SDP - Casting Area
SDP - Casting Area
8600
CISTERN TANK ELEV. = 11.50 M =18.00M ELEV. = 11.50 M =18.00M ELEV. = 11.50 M =18.00M
ABMANAGA "®"
PUMP ROOM
ABMANAGA "®"
THONNY
ÑAGA
MA
ÑAGA
MATHONNY
THONNY
ÑAGA
MA
ÑAGA
MATHONNY
SUMP PIT
THONNY
ÑAGA
MA
ÑAGA
MATHONNY
ABMANAGA "®"
ABMANAGA "®"
CISTERN PUMP S T AI N L ES S ST EEL G U T T ER
S T A IN L E S S S T E E L G U T T E R
S T A IN L E S S S T E E L G U T T E R
700cu.m. 700cu.m. 700cu.m. 700cu.m. 700cu.m. 700cu.m. 700cu.m. 700cu.m. 700cu.m. 700cu.m.
50 % S L O P E
50 % S L O P E
LOS ANGELES
ABRASION TESTING
MACHINE
2000
ELEV. = 8.00 M AGGREGATES BIN LEVEL (HOPPER) AGGREGATES BIN LEVEL (HOPPER)
10 % S L O P E
ELEV. = 11.00 M =18.30M 50 % S L O P E
ELEV. = 11.00 M =18.30M
BAGGER MIXER
S T A I NL E S S S T E E L G UT T E R
ELEV. = 4.50 M
CHUTE TO CONVEYOR
PROPOSED CEMENT LABORATORY
SLOPE PROTECTION
ELEV. = .30 M =7.30 M
10 20 30 40 50 60 80
BATCHING PLANT P R O P O S E D 1 0 . 0 0 M W I D E A C C E S S R O A D
E.P.
TRENCH DRAINS
TRENCH DRAINS
POWERHOUSE/
STEEL
FABRICATION AREA SUBSTATION
TRENCH DRAINS
TRENCH DRAINS
TRENCH DRAINS
5000
TRENCH DRAINS
TRENCH DRAINS
TRENCH DRAINS
TRENCH FOR STEAM CURRING PIPES
GIRDER
FABRICATION AREA
TRENCH DRAINS
TRENCH DRAINS
TRENCH DRAINS
STOCKING AREA STOCKING AREA
(FPT)
(FPT)
(FPT)
(FPT)
(FPT)
(FPT)
(P)
(P)
(P)
(S)
(S)
(S)
60000
LOADING AREA
TRUCK
01
01
01
IMC-LCT 01
IMC-LCT 01
IMC-LCT 01
CRANE CRANE
PORT
PSC GIRDERS
BARGE
OILER
OILER
OILER
ENGINE ROOM
ENGINE ROOM
ENGINE ROOM
TOILET
TOILET
TOILET