0% found this document useful (0 votes)
28 views

PSSR Form

Uploaded by

Fachri Fadillah
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
28 views

PSSR Form

Uploaded by

Fachri Fadillah
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

Pre Start Up Safety Review (PSSR)

Pre-Start-up Safety Review (PSSR) Form

1.0 EQUIPMENT / INSTALLATION PER DESIGN


Item Item Description New Document Assigned to: Disposition Completion/NA Completed/Applicability
or Revision
# Date Determination By
Required?
1.01 Certification documentation is
complete (certificate for:
equipment, piping,
instrumentation/Electrical Data
Sheet, calibration sheet, meger √Yes □N/A Project team √Completed 10/15/2023
test, continuity test, electrical
drawings, P&ID, and also piping
hydro test document) (Attach
Form)
1.02
Mechanical/Piping/Process
Equipment Installation Checklist □Yes √N/A Project team √Completed 10/15/2023
items complete (attach form).

1.03 LOTO Checklist form is completed


(attach form)
□Yes √N/A Project team √Completed 10/15/2023

1.04 Electrical/Instrumentation
Installation Checklist items, loop
test and functional test document □Yes √N/A Project team √Completed 10/15/2023
are complete (attach form).
1.05
Fire & Gas Installation Checklist
items and functional test document □Yes √N/A Project team √Completed 10/15/2023
are completed (attached form).
1.06 Incomplete Work List "Required for
Start-up" Items is Complete
□Yes √N/A Project team √Completed 10/15/2023

2.0 PROCEDURES
Item Item Description New Document Assigned to: Disposition Completion/NA Completed/Applicability
or Revision
# Date Determination By
Required?
2.01 Operation personnel have been
trained in Start-up procedures
and Standard Operating
Procedures. All this procedures □Yes √N/A Project team √Completed 10/15/2023
had been updated, reviewed,
and available at Control Room.
2.02 Emergency Procedures are
updated and available.
□Yes √N/A PHSS √Completed 10/15/2023

2.03 Safety procedures (e.g. alarm


management and response,
checking HPLP interfaces, □Yes √N/A PHSS √Completed 10/15/2023
PSV/ESD setting etc)
2.04 Maintenance/Preventive
Project team
Maintenance
procedures/program are □Yes √N/A √Completed 10/15/2023
PHSS
updated and available.

B.01 NOT CONTROLLED WHEN PRINTED OR DOWNLOADED Page 1 of 3


Pre Start Up Safety Review (PSSR)

3.0 ASSESS IMPACT ON SAFETY & HEALTH


Item Item Description New Document Assigned Disposition Completion/NA Completed/Applicability
or Revision
# to: Date Determination By
Required?
Confirm that Process Safety
Analysis (HAZOP) has been
conducted such that the following
Project
3.01 items are complete/attached: □Yes √N/A team √Completed 10/15/2023
- All HAZOP action items required
for start-up are complete and
approved by Process TA
- All process changes during design
(tracked by P&ID/Process Change
Logs) have been ensured that any
change does not
result in a dilution in safety, and
that the review of such changes in
fully documented.
- All process changes and variation
in safe operating limits occurred as
results of the modification/project
do not result in a dilution in safety,
and that the review of such Project
3.02
changes in fully documented in □Yes √N/A team √Completed 10/15/2023
PHSER3.
Note - If there is any changes (from
original design) during design and
construction , E&C to provide list of
design changes (as required in
PHSER 3) completed with
Justification of changes, and this
changes must have been
reviewed/recalculated.

4.0 TRAINING
Item Item Description New Document Assigned to: Disposition Completion/NA Completed/Applicability
or Revision
# Date Determination By
Required?
4.01 Operators assigned to operate
the affected process at start-
up and continuous operations □Yes √N/A Project team √Completed 10/15/2023
have been trained.

5.0 PROCESS SAFETY INFORMATION


Item New Document Assigned Disposition Completion/NA Completed/Applicability
or Revision
# Item Description to: Date Determination By
Required?
5.01 "Required for start-up" Engineering
Process Safety Information e.g P&ID,
PFD, Equipment Specs Sheet, E&I Project
Specs Sheet etc. are updated and √Yes □N/A team √Completed 10/15/2023
available in the control room

B.01 NOT CONTROLLED WHEN PRINTED OR DOWNLOADED Page 2 of 3


Pre Start Up Safety Review (PSSR)

6.0 PSSR Documentation & Approval


PSSR Form completed and required supplemental documentation attached.

Sr. Supervisor Mutiara & Pamaguan Date

Section Head Southern Area Date

Field Manager PHSS Date

Sr. Manager Production & Project Zona 9 Date

B.01 NOT CONTROLLED WHEN PRINTED OR DOWNLOADED Page 3 of 3