0% found this document useful (0 votes)
11 views

Water Distribution Layout Plan - Phase 1 - 3: Vicinity Map

Uploaded by

Champ Almonia
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
11 views

Water Distribution Layout Plan - Phase 1 - 3: Vicinity Map

Uploaded by

Champ Almonia
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

21 Parks

- 19 6 20 0 and
100.0 Playground (1)
0

LO C18K 100.0
0
100.0 197.80

B 17 100.0
0
16 100.0
0

80.00
0.00

18
Parks 15 10 .
and (7) 1.29 .O.W
und 10 R.R
Playgro eter
0 m
101.06 8.0 Parks
CABANTIAN, DAVAO CITY

K - 1 80.00
13

17
and und (3)
12 Playgro
100.00

102.05
14
11 103.71
100.00 4
K - 14

80.00
16
100.00
C
BLO 15

- 4 .00
100.00

10
Parks

100.00
13

O C 80.00
16

110
100.00

15
and d (4)
oun 100.00
Playgr

12.00 meter R.R.O.W.


.
191.92 .O.W

K12 -
.R

O.W.
1 er R

B L O100.00 1009.00

B L 80.05
et

14
100.00
0 m
8.0

100.00
17
2

.
r R.R

CK
L 11O C

81.06
3

13
100.00

8
4

mete
BLO

100.00
18
5 o.s. CK

83.72
BL (10)
- 5

12
10 B

8.00
6 OC 1 Parks and
Play ground (6)

100.00
100.00
K -

7
7 130.13 2

100.00
19
709.96
9 100.00 3B LOC

93.30
11
8
9
10.
00 BLO os (6)
21.85
100.00 4 K5 - ALLEY
met CK 100.00

103.48
er R 66 8.00
mete

9
10 .R - 9 r R.R

103.59

81.27
100.00

10
.O. os (10) Parks .O .W.

6
W.
9 11 15 1,173.96 100.00 7 and
Playground (5) 20
- 12 12. 100.00 8 162.36 21
16 14 os (9) 00 100.00
22

80.00
met 133.07 os (5)
BLO

9
10. 35.61 er R 100.00
K3 17 13 o.s. 2a 00
met .R .O.W 60.90 5 4 CK 100.45
C (12)
- 4

80.94
24
O14
1 .
18 BL 3a er R
.R
. 110.00
3 os (4)

80.63
os (7)
.W 12 OC .O.W

1
100.00

80.00
6 38.45 2
L . 23.52

8
.O
B 15 .R 19 11 1a K3 - 80.00 5
100.00
100.00 1

81.96
24
R

80.00
23
14 10 B 4 100.58

81.71
er 20 10 7 80.00

1
80.00
et
L O C80.00 80.300 2

2
16 8

K 0 - 80.010
80.00 12.00

7
m
21

.
- 9 9 meter

O.W
00 80.00
K - 11 R.R.O
17

80.00
1

23
8. 10 80.00 12 .W.

80.00
22
22 K 80.00

80.00
8 11 10 os (5) 86.40 13

2
80.00
80.33
18

R.

3
C 80.00 82.63 14
23 3a 12 15

80.0
.W.

6
7 80 os (11) 80.54

r R.
65.17
19 O 4a .00
13 80.00 16

80.00
.

22
24 80.00 43.79 80.0 17
L BL

80.00

8
21
.W 5a 10
8.0
B L O 0 80.00

R.R.O
6 14 18

80.00
o.s. 0 m 80.00

C
.O

3
80.00
te
20 B (13) OC et 9 80.00 19

4
25 .R er R 8 CK

80.00
80.48 80.00 80.00 20

0 me
5 K -

5
8 .R.O 7
R 80.00
- 3

BLO
2a 80.00

CK -
21 26 er .W. 80.00 6

80.00
7

7
80.00
et 1180.00

B L O 00 80.00
1a 5

20

21
4 80.00

meter
80.00
22 m 6 80.00 4

4
80.00
80.00 os (4)

12.0
27

5
0 5 80.00 3

80.00
3 0 9 BLO 80.00 2

4
80.00
8.

CK -
23 28 10 80. 4 80.00 1 66.41

B L O 00 80.00
00

20
2 80.00
CK 3 80.00

19
8.00

12.00
24 11 80.00

80.00
80.00

.W.
o.s. 80.00 meter

80.

5
80.00
(14) 5a 12 - 1 80.00 2 o.s.(2
10 R.R.O

6
o.s. )

80.00
80.00 .W.
(1 1 1 1 9

3
8) 6a 13
25 80.00 33.96

.O
BL 80.00 80.00 8
7

19
14 80.70 80.00
OC

80.00
o.s.

r R.R
18
80.00 80.00 6

80.

6
80.00

.
(1
K - 80.1100
1) 8.0 15 alley

80.00

O.W
8.0 4a 0 m 80.00 os (13) 80.00 5 30.00

7
0 m 10
B 0 80.00 4
et 16 80.0

81.22
et 3a er R

11
80.00

PHASE 2 B58 L O L O C K80.00 - 80.00


er R 36.93 3
o.s. 12 9 .R.O 17

mete
.R 80.00 2

80.00
2a

R.
80.00
80.00

18
(1 1 .O. .W.

2
80.00

80.00
5) 8

17
W. 80.00 o.s. 57 1
59C K -
2 1a 80.94

r R.
2 os (1)

7
80.00

80.00
134.80
BL 7

8
3 80.00 80.00 80.00
615

80.00
OC 6

12
80.00 60

8.00
12 38.91
4 B 80.00

mete
80.00

80.65
80.00
K - LO 5

17
13 80.00

1
81.06
5 62

16
80.00 80.00
CK

80.00
14 4 80.00 63

8
80.00

80.00
13a

o.s. (6)
6 80.00 64

9
3 80.00
- 180.00

80.00

40.03
15

56
80.00
7

13
80.00

8.00
80.00 2
16 2 80.00 80.00

80.10
8 8.00

K - 80.685
16
80.00
1

83.85

4
15
17 80.00 mete

80.00
80.00 r R.R

9
84.55
10
1 18 80.98 .O. W.
80.00

80.00

119.47
55
os (15)

80.00
14

25
80.00 2 8.0
0 m 80.00 19 38.77
20

82.29
15

80.00
122.95
3 et 20

26
er R

3
80.00

14
80.00

80.00
19

10
21

83.8
4 .R
18B

83.51
11
80.00 .O.W 80.00

129.72
L17O .

80.00
BLO 5

8
54
80.00
15
80.00 80.56

100.00
C16K

131.89
24

C
6
-15 1 00C 80K.00 - 80.7 8

9
80.

88.27
14

100.00

80.00
13

27
5

2
80.00
83.8

BLO
314b

11
12
33
1380.00

100.00
80.00
53
00

80.00
VICINITY MAP:

16
109.
9

100.00

7
o.s.

23

258.07
(9) 13 alle

99.11
10

13

100.00

100.00
8.0 80.00 y

100.00

10
12

28
81.84
0 m 11

1
12
ete 80.00 60.00
11
26

2
r

100.00
16

80.00
R.R 80.00 os (18)

52
K00 - 80.00
1

17

100.00

6
2.8
.O.W

o.s. (1)
22
8 . os (8)

12
29.66

100.00
17
72
8.0

100.00

11
9

29
o.s. 65.19 0 m

105.
10
25

(17) et er R
11

100.00
BL

80.00
51
12 .R.O

18
(19)

.00

100.00
12

5
.W.

21
OC

15

O00C 80.

GATE 1
4
13
80

100.00
0.8
7

100.00
o.s.

12
K -

30
14

18
6 8
24

7
10

16
13

102.

100.00
15
.00

80.00
100.0 7

50
19
4

100.00

4
0

20
80
10

B L 80.
3

14
101.3

100.00
CK -
0.0
.

100.00
2 1

13
31
23
15

p&p

19
14

0
10
1 270. (9)

- 6
.00

O.

0.0
8.0

100.00
80.00
0 m

49
80.00
66

20
80

10
R.

100.00

3
et
9

19
er R
13
R.

8 .R.O
.00

100.00
119.35
22

100.00
13
15

14
-

32
.W.

O.W.
.00

6
9
0

20
er

10

0
10

80.00
80

0.0

47 - 5

36
100.00
80.00
48
8

et

80.00

BLO
21
BL 11

100.00
C8K

2
10

CK
14

18
12
m

100.00

.
OC
1-6
21

12

100.00
r R.R
0

9
.00

13

100.00
W

15
0.0

33
7
0

O.W.
K -

15
.0

14
80

O.
21

100.00
6
10

0
7

80.00
7K

100.00
0.0

35
5

80.00
12

80.00
R.
-

22
O-

16

100.00

1
BLO
10

17
4
.

mete
20

.
.00

R.

46C K
W

C1

r R.R
3
11

102.90
19 BKL

100.00
C 0.00

16
100.00
16
W.

34
O.

80

K
19 B 3b

10
2
er
6

L1 O

CK -
22
R.

10

1
O.

80.00
et

34
80.00
0.0

O.W.

80.00
8

100.00
8.0

23
OC

8.00
K - 0)
1

100.00
R.

.00

0 m
m
R.

16
mete
4
10

B45L O
(1

et
O
80

er R
10

100.00
er
.

00
5

und

35
.R
r R

0.0

7 .O.
.
-
et

100.00
L

8.

W. r R.R
23

11
ygro
10

80.00
8
0

33
80.00
.00
BL

80.00
te

0.0

24

8.00
18

100.00
9
B

640.21

15
80
K

100.00
BL
d pla
10
me

00

10
4

BLO

O.W.
3

100.00
11

36
OC
9
0
8.

mete
OC
C

0.0
20

an

12
00

.00

6 K -

Clubhouse - 7

80.00
17

10

32
80.00
44
parks

- 2 80.00
100.00

25
LO

80

100.00
12
8.

.
3

14
r R.R
4 18 p&
8.00

100.00
3 314. p (8
21

100.00

37
BL
.00

PHASE 1
2 07 ) 2
B

80

80.00
1

80.00

31
43
80.00
2

26
mete

100.00
13
8

CK
8.0
101.89

24 8.
13

0 m

2,009.04
100.00
22

100. 00

38
ete
.00

r 10
R.R 00
B L0.00 me
101.85
80

7
1

LEGEND:
8.00
7 .O.W os (19) 25

80.00
te
1

80.00

30
C80.K
42
15

00
27
r R

100.00
. 10

12
6 O
27.03 10

BLO
0.0
23

8 0 . R. os (2
0
C .0K0

100.00
o.s. 8. 26 O. 1)

39
38.11
9
(23)

(16 os 00 10 W.
BL ) (22 me 0.0 100.
14

B L80.O

80.00
10

- 849.82
41
49

29
0 00
OC )
28
6 1 5 00
-

100.00
.66
o.s.

te 27

11
r
5 K - 11 80.0 R. 10
14 10
B BL L 80.0
0.0

100.00
2

40
o.s 0 R. 0 4.7

.
. (2 O. 4 7 28
4 19

.O.W
13

0) W
12
O O 0C 80 3 80.00
101. 40

C K .01
80.00

B L O80.01 8028
.
29

103.

100.00
3 1

10
44 13 29
C K K.00 3

100.00

.R
2

41
4 10 113.
8.0 2
12

0 m 4.3 01

er R
- 80.00 5 6 2
80.00

3 -
et

27
80.00
30

er R 1

101.25
39

.R
1780.00 103.

9
.O.
1 1
2)

os 09
7
Mechanical End Plug
W.

met
100.00
12
11

8.
. (2

42
(23
13

10 00 4 100. os (20

PHASE 3
32 )
8

o.s

.47 00 )
me
80.00

29.74

80.00
26
38

00
110.44 8.0
90.00

te os
31

r 5 0 m
8
9 (24 8.0
7

1)
10
-

BL R. 25 ) 7

12.
0 m o.s. e ter
11

.27
. (2

R.
1 O. 88 ete os (3)
(1)
43 R.R
o.s
14

O 8 W .53 6 r R 158.5 .O.


80.00

80.00
25
K

37

. .R 32.96 0 W.
CK 80.0 5 .O. 100. 44
9

2 W. 00
C

B0 L80.00 4 7 45
6

15
.

7 100.0
7

20
W
10

- O C80.00 6 BL 0
46
O

119.
O.

3 100.
15

80.00
24
3
4 K
52
5 OC 00
.

R.

100.
8

6 15 101.
-
W
BL

80 2 00
K
- .001
-

19
14
R.
O.

16 100. 4
5

147. 1 - 6
.

8. 4 80 00
8 .00

73.94
W

92
R.

00
9

o.s.
er

80.6 17 100. 3
O.

80.00
23
K

80.0
16

(2 me 6 00
R.
7

et

4) 0 2
18
C

R.

te 5 80.0 100.
13
m

r 36 00
14

Air Release Valve


er

8.0

)
.97
R.

R. 1

(2
80.00 19 o.s. 0 m 100.
4
O

00

R.
et

35 00
80

80.0
O

o.s.
(2)
5

O. 24 ete
8

er

20 101.2

80.00
80.0 0
6

22
4.20
m

r R
8.

W 34
BL

0
17

80.00 5
et

.
12

.R
BL

13

80.0 .O.
00

BL
.00
m

0 80.0 33 W.
OC 0
8.

80
0

3
3

21 32
5

80.0
.0

80.00
K

21
7

2 0
11

14
13
4
12

22 31
12

o.s 80.0
- 580.00
.00

13
5

. (4 0
-

15
8.2

81.9 80.00 23 80.0 30


80

) 7 0
4

1
12

12

o.s. 8. 80.0 16 29
80.0 24 80.0

80.00
10
.

20
00
K

(8) 0 0 0
11
W

17
.00

80.00 25
14

me 80.7
3

80.0
O.

18 8.0 0 8
OC

12
80

te 18
42.11

0 m
.00

r 80.0 80.00 26
3

R.

Residential Fire Hydrant


6
BL 0
12 (2)

19 R. B-5 e ter
11

80

19
1

R. 38 80.0
R.

27
9

80.0
10

R.R
7.9

80.00
19
OC
o.s.

5 0
.00

O. .O. 0
20
2

W 80.0 37 80.0 20 28
(3)

80.0
er
BL

W.
K
11
80
15

.
2

0 0
.00

4 0
2

36 80.0 21
et

- 7 80.00
o.s.

80.98
80

0 os (3)
21
5 8
-
m

3 22
10

35
9

80.0 80.0
.00
.

(RFH)
30.00
12.
.W

39

0 0
BL
00

.00
10
80

00 2 8. 80.0 34 80.0 23
.00

me
.O
K

00 0
OC 0
1

16

80
1

8.

ter
80

33 24
.00

me 80.00 80.0
5
.R

K 0 80 7

80.00
18

R.R
K 0
8
OC

.00

.O. 1 te 32 25
40

o.s. 80.0 80.00


R

W. r o.s.
- 4
.00
9

80

0
9

8 R.
.00

(6) (1) 31 26
er

21 R. 80.0 80.0
80
7 -
6 K -

80

0 0
)

7 O.
17

et
. (7

B L O C 80.06

W 91.6 80.00 30 80.0


80.00
17
10
BL

.00

.
m

.00

6 0
o.s

41

6
.

8.0
.00
W

75.41

29
80

20 80.0
8
.00

0 m
80
00

5 0
8

O.

80

e
BL 28
C

ter
80

BL B-6 80.0
BL 5
8.

11

4
R.

R.R 0
)

1
.00
.00

22
(2

OC 19
18

27
.00

80.00
16

.O. 80.0
42

(1)
5 O

R.

38.79

3 O
.00

80

o.s.

0
80

100. W.
7
.00

K
80

23
-

00 80.0
CK
o.s.
80

2
r

0
- 6
80
7

100.0
4

12

2 o.s. 24
.

.00
et
.00

0
8
K

.00

(3)
43

80.00
15

Blow-Off Valve
.00
m

80

-
80

3 100.0
O.
6
.00

1 25
80

21
7

0
C

80

7.9
00

2 o.s.
BL
R.
80

(4) 10
3

13

26
11

O C 0.00
4

.00
.00

8.

R.

4
6

131.
7
.00

12
44

01
.00

80
80

.0 100.
80.00

K
14
5

27
B L0

80
er

0 31 00
.0

80

me
- 2
80

5
et

20
)

100.
0
2

14

32
. (1

te 100.
3

.00

0.0

30
.00

00
0.0
m

r 00
.00

8
45
o.s

R.
74.74
.00

80

10
80

.
)

10
4

100.
.00
. (2

80

R.
W
00

29
80.00
13
80

O. 00
O.

7
80
o.s

W
8.
1

15

. 100.
2

.00

28
.00

R.

19
5

00
0

33
.00

(3)
46

BL
0.0
C
.00

6
80

0.0

8.0
80

R.
3

100.
.00

80

0 m
o.s.
10

o.s. (5)
2

00
80

10

80.00
12
- 9
.

ete
80

O
O

5
er

W
16

r R
0

CK
1
.00

O.

.R
.0
B L0

et
47

.O.
.0

Service Connection
.00

80

18

-
0

34
80

4
o.s.

W.
0

R.
0
m
80

0.0

10
.0

0.0
80
34 ) .46
(1

80

C K .00
B L O80.00 8011
R.

-
10
00

10
17

3
K
.00

o.s. (1)
3
.00

1
48

8.

er
.00

80
80

74.72
1

C
2

2
et

.
17
80

B-7
B L 100.00
.9

35
0

.O.W
-
96

0.0

10
18

0
O
.00

46
100.0

1
ce
2

10
.00

00
49

80
.27

0
spa
80

.
.R

100.0
1

20
8.

.O.W
93

6
16

4.7
0

er R
36
19

en

82.0
0.0
.00

80.00
0.0

9
1

19
0

92

8
op
.0

10
80

0
10

12
.R
45
80

100.0

80.0 .0
et

0 18
0

er R

0 o.s.
BL
20

100.0
0 m

me
2
.00

(2
15

80.0
8

80.00

te )
8

17
2.8
80

0 r 70.2
met

R.
37

5
10

8.0
9

80.0
4.2

R.
0

16
44

0 O.
101.0
16

80.0 W
9

.
00

80.00

14 38
WATER DISTRIBUTION SYSTEM
100.9

15
3

0
118.
12.

80.0 122.
14 19 63
2

0 39
80.0 13
80.04
43

100.
12

13 100.
6

0 00
123.

00 40
-

24

12
4

80.0
107.

0 12 100. 100.
00
K

80.0 00 41
11
1. ALL PIPES WITH DIAMETER LESS THAN 100mmØ MUST BE LAID WITH A MINIMUM COVER OF 0.60m.
9

11
5

0
92.8

100. 118.
OC

80.0 53
00

1 00
5

10
42

0
B L80.000 9
B L162.92

100.

100.

2. ALL PIPES WITH DIAMETER OF 100mmØ & GREATER MUST BE LAID WITH A MINIMUM COVER OF 0.76m.
4
0

12 00
O C80.00
80.0

.0
0
9
8 100.
47

me
K
6

te 00
8
100.

80

3. TRUST BLOCK MUST BE INSTALLED FOR EVERY FITTING.


3
0

- .00 7 r
80.0

R. 100.
R. 00
1 80.00 6 O.
W
. 117.
7
80.0
4. ALL LAID PIPES MUST BE SUBJECTED TO A MINIMUM PRESSURE TEST OF 150psi & LEAKAGE TEST CONFORMING TO
0
2
80.0

0 5 24
68

80.0
130.

0 4
1
0

AWWA STANDARDS.
80.0
(2)
80.0

FF

3
P-O

0 o.s.
/ DRO
o.s.

AL

80.0 (1)
MIN
TER

0 2
E
YCL
TRIC

80.0
5. ALL INSTALLED PIPES & ITS APPURTENANCES MUST BE DISINFECTED ACCORDING TO AWWA (C651-92) STANDARDS.
2

0 1
TE

80.0
0

6. ALL PIPES & FITTINGS MUST CONFORM WITH ISO STANDARDS.


GA

o.s.
65.3
1
(1)
7. ALL PE PIPES WITH LESS THAN 50mmØ MUST CONFORM WITH CTS STANDARDS.
8. ALL PIPES, FITTINGS & APPURTENANCES ARE SUBJECT FOR INSPECTION PRIOR TO ITS INSTALLATION & MUST
o.s.

20
CONFORM WITH THE DCWD SPECIFICATIONS.
9. HYDROTESTING & DISINFECTION SHALL BE CONDUCTED BY THE DEVELOPER OR CONTRACTOR AND SHALL BE
WITNESSED BY A DCWD REPRESENTATIVE.
10. THE DEVELOPER OR CONTRACTOR SHALL FURNISH A COPY OF THE RESULTS OF THE HYDROTESTING, DISINFECTION
AND WATER SAMPLE ANALYSIS TO DCWD.
11. THE PIPELINE SHOULD BE LAID UNDERNEATH THE UTILITY STRIP, WHEREIN THE SAID PIPELINE SHOULD BE OF THE
SAME SIDE WITH THE POWER AND TELECOMMUNICATION LINES, IN CASE NO UTILITY STRIP IS AVAILABLE, THE PIPE
MUST BE LAID BENEATH THE SIDEWALK OR 0.30m FROM THE EDGE OF THE CURB & GUTTER TOWARDS THE ROADWAY.
WATER DISTRIBUTION LAYOUT 12. THE HOMEOWNERS MUST NOT DEVELOP, IMPROVE NOR EMBELLISH THE BORDER OR ENCROACHMENT OF THE
ROAD-RIGHT-OF-WAY, ESPECIALLY ON THE STRIP WHERE DCWD'S PIPELINE IS LOCATED.

PLAN - PHASE 1 - 3 13.

14.
ALL PVC PIPES MUST BE CLASS 150 OR SERIES 8 (PN 1.03 MPa) WITH ETHYLENE-PROPYLENE-DIENE MONOMER (EPDM)
RING GASKET.
NON-CONFORMITY WITH THE ABOVE PROVISIONS WILL BE GROUND FOR REJECTION.

PROJECT TITLE: PREPARED BY: CHECKED BY: REVIEWED BY: SUBMITTED BY: RECOMMENDING APPROVAL: APPROVED BY: SHEET NO.

AS-BUILT PLAN FOR

DIAMOND HEIGHTS PHASE 1 - 3 1


BARANGAY COMMUNAL, BUHANGIN DISTRICT, DAVAO CITY CIVIL ENGINEER LUCKY CHAMP O. ALMONIA JOSIE E. MAMAC REU A. ASESOR RONALD A. MUÑOZ OSCAR C. DELA CRUZ MILDRED G. AVILES, CPA, DM-HRM

DAVAP SOUTHPRIME DEVELOPERS, INC.


PRC NO.:
ISSUED AT:
ISSUED ON:
PTR. NO.:
TIN NO.:
OIC
QUALITY ASSURANCE UNIT
OIC
DEVELOPMENT RESEARCH UNIT
Manager
SURVEYING, INVESTIGATION AND QUALITY ASSURANCE DIVISION
OIC
ENGINEERING DEPARTMENT
OIC AGM FOR TECHNICAL SERVICES GENERAL MANAGER
6

You might also like