0% found this document useful (0 votes)
32 views

A-102-Basement - 2 Level Plan

Second Level Plan

Uploaded by

sateyew482
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
32 views

A-102-Basement - 2 Level Plan

Second Level Plan

Uploaded by

sateyew482
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

KEY PLAN

BLOCK WORK LEGEND


01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19
100mm INTERNAL BLOCK WORK
TRAM LINE
77560 150mm INTERNAL BLOCK WORK
PLOT LIMIT PLOT LIMIT
E 481292.255 11045 7750 1190 4350 4900 3250 2820 3000 2720 3250 3100 4900 4150 1390 950 8700 1795 8300 E 481351.199 200mm INTERNAL BLOCK WORK
N 2775819.941 N 2775768.163
17000 44456 17000 250mm EXTERNAL BLOCK WORK

A2
A-503 A2 A2
A-304 A-504

A FOR BASEMENT -2
NO. OF REG. PARKING 97 NOS
300 495 495 385 385 460 410 300 390 300 300 495 3100
ST-03 300 Notes
3550

3100 3145 NO. OF P.O.D. PARKING 06 NOS

2620
B2 - 021
NO. OF TANDEM PARKING 06 NOS 1. Do not scale the dimensions, follow the written dimensions

4020
300 (mm), unless otherwise mentioned.

5420
STORE ROOM
12000

12000
5420

5500
B B2 - 056 TOTAL NO. PARKING 109 NOS

4895
61 60 59 58 57 56 55 54 53 52 51 50 49 48 47 46 45 44 43 42 41 2. Dimensions shown in these drawings are structural dimensions,

1200

5495
unless noted otherwise.
D14
DN UP UP DN 3. Any discrepancy to be brought to the notice of

2050

1572
ST-04 consultant prior to commencement of work
D11 1900 B2 - 021 D11

3630
4. The drawing to be read in conjunction with relevant architectural ,
6745 2500 2500 2500 1595 2500 2500 2500 1880 2500 2500 2500 2500 2500 2500 2500 2500 2500 2500 2500 2500 2500 2500 2500 600
elevations, sections details and specifications.

2355

1750
485 560 560 450 440 350 400 595
1930

6.0 M WIDE
9200

5. Contractor to provide necessary protection / scaffolding


DRIVEWAY
FHC for safe access to pedestrian during course of construction as directed
B2 - 048

1200
by engineer.

6000
D14 B2 - 040

7154
2500
4700 62 6. The contractor shall be responsible to coordinate structural elements
S.S.L -6.950 m
300 with relevant architectural plan, elevation, sections & details & shall
300 WIDE GI CHANNEL, submit shop drawings for engineer's review & approval.
300 510 510 510 510

3679
6000 3275 2500 875 2500 875 2500 2500 2500 2500 2500 2500 725 2500 725 6985 5500 5700 7500 GRATING DRAIN
2500
63

R1
F.F.L -6.800 m

00
500
LIMIT OF TERRACE

C
LIMIT OF TERRACE

S.S.L -6.950 m

00
300
F.F.L -6.800 m

2715
1500 1000 2250

RAMP LENGTH 3350


STORE ROOM S.S.L -6.950 m PAINT MARKING

900

SLOPE - 5%
D B2 - 056 00
32 33 34 35 36 37 38 39 40 40

5500
299

R40 R R4
00 00 49
SHAFT 0
2500

64
14645

48

1935
E B2 - 042 D12 47
8650
46
TEL. CABINATE 4500 45
F 0 R4 600 44
00 B2 - 016

650
F.F.L -6.800 m 00
2500

65 S.S.L -6.950 m R4 0 43
TORCH TOWER SIDE

42

3600
41
300

2500
40

2500
31 30 29 28 27 39

MARINA HEIGHT
38
6200

37
36
385

3272 1500 6000 1260 6000 1260 1260 6000 1260 6000 1403 3077 35
34

LIMIT OF TERRACES

LIMIT OF TERRACES
2500

2500
66 450 5.5 M WIDE 450 26 RAMP 01 33
MEP SHAFT DRIVE WAY 32
B2 - 049 31

302
B2 - 042
B2 - 048 30

LIMIT OF LOT

LIMIT OF LOT
29
5500

5500

5500

RAMP DOWN TO BASEMENT-3


G

RAMP UP FROM BASEMENT-3


28
1964
1300

S.S.L -6.950 m 27
4700 A3 FIRE MAN/
A2 26

335
F.F.L -6.800 m F.F.L -6.850 m SHAFT SERVICE LOBBY 25
3250

A-502
S.S.L -6.950 m A-517 24

2500
S.S.L -6.950 m B2 - 042

RAMP (SLOPE 10%)


RAMP (SLOPE 10%)
B2 - 113 300 25 23
800x800 WATER TANK 1075 3400 2500 2500 1550 2600 2370 3000 2370 2800 2600 1650 2500 2500 4085 22
2500

H 21

1400 610 5500


ACCESS HACTH DOOR 67
2940

20

900
300
1470

1520
19
350
1220

FHC F.F.L -6.800 m 18


1900
ST-02

920
17

1420

1500
S.S.L -6.950 m

2500
B2 - 040 D11 GL-01 D39 24
J B2 - 021
LIFT-01 16

2616

0
15

00
D14 1700 960 11 12 DN UP B2 - 041 LIFT-05 13 14

R4
SERVICE 14
1000
358

R400 B2 - 041
MECHANICAL 13

1600
2600
340 0 LIFT-09 SHAFT 12

1366
2500

5480

4300
150
4230

68 550 B2 - 041 B2 - 042 11


3650

3600
3405
10

2500
6620
23 09

1300
2420

STORE ROOM MECHANICAL 08

1400

2618
LIFT-02

375
SHAFT LIFT-06 F.F.L -6.850 m 07

30150
B2 - 056 2200
45514

45533
B2 - 041 S.S.L -6.950 m 06
B2 - 042 B2 - 041 05

1600
FIRE LIFT 10
2500

2600
69 04

1367

150
B2 - 041
575

575
03
1700
66820

5305 LIMIT OF TERRACE

HC2
870

LIMIT OF TERRACE LIMIT OF LOT

400
700
LIMIT OF LOT

D11 HC1
320 STORE ROOM LIFT-03 STORE ROOM
1400

2618
P4
L

2500
LIFT-07 22
2500

2500
10 B2 - 056 B2 - 041 B2 - 056 P3 TRAM
3985

A1 3.0 M WIDE LIFT 15 P2

4535
B2 - 041
2500

70 DN
2570

S.P.S 5700 5035 P1 SIDE


ELECTRICAL LOBBY
1367
A-301

150
ST-01 GR
398

ROOM B2 - 042 B2 - 008


575

575
A3 300 B1
3770

B2 - 017 LIFT-04 UP B2 - 021


B2
LIFT-08

2500
M 2600
610 1400

2618
1075 B2 - 041 A-501 21 B3
B2 - 041
1820

SHAFT

1000
1502

D11 D11

385
385

D14 RAMP 01

1365
B2 - 042
D11 D14 B2 - 049
N P4
2015 P5 5500
3700

3700

2500
5500 6000 5500 3030 580 6270 3000 1000 1600 1200 2000 5535 5500 5500 3600 3600
2610

DN
2500

71 6.0 M WIDE LIFT LOBBY D14 100 20 300


2400

100 GL-01

400
GL-01 FHC

RAMP DOWN FROM BASEMENT-1


DRIVEWAY B2 - 008 S.P.S
B2 - 048
F.F.L -6.850 m B2 - 040 B2 - 042 5.5 M WIDE
DN
P S.S.L -6.950 m POD RAMP @ DRIVE WAY

RAMP UP TO BASEMENT-1
4700 S.S.L -6.950 m 850 1000 850 850 1000 850 4115 B2 - 048
5% SLOPE
2500

420
2100

72 P3
2300

LIFT-11 LIFT-12 B2 - 070


S.S.L -6.950 m

RAMP (SLOPE 10%)

RAMP (SLOPE 10%)


3700

3700

2500
B2 - 041 B2 - 041 P6 19
450

5550
32635

670
2500
7740

73 00 PD RESUBMISSION 05/01/2024 MSM MM

2500
800x800 WATER TANK S.S.L -6.950 m 18
300

Rev.No. Revision/Issues Date Drawn Chkd.


2500

2500

PAINT MARKING
09 ACCESS HACTH DOOR 16
CLIENT
5500

300
485

485

RAMP LENGTH 3350


T6 T5 T4 T3 T2 T1
AHMED BUTTI AHMED
549

SLOPE - 5%
2500
MEP SHAFT 17
Q
2500

150
1200

74 B2 - 042
AL MUHAIRI

410
1900

2700
960

600
R FHC 835 545
2340

B2 - 040 F.F.L -6.800 m


2500

75 F.F.L -6.800 m
S.S.L -6.950 m

R4
S.S.L -6.950 m

00
4260
R4 PROJECT TITLE

0
300 WIDE GI CHANNEL,
5780

S 00
5500

0
549

GRATING DRAIN 3B + G + 4P + 2HC + 45TYP. + 2MECH + R


00

08 07 06 05 04 03 02 01
R4 0

RETAIL & BRANDED RESIDENTIAL TOWER

4630
P2
409

P1 ON PLOT NO. 3920594 AT MARSA - DUBAI


1930

1930

1930

8195
00 F.F.L -6.800 m
1300

1300

00
R1
2500

R1 1
76 S.S.L -6.950 m

000
3575 2500 3700 2500 2500 2500 2500 2500 2500 3700 2500 3285 5500 5700 7500
300 300 100 410 410 410 410 300 100 300 CONSULTANT:
6.0 M WIDE
9750

MAKE UP AIR
DRIVEWAY
2500

77 PLENUM
B2 - 048 B2 - 067 LV-10
6000

465
S.S.L -6.950 m

LV-05
D4

2200
1800
2500

78 300 300 478 477 475 475 450 450 350 350 350 3000
D14 5500 2500 2500 2500 520 2500 1332 2500 1332 2500 2500 2500 2500 2500 2500 2500 2500 2500 2500 2500 2500 2500 2500 3255
13000

13000
100

150
1200
170
1300

1300

205 3100
320

T FHC
800x800 WATER TANK Architect SUBHASH KALRA Reg.No. 1771
3400

3500
3595

B2 - 040
ACCESS HACTH DOOR MAKE UP AIR
300 Structural Engineer SUNIL KUMAR SARASWAT Reg.No. 8587
PLENUM D4 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97

3320
5500

SHAFT

5420
A2
4930

LV-09 B2 - 067 B2 - 042 ST-05 THIS DRAWING MUST NOT BE REPRODUCED IN WHOLE OR
B2 - 021 A-505
IN PART WITHOUT PRIOR APPROVAL OF ARKIPLAN
3215 2785 1900 700 475 450 450 350 350 350 UP DN
1705

DRAWING TITLE

1100
1685 520 D11
500

U
400

BASEMENT -2 LEVEL PLAN


17000 44456 17000
PLOT LIMIT PLOT LIMIT SCALE ARCH./ENGR.: DATE PROJECT NO.
E 481245.719 E 481304.650 MM
A1 Sheet :- 1:150 15-08-2023
N 2775766.963
A1 BASEMENT-2 LEVEL PLAN N 2775715.172 DRAWN

A-301
A2 Sheet :- 1:250
A3 Sheet :- 1:300 CHECKED
MSM
APPROVED
369
1 : 150 MM SCK
DRAWING NO. NORTH REV.
N
A-102
00
NE
N

E
NW

SE
SW S
REVIT FILE REF.
Autodesk Docs://369_AlMarsa Residential
Building/PN369_BI_PA3920594_AR_100.rvt Q

You might also like