0% found this document useful (0 votes)
90 views

ZX User Manual

Unidad evaporadora
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
90 views

ZX User Manual

Unidad evaporadora
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 20

ZX Platform Condensing Unit

User Manual
Index
Disclaimer............................................................................................................................................ 1

Introduction To ZX Platform CDU......................................................................................................... 1

Receiving Your Unit............................................................................................................................... 1

Features And Value............................................................................................................................... 1

Nomenclature...................................................................................................................................... 2

Bill Of Material (BOM)........................................................................................................................... 2

Physical Layout..................................................................................................................................... 3

Product Specification

Qualified Refrigerants And Oils .................................................................................................................... 4

E2 Control Board - Rotary Switch And Dip Switch Setting (ZX-MT & ZXL-LT).................................................. 5

Defrost Module Function Set....................................................................................................................... 6

Digital Scroll Controller (ZXD)...................................................................................................................... 6

Installation

Condensing Unit Handling........................................................................................................................... 7

Electrical Connection................................................................................................................................... 7

Refrigeration Connection............................................................................................................................. 8

Location and Fxing....................................................................................................................................... 9


Start Up & Operation............................................................................................................................. 10

Diagnostic Initialization Message (ZX-MT and ZXL-LT)............................................................................ 10

Diagnostic Messaging - LED Definition (ZX-MT and ZXL-LT)..................................................................... 11

Alarm Messaging - Digital Scroll Controller (ZXD).................................................................................. 11

Wiring Diagram.................................................................................................................................... 12

Contact Lists......................................................................................................................................... 17
ZX Platform CDU
Disclaimer
Thank you for purchasing the ZX platform condensing unit from Emerson Climate Technologies. ZX platform CDUs are the best
in class within the capacity and operating range available in the market. ZX CDU is designed to operate reliably and to deliver
high operating efficiencies in medium and low temperature refrigeration applications. It also provides constant monitoring
of the compressor operating conditions and displays the running or fault conditions of the CDU. ZX platform CDUs have to
be installed by following the industry trade practices for its safe and reliable operation. It is assumed that the CDU is selected,
installed and serviced only by professionals. The user manual does not cover good industry practices which are essential on a
refrigeration equipment installation. No responsibility can be accepted for damage caused by inexperienced or inadequately
trained site technicians or improper installation design.

If in doubt, please consult your local sales office, quoting unit model and serial number as shown on each unit nameplate. In
case of any ambiguity, the wiring diagram supplied with each unit takes precedence over the diagram in this manual.

Introduction to ZX Platform CDU


ZX medium temperature, ZXD digital medium temperature and ZXL low temperature series have been highly successful in the
Asian market and enjoys proven success with its energy savings and customer-friendly electronic features. ZX, ZXD and ZXL
CDUs have been applied by several well known end-users and chain retailers throughout Asia. The ZX platform is also gaining
wider acceptance in the global market and specific variants have been developed and exported to the USA and to the European
and Middle East markets.

Receiving your unit


All units are shipped with a holding charge of dry nitrogen inside at a low but positive pressure. Suitable labeling is prominently
displayed on both the unit and the packaging. Service connectors are provided on the CDU service valve for the convenient
checking of the integrity of the holding charge.

Caution! It is very important to check that this holding pressure exists at the time you receive each unit from us or our
authorized representatives. Please inform us or our authorized representative if the holding charge is non-existent. Failure to do
so could void the claim for other related system faults at a later period.

Transit damage is essentially an insurance claim and is not covered under manufacturing defect. It is also advisable to inspect
the rest of the unit for obvious physical damage and inform us or our authorized representative in case any is discovered.

ZX Platform Condensing Unit was designed based on three factors


demanded by industry users:

Energy Efficiency - Utilizing Copeland Scroll® compressor technology, variable speed fan motor, large capacity condenser
coil and advanced control algorithms, energy consumption is significantly reduced. End-users can save more than 20% on
annual energy costs rather than using hermetic reciprocating units.

Reliability - Combining the proven reliability of Copeland Scroll® compressors with advanced electronics controller and
diagnostics, equipment reliability is greatly enhanced. Fault code alerts and fault code retrieval capabilities provide information
to help improve speed and accuracy of system diagnostics. Integrated electronics provide protection against over-current,
over-heating, incorrect phase rotation, compressor cycling, high pressure resets, low pressure cut-outs. It can also send out a
warning message to an operator when there is a liquid floodback, which can prevent critical damage on the unit.

Flexibility - The slim shape and light weight make the ZX Condensing Unit aesthetically appealing and eases the installation
process. The ultra quiet variable-speed fan motor significantly reduces exterior sound levels, allowing additional location
flexibility. Combined with wall mounting capability, the ZX Condensing Unit delivers unmatched flexibility.

ZX Condensing Units are greatly suitable for walk-in cooler and freezer applications.

The advance scroll compressor technology, fan speed control and electronic controller are precisely collaborated in all units. It also
introduces variable-speed fan motors that go beyond national standards. Guaranteed dependable performance and operation in
foodservice applications while conveying higher energy efficiency and lower sound levels are the main objectives.

1
ZX Platform Condensing Unit

Diagnostic Protection Increased Reliability and Lower Maintenance Costs

Flexibility More Installation Options

Highest Efficiency Lower Energy Bills

ZXD Series ZX and ZXL Series


Proprietary Electronic Algorithms to Control Fan Speed,
- Shuts down unit during failure Optimizing Energy Performance for Local Seasonal Ambient
- With real time monitoring of Temperatures
compressor operating conditions
• Compressor Reverse Rotation
• Compressor Over Current
• Compressor Internal Motor
Protector Trip
• Discharge Gas Over Heat
• High Pressure Cut Out
• Low Pressure Cut Out (only on
Diagnostic Built-in ZX MT series)
Digital
Platform • Refrigerant Flood Back
Messaging
Controller • Compressor Minimum Off Time
• Internal Thermal Sensor Failure
Variable Speed Fan
Motor and High
Efficiency Fan Blade Copeland Scroll Compressor Technology
– High Efficiency, Ultra Quiet, High
Reliability
Oversized Condenser
Coil for Maximum Heat
Transfer

Figure 01. ZX Platform CDU Features

Nomenclature
Z X L 0 2 0 E - T F D - 4 5 1
TF5 = 200V/230V- 3ph- 60 Hz
PFJ = 220V/240V- 1ph- 50 Hz

TFD = 380V/420V- 3ph- 50 Hz


D = Digital Medium Temp

TF7=380 - 3ph - 60 Hz
= Medium Temp

O = Mineral Oil

Bill of Material
L = Low Temp

2.0 to 7.6 HP

E = Ester oil
Unit Family

Base Model Electrical Code Bill of Material

BOM
CDU Family ZX ZXL ZXD
BOM 401 451 451 461 471 450 451 461
Liquid Line Filter Dryer/Sight Glass
Oil Separator
Accumulator
Adjustable LP Switch
Fixed LP Switch
E2 Controller
Diagnostic Module
Buzzer
Digital Scroll Controller
Fan Speed Controller
Circuit Breaker
Sound Jacket
Defrost Module ACC ACC ACC ACC
Filter Drier V

Notes: - E2 controller has fan speed control function


- “V” indicates flare type connection
- “ACC” indicates accessory

2
Physical Layout
The following figures give an introduction to the physical layout of the ZX Platform CDU.
Figure 02: Identifies the Electronic controller assembly on a ZX platform CDU.

ZX- MT, ZXL-LT E2 Controller


* ZXD Digital Scroll Controller

Scroll Compressor

* ZXD Digital scroll controller not shown in Fig. 02. See Fig. 05 for LED and keypad

Figure 03: Identifies other major components layout on a ZX platform CDU.

Oil Separator
(Optional In MT CDU)
Liquid Receiver
Liquid Sight Glass/
Moisture Indicator
Liquid Filter Drier
Suction And Liquid
Service Valve
Receiver Out Service Valve
Compressor Oil Sight Glass

Figure 04: Shows the layout of the E2 controller, electrical components, dip switches and rotary switch in the E2 control board.

E2 Power Board

Rotary Switch
E2 Control Board
3-Bit Dip Switch
Power Isolation Switch 2-Bit Dip Switch

Compressor Contactor Diagnostic Module

Defrost Module
(optional)

Fuse Holder Electrical Cable connectors

3
ZX Platform Condensing Unit

Figure 05: Shows LED and keypad of ZXD digital scroll controller.

Suction pressure
ure
Suction temperature
erature display
d
Program Mode: browses parameter codes or
Enter Alarm increase value
Hot Key Insert : Hot key programming
procedure
Manual Restart INFO Menu: Press and release it to access
INFO Menu
Setup Menu Program Mode: below parameter codes or
decrease value
Maintenance /Clock

Condenser
ser pressu
pressure
Condenser temperature display

Product Specification
For application envelope, envelope varies according to applications and refrigerants. Please refer to ZX platform product
catalogue, product manual, or Copeland® Brand Products Selection Software.

Qualified refrigerants and oils

REFRIGERANT OIL

R404A/507 Emkarate RL 32 3MAF


Mobil EAL Artic 22 CC
R22 Suniso 3GS

Oils are pre-charged in both compressor and oil separator. Total oil volume (liter) for each unit is shown in the table below:

ZX ZXD ZXL
Model BOM Model BOM Model BOM
401 451 ALL ALL
ZX0200/E 1.18 1.68 ZXL0200/E 1.06
ZX0250/E 1.33 1.83 ZXL0250/E 1.06
ZX0300/E 1.33 1.83 ZXL0300/E 1.06
ZXL0350/E 1.74
ZX0400/E 1.83 2.33 ZXD0400/E 1.74 ZXL0400/E 1.74
ZX0500/E 1.83 2.33 ZXD0500/E 2.27 ZXL0500/E 1.74
ZX0600/E 1.66 2.16 ZXD0600/E 2.27 ZXL0600/E 2.27
ZX0750/E 1.66 2.16 ZXD0750/E 2.27 ZXL0750/E 2.27
ZX0760/E 1.66 2.16

4
E2 Control Board - Rotary Switch And Dip Switch Setting (ZX-MT & ZXL-LT)

Rotary 3-Bit Rotary 3-Bit


Model 2-Bit 1/2 Model 2-Bit 1/2
Switch No. 3 Switch No. 3

ZX0200/E-PFJ 7 OFF ON/ON ZXL0250/E-TFD 2 OFF ON/ON


ZX0250/E-PFJ 8 OFF ON/ON ZXL0300/E-TFD 3 OFF ON/ON
ZX0300/E-PFJ 9 OFF ON/ON ZXL0350/E-TFD 4 OFF ON/ON
ZX0400/E-PFJ A OFF OFF/OFF ZXL0400/E-TFD 5 OFF ON/ON
ZX0200/E-TFD 1 OFF ON/ON ZXL0500/E-TFD 6 OFF ON/ON
ZX0300/E-TFD 2 OFF ON/ON ZXL0600/E-TFD 7 OFF ON/ON
ZX0400/E-TFD 3 OFF ON/ON ZXL0750/E-TFD 8 OFF ON/ON
ZX0500/E-TFD 4 OFF ON/ON ZXL0200/E-TF5 1 ON ON/ON
ZX0600/E-TFD 5 OFF ON/ON ZXL0250/E-TF5 1 ON ON/ON
ZX0750/E- 760/E-TFD 6 OFF ON/ON ZXL0300/E-TF5 2 ON ON/ON
ZX0200/E-TF5 1 ON ON/ON ZXL0350/E-TF5 3 ON OFF/OFF
ZX0300/E-TF5 2 ON ON/ON ZXL0400/E-TF5 4 ON OFF/OFF
ZX0400/E-TF5 3 ON ON/ON ZXL0500/E-TF5 5 ON OFF/OFF
ZX0500/E-TF5 4 ON OFF/OFF ZXL0600/E-TF5 6 ON OFF/OFF
ZX0600/E-TF5 5 ON OFF/OFF ZXL0750/E-TF5 7 ON OFF/OFF
ZX0750/E- 760/E-TF5 6 ON OFF/OFF ZXL0200/E-TF7 8 ON ON/ON
ZX0200/E-TF7 7 ON ON/ON ZXL0250/E-TF7 8 ON ON/ON
ZX0300/E-TF7 8 ON ON/ON ZXL0300/E-TF7 9 ON ON/ON
ZX0400/E-TF7 9 ON ON/ON ZXL0350/E-TF7 A ON ON/ON
ZX0500/E-TF7 A ON ON/ON ZXL0400/E-TF7 B ON ON/ON
ZX0600/E-TF7 A ON ON/ON ZXL0500/E-TF7 C ON ON/ON
ZX0750/E- 760/E-TF7 B ON ON/ON ZXL0600/E-TF7 D ON ON/ON
ZXL0200/E-TFD 1 OFF ON/ON ZXL0750/E-TF7 D ON ON/ON

ON

1 2 3
OFF: Evaporator fan ON/OFF logic is same
as compressor and this is the factory
default setting.
ON: Evaporator fan will be ON for all time
irrespective of whether the compressor is
turned ON or OFF

Not applicable

Use setting in the table

Notes: The settings given in the table are pre-set at the factory for new units.

5
ZX Platform Condensing Unit

Defrost Module Function Set

Time of Defrost Time of Defrost Interval


Defrost Duration (in Minutes)
Rotary Rotary Time
Time(min)
Switch1 Switch2 (hours)
Manual Defrost Defrost Interval
0 0 0 0 Button (In Hours)
1 5 1 1
Remote Connector
2 10 2 2 For Manual Defrost E2 Connector
3 15 3 3
4 20 4 4
5 25 5 5
Figure 06
6 30 6 6
Figure 06: ZX Platform Defrost Module
7 35 7 7

Digital Scroll controller (ZXD)


The controller has been pre-programmed with a number of parameter values that are set for typical application. Individual
installation requirements, however, may make it necessary to alter parameter settings. The control target of the digital scroll
compressor controller is to maintain the suction pressure (or saturated suction temperature) at a defined value by varying the
available compressor capacity. The set-point can be altered using the SEtC parameter. Factory setting SEtC is -6oC.

The control target of the fan speed controller is to maintain the average condenser mid-coil temperature and hence the average
discharge pressure at a defined value. This is achieved by varying the fan speed. The set-point can be altered using the SEtF
parameter. Factory setting SEtF is 25oC.Initial setting of set point for saturated suction temperature.Pre-set value is located in the
SEtC position as shown in the diagram below:

press for more than 2 sec

SEtC value
Flashing

or to change set value within 30 seconds

press to memorize new set value.


Then SEtF (fan speed control set point) will be displayed automatically.

SEtC value
Flashing

or to change set value within 30 seconds

press to memorize new value and Exit, or wait for

30 seconds without pressing any key to memorize value and exit

6
Installation
Copeland ZX condensing units are delivered with a holding charge of neutral gas. The condensing unit should be located
in such a place to prevent any dirt, plastic bag, leaves or papers from covering the condenser and its fins. The unit must be
installed without restricting the airflow. A clogged condenser will increase the condensing temperature, thus reduce the
cooling capacity, and lead to a high-pressure switch tripping. Clean the condenser fins on a regular basis.
Condensing Unit Handling
Transport And Storage
Move ZX/ZXD/ZXL unit only with appropriate mechanical or handling equipment according to weight. Keep in the upright
position. Do not stack single boxes on top of each other without pallet in any case. Keep the packaging dry at all times.

Storage Transport

max max
max
2 2
300 Kg 300
300Kg
Kg

1 1

Net Weight
ZX ZXD ZXL

Model Weight (kg) Model Weight (kg) Model Weight (kg)

ZX0200/E 76 ZXD0400/E2 104 ZXL0200/E 79

ZX0250/E 79 ZXD0500/E3 112 ZXL0250/E 81

ZX0300/E 79 ZXD0600/E4 114 ZXL0300/E 81

ZX0400/E1 91 ZXD0750/E5 122 ZXL0350/E 93

ZX0500/E 108 ZXL0400/E 93

ZX0600/E 112 ZXL0500/E 106

ZX0750/E 118 ZXL0600/E 116

ZX0760/E 121 ZXL0750/E 121

Notes:
1
100 kg for models under 60 Hz TF5/7 and 50 Hz PFJ
2
109 kg for models under 60 Hz TF7
3
117 kg for models under 60 Hz TF7
4
121 kg for models under 60 Hz TF7
5
127 kg for models under 60 Hz TF7

Electrical Connection

Power supply
The ZX condensing unit electrical connection to the power supply must be made by qualified technicians, who should refer
to the electrical diagrams located inside the electric connection panel. The units are designed for below power supply at ±
10% voltage tolerance. The circuit breaker must be switched off before opening the front panel.

Codes HZ Phase Voltages


PFJ 50 1 220/240
TFD 50 3 380/420
TF7 60 3 380
TF5 60 3 200/230

Electrical wiring
Before commissioning, ensure that neutral “N” wire is connected to the terminal block (“N” furthest to the right). After proper
connection of the ZX condensing unit, the control LED on the power board and control board will light. For more details, see wiring
diagram in Appendix.

7
ZX Platform Condensing Unit

Refrigeration connections

Refrigeration piping installation


All interconnecting pipes should be of refrigeration grade, clean, dehydrated and must remain capped at both ends until
installation. Even during installation, if the system is left for any reasonable period of time (say two hours), pipes should be re-
capped to prevent moisture and contaminants from entering the system.
Do not assume that the service connection sizes on the unit (at the service valves) are the correct size to run your
interconnecting refrigeration pipes. The service valve sizes have been selected for convenience of installation and in some
cases (larger units) these may be considered too small. However for the very short pipe run within our units, these service
connection sizes are adequate. All interconnecting pipes should be sized to satisfy the duty required.

Usually the suction line is insulated, but the liquid line is not. However the liquid line can pick up additional heat from the
ambient and adversely affect the sub-cooling desirable for the liquid refrigerant before it enters the expansion valve.

The pipe should be sized to ensure optimum performance and good oil return. The sizing must also take into account the full
capacity range through which this particular unit will need to operate.

Pipe runs should be kept as short as possible, using the minimum number of directional changes. Use large radius bends and
avoid trapping of oil and refrigerant. This is particularly important for the suction line. The suction line should ideally slope
gently towards the unit. Recommendation slope is 1/200~1/250. P traps, double risers and reduced pipe diameters may be
required for suction lines where long vertical risers cannot be avoided. All pipes should be adequately supported to prevent
sagging which can create oil traps. The recommended pipe clamp support distance is shown in the table.

Max distance between


Tube Size
2 clamp support

12.7mm (1/2 inch) 1.20 m


16.0mm (5/8 inch) 1.50 m
22.0mm (7/8 inch) 1.85 m
28.5mm (1 1/8 inch) 2.20 m

ZXL liquid line insulation


ZXL liquid line should be insulated with a 19 mm insulation thickness. Temperature could be as low as –15°C.

Brazing recommendations
Maintain a flow of oxygen-free nitrogen through the system at a very low pressure during brazing. Nitrogen displaces the air
and prevents the formation of copper oxides in the system. If copper oxidization is allowed to form, the copper oxide material
can later be swept through the system and block screens such as those protecting capillary tubes, thermal expansion valves,
and accumulator oil return holes. This minimizes any entry of contaminants and moisture.

• Remove the liquid line connection cap.


• Then remove the suction connection cap.
• Open both valves midway. Care should be taken to
avoid the holding charge from releasing too quickly. OUTSIDE INSIDE UNIT
• Be sure tube fitting inner diameter and tube outer
diameter are clean prior to assembly.
• Since both tubes are extended from the condensing
unit housing, we recommend insulating the housing
by using a wet cloth on the copper tubing.
• Recommended brazing materials: a copper / End of tube
phosphorous or copper / phosphorous / silver alloy
rod should be used for joining copper to copper During brazing
During brazing
whereas to join dissimilar or ferric metals, use a protect housing with
pull back fire
insulation
silver alloy rod, either flux coated or with a separate. damp cloth
• Use a double tip torch.

8
Location and fixing
The unit should always be installed in a location that ensures clean air flow. It is recommended that a clearance of 300 mm
from the wall (or the next unit) be maintained from the unit’s left and rear panels whereas a clearance of 500 mm must be
maintained from the unit’s right, top and front panels (seen facing the front of the unit). Both service access and airflow
have been considered in making these recommendations. Where multiple units are to be installed in the same location, the
contractor needs to consider each individual case carefully. There can be many variations of unit quantities and available space
and it is not the intention of this manual to go over these. Ideally, the unit should be mounted on a solid concrete slab with
anti-vibration pads between unit feet and concrete. However the ZX condensing unit has also been designed for wall mounting
on suitable brackets. Wall mounting brackets are not included. Another factor to consider in finding a good installation site is
the direction of the prevailing wind. For example if the air leaving the condenser faces the prevailing wind, the air flow through
the condenser can be impeded, causing high condensing temperatures ultimately resulting in reducing unit life. A baffle is a
remedy for this situation.
500

1029 500 352 300

Power
Supply Hole
2 Holes 15mm DIA
Suction
Service Valve
Liquid
840

Service Valve 94
388

110
172

23 2-R7.5MM GROOVE
580
90

424
300 70 70 500 Single Fan Unit
2 to 4 HP

Fixing dimensions and distances - Single fan unit


500

1029 500 352 300

2 Holes 15mm DIA

Power
Supply Hole
1242

388

Suction
Service Valve
110

Liquid
94
Service Valve 2-R7.5MM GROOVE 580
172

23
90

Dual Fan Unit


424 4 to 7.6 HP
300 70 70 500

Fixing dimensions and distances - Dual fan unit

9
ZX Platform Condensing Unit

Start Up and Operation


Before commissioning, ensure that all valves on the condensing unit are fully opened.

Evacuation
The evacuation procedure is based upon achieving an actual system vacuum standard and is not time dependent. Before the
installation is put into commission, it has to be evacuated with a vacuum pump. Proper evacuation reduces residual moisture
to 50ppm. The installation of adequately sized access valves at the furthest point from the compressor in the suction and liquid
lines is advisable. To achieve undisturbed operation, the compressor valves are closed and the system is evacuated down to
0.3 mbar / 0.225 Torr. Pressure must be measured using a vacuum pressure (Torr) gauge on the access valves and not on the
vacuum pump; this serves to avoid incorrect measurements resulting from the pressure gradient along the connecting lines to
the pump.

Charging procedure

Refrigerant charging procedure


The scroll compressor design requires system charging as quickly as possible with liquid refrigerant into the liquid line. This will
avoid running the compressor under conditions where there is insufficient suction gas. Sufficient suction gas is available to cool
not only the motor but also the scrolls. Temperature builds up very quickly in the scrolls if this is not done. Do not charge vapor
(gas) refrigerant into the ZX Scroll unit. The suction service valve must not be fully closed at any time while the compressor is
running. To do so would cause damage to the compressor in the same manner as explained above. This valve is provided for
ease of connection and for the fitting of service gauges without removing the unit panel. It is recommended to charge the ZX
unit with refrigerant via its service valves. It is recommended to break the vacuum in the system with a partial charge of the
refrigerant, before starting the system. For charge adjustment, it is recommended to check the liquid sight glass just before the
expansion valve.

Oil charging procedure


Emerson ZX condensing units are supplied only with a compressor oil charge. After commissioning, the oil level should be
checked and topped up if necessary. The oil level should be approximately halfway up the sight glass (ZXL/ZXD units). Oil can be
charged through the Schraeder valve on suction valve.

Scroll compressor rotation direction


Scroll compressors, like several other types of compressors, will only compress in one rotational direction. The direction of
rotation is not an issue with single-phase compressors since they will always start and run in the proper direction. Three-
phase compressors will rotate in either direction depending upon the phasing of the power. Since there is a 50-50 chance of
connecting power in such a way that causes rotation in the reverse direction, it is important to include notices and instructions
in appropriate locations on the equipment to ensure proper rotation direction when the system is installed and operated.

Maximum compressor cycle


Maximum permitted starts per hour is 10.

Check before starting & during operation


Both valves should be fully opened on the liquid line, in order to prevent trapping liquid.
• Check that all valves are fully opened.
• After starting and operation conditions are stabilized, it is recommended to check the oil level in compressor(s) and see if
there is a need to add oil to ensure a sufficient oil level (halfway up the sight glass).

Diagnostic Initialization Message (ZX-MT and ZXL-LT)


When the unit is initially powered on, the diagnostic module will show the following signals.

(1 second)- > (3 seconds)- > (3 seconds)->

- Software Version No.

- Unit Identification Code


“F”-With OD Fan Speed Control; “-”- W/O OD Fan Speed Control
“-” - ZX; “L” - ZXL

- Power On
LED 2
LED 1

10
Diagnostic messaging - LED definition (ZX-MT and ZXL-LT)
LED1-Unit Status LED2-Error/Warning Code Controller
Controller
Pause Unit
Dis- Display Warning Signal Lock Unit
Display Status Error/Warning Automatic
play Manual Reset
Reset

Idle (Stop When


No error/warning
Reach To Set-point)
Compressor Phase Error (Wrong Phase Sequence/Loss of Every Protec-
Run Every Protection Action NA
Phase) tion Action
About To Start 1 Compressor Inside Thermal Protector Trip Every Protection Action NA NA
<5 times
6th Protection
Defrost Compressor Over Current Every Protection Action Protection In
In 1 Hour
1 Hour
ZX: <5 times
ZX: <6th
Protection In 1
Protection In 1
Stop Due to Error Overheat Every Protection Action Hour
Hour
ZXL: Every
ZXL: NA
Protection
<5 times
6th Protection
Lockout Compressor High Pressure Cut Out Every Protection Action Protection In 1
In 1 Hour
Hour
2 Every
Compressor Low Pressure Cut Out Every Protection Action NA
Protection
<5 times
DLT Thermistors Failure Every Protection Action Protection In 1 NA
Hour
Ambient Temperature Sensor Failure Every Protection Action NA NA

Mid-coil Temperature Sensor Failure Every Protection Action NA NA

PHE Vapor In Temperature Sensor Failure or Over Range 3 Every Protection Action NA NA

PHE Vapor Out Temperature Sensor Failure or Over Range 3 Every Protection Action NA NA

System Liquid Flood Back Warning ~20% Liquid Back NA NA

Notes:
1 New start, normal start by program and any start request delay
2 “LP Cutout”signal is not applicable in ZXL condensing unit.
3 PHE Vapor In/Out temperature sensor is not applicable in ZX medium temperature condensing unit.

Alarm messaging - Digital scroll controller (ZXD)


Alarm Mode Set Points Controller Actions Reset Remarks
DLT >= dtL after dLd time
dtL - Compressors are turned off Auto reset when DLT < dtL-dLH DLT
delay
Low pressure is lower than ELP - Compressors are turned off
E01L Auto reset when LP >= ELP(Level 3) LP
(Level 3 Parameter) - Fans are unchanged
Auto reset when Number of
activations < PEn in PEi time LP

Mechanical LP - Compressors are turned off Manual reset when Number of


E0L switch opens activations >= PEn in PEi time
- Fans are unchanged
LP
- Press key for 3 sec or
- Turn off and on the unit

C-LA LP < LAL - Signaling only Auto reset when LP = LAL + delta (0.3bar) LP

C-HA LP >= HAL - Signaling only Auto reset when LP = HAL -delta (0.3bar) LP
Auto reset when Number of activations
< PEn in PEi time Cond Mid Temp.
Condensing Temperature - Compressors are turned off - Fans are Manual reset when Number of activations
E0H High turned on >= PEn in PEi time
Cond Mid
- Press key for 3 sec or - Turn off and on the unit

F-HA HP >= HAF - HFC = yes, compressor are turned off Auto reset when HAF + delta (0.3bar) Cond Mid Temp.
Suction Transducer failure or - Compressors are activated according
P1 Auto reset when probe is normal LP
out of range to SPr or PoPr
Condenser Mid Coil Sensor
P2 - Fans are activated according to FPr Auto reset when probe is normal Cond Mid Temp.
failure or out of range
Discharge Temp Sensor failure -The functions related to No.3 probe
P3 Auto reset when probe is normal DLT
or out of range are disabled
DLT: Discharge line temperature
LP: Low pressure
HP: High pressure

11
ZX Condensing Unit Wiring Diagram
PFJ: 220V-50 Hz -1Ph
ATTENTION: Unit MUST be grounded!

BLUE
ZX Platform Condensing Unit

12
13
ZX/ZXL Condensing Unit Wiring Diagram
TFD: 380V/420V -50 Hz-3Ph
TF7: 380V-60 Hz -3Ph

ATTENTION: Unit MUST be grounded!

5.Only ZXL TF5 has 4 additional posts on


the terminal block.
ZX/ZXL Condensing Unit Wiring Diagram
TF5: 200/230V- 50 Hz/ 60 Hz - 3Ph

ATTENTION: Unit MUST be grounded!


ZX Platform Condensing Unit

14
15
ZXD Condensing Unit Wiring Diagram
(With Fan Speed Control Function)
TFD: 380V/420V -50 Hz-3Ph ATTENTION:Unit MUST be grounded!
ZXD Condensing Unit Wiring Diagram (With Fan Speed Control Function)
TF7: 380V-60 Hz-3Ph
TFD - 380/420V, 50Hz, 3Ph Notes:
TF7 - 380V, 60Hz, 3Ph
Dashed line " " is wired by installer.
ATTENTION: Unit MUST be grounded!
052-2662-00
2012-02-15

U V W N COND. Mid
Compressor DLT Coil Temp. Pressure
Sensor LP Switch
Sensor Transducer

1 3 5 Brown White

Circuit
Black Breaker N
M1 "I" 2 4 6
White
Black
Capacitor1 Blue
E
White Fuse
(2A/250V)
Terminal 1 2 3 4 5 6 7 8 9 10 11 12 N N N
Block
Blue L1 T1 Blue
Yellow L2 T2 Yellow
Red L3 T3 Red Blue
Blue Red
Aux 21N/C 22N/C Red
Black PWM Valve
A1 A2 Black
Black
M2
White
Contactor
Capacitor2
E
White Out
0~10V
4~20mA
T1(U)
15 17 19
+ - + -
16 18 20
21 22 23 24
Internal motor Digital Scroll
protector Controller
T2(V) Pb3Pb1Pb2 LP Id3 Id1 HP i2F
Hot KeY / TTL
1 3 5 7 9 11 13 - + - +
T3(W) 2 4 6 8 10 12 14 25 26 27 28

1 3 10 12 COMP'R
E
Fan Speed Controller Crankcase Heater
1 2 HP Switch
15 16 22 23 24
Transformer
Input: Output:
230VAC 12VAC
ZXD Condensing Unit Wiring Diagram
(without Fan Speed Control Function)
TFD: 380V/420V-50 Hz-3Ph
ATTENTION:Unit MUST be grounded!
TF7: 380V- 60 Hz-3Ph
ZXD Condensing Unit Wiring Diagram (Without Fan Speed Control Function)
TFD - 380/420V, 50Hz, 3Ph Notes:
TF7 - 380V, 60Hz, 3Ph
ATTENTION: Unit MUST be grounded! Dashed line " " is wired by installer.
052-2677-00
2012-03-28

U V W N COND. Mid
Compressor DLT Coil Temp. Pressure
Sensor LP Switch
Sensor Transducer

1 3 5 Brown White
Circuit
Breaker N To Fan
Black
M1 To N "I" 2 4 6
White

Capacitor1 Black
Blue
E
White Fuse
(2A/250V)
Red Terminal 1 2 3 4 5 6 7 8 9 10 11 12 N N N
Block
Blue L1 T1 Blue
Yellow L2 T2 Yellow
Red L3 T3 Red Blue
Blue Red
Aux 21N/C 22N/C Red
Black PWM Valve
A1 A2 Black
Black
M2 To N
White
Contactor
Capacitor2
E
White Out
0~10V
Red 4~20mA
T1(U)
15 17 19
+ - + -
16 18 20
21 22 23 24
Internal motor Digital Scroll
protector Controller
T2(V) Pb3Pb1Pb2 LP Id3 Id1 HP i2F
Hot KeY / TTL
1 3 5 7 9 11 13 - + - +
T3(W) 2 4 6 8 10 12 14 25 26 27 28

COMP'R
E
Crankcase Heater
1 2 HP Switch
Transformer
Input: Output:
230VAC 12VAC
ZX Platform Condensing Unit

16
Contact List
Emerson Climate Technologies India - Mumbai Malaysia
Asia Pacific Headquarters Emerson Climate Technologies (India) Ltd Emerson Electric (Malaysia) Sdn. Bhd.
10/F, Pioneer Building, Unit No. 4,5,6 & 7, Bhaveshwar Arcade Level M2, Blk A, Menara PKNS-PJ
213 Wai Yip Street, Jalan Yong Shook Lin
LBS Marg, Opp. Shreyas Cinema
Kwun Tong, Kowloon, Hong Kong 46050 Petaling Jaya, Selangor, Malaysia
Ghatkopar (West)
Tel: (852) 2866 3108 Tel: (60-3) 7949 9222
Fax: (852) 2520 6227 Mumbai 400 086, Maharashtra, India Fax: (60-3) 7949 9333
Tel: (91-22) 2500 6630/ 2500 6632
Australia Fax: (91-22) 2500 6570 Middle East & Africa
Emerson Climate Technologies Australia Emerson Climate Technologies
Pty Ltd India - PUNE PO Box 26382
Unit R7, 391 Park Road Emerson Climate Technologies (India) Ltd Jebel Ali Free Zone – South
Regents Park, NSW 2143, Australia Dubai, UAE
Plot No. 23, Rajiv Gandhi Infotech Park,
Tel: (61-2) 9795 2800 Tel: (971- 4) 811 8100
Phase - II, Hinjewadi,
Fax: (61-2) 9738 1699 Fax: (971- 4) 886 5465
Pune 411 057, Maharashtra, India
China - Beijing Tel: (91-20) 2553 4988 Philippines
Emerson Climate Technologies (Suzhou) Fax: (91-20) 2553 6350 Emerson Climate Technologies
Co. Ltd 23rd Floor San Miguel Properties Centre
Beijing Sales Office Indonesia #7 St. Francis Street, Ortigas Center,
Room 1017 JianWei Building, PT Emerson Indonesia Mandaluyong City, Philippines
66 Nan Lishi Road, XiCheng District, Tel: (632) 689 7288 / (632) 479 5200
Wisma 46 - Kota BNI, 16th Floor, Suite 16.01,
Beijing, PRC
Tel: (86-10) 5763 0488 Jl. Jend.Sudirman Kav.1. Taiwan
Fax: (86-10) 5763 0499 Jakarta 10220, Indonesia Emerson Electric (Taiwan) Co. Ltd
Tel: (62)21-2513003 3F No. 2 DunHua South Road Sec.1,
China - Guangzhou Fax: (62)21-2510622 Taipei (105), Taiwan
Emerson Climate Technologies (Suzhou) Tel: (+886-2) 8161 7688
Co. Ltd Japan Fax: (+886-2) 81617614
Guangzhou Sales Office
Emerson Japan Ltd
508-509 R&F Yinglong Plaza, Thailand - Bangkok
Shin-yokohama Tosho Building
No. 76 Huangpu Road West, Emerson Electric (Thailand) Ltd
Guangzhou, PRC No. 33-9-5 Shin-Yokohama, Kohoku-ku 34th Floor Nation Tower
Tel: (86-20) 2886 7668 Yokohama 222-0033 Japan 1858/133 Bangna Trad
Fax: (86-20) 2886 7622 Tel: (81-45)475 6371 Bangkok 10260 , Thailand
Fax: (81-45)475 3565 Tel: (66-2) 716 4700
China - Shanghai Fax: (66-2) 751 4240
Emerson Climate Technologies South Korea
(Suzhou) Co. Ltd Vietnam
Emerson Electric (South Korea) Ltd.
Shanghai Sales Office Emerson Climate Technologies - Vietnam
3F Pharos Tower, 119 Nonhyeon-dong
1801 Building B, New CaoHeJing Suite 307-308,
International Business Center, Gangnam-gu, Seoul, South Korea 135-010 123 Truong Dinh St., Dist.3
391Guiping Rd, Shanghai, PRC Tel: (82-2) 3483-1500 Ho Chi Minh, Vietnam
Tel: (86-21) 3418 3968 Fax: (82-2) 592-7883 / 592-7886 Tel: 84 908 009 189

EmersonClimate.com/Asia
Asia 02 A01 10 – R00 Issued 4/2012
Emerson, Copeland PerformanceAlert and Copeland Scroll are trademarks of Emerson Electric Co. or one of its affiliated companies.
©2011 Emerson Climate Technologies, Inc. All rights reserved.