Field Ops Manual CAARS User Manual
Field Ops Manual CAARS User Manual
Common options throughout FieldOps that will not be explained for each
process:
Print – generates a PDF. To print, use the print button in Adobe®.
Next – navigates you through different items while staying in same
screen.
Prev – navigates you through different items while staying in same
screen.
View – in most cases this option will only allow you to view, unless
screen has Add button.
Edit – in most cases you will be able to revise previous entries.
Add – creates entries
Save – if there is a save button on screen, use it. Not all entries prompt
you to Save.
Cancel – use as needed.
Help Menu
Disclaimer: Screen prints in this manual have been altered and do not
reflect actual work done in the field.
2 2
Index
System Setup........................................................................... 5
Edit ADE .............................................................................. 5
Edit Dist #............................................................................ 5
Edit Office Manager ................................................................ 5
Set Up Security ..................................................................... 5
Install Document Converter....................................................... 6
Enable Backup Feature ............................................................ 6
Set Error Report On/Off ........................................................... 6
Enable/Disable Fuel Escalation .................................................. 6
Download Project ..................................................................... 7
Resident Office Menu .............................................................. 7
Project Functions Menu – Download Project ................................... 8
Project Setup .......................................................................... 9
Mark (P) Quantities................................................................. 9
Group Description .................................................................. 9
Contact Information................................................................ 9
Engineer – Contractor Info .......................................................10
Modify Contractors ................................................................10
Modify Fuel Index Percentage ...................................................10
Mark Fuel Escalation Items.......................................................10
Utilities Tab ...........................................................................11
Monthly Fuel Index ................................................................11
Contract Time Tab ...................................................................12
Contract Time Setup ..............................................................12
Add/Edit Contract ..............................................................12
View/Delete Contract..........................................................13
Construction Status ...............................................................13
View Status tab .................................................................13
Contract Events tab ............................................................14
Payment and Documentation Tab .................................................14
Update – Enter Quantities for Payment – IRA, SA, CO, WO, Backsheets..14
View Items Tab..................................................................15
View IRA Entry Detail Tab .....................................................18
Body (Not Group Specific) .....................................................19
View MOH ........................................................................19
Fuel Escalation ..................................................................19
Backsheets – Create, Edit or Delete Backsheets (Work Orders, Change
Orders, Incentives / Disincentives) .............................................19
Work Orders –....................................................................20
Change Orders – .................................................................21
Backsheets – .....................................................................21
Material Incentives/Disincentives (I/D) .....................................22
Permanent Monetary Deducts and Temporary Withholding..............23
Material on Hand (MOH) ..........................................................23
When would you use? .............................................................23
3 3
Standard MOH – Add by Unit price ...........................................23
Standard MOH – Add by Invoice...............................................24
Lump Sum/MOH .................................................................24
Supplemental Agreements .......................................................25
View SA’s.........................................................................25
View SA’s coming in ............................................................25
Download SA Encumbrance....................................................25
Enter SA Est. Quantities .......................................................25
View All Enc’s ...................................................................25
Reports ..............................................................................25
Contract Time Tab ...................................................................26
Weekly Diary .......................................................................26
Project Totals Tab ..............................................................26
View Totals Tab .................................................................26
Contractors Tab .................................................................27
PCO (Progress Controlling Operation) Tab..................................28
Work Days Tab...................................................................28
W.D. Expl. Tab ..................................................................29
Daily Remarks ...................................................................30
Comments........................................................................30
Weather ..........................................................................30
Revise Contract Time .............................................................30
View /Delete Contract – Intermediates Tab................................30
Revise Contract – Intermediates Tab - ......................................31
View Contract Time Changes Tab ............................................31
Re-compute Working Days .......................................................31
Payment and Documentation Tab .................................................32
Estimate ............................................................................32
Utilities Tab ...........................................................................35
Send Mail............................................................................35
Contacts Tab ....................................................................35
Import from EFRD .................................................................36
Payment and Documentation Tab .................................................36
Certify ...............................................................................36
Final .................................................................................38
Final Procedures tab ...........................................................38
Final Reports Tab ...............................................................40
Project Functions Menu ..........................................................41
Backup Project ..................................................................41
Restore Project .................................................................42
Reindex Project .................................................................42
Delete Project...................................................................43
Appendix
Miscellaneous forms generated by FieldOps
4 4
System Setup
Edit ADE
Enter name of Assistant District Engineer, this will be shown on
overrun/underrun letter.
Overrun and Underrun Report (Only required on Contracts designated as
FAP; FFO; SAFO and MAP or as required by ADE).
Edit Dist #
Enter District of work being done.
Set Up Security
Enter name and initials of user. Do not use nickname.
Good thru: Enter expiration date, default is current date, if not
changed, new user will expire at midnight.
5 5
Automatic Distribution (AD) – If this is checked, it will not be
activated and users will not be able to use automatic distribution for
entries. Entries made with (AD) in error are hard to correct. Due to
rounding issues, this option is not recommended. If AD is not
enabled, all entries must be made group-specific.
6 6
Download Project
Resident Office Menu
7 7
Project Functions Menu – Download Project
Download Project
Work With Project Download Files
Download New Project Award or Approval (No Project in Place)
*Recommended when downloading project after Approval
Download Approved Contract with Original Encumbrance (Project
Already in Place) Use if project was previously downloaded at Time
of Award rather than after Approval.
Work With Project Backup Files
Download New Project from FieldOps Backup – allows download from
backup, so you won’t need original download files. Example for use:
your computer is lost/stolen/damaged, you can download from
previously created backup.
Download New Project from CAARS (DOS) Backup – NOT
RECOMMENDED Converts old CAARS projects to FieldOps. If you have
to do this, please contact FieldOps Support.
8 8
Project Setup
You are now ready to setup your downloaded project.
Group Description
Used to view or edit group descriptions. Can be edited to better define
group descriptions on larger, multi-group projects.
Contact Information
Enter Project Specific contact information for Contractor and others you
may want to communicate with throughout the life of the project. The
e-mail addresses entered here will be used for sending vouchers or
FieldOps generated reports.
9 9
Engineer – Contractor Info
Project Engineer/Supervisor – for reporting purposes, this entry will be
used for reports generated by FieldOps.
Contractor – information entered here is what will be on voucher.
Modify Contractors
Add subcontractors, click DBE if applicable. You may also enter
suppliers here, include (supplier) in name. Entries here are used when
completing diaries.
10 10
Enter the conversion factor, found in the Special Provisions in the
Gallons of Fuel per Unit column. Be sure to use proper unit, verify
English or Metric.
After you have marked all items necessary, click Update
If you mark an item in error, click Unmark Fuel Escalation Item then
Update
Utilities Tab
Add CFI – (Current Fuel Index) Enter CFI monthly, available at Monthly
Fuel Index (Current Fuel Index (CFI)) - Monthly or click on link on
bottom of pate to Fuel Index on the Web. Select month and year using
arrows in pop-up box. Enter number into Current Fuel Index box, and
then Save.
11 11
Contract Time Tab
12 12
View/Delete Contract – Intermediates
Select Intermediate you wish to delete, click delete button. Warning:
if you click the button, the Intermediate is deleted instantly. If you
delete incorrectly, you must add the Intermediate again.
13 13
Contract Events tab – Viewing area for Contract as a whole and
intermediates.
14 14
View Items Tab
Under this listing of items, on the right side of the screen is a % complete
with a highlighted box. This is available for initial contract items. The
colors are significant. For item selected:
Green – 0% – 100% of Contract Quantity has been paid
Yellow – 101% – 125% of Contract Quantity has been paid
Red – Over 125% of Contract Quantity – Start Negotiating new prices per
1903
How To Update IRAs (Same procedure for SA’s, WO’s, CO’s, and
Backsheets)
Highlight item you wish to update in View Items Tab (be sure to verify
group)
Click on Edit/Add Line Tab
Click Add Line button on bottom left of screen
Date of entry is automatically inserted
Station to Station – Enter location of work to be documented, avoid
using “thru out project”
Quantity – Enter quantity to be paid for
15 15
Option: Above Quantity is an icon for a calculator. (Do not use on
metric projects.
Click on icon.
Select shape of area to be measured
Enter dimensions (application allows 4 characters including decimal)
OK or Cancel
Entry now shows quantity, in correct unit, and calculations in the
remarks. No need to have someone else check math at this point.
16 16
Review Entry for accuracy
Use TAB key to leave remarks or just click on SAVE
By – Inserted automatically, initials of person making entry
Voucher – Inserted automatically, indicates which voucher payment will
be made
17 17
Previous entry dated xx/yy/zz made on wrong item
Previous entry dated xx/yy/zz error in math discovered
View IRA Entry Detail Tab – only an option when selected IRA has
entries. Allows you to see all item header information, as well as entry
details, including: entry date, sta to sta, Doc location, entry quantity,
initials of who made entry, voucher number, entry type (GS – group
specific, or AD – automatic distribution), group number, and remarks.
18 18
Body (Not Group Specific) – may not be available due to initial System
Setup. This tab would mainly be used for LS items that have an automatic
distribution. It is best not to use this option.
View MOH – Only an option when an item selected has MOH (Material On
Hand). For viewing only.
Fuel Escalation – Only an available when project has been set up with
BFI and CFI. This tab allows you to look at particular entries that have
associated escalation. For viewing only.
19 19
It is important to create Backsheets in the proper tab for reporting
purposes.
Work Orders –
Edit/Add WO Description
Enter WO number
Estimated Cost
Category – enter your own or click on Category button and select from
list.
Type of Work – enter your own or click on button to select from list.
Description – self explanatory
Add Items
Add item – enter item number, item name, unit price, unit, mult.
Factor, additional description, and select group by checking appropriate
box, SAVE.
Add Force Account item – this option fills in some of the header
information; enter additional description information, select group,
SAVE.
Add Similar item – this option brings up a copy of selected item, you can
edit as needed; used to avoid re-typing similar information, multiple
times
20 20
View/Delete Items
highlight item you want to delete
click delete
verify
answer yes or no to continue delete process
If you don’t see an item you know is there, remember to use side scroll
bar. When deleting, verify group number prior to deletion.
Edit Items
Edit Item (All Groups) – edit item number, item description, mult
factor, unit price, unit, or additional description for item in all groups
Edit Item (1 group) – edit item number, item description, mult factor,
unit price, unit, or additional description for item in one group
(Item/group must first be selected on view/delete tab)
Add to Other groups – after clicking this button, put check mark (or
uncheck to delete from group) in Select Box next to group number.
Change Participation – highlight group you wish to change Federal
Participation, note: you may have a non-part item in a participating
group. This will not open the item, it just checks/un-checks the
Federal Participation box in upper right corner.
Prev/Next – allows you to scroll through items
Change Orders –
Add/Edit C.O. Descriptions
Add – Enter CO number
Select Change to days from drop-down pick list
Enter additional days, enter (-) if there is a decrease in days Note:
this does not change contract time; you need to go to the Contract
Time option to do that
Enter description of Change Order
Save
For remainder of tabs under Change Orders, see process for Work Orders.
21 21
Click on Add Backsheet Tab
Click Add Similar Item button
Edit data as needed
Select Group
Save
Edit (options)
Add to other groups – self explanatory
Edit description – self explanatory
Save
22 22
Permanent Monetary Deducts and Temporary Withholding
The Process is the same for both Permanent Deductions and Temporary
Withholding. In the Help option, select deducts and withholding, this file
has information for both 00 and 05 Spec years referencing the spec
number, page of the spec book, and amount of deduct, withholding, or
incentive. As certain specs are changed quite frequently, some columns
direct you to “see special provisions”.
Add Item –
Enter Item Number, Item Name, Unit Price, Unit
Justified by – select pertinent option from pick list
Number – Enter Specification or Special Provision number that allows
for deduction/withholding
Additional Description – self explanatory
Select group by placing check mark in box
Save
This area is for creating MOH; FieldOps will ask you at time of item entry
on main body if you want to remove quantities from MOH.
After marking items with MOH, you can add more information dependent
on which method you selected.
23 23
an “invoice” with a price breakdown, so you want to pay a percentage of
the unit price.
Enter the unit price
Enter the mult factor (e.g. 0.4 for 40% of unit price form mat’l in
stockpile)
Enter remarks – helpful comments, details of MOH
When making an update entry to item that has Standard MOH, FieldOps will
ask you a quantity value of MOH to remove.
Lump Sum/MOH – when you get an invoice for a LS or Each item which
may consist of many components, e.g. signal system.
Enter Invoice Number
Enter Invoice Amount
Enter remarks – helpful comments, details of MOH
When making an update entry to item that has MOH LS/Each, FieldOps will
ask you a dollar amount value of MOH to remove.
If you use the Delete MOH function, it will remove the remaining dollar
amount from the Total Value of Material on Hand.
24 24
Supplemental Agreements
View SA’s
Allows you to view all Supplemental Agreements on project. Scroll through
top grid to select SA or verify date entered. See any comments entered
and items on SA. All remaining boxes on screen are for future use.
Download SA Encumbrance
Download new SA
Download new Encumbrance
25 25
Contract Time Tab
For additional guidance, see Contract Administration Manual section .340
Weekly Diary1
On the bottom of all tabs throughout the Weekly Diary, there are buttons
for
View - takes you back to View Totals tab
Different Diary – brings up a pick list of available diaries
Change Intermediate – if Intermediate has been entered, this button will
allow you to navigate between intermediates and contract as-a-whole on
the tab you are in.
These buttons serve the same function on all tabs.
1
Mn/DOT Standard Specification for Construction, 2005 Edition, Section 1806.1
26 26
New Diary – Enter week ending date, verify prior to Save. This creates the
diary; you must use other tabs to enter diary content. Go to Contractors
below.
Unmark Approval – If diary has been approved and you wish to edit, you
must first unmark approval. Print Diary – generates a .PDF of weekly diary,
you may print from Adobe application. Diary is stored in directory. You
may e-mail to the contractor via the Send Mail area.
Contractors Tab
Add Contractors to Diary
Double click on Contractor Name to add them to diary. If you pick
an incorrect Contractor, double click again to remove.
Click on Return to bring you back to Contractor screen
Save
You may add a new Vendor from this screen. If added here, Contractor will
be available in the Project Setup – Modify Contractor screen. However if
you want to make the new vendor a DBE, you need to go to the Modify
Contractor screen.
27 27
PCO (Progress Controlling Operation) Tab
The Progress Controlling Operation (PCO) is the major work and controlling
operation during the week covered by the report. The progress schedule
will be used to identify the controlling operations. 2 There may be more
than one controlling operation for the week.
Enter the PCO and the hours scheduled.
Edit available on diaries that have not been approved.
The PCO will carry over from week to week; remember to change it when
needed.
2
Mn/DOT Standard Specification for Construction, 2005 Edition, Section 1803
28 28
W.D. Expl. Tab
View/edit all explanations of WD charges
Edit Daily Explanation – Add or edit explanation of daily delays or working
day charges.
29 29
Daily Remarks
For entry content guidance, see Contract Administration Manual section
390
Edit Daily Remarks – Add or explain work progress, site conditions, labor
and equipment usage, and the contractor’s ability (or inability) to perform
work, etc.
Comments
Edit Weekly Remarks – Add or edit Project summary of project diaries.
Weather
Edit Weather – Add or edit weather for project.
30 30
Revise Contract – Intermediates Tab - Use if Contract Time is
changed by Supplemental Agreement.
You must first select item you wish to revise in the View/Delete
Contract – Intermediates Tab. Then select the Revise Contract –
Intermediates tab.
Click Revise Contract button or Revise Intermediate button as
appropriate.
Enter Change to Working Days, Change to Calendar Days, or New
Completion Date in appropriate box. Note: enter only additional
days, not the end result desired. If original contract is 40 WD and
you want to add 3 WD, then enter 3, not 43. If time is shortened,
enter a negative number.
Enter Reason for Change – be sure to reference SA number.
SAVE
View Contract Time Changes Tab – View only tab, synopsis of Contract
Time Changes.
31 31
Payment and Documentation Tab
Estimate – Work with Partial Estimate for Payment (View, Print, Email)
View/Print Draft Partial Estimate
Select Partial Estimate Options *indicates default
Portrait Layout* – Paper orientation
Landscape Layout – Paper orientation
Group Level Detail* – shows item quantities for each group
Proposal Level Detail – shows item quantities for project as a whole
All Pay Items* – shows all pay items, whether they have changed or not
Changed Items Only – shows items that have changed since last estimate
Detailed Format* – includes header information for each item
Regular Format – does not include header information for each item
Review draft for accuracy.
32 32
“Backup Contract No XYZ123”
Select destination:
Floppy
CD Drive
Other Drive
E-mail recipient
Backup Cancel
(This is the only e-mail function in this tab) brings up e-mail
software, enter recipient’s e-mail address, and then send.
After voucher is generated, another pop-up box will show:
Process Voucher
This will update the project for voucher XX. Do you want to continue?
Yes – Updates, all work entered after this process will be on next
voucher.
No – Voucher number does not advance.
Do not use this for “draft” functions, if you answer no, yet send a paper
copy on for voucher processing, your next voucher will be incorrect.
Print Items that Changed – Generates a report with breakdown for main
body items, SA’s, WO’s, CO’s, Backsheet items, incentive/disincentive
items, deduction items, and fuel escalation items. If the particular
category listed above has items that have changed, a more detailed
breakdown will be generated.
33 33
Preview Portions of Current Estimate – enables the options on the right side
of the screen. Pick option you wish to view.
34 34
Utilities Tab
Send Mail
Contacts Tab
MN/DOT Contacts has defaults added for support and OCIC personnel.
Construction Payment Group [email protected] is a group within OCIC
who receives/processes vouchers prior to sending them to finance. You
may add other contacts as you deem fit. Contacts are project specific.
35 35
Click back to the Send Mail tab, and click on Send. Be sure that
Selected Contacts box is checked.
Suggested usage:
Contractor – Diaries, Vouchers, and Status Reports
Mn/DOT –
CPG: Vouchers, requirement letters
Land Management: first and final Status report
EEO – requirement letter, final status report
36 36
The Certify process is the same for all items whether they are in the body,
supplemental agreements, work orders, change orders, or backsheets. The
exceptions are:
Fuel Escalation – FieldOps generated calculations based on entries; no
certification needed.
MOH – Items should have been used, retained by the contractor, or
become surplus materials - property of the state. There MOH should be
reduced to zero and deleted.
Temporary Withholding – Withholding is to be temporary. Options here
are to remove item, move to general backsheets, or move to monetary
deducts.
Remove item – withholding no longer applies and contractor deserves
money e.g., contractor removes silt fence as directed at end of
project.
Move to general backsheets – contractor fails to remedy situation
requiring withholding in the first place e.g., Contractor elects to
take deduct for failing material rather than replace. When you
select this option, FieldOps does not ask you to confirm. You will
now need to go to the backsheets tab and certify the item there.
Move to monetary deducts – contractor fails to remedy situation
requiring withholding in the first place e.g., Contractor does not
remove silt fence at end of project. When you select this option,
FieldOps does not ask you to confirm. You will now need to go to
the Monetary Deducts tab and certify the item there.
Select Add Final Quantity – the box above Final Doc. Location will show
the final quantity as totaled from all groups. The cursor will
automatically go to the group specific final quantity (box will be
highlighted blue), verify that each group has the appropriate quantity.
If person who made original entries used Automatic Distribution to make
entries, there may be some rounding error issues.
Verify final. Make adjustments if necessary.
If correct, then enter Final Documentation Location, e.g. Book 1
pages 4-12, Envelope 3, Source Documentation, ticket package.
Then Save.
If the quantity is incorrect, you have two options: you can go back
to the Update tab and make entries on the item, or you can enter
final quantity on current screen then enter Final Doc. Location.
Then Save.
37 37
Note: If you certify an item, then go back to make changes in the update
tab, you will need to certify the item again.
After item has been certified, FINALED will be printed in red next to the
unit box when in the Edit/Add Final Qty. tab.
In the View Items tab, items that have been certified will be highlighted
with a pale yellow color and F will show in the Final Column. Items that
have not been certified will be highlighted with light blue.
Final
Final Procedures tab
Edit Over-run / Under-run Letter (See CAM section .410 for requirements.)
Body Items – select Significant Pay Items or All Body Items
Based on your selection, the fields will be populated with items that are
affected.
Highlight an item
Review information on right side of screen
Choose a reason from drop down box
38 38
Enter explanation; explanation should be as short as possible and
still provide sufficient detail to account for change.
39 39
Edit Project Personnel Roster
The roster will contain the names, initials, working title and signature of
all Mn/DOT personnel involved in the quantity documentation process for
the project, i.e. scale person, street checker, inspectors, office personnel.
Add new – Enter name, working title and initials of person. Save
Add from Security – Brings up a list of personnel added during System
Setup – Setup Security process. Select appropriate people to add to
roster.
Print IRA’s
It is not necessary to print IRA’s for final submittal. If you do print, then
submit.
Make appropriate selection for your needs.
40 40
Final Date Tracking – Form for tracking documentation submittals needed
to Final Project. This form, at time of manual writing, requires data entry
by hand.
Final Doc Submittal – Generates a .pdf; summarizes information for Project
Final documentation submittal, header information is supplied, but
documentation location must be handwritten. Some districts opt to use a
Word® document so entries may be typed.
Time Certification – Generates form for Engineer’s signature; to be
included in Final Contract Time File.
Time Date Log – Old hand written form, does not need to be completed if
you use Print Contract Time Summary Data from Final Procedures Tab and
Time Certification form as directed above.
41 41
other drive: select destination from popup, then click backup
again
floppy or CD drive: have media in drive, click backup
Restore Project
For use when the unexpected happens, i.e. your laptop is stolen, damaged,
lost. You can restore the project from a previous backup, as long as the
backups were stored at a different location. Follow steps as directed on
screen. See screen shot on next page.
Undo last restore – option when you’ve made a mistake with a restore.
Reindex Project
No explanation for this.
42 42
Delete Project
When project is completed, you’ve sent in your final, you have it saved
elsewhere and you want to free space on your computer, you can delete
the project.
Click the check box for Backup Project at your discretion.
A popup box telling you that project will be deleted, verify the
Contract Number
Answer yes to continue delete process or cancel to stop delete
process.
43 43
Appendix
Forms
44
FIELD RECORD DOCUMENTATION
BODY ITEMS GROUP SPECIFIC
10.59 334.00 SY
(1) NON-CUMULATIVE SUB-TOTAL FOR QUANTITY TO BE ENTERED INTO CAARS. THIS IS FOR ANY APPROPRIATE
REPORTING PERIOD,SUCH AS WEEKLY UPDATES, PARTIAL ESTIMATE UPDATE, OR INDIVIDUAL FRD
45
ENTRY
UPDATE.
(2) BACK MAY BE USED FOR COMPUTATIONS AND DRAWINGS.
Minnesota Department of Transportation Item Record Account
Contract Body Items (Group Specific)
Contract Number S06075 Low SP 3503-12
Documentation Location/Quantity Verification (book, page, roll) SOURCE, COMPS. ABOVE CHECKED BY MEG.
Remarks:
DAY DATE HOURS WORKED HOURS DELAYED WORK PCO EXPLANATION OF DELAYS/
(1) (2) (3) Av (1)Un Av (2)Un Av (3)Un DAYS WORKING DAYS
SUN 10/08/06
WED 10/11/06 8.0 1 NO WORK TODAY DUE TO COLD WEATHER AND WET CONDITIONS.
THU 10/12/06 8.0 1 NO WORK TODAY DUE TO COLD WEATHER AND WET CONDITIONS.
FRI 10/13/06 10.0 6.0 0.5 1 ONLY .5 WORKING DAY CHARGED DUE TO COLD AND WET CONDITIONS.
Monday 10/09/06
N.P. PAVING MAINLINE AND APPROACHES. UNITED RENTAL PLACING INTERIM STRIPING.
Weather - High: 48 Low: 35 Conditions: P.C.
Tuesday 10/10/06
N.P. PAVING MAINLINE AND APPROACHES.
Weather - High: 48 Low: 31 Conditions: P.C.
Wednesday 10/11/06
NO WORK DUE TO COLD AND WET CONDITONS.
Weather - High: 32 Low: 27 Conditions: P.C. - SNOW
Thursday 10/12/06
NO WORK DUE TO COLD AND WET CONDITONS.
Weather - High: 36 Low: 33 Conditions: CLOUDY
Friday 10/13/06
N.P. PAVING MAINLINE AND APPROACHES. ONLY .5 WORKING CHARGED DUE TO COLD AND WET CONDITIONS. UNITED
RENTAL PLACING INTERIM STRIPING.
Weather - High: 37 Low: 32 Conditions: CLOUDY
Saturday 10/14/06
N.P. PAVING MAINLINE AND APPROACHES.
Weather - High: 47 Low: 36 Conditions: P.C.
48
Low SP Number: 3503-12 Contract Number: S06075 Engineer/ Supervisor: Jack Bauer
Contractor: NORTHERN PAVING INC Phone: 651-666-2424 Ext:
102 W 5TH ST Mn/DOT District: 02
CROOKSTON Chief Inspector: Tony Almeida
Comments:
49
MATERIALS CERTIFICATION EXCEPTIONS SUMMARY 06/26/2008
S.P. No. 3503-12 Contract No. S06075 Project Desc. : BITUMINOUS OVERLAY, AND AGGREGATE Const. Year : 2006
SHOULDERS
TH: District 02 Contractor: Contractor: Northern Paving Inc Project Location: TH 11, FROM RR TRACKS IN KARLSTAD TO
RR TRACKS IN GREENBUSH
Project Engineer/Supervisor: Jack Bauer Federal No. STATE FUNDS Page of
Materials and products used on project:
Grading and Base X Bituminous Concrete Aggregate Materials/Chemicals
S.P. 3503-12
Contract No. S06075
The following tabulation indicates overruns and underruns for this contract. This contract
overran by $142,426.59 or by 12.00% of the original contract amount.
51
Low S.P. Number : 3503-12 Contract Number : S06075
STATE OF MINNESOTA
DEPARTMENT OF TRANSPORTATION
52
Low S.P. Number : 3503-12 Contract Number : S06075
STATE OF MINNESOTA
DEPARTMENT OF TRANSPORTATION
Change Orders
Overrun / Underrun Explanations
53
Low S.P. Number : 3503-12 Contract Number : S06075
STATE OF MINNESOTA
DEPARTMENT OF TRANSPORTATION
This completes the report on quantity variations for Contract No. S06075. I am available for any
further explanations which may be necessary.
Sincerely,
"I have reviewed the foregoing explanation for all Supplemental Agreements and Items of work as
enumerated in the Resident / Project Engineers report of Overruns and Underruns under this
contract. To my knowledge, the explanations presented are true and accurate, and I concur fully with
the statements contained therein."
Date:
SIG HANSEN, Assistant District Engineer
54
Low S.P. Number : 3503-12 Contract Number : S06075
55
MINNESOTA DEPARTMENT OF TRANSPORTATION
Change in Contract Construction Status
Final Tracking Log
56
06/26/200 Page 1
FINAL CONTRACT TIME CERTIFICATION REPORT
S. P. Number : 3503-12
Contract No. : S06075
Contractor : NORTHERN PAVING INC
I hereby certify that the Contract Time Portion of this project has been administered
in accordance with the provisions of Standard Specifications 1806 & 1807 and as
stated in the Special Provisions for this Contract. All extensions of Contract Time,
if any, have been computed and considered in this assessment.
Date
Project Engineer/Supervisor
57
MINNESOTA DEPARTMENT OF TRANSPORTATION
Change in Contract Construction Status
Final Tracking Log
58
06/26/200 Page 1
CONTRACT TIME DIARY SUMMARY
59
CONTRACT TIME PROJECT SUMMARY
Reviewed by:
60
06/26/2008
Final Voucher Date Tracking Form
District Engineer: Do not sign the attached Final Voucher Certificate of Final Contract Acceptance unless
District Engineer:
all date boxes are completed with a date or marked N/A. This will serve as your assurance that MN Statutes
§ 161.34 and 161.32 have been observed by the Project Engineer and that all Special Contract Requirements
have been met. Once you have signed the Certificate of Final Contract Acceptance, no changes can be made
to this Contract.
Project Engineer: Please refer to the Contract Administration Manual section 5-591.370 prior to
Project Engineer:
completeing this form.
Date Certificate of Final Acceptance signed by Project Engineer and sent to Contractor via Certified
Mail.
Date Final Received by Contractor ("Date of Delivery" shown on Cert. Mail Green Card, or Electronic (A)
Tracking Notice)
Date Due Back from Contractor: (B) = (A) + 90 Calendar Days (Include Saturdays, Sundays and (B)
Holidays)
Date Signed Final Received in Engineer's Office from Contractor
Special Final Requirements – Enter Dates items Received from Contractor or Completed by Engineer
Before Submitting this final to the District Engineer for Signature, all above dates must be entered. All dates
that do not apply must be marked N/A (Not Applicable).
If all boxes are not filled in, Final must be held in District Office until all issues are resolved.
Special notes:
Box (A) – The Certified Mail stub (green card) or Electronic Tracking Notification is official
acknowledgement that the Contractor has received the Final Voucher and Certificate of Final Acceptance.
Enter the "Date of Delivery" shown on the stub or e-mail from USPS.
Box (E) – IC-134 Tax Withholding required by MN Statutes § 290.97 and 290.92.
Box (J) – Required on Federal Funding Projects designated as MAP, FAP, FFO, and SAFO and as required
by District Engineer.
Box (K) – Form required on all projects with Federal Funds.
Box (L) – Form required on all projects with Federal Funds.
Attach Certified Mail stub here, or attach copy of Electronic Notification to back of this form.
Final Voucher Recall can only be done by the Office of Construction. If this is necessary, contact the
Contract Administration Supervisor in the Office of Construction. 61
62
63
STATE OF MINNESOTA - DEPARTMENT OF TRANSPORTATION
CERTIFICATE OF FINAL CONTRACT ACCEPTANCE
LOW S.P. NO. 3503-12 FINAL VOUCHER NO. 7 CONTRACT NO. S06075
This is to certify that to the best of my knowledge, the items of work shown in the Final
Voucher herein have been actually furnished in accordance with the Plans and Sepcifications.
The undersigned Contractor hereby certifies that the work described has been performed in
accordance with the terms of the Contract, and agrees that the Final Value of Work Certified on
this Contract is $1,342,410.76 and agrees to the amount of $-3.46 as FinalPayment on
this Contract in accordance with this Final Voucher.
(Individual Acknowledgment)
be the person who executed the foregoing Acceptance and Acknowledged that he/she executed the
(Corporate Acknowledgment)
__________________________And_____________________________,to me personally known, who, being
each by me duly sworn, each did say that they are respectively the___________________________
instrument, and that the seal affixed to said instrument is the Corporate Seal of said
Corporation, and the said instrument was signed and sealed in behalf of said Corporation by
authority of it's ____________________and said______________________ and ____________________
acknowledged said instrument to be the free act and deed of said Corporation.
I hereby certify that a Final Examination has been made of the noted Contract, that the Contract
has been completed, that the entire amount of Work Shown in this Final Voucher has been performed
and the Total Value of the Work Performed in accordance with, the terms of the Contract is as
shown in this Final Voucher.
This Contract is hereby accepted in accordance with the Specification 1516. Final acceptance of
the Contract will be effective upon
fullfull Execution, by the Contractor and the Department, of the
"Certificate of Final Acceptance" included with the Final Voucher.
Dated____________________________ Signature__________________________________ District Engineer
64
65
STATE OF MINNESOTA
DEPARTMENT OF TRANSPORTATION
FINAL VOUCHER FOR PAYMENT NUMBER 7
Grp. State Trunk Federal Value of Work Less Previous Value Of Work Federal Federal
Num. Project Highway Project Certified Work Certified Non - Part Non - Part
Number Number Number To Date Certified This Voucher To Date This Voucher
001 3503-12 TH 11=011 STATE FUNDS $598,337.70 $598,341.16 $-3.46 $0.00 $0.00
002 6801-16 TH 11=011 STATE FUNDS $744,073.06 $744,073.06 $0.00 $0.00 $0.00
$1,342,410.76 $1,342,414.22 $-3.46 $0.00 $0.00
Value of Work Certified This Voucher $-3.46 Total Value of Work Certified To Date: $1,342,410.76
Liquidated Damages Charged $0.00 Funds Encumbered To Date: $1,359,987.63
LOW SP NUMBER: 3503-12 FOR WORK PERFORMED AND ACCEPTED AS OF 07/21/08 66 S06075
CONTRACT:
STATE OF MINNESOTA - DEPARTMENT OF TRANSPORTATION
S T A T E M E N T O F W O R K C E R T I F I E D
MAIN BODY ITEMS (Group Level Detail)
All Pay Items
Voucher No. 7 Sheet No.: 2
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Item Contract Unit Contract Contract To Date To Date Grp Line
Number Item Unit Price Quantity Amount Quantity Amount No. No.
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------
2021.501- MOBILIZATION LS 32,113.32 1.00 32,113.32 1.00 32,113.32 001 0010
Total for Proposal Line Number 0010: 1.00 32,113.32 1.00 $32,113.32
2051.501- MAINT & RESTORATION LS 0.98 1.00 0.98 1.00 0.98 001 0020
Total for Proposal Line Number 0020: 1.00 0.98 1.00 $0.98
2221.501- AGGREGATE TON 7.00 1,994.00 13,958.00 2,342.00 16,394.00 001 0030
2221.501- AGGREGATE TON 7.00 12,302.00 86,114.00 14,411.90 100,883.30 002 0030
Total for Proposal Line Number 0030: 14,296.00 100,072.00 16,753.90 $117,277.30
2232.501- MILL BITUMINOUS SY 10.59 334.00 3,537.06 312.00 3,304.08 001 0040
2232.501- MILL BITUMINOUS SY 10.59 312.00 3,304.08 312.00 3,304.08 002 0040
Total for Proposal Line Number 0040: 646.00 6,841.14 624.00 $6,608.16
2357.502- BITUMINOUS MATERIAL GAL 1.73 5,867.00 10,149.91 7,452.00 12,891.96 001 0050
2357.502- BITUMINOUS MATERIAL GAL 1.73 7,448.00 12,885.04 7,098.00 12,279.54 002 0050
Total for Proposal Line Number 0050: 13,315.00 23,034.95 14,550.00 $25,171.50
2357.606- BITUMINOUS MATERIAL GAL 1.75 3,180.00 5,565.00 245.00 428.75 001 0060
Total for Proposal Line Number 0060: 3,180.00 5,565.00 245.00 $428.75
2360.501- TYPE SP 12.5 WEARING TON 32.55 12,102.00 393,920.10 13,500.00 439,425.00 001 0070
2360.501- TYPE SP 12.5 WEARING TON 32.55 15,362.00 500,033.10 16,095.00 523,892.25 002 0070
Total for Proposal Line Number 0070: 27,464.00 893,953.20 29,595.00 $963,317.25
2360.505- TYPE SP 9.5 BIT MIX FOR TON 39.79 846.00 33,662.34 946.00 37,641.34 001 0080
2360.505- TYPE SP 9.5 BIT MIX FOR TON 39.79 1,039.00 41,341.81 1,269.01 50,493.90 002 0080
Total for Proposal Line Number 0080: 1,885.00 75,004.15 2,215.01 $88,135.24
2563.601- TRAFFIC CONTROL LS 2,550.00 1.00 2,550.00 1.00 2,550.00 001 0090
Total for Proposal Line Number 0090: 1.00 2,550.00 1.00 $2,550.00
2564.602- PAVEMENT MESSAGE EACH 861.90 1.00 861.90 1.00 861.90 001 0100
Total for Proposal Line Number 0100: 1.00 861.90 1.00 $861.90
2564.602- PAVEMENT MESSAGE EACH 357.00 1.00 357.00 1.00 357.00 001 0110
Total for Proposal Line Number 0110: 1.00 357.00 1.00 $357.00
2564.603- 4" SOLID LINE LF 0.18 89,295.00 16,073.10 88,064.00 15,851.52 001 0120
2564.603- 4" SOLID LINE LF 0.18 110,405.00 19,872.90 107,717.00 19,389.06 002 0120
Total for Proposal Line Number 0120: 199,700.00 35,946.00 195,781.00 $35,240.58
2564.603- 6" CROSSWALK LINE LF 6.12 96.00 587.52 102.00 624.24 002 0130
Total for Proposal Line Number 0130: 96.00 587.52 102.00 $624.24
67
LOW SP NUMBER: 3503-12 FOR WORK PERFORMED AND ACCEPTED AS OF 07/21/08 CONTRACT: S06075
STATE OF MINNESOTA - DEPARTMENT OF TRANSPORTATION
S T A T E M E N T O F W O R K C E R T I F I E D
MAIN BODY ITEMS (Group Level Detail)
All Pay Items
Voucher No. 7 Sheet No.: 3
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Item Contract Unit Contract Contract To Date To Date Grp Line
Number Item Unit Price Quantity Amount Quantity Amount No. No.
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------
2564.603- 24" STOP LINE LF 20.40 12.00 244.80 11.00 224.40 001 0140
Total for Proposal Line Number 0140: 12.00 244.80 11.00 $224.40
2564.603- 4" SOLID LINE LF 0.20 13,358.00 2,671.60 13,283.00 2,656.60 001 0150
2564.603- 4" SOLID LINE LF 0.20 2,619.00 523.80 2,587.00 517.40 002 0150
Total for Proposal Line Number 0150: 15,977.00 3,195.40 15,870.00 $3,174.00
2564.603- 4" DOUBLE SOLID LINE LF 0.41 4,879.00 2,000.39 5,512.00 2,259.92 001 0160
2564.603- 4" DOUBLE SOLID LINE LF 0.41 2,820.00 1,156.20 2,653.00 1,087.73 002 0160
Total for Proposal Line Number 0160: 7,699.00 3,156.59 8,165.00 $3,347.65
2564.603- 4" BROKEN LINE LF 0.20 7,954.00 1,590.80 7,930.00 1,586.00 001 0170
2564.603- 4" BROKEN LINE LF 0.20 10,762.00 2,152.40 10,710.00 2,142.00 002 0170
Total for Proposal Line Number 0170: 18,716.00 3,743.20 18,640.00 $3,728.00
2580.603- INTERIM PAVEMENT LF 0.16 54,185.00 8,669.60 39,100.00 6,256.00 001 0180
2580.603- INTERIM PAVEMENT LF 0.16 25,568.00 4,090.88 12,780.00 2,044.80 002 0180
Total for Proposal Line Number 0180: 79,753.00 12,760.48 51,880.00 $8,300.80
68
LOW SP NUMBER: 3503-12 FOR WORK PERFORMED AND ACCEPTED AS OF 07/21/08 CONTRACT: S06075
STATE OF MINNESOTA - DEPARTMENT OF TRANSPORTATION
S T A T E M E N T O F W O R K C E R T I F I E D
BACKSHEET ADJUSTMENTS
(ASSOCIATED WITH CHANGE ORDERS)
69
LOW SP NUMBER: 3503-12 FOR WORK PERFORMED AND ACCEPTED AS OF 07/21/08 CONTRACT: S06075
STATE OF MINNESOTA - DEPARTMENT OF TRANSPORTATION
S T A T E M E N T O F W O R K C E R T I F I E D
INCENTIVE / DISINCENTIVE PAYMENTS
0000.000- Bituminous Incentive - Disincentive for Density LS$ 1.00 1.0000 2,898.68 $2,898.68
0000.000- Bituminous Incentive - Disincentive for Ride LS$ 1.00 1.0000 25,636.25 $25,636.25
0000.000- Bituminous Incentive - Disincentive for Density LS$ 1.00 1.0000 3,000.00 $3,000.00
0000.000- Bituminous Incentive - Disincentive for Ride LS$ 1.00 1.0000 30,000.00 $30,000.00
70
LOW SP NUMBER: 3503-12 FOR WORK PERFORMED AND ACCEPTED AS OF 07/21/08 CONTRACT:S06075
STATE OF MINNESOTA - DEPARTMENT OF TRANSPORTATION
S T A T E M E N T O F W O R K C E R T I F I E D
FUEL ESCALATION
71
LOW SP NUMBER: 3503-12 FOR WORK PERFORMED AND ACCEPTED AS OF 07/21/08 CONTRACT: S06075
STATE OF MINNESOTA - DEPARTMENT OF TRANSPORTATION
72
LOW SP NUMBER: 3503-12 FOR WORK PERFORMED AND ACCEPTED AS OF 07/21/08 CONTRACT: S06075