0% found this document useful (0 votes)
28 views

Bill

Uploaded by

ranav.vipul911
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
28 views

Bill

Uploaded by

ranav.vipul911
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

HIMACHAL PRADESH STATE ELECTRICITY BOARD LIMITED (A State Govt.

Undertaking)
Electricity Bill January-24 HPSEBL Help Line No. : 18001808060 or 1912
Sub-Division: - BHARWARNA CGRF: B No.8 SDA Complex,Kasumpti [email protected] 0177-2626104
SUB-DIVISION Electricity Ombudsman: First Floor, Sharma Sadan, Khalini Shimla-2
Sub-Division code: - 2234 [email protected], 0177-2624525
Consumer Info
Name SH. RAVINDER SINGH RANA Consumer Id 200000035542 Bill No. 200020463917
Address S/O SH. MOOL RAJ Legacy A/c no. Issue Date 24.01.2024
VILL PALHOONI, PO Installation No 5002093893 Last Reading Date 18.12.2023
MALNOO, Std.Supply Voltage(kV) 0.23 Current Reading Date 16.01.2024
TEH-PALAMPUR,DISTT KANGRA Availed Supply Vol(kV) 0.23 Cash/Draft Due Date 27.01.2024
H.P 2234 176083 02 Metering Voltage(kV) 0.23 Chq. Clrnce. Due Date 27.01.2024
Tariff Category DS - Lifeline Billing Days 29
Connected Load(kW) 6.48
Meter Reading Unit B22340PU

Meter Reading & Consumption


Meter No. New Old Difference Multiplier Adjustment/ Consumption
Reading Reading Estimated units

Total kWh Energy 16316805 3591.000 3565.000 26.000 1.000 0 26.000


Power Factor
Concession unit

Bill Particulars
Particulars Base Value Rate Amount (Rs.)
Energy Charge 26.000 kWh 3.72 (Rs./kWh) 96.72

Disturbing Load Penalty 0


GoHP Subsidy on Energy Charge 26.000 kWh 3.72 (Rs./kWh) -96.72

Total Board Employee Consession 0


Fixed Charge 29 Days 55.00 (Rs./Month) 52.44
Fixed Charges GoHP Subsidy -52.44
Meter Rent 29 Days 0.00 (Rs./Month) 0.00

Net Current SOP 0


Electricity Duty 0.00 (Rs.) 3.000 % 0
MC Tax 0.000 kWh 0.00 (Paisa/unit) 0

Payment Info
Security Deposit (Cash) Rs.1680.00 SOP(Rs.) ED(Rs.) M.Tax(Rs.) Other(Rs.) Total (Rs.)
Security Deposit (BG) Current Charges 0 0 0 0

BG Expiry Date Sundry $ 0 0


Neg. Sundry$ 0
Last Bill Paid Amount Rs.421.00
Allowances
Last Bill Paid date 22.03.2023 Normal Arrear # 0 0 0.00 0
Disputed Arrears @ 0.00 0.00 0.00 0
Othrs/Adv/Int(Cr/Dr) -96.87 -96.87
TCS/TDS charge 0
Amt Before Due Date 0 0 0 -96.87 0
Late Payment Surch. 0.00
Total Amount Payable 0.00 0 0 -96.87 0
After Due Date

1 Excess AmountRs.96.87will be adjusted in next bill


2 : Advance Amount0.35-Rs.has been Released
3 Normal Meter Reading (SBM)
4 Electricity Duty calculated on Energy Charge

You might also like