0% found this document useful (0 votes)
17 views12 pages

BWC17234ACIANN1

Uploaded by

6qhhg4tytd
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
17 views12 pages

BWC17234ACIANN1

Uploaded by

6qhhg4tytd
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 12

BWM.2/Circ.34/Rev.

6
Annex 1, page 1

ANNEX 1

LIST OF BALLAST WATER MANAGEMENT SYSTEMS THAT MAKE USE OF ACTIVE SUBSTANCES WHICH RECEIVED
BASIC APPROVAL IN ACCORDANCE WITH PROCEDURE (G9)

Name of the system and Relevant


MEPC document related Name of GESAMP-Ballast Date of
Specifications
to the proposal for manufacturer Water Working Basic Approval
Basic Approval Group report
1. Peraclean® Ocean Degussa GmbH, MEPC 54/2/12, 24 March 2006 Flag State Administration was invited to authorize
(subsequently changed to Germany annex 5 (MEPC 54) onboard testing only when the concerns identified
SEDNA® Ballast Water in annex 5 of the report of the first meeting of
Management System the GESAMP-BWWG (MEPC 54/2/12) had been
(using Peraclean® Ocean)) addressed to its complete satisfaction.
MEPC 53/2/12 (Germany)
2. Electro-Clean (electrolytic Techcross Ltd. and MEPC 54/2/12, 24 March 2006 Flag State Administration was invited to authorize
disinfection) system Korea Ocean annex 6 (MEPC 54) onboard testing only when the concerns identified in
(subsequently changed to Research and annex 6 of the report of the first meeting of the
Electro-Cleen™) Development GESAMP–BWWG (MEPC 54/2/12) had been
Institute (KORDI) addressed to its complete satisfaction.
MEPC 54/2/3
(Republic of Korea)
3. Special Pipe Ballast Water Japan Association MEPC 55/2/16, 13 October 2006 Flag State Administration was invited to take into
Management System (combined of Marine Safety annex 5 (MEPC 55) account all the recommendations indicated in
with Ozone treatment) (JAMS) annex 5 of the report of the second meeting of the
GESAMP-BWWG (MEPC 55/2/16) during further
MEPC 55/2 (Japan) development of the system.
4. EctoSys™ electrochemical Permascand AB, MEPC 55/2/16, 13 October 2006 Flag State Administration was invited to take into
system Sweden, annex 7 (MEPC 55) account all the recommendations indicated in annex 7 of
subsequently the report of the second meeting of the
MEPC 55/2/4 (Sweden) acquired by RWO GESAMP-BWWG (MEPC 55/2/16) during further
GmbH, Germany development of the system.

I:\CIRC\BWM\02\BWM.2-CIRC.34-REV.6.docx
BWM.2/Circ.34/Rev.6
Annex 1, page 2

Name of the system and Relevant


MEPC document related Name of GESAMP-Ballast Date of
Specifications
to the proposal for manufacturer Water Working Basic Approval
Basic Approval Group report
5. PureBallast System Alfa Laval/ MEPC 56/2/2, 13 July 2007 Not applicable.
Wallenius Water AB annex 5 (MEPC 56)
MEPC 55/2/5 (Sweden)
6. NK Ballast Water NK Company Ltd., MEPC 56/2/2, 13 July 2007 Flag State Administration was invited to take into
Treatment System Republic of Korea annex 6 (MEPC 56) account all the recommendations indicated in
(subsequently changed annex 6 of the report of the third meeting of the
to NK-O3 BlueBallast GESAMP-BWWG (MEPC 56/2/2) during further
System (Ozone)) development of the system.

MEPC 55/2/3 and


MEPC 55/2/27
(Republic of Korea)
7. Hitachi Ballast Water Hitachi, Ltd. MEPC 57/2, 4 April 2008 Flag State Administration was invited to take into
Purification System /Hitachi Plant annex 5 (MEPC 57) account all the recommendations indicated in
(ClearBallast) Technologies, Ltd. annex 5 of the report of the fourth meeting of the
GESAMP-BWWG (MEPC 57/2) during further
MEPC 57/2/2 (Japan) development of the system.
8. Resource Ballast Resource Ballast MEPC 57/2/10, 4 April 2008 Flag State Administration was invited to take into
Technologies System Technologies (Pty) annex 5 (MEPC 57) account all the recommendations indicated in
Ltd. annex 5 of the report of the fifth meeting of the
MEPC 56/2/3 (South Africa) GESAMP-BWWG Group (MEPC 57/2/10) during
further development of the system.
9. GloEn-Patrol™ Ballast Water Panasia Co., Ltd. MEPC 57/2/10, 4 April 2008 Flag State Administration was invited to take into
Management System annex 6 (MEPC 57) account all the recommendations indicated in
annex 6 of the report of the fifth meeting of the
MEPC 57/2/4 GESAMP-BWWG (MEPC 57/2/10) during further
(Republic of Korea) development of the system.

I:\CIRC\BWM\02\BWM.2-CIRC.34-REV.6.docx
BWM.2/Circ.34/Rev.6
Annex 1, page 3

Name of the system and Relevant


MEPC document related Name of GESAMP-Ballast Date of
Specifications
to the proposal for manufacturer Water Working Basic Approval
Basic Approval Group report
10. OceanSaver® Ballast Water MetaFil AS MEPC 57/2/10, 4 April 2008 Flag State Administration was invited to take into
Management System (subsequently annex 8 (MEPC 57) account all the recommendations indicated in
changed to annex 8 of the report of the fifth meeting of the
MEPC 57/2/6 (Norway) OceanSaver AS) GESAMP-BWWG (MEPC 57/2/10) during further
development of the system.
11. TG Ballastcleaner and The Toagosei MEPC 58/2/7, 10 October 2008 Flag State Administration was invited to take into
TG Environmentalguard Group (TG annex 5 (MEPC 58) account all the recommendations indicated in
System Corporation, annex 5 of the report of the sixth meeting of the
Toagosei Co. Ltd. GESAMP-BWWG (MEPC 58/2/7) during further
MEPC 57/2/8 (Japan) and Tsurumi Soda development of the system.
Co., Ltd.)
12. Greenship Sedinox Ballast Greenship Ltd. MEPC 58/2/7, 10 October 2008 Flag State Administration was invited to take into
Water Management System annex 6 (MEPC 58) account all the recommendations indicated in
annex 6 of the report of the sixth meeting of the
MEPC 57/2/7 (Netherlands) GESAMP-BWWG (MEPC 58/2/7) during further
development of the system.

13. Ecochlor® Ballast Water Ecochlor, INC, MEPC 58/2/8, 10 October 2008 Flag State Administration was invited to take into
Treatment System Acton annex 5 (MEPC 58) account all the recommendations indicated in
(USA) annex 5 of the report of the seventh meeting of the
MEPC 58/2/2 (Germany) GESAMP-BWWG (MEPC 58/2/8) during further
development of the system.
14. Blue Ocean Shield Ballast China Ocean MEPC 59/2/16, 17 July 2009 Flag State Administration was invited to take into
Water Management System Shipping (Group) annex 7 (MEPC 59) account all the recommendations indicated in
Company annex 7 of the report of the eighth meeting of the
MEPC 59/2/2 (China) (COSCO) GESAMP-BWWG (MEPC 59/2/16) during further
development of the system.

I:\CIRC\BWM\02\BWM.2-CIRC.34-REV.6.docx
BWM.2/Circ.34/Rev.6
Annex 1, page 4

Name of the system and Relevant


MEPC document related Name of GESAMP-Ballast Date of
Specifications
to the proposal for manufacturer Water Working Basic Approval
Basic Approval Group report
15. Hyundai Heavy Industries Co., Hyundai Heavy MEPC 59/2/16, 17 July 2009 Flag State Administration was invited to take into
Ltd. (HHI) Ballast Water Industries Co., Ltd., annex 8 (MEPC 59) account all the recommendations indicated in
Management System Republic of Korea annex 8 of the report of the eighth meeting of the
(EcoBallast) GESAMP-BWWG (MEPC 59/2/16) during further
development of the system.
MEPC 59/2/4
(Republic of Korea)
16. AquaTriComb™ Ballast Water Aquaworx ATC MEPC 59/2/19, 17 July 2009 Flag State Administration was invited to take into
Treatment System GmbH annex 6 (MEPC 59) account all the recommendations indicated in
annex 6 of the report of the ninth meeting of the
MEPC 59/2/8 GESAMP-BWWG (MEPC 59/2/19) during further
(Germany) development of the system.
17. SiCURE™ Ballast Water Siemens Water MEPC 60/2/11, 26 March 2010 Flag State Administration was invited to take into
Management System Technologies annex 6 (MEPC 60) account all the recommendations indicated in
annex 6 of the report of the tenth meeting of the
MEPC 59/2/11 (Germany) GESAMP-BWWG (MEPC 60/2/11) during further
development of the system.
18. Sunrui Ballast Water Qingdao Sunrui MEPC 60/2/12, 26 March 2010 Flag State Administration was invited to take into
Management System Corrosion and annex 6 (MEPC 60) account all the recommendations indicated in
(subsequently changed to Fouling Control annex 6 of the report of the eleventh meeting of the
BalClor Ballast Water Company GESAMP-BWWG (MEPC 60/2/12) during further
Management System) development of the system.

MEPC 60/2/3 (China)


19. DESMI Ocean Guard Ballast DESMI Ocean MEPC 60/2/12, 26 March 2010 Flag State Administration was invited to take into
Water Management System Guard A/S annex 7 (MEPC 60) account all the recommendations indicated in annex 7
of the report of the eleventh meeting of the
MEPC 60/2/4 (Denmark) GESAMP-BWWG (MEPC 60/2/12) during further
development of the system.

I:\CIRC\BWM\02\BWM.2-CIRC.34-REV.6.docx
BWM.2/Circ.34/Rev.6
Annex 1, page 5

Name of the system and Relevant


MEPC document related Name of GESAMP-Ballast Date of
Specifications
to the proposal for manufacturer Water Working Basic Approval
Basic Approval Group report
20. Blue Ocean Guardian Ballast 21st Century MEPC 60/2/12, 26 March 2010 Flag State Administration was invited to take into
Water Management System Shipbuilding Co., annex 8 (MEPC 60) account all the recommendations indicated in
(subsequently changed to Ltd. annex 8 of the report of the eleventh meeting of the
"ARA Ballast" Ballast Water GESAMP-BWWG (MEPC 60/2/12) during further
Management System) development of the system.

MEPC 60/2/5
(Republic of Korea)
21. Hyundai Heavy Industries Co., Hyundai Heavy MEPC 60/2/16, 26 March 2010 Flag State Administration was invited to take into
Ltd. (HHI) Ballast Water Industries Co., Ltd., annex 4 (MEPC 60) account all the recommendations indicated in
Management System Republic of Korea annex 4 of the report of the twelfth meeting of the
(HiBallast) GESAMP-BWWG (MEPC 60/2/16) during further
development of the system.
MEPC 60/2/6
(Republic of Korea)
22. Kwang San Co., Ltd. (KS) Kwang San Co., MEPC 60/2/16, 26 March 2010 Flag State Administration was invited to take into
Ballast Water Management Ltd. annex 5 (MEPC 60) account all the recommendations indicated in
System "En-Ballast" annex 5 of the report of the twelfth meeting of the
GESAMP-BWWG (MEPC 60/2/16) during further
MEPC 60/2/7 development of the system.
(Republic of Korea)
23. OceanGuard™ Ballast Water Qingdao Headway MEPC 60/2/16, 26 March 2010 Flag State Administration was invited to take into
Management System Technology Co., annex 6 (MEPC 60) account all the recommendations indicated in annex 6
Ltd. of the report of the twelfth meeting of the
MEPC 60/2/8 (Norway) GESAMP-BWWG (MEPC 60/2/16) during further
development of the system.

I:\CIRC\BWM\02\BWM.2-CIRC.34-REV.6.docx
BWM.2/Circ.34/Rev.6
Annex 1, page 6

Name of the system and Relevant


MEPC document related Name of GESAMP-Ballast Date of
Specifications
to the proposal for manufacturer Water Working Basic Approval
Basic Approval Group report
24. Severn Trent De Nora Severn Trent MEPC 60/2/16, 26 March 2010 Flag State Administration was invited to take into
BalPure® Ballast Water De Nora (STDN), annex 7 (MEPC 60) account all the recommendations indicated in
Management System LLC annex 7 of the report of the twelfth meeting of the
(subsequently changed to GESAMP-BWWG (MEPC 60/2/16) during further
BalPure® BP-500) development of the system.

MEPC 60/2/9 (Germany)


25. Techwin Eco Co., Ltd. (TWECO) Techwin Eco Co., MEPC 61/2/15, 1 October 2010 Flag State Administration was invited to take into
Ballast Water Management Ltd. annex 4 (MEPC 61) account all the recommendations indicated in
System (Purimar) annex 4 of the report of the thirteenth meeting of the
(subsequently changed to GESAMP-BWWG (MEPC 61/2/15) during further
Purimar Ballast Water development of the system.
Management System)
MEPC 61/2
(Republic of Korea)
26. AquaStar Ballast Water AQUA Eng. Co., MEPC 61/2/15, 1 October 2010 Flag State Administration was invited to take into
Management System Ltd. annex 5 (MEPC 61) account all the recommendations indicated in
(subsequently changed to annex 5 of the report of the thirteenth meeting of the
AquaStar™ BWMS and GESAMP-BWWG (MEPC 61/2/15) during further
MACGREGOR WATER development of the system.
BALLAST TREATMENT
SYSTEM)

MEPC 61/2/1
(Republic of Korea)

I:\CIRC\BWM\02\BWM.2-CIRC.34-REV.6.docx
BWM.2/Circ.34/Rev.6
Annex 1, page 7

Name of the system and Relevant


MEPC document related Name of GESAMP-Ballast Date of
Specifications
to the proposal for manufacturer Water Working Basic Approval
Basic Approval Group report
27. Kuraray Ballast Water Kuraray Co., Ltd. MEPC 61/2/21, 1 October 2010 Flag State Administration was invited to take into
Management System annex 4 (MEPC 61) account all the recommendations indicated in
(subsequently changed to annex 4 of the report of the fourteenth meeting of the
MICROFADETM Ballast Water GESAMP-BWWG (MEPC 61/2/21) during further
Management System) development of the system.

MEPC 61/2/6 (Japan)


28. ERMA FIRST Ballast Water ERMA FIRST ESK MEPC 62/2/11, 15 July 2011 Flag State Administration was invited to take into
Management System ENGINEERING annex 5 (MEPC 62) account all the recommendations indicated in
(subsequently changed to SOLUTIONS S.A. annex 5 of the report of the fifteenth meeting of the
ERMA FIRST BWTS) GESAMP-BWWG (MEPC 62/2/11) during further
development of the system.
MEPC 61/2/11 (Greece)
29. BlueSeas Ballast Water Envirotech and MEPC 62/2/11, 15 July 2011 Flag State Administration was invited to take into
Management System Consultancy Pte. annex 6 (MEPC 62) account all the recommendations indicated in
Ltd. annex 6 of the report of the fifteenth meeting of the
MEPC 61/2/12 (Singapore) GESAMP-BWWG (MEPC 62/2/11) during further
development of the system.
30. SKY-SYSTEM® with Katayama MEPC 62/2/12, 15 July 2011 Flag State Administration was invited to take into
Peraclean® Ocean Ballast Chemical, Inc. annex 4 (MEPC 62) account all the recommendations indicated in
Water Management System annex 4 of the report of the sixteenth meeting of the
GESAMP-BWWG (MEPC 62/2/12) during further
MEPC 62/2 (Japan) development of the system.
31. JFE BallastAce that makes JFE Engineering MEPC 62/2/12, 15 July 2011 Flag State Administration was invited to take into
use of NeoChlor Marine® Corporation annex 5 (MEPC 62) account all the recommendations indicated in
Ballast Water Management annex 5 of the report of the sixteenth meeting of the
System GESAMP-BWWG (MEPC 62/2/12) during further
development of the system.
MEPC 62/2/1 (Japan)

I:\CIRC\BWM\02\BWM.2-CIRC.34-REV.6.docx
BWM.2/Circ.34/Rev.6
Annex 1, page 8

Name of the system and Relevant


MEPC document related Name of GESAMP-Ballast Date of
Specifications
to the proposal for manufacturer Water Working Basic Approval
Basic Approval Group report
32. BallastMaster Ballast Water GEA Westfalia MEPC 62/2/12, 15 July 2011 Flag State Administration was invited to take into
Management System Separator Systems annex 6 (MEPC 62) account all the recommendations indicated in
GmbH annex 6 of the report of the sixteenth meeting of the
MEPC 62/2/2 (Germany) GESAMP-BWWG (MEPC 62/2/12) during further
development of the system.
33. BlueWorld Ballast Water Envirotech and MEPC 62/2/12, 15 July 2011 Flag State Administration was invited to take into
Management System Consultancy Pte. annex 7 (MEPC 62) account all the recommendations indicated in
Ltd. annex 7 of the report of the sixteenth meeting of the
MEPC 62/2/3 (Singapore) GESAMP-BWWG (MEPC 62/2/12) during further
development of the system.
34. Neo-PurimarTM Ballast Water SAMSUNG MEPC 62/2/18, 15 July 2011 Flag State Administration was invited to take into
Management System HEAVY annex 7 (MEPC 62) account all the recommendations indicated in
INDUSTRIES Co., annex 7 of the report of the sixteenth meeting of the
MEPC 62/2/7 Ltd. GESAMP-BWWG (MEPC 62/2/18) during further
(Republic of Korea) development of the system.
35. "Smart Ballast" Ballast Water STX Metal Co., MEPC 63/2/10, 2 March 2012 Flag State Administration was invited to take into
Management System Ltd. annex 4 (MEPC 63) account all the recommendations indicated in
annex 4 of the report of the eighteenth meeting of
MEPC 62/2/8 the GESAMP-BWWG (MEPC 63/2/10) during further
(Republic of Korea) development of the system.
36. DMU ·OH Ballast Water Dalian Maritime MEPC 63/2/11, 2 March 2012 Flag State Administration was invited to take into
Management System University annex 4 (MEPC 63) account all the recommendations indicated in
annex 4 of the report of the nineteenth meeting of
MEPC 63/2 (China) the GESAMP-BWWG (MEPC 63/2/11) during further
development of the system.
37. EcoGuardianTM Ballast Water Hanla IMS Co., MEPC 63/2/21, 2 March 2012 Flag State Administration was invited to take into
Management System Ltd. annex 4 (MEPC 63) account all the recommendations indicated in
annex 4 of the report of the twentieth meeting of the
MEPC 63/2/4 GESAMP-BWWG (MEPC 63/2/21) during further
(Republic of Korea) development of the system.

I:\CIRC\BWM\02\BWM.2-CIRC.34-REV.6.docx
BWM.2/Circ.34/Rev.6
Annex 1, page 9

Name of the system and Relevant


MEPC document related Name of GESAMP-Ballast Date of
Specifications
to the proposal for manufacturer Water Working Basic Approval
Basic Approval Group report
38. KTM-Ballast Water Korea Top Marine MEPC 64/2/6, 5 October 2012 Flag State Administration was invited to take into
Management System (KT Marine) Co., annex 5 (MEPC 64) account all the recommendations indicated in
Ltd. annex 5 of the report of the twenty-first meeting of
MEPC 63/2/8 the GESAMP-BWWG (MEPC 64/2/6) during further
(Republic of Korea) development of the system.
39. Hamworthy AquariusTM-EC Hamworthy Water MEPC 64/2/6, 5 October 2012 Flag State Administration was invited to take into
BWMS Systems Ltd. annex 6 (MEPC 64) account all the recommendations indicated in
annex 6 of the report of the twenty-first meeting of
MEPC 63/2/9 the GESAMP-BWWG (MEPC 64/2/6) during further
(Netherlands) development of the system.
40. OceanDoctor Ballast Water Jiujiang Precision MEPC 64/2/7, 5 October 2012 Flag State Administration was invited to take into
Management System Measuring annex 4 (MEPC 64) account all the recommendations indicated in
Technology annex 4 of the report of the twenty-second meeting
MEPC 64/2 (China) Research Institute of the GESAMP-BWWG (MEPC 64/2/7) during
further development of the system.
41. HS-BALLAST Ballast Water HWASEUNG R&A MEPC 64/2/19, 5 October 2012 Flag State Administration was invited to take into
Management System Co., Ltd. annex 4 (MEPC 64) account all the recommendations indicated in
annex 4 of the report of the twenty-third meeting of
MEPC 64/2/3 the GESAMP-BWWG (MEPC 64/2/19) during further
(Republic of Korea) development of the system.
42. GloEn-SaverTM Ballast Water PANASIA Co., Ltd. MEPC 64/2/19, 5 October 2012 Flag State Administration was invited to take into
Management System annex 5 (MEPC 64) account all the recommendations indicated in
annex 5 of the report of the twenty-third meeting of
MEPC 64/2/4 the GESAMP-BWWG (MEPC 64/2/19) during further
(Republic of Korea) development of the system.
43. Van Oord Ballast Water Van Oord B.V. MEPC 65/2/9, 17 May 2013 Flag State Administration was invited to take into
Management System annex 6 (MEPC 65) account all the limitations indicated in annex 6 of the
report of the twenty-fourth meeting of the
MEPC 65/2/2 GESAMP-BWWG (MEPC 65/2/9) during further
(Netherlands) development of the system.

I:\CIRC\BWM\02\BWM.2-CIRC.34-REV.6.docx
BWM.2/Circ.34/Rev.6
Annex 1, page 10

Name of the system and Relevant


MEPC document related Name of GESAMP-Ballast Date of
Specifications
to the proposal for manufacturer Water Working Basic Approval
Basic Approval Group report
44. REDOX AS Ballast Water REDOX Maritime MEPC 65/2/19, 17 May 2013 Flag State Administration was invited to take into
Management System Technologies AS annex 4 (MEPC 65) account all the recommendations indicated in
annex 4 of the report of the twenty-fifth meeting of
MEPC 65/2/3 (Norway) the GESAMP-BWWG (MEPC 65/2/19) during further
development of the system.
45. Blue ZoneTM Ballast Water SUNBO MEPC 65/2/19, 17 May 2013 Flag State Administration was invited to take into
Management System INDUSTRIES Co., annex 6 (MEPC 65) account all the recommendations indicated in
Ltd., DSEC Co., annex 6 of the report of the twenty-fifth meeting of
MEPC 65/2/5 Ltd., and the the GESAMP-BWWG (MEPC 65/2/19) during further
(the Republic of Korea) Korean Institute of development of the system.
Machinery &
Material (KIMM)
46. ECOLCELL BTs Ballast Water Azienda Chimica MEPC 66/2/7, 4 April 2014 Flag State Administration was invited to take into
Management System Genovese annex 5 (MEPC 66) account all the recommendations indicated in
annex 5 of the report of the twenty-sixth meeting of
MEPC 66/2/1 (Italy) the GESAMP-BWWG (MEPC 66/2/7) during further
development of the system
47. ATPS-BLUEsys Ballast Water Panasonic MEPC 66/2/7, 4 April 2014 Flag State Administration was invited to take into
Management System Environmental annex 6 (MEPC 66) account all the recommendations indicated in
Systems & annex 6 of the report of the twenty-sixth meeting of
MEPC 66/2/2 (Japan) Engineering Co., Ltd. the GESAMP-BWWG (MEPC 66/2/7) during further
development of the system
48. Ecomarine-EC Ballast Water Ecomarine MEPC 66/2/7, 4 April 2014 Flag State Administration was invited to take into
Management System Technology annex 7 (MEPC 66) account all the recommendations indicated in
Research annex 7 of the report of the twenty-sixth meeting of
MEPC 66/2/3 (Japan) Association the GESAMP-BWWG (MEPC 66/2/7) during further
development of the system

I:\CIRC\BWM\02\BWM.2-CIRC.34-REV.6.docx
BWM.2/Circ.34/Rev.6
Annex 1, page 11

Name of the system and Relevant


MEPC document related Name of GESAMP-Ballast Date of
Specifications
to the proposal for manufacturer Water Working Basic Approval
Basic Approval Group report
49. KURITA™ Ballast Water Kurita Water MEPC 66/2/10, 4 April 2014 Flag State Administration was invited to take into
Management System Industries Ltd. annex 4 (MEPC 66) account all the recommendations indicated in
annex 4 of the report of the twenty-seventh meeting
MEPC 66/2/4 (Japan) of the GESAMP-BWWG (MEPC 66/2/10) during
further development of the system
50. ElysisGuard ballast water KALF Engineering MEPC 67/2/9, 17 October 2014 Flag State Administration was invited to take into
management system Pte. Ltd. annex 4 (MEPC 67) account all the recommendations indicated in
annex 4 of the report of the twenty-ninth meeting of
MEPC 67/2/3 (Singapore) the GESAMP-BWWG (MEPC 67/2/9) during further
development of the system
51. NK-Cl BlueBallast System NK Company Ltd. MEPC 68/2/10, 15 May 2015 Flag State Administration was invited to take into
annex 4 (MEPC 68) account all the recommendations indicated in
MEPC 68/2 annex 4 of the report of the thirtieth meeting of the
(Republic of Korea) GESAMP-BWWG (MEPC 68/2/10) during further
development of the system
52. ECS HYCHLOR™ System TECHCROSS Inc. MEPC 68/2/10, 15 May 2015 Flag State Administration was invited to take into
annex 5 (MEPC 68) account all the recommendations indicated in
MEPC 68/2/1 annex 5 of the report of the thirtieth meeting of the
(Republic of Korea) GESAMP-BWWG (MEPC 68/2/10) during further
development of the system
53. ECS HYCHEM™ System TECHCROSS Inc. MEPC 68/2/10, 15 May 2015 Flag State Administration was invited to take into
annex 6 (MEPC 68) account all the recommendations indicated in
MEPC 68/2/2 annex 6 of the report of the thirtieth meeting of the
(Republic of Korea) GESAMP-BWWG (MEPC 68/2/10) during further
development of the system
54. ECS HYBRID™ System TECHCROSS Inc. MEPC 68/2/10, 15 May 2015 Flag State Administration was invited to take into
annex 7 (MEPC 68) account all the recommendations indicated in
MEPC 68/2/3 annex 7 of the report of the thirtieth meeting of the
(Republic of Korea) GESAMP-BWWG (MEPC 68/2/10) during further
development of the system

I:\CIRC\BWM\02\BWM.2-CIRC.34-REV.6.docx
BWM.2/Circ.34/Rev.6
Annex 1, page 12

Name of the system and Relevant


MEPC document related Name of GESAMP-Ballast Date of
Specifications
to the proposal for manufacturer Water Working Basic Approval
Basic Approval Group report
55. Varuna Ballast Water Kadalneer MEPC 68/2/21, 15 May 2015 Flag State Administration was invited to take into
Treatment System Tecchnologies Pte. annex 6 (MEPC 68) account all the recommendations indicated in
Ltd. annex 6 of the report of the thirty-first meeting of the
MEPC 68/2/6 (Singapore) GESAMP-BWWG (MEPC 68/2/21) during further
development of the system
56. ClearBal BWMS University of MEPC 70/4/6, 28 October 2016 Flag State Administration was invited to take into
Strathclyde annex 4 (MEPC 70) account all the recommendations indicated in
MEPC 70/4 (Denmark) annex 4 of the report of the thirty-third meeting of the
GESAMP-BWWG (MEPC 70/4/6) during further
development of the system
57. MICROFADE II Ballast Water Kashiwa Co., Ltd. MEPC 71/4/3, 7 July 2017 Flag State Administration was invited to take into
Management System and Kuraray Co., Ltd. annex 4 account all the recommendations indicated in
annex 4 of the report of the thirty-fourth meeting of
MEPC 71/4 (Netherlands) the GESAMP-BWWG (MEPC 71/4/3) during further
development of the system
58. Envirocleanse inTank™ BWTS Envirocleanse, LLC MEPC 71/4/3, 7 July 2017 Flag State Administration was invited to take into
annex 6 account all the recommendations indicated in
MEPC 71/4/2 (Norway) annex 6 of the report of the thirty-fourth meeting of
the GESAMP-BWWG (MEPC 71/4/3) during further
development of the system

***

I:\CIRC\BWM\02\BWM.2-CIRC.34-REV.6.docx

You might also like