0% found this document useful (0 votes)
13 views

Typical Section For A Water Service Connection Pipe Alignment at Section C-C

Uploaded by

Champ Almonia
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
13 views

Typical Section For A Water Service Connection Pipe Alignment at Section C-C

Uploaded by

Champ Almonia
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

8.

00 m
PLANTERS SIDEWALK C&G ROADWAY CL ROADWAY C&G SIDEWALK PLANTERS
0.60 m 0.40 m 0.50 m 2.50 m 2.50 m 0.50 m 0.40 m 0.60 m

0.76 m 0.76 m 0.3 m

Prop. 150mmØ uPVC


WATERLINE 2" PE CASING 3/4" PE PIPE

TYPICAL SECTION FOR A WATER SERVICE CONNECTION


PIPE ALIGNMENT AT SECTION C-C

8.00 m
12.00 m

0.60 m 0.40 m 0.50 m 2.50 m 2.50 m 0.50 m 0.40 m 0.60 m


1.20 m 0.80 m 0.50 m 3.50 m 3.50 m 0.50 m 0.80 m 1.20 m

0.76 m 0.3 m
0.3 m 0.76 m
Prop. 150mmØ uPVC
Prop. 100mmØ uPVC

PIPE ALIGNMENT AT SECTION A-A PIPE ALIGNMENT AT SECTION D-D

12.00 m 0.60 m 0.40 m 0.50 m 3.50 m 3.50 m 0.50 m 0.40 m 0.60 m

1.20 m 0.80 m 0.50 m 3.50 m 3.50 m 0.50 m 0.80 m 1.20 m

0.3 m 0.76 m

0.3 m 0.76 m
Prop. 100mmØ uPVC
Prop. 100mmØ uPVC

PIPE ALIGNMENT AT SECTION B-B PIPE ALIGNMENT AT SECTION E-E

PROJECT TITLE: PREPARED BY: CHECKED BY: REVIEWED BY: SUBMITTED BY: RECOMMENDING APPROVAL: APPROVED BY: SHEET NO.

AS-BUILT PLAN FOR

DIAMOND HEIGHTS PHASE 1 - 3 5


BARANGAY COMMUNAL, BUHANGIN DISTRICT, DAVAO CITY CIVIL ENGINEER LUCKY CHAMP O. ALMONIA JOSIE E. MAMAC REU A. ASESOR RONALD A. MUÑOZ OSCAR C. DELA CRUZ MILDRED G. AVILES, CPA, DM-HRM

DAVAP SOUTHPRIME DEVELOPERS, INC.


PRC NO.:
ISSUED AT:
ISSUED ON:
PTR. NO.:
TIN NO.:
OIC
QUALITY ASSURANCE UNIT
OIC
DEVELOPMENT RESEARCH UNIT
Manager
SURVEYING, INVESTIGATION AND QUALITY ASSURANCE DIVISION
OIC
ENGINEERING DEPARTMENT
OIC AGM FOR TECHNICAL SERVICES GENERAL MANAGER
6

You might also like