0% found this document useful (0 votes)
19 views3 pages

Roof Rehab Costing - 1

Roofing at its best

Uploaded by

ryanseancooper19
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
19 views3 pages

Roof Rehab Costing - 1

Roofing at its best

Uploaded by

ryanseancooper19
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

For Office Use Only

Expense Report
STATEMENT
PURPOSE: Roof BoQ NUMBER: #2 PERIOD: From

To
EMPLOYEE INFORMATION:

Name Ryan Cooper Position Civil Engineering Technician Scope of Work Refurbishment Of PumpHouse Roof

Department Engineering

RATE AMOUNT
ITEM BRIEF DESCRIPTION UNIT QTY
(US$) (US$)

Monitoring & Conditioning System of Pumps & Motors

Budget Selling Price Actual Difference


1.01 Roof + materials 8,080.00
1.02 8,080.00
Total Budget - - -
2 Labour -
2.01 G.H Kwanele Unit 10.0 10.00 100.00
2.02 G.H Thembani Unit 10.0 10.00 100.00
2.03 Unit -
3 Roofing materials -
3.01 0.4mm X 3.6m Kalahari Red IBR Unit 30.0 19.80
3.02 0.5mm X 3.6m Kalahari Red IBR Unit 28.0 23.50
3.03 Ridges Unit 6.0 8.00

Page 1 of 3
3.04 Fascia Boards (228x38mm)6m Unit 4.0 31.60 126.40
3.05 Wiire Nails 4inch Unit 4.0 2.75 11.00
3.06 Wiire Nails 3inch Unit 4.0 2.75 11.00
3.07 Branders (50x50mm)6m Unit 12.0 7.00 84.00
3.08 Techiad PVA Interior/exterior 5litres Unit 2.0 8.00 16.00
3.09 Thinners 750ml Unit 2.0 2.00 4.00
3.1 Paint Brushes 75mm Unit 3.0 3.00 9.00
4 3.11 Ladder 2-6.8m Unit 1.0 177.00 177.00
3.12 Scaffolding 3m Tower (for two weeks) Unit 2.0 60.00 120.00
3.13 Roof Sealer 1litre Unit 2.0 8.00 16.00
3.14 claw hammer Unit 2.0 12.38 24.76
3.15 Plastic cover 50m Unit 1.0 110.00 110.00
4
Materials For Gutters

4.01 Stop ends Unit 4.0 1.86 7.44


4.02 Outlets Unit 4.0 5.54 22.16
4.03 Fascia Brackets Unit 10.0 1.59 15.90
4.04 Down Pipe Brackets Unit 8.0 1.59 12.72
4.05 Extensions Unit 4.0 8.33 33.32
4.06 Down Pipes Unit 5.0 13.00 65.00
4.07 Square Gutters Unit 4.0 32.68 130.72
4.08 Devils Glue 500ml Unit 1.0 5.42 5.42
Drill
4.09 Drill Bit (Mansonry Bit M6) Unit 3.0 3.10 9.30
5 4.1 Fasteners (M5x40)200pcs Unit 1.0 10.00 10.00
4.11 Bend shoes Unit 12.0 2.76 33.12
5.01 Transport of materials Unit 1.0 150.00 150.00
5.02 Transport to and from site (1 extra trip) Unit 1.0 150.00 150.00
5.03 Allowance (3 x 10 days) Unit 10.0 15.00 150.00
5.04 Ryan safety shoes Unit 1.0 55.00 55.00
6.01 Total 1,759.26
6.02 Balance 6,320.74

Page 2 of 3
Notes: Items in red are the costs of IBR roofing sheets in the event COB requests for the roof to have new sheets.
At the time of request for new sheets, the size 0.4/0.5mm will be decided upon

APPROVED: PROJECT MANAGER NOTES:

ACCOUNTANT

Page 3 of 3