Water Distribution Layout Plan - Phase 1 - 3: Vicinity Map
Water Distribution Layout Plan - Phase 1 - 3: Vicinity Map
- 19 6 20 0 and
100.0 Playground (1)
0
LO C18K 100.0
0
100.0 197.80
B 17 100.0
0
16 100.0
0
80.00
0.00
18
Parks 15 10 .
and (7) 1.29 .O.W
und 10 R.R
Playgro eter
0 m
101.06 8.0 Parks
CABANTIAN, DAVAO CITY
K - 1 80.00
13
17
and und (3)
12 Playgro
100.00
102.05
14
11 103.71
100.00 4
K - 14
80.00
16
100.00
C
BLO 15
- 4 .00
100.00
10
Parks
100.00
13
O C 80.00
16
110
100.00
15
and d (4)
oun 100.00
Playgr
K12 -
.R
O.W.
1 er R
B L O100.00 1009.00
B L 80.05
et
14
100.00
0 m
8.0
100.00
17
2
.
r R.R
CK
L 11O C
81.06
3
13
100.00
8
4
mete
BLO
100.00
18
5 o.s. CK
83.72
BL (10)
- 5
12
10 B
8.00
6 OC 1 Parks and
Play ground (6)
100.00
100.00
K -
7
7 130.13 2
100.00
19
709.96
9 100.00 3B LOC
93.30
11
8
9
10.
00 BLO os (6)
21.85
100.00 4 K5 - ALLEY
met CK 100.00
103.48
er R 66 8.00
mete
9
10 .R - 9 r R.R
103.59
81.27
100.00
10
.O. os (10) Parks .O .W.
6
W.
9 11 15 1,173.96 100.00 7 and
Playground (5) 20
- 12 12. 100.00 8 162.36 21
16 14 os (9) 00 100.00
22
80.00
met 133.07 os (5)
BLO
9
10. 35.61 er R 100.00
K3 17 13 o.s. 2a 00
met .R .O.W 60.90 5 4 CK 100.45
C (12)
- 4
80.94
24
O14
1 .
18 BL 3a er R
.R
. 110.00
3 os (4)
80.63
os (7)
.W 12 OC .O.W
1
100.00
80.00
6 38.45 2
L . 23.52
8
.O
B 15 .R 19 11 1a K3 - 80.00 5
100.00
100.00 1
81.96
24
R
80.00
23
14 10 B 4 100.58
81.71
er 20 10 7 80.00
1
80.00
et
L O C80.00 80.300 2
2
16 8
K 0 - 80.010
80.00 12.00
7
m
21
.
- 9 9 meter
O.W
00 80.00
K - 11 R.R.O
17
80.00
1
23
8. 10 80.00 12 .W.
80.00
22
22 K 80.00
80.00
8 11 10 os (5) 86.40 13
2
80.00
80.33
18
R.
3
C 80.00 82.63 14
23 3a 12 15
80.0
.W.
6
7 80 os (11) 80.54
r R.
65.17
19 O 4a .00
13 80.00 16
80.00
.
22
24 80.00 43.79 80.0 17
L BL
80.00
8
21
.W 5a 10
8.0
B L O 0 80.00
R.R.O
6 14 18
80.00
o.s. 0 m 80.00
C
.O
3
80.00
te
20 B (13) OC et 9 80.00 19
4
25 .R er R 8 CK
80.00
80.48 80.00 80.00 20
0 me
5 K -
5
8 .R.O 7
R 80.00
- 3
BLO
2a 80.00
CK -
21 26 er .W. 80.00 6
80.00
7
7
80.00
et 1180.00
B L O 00 80.00
1a 5
20
21
4 80.00
meter
80.00
22 m 6 80.00 4
4
80.00
80.00 os (4)
12.0
27
5
0 5 80.00 3
80.00
3 0 9 BLO 80.00 2
4
80.00
8.
CK -
23 28 10 80. 4 80.00 1 66.41
B L O 00 80.00
00
20
2 80.00
CK 3 80.00
19
8.00
12.00
24 11 80.00
80.00
80.00
.W.
o.s. 80.00 meter
80.
5
80.00
(14) 5a 12 - 1 80.00 2 o.s.(2
10 R.R.O
6
o.s. )
80.00
80.00 .W.
(1 1 1 1 9
3
8) 6a 13
25 80.00 33.96
.O
BL 80.00 80.00 8
7
19
14 80.70 80.00
OC
80.00
o.s.
r R.R
18
80.00 80.00 6
80.
6
80.00
.
(1
K - 80.1100
1) 8.0 15 alley
80.00
O.W
8.0 4a 0 m 80.00 os (13) 80.00 5 30.00
7
0 m 10
B 0 80.00 4
et 16 80.0
81.22
et 3a er R
11
80.00
mete
.R 80.00 2
80.00
2a
R.
80.00
80.00
18
(1 1 .O. .W.
2
80.00
80.00
5) 8
17
W. 80.00 o.s. 57 1
59C K -
2 1a 80.94
r R.
2 os (1)
7
80.00
80.00
134.80
BL 7
8
3 80.00 80.00 80.00
615
80.00
OC 6
12
80.00 60
8.00
12 38.91
4 B 80.00
mete
80.00
80.65
80.00
K - LO 5
17
13 80.00
1
81.06
5 62
16
80.00 80.00
CK
80.00
14 4 80.00 63
8
80.00
80.00
13a
o.s. (6)
6 80.00 64
9
3 80.00
- 180.00
80.00
40.03
15
56
80.00
7
13
80.00
8.00
80.00 2
16 2 80.00 80.00
80.10
8 8.00
K - 80.685
16
80.00
1
83.85
4
15
17 80.00 mete
80.00
80.00 r R.R
9
84.55
10
1 18 80.98 .O. W.
80.00
80.00
119.47
55
os (15)
80.00
14
25
80.00 2 8.0
0 m 80.00 19 38.77
20
82.29
15
80.00
122.95
3 et 20
26
er R
3
80.00
14
80.00
80.00
19
10
21
83.8
4 .R
18B
83.51
11
80.00 .O.W 80.00
129.72
L17O .
80.00
BLO 5
8
54
80.00
15
80.00 80.56
100.00
C16K
131.89
24
C
6
-15 1 00C 80K.00 - 80.7 8
9
80.
88.27
14
100.00
80.00
13
27
5
2
80.00
83.8
BLO
314b
11
12
33
1380.00
100.00
80.00
53
00
80.00
VICINITY MAP:
16
109.
9
100.00
7
o.s.
23
258.07
(9) 13 alle
99.11
10
13
100.00
100.00
8.0 80.00 y
100.00
10
12
28
81.84
0 m 11
1
12
ete 80.00 60.00
11
26
2
r
100.00
16
80.00
R.R 80.00 os (18)
52
K00 - 80.00
1
17
100.00
6
2.8
.O.W
o.s. (1)
22
8 . os (8)
12
29.66
100.00
17
72
8.0
100.00
11
9
29
o.s. 65.19 0 m
105.
10
25
(17) et er R
11
100.00
BL
80.00
51
12 .R.O
18
(19)
.00
100.00
12
5
.W.
21
OC
15
O00C 80.
GATE 1
4
13
80
100.00
0.8
7
100.00
o.s.
12
K -
30
14
18
6 8
24
7
10
16
13
102.
100.00
15
.00
80.00
100.0 7
50
19
4
100.00
4
0
20
80
10
B L 80.
3
14
101.3
100.00
CK -
0.0
.
100.00
2 1
13
31
23
15
p&p
19
14
0
10
1 270. (9)
- 6
.00
O.
0.0
8.0
100.00
80.00
0 m
49
80.00
66
20
80
10
R.
100.00
3
et
9
19
er R
13
R.
8 .R.O
.00
100.00
119.35
22
100.00
13
15
14
-
32
.W.
O.W.
.00
6
9
0
20
er
10
0
10
80.00
80
0.0
47 - 5
36
100.00
80.00
48
8
et
80.00
BLO
21
BL 11
100.00
C8K
2
10
CK
14
18
12
m
100.00
.
OC
1-6
21
12
100.00
r R.R
0
9
.00
13
100.00
W
15
0.0
33
7
0
O.W.
K -
15
.0
14
80
O.
21
100.00
6
10
0
7
80.00
7K
100.00
0.0
35
5
80.00
12
80.00
R.
-
22
O-
16
100.00
1
BLO
10
17
4
.
mete
20
.
.00
R.
46C K
W
C1
r R.R
3
11
102.90
19 BKL
100.00
C 0.00
16
100.00
16
W.
34
O.
80
K
19 B 3b
10
2
er
6
L1 O
CK -
22
R.
10
1
O.
80.00
et
34
80.00
0.0
O.W.
80.00
8
100.00
8.0
23
OC
8.00
K - 0)
1
100.00
R.
.00
0 m
m
R.
16
mete
4
10
B45L O
(1
et
O
80
er R
10
100.00
er
.
00
5
und
35
.R
r R
0.0
7 .O.
.
-
et
100.00
L
8.
W. r R.R
23
11
ygro
10
80.00
8
0
33
80.00
.00
BL
80.00
te
0.0
24
8.00
18
100.00
9
B
640.21
15
80
K
100.00
BL
d pla
10
me
00
10
4
BLO
O.W.
3
100.00
11
36
OC
9
0
8.
mete
OC
C
0.0
20
an
12
00
.00
6 K -
Clubhouse - 7
80.00
17
10
32
80.00
44
parks
- 2 80.00
100.00
25
LO
80
100.00
12
8.
.
3
14
r R.R
4 18 p&
8.00
100.00
3 314. p (8
21
100.00
37
BL
.00
PHASE 1
2 07 ) 2
B
80
80.00
1
80.00
31
43
80.00
2
26
mete
100.00
13
8
CK
8.0
101.89
24 8.
13
0 m
2,009.04
100.00
22
100. 00
38
ete
.00
r 10
R.R 00
B L0.00 me
101.85
80
7
1
LEGEND:
8.00
7 .O.W os (19) 25
80.00
te
1
80.00
30
C80.K
42
15
00
27
r R
100.00
. 10
12
6 O
27.03 10
BLO
0.0
23
8 0 . R. os (2
0
C .0K0
100.00
o.s. 8. 26 O. 1)
39
38.11
9
(23)
(16 os 00 10 W.
BL ) (22 me 0.0 100.
14
B L80.O
80.00
10
- 849.82
41
49
29
0 00
OC )
28
6 1 5 00
-
100.00
.66
o.s.
te 27
11
r
5 K - 11 80.0 R. 10
14 10
B BL L 80.0
0.0
100.00
2
40
o.s 0 R. 0 4.7
.
. (2 O. 4 7 28
4 19
.O.W
13
0) W
12
O O 0C 80 3 80.00
101. 40
C K .01
80.00
B L O80.01 8028
.
29
103.
100.00
3 1
10
44 13 29
C K K.00 3
100.00
.R
2
41
4 10 113.
8.0 2
12
0 m 4.3 01
er R
- 80.00 5 6 2
80.00
3 -
et
27
80.00
30
er R 1
101.25
39
.R
1780.00 103.
9
.O.
1 1
2)
os 09
7
Mechanical End Plug
W.
met
100.00
12
11
8.
. (2
42
(23
13
10 00 4 100. os (20
PHASE 3
32 )
8
o.s
.47 00 )
me
80.00
29.74
80.00
26
38
00
110.44 8.0
90.00
te os
31
r 5 0 m
8
9 (24 8.0
7
1)
10
-
BL R. 25 ) 7
12.
0 m o.s. e ter
11
.27
. (2
R.
1 O. 88 ete os (3)
(1)
43 R.R
o.s
14
80.00
25
K
37
. .R 32.96 0 W.
CK 80.0 5 .O. 100. 44
9
2 W. 00
C
B0 L80.00 4 7 45
6
15
.
7 100.0
7
20
W
10
- O C80.00 6 BL 0
46
O
119.
O.
3 100.
15
80.00
24
3
4 K
52
5 OC 00
.
R.
100.
8
6 15 101.
-
W
BL
80 2 00
K
- .001
-
19
14
R.
O.
16 100. 4
5
147. 1 - 6
.
8. 4 80 00
8 .00
73.94
W
92
R.
00
9
o.s.
er
80.6 17 100. 3
O.
80.00
23
K
80.0
16
(2 me 6 00
R.
7
et
4) 0 2
18
C
R.
te 5 80.0 100.
13
m
r 36 00
14
8.0
)
.97
R.
R. 1
(2
80.00 19 o.s. 0 m 100.
4
O
00
R.
et
35 00
80
80.0
O
o.s.
(2)
5
O. 24 ete
8
er
20 101.2
80.00
80.0 0
6
22
4.20
m
r R
8.
W 34
BL
0
17
80.00 5
et
.
12
.R
BL
13
80.0 .O.
00
BL
.00
m
0 80.0 33 W.
OC 0
8.
80
0
3
3
21 32
5
80.0
.0
80.00
K
21
7
2 0
11
14
13
4
12
22 31
12
o.s 80.0
- 580.00
.00
13
5
. (4 0
-
15
8.2
) 7 0
4
1
12
12
o.s. 8. 80.0 16 29
80.0 24 80.0
80.00
10
.
20
00
K
(8) 0 0 0
11
W
17
.00
80.00 25
14
me 80.7
3
80.0
O.
18 8.0 0 8
OC
12
80
te 18
42.11
0 m
.00
r 80.0 80.00 26
3
R.
19 R. B-5 e ter
11
80
19
1
R. 38 80.0
R.
27
9
80.0
10
R.R
7.9
80.00
19
OC
o.s.
5 0
.00
O. .O. 0
20
2
W 80.0 37 80.0 20 28
(3)
80.0
er
BL
W.
K
11
80
15
.
2
0 0
.00
4 0
2
36 80.0 21
et
- 7 80.00
o.s.
80.98
80
0 os (3)
21
5 8
-
m
3 22
10
35
9
80.0 80.0
.00
.
(RFH)
30.00
12.
.W
39
0 0
BL
00
.00
10
80
00 2 8. 80.0 34 80.0 23
.00
me
.O
K
00 0
OC 0
1
16
80
1
8.
ter
80
33 24
.00
me 80.00 80.0
5
.R
K 0 80 7
80.00
18
R.R
K 0
8
OC
.00
.O. 1 te 32 25
40
W. r o.s.
- 4
.00
9
80
0
9
8 R.
.00
(6) (1) 31 26
er
21 R. 80.0 80.0
80
7 -
6 K -
80
0 0
)
7 O.
17
et
. (7
B L O C 80.06
.00
.
m
.00
6 0
o.s
41
6
.
8.0
.00
W
75.41
29
80
20 80.0
8
.00
0 m
80
00
5 0
8
O.
80
e
BL 28
C
ter
80
BL B-6 80.0
BL 5
8.
11
4
R.
R.R 0
)
1
.00
.00
22
(2
OC 19
18
27
.00
80.00
16
.O. 80.0
42
(1)
5 O
R.
38.79
3 O
.00
80
o.s.
0
80
100. W.
7
.00
K
80
23
-
00 80.0
CK
o.s.
80
2
r
0
- 6
80
7
100.0
4
12
2 o.s. 24
.
.00
et
.00
0
8
K
.00
(3)
43
80.00
15
Blow-Off Valve
.00
m
80
-
80
3 100.0
O.
6
.00
1 25
80
21
7
0
C
80
7.9
00
2 o.s.
BL
R.
80
(4) 10
3
13
26
11
O C 0.00
4
.00
.00
8.
R.
4
6
131.
7
.00
12
44
01
.00
80
80
.0 100.
80.00
K
14
5
27
B L0
80
er
0 31 00
.0
80
me
- 2
80
5
et
20
)
100.
0
2
14
32
. (1
te 100.
3
.00
0.0
30
.00
00
0.0
m
r 00
.00
8
45
o.s
R.
74.74
.00
80
10
80
.
)
10
4
100.
.00
. (2
80
R.
W
00
29
80.00
13
80
O. 00
O.
7
80
o.s
W
8.
1
15
. 100.
2
.00
28
.00
R.
19
5
00
0
33
.00
(3)
46
BL
0.0
C
.00
6
80
0.0
8.0
80
R.
3
100.
.00
80
0 m
o.s.
10
o.s. (5)
2
00
80
10
80.00
12
- 9
.
ete
80
O
O
5
er
W
16
r R
0
CK
1
.00
O.
.R
.0
B L0
et
47
.O.
.0
Service Connection
.00
80
18
-
0
34
80
4
o.s.
W.
0
R.
0
m
80
0.0
10
.0
0.0
80
34 ) .46
(1
80
C K .00
B L O80.00 8011
R.
-
10
00
10
17
3
K
.00
o.s. (1)
3
.00
1
48
8.
er
.00
80
80
74.72
1
C
2
2
et
.
17
80
B-7
B L 100.00
.9
35
0
.O.W
-
96
0.0
10
18
0
O
.00
46
100.0
1
ce
2
10
.00
00
49
80
.27
0
spa
80
.
.R
100.0
1
20
8.
.O.W
93
6
16
4.7
0
er R
36
19
en
82.0
0.0
.00
80.00
0.0
9
1
19
0
92
8
op
.0
10
80
0
10
12
.R
45
80
100.0
80.0 .0
et
0 18
0
er R
0 o.s.
BL
20
100.0
0 m
me
2
.00
(2
15
80.0
8
80.00
te )
8
17
2.8
80
0 r 70.2
met
R.
37
5
10
8.0
9
80.0
4.2
R.
0
16
44
0 O.
101.0
16
80.0 W
9
.
00
80.00
14 38
WATER DISTRIBUTION SYSTEM
100.9
15
3
0
118.
12.
80.0 122.
14 19 63
2
0 39
80.0 13
80.04
43
100.
12
13 100.
6
0 00
123.
00 40
-
24
12
4
80.0
107.
0 12 100. 100.
00
K
80.0 00 41
11
1. ALL PIPES WITH DIAMETER LESS THAN 100mmØ MUST BE LAID WITH A MINIMUM COVER OF 0.60m.
9
11
5
0
92.8
100. 118.
OC
80.0 53
00
1 00
5
10
42
0
B L80.000 9
B L162.92
100.
100.
2. ALL PIPES WITH DIAMETER OF 100mmØ & GREATER MUST BE LAID WITH A MINIMUM COVER OF 0.76m.
4
0
12 00
O C80.00
80.0
.0
0
9
8 100.
47
me
K
6
te 00
8
100.
80
- .00 7 r
80.0
R. 100.
R. 00
1 80.00 6 O.
W
. 117.
7
80.0
4. ALL LAID PIPES MUST BE SUBJECTED TO A MINIMUM PRESSURE TEST OF 150psi & LEAKAGE TEST CONFORMING TO
0
2
80.0
0 5 24
68
80.0
130.
0 4
1
0
AWWA STANDARDS.
80.0
(2)
80.0
FF
3
P-O
0 o.s.
/ DRO
o.s.
AL
80.0 (1)
MIN
TER
0 2
E
YCL
TRIC
80.0
5. ALL INSTALLED PIPES & ITS APPURTENANCES MUST BE DISINFECTED ACCORDING TO AWWA (C651-92) STANDARDS.
2
0 1
TE
80.0
0
o.s.
65.3
1
(1)
7. ALL PE PIPES WITH LESS THAN 50mmØ MUST CONFORM WITH CTS STANDARDS.
8. ALL PIPES, FITTINGS & APPURTENANCES ARE SUBJECT FOR INSPECTION PRIOR TO ITS INSTALLATION & MUST
o.s.
20
CONFORM WITH THE DCWD SPECIFICATIONS.
9. HYDROTESTING & DISINFECTION SHALL BE CONDUCTED BY THE DEVELOPER OR CONTRACTOR AND SHALL BE
WITNESSED BY A DCWD REPRESENTATIVE.
10. THE DEVELOPER OR CONTRACTOR SHALL FURNISH A COPY OF THE RESULTS OF THE HYDROTESTING, DISINFECTION
AND WATER SAMPLE ANALYSIS TO DCWD.
11. THE PIPELINE SHOULD BE LAID UNDERNEATH THE UTILITY STRIP, WHEREIN THE SAID PIPELINE SHOULD BE OF THE
SAME SIDE WITH THE POWER AND TELECOMMUNICATION LINES, IN CASE NO UTILITY STRIP IS AVAILABLE, THE PIPE
MUST BE LAID BENEATH THE SIDEWALK OR 0.30m FROM THE EDGE OF THE CURB & GUTTER TOWARDS THE ROADWAY.
WATER DISTRIBUTION LAYOUT 12. THE HOMEOWNERS MUST NOT DEVELOP, IMPROVE NOR EMBELLISH THE BORDER OR ENCROACHMENT OF THE
ROAD-RIGHT-OF-WAY, ESPECIALLY ON THE STRIP WHERE DCWD'S PIPELINE IS LOCATED.
14.
ALL PVC PIPES MUST BE CLASS 150 OR SERIES 8 (PN 1.03 MPa) WITH ETHYLENE-PROPYLENE-DIENE MONOMER (EPDM)
RING GASKET.
NON-CONFORMITY WITH THE ABOVE PROVISIONS WILL BE GROUND FOR REJECTION.
PROJECT TITLE: PREPARED BY: CHECKED BY: REVIEWED BY: SUBMITTED BY: RECOMMENDING APPROVAL: APPROVED BY: SHEET NO.