Eltek Commissioning Procedure
Eltek Commissioning Procedure
Commissioning
Guide
Tools Needed
Laptop
PowerSuite software
Printer cable
LAN cable
Accessing Eltek Rectifier System
Choose Network
Set the needed parameters
IP Address
192.168.10.20
Accessing Eltek Rectifier System
Select Log In
Type 3 as password
Accessing Eltek Rectifier System
Successfully Connected
Commissioning Proper: System Voltage Levels
Click Mains
Number of Phases: 1
Commissioning Proper: Mains
Click MainsLow
Click MainsPhase 1
Click MainsVolt 1
Commissioning Proper: Mains
Click Rectifier
Click Rectifier Error
Commissioning Proper: Rectifier
Click LoadBank 1
Click LoadFuse 1
Commissioning Proper: Load
Click Battery
Click Status Tab
Click Battery Voltage
Commissioning Proper: Battery
Click Battery
Click Status Tab
Click Battery Temp
Commissioning Proper: Battery
Click Battery
Click Configuration Tab
Number of banks: 1
Number of Strings: 4*
Description:
Battery installed date: today
Capacity AH: 100*
Commissioning Proper: Battery
Click Battery
Enable Temp comp
Reference voltage: 2.25*
Reference temp: 25*
Temp slope: 3*
Min comp voltage: 2.1*
Max comp voltage: 2.35*
Click Battery
Click Current Limitation
Enable Current Limitation
Set Current Limit: 40*
Apply then Ok
Click Currents
Click BattCurrent1.1
Commissioning Proper: Battery
Click Fuses
Click BattFuse1.1
Commissioning Proper: Battery