A Heuristic Approach To Stochastic Cutoff Grade Optimization For Open
A Heuristic Approach To Stochastic Cutoff Grade Optimization For Open
Resources Policy
journal homepage: www.elsevier.com/locate/resourpol
art ic l e i nf o a b s t r a c t
Article history: Cutoff grade specifies the available supply of metallic ore from an open pit mine to the multiple
Received 6 December 2012 processing streams of an open pit mining complex. An optimal cutoff grade strategy maximizes the net
Received in revised form present value (NPV) of an open pit mining operation subject to the mining, processing, and marketing/
11 September 2013
refining capacity constraints. Even though, the quantities of material flowing from the mine to the
Accepted 19 September 2013
market are influenced by the expected variation in the available metal content or inherent uncertainty in
Available online 18 October 2013
the supply of ore, the majority of cutoff grade optimization models not only disregard this aspect and
JEL classification: may lead to unrealistic cash flows, but also they are limited in application to an open pit mining
Q operation with single processing facility. The model proposed herein determines the optimal cutoff grade
Keywords: policy based on a stochastic framework that accounts for uncertainty in supply of ore to the multiple ore
Stochastic optimization processing streams. An application on a large-scale open pit mining operation develops a unique cutoff
Cutoff grade grade policy along with a portfolio of mining, processing, and marketing/refining rates. Owing to the
Heuristic algorithms geological uncertainty, the approach addresses risk by showing a difference of 14% between the
Open pit mine planning minimum and maximum production rates, cash flows and NPV.
& 2013 Elsevier Ltd. All rights reserved.
Introduction 1972). Cutoff grade policy maximizes NPV of an open pit mining
complex subject to the mining, processing, and marketing/refining
In an open pit mining complex, a typical open pit produces capacity constraints (Rendu, 2008; King, 2011). Given that multiple
material of various categories, which is transported to the appro- ore processing options exist, cutoff grade for a particular proces-
priate processing streams for recovering metal as a valuable sing option is defined from the known economic parameters and
product. Knowing the ultimate pit limit, i.e., the size or extent of grade–tonnage curves, and depending upon the quality of ores
an open pit mine, the supply of material in terms of grade–tonnage described in grade–tonnage curves, it is sent to the most economic
curves is established (Hustrulid and Kuchta, 2006), that is the processing stream (Dagdelen and Kawahata, 2008).
available quality (grade categories) and quantity (tonnes within While, mine is a source of supplying ore to a number of processes
these categories) of material within the pit limit. The grade– that convert raw ore to a profitable product, expected variation in
tonnage curves along with the economic parameters such as price metal content throughout the extent of the orebody defines the
of metal, operating costs, metallurgical recovery, and discount rate inherent uncertainty in supply of ore. Taking the limited exploratory
become the basic input to determine the optimal cutoff grade drill-hole information as an input, the geostatistical technique of
policy. conditional stochastic simulation (Goovaerts, 1997; Boucher and
Cutoff grade policy defines the amount of ore and waste in a Dimitrakopoulos, 2012; Machuca-Mory and Deutsch, 2013) is used
given period during the life of an operation. While waste is hauled to characterize this geological uncertainty, resulting in a set of
to the waste dumps, ore being valuable material is sent to the equally probable simulated realizations of the orebody, showing
processing streams for crushing, grinding, and upgrading to the variation of the metal content and corresponding tonnages from
produce concentrate, which, in turn, may be upgraded further by one realization to the next. Thus, as opposed to a traditional
refining to produce a final marketable product (Lane, 1964; Taylor, procedure that calculates or derives a single grade–tonnage curve
from a single (or constant and known) estimated orebody realiza-
tion, the stochastic procedures derive multiple or equally probable
n
Corresponding author. Tel.: þ 61 8 9088 6139. grade–tonnage curves from a set of conditionally simulated or
E-mail addresses: [email protected], [email protected]
(M.W.A. Asad), [email protected] (R. Dimitrakopoulos).
equally probable realizations of the orebody. As a result, each
1
Previously (12/2009 to 06/2012) Research Associate at COSMO Stochastic simulated realization of the orebody is translated into grade cate-
Mine Planning Laboratory, McGill University, Canada. gories and corresponding tonnages within these grade categories to
0301-4207/$ - see front matter & 2013 Elsevier Ltd. All rights reserved.
http://dx.doi.org/10.1016/j.resourpol.2013.09.008
592 M.W.A. Asad, R. Dimitrakopoulos / Resources Policy 38 (2013) 591–597
create a grade–tonnage curve. Consequently, being derived from do not attempt to look into the combined impact of considering a
simulated or equally probable realizations of the orebody, each set of simulated or equally probable grade–tonnage curves derived
grade–tonnage curve in the set of simulated grade–tonnage curves from simulated or equally probable orebody realizations and multi-
becomes equally probable, i.e., at the time of actual mining, the ple processing options.
probability of supplying material from (or corresponding to) a Unlike previous studies, realizing the importance of acknowl-
particular grade–tonnage curve remains the same. Given this edging geological risk to open pit mine planning, we propose an
fundamental difference between the traditional and stochastic extension in Lane's theory herein, such that, it is applicable in a
procedures, it is well-established that the geological uncertainty stochastic framework that not only takes into account multiple
impacts the ore and metal production targets (Elkington and simulated or equally probable grade–tonnage curves generated
Durham, 2011). For instance, Baker and Giacomo (1998) validate from a set of simulated or equally probable orebody realizations
that owing to the discrepancies came from the poor description of (Boucher and Dimitrakopoulos, 2012; Horta and Amilcar, 2010),
the orebody, out of 48 mining projects in Australasia, 13 revealed but also considers supply of ore to multiple ore processing
20% more than projected reserves, and 9 realized 20% less than the destinations in an open pit mining complex. The proposed cutoff
originally forecasted reserves. Similarly, a World Bank survey in grade optimization model (i) maximizes NPV of future cash flows;
Canada and USA shows that 73% of mining projects were closed (ii) satisfies the mining, processing, and marketing/refining capa-
prematurely due to problems in their ore reserve estimates, and led cities constraints; (iii) develops a unique and optimal cutoff grade
to severe losses in capital investment (Vallee, 2000). Consequently, policy for the life of operation by simultaneously utilizing all
recognizing the importance of incorporating geological uncertainty, available equally probable realizations of the grade–tonnage
it is imperative to adopt a stochastic framework for making a curves; and (iv) addresses risk by developing a portfolio of
strategic decision on cutoff grade policy. Owing to the variation in possible mining, processing, and marketing/refining rates that
metal content (grade) and corresponding tonnages from one grade– correspond to the optimal cutoff grade policy.
tonnage curve to the next, the stochastic framework honors the fact In the following sections, we discuss the stochastic cutoff grade
that given a defined cutoff grade, there is a possibility that the same optimization model, describe the heuristic procedure for calculat-
material may be identified as ore in one grade–tonnage curve and ing optimum cutoff grade, present the steps to implement the
waste in another grade–tonnage curve (Godoy and Dimitrakopoulos, heuristic approach, and demonstrate the benefits of the proposed
2011). Thus, as opposed to the traditional approaches that ignore the model in a case study followed by conclusions.
geological uncertainty by considering a single (or constant and
known) grade–tonnage curve, a stochastic framework jointly con-
siders multiple simulated or equally probable grade–tonnage curves Stochastic cutoff grade optimization model
and addresses the risk of not having enough ore to feed the
processing streams under geological uncertainty (Satybaldiev and The stochastic optimization model is limited in application to
Freidin, 2006; Dimitrakopoulos and Abdel Sabour, 2007; Elkington an open pit mining complex that consists of a single material
and Durham, 2011). source (mine), multiple material destinations (processing streams
Lane proposed a heuristic approach to cutoff grade optimization and waste dump), and a market/refinery receiving concentrate
(Lane, 1964, 1988) that not only considers a constant grade–tonnage from these processing streams. Also, it is assumed that an optimal
curve, but also limited in application to open pit mining operations ultimate pit limit has been established and the available reserves
with mine feeding ore to a single processing plant. Lane's theory (in terms of multiple simulated or equally probable grade–tonnage
has been modified in a number of traditional cutoff grade optimiza- curves) within the pit limit are known (Asad and Dimitrakopoulos,
tion models (Dagdelen, 1992, 1993; King, 2001; Asad, 2002; Cetin 2013). However, the model jointly accounts for a set of simulated
and Dowd, 2002; Ataei and Osanloo, 2004; Asad, 2005, 2007; or equally probable grade–tonnage curves and multiple processes
Bascetin and Nieto, 2007; Osanloo et al., 2008; He et al., 2009; for defining the cutoff grade policy. The uniqueness of the model
King, 2011). Dagdelen (1992, 1993) and Asad (2002) propose the lies in simultaneous utilization of a set of simulated or equally
steps of the algorithm that implements Lane's approach. King probable grade–tonnage curves for developing an exclusive cutoff
(2001) includes variations in ore type throughput in cutoff grade grade policy. The following parameters (Lane, 1964; Hustrulid and
optimization models for multi-element mineralization. Cetin and Kuchta, 2006; Asad and Dimitrakopoulos, 2012) facilitate descrip-
Dowd (2002) suggest a genetic algorithm for multi-mineral cutoff tion of the model:
grade optimization. Ataei and Osanloo (2004) recommend a com-
bination of genetic algorithm and grid search technique to deter- t period (year) indicator;
mine cutoff grades for multi-metal deposits. Asad (2005) T life of operation (years);
incorporates stockpiles into the cutoff grade optimization model p process indicator;
for multi-mineral deposits. Asad (2007) looks into the impact of ω grade–tonnage curve indicator;
metal price and cost escalation on cutoff grade optimization. n grade categories indicator;
Bascetin and Nieto (2007) suggest an NPV maximization model N number of grade categories in a particular grade–
through an optimization factor to determine cutoff grades. Osanloo tonnage curve;
et al. (2008) incorporate environmental issues into cutoff grade φωt cash flow for grade–tonnage curve ω during period t
optimization model. He et al. (2009) share a genetic algorithm and ($/year);
neural network based strategy to simulate a complex mining S selling price of metal ($/tonne of metal);
system for calculating the optimal cutoff grade. King (2011) explains r marketing/refining cost ($/tonne of metal);
the intricacies of Lane's approach giving details of various policies to m mining cost ($/tonne of material);
consider operating and administrative costs. Dagdelen and cp processing cost of process p ($/tonne of ore);
Kawahata (2008) present a linear programming based cutoff grade f administrative or fixed cost ($/year);
optimization model that considers constant grade–tonnage curve M mining capacity (tonnes/year);
with multiple processing options. Rendu (2008) covers the proce- Cp processing capacity of process p (tonnes/year);
dural aspects of considering multiple processing options in a cutoff R marketing/refining capacity (tonnes/year);
grade optimization model. While constant grade–tonnage curve as Qmωt quantity of material mined for grade–tonnage curve ω
an input is the common feature of these studies, majority of them during period t (tonnes of material);
M.W.A. Asad, R. Dimitrakopoulos / Resources Policy 38 (2013) 591–597 593
Qcωpt quantity of ore processed for grade–tonnage curve ω in then (Lane, 1964; Asad, 2007)
process p during period t (tonnes of ore); ′
ððS rÞQr ω ∑p cp Qcωp mQmω ft Þ þ V ′ω
Qr ωt quantity of marketable product or metal in concentrate Vω ¼ t′
ð5Þ
to be marketed/refined for grade–tonnage curve ω dur- ð1 þ dÞ
ing period t (tonnes of marketable product); Hence, the difference between V ω and V ′ω , i.e., vω , is the
yp metallurgical recovery of process p (%); increase in the present value achieved through mining next Qmω
d discount rate (%). of material. An expansion of the denominator in Eq. (5) gives
vω ¼ ððS rÞQr ω ∑cp Qcωp mQmω ðf þ dV ω Þt′Þ ð6Þ
Given a set of equally probable grade–tonnage curves, the p
model develops the cutoff grade policy for life of operation, i.e.,
If g ω represents the average grade of ore, then
it determines the cutoff grade γ p for process p from periods 1 to T,
Qr ω ¼ ∑p Qcωp g ω yp updates Eq. (6) as
such that, the present value of future cash flows is maximized
subject to the mining, processing, and marketing/refining capacity vω ¼ ððS rÞ∑Qcωp g ω yp ∑cp Qcωp mQmω ðf þ dV ω Þt′Þ ð7Þ
p p
constraints. The mathematical representation of the model is as
follows: Eq. (7) presents the basic value function that is in fact max-
imized by satisfying the limiting operational capacities and solving
T φωt
max ∑ t ð1Þ for the optimal value of cutoff grade. Therefore, it dictates the
t ¼ 1 ð1 þ dÞ derivation of mine, processes, and market/refinery limiting cutoff
subject to grades. The term ðf þ dV ω Þ is the opportunity cost of not mining
the remainder of the deposit due to limiting capacities of mining,
Qmωt r M; 8t ð2Þ processing, and marketing/refining stages. Therefore, depending
upon the limiting stage, the time t′ becomes Qmω =M, Qcωp =C p , or
Qcωpt rC p ; 8t ð3Þ Qr ω =R, if mine, processes, or market/refinery are limiting the
operation, respectively. Consequently, the opportunity cost
Qr ωt rR; 8t ð4Þ ðf þdV ω Þ may be distributed per tonne of material, per tonne of
ore, or per tonne of saleable product, if mine, processes, or market/
here φωt ¼ ðS rÞQr ωt ∑p cp Qcωpt mQmωt f is the cash flow
refinery are limiting the operation, respectively. This leads to the
realized from mining Qmωt quantity of material, processing Qcωpt
formulation for mine, processes, and refinery limiting cutoff
quantity of ore in process p, and marketing/refining Qr ωt quantity
grades, as follows (Lane, 1964; Asad, 2007):
of marketable product/concentrate during period t.
cp
The formulation (1)–(4) decides on the optimal cutoff grade γ p γ mp ¼ ð8Þ
such that the function in (1) is maximized relying on the fact that ðS rÞyp
the constraints (2)–(4) may be limiting the mining operation
f þdV ω
either individually or in pairs. If constraints (2)–(4) limit the cp þ
Cp
operation individually, then the optimal cutoff grade corresponds γ cp ¼ ð9Þ
to mine limiting γ mp , process limiting γ pp , or market/refinery ðS rÞyp
limiting γ r p cutoff grades. However, if constraints (2)–(4) limit the cp
operation in pair, then maximum available capacity of these γrp ¼ ð10Þ
f þ dV ω
constraints may be utilized by balancing the output from mine, Sr yp
R
process, or market/refinery stages, such that the optimal cutoff
grade corresponds to mine-process γ mp, mine-market γ mr, or The balancing cutoff grades are meant for harmonizing the
process-market γ pr balancing cutoff grades. As such, depending available material in ground with the production capacities. Hence,
upon the constraints (2)–(4), the optimal cutoff grade for a they are deduced from the grade–tonnage curves. Assume that
particular process is selected among the limiting and balancing a grade–tonnage curve ω consists of N grade categories
cutoff grades. ½½g ω ð1Þ; g ω ð2Þ; ½g ω ð2Þ; g ω ð3Þ; …; ½g ω ðN 1Þ; g ω ðNÞ and qωn quantity
(tonnes) of material in each grade category. If lower grade in
½g ω ðnÞ; g ω ðn þ 1Þ (let us identify this grade category as nn) is chosen
as a cutoff grade, i.e., γ ′ ¼ g ω ðnÞ, then the quantity of ore per unit of
Calculating optimum cutoff grades—a heuristic approach
material mined, recoverable metal in concentrate per unit of
material mined, and the recoverable metal in concentrate per unit
Formulation (1)–(4) is solved using a heuristic procedure that
of ore processed, represented as mpω ðγ ′Þ, mr ω ðγ ′Þ, and prω ðγ ′Þ,
maximizes the NPV of operation by keeping the quantities of
respectively, are calculated as follows (Lane, 1964; Asad and Topal,
material mined, processed, and marketed/refined within the
2011):
available limiting capacities in a given period t. The heuristic
framework allows the selection of the optimal cutoff grade γ p for a qoω ðγ ′Þ
mpω ðγ ′Þ ¼ ð11Þ
process p, such that it corresponds not only to the NPV of the qoω ðγ ′Þ þ qwω ðγ ′Þ
operation, but also to the operational capacities, leading to
qoω ðγ ′Þg ω ðγ ′Þy
dynamic values changing from one period to the next with the mr ω ðγ ′Þ ¼ ð12Þ
exhaustion of reserves. qoω ðγ ′Þ þ qwω ðγ ′Þ
Given a grade–tonnage curve ω, if total quantity of material in
pr ω ðγ ′Þ ¼ g ω ðγ ′Þy ð13Þ
ground is Q, and due to limited available operational capacities, if
it takes time t′ to mine next Qmω of material, then the present here qoω ðγ ′Þ, qwω ðγ ′Þ, g ω ðγ ′Þ, and y represent the quantity of ore,
value V ω of future cash flows at time zero (now) is equal to the quantity of waste, average grade, and average metal recovery
present value of cash flows generated by mining next Qmω of corresponding to a particular value of γ ′, respectively. Mine and
material at the end of time t′ and the present value of remainder processing stages, mine and market/refining stages, and processing
ðQ Qmω Þ of the deposit V ′ω at time t′. If cash flow from mining and market/refining stages will be balanced if the quantity of ore per
′
next Qmω is represented as ððS rÞQr ω ∑p cp Qcωp mQmω ft Þ, unit of material mined, quantity of metal in concentrate per unit of
594 M.W.A. Asad, R. Dimitrakopoulos / Resources Policy 38 (2013) 591–597
material mined, and the quantity of metal in concentrate per unit of 6. Compute:
ore processed are equal to the ratios ∑p C p =M, R=M, and R=∑p C p (a) Limiting economic cutoff grades γ mp , γ pp , γ r p using Eqs.
respectively. Applying linear approximation on the curves obtained (8)–(10), respectively.
from Eqs. (11) to (13), we get the formulation for balancing cutoff (b) γ p using Eq. (17).
grades as follows (Lane, 1964; Asad and Topal, 2011): (c) qoω ðγ p Þ, qwω ðmin γ p Þ, g ω ðγ p Þ using Eqs. (18)–(20),
2 3 respectively.
∑p C p
6 mp ω ð γ ′Þ 7 (d) Qmω , Qcωp , Qr ω as follows:
γ mp ¼ min6 M þ g ω ðnÞ7 ð14Þ Qmω ¼ M, Qcωp ¼ fQmω ∑p qoω ðγ p Þ=
ω 4mpω ðγ ′ þ 1Þ mpω ðγ ′Þ 5 Set
g ω ðn þ 1Þ g ω ðnÞ ð∑p qoω ðγ p Þ þ qwω ðmin γ p ÞÞgfC p =∑p C p g, Qr ω ¼ ∑p Qcωp γ ω yp .
If Qcωp 4 C p or Qr ω 4 R, then
2 3
R Qcωp ¼ C p , Qmω ¼ f∑p Qcωp gf1 þqwω ðmin γ p Þ=∑p qoω ðγ p Þg,
6 mr ω ðγ ′Þ 7 Qr ω ¼ ∑p Qcωp γ ω yp .
γ mr ¼ min6 M þ g ω ðnÞ7 ð15Þ
ω 4mrω ðγ ′þ 1Þ mrω ðγ ′Þ 5 If Qr ω 4 R or Qmω 4 M, then
g ω ðn þ 1Þ g ω ðnÞ Qr ω ¼ R, Qcωp ¼ ðQr ω C p =∑p C p Þ=γ ω yp ,
Qmω ¼ f∑p Qcωp gf1 þ qwω ðmin γ p Þ=∑p qoω ðγ p Þg.
2 3
R (e) v′ ¼ ∑t φωt =ð1 þ dÞt .
pr ω ðγ ′Þ
6 ∑p C p 7 7. Compare V ω with v′ for NPV convergence (within some
γ pr ¼ min6 þ g ω ðnÞ7 ð16Þ
ω 4pr ðγ ′ þ 1Þ pr ðγ ′Þ
ω ω
5 tolerance). If V ω is converged, then go to step 8, otherwise
g ω ðn þ 1Þ g ω ðnÞ go to step 5.
8. Given γ p and the corresponding flow of ore and waste to
The optimum cutoff grade corresponding to a particular processing
respective processes and waste dump, adjust the grade–
stream is selected among the limiting economic ðγ mp ; γ pp ; γ r p Þ and
tonnage curve ω.
balancing ðγ mp; γ mr; γ prÞ cutoff grades. Eq. (8) reveals that the
9. Set t ¼ t þ 1, go to step 2.
optimum cutoff grade may never be less than mine limiting cutoff
10. Present the optimal cutoff grade policy from periods 1 to T,
grade, because it corresponds to the minimum (break-even) cutoff
showing quantity mined, cutoff grade for process p, quantity of
grade, and cutoff grade less than this value would result in sending
ore processed in process p, quantity of metal in concentrate to
waste to a particular processing stream. Similarly, Eq. (9) shows that
be marketed/refined, cash flow, and the respective NPV.
the optimum cutoff grade may never exceed the process limiting
cutoff grade, because, it would schedule some of the valuable
materials to the waste dumps. Hence, the optimum cutoff grade for
a processing stream p refers to the possible values between γ mp and
Application at a copper mining complex
γ pp , i.e., γ mp r γ p r γ pp . If m~ corresponds to the median value, then
the optimum cutoff grade is selected as
This section presents an application of the stochastic cutoff
γ p ¼ mð ~ γ mp ; γ pp ; γ mpÞ; mð
~ mð ~ γ mp ; γ r p ; γ mrÞ; mð
~ γ pp ; γ r p ; γ prÞÞ ð17Þ grade optimization model to an actual copper mining complex.
The open pit mining complex constitutes an open pit, four ore
processing facilities, and a waste dump. The open pit produces
sulphide and oxide ores along with waste material to uncover
Implementing the proposed heuristic
these ores. The ore may be processed in two flotation-mills, a bio-
leach pad, or an acid leaching plant, and the waste material is
The heuristic procedure simultaneously accounts for a set of
destined to the waste dump. Mining capacity stands at 182.5
simulated or equally probable grade–tonnage curves and deter-
million tonnes of ore and waste. The processing capacity of
mines a single as well as optimum cutoff grade policy. The
flotation-mills, bio-leaching pad, and acid-leaching plant is 43.8
procedure is computation-intensive and iterative, requiring imple-
million, 21.9 million, and unlimited tonnes of ore, respectively.
mentation of the algorithmic steps in a programming language.
Similarly, it is assumed that the operation has an unrestricted
Given a particular period t, the iterative steps continue finding the
potential to refine or market the annual copper production. Fig. 1
optimum values of γ p until the convergence of NPV subject to the
explains the flow of material from the mine to processing facilities,
quantities of material mined, ore processed, and metal in concen-
waste dump, and refinery.
trate marketed/refined within the operational limits. The steps of
Table 1 presents fifteen (15) simulated or equally probable
the algorithm are given as follows:
grade–tonnage curves derived from a set of fifteen (15) simulated
or equally probable orebody realizations. The grade categories and
1. Set t¼1.
tonnages (quantity of material) corresponding to these categories
2. Compute reserves Q ωt , if Q ωt ¼ 0, then go to step 10.
3. Compute balancing cutoff grades γ mp, γ mr, γ pr based on mpω ,
mr ω , and pr ω curves using Eqs. (11)–(13), respectively, such Bio-Leach Pad
that (21.9 Million)
004.266
013.232
000.260
000.025
088.568
000.725
669.831
432.766
000.071
001.574
000.145
037.114
available reserves inside the optimal ultimate pit limit. Utilizing
15
these equally probable grade–tonnage curves, the optimal cutoff
grade policy is developed by maintaining the discount rate at 8%
and copper recoveries from flotation mill A, flotation mill B, bio-
033.295
012.046
001.862
000.784
000.263
000.025
090.949
003.730
000.073
467.816
000.215
637.519 leach pad, and acid leaching plant at 80%, 81%, 35%, and 55%,
14
002.048
416.487
000.280
088.023
685.635
034.961
005.691
000.710
000.144
014.311
000.170
000.119
processing cost of $6.00 per tonne of ore processed in flotation
13
033.954
012.864
001.294
000.306
087.475
425.106
002.156
000.163
000.518
000.189
Knowing the input information, the steps of the heuristic
12
005.283
000.732
000.073
000.072
001.813
642.351
014.117
004.925
035.873
001.729
013.315
000.143
000.165
000.117
036.928
005.405
000.833
000.238
000.024
000.096
660.670
001.847
013.213
000.310
099.139
005.243
001.035
002.397
000.097
034.972
000.631
454.376
000.210
000.215
644.190
033.706
001.733
005.762
445.341
000.470
087.472
000.213
014.516
000.192
000.144
000.069
448.988
002.678
000.308
000.239
032.279
005.270
001.401
013.051
090.711
653.115
001.699
000.094
481.067
005.039
000.679
000.072
619.419
013.418
000.186
000.167
035.101
005.309
002.360
000.888
014.248
000.024
000.353
454.291
000.376
113.312
000.188
Conclusions
4
031.430
000.024
000.073
004.357
422.541
001.951
000.215
000.717
089.105
011.158
000.142
013.464
034.363
002.085
000.783
000.095
000.069
665.319
435.317
000.192
000.121
004.606
397.895
013.875
000.681
000.468
086.926
000.024
001.762
708.314
000.190
000.192
policy and looks into the risk of maintaining the cash flows to
maximize NPV based on the possible variations in production from
1
2.50–3.00
3.50–4.00
4.50–5.00
0.00–0.55
2.00–2.50
3.00–3.50
4.00–4.50
5.00–5.50
0.50–1.00
1.00–1.50
Table 2
The optimal cutoff grade policy and corresponding production rates, cash flows, and NPV for a grade–tonnage curve.
Year Qm (MT) Flotation mill A Flotation mill B Bio-leach pad Acid leaching plant Qr (MT) ϕ ($M) NPV ($M)
CoG (%) Qc (MT) CoG (%) Qc (MT) CoG (%) Qc (MT) CoG (%) Qc (MT)
1 157.41 0.48 22.19 0.48 8.46 1.43 11.10 0.40 44.39 0.36 772.55 3588.74
2 153.92 0.45 23.31 0.44 6.89 1.28 11.66 0.37 46.62 0.34 704.80 3041.48
3 151.00 0.42 24.47 0.41 5.46 1.12 12.23 0.35 48.94 0.33 643.42 2523.61
4 140.44 0.38 25.67 0.38 4.18 0.96 12.84 0.32 46.21 0.30 553.09 2030.61
5 112.49 0.34 26.87 0.34 3.11 0.80 13.44 0.30 31.12 0.24 413.11 1595.71
6 093.99 0.31 27.97 0.31 2.33 0.65 13.99 0.27 20.54 0.19 316.17 1277.21
7 081.56 0.28 28.96 0.28 1.73 0.51 14.48 0.25 13.07 0.16 246.67 1037.93
8 075.23 0.27 29.45 0.26 1.34 0.44 14.72 0.24 09.12 0.15 202.90 0854.56
9 070.97 0.26 29.76 0.25 1.02 0.40 14.88 0.23 06.42 0.13 174.20 0703.79
10 067.07 0.25 29.38 0.25 0.75 0.37 14.98 0.23 04.44 0.12 155.87 0571.97
11 049.86 0.25 18.50 0.25 0.50 0.36 15.02 0.23 02.92 0.09 133.45 0449.38
12 038.41 0.25 11.29 0.24 0.33 0.35 15.06 0.23 01.85 0.07 120.82 0341.21
13 030.29 0.24 06.20 0.24 0.19 0.34 15.10 0.23 01.06 0.06 112.73 0238.02
14 021.04 0.22 00.21 0.22 0.08 0.23 15.52 0.21 00.30 0.04 091.38 0135.31
15 004.90 0.20 03.79 0.20 0.01 0.14 00.31 0.19 00.03 0.02 047.45 0047.45
2000
References
1500
Godoy, M.C., Dimitrakopoulos, R., 2011. A risk quantification framework for Lane, K.F., 1988. The Economic Definition of Ore, Cutoff Grade in Theory and
strategic mine planning: method and application. Journal of Mining Science Practice. Mining Journal Books, London.
47 (2), 235–246. Machuca-Mory, D.F., Deutsch, C.V., 2013. Non-stationary geostatistical modeling
Goovaerts, P., 1997. Geostatistics for Natural Resources Evaluation. Oxford based on distance weighted statistics and distributions. Mathematical Geo
University Press, New York. sciences 45 (1), 1–30.
He, Y., Zhu, K., Gao, S., Liu, T., Li, Y., 2009. Theory and method of genetic-neural Osanloo, M., Rashidinejad, F., Rezai, B., 2008. Incorporating environmental issues
optimizing cutoff grade and grade of crude ore. Expert Systems with Applica- into optimum cutoff grades modelling at porphyry copper deposits. Resources
tions 36 (4), 7617–7623. Policy 33 (4), 222–229.
Horta, A., Amilcar, S., 2010. Direct sequential co-simulation with joint probability Rendu, M., 2008. An Introduction to Cutoff Grade Estimation. Society of Mining,
distributions. Mathematical Geosciences 42 (3), 269–292. Metallurgy, and Exploration, Inc. (SME), United States.
Hustrulid, W., Kuchta, M., 2006. Open Pit Mine Planning and Design, second edition Satybaldiev, N.M., Freidin, A.M., 2006. Optimization of mineral mining geometry
Taylor and Francis/Balkema, The Netherlands.
and mine production capacity. Journal of Mining Science 42 (3), 245–250.
King, B., 2001. Optimal Mine Scheduling Policies (Ph.D. thesis). Royal School of
Taylor, H.K., 1972. General background theory of cutoff grades. Transactions of the
Mines, Imperial College, London University, UK.
Institution of Mining and Metallurgy, A160–A179.
King, B., 2011. Optimal mining practice in strategic planning. Journal of Mining
Vallee, M., 2000. Mineral resource þ engineering, economic and legal feasibility¼ ore
Science 47 (2), 247–253.
reserve. CIM Bulletin 93.
Lane, K.F., 1964. Choosing the optimum cutoff grade. Colorado School of Mines
Quarterly 59, 811–829.