0% found this document useful (0 votes)
197 views4 pages

BCV302 - 1 IA - Praveen Jyoti - Praveen Jyoti

Uploaded by

examstce
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
197 views4 pages

BCV302 - 1 IA - Praveen Jyoti - Praveen Jyoti

Uploaded by

examstce
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

STSKK’s

TONTADARYA COLLEGE OF ENGINEERING, GADAG


Department of Civil Engineering
--------------------------------------------------------------------------------------------------------------------------

Internal Assessment – I
Subject : Engineering Survey (BCV302) Date: 05.01.2024
Semester: III Time:
Note: Answer one FULL question from each part.
Assume missing data suitably. Max Marks: 25
PART-A CO (RBT)
Q1 a) Define Surveying and Explain classification of surveying. 08 M 1 (II)

b) Convert the following bearings as mentioned


I. WCB to QB: 1. 170⁰12’ 2. 327⁰24’ 04 M 1 (II)
II. QB to WCB: 1. S31⁰36’E 2. N12⁰24’E

Q2 a) Explain the various methods of direct measurements. 04 M 1 (II)

b) The following bearings were observed with a compass. Calculate 08 M 1 (II)


the interior angles.
Line AB BC CD DE EA
FB 60⁰30’ 122⁰0’ 46⁰0’ 205⁰30’ 300⁰0’

PART-B
Q3 a) The following bearings were observed in running a closed 13 M 2 (II)
traverse. At what station do you suspect the local attraction?
Determine the correct magnetic bearings. If declination was
5⁰10’E, what are the true bearings?
Line AB BC CD DE EA
FB 75⁰5’ 115⁰20’ 165⁰35’ 224⁰50’ 304⁰50’
BB 254⁰20’ 296⁰35’ 345⁰35’ 44⁰5’ 125⁰5’

Q4 a) Define: i) MSL, ii)Bench Mark, iii) Datum 03 M 2 (II)


b) With a neat sketch explain the step by step procedure to 10 M 2 (II)
measure horizontal angle by repetition method.

RBT – Revised Bloom’s Taxonomy


I. Remembering II. Understanding III. Applying
IV. Analyzing V. Evaluating VI. Creating

Course File Format: Acad/01/Rev(i)


STSKK’s
TONTADARYA COLLEGE OF ENGINEERING, GADAG
Department of Civil Engineering
--------------------------------------------------------------------------------------------------------------------------

CO mapping with RBT and POs:


CO BCV302: Engineering Survey
Summarize various types of surveying and carry out distance measurement
BCV302.1
using various equipment’s
BCV302.2 Illustrate the use and applications of levelling and theodolite

BCV302.3 Plot contours, longitudinal and cross sections for construction projects.
Set curves for construction works and carry out estimation of areas and
BCV302.4
volumes.
BCV302.5 Demonstrate the necessary skills to carry out GPS and DRONE Surveying

CO-PO/PSO Mapping
(COs) / (POs) 1 2 3 4 5 6 7 8 9 10 11 12 PSO1 PSO2 PSO3 PSO4
BCV302.1 2 1 1
BCV302.2 2 1 2 2 1 1
BCV302.3 2 1 1 1 1
BCV302.4 2 1 2
BCV302.5 2 2 2

Course File Format: Acad/01/Rev(i)


STSKK’s
TONTADARYA COLLEGE OF ENGINEERING, GADAG
Department of Civil Engineering
--------------------------------------------------------------------------------------------------------------------------

Internal Assessment – I
Subject : Engineering Survey (BCV302) Date: 05.01.2024
Semester: III Time:
Note: Answer one FULL question from each part.
Assume missing data suitably. Max Marks: 25
PART-A CO (RBT)
Q1 a) Explain classification of surveying. 08 M 1 (II)

b) The following are observed fore bearings of the lines. Determine


their back bearing 04 M 1 (II)

Line AB BC CD DE
FB 12⁰24’ 119⁰48’ 266⁰30’ S12⁰24’E

Q2 a) Explain the classifications of Bearing. 04 M 1 (II)

b) The following interior angles were measured with a compass in a 08 M 1 (II)


closed traverse. The bearing of the line AB was 60⁰00’. Calculate
the bearings of all other line if
∟A=140⁰10’ ∟B=90⁰8’ ∟C=60⁰22’ and ∟D=69⁰20’
Line AB BC CD DE EA
FB 60⁰30’ 122⁰0’ 46⁰0’ 205⁰30’ 300⁰0’

PART-B
Q3 a) Plot the following compass traverse and adjust it for closing 13 M 2 (II)
error if any by Bowditch Method.
Line AB BC CD DE EA
Length (m) 89.31 219.76 151.18 159.10 232.26
Bearing 45⁰10’ 72⁰5’ 161⁰50’ 228⁰43’ 300⁰42’

Q4 a) Define: i) MSL, ii)Bench Mark, iii) Datum 03 M 2 (II)

10 M 2 (II)
b) With a neat sketch explain the step by step procedure to
measure horizontal angle by repetition method.

RBT – Revised Bloom’s Taxonomy


I. Remembering II. Understanding III. Applying
IV. Analyzing V. Evaluating VI. Creating

Course File Format: Acad/01/Rev(i)


STSKK’s
TONTADARYA COLLEGE OF ENGINEERING, GADAG
Department of Civil Engineering
--------------------------------------------------------------------------------------------------------------------------

CO mapping with RBT and POs:


CO BCV302: Engineering Survey
Summarize various types of surveying and carry out distance measurement
BCV302.1
using various equipment’s
BCV302.2 Illustrate the use and applications of levelling and theodolite
BCV302.3 Plot contours, longitudinal and cross sections for construction projects.
Set curves for construction works and carry out estimation of areas and
BCV302.4
volumes.
BCV302.5 Demonstrate the necessary skills to carry out GPS and DRONE Surveying

CO-PO/PSO Mapping
(COs) / (POs) 1 2 3 4 5 6 7 8 9 10 11 12 PSO1 PSO2 PSO3 PSO4
BCV302.1 2 1 1
BCV302.2 2 1 2 2 1 1
BCV302.3 2 1 1 1 1
BCV302.4 2 1 2
BCV302.5 2 2 2

Course File Format: Acad/01/Rev(i)

You might also like