Safe Work Method Statement Template
Safe Work Method Statement Template
Note: Work must be performed in accordance with this safe work method statement (SWMS). This SWMS must be kept and be available for inspection
until the high-risk construction work to which this SWMS relates is completed. If the SWMS is revised, every version should be kept. If a notifiable incident
occurs in relation to the high-risk construction work in this SWMS, the SWMS must be kept for at least 2 years from the date of the notifiable incident
Person conducting a business or undertaking (PCBU): Click or tap here to enter text.
Principle Contractor (PC): Click or tap here to enter text.
Works Manager: Click or tap here to enter text. Date SWMS provided to PC: Click or tap here to enter text.
Work activity: Click or tap here to enter text. Workplace location: Click or tap here to enter text.
Work on, in or adjacent to a road, railway, shipping lane or other traffic Work in areas with artificial extremes of temperature
corridor in use by traffic other than pedestrians
☐ ☐