Waterstop PVC SW20

Uploaded by

ibbyimelda13
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 24

2

Supercast MY – March 2017

PVC Waterstops constructive solutions

Centrally and externally placed PVC


waterstops

Uses

The Supercast range of PVC waterstops is designed to The range consists of centrally placed profiles; Supercast
provide an integral sealing system for movement and Hydrofoil, Supercast Watafoil, and externally placed
construction joints in concrete cast in-situ. These joints profiles; Supercast Rearguard S.
typically occur in the following types of structure:
Standards compliance
Water retaining
Supercast PVC waterstops are suitable for use in contact
 Reservoirs, water towers and sewage tanks with potable water.

 Dams, culverts, canals and spillways


Description
 Swimming pools
Supercast waterstops are extruded from a high grade PVC
 Bundled areas surrounding liquid retaining tanks compound which has been formulated to give excellent
flexibility and longevity characteristics. They are available
Water excluding as straight lengths and factory produced intersections or as
a factory prefabricated segment of a network to minimize
 Basements and underground car parks site jointing.

 Tunnels and subways Principles of waterstop function

 Abutments and retaining walls Supercast waterstops work because of two specific
aspects of their design.
 Roof decks and podium areas
a) Valve principle
Advantages
Simple waterstop profiles based on dumbells are cast
into the edges of adjacent concrete panels, which act
 Range of profiles to suit every need
as baffles. In the event of joints opening as drying
shrinkage or other movement occurs, the edge bulbs
 Fully continuous 4 bulbed network
of the profile act as anchors. These induce tensions
across the waterstop resulting in a sealing effect at
 Reinforced eyeleted edge flanges for positive fixing
the inner faces of the edge bulbs.
 Simple on-site jointing

 Full range of moulded and fabricated intersection pieces

 WRC approval for use in contact with potable water

 Special grades for Hydrocarbons resistant applications

Page 1
Supercast 2
MY – March 2017

PVC Waterstops
Supercast Hydrofoil

Centre bulb sections are used in expansion, contraction


and construction joints. The centre bulb allows for
movements in a structure to be accommodated whilst its
hexagonal design provides a flat surface. This allows
shuttering and joint fillers to fit snugly.

The 330 mm profile is specially designed for use in roof


slabs where a greater degree of movement may occur
b) Tortuous path principle particularly during construction.

Profiles with a more complex cross section have a Hydrofoil sections


much greater surface area. They present a much
greater resistance and more difficult path for water to
seep around the section.

The Supercast range incorporates both of these principles.


The products offer a fully continuous 4 bulbed design
maintaining both the valve and tortuous path principles.
These principles are maintained in the transition from
Rearguard profiles in floors to centrally placed profiles in
walls.
Supercast Watafoil

Plain web sections are used in construction and


contraction joints.

Watafoil sections

Design criteria

The choice of the width and thickness of waterstop is


largely governed by concrete thickness, the position of the
reinforcement, aggregate size and complexity of the pour.

In general the 250 mm width of waterstop is suited to wall


thicknesses of 250 mm and over. For concrete less All centrally placed Supercast waterstops incorporate an
than 250 mm thick, the use of a narrower waterstop eyeletted, reinforced edge flange. This enables them to be
approximating to the wall thickness will be appropriate. easily positioned by wiring to surrounding reinforcement.

constructive solutions Page 2


Supercast 2
MY – March 2017

PVC Waterstops
Supercast Angleguard
Supercast Rearguard R
An externally placed waterstop for use where the joint line
Plain web sections, which are placed externally, for use in coincides with a change in level of the slab soffit. The
contraction and construction joints. They incorporate a profile is designed to coordinate with the 250 mm
central fin to assist setting out shutter location. Rearguard S profile.

Dimensions are approximate and subject to manufacturing


tolerances Heavy duty sections (XHD)

Supercast Rearguard S Increased web thickness gives a much stiffer section. The
stiffened profile is used where large volumes of concrete
Sections incorporate a flat top center box, which allows are being placed. They are used where concrete is being
movement to be accommodated in expansion joints. The placed from a great height such as deep wall shutters.
box also provides a seating to support joint fillers.

XHD Rearguard R

All Rearguard sections incorporate a nailing flange with a


reinforced edge to provide a secure fixing that will resist
tearing.
XHD Rearguard S
Supercast Rearguard Kicker

An extra wide version of Rearguard R profile which is used


to seal wall/kicker joints where the concrete kicker is being
cast after the slab rather than monolithically with the slab.
The extra width enables the waterstop to span both the XHD Rearguard SLX
joint between kicker and slab as well as the joint between
kicker and wall.

Dimensions are approximate and subject to


manufacturing tolerances

constructive solutions Page 3


Supercast 2
MY – March 2017

PVC Waterstops

constructive solutions Page 4


Supercast 2
MY – March 2017

PVC Waterstops
Centrally placed waterstop
Installation instructions
These waterstops are positioned within the thickness of the
concrete components and as a result are supported by Supercast Hydrofoil and Watafoil
concrete on both sides. They are therefore able to withstand
water pressure from either side. This makes them suitable for Waterstops must be installed so that they are securely
use in water retaining structures. They will prevent loss of held in their correct position while the concrete is being
water from within the tank and will prevent ingress of ground placed. Concrete must be fully compacted around the
water when the tank is drained down. waterstops to ensure that no voids or porous areas
remain. Where reinforcement is present, an adequate
Externally placed waterstop clearance must be left to permit proper compaction.

These waterstops are designed for use in basement, The brass eyelets used for securing the waterstop are
foundation and floor slab construction in vertical and located outside the edge bulbs so as not to create water
horizontal joints in both water retaining and water excluding paths around the profile.
structures. When used in walls, externally placed waterstops
will only resist water pressure from the face to which they are Example of a kicker joint
fixed. When used below floor slabs, where the waterstop is
supported by the blinding concrete or when placed in vertical
situations against permanent concrete shuttering, externally
placed waterstops will resist water pressure from either face.

Properties

Profiles

Form: Extruded thermoplastic


sections
Colour: Blue
Hydrostatic head: Up to 100 m (10 bar)
Joint movement:
Hydrofoil (standard & XHD): up to 10 mm
Rearguard S (standard & XHD): up to 40 mm
Rearguard SLX XHD up to 60 mm

PVC Compound Supercast Rearguard


o
Typical figures: To BS 2782 at 25 C
Tensile strength: 2 When used on ground slabs where the waterstop is
> 15 N/mm
supported on blinding, Rearguard profiles usually require
Elongation at break: > 300% no fixing. Lay the waterstop centrally over the line of the
Hardness: Shore ‘A’ 80 to 90 joint to be formed.

Specification clauses Fixing to vertical shuttering is done by nailing through the


outer nailing flanges leaving the head of the nail proud
1. Supplier specification so that it is held in the cured concrete. This prevents the
waterstop being displaced when the shuttering is struck.
Where indicated on the drawings, PVC waterstops shall
be Supercast Waterstops obtained from Fosroc Fixing to vertical shutter
(address as shown). All wall/floor waterstop connections
shall be made using Supercast injection moulded
transition pieces to ensure continuity of the four bulb
profiles.

2. Performance specification

Where indicated on the drawings, PVC waterstops shall


be made from extruded plasticised PVC compound.
The compound used shall meet the US Corps of
Engineers specification CRD-C 572-74. it shall have a
tensile strength in excess of 14 MN/m2 and an
elongation at break in excess of 300%.

constructive solutions Page 5


Supercast 2
MY – March 2017

PVC Waterstops
Fixing Supercast Kicker Waterstop Intersection pieces

In addition to nailing to the external shutter, the Kicker profile Standard intersection pieces are available for each
is equipped with brass eyelets in the central rib. Twist short Supercast waterstop profile. The standard on-flat
lengths of tying wire through these eyelets so that when the intersection leg length is 230 mm from centre line. On-
kicker is cast they act as anchors, holding the center of the edge intersections have a standard 75 mm leg length.
waterstop tight against the face of the concrete. This prevents
the build-up of debris between the waterstop and the kicker Factory welded intersections for Supercast Hydrofoil /
prior to the wall being poured. Watafoil ad XHD Hydrofoil / Watafoil.

Supercast Angleguard

Fixing in position is done in a similar manner to Supercast


Rearguard.

Site jointing instructions

Jointing of Supercast waterstops is carried out using Fosroc


Heat Welding Equipment. The ends to be joined are cut
square and held in alignment in a special jig. The ends are
then pressed either side of a special heated blade, until an
even, molten bead of PVC appears around the section. The
heated blade is then removed and the molten ends pressed
fully together. The PVC cools to form a strong fusion welded
joint. Full instructions are available from Fosroc.

Fosroc PVC heat welding equipment

constructive solutions Page 6


Supercast 2
MY – March 2017

PVC Waterstops
Estimating Precautions

Section Minimum radii Roll Health and safety


Supercast Width in On flat On edge Length
(mm) (m) (m) (m) Hot weld site jointing of PVC waterstops results in the
Hydrofoil 330 20 0.15 12 liberation of hydrogen chloride mist and vapour. The
250 15 0.15 12 OEL (operational exposure limit) of 5 ppm can be
200 14 0.15 15 exceeded in still air confined spaces, therefore forced
150 12 0.075 15 ventilation must be provided or a suitable respirator
Watafoil 250 15 0.15 12 used.
200 14 0.15 15
150 12 0.075 20
Rearguard R 250 10 N/A 12
200 9 N/A 15
150 8 N/A 12 & 20
Rearguard S 250 10 N/A 12
200 9 N/A 12
150 8 N/A 12
Rearguard
Kicker 300 20 N/A 12
Angleguard 250 10 N/A 3m
girth lengths
XHD
Hydrofoil 250 15 0.23 10
XHD
Watafoil 250 15 0.23 10
XHD
Rearguard R 250 15 0.23 10
XHD
Rearguard S 250 15 0.23 10
XHD
Rearguard 250 15 0.23 5
SLX

Equipment

Jointing jigs

150 mm Supercast Rearguard R & S


200 mm Supercast Rearguard R & S
250 mm Supercast Rearguard R & S
330 mm Supercast Rearguard Kicker
150 mm Supercast Hydrofoil & Watafoil
200 mm Supercast Hydrofoil & Watafoil
250 mm Supercast Hydrofoil & Watafoil
250 mm Supercast XHD Hydrofoil & Watafoil
330 mm Supercast Hydrofoil

Heater blades

110v and 220v, 350w blades are available.

Warning:
Ensure that heater blades are earthed by the
green/yellow wire.

constructive solutions Page 7


Supercast 2
MY – March 2017

PVC Waterstops
Technical support

Fosroc offers a comprehensive range of high performance


high quality; construction products all backed by BS 5750
certification. Fosroc offers a technical support package to
specifiers and contractors which include computer-aided
design (CAD), standard details and technical advice from
staff with unrivalled experience in the industry.

Additional information

Application at low temperatures

Care in the handling and installation of Supercast PVC


waterstops is necessary at low ambient temperatures. Such
temperatures will also require special precautions to be
taken with the placing and curing of concrete.

Fosroc manufactures a wide range of complementary


products which include:

 Waterproofing membranes & waterstops

 Joint sealants & filler boards

 Cementitious & epoxy grouts

 Specialised flooring materials

Fosroc additionally offers a comprehensive package of


products specifically designed for the repair and
refurbishment of damaged concrete. Fosroc’s ‘Systematic
Approach’ to concrete repair features the following:

 Hand-placed repair mortars

 Spray grade repair mortars

 Fluid micro-concretes

 Chemically resistant epoxy mortars

 Anti-carbonation/anti-chloride protective coatings

 Chemical and abrasion resistant coatings

For further information on any of the above, please consult


your local Fosroc office - as below.

Important note
Fosroc products are guaranteed against defective materials and manufacture and are sold subject to its standard Conditions for the
Supply of Goods and Services, copies of which may be obtained on request. Whilst Fosroc endeavours to ensure that any advice,
recommendation, specification of information it may give is accurate and correct, it cannot, because it has no direct or continuous control
over where or how its products are applied, accept any liability either directly or indirectly arising from the use of its products, whether or
not in accordance with any advice, specification, recommendation of information given by it.

Fosroc Sdn. Bhd.


telephone: fax: email:
No 8 Jalan Trompet, 33/8
+60 3 5102 5660 +60 3 5102 5668 [email protected]
Seksyen 33, 40400 Shah Alam
Selangor, Malaysia.

www.fosroc.com

Page 8
method statement constructive solutions

Supercast PVC
Section A : General Comments

High temperature working

It is suggested that, for temperatures above 35ºC, the following guidelines are adopted as
good working practice:

(i) Keep equipment cool, arranging shade protection if necessary. It is especially important to
keep cool those surfaces of the equipment, which will come into direct contact with the material
itself.
(ii) Try to avoid application during the hottest times of the day, arrange temporary shading as
necessary.
(iii) Make sufficient material, plant and labour available to ensure that installation is a continuous
process.

Equipment
It is suggested that the following list of equipment is adopted as a minimum requirement

Protective clothing : Protective overalls


: Good quality gloves, goggles and face mask
Application equipment : Marker chalk or pen, Hammer
: Cutter Blade,
: Wire Brush, Supercast jointing rig, 110V electrically heated
welding blade (or non-electric blade if no power supply is
available)
constructive solutions

Section B : Installation Method

1. Supercast Hydrofoil

Waterstops must be installed so that they are securely held in their correct position while the
concrete is being placed. Concrete must be fully compacted around the waterstops to
ensure that no voids or porous areas remain. Where reinforcement is present, an adequate
clearance must be left to permit proper compaction.

The brass eyelets used for securing the waterstop are located outside the edge bulbs so as
not to create water paths around the profile.

Example of a kicker joint

2. Supercast Rearguard S

When used on ground slabs where the waterstop is supported on blinding, Rearguard
profiles usually require no fixing. Lay the waterstop centrally over the line of the joint to be
formed. Fixing to vertical shuttering is done by nailing through the outer nailing flanges
leaving the head of the nail proud so that it is held in the cured concrete. This prevents the
waterstop being displaced when the shuttering is struck.

Fixing to vertical shutter

Page 2 of 5
constructive solutions

3. Supercast Rearguard Kicker

In addition to nailing to the external shutter, the 330mm Kicker profile is equipped with brass
eyelets in the central rib. Twist short lengths of tying wire through these eyelets so that when
the kicker is cast they act as anchors, holding the centre of the waterstop tight against the
face of the concrete. This prevents the build-up of debris between the waterstop and the
kicker prior to the wall being poured.

4. Supercast Angleguard

Fixing in position is done in a similar manner to Supercast Rearguard.

Section B : Site jointing instructions

Step 1
Equipment required:
- Supercast jointing rig
- 110V electrically heated welding blade (or
non-electric blade if no power supply is
available)
- Sharp knife
- Wire brush

Step 2
To trim the waterstop to length carefully
measure the length of waterstop required and
add 5 to 6mm to each mating end to allow for
melting of the compound during the heat
welding process.

Clamp the end to be trimmed into one of the


jointing jigs and cut to the required length using
the side of the jig as a guide

Page 3 of 5
constructive solutions

Step 3
Repeat this operation for the other mating end.
Clamp the two ends into their respective sides
of the jointing jig, with approximately 10mm
projecting and engage the guide rods.

Step 4
Plug in the welding blade and allow to warm
up. Using a small offcut of waterstop, check
that the blade reaches a temperature sufficient
to melt the PVC.

When the blade is at melt temperature, place


it on edge on the guide rods of the jig between
the mating ends of the waterstop and press
the waterstop firmly against either face of the
blade.

Step 5
The PVC will start to melt in contact with the
blade. Maintain the pressure against the blade
until a 5mm diameter bead of molten PVC has
formed on both sides all around the section.
When this has happened, pull the jig apart and
lift away the blade with an upwards motion
taking care to avoid too much displacement of
the molten PVC bead. Turn off the blade.
Without delay, whilst the PVC is still molten,
press the two mating ends together and hold
firmly for 20 seconds or so until the joint has
cooled and solidified.

Page 4 of 5
constructive solutions

Step 6
Unclamp the jig and carefully lift out the
waterstop allowing it to cool thoroughly. Do
not flex the joint until cool. Once cool inspect
for imperfections.

Step 7
To fix to the rebar simply loop wire through
the fixing eyelets and twist using a pair of
pliers. This will leave the Supercast PVC
Waterstop ready for your concrete pour.

Section C : Approval and variations


This method statement is offered by Fosroc as a ‘standard proposal’ for the application of Supercast
PVC. It remains the responsibility of the Engineer to determine the correct method for any given
application.

Where alternative methods are to be used, these must be submitted to Fosroc for approval, in
writing, prior to commencement of any work. Fosroc will not accept responsibility or liability for
variations to the above method statement under any other condition.

Page 5 of 5
Page 1 of 6
Industry & Facilities Division

 Interim
√ Final

INSPECTION REPORT Nr:FINAL


Fosroc Chemicals/Blr/IR/FINAL

BV Job nr : IND. B.4.16.0061

PROJECT: Witness of Determination of Watertightness of Supercast Ref: ....


PVC Watrestop as per Fosroc Test Method 262 Ver 1.0
BV Client: P/o nr: (client to BV) : IN 1PO 37231 -1 – dated
M/s. Fosroc Chemicals( I ) Pvt Ltd.,Bangalore 13/04/16
Manufacturer: P/o nr: (client to Manufacturer) - NIL
M/s. Fosroc Chemicals( I ) Pvt Ltd., Bangalore
Inspection Requested By:M/s. Fosroc Technology Centre ,
Fosroc Chemicals( I ) Pvt Ltd., Bangalore

SUPPLY / SUBJECT OF INSPECTION ITEM / TAG Nr QTY


Witness of Determination of Watertightness of Supercast PVC
Waterstop sample as per Fosroc Test Method 262 Version 1.0 ---- --------

DOCUMENTS OF REFERENCE : See continuation sheet for additional documents: Yes No


Title Reference n° Rev. Approved by Date
IN 1PO 37231 -1 – dtd 13/04/16 IN 1PO 37231 -1 –dtd 13.4.16 ------ M/s.Fosroc 13/04/2016

INSPECTIONS : Results of inspection : Satisfactory Unsatisfactory


Inspection place & Date or Period:
M/s.Fosroc Chemicals ( I) Pvt Ltd, Witnessing of Determination of Watertightness of Supercast
Fosroc Technology Centre Kuluvanahalli, PVC Waterstop
Bangalore Rural Dist
on 18/08/16,15/09/16 & 29/09/16  Designed Concrete Mix poured in the mould to 10 cm
Stage of inspection : height
Before manufacturing  Sample positioned in the middle of the mould
During manufacturing  Concrete filled up to half height of the sample
Final  A 100 mm diameter funnel fitted with a hose is positioned
Packing upside down in the centre of half concrete block
Type of inspection:  The second half of the mould is filled with same Concrete
Pre-inspection meeting Mix
Document and QC record review
 The Concrete Test Block is de-moulded & cured for 28
Visual examination, checks
days
Witnessing tests
 The same is put in the Test Rig; bolts are tightened & kept
Manufacturing progress status
in test position
Vendor assessment
Final inspection  Water is filled in the hose pipe & then connected to
pressure line
Packing
(for details see continuation sheet)  Positive Pressure is applied initially from 0.5 bar to 1.0
Stamping : bar, then increased in the increment of 1 bar per day till it
reaches 15 bars in 15 days. This 15 bar pressure is
No further maintained for 7 days.

Next visit scheduled: as per call request from M/s Fosroc


Chemicals (I) Pvt Ltd, Bangalore.

INSP 002 En 1
GM SI 101 Copyright Bureau Veritas 04/2011
Page 2 of 6
Industry & Facilities Division

 Interim
√ Final

INSPECTION REPORT Nr:FINAL


Fosroc Chemicals/Blr/IR/FINAL

BV Job nr : IND. B.4.16.0061

Description of the inspections carried out:

Introduction: As per the request of Fosroc Technology Centre , M/s Fosroc Chemicals (I) Pvt Ltd, the
undersigned Surveyor witnessed the first step of a series of methods adopted for the Determination of
Watertightness of Supercast PVC Waterstops. The visits were carried out on 18/08/16, 15/09/16 &
29/09/16 from preparation of the sample, to intermediate pressure gauge readings checks at 7 bar until the
final 15 bar pressure applied & subsequently retained at 15 bar, for further 7 days.

The following persons were present :

Mr. Abdul Rakib – Senior Surveyor – Bureau Veritas (I) Pvt. Ltd., Bangalore

Ms. Srabani Pal - M/s Fosroc Technology Centre – Bangalore

 Applicable Documents & Status of Approval : Nil


 Manufacturing Progress Status : Not Covered under BVIL Scope of inspection
 Details of inspection activities carried out with respect to scope of work :
The procedure adopted for the Determination of Watertightness of Supercast PVC Waterstop
on samples identified & prepared by M/s Fosroc

 Surveillance with reference to ITP :


Determination of Watertightness of Supercast PVC Waterstop:
Tests conducted under following conditions :
Room Temperature During testing : 25 ±1º C
Relative Humidity in room During Testing :50 % RH
 Designed Concrete Mix poured in the mould to 10 cm height
 Sample positioned in the middle of the mould
 Concrete filled up to half height of the sample
 A 100 mm diameter funnel which is fitted with a hose is positioned upside down in the centre of
half concrete block
 The second half of the mould is filled with same Concrete Mix
 Concrete Test Block is de-moulded & cured for 28 days
 The same is put in the Test Rig; bolts are tightened & kept in test position
 Water is filled in the hose pipe & then connected to pressure line
 Positive Pressure is applied initially from 0.5 bar to 1.0 bar, then increased in the increment of 1
INSP 002 En 2
GM SI 101 Copyright Bureau Veritas 04/2011
Page 3 of 6
Industry & Facilities Division

 Interim
√ Final

INSPECTION REPORT Nr:FINAL


Fosroc Chemicals/Blr/IR/FINAL

BV Job nr : IND. B.4.16.0061

bar per day till it reaches 15 bars in 15 days. This 15 bar pressure is further maintained for 7
days.

Name of Sample - Supercast PVC Waterstop

Type of Test – Determination of Watertightness of Supercast PVC Waterstop as per Fosroc


Test Method 262 Version 1.0 (FTM- 262 Version 1.0).

RESULT :
Results of Inspection: The sample was kept in the test position with a pressure of 15 bar for 7
days & it was observed that there was no pressure drop & no leakage outside the casted test
samples

Problems pending :Nil

****************************** End Of This Report *************************************


ANNEXES Yes (Total number of pages….. ) No

Inspected by: Checked by :

Name: Abdul Rakib Signature.... Name: Abdul Rakib Signature....

Date of Issue : 21/10/2016

Inspection Centre : BV BANGALORE


Distribution : FOSROC CHEMICALS BV BANGALORE

INSP 002 En 3
GM SI 101 Copyright Bureau Veritas 04/2011
Page 4 of 6
Industry & Facilities Division

 Interim
√ Final

INSPECTION REPORT Nr:FINAL


Fosroc Chemicals/Blr/IR/FINAL

BV Job nr : IND. B.4.16.0061

PHOTOGRAPHS OF TEST WITNESSED AT FOSROC TECHNOLOGY CENTRE, BANGALORE:

PHOTO # 1
PHOTO # 2

SUPERCAST PVC WATERSTOP PVC MOULDS FOR POURING OF CONCRETE


WITH THE TEST SAMPLS

PHOTO # 3 PHOTO # 4

CONCRETE POUR UNDER PROGRESS SAMPLE PLACED IN PVC MOULD

INSP 002 En 4
GM SI 101 Copyright Bureau Veritas 04/2011
Page 5 of 6
Industry & Facilities Division

 Interim
√ Final

INSPECTION REPORT Nr:FINAL


Fosroc Chemicals/Blr/IR/FINAL

BV Job nr : IND. B.4.16.0061

PHOTO # 6
PHOTO # 5

MIX DESIGNED CONCRETE HALF-FILLED IN FIXING OF HOSE (TO BE EMBEDDED IN


THE MOULD WITH SAMPLE IN THE CENTRE SECOND HALF CONCRETE POUR)

PHOTO # 8
PHOTO # 7

SECOND HALF OF CONCRETE POUR UNDER CURING OF CONCRETE BLOCKS


PROGRESS WITH HOSE PIPE IN POSITION WITH EMBEDDED SAMPLE UNDER
PROGRESS

INSP 002 En 5
GM SI 101 Copyright Bureau Veritas 04/2011
Page 6 of 6
Industry & Facilities Division

 Interim
√ Final

INSPECTION REPORT Nr:FINAL


Fosroc Chemicals/Blr/IR/FINAL

BV Job nr : IND. B.4.16.0061

PHOTO # 10
PHOTO # 9

PRESSURE GUAGE SHOWING 2 BAR 15 BAR PRESSURE APPLIED ON DAY 15


PRESSURE ON DAY 2 AND LEFT FOR 7 DAYS WITHOUT DROP IN
PRESSURE

PHOTO #
PHOTO # 12
11

PRESSURE GUAGE READING AT 15 BAR


PRESSURE EVEN AFTER 7 DAYS OF SAMPLES UNDER GOOD CONDITION AFTER
OBSERVATION.NO FALL IN PRESSURE THE WATERTIGHTNESS TEST
OBSERVED

INSP 002 En 6
GM SI 101 Copyright Bureau Veritas 04/2011
Project References for FOSROC SUPERCAST SW - Malaysia
For more comprehensive project references please contact your local Fosroc

Project Name Year


1 PETRONAS Rapid Project, Southern Johor 2020
2 Station LRT3 Package GS01 Mudajaya 2020
3 Warisan Merdeka Tower (KL118), Kuala Lumpur 2019
4 Arte Cheras Serviced Residence, Cheras, Kuala Lumpur 2019
5 Kompleks DBKL, Kuala Lumpur 2019
6 Dijaya Office Tower, Persiaran Tropicana, Petaling Jaya 2018
7 Paramount Utropolis, Plot B Phase 2A, Glenmarie, Shah Alam 2018
8 Sekitar 26, HICOM Industrial Estate, Shah Alam 2018
9 Bangsar South Serviced Apartment, Kuala Lumpur 2018
10 VIM3 Desa Park North Residence, Bandar Menjalara Kepong, Kuala Lumpur 2017
11 The Royal Selangor Golf Club, Kuala Lumpur 2017
12 Sentul Village Serviced Residence, Phase 2, Kuala Lumpur 2017
13 PETRONAS Cogent Plant, Rapid Project, Southern Johor 2016
14 Hospital Wanita Dan Kanak-Kanak Wangsa Maju, Kuala Lumpur 2016
15 Bandar Botanic Residential, Klang, Selangor 2015
16 Grand Medini Residential, Iskandar, Johor 2015
17 The Fennel Sentul East Condominium, Kuala Lumpur 2015
18 IOI Resort City, Putrajaya 2015
19 One City Mall, Subang Jaya, Kuala Lumpur 2015
20 Sunway Velocity Mall Phase 2, Cheras, Kuala Lumpur 2015
21 Tropicana Gardens, Kota Damansara, Kuala Lumpur 2015
22 Tun Razak Tower, Jalan Raja Laut, Kuala Lumpur 2014
23 Menara Celcom, Petaling Jaya, Kuala Lumpur 2014
24 i-City Theme Park, Section 7, Shah Alam, Selangor 2014
25 BRT (Bus Rapid Transit - Guideway & Halts) 2014
26 Bukit Palma Kemensah Bunglow House Phase 2, Ampang, Selangor 2014
27 The Capers Condominium, Sentul East, Kuala Lumpur 2014
28 Alam Sanjung Condominium, Batu 3 Shah Alam 2014
29 Tropicana Mall & Hotel, Danga Bay Johor 2014
30 Lagenda Kuching Condominium 2014
31 Mercu Mustapha Kamal (MK) Building, Mutiara Damansara, Petaling Jaya 2013
32 Dedaun Condominium Jalan Ampang, Kuala Lumpur 2013
33 MATRADE Exhibition and Convention Centre (Pusat Pameran dan Konvensyen MATRADE), Kuala Lumpur 2013
34 River of Life (RoL), Kuala Lumpur 2013
35 The Horizon Residences Jalan Tun Razak, Kuala Lumpur 2013
36 Tropicana Avenue Serviced Residences, Golf & Country Resort, Petaling Jaya 2013