
(LHS) board as per IRC: 67.

Hazard marker are not provided.


2302231 92+500 High Remove Electric pole Essential
(Median) immediately and shifted in
utility corridor at end of RoW
with consultation with concern
department.

Electric pole on median.

Revision Level: R0 March - 2023 Page 207 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
2302232 92+700 High Remove Electric pole Essential
(Median) immediately and shifted in
utility corridor at end of RoW
with consultation with concern
department.

Electric pole on median.


2302233 93+000 High Remove Electric pole Essential
(Median) immediately and shifted in
utility corridor at end of RoW
with consultation with concern
department.

Electric pole on median.

Revision Level: R0 March - 2023 Page 208 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
2302234 93+400 High Remove Electric pole Essential
(Median) immediately and shifted in
utility corridor at end of RoW
with consultation with concern
department.

Electric pole on median.


2302235 94+300 High Remove Electric pole Essential
(Median) immediately and shifted in
utility corridor at end of RoW
with consultation with concern
department.

Electric pole on median.

Revision Level: R0 March - 2023 Page 209 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
2302236 94+500 High 1. Provide Metal Beam Crash Essential
(LHS barrier to protect the
& pedestal of cantilever sign
Median) board.
2. The minimum length of
safety barriers shall be
50m as per Clause 4.9 of
IRC: 119-2015 (Guidelines
for Traffic Safety Barriers).
For barriers at hazardous
Metal beam crash barrier not location 2/3rd of length
provided to shield the pedestal of shall be before the hazard
Cantilever sign board. and 1/3rd after hazard.
2302237 3. Provide Object hazard
marker sign board as per
Clause 15.64 of
IRC:67:2012.

LHS Pedestal of Cantilever not


shielded.

Revision Level: R0 March - 2023 Page 210 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
2302238 94+800 High Service road needs to be Essential
(RHS) extended till Km 94+700 and
Entry/Exit should be developed
as per fig 2.1A of IRC:SP-84-
2014 (Attached Annexure‐2).

Service road ends at Km 94+900


after median opening.
2302239 95+100 – High 1. Provide Metal beam crash Essential
95+300 barrier.
(LHS) 2. The methodology for fixing
of Safety Barrier and the
end treatment for the
start/end of the Safety
Barrier shall be as per
clause 4.10, fig 13 and 14
page no 13-15 of IRC:
119:2015 (Annexure‐3).
Metal beam crash barrier not
provided as there sharp earthen
shoulder drop.

Revision Level: R0 March - 2023 Page 211 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
2302240 95+100 High 1. Enty/Exit already available Essential
(RHS) at Km. 95+800. Develop
Entry/Exit Arrangement
with Service/Slip road at
Km 95+500 as per fig 2.1A
of IRC:SP-84-2014
(Attached Annexure‐2).
2. Close the access to service
road at Km. 95+300.

Close the access to service road.


2302241 95+300 High 1. Enty/Exit already available Essential
(RHS) at Km. 95+800. Develop
Entry/Exit Arrangement
with Service/Slip road at
Km 95+500 as per fig 2.1A
of IRC:SP-84-2014
(Attached Annexure‐2).
2. Close the access to service
road at Km. 95+300.

Close the access to service road.

Revision Level: R0 March - 2023 Page 212 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
2302242 95+500 High Develop Entry/Exit Essential
(RHS) Arrangement with Service/Slip
road as per fig 2.1A of IRC:SP-
84-2014 (Attached Annexure‐
2).

Entry/Exit to service road not as per


IRC standard.
2302243 95+700 High 1. Develop Entry/Exit Essential
(LHS) Arrangement with
Service/Slip road as per fig
2.1A of IRC:SP-84-2014
(Annexure‐2).
2. Chevron/diagonal marking
with red color road studs
shall be provided as per
IRC: 35-2015 as per Clause
5.5.5, page 30 and Clause
Proper Entry/exit has not been 7.2, Table 7.1: Spacing
provided. between Diagonals /
Chevrons, at page 36.

Revision Level: R0 March - 2023 Page 213 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
2302244

1. Pavement marking not done on


service road.
2. Chevron marking not provided. 3. Provide pavement marking
on service road as per
IRC:35-2015.
4. Direction Information sign
should be provided as per
Clause 9.2.9 and Fig. 9.2 of
page 83 of IRC:84-2014.
Gantry and shoulder
mounted Advance
Direction Sign shall be
provided in advance of an
interchange/ Flyover/ VUP
or any urban reach. Flag
type direction information

Revision Level: R0 March - 2023 Page 214 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
sign shall be installed at the
start of deceleration length
or gorge indicating the
destinations of the side
roads. (Annexure – 7)
2302245 95+800 High Remove Electric pole Essential
(Median) immediately and shifted in
utility corridor at end of RoW
with consultation with concern
department.

Electric pole on median.


2302246 96+100 – High 1. Provide Metal beam crash Essential
96+200 barrier.
(LHS) 2. The methodology for fixing
of Safety Barrier and the
end treatment for the
start/end of the Safety
Barrier shall be as per
clause 4.10, fig 13 and 14
page no 13-15 of IRC:
119:2015 (Annexure‐3).

Revision Level: R0 March - 2023 Page 215 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
Metal beam crash barrier not
provided on LHS service road.

2302247 96+300 High 1. Develop Entry/Exit Essential


(RHS) Arrangement with
Service/Slip road as per fig
2.1A of IRC:SP-84-2014
(Attached Annexure‐2).
2. Provide pavement marking
on service road as per
IRC:35-2015.
3. Provide road studs as per
clause 9.5 and table 9.1 of
1. Traffic Impact Attenuators are IRC:SP:84-2014.
not provided, Gore areas need 4. Provide traffic Impact
traffic impact attenuators for Attenuators as per Clause
the safety of road users, where 9.6 of IRC: SP:84 (Manual
the lane-changing menoeuvring of Specifications and
of the vehicle is substantial. Standards for four laning of
2. If Traffic Impact Attenuators is highways), page 92 and per
not provided at these locations MoRTH Technical
vehicle may hit the Concrete Specification clause 814.3
Crash Barrier and a serious at gore area locations,
accident will take place. start & end of service road
locations where structures

Revision Level: R0 March - 2023 Page 216 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
concrete crash barrier
ends or where the lane
changing menoeuvring of
vehicle is substantial.

Revision Level: R0 March - 2023 Page 217 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
2302248 96+600 High 1. At this location, abrupt Essential
Bridge at ending of MCB without
Safola integrating with CCB
River created hazardous
(LHS/ situation for the errant
RHS) vehicle. MCB shall be
extended up to parapet
wall as per IRC: 119, by
overlapping for at least
60cm over the parapet
1. Roadside concrete barrier end wall/CC Barrier as per
treatment damaged (both clause 4.11 and Fig 16 (W
sides). Beam to Concrete
2302249 Connection Details) of IRC
119-2015 (Annexure‐2).
2. The methodology for fixing
of Safety Barrier and the
end treatment for the
start/end of the Safety
Barrier shall be as per
clause 4.10, fig 13 and 14
page no 13-15 of IRC:
119:2015 (Annexure‐3).
2. If End treatment is not proper
with faring of 17:1/14:1 for a
design speed of project

Revision Level: R0 March - 2023 Page 218 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
highway, the vehicle may hit
and an untreated end of the
roadside barrier can be
hazardous because of the beam
barrier can penetrate in to the
vehicle and lead to fatal
accident.
2302250 96+900 High 1. Develop Entry/Exit Essential
(LHS) Arrangement with
Service/Slip road as per fig
2.1A of IRC:SP-84-2014
(Attached Annexure‐2).
2. Chevron/diagonal marking
with red color road studs
shall be provided as per
IRC: 35-2015 as per Clause
5.5.5, page 30 and Clause
1. Entry/Exit not as per IRC 7.2, Table 7.1: Spacing
standards. between Diagonals /
2. Cleaning is required. Chevrons, at page 36.

Revision Level: R0 March - 2023 Page 219 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
2302251

3. Chevron marking has not been


provided.
3. Provide pavement marking
on service road as per
IRC:35-2015.
4. Direction Information sign
should be provided as per
Clause 9.2.9 and Fig. 9.2 of
page 83 of IRC:84-2014.
Gantry and shoulder
mounted Advance
Direction Sign shall be
provided in advance of an
interchange/ Flyover/ VUP
or any urban reach. Flag
type direction information

Revision Level: R0 March - 2023 Page 220 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
sign shall be installed at the
start of deceleration length
or gorge indicating the
destinations of the side
roads. (Annexure – 7)
2302252 97+000 High 1. Develop Entry/Exit Essential
(RHS) Arrangement with
Service/Slip road as per fig
2.1A of IRC:SP-84-2014
(Annexure‐2).
2. Chevron/diagonal marking
with red color road studs
shall be provided as per
IRC: 35-2015 as per Clause
5.5.5, page 30 and Clause
1. Proper Entry/exit has not been 7.2, Table 7.1: Spacing
provided. between Diagonals /
2. Pavement marking not done on Chevrons, at page 36.
service road.

Revision Level: R0 March - 2023 Page 221 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
2302253

3. Chevron marking not provided.


3. Provide pavement marking
on service road as per
IRC:35-2015.
4. Direction Information sign
should be provided as per
Clause 9.2.9 and Fig. 9.2 of
page 83 of IRC:84-2014.
Gantry and shoulder
mounted Advance
Direction Sign shall be
provided in advance of an
interchange/ Flyover/ VUP
or any urban reach. Flag
type direction information

Revision Level: R0 March - 2023 Page 222 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
sign shall be installed at the
start of deceleration length
or gorge indicating the
destinations of the side
roads. (Annexure – 7)
2302254 97+400 High Short Term: Essential
(RHS) 1. Barricade the structure
using Metal beam crash
barrier.
2. The methodology for fixing
of Safety Barrier and the
end treatment for the
start/end of the Safety
Barrier shall be as per
clause 4.10, fig 13 and 14
Structure on paved shoulder may page no 13-15 of IRC:
lead to unavoidale situations to 119:2015 (Attached
drivers during night time. Annexure-3).
3. The minimum length of
safety barriers shall be
50m as per Clause 4.9 of
IRC: 119-2015 (Guidelines
for Traffic Safety Barriers).
For barriers at hazardous
location 2/3rd of length

Revision Level: R0 March - 2023 Page 223 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
shall be before the hazard
and 1/3rd after hazard.
4. Provide Object hazard
marker sign board as per
Clause 15.64 of
IRC:67:2012.
5. Provide black and yellow
stripes on the structure
sloping downwards at an
angle of 45 degrees
towards facing side of
traffic as per Clause 14.2 of
IRC:35-2015, page 90.
Long Term:
1. Remove the structure.
2302255 97+700 High 1. Develop Entry/Exit Essential
(RHS) Arrangement with
Service/Slip road as per fig
2.1A of IRC:SP-84-2014
(Annexure‐2).
2. Chevron/diagonal marking
with red color road studs
shall be provided as per
IRC: 35-2015 as per Clause
5.5.5, page 30 and Clause
7.2, Table 7.1: Spacing

Revision Level: R0 March - 2023 Page 224 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
1. Proper Entry/exit has not been between Diagonals /
provided. Chevrons, at page 36.
2. Pavement marking not done on
service road.
2302256

3. Chevron marking has faded. 3. Provide pavement marking


on service road as per
IRC:35-2015.
4. Direction Information sign
should be provided as per
Clause 9.2.9 and Fig. 9.2 of
page 83 of IRC:84-2014.
Gantry and shoulder
mounted Advance
Direction Sign shall be
provided in advance of an
interchange/ Flyover/ VUP

Revision Level: R0 March - 2023 Page 225 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
or any urban reach. Flag
type direction information
sign shall be installed at the
start of deceleration length
or gorge indicating the
destinations of the side
roads. (Annexure – 7)
2302257 98+000 High 1. Provide Metal Beam Crash Essential
(LHS, RHS barrier to protect the
& pedestal of gantry
Median) mounted sign board.
2. The minimum length of
safety barriers shall be
50m as per Clause 4.9 of
IRC: 119-2015 (Guidelines
for Traffic Safety Barriers).
For barriers at hazardous
Metal beam crash barrier not location 2/3rd of length
provided to shield the pedestal of shall be before the hazard
gantry mounted sign board. and 1/3rd after hazard.
3. Provide Object hazard
marker sign board as per
Clause 15.64 of
IRC:67:2012.

Revision Level: R0 March - 2023 Page 226 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
2302258 98+300 High 1. Provide Metal Beam Crash Essential
(RHS) barrier to protect the
pedestal of cantilever sign
board.
2. The minimum length of
safety barriers shall be
50m as per Clause 4.9 of
IRC: 119-2015 (Guidelines
for Traffic Safety Barriers).
For barriers at hazardous
Metal beam crash barrier not location 2/3rd of length
provided to shield the pedestal of shall be before the hazard
Cantilever sign board. and 1/3rd after hazard.
3. Provide Object hazard
marker sign board as per
Clause 15.64 of
IRC:67:2012.

Revision Level: R0 March - 2023 Page 227 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
2302259 98+400 High 1. Provide Metal Beam Crash Essential
(Median) barrier to protect the
pedestal of cantilever sign
board.
2. The minimum length of
safety barriers shall be
50m as per Clause 4.9 of
IRC: 119-2015 (Guidelines
for Traffic Safety Barriers).
For barriers at hazardous
Metal beam crash barrier not location 2/3rd of length
provided to shield the pedestal of shall be before the hazard
Cantilever sign board. and 1/3rd after hazard.
3. Provide Object hazard
marker sign board as per
Clause 15.64 of
IRC:67:2012.

Revision Level: R0 March - 2023 Page 228 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
2302260 98+400 High Provide Object hazard marker Essential
(LHS) sign board as per Clause 15.64
of IRC:67:2012.

Object Hazard marker sign not


provided.
2302261 98+600 High Remove Electric pole Essential
(Median) immediately and shifted in
utility corridor at end of RoW
with consultation with concern
department.

Electric pole on median.

Revision Level: R0 March - 2023 Page 229 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
2302262 99+300, High Remove Electric pole Essential
99+700 & immediately and shifted in
99+800 utility corridor at end of RoW
(Median) with consultation with concern
department.

Electric pole on median.


2302263 99+900 High Provide continuous Pedestrian Essential
(Median) guard railing as per site
location.

Pedestrian guard rail not continuous

Revision Level: R0 March - 2023 Page 230 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
2302264 100+200 High Remove Electric pole Essential
(Median) immediately and shifted in
utility corridor at end of RoW
with consultation with concern
department.

Electric pole on median.


2302265 100+700 Develop Entry/Exit Essential
(LHS) Arrangement with Service/Slip
road as per fig 2.1A of IRC:SP-
84-2014 (Attached Annexure‐
2).

Sharp entry/exit just before bridge.

Revision Level: R0 March - 2023 Page 231 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
2302266 100+300 – High 1. Provide Metal beam crash Essential
100+750 barrier.
(RHS) 2. The methodology for fixing
of Safety Barrier and the
end treatment for the
start/end of the Safety
Barrier shall be as per
clause 4.10, fig 13 and 14
page no 13-15 of IRC:
119:2015 (Attached
Metal beam crash barrier not Annexure-3).
provided as there is level difference
between main carriageway and
service road.
2302267 100+200 – High 1. Provide Metal beam crash Essential
100+600 barrier on higher side of
(LHS) carrigeway.
2. The methodology for fixing
of Safety Barrier and the
end treatment for the
start/end of the Safety
Barrier shall be as per
clause 4.10, fig 13 and 14
page no 13-15 of IRC:
Metal beam crash barrier not 119:2015 (Attached
provided as there is level difference Annexure‐3).

Revision Level: R0 March - 2023 Page 232 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
between main carriageway and
service road.

2302268 101+600 High 1. Provide Thermoplastic Essential


(LHS) Traverse Bar Marking (3
sets) on both sides of
Hazardous Reach as per Fig
11.2 of IRC-35-2015 to
alert the drivers to reduce
the speed of vehicle on
main carriageway
(Annexure‐1).
2. At this location, abrupt
1. Narrow Bridge ending of MCB without
2. Metal beam crash barrier end integrating with CCB
treatment not done with CC created hazardous
barrier situation for the errant
3. If End treatment is not proper vehicle. MCB shall be
with faring of 17:1/14:1 for a extended up to parapet
design speed of project wall as per IRC: 119, by
highway, the vehicle may hit overlapping for at least
and an untreated end of the 60cm over the parapet
roadside barrier can be wall/CC Barrier as per
hazardous and the beam barrier clause 4.11 and Fig 16 (W
Beam to Concrete

Revision Level: R0 March - 2023 Page 233 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
can penetrate in to the vehicle Connection Details) of IRC
and lead to fatal accident. 119-2015 (Annexure‐2).
2302269 3. The methodology for fixing
of Safety Barrier and the
end treatment for the
start/end of the Safety
Barrier shall be as per
clause 4.10, fig 13 and 14
page no 13-15 of IRC:
119:2015 (Annexure‐3).
4. Metal beam crash barrier
should be fixed at least
4. Hand pipe railing has rusted. 0.6m from earthen
shoulder.
5. Hand pipe railing should be
replaced.

Revision Level: R0 March - 2023 Page 234 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
2302270 101+600 High 1. At this location, abrupt Essential
(Median) ending of MCB without
integrating with CCB
created hazardous
situation for the errant
vehicle. MCB shall be
extended up to parapet
wall as per IRC: 119, by
overlapping for at least
60cm over the parapet
1. Roadside concrete barrier end wall/CC Barrier as per
treatment damaged (both clause 4.11 and Fig 16 (W
sides). Beam to Concrete
2. If End treatment is not proper Connection Details) of IRC
with faring of 17:1/14:1 for a 119-2015 (Annexure‐2).
design speed of project 2. The methodology for fixing
highway, the vehicle may hit of Safety Barrier and the
and an untreated end of the end treatment for the
roadside barrier can be start/end of the Safety
hazardous because of the beam Barrier shall be as per
barrier can penetrate in to the clause 4.10, fig 13 and 14
vehicle and lead to fatal page no 13-15 of IRC:
accident. 119:2015 (Annexure‐3).

Revision Level: R0 March - 2023 Page 235 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
2302271 101+650 1. Develop Entry/Exit Essential
(RHS) Arrangement with
Service/Slip road as per fig
2.1A of IRC:SP-84-2014
(Attached Annexure‐2).
2. Damaged kerb needs to be
repaired.

Sharp opening just after bridge.


2302272

Damaged kerb.

Revision Level: R0 March - 2023 Page 236 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
2302273 101+950 High 1. The methodology for fixing Essential
(LHS & of Safety Barrier and the
Median) end treatment for the
start/end of the Safety
Barrier shall be as per
clause 4.10, fig 13 and 14
page no 13-15 of IRC:
119:2015 (Attached
Annexure-3).
2. The minimum length of
Metal beam crash barrier not safety barriers shall be
provided. 50m as per Clause 4.9 of
IRC: 119-2015 (Guidelines
for Traffic Safety Barriers).
For barriers at hazardous
location 2/3rd of length
shall be before the hazard
and 1/3rd after hazard.
3. Provide Object hazard
marker sign board as per
Clause 15.64 of
IRC:67:2012.
4. Crash barrier should be
flushed with kerb as per
MoRTH circular RW/NH-

Revision Level: R0 March - 2023 Page 237 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
29023/02/2019-S & R (P &
B) dated January 01, 2020.

2302274 102+000 – High 1. Provide metal beam crash Essential


102+400 barrier on high
(LHS) embankment portion.
2. The methodology for fixing
of Safety Barrier and the
end treatment for the
start/end of the Safety
Barrier shall be as per
clause 4.10, fig 13 and 14
page no 13-15 of IRC:
Metal beam crash barrier not 119:2015 (Annexure‐3).
provided high embankment portion. 3. Provide Object hazard
marker sign board as per
Clause 15.64 of
IRC:67:2012.

Revision Level: R0 March - 2023 Page 238 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
2302275 102+000 High 1. At this location, abrupt Essential
(RHS) ending of MCB creates
hazardous situation for the
errant vehicle. MCB should
be extended due to high
embankment as per IRC:
119 .
2. The methodology for fixing
of Safety Barrier and the
end treatment for the
Metal beam crash barrier needs to be start/end of the Safety
extended at this location due to high Barrier shall be as per
embankment. clause 4.10, fig 13 and 14
page no 13-15 of IRC:
119:2015 (Annexure‐3).
3. Provide Object hazard
marker sign board as per
Clause 15.64 of
IRC:67:2012

Revision Level: R0 March - 2023 Page 239 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
2302276 102+100 High 1. The methodology for fixing Essential
(Median) of Safety Barrier and the
end treatment for the
start/end of the Safety
Barrier shall be as per
clause 4.10, fig 13 and 14
page no 13-15 of IRC:
119:2015 (Attached
Annexure-3).
2. The minimum length of
Metal beam crash barrier not safety barriers shall be
provided on median side before CC 50m as per Clause 4.9 of
barrier. IRC: 119-2015 (Guidelines
for Traffic Safety Barriers).
For barriers at hazardous
location 2/3rd of length
shall be before the hazard
and 1/3rd after hazard.
3. Provide Object hazard
marker sign board as per
Clause 15.64 of
IRC:67:2012.
4. Crash barrier should be
flushed with kerb as per
MoRTH circular RW/NH-

Revision Level: R0 March - 2023 Page 240 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
29023/02/2019-S & R (P &
B) dated January 01, 2020.

2302277 102+100 High 1. At this location, abrupt Essential


(RHS) ending of MCB creates
hazardous situation for the
errant vehicle. MCB should
be extended due to high
embankment as per IRC:
119 .
2. The methodology for fixing
of Safety Barrier and the
end treatment for the
Metal beam crash barrier needs to be start/end of the Safety
extended at this location due to high Barrier shall be as per
embankment. clause 4.10, fig 13 and 14
page no 13-15 of IRC:
119:2015 (Annexure‐3).

Revision Level: R0 March - 2023 Page 241 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
2302278 102+600 High Remove Electric pole Essential
(Median) immediately and shifted in
utility corridor at end of RoW
with consultation with concern
department.

Electric pole on median.


2302279 103+200 High Remove Electric pole Essential
(Median) immediately and shifted in
utility corridor at end of RoW
with consultation with concern
department.

Electric pole on median.

Revision Level: R0 March - 2023 Page 242 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
2302280 104+000 High Remove Electric pole Essential
(Median) immediately and shifted in
utility corridor at end of RoW
with consultation with concern
department.

Electric pole on median.


2302281 104+300 High 1. Provide metal beam crash Essential
104+900 barrier.
(LHS) 2. The methodology for fixing
of Safety Barrier and the
end treatment for the
start/end of the Safety
Barrier shall be as per
clause 4.10, fig 13 and 14
page no 13-15 of IRC:
119:2015 (Annexure‐3).
Metal beam crash barrier not 3. Provide Object hazard
provided. marker sign board as per
Clause 15.64 of
IRC:67:2012.

Revision Level: R0 March - 2023 Page 243 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
2302282 104+200 High Remove Electric pole Essential
(Median) immediately and shifted in
utility corridor at end of RoW
with consultation with concern
department.

Electric pole on median.


2302283 105+200 High Remove Electric pole Essential
(Median) immediately and shifted in
utility corridor at end of RoW
with consultation with concern
department.

Electric pole on median.

Revision Level: R0 March - 2023 Page 244 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
2302284 105+800 – High 1. Provide metal beam crash Essential
106+600 barrier.
(LHS) 2. The methodology for fixing
of Safety Barrier and the
end treatment for the
start/end of the Safety
Barrier shall be as per
clause 4.10, fig 13 and 14
page no 13-15 of IRC:
119:2015 (Annexure‐3).
Metal beam crash barrier not 3. Provide Object hazard
provided. marker sign board as per
Clause 15.64 of
IRC:67:2012.
2302285 106+000 Very 1. Develop Entry/Exit Essential
(LHS) High Arrangement with
Service/Slip road as per fig
2.1A of IRC:SP-84-2014
(Attached Annexure‐2).
2. Chevron/diagonal marking
with red color road studs
shall be provided as per
IRC: 35-2015 as per Clause
5.5.5, page 30 and Clause
Sharp Entry/Exit. 7.2, Table 7.1: Spacing

Revision Level: R0 March - 2023 Page 245 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
between Diagonals /
Chevrons, at page 36.

2302286 106+100 High Remove Electric pole Essential


(Median) immediately and shifted in
utility corridor at end of RoW
with consultation with concern
department.

Electric pole on median.

Revision Level: R0 March - 2023 Page 246 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
2302287 106+300 High Provide Hazard Markers as per Essential
(LHS) IRC-67.

1. Hazard marker not provided at


SOS.
2302288 106+500 High Remove Electric pole Essential
(Median) immediately and shifted in
utility corridor at end of RoW
with consultation with concern
department.

Electric pole on median.

Revision Level: R0 March - 2023 Page 247 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
2302289 106+800 High Remove Electric pole Essential
(Median) immediately and shifted in
utility corridor at end of RoW
with consultation with concern
department.

Electric pole on median.


2302290 107+100 – High 1. Provide Metal beam crash Essential
107+400, barrier at ends of structure
107+500 – locations.
107+700 2. The methodology for fixing
& of Safety Barrier and the
107+800 – end treatment for the
107+900 start/end of the Safety
(LHS) Barrier shall be as per
clause 4.10, fig 13 and 14
page no 13-15 of IRC:
Metal beam crash barrier not 119:2015 (Attached
provided. Annexure‐3).
3. Provide Object hazard
marker sign board as per

Revision Level: R0 March - 2023 Page 248 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
Clause 15.64 of
IRC:67:2012.

2302291 108+800 High 1. Provide appropriate traffic Highly


(RHS) calming measures to Desirable
reduce the speed on
approaches to work site
and maintain the speed of
traffic as it passes through
work area.
2. Speed breakers require
proper retro reflective
paint supported with
Diversion for under construction Cautionary sign board
LVUP. erected at least 45 m
before the Hump. Need to
2302292 be removed after
construction.
3. Type IV barricading needs
to be provided at
construction site.

Revision Level: R0 March - 2023 Page 249 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
LVUP under construction.

2302293 108+900 High Remove Electric pole Essential


(Median) immediately and shifted in
utility corridor at end of RoW
with consultation with concern
department.

Electric pole on median.


2302294 109+200 High Remove Electric pole Essential
(Median) immediately and shifted in
utility corridor at end of RoW
with consultation with concern
department.

Electric pole on median.

Revision Level: R0 March - 2023 Page 250 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
2302295 110+100 High Remove Electric pole Essential
(Median) immediately and shifted in
utility corridor at end of RoW
with consultation with concern
department.

Electric pole on median.


2302296 110+500 High 1. Provide Metal beam crash Essential
(LHS) barrier to shield the
pedestal of Gantry
mounted sign board.
2. The methodology for fixing
of Safety Barrier and the
end treatment for the
start/end of the Safety
Barrier shall be as per
clause 4.10, fig 13 and 14
Pedestal of Gantry mounted sign page no 13-15 of IRC:
board not shielded. 119:2015 (Annexure‐3).
3. The minimum length of
safety barriers shall be
50m as per Clause 4.9 of

Revision Level: R0 March - 2023 Page 251 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
IRC: 119-2015 (Guidelines
for Traffic Safety Barriers).
For barriers at hazardous
location 2/3rd of length
shall be before the hazard
and 1/3rd after hazard.
4. Provide Hazard Marker
sign board as per IRC: 67.
2302297 110+500 High 1. The methodology for fixing Essential
(RHS) of Safety Barrier and the
end treatment for the
start/end of the Safety
Barrier shall be as per
clause 4.10, fig 13 and 14
page no 13-15 of IRC:
119:2015 (Annexure‐3).
2. The minimum length of
safety barriers shall be
1. End treatment on Metal beam 50m as per Clause 4.9 of
crash barrier not done. IRC: 119-2015 (Guidelines
2. Hazard marker not provided at for Traffic Safety Barriers).
SOS. For barriers at hazardous
location 2/3rd of length
shall be before the hazard
and 1/3rd after hazard.

Revision Level: R0 March - 2023 Page 252 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
2302298 3. Remove Electric pole
immediately and shifted in
utility corridor at end of
RoW with consultation
with concern department.
4. Provide Hazard Markers as
per IRC-67.

3. Electric pole on median.


2302299 112+500 High Remove Electric pole Essential
(Median) immediately and shifted in
utility corridor at end of RoW
with consultation with concern
department.

Electric pole on median

Revision Level: R0 March - 2023 Page 253 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
2302300 112+600 - High Damaged railing needs to be Essential
112+700 repaired.
(Median)

Damaged railing
2302301

Revision Level: R0 March - 2023 Page 254 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
2302302 112+950 High 1. At this location, metal Essential
(RHS) beam crash barrier should
be provided and integrated
with CCB created
hazardous situation for the
errant vehicle. MCB shall
be extended up to parapet
wall as per IRC: 119, by
overlapping for at least
60cm over the parapet
1. Canal crossing wall/CC Barrier as per
2. Metal beam carsh barrier clause 4.11 and Fig 16 (W
needsnto be provided to shield Beam to Concrete
the opening at canal crossing. Connection Details) of IRC
3. Metal beam crash barrier on 119-2015 (Annexure‐2).
median should be of minimum 2. The methodology for fixing
length 50m. of Safety Barrier and the
end treatment for the
start/end of the Safety
Barrier shall be as per
clause 4.10, fig 13 and 14
page no 13-15 of IRC:
119:2015 (Annexure‐3).
3. The minimum length of
safety barriers shall be
50m as per Clause 4.9 of

Revision Level: R0 March - 2023 Page 255 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
IRC: 119-2015 (Guidelines
for Traffic Safety Barriers).
For barriers at hazardous
location 2/3rd of length
shall be before the hazard
and 1/3rd after hazard.
2302303 113+200 High Repair damaged railings Essential
(Median)

Damaged railing

Revision Level: R0 March - 2023 Page 256 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
2302304 113+700 High Repair damaged railings Essential
(RHS)

Damaged railing
2302305 114+000 High 1. Provide Metal beam crash Essential
(RHS) barrier due to level
diffrence between main
carriageway and service
road.
2. The methodology for fixing
of Safety Barrier and the
end treatment for the
start/end of the Safety
Barrier shall be as per
1. Painting of kerb has faded. clause 4.10, fig 13 and 14
2. Metal beam carsh barrier not page no 13-15 of IRC:
provided due to level diffrence 119:2015 (Annexure‐3).
between main carriageway and 3. Painting of kerb should be
service road. done a per IRC:35 to aware

Revision Level: R0 March - 2023 Page 257 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
the drivers of carriageway
edge during night time.

2302306 114+500 High 1. Develop Entry/Exit Essential


(RHS) Arrangement with
Service/Slip road as per fig
2.1A of IRC:SP-84-2014
(Attached Annexure‐2).
2. Provide traffic Impact
Attenuators as per Clause
9.6 of IRC: SP:84 (Manual
of Specifications and
Standards for four laning of
1. Traffic Impact Attenuator is not highways), page 92 and per
provided, Gore areas need MOST Technical
traffic impact attenuators for Specification clause 814.3
the safety of road users, where at gore area locations,
the lane-changing menoeuvring start & end of service road
of the vehicle is substantial. locations where structures
2. If Traffic Impact Attenuator is concrete crash barrier
not provided at these locations ends or where the lane
vehicle may hit the Concrete changing menoeuvring of
Crash Barrier and a serious vehicle is substantial.
accident will take place.
3. Chevron marking has faded.

Revision Level: R0 March - 2023 Page 258 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)

3. Chevron/diagonal marking
with red color road studs
shall be provided as per
IRC: 35-2015 as per Clause
5.5.5, page 30 and Clause
7.2, Table 7.1: Spacing

Revision Level: R0 March - 2023 Page 259 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
between Diagonals /
Chevrons, at page 36.

2302307 114+750 High 1. At this location, abrupt Essential


(LHS/RHS) ending of MCB without
integrating with CCB
created hazardous
situation for the errant
vehicle. MCB shall be
extended up to parapet
wall as per IRC: 119, by
overlapping for at least
60cm over the parapet
1. Painting of kerb has been faded wall/CC Barrier as per
out. clause 4.11 and Fig 16 (W

Revision Level: R0 March - 2023 Page 260 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
2. Metal beam carsh barrier not Beam to Concrete
integrated properly with Connection Details) of IRC
cement concrete barrier. 119-2015 (Annexure‐2).
3. Metal beam crash barrier on 2. The methodology for fixing
median should be of minimum of Safety Barrier and the
length 50m. end treatment for the
start/end of the Safety
Barrier shall be as per
clause 4.10, fig 13 and 14
page no 13-15 of IRC:
119:2015 (Annexure‐3).
3. Painting of kerb should be
done a per IRC:35 to aware
the drivers of carriageway
edge during night time.
4. The minimum length of
safety barriers shall be
50m as per Clause 4.9 of
IRC: 119-2015 (Guidelines
for Traffic Safety Barriers).
For barriers at hazardous
location 2/3rd of length
shall be before the hazard
and 1/3rd after hazard.

Revision Level: R0 March - 2023 Page 261 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
2302308 116+600 High Remove Electric pole Essential
(RHS) immediately and shifted in
utility corridor at end of RoW
with consultation with concern
department.

Electric pole on median.


2302309 117+600 High 1. Provide Metal beam crash Essential
(RHS) barrier to shield the
pedestal of Gantry
mounted sign board and
Variable message sign
board.
2. The methodology for fixing
of Safety Barrier and the
end treatment for the
start/end of the Safety
1. End of Project Road. Barrier shall be as per
2. Gantry Mounted sign board clause 4.10, fig 13 and 14
provided. page no 13-15 of IRC:
3. Hazard marker available. 119:2015 (Annexure‐3).

Revision Level: R0 March - 2023 Page 262 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
4. Also, pavement marking and 3. The minimum length of
kerb marking has been done to safety barriers shall be
alert the drivers of pavement 50m as per Clause 4.9 of
edge during night time . IRC: 119-2015 (Guidelines
2302310 for Traffic Safety Barriers).
For barriers at hazardous
location 2/3rd of length
shall be before the hazard
and 1/3rd after hazard.
4. Pedestal of Variable
mounted sign board should
be painted. Provide black
and yellow stripes sloping
downwards at an angle of
5. Metal beam crash barrier not 45 degrees towards traffic
provided at Km 117+400 to on face of foundation of
shield the pedestal of gantry cantilever as per Clause
mounted sign board. 14.2 of IRC:35-2015, page
90.
5. Provide Hazard Marker
sign board as per IRC: 67.

Revision Level: R0 March - 2023 Page 263 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE Response
Safety Concern of Audit Findings Recommendations and
Concessionaire
ID No. Chainage Compliance
Compliance
Description Risk Description Priority
(With Image if any) (With Image if any)
2302311

Pedestal of Variable message


mounted sign board not painted at
Km 117+400.

General Observation & Recommendations:

 The safety barrier is required along with the roadside ponds/stream/water bodies near to road wherever is present along the project highway for the
safety of vehicles.
 Hazard /Object marker signboard shall be placed as per IRC-67.
 Safety Barrier shall be provided where embankment height is more than 3.0m as per Clause 9.7.1, page no 92 of IRC SP: 84-2014.
 The methodology for fixing of Safety Barrier and the end treatment for the start/end of the Safety Barrier shall be as per clause 4.10, fig 13 and 14
page no 13-15 of IRC: 119:2015 (Attached Annexure‐3).
 Roadside Concrete barrier end treatment shall be as per clause 9.7.3 & table 9.2 of IRC: SP:84-2014 with flaring of 17:1 for a design speed of 100 Kmph
and 14.:1 for a design speed of 80Kmph OR as per clause 4.11 and Fig 16 (W Beam to Concrete Connection Details) of IRC 119-2015 (Attached
Annexure‐4).

Revision Level: R0 March - 2023 Page 264 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

 Safety Barrier shall be provided on the higher carriageway in case of the split carriageway and the difference in level at the median edge of both
carriageway is more than 1 horizontal to 10 verticals.
 Safety Barrier shall be provided between the main carriageway and service road till the same level is attained of main carriageway & service/slip road.

Revision Level: R0 March - 2023 Page 265 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

4.6 AUDIT OF DRAINAGE

IE
Safety Concern of Audit Findings Recommendations
Concessionaire Response
ID No. Chainage Description (With Image if any) Risk Description Priority Compliance and
(With Image if any) Compliance
2302312 6+600 High Median drain needs to be Essential
6+800 covered so that it can
(Median) withstand the load of vehicle.

Median drain without cover may lead


to accidents if the vehicle topple over
median.
2302313 7+600 High Median drain needs to be Essential
7+800 covered so that it can
(Median) withstand the load of vehicle.

Revision Level: R0 March - 2023 Page 266 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE
Safety Concern of Audit Findings Recommendations
Concessionaire Response
ID No. Chainage Description (With Image if any) Risk Description Priority Compliance and
(With Image if any) Compliance
Median drain without cover may lead
to accidents if the vehicle topple over
median.
2302314 12+700 High Provide RCC covered drain. Essential
(LHS)

Open RCC drain on service road can


be dangerous to vulnerable road
users during night time.
2302315 17+900 - High Provide median drain to Essential
18+100 collect the water in the
(Median) super-elevated portion in the
curve portion and drain off
the stormwater near to
culverts/bridge location as
per IRC:SP: 42 (Guidelines
for Road Drainage), at page
32.

Revision Level: R0 March - 2023 Page 267 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE
Safety Concern of Audit Findings Recommendations
Concessionaire Response
ID No. Chainage Description (With Image if any) Risk Description Priority Compliance and
(With Image if any) Compliance
At the Super elevated portion median
drain not provided and water flowing
from one carriageway to another
carriageway may damage the
pavement and create slippery
conditions during the rainy season.
2302316 19+200 High Provide median drain to Essential
19+500 collect the water in the
(Median) super-elevated portion in the
curve portion and drain off
the stormwater near to
culverts/bridge location as
per IRC:SP: 42 (Guidelines
for Road Drainage), at page
32.

At the Super elevated portion median


drain not provided and water flowing
from one carriageway to another
carriageway may damage the
pavement and create slippery
conditions during the rainy season.

Revision Level: R0 March - 2023 Page 268 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE
Safety Concern of Audit Findings Recommendations
Concessionaire Response
ID No. Chainage Description (With Image if any) Risk Description Priority Compliance and
(With Image if any) Compliance
2302317 19+800 High Provide median drain to Essential
20+200 collect the water in the
(Median) super-elevated portion in the
curve portion and drain off
the stormwater near to
culverts/bridge location as
per IRC:SP: 42 (Guidelines
for Road Drainage), at page
32.

At the Super elevated portion median


drain not provided and water flowing
from one carriageway to another
carriageway may damage the
pavement and create slippery
conditions during the rainy season.
2302318 23+300 High Provide median drain to Essential
23+800 collect the water in the
(Median) super-elevated portion in the
curve portion and drain off
the stormwater near to
culverts/bridge location as
per IRC:SP: 42 (Guidelines
for Road Drainage), at page
32.

Revision Level: R0 March - 2023 Page 269 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE
Safety Concern of Audit Findings Recommendations
Concessionaire Response
ID No. Chainage Description (With Image if any) Risk Description Priority Compliance and
(With Image if any) Compliance
At the Super elevated portion median
drain not provided and water flowing
from one carriageway to another
carriageway may damage the
pavement and create slippery
conditions during the rainy season.
2302319 25+100 High Provide median drain to Essential
25+450 collect the water in the
(Median) super-elevated portion in the
curve portion and drain off
the stormwater near to
culverts/bridge location as
per IRC:SP: 42 (Guidelines
for Road Drainage), at page
32.

At the Super elevated portion median


drain not provided and water flowing
from one carriageway to another
carriageway may damage the
pavement and create slippery
conditions during the rainy season.

Revision Level: R0 March - 2023 Page 270 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE
Safety Concern of Audit Findings Recommendations
Concessionaire Response
ID No. Chainage Description (With Image if any) Risk Description Priority Compliance and
(With Image if any) Compliance
2302320 25+600 High Provide median drain to Essential
26+100 collect the water in the
(Median) super-elevated portion in the
curve portion and drain off
the stormwater near to
culverts/bridge location as
per IRC:SP: 42 (Guidelines
for Road Drainage), at page
32.

At the Super elevated portion median


drain not provided and water flowing
from one carriageway to another
carriageway may damage the
pavement and create slippery
conditions during the rainy season.
2302321 28+100 High Provide median drain to Essential
28+300 collect the water in the
(Median) super-elevated portion in the
curve portion and drain off
the stormwater near to
culverts/bridge location as
per IRC:SP: 42 (Guidelines
for Road Drainage), at page
32.

Revision Level: R0 March - 2023 Page 271 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE
Safety Concern of Audit Findings Recommendations
Concessionaire Response
ID No. Chainage Description (With Image if any) Risk Description Priority Compliance and
(With Image if any) Compliance
At the Super elevated portion median
drain not provided and water flowing
from one carriageway to another
carriageway may damage the
pavement and create slippery
conditions during the rainy season.
2302322 30+100 High Provide median drain to Essential
30+300 collect the water in the
(Median) super-elevated portion in the
curve portion and drain off
the stormwater near to
culverts/bridge location as
per IRC:SP: 42 (Guidelines
for Road Drainage), at page
32.

At the Super elevated portion median


drain not provided and water flowing
from one carriageway to another
carriageway may damage the
pavement and create slippery
conditions during the rainy season.

Revision Level: R0 March - 2023 Page 272 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE
Safety Concern of Audit Findings Recommendations
Concessionaire Response
ID No. Chainage Description (With Image if any) Risk Description Priority Compliance and
(With Image if any) Compliance
2302323 38+700 High Provide median drain to Essential
38+900 collect the water in the
(Median) super-elevated portion in the
curve portion and drain off
the stormwater near to
culverts/bridge location as
per IRC:SP: 42 (Guidelines
for Road Drainage), at page
32.

At the Super elevated portion median


drain not provided and water flowing
from one carriageway to another
carriageway may damage the
pavement and create slippery
conditions during the rainy season.
2302324 41+400 High Provide median drain to Essential
41+700 collect the water in the
(Median) super-elevated portion in the
curve portion and drain off
the stormwater near to
culverts/bridge location as
per IRC:SP: 42 (Guidelines
for Road Drainage), at page
32.

Revision Level: R0 March - 2023 Page 273 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE
Safety Concern of Audit Findings Recommendations
Concessionaire Response
ID No. Chainage Description (With Image if any) Risk Description Priority Compliance and
(With Image if any) Compliance
At the Super elevated portion median
drain not provided and water flowing
from one carriageway to another
carriageway may damage the
pavement and create slippery
conditions during the rainy season.
2302325 44+700 High Provide median drain to Essential
44+900 collect the water in the
(Median) super-elevated portion in the
curve portion and drain off
the stormwater near to
culverts/bridge location as
per IRC:SP: 42 (Guidelines
for Road Drainage), at page
32.

At the Super elevated portion median


drain not provided and water flowing
from one carriageway to another
carriageway may damage the
pavement and create slippery
conditions during the rainy season.

Revision Level: R0 March - 2023 Page 274 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE
Safety Concern of Audit Findings Recommendations
Concessionaire Response
ID No. Chainage Description (With Image if any) Risk Description Priority Compliance and
(With Image if any) Compliance
2302326 46+900 High Provide median drain to Essential
47+000 collect the water in the
(Median) super-elevated portion in the
curve portion and drain off
the stormwater near to
culverts/bridge location as
per IRC:SP: 42 (Guidelines
for Road Drainage), at page
32.

At the Super elevated portion median


drain not provided and water flowing
from one carriageway to another
carriageway may damage the
pavement and create slippery
conditions during the rainy season.
2302327 55+500 High Provide median drain to Essential
57+700 collect the water in the
(Median) super-elevated portion in the
curve portion and drain off
the stormwater near to
culverts/bridge location as
per IRC:SP: 42 (Guidelines
for Road Drainage), at page
32.

Revision Level: R0 March - 2023 Page 275 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE
Safety Concern of Audit Findings Recommendations
Concessionaire Response
ID No. Chainage Description (With Image if any) Risk Description Priority Compliance and
(With Image if any) Compliance
At the Super elevated portion median
drain not provided and water flowing
from one carriageway to another
carriageway may damage the
pavement and create slippery
conditions during the rainy season.
2302328 68+600 High Provide median drain to Essential
68+900 collect the water in the
(Median) super-elevated portion in the
curve portion and drain off
the stormwater near to
culverts/bridge location as
per IRC:SP: 42 (Guidelines
for Road Drainage), at page
32.

At the Super elevated portion median


drain not provided and water flowing
from one carriageway to another
carriageway may damage the
pavement and create slippery
conditions during the rainy season.

Revision Level: R0 March - 2023 Page 276 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE
Safety Concern of Audit Findings Recommendations
Concessionaire Response
ID No. Chainage Description (With Image if any) Risk Description Priority Compliance and
(With Image if any) Compliance
2302329 69+900 High Provide median drain to Essential
70+200 collect the water in the
(Median) super-elevated portion in the
curve portion and drain off
the stormwater near to
culverts/bridge location as
per IRC:SP: 42 (Guidelines
for Road Drainage), at page
32.

At the Super elevated portion median


drain not provided and water flowing
from one carriageway to another
carriageway may damage the
pavement and create slippery
conditions during the rainy season.
2302330 72+700 High Provide median drain to Essential
72+900 collect the water in the
(Median) super-elevated portion in the
curve portion and drain off
the stormwater near to
culverts/bridge location as
per IRC:SP: 42 (Guidelines
for Road Drainage), at page
32.

Revision Level: R0 March - 2023 Page 277 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE
Safety Concern of Audit Findings Recommendations
Concessionaire Response
ID No. Chainage Description (With Image if any) Risk Description Priority Compliance and
(With Image if any) Compliance
At the Super elevated portion median
drain not provided and water flowing
from one carriageway to another
carriageway may damage the
pavement and create slippery
conditions during the rainy season.
2302331 74+800 High Provide median drain to Essential
75+400 collect the water in the
(Median) super-elevated portion in the
curve portion and drain off
the stormwater near to
culverts/bridge location. As
per IRC:SP: 42 (Guidelines
for Road Drainage), at page
32.

At the Super elevated portion median


drain not provided and water flowing
from one carriageway to another
carriageway may damage the
pavement and create slippery
conditions during the rainy season.

Revision Level: R0 March - 2023 Page 278 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE
Safety Concern of Audit Findings Recommendations
Concessionaire Response
ID No. Chainage Description (With Image if any) Risk Description Priority Compliance and
(With Image if any) Compliance
2302332 90+500 High Provide covered slab on Essential
90+700 median drain to collect the
(Median) water in the super-elevated
portion in the curve portion
and drain off the stormwater
near to culverts/bridge
location. As per IRC:SP: 42
(Guidelines for Road
Drainage), at page 32.

Open median drain has been


provided on the kerb edge, which will
lead to accident if the vehicle
accidentally topple over open drain.
2302333 92+100 High Provide median drain to Essential
92+450 collect the water in the
(Median) super-elevated portion in the
curve portion and drain off
the stormwater near to
culverts/bridge location. As
per IRC:SP: 42 (Guidelines
for Road Drainage), at page
32.

At the Super elevated portion median


drain not provided and water flowing
from one carriageway to another

Revision Level: R0 March - 2023 Page 279 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE
Safety Concern of Audit Findings Recommendations
Concessionaire Response
ID No. Chainage Description (With Image if any) Risk Description Priority Compliance and
(With Image if any) Compliance
carriageway may damage the
pavement and create slippery
conditions during the rainy season.
2302334 93+200 High Provide median drain to Essential
93+400 collect the water in the
(Median) super-elevated portion in the
curve portion and drain off
the stormwater near to
culverts/bridge location. As
per IRC:SP: 42 (Guidelines
for Road Drainage), at page
32.

At the Super elevated portion median


drain not provided and water flowing
from one carriageway to another
carriageway may damage the
pavement and create slippery
conditions during the rainy season.

Revision Level: R0 March - 2023 Page 280 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE
Safety Concern of Audit Findings Recommendations
Concessionaire Response
ID No. Chainage Description (With Image if any) Risk Description Priority Compliance and
(With Image if any) Compliance
2302335 97+450 High Hook of the covered drain Desirable
(RHS) needs to be removed.

Hook on the slab of covered drain at


service road location at LVUP can
create discomfort to pedestrians.
2302336 102+900 High Provide median drain to Essential
103+100 collect the water in the
(Median) super-elevated portion in the
curve portion and drain off
the stormwater near to
culverts/bridge location. As
per IRC:SP: 42 (Guidelines
for Road Drainage), at page
32.

At the Super elevated portion median


drain not provided and water flowing
from one carriageway to another
carriageway may damage the

Revision Level: R0 March - 2023 Page 281 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE
Safety Concern of Audit Findings Recommendations
Concessionaire Response
ID No. Chainage Description (With Image if any) Risk Description Priority Compliance and
(With Image if any) Compliance
pavement and create slippery
conditions during the rainy season.
2302337 103+500 High Provide median drain to Essential
103+700 collect the water in the
(Median) super-elevated portion in the
curve portion and drain off
the stormwater near to
culverts/bridge location. As
per IRC:SP: 42 (Guidelines
for Road Drainage), at page
32.

At the Super elevated portion median


drain not provided and water flowing
from one carriageway to another
carriageway may damage the
pavement and create slippery
conditions during the rainy season.

Revision Level: R0 March - 2023 Page 282 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE
Safety Concern of Audit Findings Recommendations
Concessionaire Response
ID No. Chainage Description (With Image if any) Risk Description Priority Compliance and
(With Image if any) Compliance
2302338 104+800 High Provide median drain to Essential
105+300 collect the water in the
(Median) super-elevated portion in the
curve portion and drain off
the stormwater near to
culverts/bridge location. As
per IRC:SP: 42 (Guidelines
for Road Drainage), at page
32.

At the Super elevated portion median


drain not provided and water flowing
from one carriageway to another
carriageway may damage the
pavement and create slippery
conditions during the rainy season.
2302339 105+800 High Hook of the covered drain Desirable
(RHS) needs to be removed.

Revision Level: R0 March - 2023 Page 283 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE
Safety Concern of Audit Findings Recommendations
Concessionaire Response
ID No. Chainage Description (With Image if any) Risk Description Priority Compliance and
(With Image if any) Compliance
Hook on the slab of covered drain at
service road location at LVUP can
create discomfort to pedestrians.
2302340 106+100 High Provide median drain to Essential
106+300 collect the water in the
(Median) super-elevated portion in the
curve portion and drain off
the stormwater near to
culverts/bridge location. As
per IRC:SP: 42 (Guidelines
for Road Drainage), at page
32.

At the Super elevated portion median


drain not provided and water flowing
from one carriageway to another
carriageway may damage the
pavement and create slippery
conditions during the rainy season.

Revision Level: R0 March - 2023 Page 284 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE
Safety Concern of Audit Findings Recommendations
Concessionaire Response
ID No. Chainage Description (With Image if any) Risk Description Priority Compliance and
(With Image if any) Compliance
2302341 107+100 High Provide median drain to Essential
(Median) collect the water in the
super-elevated portion in the
curve portion and drain off
the stormwater near to
culverts/bridge location. As
per IRC:SP: 42 (Guidelines
for Road Drainage), at page
32.

At the Super elevated portion median


drain not provided and water flowing
from one carriageway to another
carriageway may damage the
pavement and create slippery
conditions during the rainy season.
2302342 110+800 High Provide median drain to Essential
(Median) collect the water in the
super-elevated portion in the
curve portion and drain off
the stormwater near to
culverts/bridge location. As
per IRC:SP: 42 (Guidelines
for Road Drainage), at page
32.

Revision Level: R0 March - 2023 Page 285 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

IE
Safety Concern of Audit Findings Recommendations
Concessionaire Response
ID No. Chainage Description (With Image if any) Risk Description Priority Compliance and
(With Image if any) Compliance
At the Super elevated portion median
drain not provided and water flowing
from one carriageway to another
carriageway may damage the
pavement and create slippery
conditions during the rainy season.
2302343 114+500 High Provide median drain to Essential
(Median) collect the water in the
super-elevated portion in the
curve portion and drain off
the stormwater near to
culverts/bridge location. As
per IRC:SP: 42 (Guidelines
for Road Drainage), at page
32.

At the Super elevated portion median


drain not provided and water flowing
from one carriageway to another
carriageway may damage the
pavement and create slippery
conditions during the rainy season.

Revision Level: R0 March - 2023 Page 286 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

General Observation & Recommendations:

 Provide median drain per clause 6.3 of IRC:SP-84 at all the Super elevated portion of Project Highway. If median drain is not provided
then water flowing from one carriageway to another carriageway may damage the pavement and create slippery conditions during the
rainy season.
 Open RCC drain near to carriageway , it will be required to cover the drain to use by pedestrian to provide safety barrier to prevent the
vehicle tyre to stuck into the open drain.

Revision Level: R0 March - 2023 Page 287 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

4.7 AUDIT OF ROAD SIDE FURNITURE & PAVEMENT MARKING

Safety Concern of Audit Findings Recommendations IE Response


Concessionaire
Chainage and
ID No. Description (With Image if any) Risk Description (With Image if Priority Compliance
Compliance
any)
2302344 1+960 High Provide pavement marking as Essential
(LHS) per IRC:35.

Start of project road.


2302345 2+400 High Trimming of over grown Desirable
(LHS) plantation shall be done on
regularly basis as per clause
11.22 of IRC :SP-21.

Directional sign board visibility


obstructed by plantation.

Revision Level: R0 March - 2023 Page 288 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

Safety Concern of Audit Findings Recommendations IE Response


Concessionaire
Chainage and
ID No. Description (With Image if any) Risk Description (With Image if Priority Compliance
Compliance
any)
2302346 4+100 High Provide pavement marking Essential
(LHS) on service road as per IRC:35-
2015.

Pavement marking has been faded


out on service road.
2302347 13+800 High 1. Provide Solar Traffic LED Essential
(Median Blinker Light at the nose of
Opening) median opening on both
sides to alert the drivers of
median opening during
night.
2. Provide median opening
with storage lane as per
IRC:SP:84, clause 2.14.3 of
page 22 and Fig. 3.7 of
1. Solar Blinker should be provided IRC:Sp:84 of page 33
at the nose of median opening on (Annexure – 9).
both sides.
2. Thermoplastic Traverse Bar
Marking (3 sets) has been

Revision Level: R0 March - 2023 Page 289 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

Safety Concern of Audit Findings Recommendations IE Response


Concessionaire
Chainage and
ID No. Description (With Image if any) Risk Description (With Image if Priority Compliance
Compliance
any)
provided on both sides of
Hazardous Reach.
3. Zebra crossing has been
provided.
4. Delineators has been provided.
2302348 12+400 High 1. Chevron/diagonal Essential
(LHS) marking with red color
road studs shall be
provided as per IRC: 35-
2015 as per Clause 5.5.5,
page 30 and Clause 7.2,
Table 7.1: Spacing
between Diagonals /
Chevrons, at page 36.

1. Chevron marking not provided.


2. Pavement marking not provided
on service road

Revision Level: R0 March - 2023 Page 290 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

Safety Concern of Audit Findings Recommendations IE Response


Concessionaire
Chainage and
ID No. Description (With Image if any) Risk Description (With Image if Priority Compliance
Compliance
any)
2. Provide pavement
marking as per iRC:35.
2302349 14+800 High 1. Chevron/diagonal Essential
(LHS) marking with red color
road studs shall be
provided as per IRC: 35-
2015 as per Clause 5.5.5,
page 30 and Clause 7.2,
Table 7.1: Spacing
between Diagonals /
Chevrons, at page 36.

1. Chevron marking not provided.


2. Pavement marking not
provided on service road

2. Provide pavement
marking as per IRC:35.

Revision Level: R0 March - 2023 Page 291 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

Safety Concern of Audit Findings Recommendations IE Response


Concessionaire
Chainage and
ID No. Description (With Image if any) Risk Description (With Image if Priority Compliance
Compliance
any)
2302350 17+300 High 1. Provide pavement Essential
(LHS) marking as per iRC:35.

Pavement marking on service road


not provided.
2302351 22+600 High 1. Provide Solar Traffic LED Essential
(Median Blinker Light at the nose of
Opening) median opening on both
sides to alert the drivers of
median opening during
night.
2. Provide median opening
with storage lane as per
IRC:SP:84, clause 2.14.3 of
page 22 and Fig. 3.7 of
1. Solar Blinker should be provided IRC:Sp:84 of page 33
at the nose of median opening on (Annexure – 9).
both sides.
2. Thermoplastic Traverse Bar
Marking (3 sets) has been

Revision Level: R0 March - 2023 Page 292 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

Safety Concern of Audit Findings Recommendations IE Response


Concessionaire
Chainage and
ID No. Description (With Image if any) Risk Description (With Image if Priority Compliance
Compliance
any)
provided on both sides of
Hazardous Reach.
3. Zebra crossing has been
provided.
4. Delineators has been provided.
2302352 24+800 High 1. Chevron/diagonal Essential
(LHS) marking with red color
road studs shall be
provided as per IRC: 35-
2015 as per Clause 5.5.5,
page 30 and Clause 7.2,
Table 7.1: Spacing
between Diagonals /
Chevrons, at page 36.

1. Chevron marking not provided.


2. Pavement marking not provided
on service road

Revision Level: R0 March - 2023 Page 293 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

Safety Concern of Audit Findings Recommendations IE Response


Concessionaire
Chainage and
ID No. Description (With Image if any) Risk Description (With Image if Priority Compliance
Compliance
any)
2. Provide pavement
marking as per IRC:35.
2302353 25+400 - Safety measures have been -
(LHS) taken while doing pavement
marking.

Pavement marking in progress


2302354 26+000 High Provide Solar Traffic LED Essential
(Median Blinker Light at the nose of
Opening) median opening on both sides
to alert the drivers of median
opening during night.

1. Solar Blinker should be provided


at the nose of median opening on
both sides.

Revision Level: R0 March - 2023 Page 294 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

Safety Concern of Audit Findings Recommendations IE Response


Concessionaire
Chainage and
ID No. Description (With Image if any) Risk Description (With Image if Priority Compliance
Compliance
any)
2. Thermoplastic Traverse Bar
Marking (3 sets) has been
provided on both sides of
Hazardous Reach.
3. Zebra crossing has been
provided.
4. Delineators has been provided.
2302355 29+500 High Provide Solar Traffic LED Essential
(Median Blinker Light at the nose of
Opening) median opening on both sides
to alert the drivers of median
opening during night.

1. Solar Blinker should be provided


at the nose of median opening on
both sides.
2. Thermoplastic Traverse Bar
Marking (3 sets) has been
provided on both sides of
Hazardous Reach.
3. Zebra crossing has been
provided.
4. Delineators has been provided.

Revision Level: R0 March - 2023 Page 295 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

Safety Concern of Audit Findings Recommendations IE Response


Concessionaire
Chainage and
ID No. Description (With Image if any) Risk Description (With Image if Priority Compliance
Compliance
any)
2302356 29+600 Very 1. Chevron/diagonal Essential
(RHS) High marking with red color
road studs shall be
provided as per IRC: 35-
2015 as per Clause 5.5.5,
page 30 and Clause 7.2,
Table 7.1: Spacing
between Diagonals /
Chevrons, at page 36.

Chevron marking has been faded


out.

Revision Level: R0 March - 2023 Page 296 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

Safety Concern of Audit Findings Recommendations IE Response


Concessionaire
Chainage and
ID No. Description (With Image if any) Risk Description (With Image if Priority Compliance
Compliance
any)
2302357 30+000 High Painting of Pedestrian guard Essential
(LHS) railing should be done.

Painting of pedestrain guard railing


has faded.
2302358 30+500 High 1. Chevron/diagonal Essential
(LHS) marking with red color
road studs shall be
provided as per IRC: 35-
2015 as per Clause 5.5.5,
page 30 and Clause 7.2,
Table 7.1: Spacing
between Diagonals /
Chevrons, at page 36.

1. Chevron marking not provided.


2. Pavement marking not provided
on service road

Revision Level: R0 March - 2023 Page 297 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

Safety Concern of Audit Findings Recommendations IE Response


Concessionaire
Chainage and
ID No. Description (With Image if any) Risk Description (With Image if Priority Compliance
Compliance
any)

2. Provide pavement
marking as per iRC:35.
2302359 30+600 1. Cleaning should be done Essential
(LHS) on service road.
2. Pavement marking should
be done as per IRC:35.

1. Pavement marking not done on


service road.

Revision Level: R0 March - 2023 Page 298 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

Safety Concern of Audit Findings Recommendations IE Response


Concessionaire
Chainage and
ID No. Description (With Image if any) Risk Description (With Image if Priority Compliance
Compliance
any)
2302360

2. Cleaning is required on service


road.
2302361 31+500 High Provide Solar Traffic LED Essential
(Median Blinker Light at the nose of
Opening) median opening on both sides
to alert the drivers of median
opening during night.

1. Solar Blinker should be provided


at the nose of median opening on
both sides.
2. Thermoplastic Traverse Bar
Marking (3 sets) has been

Revision Level: R0 March - 2023 Page 299 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

Safety Concern of Audit Findings Recommendations IE Response


Concessionaire
Chainage and
ID No. Description (With Image if any) Risk Description (With Image if Priority Compliance
Compliance
any)
provided on both sides of
Hazardous Reach.
3. Zebra crossing has been
provided.
4. Delineators has been provided.
2302362 37+600 Very 1. Paint the bus bay kerb Essential
(LHS) High separator as per IRC:35.
2. Chevron/diagonal
marking with red color
road studs shall be
provided as per IRC: 35-
2015 as per Clause 5.5.5,
page 30 and Clause 7.2,
Table 7.1: Spacing
between Diagonals /
Chevron marking has been faded Chevrons, at page 36.
out.

Revision Level: R0 March - 2023 Page 300 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

Safety Concern of Audit Findings Recommendations IE Response


Concessionaire
Chainage and
ID No. Description (With Image if any) Risk Description (With Image if Priority Compliance
Compliance
any)

2302363 36+000 High Provide Solar Traffic LED Essential


(Median Blinker Light at the nose of
Opening) median opening on both sides
to alert the drivers of median
opening during night.

1. Solar Blinker should be provided


at the nose of median opening on
both sides.
2. Thermoplastic Traverse Bar
Marking (3 sets) has been

Revision Level: R0 March - 2023 Page 301 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

Safety Concern of Audit Findings Recommendations IE Response


Concessionaire
Chainage and
ID No. Description (With Image if any) Risk Description (With Image if Priority Compliance
Compliance
any)
provided on both sides of
Hazardous Reach.
3. Zebra crossing has been
provided.
4. Delineators has been provided.
2302364 39+900 High 1. Provide Solar Traffic LED Essential
(Median Blinker Light at the nose of
Opening) median opening on both
sides to alert the drivers of
median opening during
night.
2. Provide median opening
with storage lane as per
IRC:SP:84, clause 2.14.3 of
page 22 and Fig. 3.7 of
1. Solar Blinker should be provided IRC:Sp:84 of page 33
at the nose of median opening on (Annexure – 9).
both sides.
2. Thermoplastic Traverse Bar
Marking (3 sets) has been
provided on both sides of
Hazardous Reach.
3. Zebra crossing has been
provided.
4. Delineators has been provided.

Revision Level: R0 March - 2023 Page 302 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

Safety Concern of Audit Findings Recommendations IE Response


Concessionaire
Chainage and
ID No. Description (With Image if any) Risk Description (With Image if Priority Compliance
Compliance
any)
2302365 40+700 High 1. Provide Solar Traffic LED Essential
(Median Blinker Light at the nose of
Opening) median opening on both
sides to alert the drivers of
median opening during
night.
2. Provide median opening
with storage lane as per
IRC:SP:84, clause 2.14.3 of
page 22 and Fig. 3.7 of
1. Solar Blinker should be provided IRC:Sp:84 of page 33
at the nose of median opening on (Annexure – 9).
both sides.
2. Thermoplastic Traverse Bar
Marking (3 sets) has been
provided on both sides of
Hazardous Reach.
3. Zebra crossing has been
provided.
4. Delineators has been provided.

Revision Level: R0 March - 2023 Page 303 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

Safety Concern of Audit Findings Recommendations IE Response


Concessionaire
Chainage and
ID No. Description (With Image if any) Risk Description (With Image if Priority Compliance
Compliance
any)
2302366 41+500 High Retro-reflective sheet of Essential
(LHS) chevron sign should be
replaced.

Chevron sign has faded.


2302367 42+600 High Provide Solar Traffic LED Essential
(Median Blinker Light at the nose of
Opening) median opening on both sides
to alert the drivers of median
opening during night.

1. Solar Blinker should be provided


at the nose of median opening on
both sides.
2. Thermoplastic Traverse Bar
Marking (3 sets) has been

Revision Level: R0 March - 2023 Page 304 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

Safety Concern of Audit Findings Recommendations IE Response


Concessionaire
Chainage and
ID No. Description (With Image if any) Risk Description (With Image if Priority Compliance
Compliance
any)
provided on both sides of
Hazardous Reach.
3. Zebra crossing has been
provided.
4. Delineators has been provided.
2302368 44+400 High Provide Hazard Markers as Essential
(RHS) per IRC-67.

Hazard marker not provided before


Metal beam crash barrier.
2302369 45+500 High 1. Chevron/diagonal Essential
(LHS) marking with red color
road studs shall be
provided as per IRC: 35-
2015 as per Clause 5.5.5,
page 30 and Clause 7.2,
Table 7.1: Spacing
between Diagonals /
Chevrons, at page 36.

Revision Level: R0 March - 2023 Page 305 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

Safety Concern of Audit Findings Recommendations IE Response


Concessionaire
Chainage and
ID No. Description (With Image if any) Risk Description (With Image if Priority Compliance
Compliance
any)
1. Chevron marking not provided.
2. Pavement marking not provided
on service road.

2. Provide pavement
marking as per IRC:35.
2302370 46+500 Very 1. Develop Entry/Exit Essential
(RHS) High Arrangement with
Service/Slip road as per
fig 2.1A of IRC:SP-84-2014
(Attached Annexure‐2).
2. Chevron/diagonal
marking with red color
road studs shall be
provided as per IRC: 35-
2015 as per Clause 5.5.5,
Chevron marking has been faded page 30 and Clause 7.2,
out. Table 7.1: Spacing

Revision Level: R0 March - 2023 Page 306 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

Safety Concern of Audit Findings Recommendations IE Response


Concessionaire
Chainage and
ID No. Description (With Image if any) Risk Description (With Image if Priority Compliance
Compliance
any)
between Diagonals /
Chevrons, at page 36.

2302371 46+300 Very 1. Develop Entry/Exit Essential


(RHS) High Arrangement with
Service/Slip road as per
fig 2.1A of IRC:SP-84-2014
(Attached Annexure‐2).
2. Chevron/diagonal
marking with red color
road studs shall be
provided as per IRC: 35-
2015 as per Clause 5.5.5,
Chevron marking has been faded page 30 and Clause 7.2,
out. Table 7.1: Spacing

Revision Level: R0 March - 2023 Page 307 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

Safety Concern of Audit Findings Recommendations IE Response


Concessionaire
Chainage and
ID No. Description (With Image if any) Risk Description (With Image if Priority Compliance
Compliance
any)
between Diagonals /
Chevrons, at page 36.

2302372 47+300 High 1. Chevron/diagonal Essential


(LHS) marking with red color
road studs shall be
provided as per IRC: 35-
2015 as per Clause 5.5.5,
page 30 and Clause 7.2,
Table 7.1: Spacing
between Diagonals /
Chevrons, at page 36.

1. Chevron marking not provided.


2. Pavement marking not provided
on service road

Revision Level: R0 March - 2023 Page 308 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

Safety Concern of Audit Findings Recommendations IE Response


Concessionaire
Chainage and
ID No. Description (With Image if any) Risk Description (With Image if Priority Compliance
Compliance
any)

2. Provide pavement
marking as per iRC:35.
2302373 49+300 High Provide Hazard Markers as Essential
(RHS) per IRC-67.

Hazard marker not provided before


Metal beam crash barrier.

Revision Level: R0 March - 2023 Page 309 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

Safety Concern of Audit Findings Recommendations IE Response


Concessionaire
Chainage and
ID No. Description (With Image if any) Risk Description (With Image if Priority Compliance
Compliance
any)
2302374 51+300 High 1. Provide median opening
(Median with storage lane as per
Opening) IRC:SP:84, clause 2.14.3 of
page 22 and Fig. 3.7 of
IRC:Sp:84 of page 33
(Annexure – 9).
2. Provide Solar Traffic LED
Blinker Light at the nose of
median opening on both
sides to alert the drivers of
1. Storage lane has not been median opening during
provided. night.
2. Solar Blinker should be provided 3. Provide Thermoplastic
at the nose of median opening on Traverse Bar Marking (3
both sides. sets) on both sides of
3. Delineators has not been Hazardous reach as per
provided. Fig 11.2 of IRC-35-2015 to
alert the drivers to reduce
the speed of vehicle on
main carriageway
(Annexure‐1).

Revision Level: R0 March - 2023 Page 310 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

Safety Concern of Audit Findings Recommendations IE Response


Concessionaire
Chainage and
ID No. Description (With Image if any) Risk Description (With Image if Priority Compliance
Compliance
any)
2302375 53+300 High 1. Chevron/diagonal Essential
(LHS) marking with red color
road studs shall be
provided as per IRC: 35-
2015 as per Clause 5.5.5,
page 30 and Clause 7.2,
Table 7.1: Spacing
between Diagonals /
Chevrons, at page 36.

1. Chevron marking not provided.


2. Pavement marking not provided
on service road

2. Provide pavement
marking as per IRC:35.

Revision Level: R0 March - 2023 Page 311 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

Safety Concern of Audit Findings Recommendations IE Response


Concessionaire
Chainage and
ID No. Description (With Image if any) Risk Description (With Image if Priority Compliance
Compliance
any)
2302376 54+100 High 1. Provide Solar Traffic LED Essential
(Median Blinker Light at the nose of
Opening) median opening on both
sides to alert the drivers of
median opening during
night.
2. Provide Thermoplastic
Traverse Bar Marking (3
sets) on both sides of
Hazardous reach as per
1. Solar Blinker should be provided Fig 11.2 of IRC-35-2015 to
at the nose of median opening on alert the drivers to reduce
both sides. the speed of vehicle on
2. Delineators has not been main carriageway
provided. (Annexure‐1).
3. Provide delineators at
median opening.
2302377 55+200 High Provide Solar Traffic LED Essential
(Median Blinker Light at the nose of
Opening) median opening on both sides
to alert the drivers of median
opening during night.

Revision Level: R0 March - 2023 Page 312 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

Safety Concern of Audit Findings Recommendations IE Response


Concessionaire
Chainage and
ID No. Description (With Image if any) Risk Description (With Image if Priority Compliance
Compliance
any)
1. Solar Blinker should be provided
at the nose of median opening on
both sides.
2. Thermoplastic Traverse Bar
Marking (3 sets) has been
provided on both sides of
Hazardous Reach.
3. Zebra crossing has been
provided.
4. Delineators has been provided.
2302378 57+400 High 1. Chevron/diagonal Essential
(LHS) marking with red color
road studs shall be
provided as per IRC: 35-
2015 as per Clause 5.5.5,
page 30 and Clause 7.2,
Table 7.1: Spacing
between Diagonals /
Chevrons, at page 36.

1. Chevron marking not provided.

Revision Level: R0 March - 2023 Page 313 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

Safety Concern of Audit Findings Recommendations IE Response


Concessionaire
Chainage and
ID No. Description (With Image if any) Risk Description (With Image if Priority Compliance
Compliance
any)

2. Provide pavement
marking as per IRC:35.
2302379 58+100 High Provide Solar Traffic LED Essential
(Median Blinker Light at the nose of
Opening) median opening on both sides
to alert the drivers of median
opening during night.

1. Solar Blinker should be provided


at the nose of median opening on
both sides.

Revision Level: R0 March - 2023 Page 314 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

Safety Concern of Audit Findings Recommendations IE Response


Concessionaire
Chainage and
ID No. Description (With Image if any) Risk Description (With Image if Priority Compliance
Compliance
any)
2. Thermoplastic Traverse Bar
Marking (3 sets) has been
provided on both sides of
Hazardous Reach.
3. Zebra crossing has been
provided.
4. Delineators has been provided.
2302380 58+400 High Provide Hazard Markers as Essential
(LHS/RHS per IRC-67.
)

Hazard marker not provided before


Metal beam crash barrier.

Revision Level: R0 March - 2023 Page 315 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

Safety Concern of Audit Findings Recommendations IE Response


Concessionaire
Chainage and
ID No. Description (With Image if any) Risk Description (With Image if Priority Compliance
Compliance
any)
2302381 62+000 High 1. Chevron/diagonal Essential
(LHS) marking with red color
road studs shall be
provided as per IRC: 35-
2015 as per Clause 5.5.5,
page 30 and Clause 7.2,
Table 7.1: Spacing
between Diagonals /
Chevrons, at page 36.

1. Chevron marking not provided.


2. Pavement marking not provided
on service road

2. Provide pavement
marking as per IRC:35.

Revision Level: R0 March - 2023 Page 316 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

Safety Concern of Audit Findings Recommendations IE Response


Concessionaire
Chainage and
ID No. Description (With Image if any) Risk Description (With Image if Priority Compliance
Compliance
any)
2302382 62+400 High 1. Chevron/diagonal Essential
(LHS) marking with red color
road studs shall be
provided as per IRC: 35-
2015 as per Clause 5.5.5,
page 30 and Clause 7.2,
Table 7.1: Spacing
between Diagonals /
Chevrons, at page 36.

1. Chevron marking not provided.


2. Pavement marking not provided
on service road

2. Provide pavement
marking as per iRC:35.

Revision Level: R0 March - 2023 Page 317 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

Safety Concern of Audit Findings Recommendations IE Response


Concessionaire
Chainage and
ID No. Description (With Image if any) Risk Description (With Image if Priority Compliance
Compliance
any)
2302383 64+900 High Provide Solar Traffic LED Essential
(Median Blinker Light at the nose of
Opening) median opening on both sides
to alert the drivers of median
opening during night.

1. Solar Blinker should be provided


at the nose of median opening on
both sides.
2. Thermoplastic Traverse Bar
Marking (3 sets) has been
provided on both sides of
Hazardous Reach.
3. Zebra crossing has been
provided.
4. Delineators has been provided.

Revision Level: R0 March - 2023 Page 318 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

Safety Concern of Audit Findings Recommendations IE Response


Concessionaire
Chainage and
ID No. Description (With Image if any) Risk Description (With Image if Priority Compliance
Compliance
any)
2302384 68+900 High 1. Provide Solar Traffic LED Essential
(Median Blinker Light at the nose of
Opening) median opening on both
sides to alert the drivers of
median opening during
night.
2. Chevron/diagonal
marking with red color
road studs shall be
provided as per IRC: 35-
1. Chevron marking not provided at 2015 as per Clause 5.5.5,
separator of bus bay. page 30 and Clause 7.2,
2302385 Table 7.1: Spacing
between Diagonals /
Chevrons, at page 36.

2. Solar Blinker should be provided


at the nose of median opening on
both sides.
3. Thermoplastic Traverse Bar
Marking (3 sets) has been

Revision Level: R0 March - 2023 Page 319 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

Safety Concern of Audit Findings Recommendations IE Response


Concessionaire
Chainage and
ID No. Description (With Image if any) Risk Description (With Image if Priority Compliance
Compliance
any)
provided on both sides of 3. Provide zebra crossing
Hazardous Reach. as per IRC guidelines.
4. Delineators has been provided.

2302386 70+500 High 1. Provide median opening Essential


(Median with storage lane as per
Opening) IRC:SP:84, clause 2.14.3 of
page 22 and Fig. 3.1 of
IRC:Sp:84 of page 30
(Annexure – 9).
2. Provide Solar Traffic LED
Blinker Light at the nose of
median opening on both
sides to alert the drivers of
1. Storage lane has not been median opening during
provided. night.
2. Solar Blinker should be provided 3. Provide Thermoplastic
at the nose of median opening on Traverse Bar Marking (3
both sides. sets) on both sides of
3. Delineators has been provided. Hazardous reach as per
Fig 11.2 of IRC-35-2015 to
alert the drivers to reduce
the speed of vehicle on
main carriageway
(Annexure‐1).

Revision Level: R0 March - 2023 Page 320 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

Safety Concern of Audit Findings Recommendations IE Response


Concessionaire
Chainage and
ID No. Description (With Image if any) Risk Description (With Image if Priority Compliance
Compliance
any)
2302387 71+350 High 1. Provide median opening Essential
(Median with storage lane as per
Opening) IRC:SP:84, clause 2.14.3 of
page 22 and Fig. 3.7 of
IRC:Sp:84 of page 33
(Annexure – 9).
2. Provide Solar Traffic LED
Blinker Light at the nose of
median opening on both
sides to alert the drivers of
1. Storage lane has not been median opening during
provided. night.
2. Solar Blinker should be provided 3. Provide Thermoplastic
at the nose of median opening on Traverse Bar Marking (3
both sides. sets) on both sides of
3. Delineators has been provided. Hazardous reach as per
Fig 11.2 of IRC-35-2015 to
alert the drivers to reduce
the speed of vehicle on
main carriageway
(Annexure‐1).
4. Provide Zebra crossing as
per IRC guidelines.

Revision Level: R0 March - 2023 Page 321 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

Safety Concern of Audit Findings Recommendations IE Response


Concessionaire
Chainage and
ID No. Description (With Image if any) Risk Description (With Image if Priority Compliance
Compliance
any)
2302388 75+700 High 1. Chevron/diagonal Essential
(LHS) marking with red color
road studs shall be
provided as per IRC: 35-
2015 as per Clause 5.5.5,
page 30 and Clause 7.2,
Table 7.1: Spacing
between Diagonals /
Chevrons, at page 36.

1. Chevron marking not provided.


2. Pavement marking not provided
on service road

2. Provide pavement
marking as per IRC:35.

Revision Level: R0 March - 2023 Page 322 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

Safety Concern of Audit Findings Recommendations IE Response


Concessionaire
Chainage and
ID No. Description (With Image if any) Risk Description (With Image if Priority Compliance
Compliance
any)
2302389 83+400 High Provide Solar Traffic LED Essential
(Median Blinker Light at the nose of
Opening) median opening on both sides
to alert the drivers of median
opening during night.

1. Solar Blinker should be provided


at the nose of median opening on
both sides.
2. Thermoplastic Traverse Bar
Marking (3 sets) has been
provided on both sides of
Hazardous Reach.
3. Zebra crossing has been
provided.
4. Delineators has been provided.

Revision Level: R0 March - 2023 Page 323 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

Safety Concern of Audit Findings Recommendations IE Response


Concessionaire
Chainage and
ID No. Description (With Image if any) Risk Description (With Image if Priority Compliance
Compliance
any)
2302390 84+100 High Provide Hazard Markers as Essential
(Median) per IRC-67.

Hazard marker not provided before


Metal beam crash barrier.
2302391 84+500 High Provide Solar Traffic LED Essential
(Median Blinker Light at the nose of
Opening) median opening on both sides
to alert the drivers of median
opening during night.

1. Solar Blinker should be provided


at the nose of median opening on
both sides.
2. Thermoplastic Traverse Bar
Marking (3 sets) has been

Revision Level: R0 March - 2023 Page 324 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

Safety Concern of Audit Findings Recommendations IE Response


Concessionaire
Chainage and
ID No. Description (With Image if any) Risk Description (With Image if Priority Compliance
Compliance
any)
provided on both sides of
Hazardous Reach.
3. Zebra crossing has been
provided.
4. Delineators has been provided.
2302392 84+500 High Provide Hazard Markers as Essential
(RHS) per IRC-67.

Hazard marker not provided before


Metal beam crash barrier.
2302393 85+700 High Provide Hazard Markers as Essential
(Median) per IRC-67.

Revision Level: R0 March - 2023 Page 325 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

Safety Concern of Audit Findings Recommendations IE Response


Concessionaire
Chainage and
ID No. Description (With Image if any) Risk Description (With Image if Priority Compliance
Compliance
any)
Hazard marker not provided before
Metal beam crash barrier.
2302394 85+700 High Provide Hazard Markers as Essential
(Median) per IRC-67.

Hazard marker not provided before


Metal beam crash barrier.
2302395 86+200 High 1. Provide Solar Traffic LED Essential
(Median Blinker Light at the nose of
Opening) median opening on both
sides to alert the drivers of
median opening during
night.

1. Solar Blinker should be provided


at the nose of median opening on
both sides.

Revision Level: R0 March - 2023 Page 326 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

Safety Concern of Audit Findings Recommendations IE Response


Concessionaire
Chainage and
ID No. Description (With Image if any) Risk Description (With Image if Priority Compliance
Compliance
any)
2. Thermoplastic Traverse Bar
Marking (3 sets) has been
provided on both sides of
Hazardous Reach.
3. Zebra crossing has been
provided.
4. Delineators has been provided.
2302396 86+500 High Provide Hazard Markers as Essential
(RHS) per IRC-67.

Hazard marker not provided before


Metal beam crash barrier.

Revision Level: R0 March - 2023 Page 327 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

Safety Concern of Audit Findings Recommendations IE Response


Concessionaire
Chainage and
ID No. Description (With Image if any) Risk Description (With Image if Priority Compliance
Compliance
any)
2302397 86+900 Repair the retro reflective Essential
(Median) sheet of chevron sign as per
IRC:67-2012.

Chevron sign has faded.


2302398 87+200 High Provide Hazard Markers as Essential
(RHS) per IRC-67.

Hazard marker not provided before


Metal beam crash barrier.

Revision Level: R0 March - 2023 Page 328 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

Safety Concern of Audit Findings Recommendations IE Response


Concessionaire
Chainage and
ID No. Description (With Image if any) Risk Description (With Image if Priority Compliance
Compliance
any)
2302399 87+400 High Provide Hazard Markers as Essential
(RHS) per IRC-67.

Hazard marker not provided before


Metal beam crash barrier.
2302400 88+400 High Provide Hazard Markers as Essential
(RHS) per IRC-67.

Hazard marker not provided before


Metal beam crash barrier.

Revision Level: R0 March - 2023 Page 329 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

Safety Concern of Audit Findings Recommendations IE Response


Concessionaire
Chainage and
ID No. Description (With Image if any) Risk Description (With Image if Priority Compliance
Compliance
any)
2302401 89+900 High 1. Provide Solar Traffic LED Essential
(Median Blinker Light at the nose of
Opening) median opening on both
sides to alert the drivers of
median opening during
night.
2. Provide speed
breaker/Speed table as
per clause 3.1 of IRC-99-
2018 on cross road.
1. Solar Blinker should be provided 3. Signages at cross road
at the nose of median opening on should be provided as per
both sides. IRC:67-2012, Fig. V.5
2. Thermoplastic Traverse Bar Minor side road with
Marking (3 sets) has been speed breaker of page 131
provided on both sides of (Annexure ‐5).
Hazardous Reach.
3. Zebra crossing has been
provided.
4. Delineators has been provided.

Revision Level: R0 March - 2023 Page 330 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

Safety Concern of Audit Findings Recommendations IE Response


Concessionaire
Chainage and
ID No. Description (With Image if any) Risk Description (With Image if Priority Compliance
Compliance
any)
2302402 90+000 High Provide Hazard Markers as Essential
(RHS) per IRC-67.

Hazard marker not provided before


Metal beam crash barrier.
2302403 90+400 High Provide Hazard Markers as Essential
(RHS) per IRC-67.

Hazard marker not provided before


Metal beam crash barrier.

Revision Level: R0 March - 2023 Page 331 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

Safety Concern of Audit Findings Recommendations IE Response


Concessionaire
Chainage and
ID No. Description (With Image if any) Risk Description (With Image if Priority Compliance
Compliance
any)
2302404 92+450 High 1. Provide Solar Traffic LED Essential
(Median Blinker Light at the nose of
Opening) median opening on both
sides to alert the drivers of
median opening during
night.
2. Provide Hazard Markers
as per IRC-67on RHS
before metal beam crash
barrier.
1. Solar Blinker should be provided
at the nose of median opening on
both sides.
2. Thermoplastic Traverse Bar
Marking (3 sets) has been
provided on both sides of
Hazardous Reach.
3. Zebra crossing has been
provided.
4. Delineators has been provided.

Revision Level: R0 March - 2023 Page 332 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

Safety Concern of Audit Findings Recommendations IE Response


Concessionaire
Chainage and
ID No. Description (With Image if any) Risk Description (With Image if Priority Compliance
Compliance
any)
2302405 94+400 High Provide Hazard Markers as Essential
(RHS) per IRC-67.

Hazard marker not provided before


Metal beam crash barrier..
2302406 94+800 High Provide Solar Traffic LED Essential
(Median Blinker Light at the nose of
Opening) median opening on both sides
to alert the drivers of median
opening during night

1. Solar Blinker should be provided


at the nose of median opening on
both sides.
2. Thermoplastic Traverse Bar
Marking (3 sets) has been

Revision Level: R0 March - 2023 Page 333 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

Safety Concern of Audit Findings Recommendations IE Response


Concessionaire
Chainage and
ID No. Description (With Image if any) Risk Description (With Image if Priority Compliance
Compliance
any)
provided on both sides of
Hazardous Reach.
3. Zebra crossing has been
provided.
4. Delineators has been provided.
2302407 94+900 High 1. Chevron/diagonal Essential
(LHS) marking with red color
road studs shall be
provided as per IRC: 35-
2015 as per Clause 5.5.5,
page 30 and Clause 7.2,
Table 7.1: Spacing
between Diagonals /
Chevrons, at page 36.

Chevron marking not provided on


Entry/Exit.
2302408

Revision Level: R0 March - 2023 Page 334 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

Safety Concern of Audit Findings Recommendations IE Response


Concessionaire
Chainage and
ID No. Description (With Image if any) Risk Description (With Image if Priority Compliance
Compliance
any)
2302409 99+600 High 1. Chevron/diagonal Essential
(LHS) marking with red color
road studs shall be
provided as per IRC: 35-
2015 as per Clause 5.5.5,
page 30 and Clause 7.2,
Table 7.1: Spacing
between Diagonals /
Chevrons, at page 36.

1. Chevron marking not provided.


2. Pavement marking not provided
on service road

2. Provide pavement
marking on service road as
per IRC:35.

Revision Level: R0 March - 2023 Page 335 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

Safety Concern of Audit Findings Recommendations IE Response


Concessionaire
Chainage and
ID No. Description (With Image if any) Risk Description (With Image if Priority Compliance
Compliance
any)
2302410 97+400 High 1. Painting of kerb and Essential
(Junction) pavement should be done
as per IRC:35-2015.
2. Provide two way hazard
marker sign board on
junction island as per
Clause 15.64 of
IRC:67:2012, at page 46
and Fig. 15.78 of page 89.

1. Hazard marker not provided on


junction island.
2. Kerb marking and pavement
marking has faded.

2302411 97+700 High 1. Develop Entry/Exit Essential


(LHS) Arrangement with
Service/Slip road as per
fig 2.1A of IRC:SP-84-
2014 (Attached
Annexure‐2).
2. Chevron/diagonal
marking with red color
road studs shall be
provided as per IRC: 35-

Revision Level: R0 March - 2023 Page 336 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

Safety Concern of Audit Findings Recommendations IE Response


Concessionaire
Chainage and
ID No. Description (With Image if any)
Risk Description (With Image if Priority Compliance
Compliance
any)
1. Entry/Exit not as per IRC 2015 as per Clause 5.5.5,
standards. page 30 and Clause 7.2,
2302412 Table 7.1: Spacing
between Diagonals /
Chevrons, at page 36.

2. Chevron marking has not been


provided.

3. Provide pavement
marking on service road
as per IRC:35-2015.

Revision Level: R0 March - 2023 Page 337 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

Safety Concern of Audit Findings Recommendations IE Response


Concessionaire
Chainage and
ID No. Description (With Image if any) Risk Description (With Image if Priority Compliance
Compliance
any)
2302413 98+800 High Provide Solar Traffic LED Essential
(Dhoraji Blinker Light at the nose of
Bypass median opening on both sides
Median to alert the drivers of median
Opening) opening during night.

1. Solar Blinker should be provided


at the nose of median opening on
both sides.
2. Thermoplastic Traverse Bar
Marking (3 sets) has been
provided on both sides of
Hazardous Reach.
3. Zebra crossing has been
provided.
4. Delineators has been provided.

Revision Level: R0 March - 2023 Page 338 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

Safety Concern of Audit Findings Recommendations IE Response


Concessionaire
Chainage and
ID No. Description (With Image if any) Risk Description (With Image if Priority Compliance
Compliance
any)
2302414 100+750 High 1. Chevron/diagonal Essential
(RHS) marking with red color
road studs shall be
provided as per IRC: 35-
2015 as per Clause 5.5.5,
page 30 and Clause 7.2,
Table 7.1: Spacing
between Diagonals /
Chevrons, at page 36.

1. Pavement marking not done on


service road.
2. Chevron marking has faded.

2. Provide pavement
marking on service road as
per IRC:35-2015.

Revision Level: R0 March - 2023 Page 339 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

Safety Concern of Audit Findings Recommendations IE Response


Concessionaire
Chainage and
ID No. Description (With Image if any) Risk Description (With Image if Priority Compliance
Compliance
any)
2302415 102+000 High Provide Hazard Markers as Essential
(RHS) per IRC-67

Hazard marker not provided before


Metal beam crash barrier..
2302416 102+600 High Provide Solar Traffic LED Essential
(Median Blinker Light at the nose of
Opening) median opening on both sides
to alert the drivers of median
opening during night.

1. Solar Blinker should be provided


at the nose of median opening on
both sides.
2. Thermoplastic Traverse Bar
Marking (3 sets) has been

Revision Level: R0 March - 2023 Page 340 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

Safety Concern of Audit Findings Recommendations IE Response


Concessionaire
Chainage and
ID No. Description (With Image if any) Risk Description (With Image if Priority Compliance
Compliance
any)
provided on both sides of
Hazardous Reach.
3. Zebra crossing has been
provided.
4. Delineators has been provided.
2302417 104+200 High Provide Hazard Markers as Essential
(RHS) per IRC-67

Hazard marker not provided before


Metal beam crash barrier.
2302418 105+100 High Provide pavement marking as Essential
(LHS) per IRC:35.

Revision Level: R0 March - 2023 Page 341 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

Safety Concern of Audit Findings Recommendations IE Response


Concessionaire
Chainage and
ID No. Description (With Image if any) Risk Description (With Image if Priority Compliance
Compliance
any)
Pavement marking not provided.
2302419 105+300 High 1. Chevron/diagonal Essential
(LHS) marking with red color
road studs shall be
provided as per IRC: 35-
2015 as per Clause 5.5.5,
page 30 and Clause 7.2,
Table 7.1: Spacing
between Diagonals /
Chevrons, at page 36.

1. Chevron marking not provided.


2. Pavement marking not provided
on service road

2. Provide pavement
marking as per IRC:35.

Revision Level: R0 March - 2023 Page 342 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

Safety Concern of Audit Findings Recommendations IE Response


Concessionaire
Chainage and
ID No. Description (With Image if any) Risk Description (With Image if Priority Compliance
Compliance
any)
2302420 116+300 High Provide Kerb painting as per Essential
(Median) IRC-35

Kerb painting not done.


2302421 106+400 High Provide Hazard Markers as Essential
(RHS) per IRC-67

Hazard marker not provided.

Revision Level: R0 March - 2023 Page 343 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

Safety Concern of Audit Findings Recommendations IE Response


Concessionaire
Chainage and
ID No. Description (With Image if any) Risk Description (With Image if Priority Compliance
Compliance
any)
2302422 107+600 High Provide Solar Traffic LED Essential
(Median Blinker Light at the nose of
Opening) median opening on both sides
to alert the drivers of median
opening during night.

1. Solar Blinker should be provided


at the nose of median opening on
both sides.
2. Thermoplastic Traverse Bar
Marking (3 sets) has been
provided on both sides of
Hazardous Reach.
3. Zebra crossing has been
provided.
4. Delineators has been provided.

Revision Level: R0 March - 2023 Page 344 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

Safety Concern of Audit Findings Recommendations IE Response


Concessionaire
Chainage and
ID No. Description (With Image if any) Risk Description (With Image if Priority Compliance
Compliance
any)
2302423 109+400 High Provide Solar Traffic LED Essential
(Median Blinker Light at the nose of
Opening) median opening on both sides
to alert the drivers of median
opening during night.

1. Solar Blinker should be provided


at the nose of median opening on
both sides.
2. Thermoplastic Traverse Bar
Marking (3 sets) has been
provided on both sides of
Hazardous Reach.
3. Zebra crossing has been
provided.
4. Delineators has been provided.

Revision Level: R0 March - 2023 Page 345 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

Safety Concern of Audit Findings Recommendations IE Response


Concessionaire
Chainage and
ID No. Description (With Image if any) Risk Description (With Image if Priority Compliance
Compliance
any)
2302424 109+600 High 1. Provide Solar Traffic LED Essential
(Median Blinker Light at the nose of
Opening) median opening on both
sides to alert the drivers of
median opening during
night.
2. Repair the damaged kerb
on both sides of median
opening.
3. Painting of kerb should be
1. Kerb damaged on both sides of done as per IRC:35-2015
median opening. after repairing.
2. Solar Blinker should be provided 4. Trimming of over grown
at the nose of median opening on vegetation on median shall
both sides. be done on regularly basis
3. Thermoplastic Traverse Bar as per clause 11.22 of IRC
Marking (3 sets) has been :SP-21.
provided on both sides of
Hazardous Reach.
4. Zebra crossing has been
provided.
5. Delineators has been provided.

Revision Level: R0 March - 2023 Page 346 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

Safety Concern of Audit Findings Recommendations IE Response


Concessionaire
Chainage and
ID No. Description (With Image if any) Risk Description (With Image if Priority Compliance
Compliance
any)
2302425 112+800 High 1. Chevron/diagonal Essential
(RHS) marking with red color
road studs shall be
provided as per IRC: 35-
2015 as per Clause 5.5.5,
page 30 and Clause 7.2,
Table 7.1: Spacing
between Diagonals /
Chevrons, at page 36.

1. Pavement marking not done on


service road.
2. Chevron marking has faded.

2. Provide pavement
marking on service road as
per IRC:35-2015.

Revision Level: R0 March - 2023 Page 347 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

Safety Concern of Audit Findings Recommendations IE Response


Concessionaire
Chainage and
ID No. Description (With Image if any) Risk Description (With Image if Priority Compliance
Compliance
any)
2302426 114+900 High Footpath should be repaired Essential
(RHS) and raised to provide ease
and safe environment to
pedestrians.

Footpath damaged on Major bridge


of Bhadar river.
2302427 114+950 High Painting of kerb should be Essential
(Median) done as per IRC:35-2015.

Kerb painting has faded.

Revision Level: R0 March - 2023 Page 348 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

Safety Concern of Audit Findings Recommendations IE Response


Concessionaire
Chainage and
ID No. Description (With Image if any) Risk Description (With Image if Priority Compliance
Compliance
any)
2302428 115+000 High Provide Hazard Markers as Essential
(RHS) per IRC-67

Hazard marker not provided.


2302429 115+200 High 1. Provide Solar Traffic LED Essential
(Median Blinker Light at the nose of
Opening) median opening on both
sides to alert the drivers of
median opening during
night.
2. Repair the damaged kerb
on both sides of median
opening.
3. Painting of kerb should be
1. Kerb damaged on both sides of done as per IRC:35-2015
median opening. after repairing.
2. Solar Blinker should be provided
at the nose of median opening on
both sides.

Revision Level: R0 March - 2023 Page 349 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

Safety Concern of Audit Findings Recommendations IE Response


Concessionaire
Chainage and
ID No. Description (With Image if any) Risk Description (With Image if Priority Compliance
Compliance
any)
3. Thermoplastic Traverse Bar
Marking (3 sets) has been
provided on both sides of
Hazardous Reach.
4. Zebra crossing has been
provided.
5. Delineators has been provided.
2302430 115+500 High Provide Hazard Markers as Essential
(RHS) per IRC-67

Hazard marker not provided.

Revision Level: R0 March - 2023 Page 350 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

Safety Concern of Audit Findings Recommendations IE Response


Concessionaire
Chainage and
ID No. Description (With Image if any) Risk Description (With Image if Priority Compliance
Compliance
any)
2302431 115+900 High 1. Provide Solar Traffic LED Essential
(Median Blinker Light at the nose of
Opening) median opening on both
sides to alert the drivers of
median opening during
night.
2. Repair the damaged kerb
on one side of median
opening.
3. Painting of kerb should be
1. Kerb damaged on one side of done as per IRC:35-2015
median opening. after repairing.
2. Solar Blinker should be provided
at the nose of median opening on
both sides.
3. Thermoplastic Traverse Bar
Marking (3 sets) has been
provided on both sides of
Hazardous Reach.
4. Zebra crossing has been
provided.
5. Delineators has been provided.

Revision Level: R0 March - 2023 Page 351 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

Safety Concern of Audit Findings Recommendations IE Response


Concessionaire
Chainage and
ID No. Description (With Image if any) Risk Description (With Image if Priority Compliance
Compliance
any)
2302432 116+500 High Provide Hazard Markers as Essential
(RHS) per IRC-67

Hazard marker not provided.

2302433 116+800 High 1. Chevron/diagonal Essential


(Median marking with red color
Opening) road studs shall be
provided as per IRC: 35-
2015 as per Clause 5.5.5,
page 30 and Clause 7.2,
Table 7.1: Spacing
between Diagonals /
Chevrons, at page 36.

1. Kerb painting not done.


2. Chevron marking has faded at
bus bay separator.

Revision Level: R0 March - 2023 Page 352 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

Safety Concern of Audit Findings Recommendations IE Response


Concessionaire
Chainage and
ID No. Description (With Image if any) Risk Description (With Image if Priority Compliance
Compliance
any)
3. Solar Blinker not working and
should be shifted at the nose of
median opening on both sides.
4. Thermoplastic Traverse Bar
Marking (3 sets) has been
provided on both sides of
Hazardous Reach.
5. Zebra crossing has been
provided.
6. Delineators has been provided.
2302434

2. Provide Solar Traffic LED


Blinker Light at the nose of
median opening on both
sides to alert the drivers of
median opening during
night.
3. Repair the separator.

7. Broken separator between main


carraigeway and slip road can
lead to accident.

Revision Level: R0 March - 2023 Page 353 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

General Observation & Recommendations:

a) Provide the Stop/Give way sign on all minor roads by developing the minor/ major junction. There should be no stop sign on the main project highway. It
should be as per fig. 14.01 to 14.03, page no. 65 of IRC: 67-2012.
b) The background and border colour of the informatory gantry-mounted signboard should be as per table 8.3, page no. 21 of IRC: 67-2012. Ensure all
specifications of informatory gantry mounted signboard should be as per table 11.1-page no.22 of IRC: 67-2012.
c) The background and border colour of the reassurance signboard should be as per Table 8.3, page no. 21 of IRC: 67-2012. Ensure all specification of
reassurance signboard should be as per table 11.1, page no.22 of IRC: 67-2012
d) The background and border colour of the flag type direction signboard should be as per fig. 16.04, page no. 93 of IRC: 67-2012
e) The background and border colour of the facility information sign should be as per clause 17.1 to 17.42, page no. 50 to 54 of IRC: 67-2012. Ensure all
specifications of facility information signboard as per IRC-67-2012.
f) The school signboard should be as per Fig. 15.48, page no 126 of IRC: 67-2012. The location of the signboard should be as per table 15.1, page no. 37 of IRC:
67-2012 before the start of school in both directions of the highway.
g) Provide side road ahead sign on the entire crossroads as per Fig 15.09 & 15.10, page no. 77 of IRC: 67-2012.
h) Right hand/Left-hand curve signboards should be placed as per fig. 15.01 to 15.02, page no. 76 of IRC: 67-2012.
i) Chevron sign shall be placed on the outer edge of horizontal curves having a radius less than 700m
j) The typical layout for emergency helpline numbers can be in this pattern +91 9999 999 999 so that it can be easily readable.
k) The signboard should be placed away from the earthen shoulder.
l) The signboard post should be painted with yellow & black bands.
m) Steel delineators can be provided as per clause3.1, page no 3 of IRC-79-1981.
n) The typical drawing of delineator shall be as per clause 3.1, 3.7 & 3.11, page no 3,4,5 & 6 of IRC-79
o) Provide road studs as per clause 9.5 and Table 9.1, page no. 88-90 of IRC: SP: 84-2014 and IRC-35-2015.
p) Typical details of KM stone as per plate no 1, 2, 3 & 4 of IRC: 8-1980.
q) Provide fixing details Hectometer Stones are as per fig. 1 & 2 of IRC: 26-1967.
r) Provide painting details for KM stone/5th KM stone
s) Typical details of Road marking are as per IRC 35-2015.
t) Complete detail of speed breaker/rumble strips with locations on the crossroad is required to be provided.

Revision Level: R0 March - 2023 Page 354 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

4.8 AUDIT OF VULNERABLE ROAD USERS

Safety Concern of Audit Findings Recommendations IE Response


Concessionaire
ID No. Chainage Description Risk Description Priority and
Compliance
(With Image if any) (With Image if any) Compliance
2302435 14+900 High Remove the debris on service Essential
(LHS) road.

Debris on service road before


Pedestrian underpass.
2302436 16+500 Very Close unauthorized median Essential
(LHS) High cut immediately.

Unauthorized median cut.

Revision Level: R0 March - 2023 Page 355 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

Safety Concern of Audit Findings Recommendations IE Response


Concessionaire
ID No. Chainage Description Risk Description Priority and
Compliance
(With Image if any) (With Image if any) Compliance
2302437 26+500 Very Close unauthorized median Essential
High cut immediately.

Unauthorized median cut.


2302438 26+900 High Repair the cracks. Essential
(LHS)

Cracks on pavement

Revision Level: R0 March - 2023 Page 356 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

Safety Concern of Audit Findings Recommendations IE Response


Concessionaire
ID No. Chainage Description Risk Description Priority and
Compliance
(With Image if any) (With Image if any) Compliance
2302439 27+300 Very Close unauthorized median Essential
High cut immediately.

Unauthorized median cut.


2302440 28+300 Very Close unauthorized median Essential
High cut immediately.

Unauthorized median cut.

Revision Level: R0 March - 2023 Page 357 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

Safety Concern of Audit Findings Recommendations IE Response


Concessionaire
ID No. Chainage Description Risk Description Priority and
Compliance
(With Image if any) (With Image if any) Compliance
2302441 30+970 Very Close unauthorized median Essential
High cut immediately.

Accident location due to


unauthorized median cut.
2302442 31+000 Very Close unauthorized median Essential
High cut immediately.

Unauthorized median cut.

Revision Level: R0 March - 2023 Page 358 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

Safety Concern of Audit Findings Recommendations IE Response


Concessionaire
ID No. Chainage Description Risk Description Priority and
Compliance
(With Image if any) (With Image if any) Compliance
2302443 32+600 Very Close unauthorized median Essential
High cut immediately.

Unauthorized median cut.


2302444 33+500 Very Remove the barbed wire Essential
34+000 High fencing.
(LHS)

Barbed wire fencing done near


paved shoulder at Baloch village.

Revision Level: R0 March - 2023 Page 359 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

Safety Concern of Audit Findings Recommendations IE Response


Concessionaire
ID No. Chainage Description Risk Description Priority and
Compliance
(With Image if any) (With Image if any) Compliance
2302445 34+900 Very Close unauthorized median Essential
High cut immediately.

Unauthorized median cut.


2302446 35+400 High Repair the cracks Essential
35+600 immediately.
(RHS)

Cracks on carriageway.

Revision Level: R0 March - 2023 Page 360 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

Safety Concern of Audit Findings Recommendations IE Response


Concessionaire
ID No. Chainage Description Risk Description Priority and
Compliance
(With Image if any) (With Image if any) Compliance
2302447 36+400 Very Remove the barbed wire Essential
36+700 High fencing.
(LHS)

Barbed wire fencing done near


paved shoulder.
2302448 37+100 Very Remove the barbed wire Essential
37+800 High fencing.
(LHS)

Barbed wire fencing done near


paved shoulder.

Revision Level: R0 March - 2023 Page 361 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

Safety Concern of Audit Findings Recommendations IE Response


Concessionaire
ID No. Chainage Description Risk Description Priority and
Compliance
(With Image if any) (With Image if any) Compliance
2302449 36+400 Very Remove the barbed wire Essential
36+700 High fencing.
(LHS)

Barbed wire fencing done near


paved shoulder.
2302450 40+200 High Repair the cracks Essential
(RHS) immediately.

Cracks on carriageway due to


settlement.

Revision Level: R0 March - 2023 Page 362 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

Safety Concern of Audit Findings Recommendations IE Response


Concessionaire
ID No. Chainage Description Risk Description Priority and
Compliance
(With Image if any) (With Image if any) Compliance
2302451 40+700 Very Close unauthorized median Essential
High cut immediately.

Unauthorized median cut.


2302452 41+300 Very Close unauthorized median Essential
High cut immediately.

Unauthorized median cut.

Revision Level: R0 March - 2023 Page 363 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

Safety Concern of Audit Findings Recommendations IE Response


Concessionaire
ID No. Chainage Description Risk Description Priority and
Compliance
(With Image if any) (With Image if any) Compliance
2302453 41+700 Very Close unauthorized median Essential
High cut immediately.

Unauthorized median cut.


2302454 44+200 Very Close unauthorized median Essential
High cut immediately.

Unauthorized median cut.

Revision Level: R0 March - 2023 Page 364 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

Safety Concern of Audit Findings Recommendations IE Response


Concessionaire
ID No. Chainage Description Risk Description Priority and
Compliance
(With Image if any) (With Image if any) Compliance
2302455 45+300 Very Close unauthorized median Essential
High cut immediately.

Unauthorized median cut.


2302456 45+400 High Provide Thermoplastic Essential
(RHS) Traverse Bar Marking (3
sets) on both sides of
Hazardous reach as per Fig
11.2 of IRC-35-2015 to alert
the drivers to reduce the
speed of vehicle on main
carriageway (Annexure‐1).

Police check post on median.

Revision Level: R0 March - 2023 Page 365 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

Safety Concern of Audit Findings Recommendations IE Response


Concessionaire
ID No. Chainage Description Risk Description Priority and
Compliance
(With Image if any) (With Image if any) Compliance
2302457 47+500 High Cleaning is required on Desirable
(LHS) service road.

Cleaning not done on service road.


2302458 48+100 Very Remove the barbed wire Essential
(LHS) High fencing.

Barbed wire fencing done near


paved shoulder at Baloch village.

Revision Level: R0 March - 2023 Page 366 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

Safety Concern of Audit Findings Recommendations IE Response


Concessionaire
ID No. Chainage Description Risk Description Priority and
Compliance
(With Image if any) (With Image if any) Compliance
2302459 48+800 High Repair the cracks Essential
(RHS) immediately.

Longitudinal cracks on carriageway


due to settlement.
2302460 50+300 Very Close unauthorized median Essential
High cut immediately.

Unauthorized median cut.

Revision Level: R0 March - 2023 Page 367 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

Safety Concern of Audit Findings Recommendations IE Response


Concessionaire
ID No. Chainage Description Risk Description Priority and
Compliance
(With Image if any) (With Image if any) Compliance
2302461 56+400 Very Close unauthorized median Essential
High cut immediately.

Unauthorized median cut.


2302462 59+000 Very Close unauthorized median Essential
High cut immediately.

Unauthorized median cut.

Revision Level: R0 March - 2023 Page 368 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

Safety Concern of Audit Findings Recommendations IE Response


Concessionaire
ID No. Chainage Description Risk Description Priority and
Compliance
(With Image if any) (With Image if any) Compliance
2302463 61+400 High Repair the cracks Essential
(RHS) immediately.

Longitudinal cracks on carriageway


due to settlement.
2302464 61+700 – High Repair the cracks. Essential
61+900
(LHS)

Cracks on pavement

Revision Level: R0 March - 2023 Page 369 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

Safety Concern of Audit Findings Recommendations IE Response


Concessionaire
ID No. Chainage Description Risk Description Priority and
Compliance
(With Image if any) (With Image if any) Compliance
2302465

Potholes and cracks on road surface.


2302466 61+900 Very Close unauthorized median Essential
High cut immediately.

Unauthorized median cut

Revision Level: R0 March - 2023 Page 370 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

Safety Concern of Audit Findings Recommendations IE Response


Concessionaire
ID No. Chainage Description Risk Description Priority and
Compliance
(With Image if any) (With Image if any) Compliance
2302467 62+200 Very Close unauthorized median Essential
High cut immediately.

Unauthorized median cut.


2302468 62+800 High Repair the road surface. Essential
(LHS)

Ravelling on road surface.

Revision Level: R0 March - 2023 Page 371 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

Safety Concern of Audit Findings Recommendations IE Response


Concessionaire
ID No. Chainage Description Risk Description Priority and
Compliance
(With Image if any) (With Image if any) Compliance
2302469 66+600 Very Close unauthorized median Essential
High cut immediately.

Unauthorized median cut.


2302470 67+400 Very 1. Provide median opening Essential
High with storage lane as per
IRC:SP:84, clause 2.14.3
of page 22 and Fig. 3.7 of
IRC:Sp:84 of page 33
(Annexure – 9).
2. Provide Solar Traffic LED
Blinker Light at the nose
of median opening on
both sides to alert the
Unauthorized median cut. drivers of median
opening during night.
3. Provide Thermoplastic
Traverse Bar Marking (3
sets) on both sides of
Hazardous reach as per

Revision Level: R0 March - 2023 Page 372 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

Safety Concern of Audit Findings Recommendations IE Response


Concessionaire
ID No. Chainage Description Risk Description Priority and
Compliance
(With Image if any) (With Image if any) Compliance
2302471 Fig 11.2 of IRC-35-2015
to alert the drivers to
reduce the speed of
vehicle on main
carriageway
(Annexure‐1).
4. Provide Zebra crossing
as per IRC guidelines.
Considering the site condition,
median opening with storage lane
should be provided as per IRC
standards.
2302472 67+380 Very Close unauthorized median Essential
High cut immediately.

Unauthorized median cut. Cross


road on LHS.

Revision Level: R0 March - 2023 Page 373 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

Safety Concern of Audit Findings Recommendations IE Response


Concessionaire
ID No. Chainage Description Risk Description Priority and
Compliance
(With Image if any) (With Image if any) Compliance
2302473 69+700 High Repair the cracks Essential
(RHS) immediately.

Cracks on carriageway due to


settlement.
2302474 71+900 High Repair the cracks Essential
(RHS) immediately.

Cracks on carriageway due to


settlement.

Revision Level: R0 March - 2023 Page 374 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

Safety Concern of Audit Findings Recommendations IE Response


Concessionaire
ID No. Chainage Description Risk Description Priority and
Compliance
(With Image if any) (With Image if any) Compliance
2302475 72+100 Very Close unauthorized median Essential
High cut immediately.

Unauthorized median cut.


2302476 75+750 High Develop Entry/Exit Essential
(RHS) Arrangement with
Service/Slip road as per fig
2.1A of IRC:SP-84-2014
(Annexure‐2).

Entry/Exit not provided as per IRC


standards.

Revision Level: R0 March - 2023 Page 375 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

Safety Concern of Audit Findings Recommendations IE Response


Concessionaire
ID No. Chainage Description Risk Description Priority and
Compliance
(With Image if any) (With Image if any) Compliance
2302477 76+500 – High Repair the cracks Essential
76+400 immediately.
(RHS)

Cracks on paved shoulder due to


settlement.
2302478 83+000 High Repair the cracks Essential
immediately.

Cracks on main carriageway.

Revision Level: R0 March - 2023 Page 376 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

Safety Concern of Audit Findings Recommendations IE Response


Concessionaire
ID No. Chainage Description Risk Description Priority and
Compliance
(With Image if any) (With Image if any) Compliance
2302479 87+400 High 1. Repair the footpath. Essential
(RHS) 2. Paint the kerb as per
IRC:35 to alert the driver
of carriageway edge
during night time.

2302480 Foothpath damaged.

Repair required for foothpath.

Revision Level: R0 March - 2023 Page 377 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

Safety Concern of Audit Findings Recommendations IE Response


Concessionaire
ID No. Chainage Description Risk Description Priority and
Compliance
(With Image if any) (With Image if any) Compliance
2302481 109+000 Very Close unauthorized median Essential
High cut immediately.

Unauthorized median cut.


2302482 111+700 Very Close unauthorized median Essential
High cut immediately.

Unauthorized median cut.

Revision Level: R0 March - 2023 Page 378 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

Safety Concern of Audit Findings Recommendations IE Response


Concessionaire
ID No. Chainage Description Risk Description Priority and
Compliance
(With Image if any) (With Image if any) Compliance
2302483 113+000 Very Close unauthorized median Essential
High cut immediately.

Unauthorized median cut.


2302484 114+700 Very Close unauthorized median Essential
High cut immediately.

Unauthorized median cut.

Revision Level: R0 March - 2023 Page 379 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

Safety Concern of Audit Findings Recommendations IE Response


Concessionaire
ID No. Chainage Description Risk Description Priority and
Compliance
(With Image if any) (With Image if any) Compliance
2302485 116+200 Very Close unauthorized median Essential
High cut immediately.

Unauthorized median cut.

Revision Level: R0 March - 2023 Page 380 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

4.9 AUDIT OF ACCESS TO PROPOERTY AND DEVELOPMENTS

Safety Concern of Audit Findings Recommendations IE Response


Concessionaire
ID No. Chainage Description Risk Description Priority and
Compliance
(With Image if any) (With Image if any) Compliance
2302486 45+200 High Petrol Pump entry/exit shall Essential
(LHS) be provided as per MoRTH
circular No. RW/NH-
33032/01/2017-5 S & R ( R)
dated June 26, 2020.

Proper Entry-exit for Petrol pump is


not available.

Revision Level: R0 March - 2023 Page 381 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

4.10 AUDIT OF LIGHTING AND NIGHT TIME ISSUES

Safety Concern of Audit Findings Recommendations IE Response


Concessionaire
ID No. Chainage Description (With Image if any) Risk Description Priority and
Compliance
(With Image if any) Compliance
2302487 3+100 - - -
(Median)

Street ligths on median are providing


proper illuminance.
2302488 109+700 - - -
(Median)

Street ligths on median are providing


proper illuminance.

Revision Level: R0 March - 2023 Page 382 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

Safety Concern of Audit Findings Recommendations IE Response


Concessionaire
ID No. Chainage Description (With Image if any) Risk Description Priority and
Compliance
(With Image if any) Compliance
2302489 110+600 - - -
(LHS)

Proper Night time visibility of


signages.
2302490 Toll Plaza - High Mask Lighting has been -
provided at Toll Plaza
Locations.

Ligting has been provided at


Dumiyani Toll Plaza

General Observation & Recommendations:


 Lighting shall be provided on Structures (PUP, LVUP, and VUP), Interchanges, built-up area, truck lay byes, bus bays as per clause 12.3 of IRC: SP: 84-
2014 or as per CA.

Revision Level: R0 March - 2023 Page 383 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

 The concessionaire shall make suitable arrangements for procuring power supply to ensure uninterrupted lighting during night and when visibility
is low, including the provision of DG sets as standby arrangements.
 Lighting needs to be provided in and around Toll Plaza, toll booths, office building, truck lay byes, bus bays, etc. as per 12.3.3 clause of IRC: SP: 84-
2014
 Unless stated otherwise elsewhere in IRC: SP: 84, the minimum level of illumination on the stretches of the project highway including Toll plazas,
Truck Lay-byes, Intersections, bus bays, etc. shall be 40Lux.
 Yellow Solar blinkers shall be provided at all the median opening locations.

Revision Level: R0 March - 2023 Page 384 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

4.11 AUDIT OF TOLL PLAZA

Safety Concern of Audit Findings Recommendations IE Response


Concessionaire
ID No. Description (With Image if any) Risk Description (With Image if any) Priority and
Compliance
Compliance
Dumiyani - - -
Toll Plaza
(82+200)

Toll rates provided.


Very 1. Provide pavement marking as per Essential
High 10.4.16 of IRC:SP-84.
2. Provide Traverse bar marking as
per Clause 10.4.16 and Fig. 10.4
(Attached Annexure 8) of
IRC:SP:84-2014 (Manual for Four
Laning of Highway).

Pavement marking is not


provided and Traverse Bar
marking is also missing at Toll
Plaza Location

Revision Level: R0 March - 2023 Page 385 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

Safety Concern of Audit Findings Recommendations IE Response


Concessionaire
ID No. Description (With Image if any) Risk Description (With Image if any) Priority and
Compliance
Compliance
High Provide Traverse bar marking as per Essential
Clause 10.4.16 and Fig. 10.4
(Attached Annexure 8) of
IRC:SP:84-2014 (Manual for Four
Laning of Highway).

Pavement and traverse bar


marking not available.

Traffic Management Centre


maintained by Porbandar-Jetpur
tollway Pvt. Ltd.

Revision Level: R0 March - 2023 Page 386 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

Safety Concern of Audit Findings Recommendations IE Response


Concessionaire
ID No. Description (With Image if any) Risk Description (With Image if any) Priority and
Compliance
Compliance
- Highway Traffic management -
System is working properly during
audit visit.

ATMS system available at Toll


Plaza and working properly.
- Ambulance at Toll Plaza -

Revision Level: R0 March - 2023 Page 387 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

Safety Concern of Audit Findings Recommendations IE Response


Concessionaire
ID No. Description (With Image if any) Risk Description (With Image if any) Priority and
Compliance
Compliance
- Crane available at Toll Palza -

Vahana - - -
Toll Plaza
(10+750)

Toll Rates provided.

Revision Level: R0 March - 2023 Page 388 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

Safety Concern of Audit Findings Recommendations IE Response


Concessionaire
ID No. Description (With Image if any) Risk Description (With Image if any) Priority and
Compliance
Compliance
High 1. Provide Pavement marking as per Essential
IRC:35.
2. Provide Traverse bar marking as
per Clause 10.4.16 and Fig. 10.4
(Attached Annexure 8) of
IRC:SP:84-2014 (Manual for Four
Laning of Highway).

Pavement marking is not


provided and TBM marking is also
missing at Toll Plaza Location
- - -

Proper Toilet facilty available at


Toll Plaza.

Revision Level: R0 March - 2023 Page 389 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

Safety Concern of Audit Findings Recommendations IE Response


Concessionaire
ID No. Description (With Image if any) Risk Description (With Image if any) Priority and
Compliance
Compliance
- - -

Mediacal facility available.


- - -

Service vehicle available.

General Observation & Recommendations:


 Between each toll lane of the toll plaza, traffic islands are required to accommodate toll booth. These islands shall be of minimum 25m length and 1.8m width.
 The toll booths shall have adequate space for seating of toll collector, computer, printer, cash box etc. It should have provision for light, fan or air conditioning.
 There shall be CCTV camera installed at each booth.
 Medical Aid Post at the Toll Plaza.
 Lighting of toll plaza shall be provided as per clause 10.4.17 of IRC: SP: 84-2014.

Revision Level: R0 March - 2023 Page 390 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600 of
NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

ANNEXURE‐1

Revision Level: R0 March - 2023 Page 391 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600
of NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

ANNEXURE‐2

Revision Level: R0 March - 2023 Page 392 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600
of NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

ANNEXURE‐3

Revision Level: R0 March - 2023 Page 393 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600
of NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

ANNEXURE‐4

Revision Level: R0 March - 2023 Page 394 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600
of NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

ANNEXURE‐5

Revision Level: R0 March - 2023 Page 395 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600
of NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

ANNEXURE‐6

Revision Level: R0 March - 2023 Page 396 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600
of NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

ANNEXURE‐7

Revision Level: R0 March - 2023 Page 397 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600
of NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

ANNEXURE‐8

Revision Level: R0 March - 2023 Page 398 of 399


Safety Consultancy Services during Operation and Maintenance period for Porbandar - Jetpur section from Km. 1+960 to 117+600
of NH-27 (Design Length = 115.64 Km) in the State of Gujarat
Highway Division
Draft Road Safety Audit Report Porbandar – Jetpur

ANNEXURE‐9

Revision Level: R0 March - 2023 Page 399 of 399