GREENKO GROUP
GREENKO HUB, # 13, HITECH CITY,
MADHAPUR, HYDERABAD-500081
TITLE
3.0 ABOUT TCE: TCE has over 6 decades of experience in engineering and commissioning hydro-
electric projects in diverse geographic and geological conditions. Our experiences, lesson learnt in
similar projects and strong resource pool with subject matter experts will help GREENKO in
successfully implementing and commission the subject Project.
TCE is associated with engineering of more than 501,000 MW of installed capacities in the field of
hydro power engineering, including all types of projects (viz., run-of-the-river, canal based, dam-
toe and pumped storage projects), which includes about 8000 MW of commissioned and
operational hydro projects. TCE has contributed significant value additions in Pumped Storage
Projects which are listed below;
• Feasibility & Detailed Project Report preparation of 2800MW PSP projects for Govt of
Andhra Pradesh
• Pre-Feasibility Studies of 8 PSP sites in Tamil Nadu for TANGEDCO totaling nearly 7000
MW
• Owners Engineering Services for 1680 MW Pinnapuram PSP in Andhra Pradesh
• Detailed design engineering services for 1920 MW Gandhisagar PSP in Madhya
Pradesh
• Detailed design engineering services for 210 MW Luhiri HEP in Himachal Pradesh
Detailed design engineering services for 1500 MW Tarali PSP in Maharashtra
Detailed design engineering services for 300 MW Narihalla PSP in Karnataka
Owners Engineer for 500 MW Chitravathi PSP in Andhra Pradesh
PMC for Lakhwar MPP (300 MW), Uttarakhand
• Owners Engineering Services for 1260 MW Saundatti PSP in Karnataka
• Detailed Project reports for three PSPs in MP, Telangana and Karnataka totaling 3050 MW
• Pre-Feasibility Studies of 9 PSP sites in Various states in India for THDC totaling nearly
14,000 MW
• Detailed design of Bhira (150 MW) pumped storage unit - with 510 m head and deep
shaft powerhouse, Asia’s one of the largest units with deep shaft powerhouse –
Only a very few consultants have the expertise.
• 700 MW Malshej Ghat Pumped storage scheme - Capacity of the plant revised from 600
MW to 700 MW by making provision for more storage, which was an outcome of the study
by TCE and accepted by NPC/THDC
• Detailed Engineering for 250 MW Ghatghar Pumped storage scheme - Completion of
first Roller Compact Concrete dam project in India. Stepped spillway energy
dissipation concept was used by TCE first time for such high dam in India
• Ingula PSP (1332 MW) in South Africa, Saundatti PSP (1200 MW) and other PSPs in India.
Please refer ANNEXURE II for Current & Past Experiences & company brochure
for more details.
5.1.1. TCE along with ARTELIA will assist GREENKO for the scope of services as per the given ToR of
RFP issued.
5.1.2. ARTELIA will nominate a Design Coordinator based in France who will be available for visits to
India on need basis. Visits shall be chargeable as per ARTELIA man-day rates and costs towards
travel, boarding & lodging.
5.1.3. TCE and ARTELIA engineers will be fully involved in the project through;
Design Basis Report (DBR) & Workshop will be conducted by ARTELIA and TCE to discuss
Design Memorandums (DBM) and finalise the DBR/DBM. TCE will prepare in consultation with
ARTELIA.
TCE along with ARTELIA will assist GREENKO in successful implementation of the project. We
will address typical execution challenges as below;
Challenges What we offer
7.1. We have considered a duration of 42 months in line with schedule as per RFP.