0% found this document useful (0 votes)
17 views

H1129a, h1130

Uploaded by

jeffrey choy
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
17 views

H1129a, h1130

Uploaded by

jeffrey choy
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Edge saw cut - •• .

course _~ Edge sow cUt


LFriction course
....!.whereLesenll_ to 30 depth _ r-- _1= _ _ _ _ _ _ _ .r
Bituminous frlchon
to 40 depth

Surfacing

Roacllose 150 min.- 7 I


" - Bitumilous surfacing
minm.m 105 thick
Subbase
~
Bituminous roaclxlse ~ Compacted backfil ~ Granular subbase
minimum 200 thick mininvn 150 thick
i •
Extent of trench • i

Existing Construction Permanent Reinstatement


Notes:

1. The subbase to be put bock shal be of the same thickness as the ad joining pavement subject to a milimum of 15Omm.
2. The roodbase to be put bock sholl be of bituminous material and of the sane thickness as the adjoining pavement subject
to a minilKlm of 200mm.
3. The bituminous surfoeing layer to be put bock sholl be 105mm thick and sholl consist 01 a bose course (65mm) and a wearing
course (40mml.
4. Friction course is absent il most urban roods, but where a friction course is present, a friction course layer of the some
thickness shal be put back.
5. Refer to General Specification for the material specifications. In general a typical construction could consist of
friction course - IOmm nominal size friction course material
wearing course - 10 or 20mm nomilol sile wearing course material
bose course - 28mm or 37.Srnn norrinol size base course material
roadbase - 37.5mm nominal size roodbose material
subbase - gronular subbose material
6. Refer to Drg. No. HI130 for Imit 01 reinstatement.

BITUMINOUS CARRIAGEWAY
Edge saw cut
10mm Bituminous surfacing \
to 20 depth
minimum 25 thick
,
Surfacing
I
Subbase T
150 min.
I!'
Bituminous or ~ '"'-
Extent of trench ~ Compacted
granular subbase
bockfil
minimum 75 thick

Existing Construction Permanent Reinstatement


Notes :

1. The subbase to be put back sholl be 01 either granular material or bitumilous material and sholl be of the same
thickness as the ad jailing footway or cycleway subject to a milimum of 75mm.
2. The surfacing to be put bock shal be of IOmm nominal sile wearilg course moterial and shal be of the same thickness as
the adjoiing lootway or cycleway subject to a miimum of 25mm.
3. Refer to Org. No. H1130 for fimit 01 reinstatement.

BITUMINOUS FOOTWAY AND CYCLEWAY


Description in Permanent
A Sept 96
Reinstatement Oetois revised
Former Org. No. H101817
June 94
with general revision
Dimensions in milfimetres
REr. REVISION SlGNATlJlE DATE

PERMANENT REINSTATEMENT HIGHWAYS DEPARTMENT


OF PAVEMENT - REFERENCE ORAWtIC No.
~
BITUMINOUS PAVEMENT
(SHEET 1 OF 2) SCALE
N.T.S.
H 1129A
Rules to determine the limit of reinstatement in bituminous
carriageway, footway and cycleway
A. Carrialeway conslrucled more lhan 5 years a80, Carrialeway re·surfaced more lhan 1 year ala
and Foolway or Cycleway conllrucled more lhan 1 year ago
1. The reinslalemenl (no sholl be 01 su"icienl widlh 10 allow Ihe use 01 proper compacling e(Jipmenl.
2. The reinslalemenl area shal eilher
0) abul on edge Uhe kerb lile,lhe building line or on adjainilg concrele pavemenll 01 Ihe billl'Dinous pavemenl; or
b) be 01 a ninilllm dislooce (measured Irom any pori 01 reinslalemenl area 01 rq,1 angle 10 Ihe edge) 01
450 m~imelres Irom on edge.

Areo 10 extend 10 kerl,/eldae~


Area shall nol be less Ihan
Kerb/edge
450 Irom

~ •.lmll01 reinslalemenl area Adjoiring concrele povemenl


"less lhal 450 Trench - - - - - - - - - - 1 '

3. The reinslalemenl orea shall be reclalKJllar in plan wilh Ihe sides eilher parallel or perpendculor 10 lhe nearesl edge
01 Ihe bilumilous pavement. Slepped or L-shaped reilslolemenl areo is pernilled only il
a) lhe reinslalemenl orea runs along lhe lenglh 01 Ihe carriageway, loolway or cyclewoy, in such cases
- Ihe lenglh 01 each slep along Ihe lenglh 01 Ihe corriageway,loolwoy or cycleway is nolless Ihon 20 melres
excepl 01 localion 01 manholes or junclion boxes;
- Ihe lenglh 01 each slep perpendicular 10 Ihe lenglh 01 Ihe carriageway, loolway or cycleway is
nolless lhal 300 milimelres; OR
b) lhe Irench goes round a rood junclion, in such coses a chamler 01 Ihe corner is permilled.

1---+-- Limil 01 reinslolemenl orea


Kerb Iile Manhole locolion
Chamler 01 junclion permilled

)20000 )20000 )20000

B. Carriageway conslruclad wllhln lhe lasl 5 years, Carrlagewa, re-surfaced wllhln lhe lasl 1
year and Foolway or Cycleway conslrucled wilhin lhe lasl I year
1. In addilion 10 Ihe RlAes Al, A2 and A3 menlioned above, Ihe reinslalemenl area shall exlend 10 Ihe lui widlh 01 lhe
Ira"ie lane(s) in which Ihe lrench is silualed. My exlension 01 Ihe reilslolemenl areo beyond lhe nininum limil
can be done by cold niling and resurlocing Ihe wearilg course wilhil Ihe exlended orea.
~,-----lOoo ninimum-----~'

~----,---Reinsl,alemeo'l orea 10 exlend


llAl.idlh 01 Ira"ic lone
Tra"ic lane malrkinQS-~
Linil 01 reilslalemenl

Former Org. No. Hl018/8


wilh general revision June 94
Dimensions i'I milinetres.
REF. REVISION SIGNATUR DATE

PERMANENT REINSTATEMENT HIGHWAYS DEPARTMENT


OF PAVEMENT - REFERENCE DRAWING No. CAll
BITUMINOUS PAVEMENT
(SHEET 2 OF 2) SCALE
N.T.S.
H 1130